The SESAR Definition Phase is co-financed by the European Community and EUROCONTROL
Responding to the 2020 Challenge
Introduction to SESAR
DEFINING THE FUTURE EUROPEAN
AIR TRAFFIC MANAGEMENT SYSTEM FOR 2020 AND BEYOND
Dipl. Ing. Susanne Reed, Airbus ASAS TN2 Workshop & FLYSAFE Forum, Toulouse
Page : 2
We need to address some challenges !
Traffic demandTraffic demand
Complex institutional frameworkComplex institutional framework
Fragmented operationsFragmented operations
Existing infrastructuresExisting infrastructures
Influences & Considerations
Institutional Drivers
Influences & Considerations
Institutional Drivers
DelaysDelays
CostsCosts
EnvironmentEnvironmentTHE SESAR DEFINITION
PHASE STUDY
Page : 3
The Demand is growing – ATM is near its limits!
The current Air Traffic Management …… is nearing the end of its ability to deliver the capacity necessary to accommodate the increasing demand.
Both the underlying operational concept and the supporting technologies need major improvements.
The existing airport infrastructure … … cannot fully accommodate the increasing demand.
Whereas the European traffic … … will almost double by 2020, i.e. 18 Million IFR flights per year.
Page : 4
Military
Definition Phase involves all Stakeholder categories
Prof. StaffAssociations
ANSPs
EU Industry Research Centres
Airports Airspace Users
EurocontrolSafety Regulator US Industry
Page : 5
SESAR – The Definition Phase: Building the Master Plan for the Future
Analyse air
transport value and
role of ATM
Analyse air
transport value and
role of ATM
ATM Target
Concept selection
ATM Target
Concept selection
Deployment sequence analysis
Deployment sequence analysis
Build the ATM Master
Plan
Build the ATM Master
Plan
Define organisation & work- programme 2008-2013
Define organisation & work- programme 2008-2013
24 months
The Market Its Requirements The
Top Product How toBuild it
ActionPlan Go!
PerformanceRequirement
s
PerformanceRequirement
s
COMPLETEDCOMPLETED
D1: - A shared view of currentsituation - Agreement on blocking points and way ahead
COMPLETEDCOMPLETED
D1: - A shared view of currentsituation - Agreement on blocking points and way ahead
COMPLETEDCOMPLETED
D2: - ATM Performance Partnership
- Performance requirements
COMPLETEDCOMPLETED
D2: - ATM Performance Partnership
- Performance requirements
ON-GOINGON-GOING
D3: The selection of a viable solution.....
The Concept The Concept of Operationsof Operations
ON-GOINGON-GOING
D3: The selection of a viable solution.....
The Concept The Concept of Operationsof Operations
Page : 6
Designed for Growth – Deployed by 2020
A Performance-based partnership builds
the European ATM System of the future
Design Targets of the ATM System:
•Capacity 3-fold
•Safety x 10
•Minimize Environmental Impact •Direct ATM Costs 1/2
Page : 8
Implementation Packages (IP) & Roadmap View
ATM TargetConcept (D3)
ConceptArea
ConceptArea
ConceptArea
Vision / Performance Objectives (D2)
Current Status / Issues
(D1)
Transition Scenario (IP sequence) (D4)
Master Plan(D5) Implementation
Package 1ImplementationPackages 2 & 3
ImplementationPackage m
today 20202013 …beyond
OI Step1.a
OI Step1.b
OI 1
OI Step3.a
OI Step3.q
OI 3
OI Step2.a
OI 2OI Step
2.pIP 2
IP 1
IP 3 IP m
Page : 9
20082008
System Based Performance Based
Cooperating ground and airborne Cooperating ground and airborne decision making toolsdecision making tools
Moving from airspace to trajectory Moving from airspace to trajectory based operationsbased operations
New Separation ModesNew Separation Modes
Information ManagementInformation Management
ATM
Op
era
tion
al
ATM
Op
era
tion
al
Con
cep
tC
on
cep
t
Queue management toolsQueue management tools
Short TermShort Term Medium TermMedium Term Long TermLong Term
Page : 10
DefinitionPhase
JU
Incremental Steps towards the deployment of the new ATM Target Concept
20xx2008 20202013Time
DevelopmentPhase
DeploymentPhase
SESAR
R&T FS DP *Baseline 2013Mid-termTarget
R&T *Baseline 2020NominalTarget
FS DP
*Target 20xxResearch & Technology
Feasibility StudiesDeployment
Long-termAfter 2020
FS DPShort-termBefore 2013 *Quick Wins
NominalR
&T
FS
DP
Project Phases
Level 3
Level 2
Level 1
Level 4