TGTC-3 Date: 05.06.2014 Magnus Eikens (Connect LNG) David Berstad (SINTEF Energy Research)

TGTC-3 Date: 05.06 - SINTEF · 10 3rd Trondheim Gas Technology Conference, 5th of June 2014 Existing LNG terminals Multi buoy mooring Floating flexible cryogenic hoses Buoy Small-scale

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: TGTC-3 Date: 05.06 - SINTEF · 10 3rd Trondheim Gas Technology Conference, 5th of June 2014 Existing LNG terminals Multi buoy mooring Floating flexible cryogenic hoses Buoy Small-scale

TGTC-3

Date: 05.06.2014

Magnus Eikens (Connect LNG)

David Berstad (SINTEF Energy Research)

Page 2: TGTC-3 Date: 05.06 - SINTEF · 10 3rd Trondheim Gas Technology Conference, 5th of June 2014 Existing LNG terminals Multi buoy mooring Floating flexible cryogenic hoses Buoy Small-scale

2

3rd Trondheim Gas Technology Conference, 5th of June 2014

1. Small-Scale LNG Market Introduction

2. The Connect LNG technology (the UBS)

3. Preliminary results from Sintef Energy Research

OUTLINE

Page 3: TGTC-3 Date: 05.06 - SINTEF · 10 3rd Trondheim Gas Technology Conference, 5th of June 2014 Existing LNG terminals Multi buoy mooring Floating flexible cryogenic hoses Buoy Small-scale

3

3rd Trondheim Gas Technology Conference, 5th of June 2014

ENABLING LNG TERMINALS

Page 4: TGTC-3 Date: 05.06 - SINTEF · 10 3rd Trondheim Gas Technology Conference, 5th of June 2014 Existing LNG terminals Multi buoy mooring Floating flexible cryogenic hoses Buoy Small-scale

4

3rd Trondheim Gas Technology Conference, 5th of June 2014

For illustration purposes only. Not necessarily actual trading routes.

TRADING ROUTE

Page 5: TGTC-3 Date: 05.06 - SINTEF · 10 3rd Trondheim Gas Technology Conference, 5th of June 2014 Existing LNG terminals Multi buoy mooring Floating flexible cryogenic hoses Buoy Small-scale

5

3rd Trondheim Gas Technology Conference, 5th of June 2014

For illustration purposes only. Not necessarily actual trading routes.

Small-Scale

Page 6: TGTC-3 Date: 05.06 - SINTEF · 10 3rd Trondheim Gas Technology Conference, 5th of June 2014 Existing LNG terminals Multi buoy mooring Floating flexible cryogenic hoses Buoy Small-scale

6

3rd Trondheim Gas Technology Conference, 5th of June 2014

EMERGING MARKET Existing LNG terminals

Emerging Small

Scale LNG Markets

Page 7: TGTC-3 Date: 05.06 - SINTEF · 10 3rd Trondheim Gas Technology Conference, 5th of June 2014 Existing LNG terminals Multi buoy mooring Floating flexible cryogenic hoses Buoy Small-scale

7

3rd Trondheim Gas Technology Conference, 5th of June 2014

Jetty CAPEX

Jetty CAPEX

Storage&Regas

Storage&Regas

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

320.000 m3 20.000 m3

Large Scale Terminal Small Scale Terminal

Reduce Payback

Time Payback time: 8 years 12 years

TOO LONG PAYBACK TIME

Te

rmin

al

Inv

estm

en

t c

ost

Source: EU Feasibility Report (2011) & Energy and Power (2012)

Page 8: TGTC-3 Date: 05.06 - SINTEF · 10 3rd Trondheim Gas Technology Conference, 5th of June 2014 Existing LNG terminals Multi buoy mooring Floating flexible cryogenic hoses Buoy Small-scale

8

3rd Trondheim Gas Technology Conference, 5th of June 2014

TOO LONG CONSTRUCTION TIME

Available Solution: Jetty or dredging of large seabed volumes

Page 9: TGTC-3 Date: 05.06 - SINTEF · 10 3rd Trondheim Gas Technology Conference, 5th of June 2014 Existing LNG terminals Multi buoy mooring Floating flexible cryogenic hoses Buoy Small-scale

9

3rd Trondheim Gas Technology Conference, 5th of June 2014

UNIVERSAL BUOYANCY

SYSTEM (UBS)

Interface

Floating Cryogenic Hoses

Buoy Mooring

System

Applicable for:

• LNG Loading

• LNG Discharge

• LNG Bunkering

Page 10: TGTC-3 Date: 05.06 - SINTEF · 10 3rd Trondheim Gas Technology Conference, 5th of June 2014 Existing LNG terminals Multi buoy mooring Floating flexible cryogenic hoses Buoy Small-scale

10

3rd Trondheim Gas Technology Conference, 5th of June 2014

Existing LNG

terminals

Multi buoy

mooring

Floating flexible

cryogenic hoses

Buoy

Small-scale terminal

LNGC carrier (1000-

30.000 m3)

• Mobile: can be Relocated if change in market

• Combined with IMO-C tanks, even higher mobility

• Low CAPEX compared to alternative

• Up to 6 x times faster construction time

FLEXIBLE TERMINALS

LNG Carrier (1000-

30.000 m3)

Pressurized Tanks

(1000-15.000 m3)

• Designed for in-shore weather

conditions

• System stored near shore

when not in operation

Page 11: TGTC-3 Date: 05.06 - SINTEF · 10 3rd Trondheim Gas Technology Conference, 5th of June 2014 Existing LNG terminals Multi buoy mooring Floating flexible cryogenic hoses Buoy Small-scale

11

3rd Trondheim Gas Technology Conference, 5th of June 2014

FOCUS ON HYDRODYNAMIC

SIMULATIONS

Page 12: TGTC-3 Date: 05.06 - SINTEF · 10 3rd Trondheim Gas Technology Conference, 5th of June 2014 Existing LNG terminals Multi buoy mooring Floating flexible cryogenic hoses Buoy Small-scale

12

3rd Trondheim Gas Technology Conference, 5th of June 2014

Three Model Tests

MODEL TEST 3

ATTACHMENT SYSTEM

MODEL TEST 2

HOSE CONFIGURATION

MODEL TEST 1

UBS V 1.0

MC-LAB MARINTEK,

OCTOBER 2012 OCEAN BASIN MARINTEK, MAY 2013

MC-LAB, MARINTEK,

FEBRUARY 2014

Page 13: TGTC-3 Date: 05.06 - SINTEF · 10 3rd Trondheim Gas Technology Conference, 5th of June 2014 Existing LNG terminals Multi buoy mooring Floating flexible cryogenic hoses Buoy Small-scale

13

3rd Trondheim Gas Technology Conference, 5th of June 2014

CRYOGENIC HOSE

TECHNOLOGIES

Third party expert opinion:

Hose Alternatives

Vacuum Insulated hoses

Composite Hoses

Cryogel Hoses

Page 14: TGTC-3 Date: 05.06 - SINTEF · 10 3rd Trondheim Gas Technology Conference, 5th of June 2014 Existing LNG terminals Multi buoy mooring Floating flexible cryogenic hoses Buoy Small-scale

14

3rd Trondheim Gas Technology Conference, 5th of June 2014

INDUSTRY CONCERNS

a) How much boil-off will the UBS add during LNG discharge/loading?

b) What will the pressure loss through the UBS be?

c) What is the optimal flow-rate and inner diameter to minimize BOG?