36
EUROCONTROL General Presentation Eamonn Brennan Director General EUROCONTROL

General Presentation in English TF1... · EUROCONTROL - General Presentation 16 Public-private partnership to manage the SESAR Development Phase Execute the European ATM Master Plan

  • Upload
    others

  • View
    7

  • Download
    0

Embed Size (px)

Citation preview

Page 1: General Presentation in English TF1... · EUROCONTROL - General Presentation 16 Public-private partnership to manage the SESAR Development Phase Execute the European ATM Master Plan

EUROCONTROL

General Presentation

Eamonn Brennan Director General EUROCONTROL

Page 2: General Presentation in English TF1... · EUROCONTROL - General Presentation 16 Public-private partnership to manage the SESAR Development Phase Execute the European ATM Master Plan

EUROCONTROL - General Presentation 2

One day’s traffic

Page 3: General Presentation in English TF1... · EUROCONTROL - General Presentation 16 Public-private partnership to manage the SESAR Development Phase Execute the European ATM Master Plan

3

ATM Today Air Transport – Air Navigation - Europe

EUROCONTROL 41 Member States, typically each with its own ANSP

Approximately 68 Area Control Centres (ACC)

Over 700 sectors when at full capacity

Approx. 17,000 Air Traffic Controllers

Approx. 41,000 other staff

Total Employees 58,000 Total revenue B€8/year

ICAO: The contracting States recognise that every State has complete and exclusive sovereignty over the airspace above its territory.

EUROCONTROL - General Presentation

Page 4: General Presentation in English TF1... · EUROCONTROL - General Presentation 16 Public-private partnership to manage the SESAR Development Phase Execute the European ATM Master Plan

EUROCONTROL - General Presentation 4

Concentration of costs

EUROCONTROL - General Presentation 4

Gate-to-gate ATM/CNS provision costs

400

M€

0

200

600

800

1 000

1 200

Fran

ce

Ger

man

y

UK

Spa

in

Italy

57%

MU

AC

Cze

ch R

epub

lic

Irela

nd

Den

mar

k

Turk

ey

Sw

itzer

land

Nor

way

Sw

eden

Aus

tria

Net

herla

nds

Pol

and

Rom

ania

Ukr

aine

Bel

gium

/Lux

embo

urg

Gre

ece

Por

tuga

l

35%

Hun

gary

Cro

atia

Bul

garia

Ser

bia

& M

onte

negr

o

Finl

and

Slo

vak

Rep

ublic

Cyp

rus

Slo

veni

a

Lith

uani

a

Latv

ia

Alb

ania

Est

onia

Mal

ta

FYR

OM

Arm

enia

8%

Mol

dova

Page 5: General Presentation in English TF1... · EUROCONTROL - General Presentation 16 Public-private partnership to manage the SESAR Development Phase Execute the European ATM Master Plan

5

Ann

ual G

row

th

2035 -10%

Aver

age

daily

flig

hts

in E

urop

e

2030 2020 2015 2010 2005 2000 1995 1990 1985 1975 1970 1965 1960 2025

10.000

1980

-5%

0%

5%

10%

15%

20%

25%

30%

0

20.000

30.000

40.000

50.000

60.000

70.000

80.000

IFR traffic in Europe 1960-2016 historical figures

2017-2035 forecast

Annual Growth

Actual Traffic

Forecast Traffic

Long-Term Trend

Long-Term Average Growth

Traffic in Europe

EUROCONTROL - General Presentation

Page 6: General Presentation in English TF1... · EUROCONTROL - General Presentation 16 Public-private partnership to manage the SESAR Development Phase Execute the European ATM Master Plan

EUROCONTROL - General Presentation 6

Europe in World Traffic 2010/2036

2010

2036

Page 7: General Presentation in English TF1... · EUROCONTROL - General Presentation 16 Public-private partnership to manage the SESAR Development Phase Execute the European ATM Master Plan

EUROCONTROL - General Presentation 7

SES II - ‘Pillars’

1. Regulating Performance

Performance Scheme

Functional Airspace Blocks

Network Manager

2. A Single Safety Framework

3. New Technologies

4. Managing Capacity on the Ground

Page 8: General Presentation in English TF1... · EUROCONTROL - General Presentation 16 Public-private partnership to manage the SESAR Development Phase Execute the European ATM Master Plan

EUROCONTROL - General Presentation 8

Performance Scheme

Main feature Key Performance Areas (KPA) and Indicators

On safety, the environment, capacity and cost-efficiency

European targets

National/FAB Performance Plans

Periodic review, monitoring and benchmarking

Performance Review Body to assist the EC

European and local targets set for three to five years Reference Period 1: 2012-2014

Reference Period 2: 2015-2019

Page 9: General Presentation in English TF1... · EUROCONTROL - General Presentation 16 Public-private partnership to manage the SESAR Development Phase Execute the European ATM Master Plan

EUROCONTROL - General Presentation 9

KPIs for EU-wide targets in RP1

Key Performance Area Key Performance Indicator for EU-wide target setting

Safety No EU target in RP1 Safety ensured through EASA Monitoring of performance indicators

Environment Horizontal en route flight-efficiency (% additional distance)

Capacity En route ATFM delay (Minutes per flight)

Cost-efficiency Unit price (Average determined en-route unit rate)

Page 10: General Presentation in English TF1... · EUROCONTROL - General Presentation 16 Public-private partnership to manage the SESAR Development Phase Execute the European ATM Master Plan

EUROCONTROL - General Presentation 10

EU-wide performance targets for RP2

Key Performance Area Key Performance Indicator for EU-wide target setting

Safety

• All NSAs and ANSPs to achieve EoSM levels C/D (respectively) by 2019

• All NSAs and ANSPs to adopt the RAT methodology by 2019

Environment By 2019, average horizontal en-route flight efficiency: Of last filed flight plan (KEP): 4.1% Of the actual trajectory (KEA): 2.6%

Capacity Annual average en-route ATFM delay (all causes) of 0.5 minutes per flight, to be reached for each year

Cost-efficiency

Determined unit rate for en-route air navigation services (expressed in real terms €2009):

Year 2015 2016 2017 2018 2019

Rate €56.64 €54.95 €52.98 €51.00 €49.10

Page 11: General Presentation in English TF1... · EUROCONTROL - General Presentation 16 Public-private partnership to manage the SESAR Development Phase Execute the European ATM Master Plan

EUROCONTROL - General Presentation 11

Single European Sky

Functional Airspace Blocks

Network Manager

SESAR & the SJU

Performance Scheme

Page 12: General Presentation in English TF1... · EUROCONTROL - General Presentation 16 Public-private partnership to manage the SESAR Development Phase Execute the European ATM Master Plan

EUROCONTROL - General Presentation 12

Fragmentation

Page 13: General Presentation in English TF1... · EUROCONTROL - General Presentation 16 Public-private partnership to manage the SESAR Development Phase Execute the European ATM Master Plan

EUROCONTROL - General Presentation 13

Defragmentation – FABs

Page 14: General Presentation in English TF1... · EUROCONTROL - General Presentation 16 Public-private partnership to manage the SESAR Development Phase Execute the European ATM Master Plan

EUROCONTROL - General Presentation 14

SESAR Concept of Operations is a Paradigm Shift for ATC

Past

Procedural Control

the current and planned a/c positions

Today

Radar Control

Know the current and estimate planned a/c

positions

Future

Trajectory Management

Know & share the current

& planned a/c positions

Page 15: General Presentation in English TF1... · EUROCONTROL - General Presentation 16 Public-private partnership to manage the SESAR Development Phase Execute the European ATM Master Plan

SESAR milestones

EUROCONTROL - General Presentation 15

Page 16: General Presentation in English TF1... · EUROCONTROL - General Presentation 16 Public-private partnership to manage the SESAR Development Phase Execute the European ATM Master Plan

EUROCONTROL - General Presentation 16

Public-private partnership to manage the SESAR Development Phase Execute the European ATM Master Plan

Work with the Deployment Manager on the Deployment phase

One single ATM R&D programme in Europe Innovation from private sector

Public financial stability & enforcement power

Founding members:

Industry members:

As part of SESAR 2020, being extended until 2024 with revised membership

SESAR Joint Undertaking

Page 17: General Presentation in English TF1... · EUROCONTROL - General Presentation 16 Public-private partnership to manage the SESAR Development Phase Execute the European ATM Master Plan

17

43 States

1750 Sectors – 68 en-route centres

520 Airports

1940 Aircraft Operators

61 FMPs

6,700+ connected end-users

Peak traffic – 35,937 flights in one day

10,600,000+ flights a year

Network Manager

One single Flow Management

System over Europe

EUROCONTROL - General Presentation

Page 18: General Presentation in English TF1... · EUROCONTROL - General Presentation 16 Public-private partnership to manage the SESAR Development Phase Execute the European ATM Master Plan

Network Manager Main tasks Improve network operations, contributing to EU-wide performance targets

Develop an integrated Route Network design Provide a central function for radio frequencies Coordinate improvement of SSR code allocation Manage the operations of ATFM Develop, maintain and implement Network Strategic Plan and Network Operations Plan Consolidated approach to all planning and operational phases Coordination with other regions and countries Coordinate management of the response to network crises (EACCC)

Support operational stakeholders in deploying ATM/ANS systems/procedures and

SESAR Support accident and incident investigations

Contribute to the implementation of the Performance scheme

Operational stakeholders: the civil and military airspace users, civil and military air navigation service providers, Functional Airspace Blocks (FABs), airport operators, airport slot co-ordinators and operating organisations and any additional stakeholder groups considered relevant for the individual functions

FUN

CTI

ON

S M

ANAG

ER

SUPP

OR

T

Page 19: General Presentation in English TF1... · EUROCONTROL - General Presentation 16 Public-private partnership to manage the SESAR Development Phase Execute the European ATM Master Plan

19

Main tasks of Network Manager

Its main role is to:

optimise European ATM Network’s operations with ANSPs and airports;

ensure that European ATM meets its performance targets

provide a consolidated and coordinated approach to all planning and operational activities of the Network through defined functions and services

EUROCONTROL was nominated as the SES Network Manager in July 2011

EUROCONTROL - General Presentation

Page 20: General Presentation in English TF1... · EUROCONTROL - General Presentation 16 Public-private partnership to manage the SESAR Development Phase Execute the European ATM Master Plan

EUROCONTROL - General Presentation 20

EUROCONTROL – History

1980s

1960s

1990s

2000s

2010s

41 member states & the European Community

2 ‘Comprehensive Agreement’ states – Morocco & Israel

Page 21: General Presentation in English TF1... · EUROCONTROL - General Presentation 16 Public-private partnership to manage the SESAR Development Phase Execute the European ATM Master Plan

EUROCONTROL & EU EUROCONTROL but not EU 2 Comprehensive Agreement States: Israel and Morocco

21 21 EUROCONTROL - General Presentation

EUROCONTROL members

Page 22: General Presentation in English TF1... · EUROCONTROL - General Presentation 16 Public-private partnership to manage the SESAR Development Phase Execute the European ATM Master Plan

EUROCONTROL - General Presentation 22

ATM in Europe – looking forward

Research

SJU (to 2024)

Operate/Coordinate

Network Manager

FAB

FAB

FAB

FAB

FAB

FAB

EC

EASA

Regulate

NSAs

Founding member

Major contributor

Longer term research

Network management

Deployment coordination

Route charges

Technical support

Performance review

EU

RO

CO

NTR

OL

role

Page 23: General Presentation in English TF1... · EUROCONTROL - General Presentation 16 Public-private partnership to manage the SESAR Development Phase Execute the European ATM Master Plan

EUROCONTROL - General Presentation 23

Network Manager

EUROCONTROL – Structure

Pan-European Single Sky ATM

Corporate Functions

Route Charges Maastricht Upper Area Centre

Page 24: General Presentation in English TF1... · EUROCONTROL - General Presentation 16 Public-private partnership to manage the SESAR Development Phase Execute the European ATM Master Plan

EUROCONTROL - General Presentation 24

Central Route Charges Office

Collects air navigation charges on behalf of States across Europe En-route Terminal Communication

Pan-European service Simple, equitable and transparent for airspace users Quick, efficient and cost-effective for States/ANSPs

Over 7,1 billion € collected annually

Collection cost of less than 0.3% of amounts billed

Page 25: General Presentation in English TF1... · EUROCONTROL - General Presentation 16 Public-private partnership to manage the SESAR Development Phase Execute the European ATM Master Plan

EUROCONTROL - General Presentation 25

The Route Charges System S

tate

s / A

NS

Ps

CRCO

One message per flight

Monthly bill

Payment Disbursement

Airl

ines

/ ai

rspa

ce u

sers

Page 26: General Presentation in English TF1... · EUROCONTROL - General Presentation 16 Public-private partnership to manage the SESAR Development Phase Execute the European ATM Master Plan

26 EUROCONTROL - General Presentation

Page 27: General Presentation in English TF1... · EUROCONTROL - General Presentation 16 Public-private partnership to manage the SESAR Development Phase Execute the European ATM Master Plan

EUROCONTROL - General Presentation 27

260,000 km2 extending over Belgium, the Netherlands, Luxembourg and North-West Germany

More than 1.7 million flights controlled (2016)

Annual costs (2016): € 143 M

3rd largest control centre in Europe

6th largest ANSP in Europe

Highest controller productivity in Europe

Maastricht Upper Area Control Centre

One of the most cost-effective ANSPs

Page 28: General Presentation in English TF1... · EUROCONTROL - General Presentation 16 Public-private partnership to manage the SESAR Development Phase Execute the European ATM Master Plan

EUROCONTROL

General Presentation

Eamonn Brennan Director General EUROCONTROL

Page 29: General Presentation in English TF1... · EUROCONTROL - General Presentation 16 Public-private partnership to manage the SESAR Development Phase Execute the European ATM Master Plan

Inter-institutional relationships

29

DGs MOVE, GROW, RTD, ENV, CLIMA,

CNECT

EUROCONTROL - General Presentation

Page 30: General Presentation in English TF1... · EUROCONTROL - General Presentation 16 Public-private partnership to manage the SESAR Development Phase Execute the European ATM Master Plan

2015 - Daily Flights in European NM Area

Far East 285

NAM/SAM 1533

Russian Fed & *STAN 1383

Very significant growth expected • Gulf • SE Asia • China • Russia

NM area internal traffic 25862

Gulf 652

Southern MED 843

Africa 334

Middle East 151

• Improved connectivity & interoperability required • Predictability & capacity optimisation • Disruption planning & management

Page 31: General Presentation in English TF1... · EUROCONTROL - General Presentation 16 Public-private partnership to manage the SESAR Development Phase Execute the European ATM Master Plan

Network Manager

31 EUROCONTROL - General Presentation

Page 32: General Presentation in English TF1... · EUROCONTROL - General Presentation 16 Public-private partnership to manage the SESAR Development Phase Execute the European ATM Master Plan

The Network Manager Connecting the Network to deliver Improved Performance

FLOW MANAGEMENT SINCE 1995

FLIGHT EFFICIENCY INITIATIVE LAUNCHED IN 2013

32 EUROCONTROL - General Presentation

Page 33: General Presentation in English TF1... · EUROCONTROL - General Presentation 16 Public-private partnership to manage the SESAR Development Phase Execute the European ATM Master Plan

EUROCONTROL Headquarters Brussels

The European Organisation for the Safety of Air Navigation (EUROCONTROL) is an intergovernmental organisation for the central coordination of air traffic control in Europe. The headquarters of EUROCONTROL are in Brussels.

EUROCONTROL - General Presentation 33

Page 35: General Presentation in English TF1... · EUROCONTROL - General Presentation 16 Public-private partnership to manage the SESAR Development Phase Execute the European ATM Master Plan

IANS, Luxembourg

EUROCONTROL - General Presentation 35

Page 36: General Presentation in English TF1... · EUROCONTROL - General Presentation 16 Public-private partnership to manage the SESAR Development Phase Execute the European ATM Master Plan

EUROCONTROL Experimental Centre Paris Brétigny