The Regional Municipality of Peel Review of Property Requirement Changes to the Class Environmental Assessment Project File Report Burnhamthorpe Road Watermain Project BRM-605644-A0 Prepared By: Joel Gretton / Jesse Newton Reviewed By: Jean Louis Gaudet exp Services Inc. 1595 Clark Blvd Brampton, ON L6T 4V1 Canada Date December 8, 2017

The Regional Municipality of Peel...The Regional Municipality of Peel Review of Property Requirement Changes to the Class Environmental Assessment Project File Report Burnhamthorpe

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

Page 1: The Regional Municipality of Peel...The Regional Municipality of Peel Review of Property Requirement Changes to the Class Environmental Assessment Project File Report Burnhamthorpe

The Regional Municipality of

Peel

Review of Property Requirement Changes to

the Class Environmental Assessment

Project File Report

Burnhamthorpe Road Watermain Project BRM-605644-A0

Prepared By: Joel Gretton / Jesse Newton

Reviewed By: Jean Louis Gaudet

exp Services Inc. 1595 Clark Blvd Brampton, ON L6T 4V1 Canada

Date December 8, 2017

Page 2: The Regional Municipality of Peel...The Regional Municipality of Peel Review of Property Requirement Changes to the Class Environmental Assessment Project File Report Burnhamthorpe
Page 3: The Regional Municipality of Peel...The Regional Municipality of Peel Review of Property Requirement Changes to the Class Environmental Assessment Project File Report Burnhamthorpe

The Regional Municipality of Peel

Review of Property Requirement Changes to the Class Environmental Assessment Project File Report

Project Name: Burnhamthorpe Road Watermain Project

Project Number: BRM-00605544

Prepared By: Joel Gretton / Jesse Newton

Reviewed By: Jean Louis Gaudet exp Services Inc. 1595 Clark Blvd Brampton, ON L6T 4V1 Canada T: +1.905.793.9800 F: +1.905.793.0641 www.exp.com

Date:

December 8, 2017

Page 4: The Regional Municipality of Peel...The Regional Municipality of Peel Review of Property Requirement Changes to the Class Environmental Assessment Project File Report Burnhamthorpe

The Regional Municipality of Peel Burnhamthorpe Road Watermain Project | exp ref 605544

Review of Property Requirement Changes to the Class EA Project File Report December 8, 2017

Legal Notification

This report was prepared by exp Services Inc. for the account of The Regional Municipality of Peel.

Any use which a third party makes of this report, or any reliance on or decisions to be made based on it, are the responsibility of such third parties. Exp Services Inc. accepts no responsibility for damages, if any, suffered by any third party as a result of decisions made or actions based on this project.

Page 5: The Regional Municipality of Peel...The Regional Municipality of Peel Review of Property Requirement Changes to the Class Environmental Assessment Project File Report Burnhamthorpe

The Regional Municipality of Peel Burnhamthorpe Road Watermain Project | exp ref 605544

Review of Property Requirement Changes to the Class EA Project File Report December 8, 2017

i

Table of Contents

Table of Contents ............................................................................................................................ i

Glossary .......................................................................................................................................... ii

1 Introduction ........................................................................................................................ 1

2 Project Overview ............................................................................................................... 1

2.1 General Description ............................................................................................................. 1

2.2 Description of Project Changes ........................................................................................... 1

3 Overview of Project Modifications ................................................................................... 3

3.1 55 City Centre Drive (Morguard Corp.) Easement Requirements ....................................... 3

3.2 201 City Centre Drive (Morguard Corp.) Easement Requirements ..................................... 5

3.3 325 Burnhamthorpe Road West (YMCA) Easement Requirements ................................... 7

3.4 691 Burnhamthorpe Road East (V. & E. Amaral) Easement Requirements ....................... 9

4 Conclusion and Recommendations .............................................................................. 11

5 Bibliography ..................................................................................................................... 11

Appendix A – Property Requirement Maps

Appendix B – Revised Notice of Completion

Page 6: The Regional Municipality of Peel...The Regional Municipality of Peel Review of Property Requirement Changes to the Class Environmental Assessment Project File Report Burnhamthorpe

The Regional Municipality of Peel Burnhamthorpe Road Watermain Project | exp ref 605544

Review of Property Requirement Changes to the Class EA Project File Report December 8, 2017

ii

Glossary

BTEX benzene, toluene, ethylbenzene and xylenes

EC electrical conductivity

MOECC Ministry of the Environment and Climate Change

PAHs polycyclic aromatic hydrocarbons

PCBs polychlorinated biphenyls

PDR Preliminary Design Report

PE permanent easement

PFR Project File Report

PHCs petroleum hydrocarbons

SAR sodium adsorption ratio

Table 1 SCS Table 1 Full Depth Background Site Condition Standards, in MOECC (2011).

Table 3 SCS Table 3 Full Depth Generic Site Condition Standards in a Non Potable Ground Water Condition for a Residential/Parkland/Institutional Property Use with Medium and Fine Textured Soil, in MOECC (2011).

TE temporary easement

VC valve chamber

VOCs volatile organic compounds

WM watermain

Page 7: The Regional Municipality of Peel...The Regional Municipality of Peel Review of Property Requirement Changes to the Class Environmental Assessment Project File Report Burnhamthorpe

The Regional Municipality of Peel Burnhamthorpe Road Watermain Project | exp ref 605544

Review of Property Requirement Changes to the Class EA Project File Report December 8, 2017

1

1 Introduction This Review outlines the relevant changes to the Project File Report (PFR) for the Schedule ‘B’ Class Environmental Assessment (EA) completed for the Region of Peel’s Burnhamthorpe Road Watermain Project. This Review is being completed as part of the approved Class EA process for amending project file reports to account for changes to the project occurring after completion of the PFR (Municipal Engineers Association, 2000, as amended 2007, 2011, 2015; Section A.4.1).

The original PFR, filed in September 2015 (GHD, 2015a) identified properties that would require easements to facilitate construction and maintenance. This Review addresses modifications in the easement requirements associated with changes in the project since the original PFR.

2 Project Overview

2.1 General Description

The Burnhamthorpe Road Watermain Class EA aimed to improve water supply through water infrastructure upgrades in support of approved growth in the Mississauga City Centre (MCC) area. The identified Preferred Alternative was to construct a new 1500 mm diameter watermain using trenchless / tunnelling construction methods between Grand Park Drive and Cawthra Road. Additional improvements included interconnections between existing 600/750 mm diameter and 1050 mm diameter watermains and the new 1500 mm diameter watermain to maintain pressure in the water system within acceptable limits, and construction of two local distribution watermains (600 mm diameter along Duke of York Boulevard from Webb Drive to City Centre Drive; and 400 mm diameter from Kariya Drive, running west along Webb Drive and north up Grand Park Drive to Burnhamthorpe Road West).

All property requirements previously identified were associated with the 1500 mm diameter deep tunnel watermain, and changes in property requirements remain limited to the same.

2.2 Description of Project Changes

Since the 2015 Project File Report, minor modifications have been made to the proposed design during the detailed design stage. These include modifications to the alignment of the 1500 mm dia. watermain, the location of shafts for riser pipes and valve chambers and the staging area requirements. These changes have resulted in updated property requirements, as outlined in Table 1.

Page 8: The Regional Municipality of Peel...The Regional Municipality of Peel Review of Property Requirement Changes to the Class Environmental Assessment Project File Report Burnhamthorpe

The Regional Municipality of Peel Burnhamthorpe Road Watermain Project | exp ref 605544

Review of Property Requirement Changes to the Class EA Project File Report December 8, 2017

2

Table 1: Details of Properties with Updated Easement Requirements

Property Property Owner

Update to 2015 PFR (GHD, 2015a)

Revised Required Areas (m2)

TE Details PE Details

TE PE

55 City Centre Drive, (northwest corner of Burnhamthorpe Road and Hurontario Street) PIN’s 13142-0012 and 13142-0011

Morguard Corporation

No easements previously identified; TE and PE now required

2774 810 Construction staging

WM and VC installation

201 City Centre Drive (northeast corner of Burnhamthorpe Road and Duke of York Boulevard) PIN 13142-0005

Morguard Corporation

TE previously identified only; PE now required in addition

520 85 Construction staging

VC installation

325 Burnhamthorpe Rd W (east of Confederation Parkway, north side) PIN 13141-0205

YMCA TE previously identified only; PE now required in addition

436 86 Construction staging

VC installation

691 Burnhamthorpe Rd E (northwest corner of Burnhamthorpe Road and Cawthra Road ) PIN 13170-0241

Victor and Eduarda Amaral

TE previously identified only; PE now required in addition

2676 623 Construction staging and equipment storage

Riser pipe connection shaft access, WM connection and water VC

TE = temporary easement; PE = permanent easement; WM = watermain; VC = valve chamber

Page 9: The Regional Municipality of Peel...The Regional Municipality of Peel Review of Property Requirement Changes to the Class Environmental Assessment Project File Report Burnhamthorpe

The Regional Municipality of Peel Burnhamthorpe Road Watermain Project | exp ref 605544

Review of Property Requirement Changes to the Class EA Project File Report December 8, 2017

3

3 Overview of Project Modifications

3.1 55 City Centre Drive (Morguard Corp.) Easement Requirements

3.1.1 Changes and Rationale

This property (PINs 13142-0012 and 13142-0011) is owned by Morguard Corporation and is located at 55 City Centre Drive (northwest corner of Burnhamthorpe Road and Hurontario Street). In the 2015 PFR, no easements were identified for this property. It now requires both a temporary and permanent easement due to a change in watermain alignment and water valve chamber location (see Table 2).

Table 2: Changes in Easement Requirements for 55 City Centre Drive

TE Area (m2) PE Area (m2) TE Details PE Details

Original EA N/A N/A N/A N/A

Amended Requirements 2774 810 Construction staging

WM alignment and VC installation

TE = temporary easement; PE = permanent easement; WM = watermain; VC = valve chamber

Figure 1 shows both the original and revised proposed works and watermain alignment. The original proposed chamber was set within a City of Mississauga Property, with the watermain crossing this City of Mississauga Property before returning to the road right-of-way (ROW). The revised design locates the proposed chamber at 55 City Centre Drive. This change was made during detailed design as it was deemed to be superior with respect to both construction and operations.

Figure 1: Watermain Alignment – 55 City Centre Drive

Note: The chamber structure will be located within the noted shaft.

Page 10: The Regional Municipality of Peel...The Regional Municipality of Peel Review of Property Requirement Changes to the Class Environmental Assessment Project File Report Burnhamthorpe

The Regional Municipality of Peel Burnhamthorpe Road Watermain Project | exp ref 605544

Review of Property Requirement Changes to the Class EA Project File Report December 8, 2017

4

3.1.2 Overview of Potential Impacts and Mitigation

Table 3 outlines the potential impacts, mitigations, and net effect of the change to property requirements.

Table 3: Impacts for 55 City Centre Drive Property (Morguard Corp.)

Impact Category

Impact Details Measures to Mitigate Impacts

Net Effect

Trees 37 trees to be removed: (5 for PE areas, 32 for TE areas)

Tree removal addressed through compensation/ tree replacement program; Shallow/removable vegetation may be considered in locations in which PEs are required

Net 5 of 37 trees anticipated not being replaced; Owner compensated where appropriate.

Groundwater • Negligible change in potential dewatering requirements

• Comparatively fewer potential impacts identified/exceedances of Table 1 SCS and Table 3 SCS standards; (Original site’s monitoring wells’ samples had exceedances for EC, SAR, PHCs, BTEX and VOCs, Chlorides, Sodium, PHCs and

VOCs, see WSP, 2017b)

• None beyond those previously identified (GHD, 2015a, 2015b)

• Groundwater infiltration expected to be suitable for discharge to the municipal sanitary sewer (WSP, 2017a, 2017b; GHD, 2015a). Filtration may be required to reduce TSS if needed.

• Contaminant sampling required pre- and post-construction at minimum

No change in dewatering requirements anticipated.

Soil • Negligible change in anticipated impacts

• Comparatively fewer potential impacts identified/exceedances of Table 1 SCS and Table 3 SCS (Original site has exceedances for Metals, Inorganics and VOCs; New site shows only exceedances for EC and SAR)

• Soil cuttings classified as non-hazardous waste (WSP, 2017b)

• Salt-impacted soils may be reused onsite or on municipal roads; excess and otherwise contaminated soils will be disposed at an MOECC licensed facility (GHD, 2015c; WSP, 2017b)

• Proposed three (3) additional boreholes will provide baseline levels and post-construction comparison.

Negligible change anticipated.

Archaeological No archaeological potential identified during Class EA (ASI, 2015). Expanded easement area requires further investigation.

Expanded easement area confirmed as disturbed through additional investigation during detailed design (report forthcoming).

No archeological impacts.

Property Owner/ Occupier

TE and PE are now required resulting in temporary and permanent usage limitations for the owner.

Region of Peel is engaging with property owner to achieve an agreement.

Working towards fair easement agreement.

3.1.3 Owner Consultation

Morguard property owner representatives were engaged by the Region to discuss property requirements. Prior to the filing of the PFR, the Region and their consultant GHD met on May 6, 2015 regarding a separate property owned by Morguard. Since the filing of the PFR, additional

Page 11: The Regional Municipality of Peel...The Regional Municipality of Peel Review of Property Requirement Changes to the Class Environmental Assessment Project File Report Burnhamthorpe

The Regional Municipality of Peel Burnhamthorpe Road Watermain Project | exp ref 605544

Review of Property Requirement Changes to the Class EA Project File Report December 8, 2017

5

email correspondence has occurred between the Region of Peel and Morguard, and additional meetings took place as follows:

• May 26, 2016 with Region of Peel and Hatch/exp (present consultant);

• June 27, 2016 with Region of Peel and Hatch/exp (present consultant); and

• June 26, 2017 with Region of Peel.

Meeting discussions led to modifications to easements and uses pertaining to snow storage and pedestrian access. Additional discussion included: construction details; irrigation lines onsite; electrical wiring for lighting; minimizing impacts to a sign; and site restoration. At the time of writing, development of the agreement was underway. See Appendix A for a delineation of the easement requirements.

3.2 201 City Centre Drive (Morguard Corp.) Easement Requirements

3.2.1 Changes and Rationale

This property (PIN 13142-0005) is owned by Morguard Corporation and is located at the northeast corner of Burnhamthorpe Road West at Duke of York Boulevard (at 201 City Centre Drive, in the boulevard of Burnhamthorpe Road). In the 2015 PFR, a temporary easement was identified for this property. A permanent easement is now required (see Table 4).

Table 4: Changes in Easement Requirements for 201 City Centre Drive

TE Area (m2) PE Area (m2) TE Details PE Details

Original EA 480 N/A Construction staging (for a connection shaft)

N/A

Amended Requirements

520 85 Construction staging Permanent rock bolts to stabilize excavation

TE = temporary easement; PE = permanent easement; WM = watermain; VC = valve chamber

Figure 2 below shows both the original and new proposed works.

Figure 2: Watermain Alignment – 201 City Centre Drive

Note: The chamber structure will be located within the noted shaft.

Page 12: The Regional Municipality of Peel...The Regional Municipality of Peel Review of Property Requirement Changes to the Class Environmental Assessment Project File Report Burnhamthorpe

The Regional Municipality of Peel Burnhamthorpe Road Watermain Project | exp ref 605544

Review of Property Requirement Changes to the Class EA Project File Report December 8, 2017

6

3.2.2 Overview of Potential Impacts and Mitigation

Table 5 outlines the potential impacts, mitigations, and net effect of the change to property requirements.

Table 5: Impacts for 201 City Centre Drive (Morguard Corp.)

Impact Category

Impact Details Measures to Mitigate Impacts

Net Effect

Trees Approx. 4-5 additional trees to be removed in new TE; 4 trees previously in TE area now in PE; total of 30 trees requiring removal.

Tree removal addressed through compensation/ tree replacement program. Shallow/removable vegetation may be considered in locations in which PEs are required.

Net 4-5 of 30 trees anticipated not being replaced; Owner compensated where appropriate.

Groundwater • Negligible change in potential dewatering requirements

• Negligible change in potential impacts identified/ exceedances of Table 1 SCS and Table 3 SCS standards (Metals and Inorganics and VOCs according to samples from adjacent monitoring well)

• No additional mitigation measures required beyond those associated with the PFR and PDR.

• Groundwater infiltration is expected to be suitable for discharge to the municipal sanitary sewer after filtration to reduce TSS levels sewer (WSP, 2017a, 2017b; GHD, 2015a).

• Contaminant sampling pre- and post- construction at minimum.

No change in dewatering requirements anticipated.

Soil • Negligible change in anticipated impacts

• Negligible change in associated potential impacts identified/exceedances of Table 1 SCS and Table 3 SCS standards (still include EC, SAR and VOCs according to samples from adjacent monitoring well)

• Salt-impacted soils may be reused onsite or on municipal roads; excess and otherwise contaminated soils will be disposed at an MOECC licensed facility (GHD, 2015c; WSP, 2017b).

• Proposed three (3) additional boreholes will provide baseline levels and post-construction comparison.

Negligible change anticipated.

Archaeological No archaeological potential (ASI, 2015)

N/A N/A

Property Owner/Occupier

PE is now required resulting in permanent usage limitations for the owner.

Region of Peel is engaging with property owner to achieve a fair easement agreement.

Working towards fair easement agreement.

3.2.3 Owner Consultation

Prior to the filing of the PFR, the Region of Peel and their consultant GHD met with Morguard representatives on May 6, 2015 to discuss property requirements. Since the filing of the PFR, additional email correspondence has occurred, and additional meetings as follows:

• May 26, 2016 with Region of Peel and Hatch/exp (present consultant);

Page 13: The Regional Municipality of Peel...The Regional Municipality of Peel Review of Property Requirement Changes to the Class Environmental Assessment Project File Report Burnhamthorpe

The Regional Municipality of Peel Burnhamthorpe Road Watermain Project | exp ref 605544

Review of Property Requirement Changes to the Class EA Project File Report December 8, 2017

7

• June 27, 2016 with Region of Peel and Hatch/exp (present consultant); and

• June 26, 2017 with Region of Peel.

In these meetings, the proposed property impact plan was presented and discussed. Discussions pertained to a power line, irrigation lines, recent tree removals and site restoration. At the time of writing, development of the agreement was underway. See Appendix A for a delineation of the easement requirements.

3.3 325 Burnhamthorpe Road West (YMCA) Easement Requirements

3.3.1 Changes and Rationale

This property (PIN 13141-0205) is owned by the YMCA and is located at 325 Burnhamthorpe Road West (east of Confederation Parkway, north side). In the 2015 PFR, a temporary easement was identified for this property. A permanent easement is now required for future maintenance access (see Table 6).

Table 6: Changes in Easement Requirements for 325 Burnhamthorpe Road West

TE Area (m2) PE Area (m2) TE Details PE Details

Original EA 360 N/A Construction staging (for a connection shaft)

N/A

Amended Requirements

436 86 Construction staging Permanent rock bolts to stabilize excavation

TE = temporary easement; PE = permanent easement; WM = watermain; VC = valve chamber

Figure 3 shows both the original and revised proposed works.

Figure 3: Watermain Alignment – 325 Burnhamthorpe Road West

Note: The chamber structure will be located within the noted shaft.

Page 14: The Regional Municipality of Peel...The Regional Municipality of Peel Review of Property Requirement Changes to the Class Environmental Assessment Project File Report Burnhamthorpe

The Regional Municipality of Peel Burnhamthorpe Road Watermain Project | exp ref 605544

Review of Property Requirement Changes to the Class EA Project File Report December 8, 2017

8

3.3.2 Overview of Potential Impacts and Mitigation

Table 7 below outlines the potential impacts, mitigations, and net effect of the change in the property requirements.

Table 7: Impacts for 325 Burnhamthorpe Road West (YMCA)

Impact Category

Impact Details Measures to Mitigate Impacts Net Effect

Trees No additional impacts. N/A Removal of 1 tree previously identified; Owner compensated where appropriate

Groundwater • Negligible change in potential dewatering requirements

• Negligible change in potential impacts identified/ exceedances of Table 1 SCS and Table 3 SCS standards (one adjacent monitoring well exceeded Metals and Inorganics, PHCs and VOCs)

• No additional mitigation measures required beyond those identified (GHD, 2015a, 2015b).

• Groundwater infiltration is expected to be suitable for discharge to the municipal sanitary sewer, after suitable pre-treatment (WSP, 2017a, 2017b; GHD, 2015a).

• Contaminant sampling pre- and post-construction at minimum.

No change in dewatering requirements anticipated.

Soil • Negligible change in anticipated impacts

• Negligible change in potential impacts identified/ exceedances of Table 1 SCS and Table 3 SCS standards (including Metals and Inorganics, VOCs and PCBs according to samples from adjacent monitoring well)

• Salt-impacted soils may be reused onsite or on municipal roads; excess and otherwise contaminated soils will be disposed at an MOECC licensed facility (GHD, 2015c; WSP, 2017b)

• Proposed three (3) additional boreholes will provide baseline levels and post-construction comparison.

Negligible change anticipated.

Archaeological No archaeological potential (ASI, 2015)

N/A N/A

Property Owner/ Occupier

PE is now required, resulting in permanent usage limitations for the owner.

Region of Peel is engaging with property owner to achieve a fair easement agreement.

Working towards fair easement agreement.

3.3.3 Owner Consultation

Prior to the filing of the PFR, the Region of Peel and their consultant GHD met with YMCA representatives on April 24, 2015 to discuss property requirements. Since the filing of the PFR, additional email correspondence has occurred, and a second meeting between the Region and the YMCA was held on June 23, 2017.

In these meetings, the proposed property impact plan was presented and discussed. Discussions pertained to construction noise, dust, debris and a fibre optic cable connection. At the time of writing, development of the agreement was underway. See Appendix A for a delineation of the easement requirements.

Page 15: The Regional Municipality of Peel...The Regional Municipality of Peel Review of Property Requirement Changes to the Class Environmental Assessment Project File Report Burnhamthorpe

The Regional Municipality of Peel Burnhamthorpe Road Watermain Project | exp ref 605544

Review of Property Requirement Changes to the Class EA Project File Report December 8, 2017

9

3.4 691 Burnhamthorpe Road East (V. & E. Amaral) Easement Requirements

3.4.1 Changes and Rationale

This property (PIN 13170-0241) is owned by Victor and Eduarda Amaral and is located at 691 Burnhamthorpe Road East (northwest corner of Burnhamthorpe Road and Cawthra Road). In the 2015 PFR, a temporary easement was identified for this property. A permanent easement is now required due to the change in the location of a shaft and also to allow for future utility work by the Region (see Table 8).

Table 8: Changes in Easement Requirements for 691 Burnhamthorpe Road East

TE Area (m2) PE Area (m2) TE Details PE Details

Original EA 3300 N/A Construction staging N/A

Amended Requirements

2676 623 Construction staging

Connection shaft, WM connection and VC installation, maintenance access, future work

TE = temporary easement; PE = permanent easement; WM = watermain; VC = valve chamber

Figure 4 below shows the original and revised proposed works. In the original design, the shaft and watermain were set within the road ROW. In the revised design, the shaft has been moved to within the Amaral property, and connections of the watermain likewise cross the Amaral property before returning to the ROW. The shaft was relocated during detailed design because it was deemed to be a superior design.

Figure 4: Watermain Alignment – 691 Burnhamthorpe Road East

Note: The valve chamber structure will be located within the noted chamber shaft.

Page 16: The Regional Municipality of Peel...The Regional Municipality of Peel Review of Property Requirement Changes to the Class Environmental Assessment Project File Report Burnhamthorpe

The Regional Municipality of Peel Burnhamthorpe Road Watermain Project | exp ref 605544

Review of Property Requirement Changes to the Class EA Project File Report December 8, 2017

10

3.4.2 Overview of Potential Impacts and Mitigation

Table 9 below outlines the potential impacts, mitigations, and net effect of the change to property requirements.

Table 9: Impacts for 691 Burnhamthorpe Road East (V. & E. Amaral)

Impact Category

Impact Details Measures to Mitigate Impacts Net Effect

Trees No additional trees to be removed; 1 tree previously in TE area now in PE area; total of 9 trees requiring removal

Tree removal addressed through compensation/ tree replacement program. Shallow/removable vegetation may be considered in locations in which PEs are required.

Net 1 of 9 trees anticipated not being replaced; Owner compensated where appropriate

Groundwater • Negligible change in potential dewatering requirements;

• Uncertain change in potential impacts identified/ exceedances of Table 1 SCS standards (one adjacent monitoring well exceeded Metals and Inorganics, and VOCs, whereas another adjacent monitoring well did not identify exceedances)

• No additional mitigation measures required beyond those identified (GHD, 2015a, 2015b).

• Groundwater infiltration is expected to be suitable for discharge to the municipal sanitary sewer, after suitable pre-treatment (WSP, 2017a, 2017b; GHD, 2015a).

• Contaminant sampling pre- and post- construction at minimum

No change in dewatering requirements anticipated.

Soil • Negligible change in anticipated impacts

• Uncertain change in potential impacts identified/ exceedances of Table 1 and Table 3 SCS standards including SAR, cyanide, BTEX and VOCs)

• Salt-impacted soils may be reused onsite or on municipal roads; excess and otherwise contaminated soils will be disposed at an MOECC licensed facility (GHD, 2015c; WSP, 2017b).

• Proposed three (3) additional boreholes will provide baseline levels and post-construction comparison.

Negligible change anticipated.

Archaeological No archaeological potential identified during Class EA (ASI, 2015). Expanded easement area requires further investigation.

Expanded easement area confirmed as disturbed through additional investigation during detailed design (report forthcoming).

No archeological impacts.

Property Owner/ Occupier

PE is now required on the property resulting in permanent usage limitations for the owner.

Region of Peel is engaging with property owner to achieve a fair easement agreement.

Working towards fair easement agreement.

3.4.3 Owner Consultation

Prior to the filing of the PFR, the Region of Peel and their consultant GHD met with the property owner on June 15, 2015 to discuss property requirements. Since the filing of the PFR, the following additional meetings took place:

• August 10, 2016 with Region of Peel; and

• September 9, 2017 with Region of Peel (via teleconference).

Page 17: The Regional Municipality of Peel...The Regional Municipality of Peel Review of Property Requirement Changes to the Class Environmental Assessment Project File Report Burnhamthorpe

The Regional Municipality of Peel Burnhamthorpe Road Watermain Project | exp ref 605544

Review of Property Requirement Changes to the Class EA Project File Report December 8, 2017

11

In these meetings, the proposed property impact plan was presented and discussed. Discussions pertained to plans for utilizing the property and the Region’s project timelines. At the time of writing, development of this agreement was underway. See Appendix A for a delineation of the easement requirements.

4 Conclusion and Recommendations The purpose of this Review was to update the public record regarding the Burnhamthorpe Watermain Project Schedule ‘B’ Class EA that was filed in September 2015.

In this Review, we have identified the impacts of the project changes, the resulting potential environmental impacts of those changes, and mitigation measures to minimize or eliminate impacts. A Revised Notice of Completion will subsequently be filed to reflect these changes (see Appendix B).

5 Bibliography ASI. (2015). Stage 1 Archaeological Assessment Burnhamthorpe Road Watermain Former

Township of Toronto, County of Peel, City of Mississauga, Regional Municipality of Peel. Prepared for GHD on behalf of the Regional Municipality of Peel. Dated July 6, 2015. Included as Appendix 2F in GHD, 2015a.

GHD. (2015a). Burnhamthorpe Road Watermain Class Environmental Assessment Project File Report. Prepared for The Regional Municipality of Peel. Dated September 2015.

GHD. (2015b). Burnhamthorpe Road Watermain Preliminary Design Report. Prepared for The Regional Municipality of Peel. Dated December 2015.

GHD. (2015c). Burnhamthorpe Road Watermain Tunnelling Technical Memo. Prepared for The Regional Municipality of Peel. Dated December 2015. Included as Appendix J in GHD, 2015b.

MOECC. (2011). Soil, Ground Water and Sediment Standards for Use Under Part XV.1 of the Environmental Protection Act. Published April 15, 2011.

Municipal Engineers Association (MEA). (October 2000, as amended in 2007, 2011, and 2015). Municipal Class Environmental Assessment.

WSP. (2017a). Draft Hydrogeological Investigation - Burnhamthorpe Water Project (BWP) Detail Design – Contract 1 & 2. Prepared for the Regional Municipality of Peel. Dated August 14, 2017.

WSP. (2017b). Draft Stage II ESA Report Environmental Site Assessment for the Burnhamthorpe Water Project. Prepared for the Regional Municipality of Peel. Dated September 8, 2017.

Page 18: The Regional Municipality of Peel...The Regional Municipality of Peel Review of Property Requirement Changes to the Class Environmental Assessment Project File Report Burnhamthorpe

The Regional Municipality of Peel Burnhamthorpe Road Watermain Project | exp ref 605544

Review of Property Requirement Changes to the Class EA Project File Report December 8, 2017

Appendix A – Property Requirement Maps

This appendix contains maps delineating the permanent easements for the properties identified through the detailed design stage that were not identified during the initial Class EA (GHD, 2015a). The properties are as follows:

• 55 City Centre Drive (owned by Morguard Corporation).

• 201 City Centre Drive (owned by Morguard Corporation).

• 325 Burnhamthorpe Road West (owned by YMCA).

• 691 Burnhamthorpe Road East (owned by Victor and Eduarda Amaral).

Page 19: The Regional Municipality of Peel...The Regional Municipality of Peel Review of Property Requirement Changes to the Class Environmental Assessment Project File Report Burnhamthorpe

Date

Area

Drawn by

Sheet

Project No.

Checked byPlan No.

CAD Area

DATE DETAILS

REVISIONS

INIT.

Approved byDesigned by

Chkd.

UTILITIES TO BE VERIFIED BY SUBSURFACE UTILITY ENGINEERING INVESTIGATION.3.

PURPOSES AND WILL BE VERIFIED THROUGH A LEGAL SURVEY

EASEMENT ALIGNMENTS AND DIMENSIONS ARE PRELIMINARY FOR DISCUSSION 2.

ALL PROPERTY LINES TO BE VERIFIED THROUGH A LEGAL PROPERTY SURVEY.1.

NOTES:

BH16-307

55

4033 - 50

60

0

12

M

TJBTJBTJB

HC

GV

ASPHALT WALK

CONCRETE WALKCONCRETE WALK

TV VAULTT VAULT

ASPHALT WALKWAY

PAVING S

TONES

BM

SI

GN

HLPHLPHLP

HLP

HLP

HWHW

HW

HW

HW

HW

HW

HW

HW

HW

TS

TS

TS

HP

ELMH

GVGV

JB

JB

ELMH

ELMH

LS

TSTS

TS

TS

TS

TSTS

TS

TS TS

TS

TSTSTS

TS

LS

SI

GN

LS

LS

HP

LS

LS

OW OW OW

OW

OW

TS

TS

TS

TS

SW

AL

E

TS

TS

CO

NC

CU

RB

(TYP.)

CO

NC/ILB

OW

OW

OW

OW

OW

OW

TS

ILBC

ON

C

ILB

CP

ILB

SW

ICV

JB

ILB

ILBTCL

TCL

SW

SW

SW

SW

ILB

CO

NC

CO

NC

CO

NC

CONC ILB

SW

SW

CO

NC

ILB

OW

S

S

S

S

S

S

S

S

S

S

S

S

TL

TL

ILB

HW

HW

HW

HW

HW

HW

CONCCONCCONC CONC

ILB

CONCCONC

CONC

CO

NC

RE

TE

WA

LK

CONCRETE WALK

CO

NC

RE

TE

WA

LK

CONCRETE WALK

AN

D

GU

TT

ER

CO

NC

RE

TE

WA

LK

CO

NC

RE

TE

WA

LK

CO

NC

RE

TE

WA

LK

CO

NC

RE

TE

WA

LK

CONCRETE WALK

SW

CONC CONC

ILB

CONC

ILB

ILB

CONCRETE WALK

CO

NC

CU

RB

AN

D

GU

TT

ER

CONC CURB AND GUTTER

CONCCONC CONC CONCSW

SW

ILB

ILB

ILB

ILB

ILB

ILB

ILB

CO

NC

CO

NC

CO

NC

CO

NC

& IL

B

CR

OS

SW

AL

K

CONC

CONC

CO

NC

ASPHALT PATH

ILB

ILB

ILB

CO

NC

CU

RB

AN

D

GU

TT

ER

CO

NC

CU

RB

AN

D

GU

TT

ER

AND G

UTTER

CO

NC

CU

RB

AN

D

GU

TT

ER

CONC CURB AND GUTTER

CO

NC C

URB

AN

D

GUTTER

CO

NC C

URB

GR

AS

S

GR

AS

S

GR

AS

S

GR

AS

S

GRASS

GA

RD

EN

GR

AS

S

GR

AS

S

CONC & ILB CROSSWALK

ILB

ILB

CONC & ILB CROSSWALK

CO

NC

& IL

B

CR

OS

SW

AL

K

ILB

GA

RD

EN

GARDEN

ILB

GR

AS

S

GD

N

GA

RD

EN

GR

AS

S

GR

AS

S

GR

AS

S

CONC

GD

N

GD

N

GD

N

GD

N

GD

NG

DN

GD

N

CO

NC

CU

RB

AN

D

GU

TT

ERB

US

CB

RW

CR

W

CB

RW

CR

W

LS

BA

SE

LS

TL

TL/

PS

LS

LS/

TL/

PS

LS/

TL/

PS

LS/

TL/

PS

GV

HP/

LS

LS

UC

GP

BX

BX

BM

HB

MH

BM

H

TL

TL

LS/

TL

HP/

LS

LS

5G

W

CONC CURB AND GUTTER

CO

NC

CU

RB

AN

D

GU

TT

ER

CO

NC

CU

RB

AN

D

GU

TT

ER

CO

NC

CU

RB

AN

D

GU

TT

ER

CO

NC

CU

RB

AN

D

GU

TT

ER

CUT

CU

RB

TL

TL

LS

LS

HP

HM

H

TL

B

PS

HM

H

TL

LS/

TL

LS/

PS

HP/

LS

BC

HB

CH

BC

H

BC

HB

CH

BC

H

BC

H

BC

H

BC

HB

CH

BC

HB

CH

BC

HB

CH

GA

TE

DR

IVE

CL

EV

ED

ON

DU

RS

LY

CR

ES.

BS

HO

PS

TO

KE

LANE

BISHOPSTOKE

MEADOWS

DRIVE

MACEDONIA

DR.

PLACE

ENFIELD

GATE

GA

TE

WA

LF

OR

D C

T.

ARIS

TA

WA

Y

KA

NE

FF

CRES.

MIS

S

ISS

AUGA

HU

RO

NT

ARIO

WALES DR.

ROYAL DR.

ABSOLUTE

VALLEY

MATTHEWS

SU

SS

EX

KA

RIY

A

GA

TE

E

I

KA

RIY

ASQUARE

CELEBRATION

DU

KE O

F Y

OR

K B

LV

D.

CIT

Y C

EN

TR

E D

RIV

E

SQUARE ONE

HU

RO

NT

ARIO S

TR

EE

T

BL

VD.

DU

KE O

F Y

OR

K

BURNHAMTHORPE ROAD WEST

AVE

NU

E

ROBERT SPECK PKWY

BURNHAMTHORPE ROAD EAST

KEY PLAN (N.T.S.)

0 10 20 30m10m

HU

RO

NT

ARIO S

TR

EE

T

SU

SS

EX G

AT

E

BURNHAMTHORPE ROAD WEST

LEGEND:

N.L.

13-1125

PROPERTY IMPACT PLAN

PROPERTY OWNER:

MORGUARD CORPORATION

SK002

EXISTING R.O.W

EXISTING PROPERTY LINE

(810.1m², 0.200 acres)PERMANENT EASEMENT

a

BURNHAMTHORPE ROAD

6.6

m

ABSOLUTE DRIVE

ROAD/ACCESS RAMP

POTENTIAL CONSTRUCTION

8.0m124.3m

44.0m

22.3

m

109.5m

10.0m

A.R.

JUNE 2017

(2773.7m², 0.685 acres)TEMPORARY EASEMENT

12.1m

12.4

m

56.1m

68.9

m

ROAD/ACCESS RAMP

CONSTRUCTION

POTENTIAL

8.0

m

CONSTRUCTION

BE RELOCATED DURING

EXISTING BUS SHELTER TO

LANEWAY

PARKING LOT

73.1

m

5.3

m

27.8

m

SNOW STORAGE AREA

DURING CONSTRUCTION

SIGN TO BE MAINTAINED

EXISTING TRIOS COLLEGE

Page 20: The Regional Municipality of Peel...The Regional Municipality of Peel Review of Property Requirement Changes to the Class Environmental Assessment Project File Report Burnhamthorpe

Date

Area

Drawn by

Sheet

Project No.

Checked byPlan No.

CAD Area

DATE DETAILS

REVISIONS

INIT.

Approved byDesigned by

Chkd.

UTILITIES TO BE VERIFIED BY SUBSURFACE UTILITY ENGINEERING INVESTIGATION.3.

PURPOSES AND WILL BE VERIFIED THROUGH A LEGAL SURVEY

EASEMENT ALIGNMENTS AND DIMENSIONS ARE PRELIMINARY FOR DISCUSSION 2.

ALL PROPERTY LINES TO BE VERIFIED THROUGH A LEGAL PROPERTY SURVEY.1.

NOTES:

SC

H

GA

TE

WALLENBERG

PARKVIEW

TURNBRIDGE

BLVD.

ROAD

DRIVE

DR.

PLACE

ENFIELD

GATE

GA

TE

RO

AD

WEBB DRIVE

HU

RO

NT

ARIO

PRINCE OF WALES DR.

PRINCESS ROYAL DR.

LIVIN

G

AR

TS D

RIV

E

MATTHEWS

SU

SS

EX

KA

RIY

AK

ARIY

A

EN

CT.

RU

SS

O

VIA

CO

NF

ED

ER

ATIO

N P

KW

Y.

ARBUTUS

WAY

HA

MM

ER

SO

N

DRIVEONE

ASQU RE

CITY

CENTRE DR.SQUARE

CELEBRATIONPL.

CURRAN

CRES.

BRIC

KS

TO

NE

ME

WS

PA

RK

SID

E VIL

LA

GE D

R.

DU

KE O

F Y

OR

K B

LV

D.

CIT

Y C

EN

TR

E D

RIV

E

SQUARE ONE

SQUARE ONE DRIVE

HU

RO

NT

ARIO S

TR

EE

T

BURNHAMTHORPE ROAD WEST

BL

VD.

DU

KE O

F Y

OR

K

BURNHAMTHORPE ROAD WEST

ST

RE

ET

KEY PLAN (N.T.S.)

0 10 20 30m10m

DU

KE O

F Y

OR

K B

OU

LE

VA

RD

BURNHAMTHORPE ROAD WEST

EXISTING PROPERTY LINE

78.5m

7.8

m

EXISTING R.O.W

LEGEND:

, 0.129 acres)2

(520.1m

TEMPORARY EASEMENT

ASPHALT WALKWAY

CONCRETE WALKWAY

CO

NC

RE

TE W

AL

KW

AY

N.L.

13-1125

PROPERTY IMPACT PLAN

PROPERTY OWNER

MORGUARD CORPORATION

NOVEMBER 2016

SK003a

BURNHAMTHORPE RD WEST

21.1m

4.0

m

, 0.021 acres)2

(84.5m

PERMANENT EASEMENT

CITY CENTRE DRIVE

J.M./A.R.

Page 21: The Regional Municipality of Peel...The Regional Municipality of Peel Review of Property Requirement Changes to the Class Environmental Assessment Project File Report Burnhamthorpe

Date

Area

Drawn by

Sheet

Project No.

Checked byPlan No.

CAD Area

DATE DETAILS

REVISIONS

INIT.

Approved byDesigned by

Chkd.

UTILITIES TO BE VERIFIED BY SUBSURFACE UTILITY ENGINEERING INVESTIGATION.3.

PURPOSES AND WILL BE VERIFIED THROUGH A LEGAL SURVEY

EASEMENT ALIGNMENTS AND DIMENSIONS ARE PRELIMINARY FOR DISCUSSION 2.

ALL PROPERTY LINES TO BE VERIFIED THROUGH A LEGAL PROPERTY SURVEY.1.

NOTES:

325 - 329

TSC

TSC

ASPHALT WALK

CONCRETE WALK

CONCRETE WALK

ST

ON

E

FE

NC

E

DCB

TS

TS

TS

CONTAINER

STONE

STORAGE

CONC

CO

NC

CONCASPHALT

CONC

COL

CONC

ASPHALT

SW

CONC

ILB

PS

CS

SW

SWSW

SW

SW

COL

CPLX

MG

MG

MG MG

CURBC

ONC

CU

RB

CU

T

TPLX

CONC CURB AND GUTTER

CONC CURBCONC CURB

GA

TE

WALLENBERG

PARKVIEW

TURNBRIDGE

BLVD.

ROADGATE

RIDEAU

EID

ER

DO

WN

PL.

LIONS

GATECHELMSFORD

CT.

HARTFORDSHIRE

PAVILLION

CT.

CIRCLE

EL

OR

A

US

DR.

CT.

CR

OA

TIA

DR.

DRIVE

MACEDONIA

CRES.

NA

BL

US

DR.

PLACE

ENFIELD

RIE

L

RE

DM

ON

DR

OA

D

WA

LF

OR

D C

T.

PA

RK

DRIV

E

RO

AD

ITA

LIA

CRES.

ITALIA

COMMONWEALTCIR

CLECOMMONWEALTH

RD.

C

WEBB DRIVE

PRINCESS ROYAL DR.

MA

LA

GA

LIVIN

G

AR

TS D

RIV

E

ELM DR.

KA

RIY

A

GA

TE

LOTUSPOND

H

KA

RIY

A

ARBUTUS

WAY

CITY

CENTRE DR.SQUARE

CELEBRATIONPL.

CURRAN

CRES.

BRIC

KS

TO

NE

ME

WS

PA

RK

SID

E VIL

LA

GE D

R.

DU

KE O

F Y

OR

K B

LV

D.

SQUARE ONE

BURNHAMTHORPE ROAD WEST

BL

VD.

DU

KE O

F Y

OR

K

BURNHAMTHORPE ROAD WEST

KEY PLAN (N.T.S.)

N.L.

13-1125

BURNHAMTHORPE ROAD

0 10 20 30m10m

LIVIN

G A

RTS D

RIV

E

BURNHAMTHORPE ROAD WEST

NOVEMBER 2016

LEGEND:

EXISTING PROPERTY LINE

EXISTING R.O.W

PROPERTY IMPACT PLAN

PROPERTY OWNER:

SK004

YMCA

40.3m

12.9

m

a

, 0.021 acres)2

(85.9m

PERMANENT EASEMENT

,0.108 acres)2

(436.4m

TEMPORARY EASEMENT

21.2m

4.0

m

J.M./A.R.

Page 22: The Regional Municipality of Peel...The Regional Municipality of Peel Review of Property Requirement Changes to the Class Environmental Assessment Project File Report Burnhamthorpe

Date

Area

Drawn by

Sheet

Project No.

Checked byPlan No.

CAD Area

DATE DETAILS

REVISIONS

INIT.

Approved byDesigned by

Chkd.

UTILITIES TO BE VERIFIED BY SUBSURFACE UTILITY ENGINEERING INVESTIGATION.3.

PURPOSES AND WILL BE VERIFIED THROUGH A LEGAL SURVEY

EASEMENT ALIGNMENTS AND DIMENSIONS ARE PRELIMINARY FOR DISCUSSION 2.

ALL PROPERTY LINES TO BE VERIFIED THROUGH A LEGAL PROPERTY SURVEY.1.

NOTES:

MID

HU

RS

T

LA

NE

MIDHURST

LA

NED

U

NM

OW

CR

ES.

MOLLY

AV

E.

TWINE

CR

ES

CE

NT

SYCAMORE

CT.

WIL

CO

X

AMHERST

CT.

BOOKHAM

CR

ES.

CA

RIG

AR

CT.

CARIBBEANCT.

RA

YFIE

LD

GR

EY

CE

DA

R

RESCENT

RO

AD

WIL

LO

WB

AN

K

TRAGR

EY

CE

DA

RC

OU

RT

WEST

MI

ST

ER

PL.

WETHERBY

VI

N

R

WETHERBY LN.

ANNAMORE

ROAD

GREENORE

ROAD BR

OO

MHIL

L

CR

ES

CE

NT

RUNNINGBROOK

DRIVE

HOLLOWTREE

CRES.

SADDLE

CRES.

LA

ME

WO

OD

DR.

SWIR

LIN

GE

AV

ES

CR

ES.

GALEDOWNS

COURT

HEIGHTS HOLDEN

CR

ES.

HASSALL RD.

AV

E.

O

LY

EVERSLEY

DRIV

E

KIL

MA

NA

GH

RO

AD

BOULEVARD

SU

NS

ET V

ALLE

Y C

T.

WI

LL

O

RATHBURN

AD

EAST

DA

RA

LE

A

F

L

M

NT

EDR.

C

SIL

VE

RH

AZ

E

LI

N

CA

WT

HR

A

W

BURNHAMTHORPE ROAD

CA

WT

HR

A R

OA

D

691

695

699

703

CO

NC

RE

TE

CU

RB

CONC. WALK

ASP

HA

LT SID

EW

AL

K

BOARD FENCE

BO

AR

D

FE

NC

E

ASPHALT WALK

CONCRETE WALK

TL

SHELTER

BUS

BUS PAD - CONCRETE

BUS PAD - CONCRETE

CO

NC

RE

TE

CU

RB

POLE

HW

HW

HW

HW

HW

HW HW

HW HW

HW

LS

LS

LS

LS

LS

LS

LS

TL

TL

TL TL

TL

TS

TS

TS

HP

JB

VE

NT

FUEL

HP

OW

OW

PV

C

VP

x x x x x x x x

xx

xx

x

BUS

MW

MW

MW

MW

PL

PL

PL

PL

PL

PLPL

PL

PL

PL

PL

PL

PL

PL

PL

PL

PL

PL

BLOCK 57

LOT 41

(REGISTERED PLAN 43M-466)

(0.30 RESERVE)

REGISTERED PLAN 43M-466

REGISTERED PLAN A-24LOT 5

BLOCK 54

(REGISTERED PLAN 43M-466)

REGISTERED

PLAN 43M-466

(0.30 RESERVE)

LO

T 40

BLOCK 61

BLOCK 56

LO

T 39

HY

D

WV

WV

WVWV

WV

WV

WV

CONC

SW

CP

CONC

AS

PH

AL

T

SW

CP

SW

SW

AS

PH

AL

T

RO

AD

WA

Y

4C

P

CO

NC

4C

BL

CONC

4CBL

CONCASPHALT

ASP

HA

LT

SW

CONC

GR

AV

EL

WX

ASPHALT

5CBL

AS

PH

AL

T

RO

AD

WA

YC

ON

C

TREES

OPEN FIELDTR

EE

S

AN

D

BU

SH

GRASS

GRASS

CB

MH

MH

MH

MH

CB

MH

CB

CB

MH

MH

CB

DC

B

MH

MH

DC

B

MH

MH

MH

MH

CB

DC

B

MH

MH

MH

MH

BS

TS

BS

TS

TS

BS

TS

TS

TS

S

S

S

S

CURB CUT

CU

RB

CU

T

RE

MAIN

S

OF

CO

NC

CU

RB

CONC CURB AND GUTTER

CURB CUT

REMAINS

OF CONC

CURB

AN

D

GU

TT

ER

CU

RB

CUT

RE

MAIN

S

OF

CO

NC

CU

RB

CO

NC

CU

RB

CO

NC

CU

RB

CO

NC C

URB

CUT

CONC CURB

AND GUTTER

CONC CURB

CO

NC

CU

RB

CU

RB

CO

NC

CU

RB

REMAINS OF CONC CURB

CU

RB

CU

T

REM

AINS

OF

AN

D

GU

TT

ER

PART 2, PLAN 43R-10037

PL

AN 43

R-10

037

PA

RT 6

5G

W

LS

HP

LS/TL

LS

TL/PS

LS

TL

GW

TL/PS

GP

LS

LS

GW

OW

GWX2

LS

TL/P

S

HPGW

TL

TL

LS

CF

BFBF

CF

CF

CF

BFKEY PLAN (N.T.S.)

N.L.

13-1125

BURNHAMTHORPE ROAD

0 10 20 30m

J.M.

NOVEMBER 2016

10m

BURNHAMTHORPE ROAD

CA

WT

HR

A R

OA

D

EXISTING R.O.W

LEGEND:

EXISTING PROPERTY LINE

62.6m

12.1

m

PROPERTY IMPACT PLAN

PROPERTY OWNER:

VICTOR AND EDUARDA AMARAL

SK007

, 0.154acres)2

(622.9m

PERMANENT EASEMENT

, 0.661 acres)2

(2675.7m

TEMPORARY EASEMENT

a

77.8m

42.8

m

38.3

m

25.5

m

40.5m

Page 23: The Regional Municipality of Peel...The Regional Municipality of Peel Review of Property Requirement Changes to the Class Environmental Assessment Project File Report Burnhamthorpe

The Regional Municipality of Peel Burnhamthorpe Road Watermain Project | exp ref 605544

Review of Property Requirement Changes to the Class EA Project File Report December 8, 2017

Appendix B – Revised Notice of Completion

Page 24: The Regional Municipality of Peel...The Regional Municipality of Peel Review of Property Requirement Changes to the Class Environmental Assessment Project File Report Burnhamthorpe

Revised Notice of Completion Burnhamthorpe Road Watermain Class Environmental Assessment

Study Background The Region of Peel completed a Class Environmental Assessment (EA) in September 2015 to improve water supply for projected growth in the Mississauga City Centre area. The preferred alternative, which would minimize disruption along Burnhamthorpe Road, included tunnelling a new 1500 mm (5 foot) diameter watermain from Grand Park Drive to Cawthra Road. Nine connections between the new watermain and existing water infrastructure will also be constructed. The Class EA also included two new smaller diameter watermains to be constructed by open-cut method along Grand Park Drive and Webb Drive and Duke of York Boulevard from Webb Drive to City Centre Drive. Following the Notice of Completion and the Project File Report filing, the Region started detailed design work to prepare for the installation of these watermains. Revised Notice of Completion Through the design process, minor modifications were made to the 1500 mm watermain alignment, shaft locations, valve chambers, and the required construction staging areas. These changes require new permanent easements at four locations along Burnhamthorpe Road West, including:

• 55 City Centre Drive (northwest corner of Burnhamthorpe Road and Hurontario Street).

• 201 City Centre Drive (northeast corner of Burnhamthorpe Road and Duke of York Boulevard).

• 325 Burnhamthorpe Road West (east of Confederation Parkway, north side of Burnhamthorpe Road).

• 691 Burnhamthorpe Road East (northwest corner of Burnhamthorpe Road and Cawthra Road).

We Want to Hear from You - Comments Invited The Region of Peel would like to hear from you. A report with the revisions is available for public review between December 14, 2017 and January 31, 2018 at peelregion.ca/pw/construction/miss/bwp.htm and at the following locations:

• Region of Peel: Clerk’s Department, 5th Floor, Suite A, 10 Peel Centre Drive, Brampton (Mon-Fri: 8:30 a.m. to 4:30 p.m.)

• Mississauga Central Library: 301 Burnhamthorpe Road West, Mississauga (Mon-Fri: 9 a.m. to 9 p.m., Sat: 9 a.m. to 5 p.m., Sun: 1 p.m. to 5 p.m.)

If you have any comments, please send them to the Project Manager by January 31, 2018:

• Heather Jefferson, Project Manager, Water Division, Capital Works, 10 Peel Centre Drive, Brampton, L6T 4B9 Tel: 905-791-7800 ext. 7881 / Email [email protected]

If concerns regarding this Class EA cannot be resolved in discussion with the Region of Peel during this minimum 30-day review period, a person or party may request that the Minister of Environment and Climate Change make an order for the project to comply with Part II of the Environmental Assessment Act (1990). This request must be received by the Ministry, at the addresses listed below and copied to Heather Jefferson at the Region of Peel, on or before January 31, 2018.

• The Ministry/Minister of Environment and Climate Change,

77 Wellesley St West, 11th Floor, Toronto ON M7A 2T5 and

• Ministry of the Environment and Climate Change, Environmental Approvals Branch

135 St. Clair Avenue West, 1st Floor, Toronto, ON M4V 1P5

Subject to requests and comments received as a result of this notice and issue of the necessary permits and approvals, the Region of Peel intends to proceed with construction of this preferred alternative.