23
THE PRACTICE OF TOLLING Theory in Motion May 7, 2013 Michael Copeland Yagnesh Jarmarwala Justin Winn

THE PRACTICE OF TOLLING

  • Upload
    jolie

  • View
    45

  • Download
    2

Embed Size (px)

DESCRIPTION

THE PRACTICE OF TOLLING. Theory in Motion. May 7, 2013. Michael Copeland Yagnesh Jarmarwala Justin Winn. Agenda. Introduction Need for tolling Generating Capital Funding and financing Credit enhancement Assessing Toll Feasibility Traffic and revenue Costs Financial analysis - PowerPoint PPT Presentation

Citation preview

Page 1: THE PRACTICE OF  TOLLING

THE PRACTICE OF TOLLINGTheory in Motion

May 7, 2013

Michael CopelandYagnesh JarmarwalaJustin Winn

Page 2: THE PRACTICE OF  TOLLING

Agenda

• Introduction– Need for tolling

• Generating Capital– Funding and financing– Credit enhancement

• Assessing Toll Feasibility– Traffic and revenue– Costs– Financial analysis– Toll rate policies

• Recent Toll Projects in the US• Conclusions

2

Page 3: THE PRACTICE OF  TOLLING

INTRODUCTIONThe Practice of Tolling:

3

Page 4: THE PRACTICE OF  TOLLING

$0.000

$0.004

$0.008

$0.012

$0.016

$0.020

2010 2020 2030 2040 2050

Gas T

ax R

even

ue P

er M

ile (2

010$

) Gas tax indexed for inflationNo gas tax increase

0.9¢

0.3¢

1.8¢

Current State of Transportation Funding

• Two primary funding sources for roads– Taxes– Tolls and other fees

• Buying power of fuel taxes decreasing– Not indexed to inflation– Increased fuel efficiency

• “There are no free roads”

4

Page 5: THE PRACTICE OF  TOLLING

Tolling in the United States

States with Toll Facilities

States without Toll Facilities

5

Page 6: THE PRACTICE OF  TOLLING

Uses of Tolling

• Revenue generation to support– Construction– Operations– Maintenance

• Traffic management– Optimization of available

capacity– Management of peak period

trips

6

Page 7: THE PRACTICE OF  TOLLING

GENERATING CAPITALThe Practice of Tolling:

7

Page 8: THE PRACTICE OF  TOLLING

Funding Sources and Financing Methods

• Tolling may not provide sufficient revenue for financing• Options

– State tax funds– Federal tax funds– Innovative financing methods

• Examples– Maryland ICC– Triangle Expressway

8

Page 9: THE PRACTICE OF  TOLLING

Toll Revenue Bonds, 22.7%

TIFIA Loan, 33.0%

State Funds, 15.0%

State-backed Bonds, 29.3%

Toll Revenue Bonds, 29.1%

TIFIA Loan, 21.0%

State Funds, 18.1%

Federal Funds, 31.9%

Innovative Financings

9

Intercounty Connector50.1% of total financing backed by toll revenue

Triangle Expressway55.7% of total financing backed by toll revenue

Page 10: THE PRACTICE OF  TOLLING

Credit Enhancement

• Leveraging additional resources– Future tax revenue– Future revenue of existing toll facilities

• Examples– Sam Rayburn Tollway

• Financed based on the combined revenue potential of both SRT and 60+ additional miles of NTTA toll facilities

– President George Bush Turnpike – Western Extension• Toll equity loan agreement

• Advantages– Financing may not be otherwise feasible– Better bond ratings and interest rates

10

Page 11: THE PRACTICE OF  TOLLING

ASSESSING TOLL FEASIBILITYThe Practice of Tolling:

11

Page 12: THE PRACTICE OF  TOLLING

Toll Facility Development Overview

• How do we know how much money we can generate from tolling?– Traffic and Revenue Projection Process

• Can we generate enough money to make tolling worthwhile? – Feasibility Assessment

• If we can generate enough money, how do we finance it? – Project Financing

12

Page 13: THE PRACTICE OF  TOLLING

Elements of a Feasibility Study

13

Traffic and Revenue

Project Cost Evaluation

General Financial Analysis

Tolling Feasibility

Page 14: THE PRACTICE OF  TOLLING

Traffic and Revenue: Key Questions

• What is the overall travel demand in the corridor?• How much will it grow in the future?• What share of the demand can be expected to use the new

facility?• How much will users be willing to pay?• Types of studies

– Sketch level– Preliminary– Investment Grade

14

Sketch PreliminaryInvestment

Grade

Confi

denc

e Ra

nge

Page 15: THE PRACTICE OF  TOLLING

Project Cost Evaluation

• Construction costs• Maintenance costs• Operations costs• Examples

Pre-Construction Construction Post-Construction

• Traffic and Revenue• Financial Analysis• Environmental

Assessment• Design

• Construction• Tolling Technology• Customer Service

Center• Transaction

Processing Office

• Customer Service• Roadway Maintenance• Equipment Maintenance• Toll Collection/Processing• Violations Processing• Incident Management

15

Page 16: THE PRACTICE OF  TOLLING

Financial Coverage

• Ability for project to meet financial obligations• Components impacting financial coverage

– Costs• Capital• Operations • Maintenance• Debt (borrowing)

– Revenue• Traffic• Toll rates• Leakage• Fees and fines• Other investment revenue

• Does the project pay for itself?

16

$0.00

$50.00

$100.00

$150.00

$200.00

$250.00

Annu

al R

even

ue ($

)

Year

Projected Revenue

1.5x Coverage

Debt Obligations

Page 17: THE PRACTICE OF  TOLLING

Toll Rate Policies

• Toll rate increase options– As needed to fulfill debt

obligation– Planned periodic increases

• Could strengthen revenue outlook

17

Annu

al R

even

ue ($

)

Year• Removal of tolls– After debt retirement, removal of tolls from the facility may be

proposed– Operation and maintenance costs should be considered,

particularly for aging roadways– Toll removal may be short-term benefit and long-term liability

Page 18: THE PRACTICE OF  TOLLING

RECENT TOLL PROJECTSThe Practice of Tolling :

18

Page 19: THE PRACTICE OF  TOLLING

Sam Rayburn TollwayDallas-Fort Worth, Texas

• 26-mile, all-electronic toll road in Dallas’ northern suburbs

• Originally pursued as a private concession– Met with public

and political resistance

19

• Awarded to NTTA for a $3.2 billion upfront payment• Financed as part of the 90+ mile NTTA System

Page 20: THE PRACTICE OF  TOLLING

Intercounty ConnectorMaryland

• Collaborative development between Maryland Transportation Authority and Maryland State Highway Authority

• Opened in 2011 as all-electronic toll road– Operated for one week

without tolls for patrons to “try out” the road

20

• Multiple financing methods– GARVEE bonds, TIFIA loan, toll revenue bonds

• Leveraged entire MdTA system

Page 21: THE PRACTICE OF  TOLLING

Triangle ExpresswayRaleigh-Durham, North Carolina

• 18.8-miles• Two phases

– Triangle Parkway (opened December 2011)

– Western Wake Freeway (under construction)

• All-electronic toll collection

• Multiple financing methods

21

– Toll revenue bonds, TIFIA loan, bonds backed by state tax revenue, additional state funds

Page 22: THE PRACTICE OF  TOLLING

CONCLUSIONS/RECOMMENDATIONSThe Practice of Tolling:

22

Page 23: THE PRACTICE OF  TOLLING

Conclusions/Recommendations

• Tolling has proven to be an effective funding source for new highway capacity as state and federal tax revenues diminish– In many cases, however, tolling cannot support the entire cost

of projects– Must be supplemented with alternative funding sources

• Risk management– Demographic growth– Financial coverage– Public opinion

• Consideration of all options, not just tolling, may yield a more sustainable finance plan

• Method of evaluating potential toll projects is needed23