TGTC-3
Date: 05.06.2014
Magnus Eikens (Connect LNG)
David Berstad (SINTEF Energy Research)
2
3rd Trondheim Gas Technology Conference, 5th of June 2014
1. Small-Scale LNG Market Introduction
2. The Connect LNG technology (the UBS)
3. Preliminary results from Sintef Energy Research
OUTLINE
3
3rd Trondheim Gas Technology Conference, 5th of June 2014
ENABLING LNG TERMINALS
4
3rd Trondheim Gas Technology Conference, 5th of June 2014
For illustration purposes only. Not necessarily actual trading routes.
TRADING ROUTE
5
3rd Trondheim Gas Technology Conference, 5th of June 2014
For illustration purposes only. Not necessarily actual trading routes.
Small-Scale
6
3rd Trondheim Gas Technology Conference, 5th of June 2014
EMERGING MARKET Existing LNG terminals
Emerging Small
Scale LNG Markets
7
3rd Trondheim Gas Technology Conference, 5th of June 2014
Jetty CAPEX
Jetty CAPEX
Storage&Regas
Storage&Regas
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
320.000 m3 20.000 m3
Large Scale Terminal Small Scale Terminal
Reduce Payback
Time Payback time: 8 years 12 years
TOO LONG PAYBACK TIME
Te
rmin
al
Inv
estm
en
t c
ost
Source: EU Feasibility Report (2011) & Energy and Power (2012)
8
3rd Trondheim Gas Technology Conference, 5th of June 2014
TOO LONG CONSTRUCTION TIME
Available Solution: Jetty or dredging of large seabed volumes
9
3rd Trondheim Gas Technology Conference, 5th of June 2014
UNIVERSAL BUOYANCY
SYSTEM (UBS)
Interface
Floating Cryogenic Hoses
Buoy Mooring
System
Applicable for:
• LNG Loading
• LNG Discharge
• LNG Bunkering
10
3rd Trondheim Gas Technology Conference, 5th of June 2014
Existing LNG
terminals
Multi buoy
mooring
Floating flexible
cryogenic hoses
Buoy
Small-scale terminal
LNGC carrier (1000-
30.000 m3)
• Mobile: can be Relocated if change in market
• Combined with IMO-C tanks, even higher mobility
• Low CAPEX compared to alternative
• Up to 6 x times faster construction time
FLEXIBLE TERMINALS
LNG Carrier (1000-
30.000 m3)
Pressurized Tanks
(1000-15.000 m3)
• Designed for in-shore weather
conditions
• System stored near shore
when not in operation
11
3rd Trondheim Gas Technology Conference, 5th of June 2014
FOCUS ON HYDRODYNAMIC
SIMULATIONS
12
3rd Trondheim Gas Technology Conference, 5th of June 2014
Three Model Tests
MODEL TEST 3
ATTACHMENT SYSTEM
MODEL TEST 2
HOSE CONFIGURATION
MODEL TEST 1
UBS V 1.0
MC-LAB MARINTEK,
OCTOBER 2012 OCEAN BASIN MARINTEK, MAY 2013
MC-LAB, MARINTEK,
FEBRUARY 2014
13
3rd Trondheim Gas Technology Conference, 5th of June 2014
CRYOGENIC HOSE
TECHNOLOGIES
Third party expert opinion:
Hose Alternatives
Vacuum Insulated hoses
Composite Hoses
Cryogel Hoses
14
3rd Trondheim Gas Technology Conference, 5th of June 2014
INDUSTRY CONCERNS
a) How much boil-off will the UBS add during LNG discharge/loading?
b) What will the pressure loss through the UBS be?