Tarek Elabrak updated CV

Embed Size (px)

Citation preview

Tarek Raafat El-Abrak

Tarek Raafat El-Abrak

Objective:Seeking a challenging managerial position in a well-established firm that allows me to combine the talents & experiences I have developed in the previous years.

Personal Details PreviewName:Tarek Raafat El AbrakNationality:EgyptianBirth date:16 January 1969Gender:MaleMarital Status:MarriedNumber of Dependants:3Street Address 37 El Eman st.-Ext. Sayed Abulkhair

El Haram St Giza

City:GizaLocation:Egypt Email:[email protected] Phone:02 33841008Mobile:01024207000

Professional Experience Preview

Dates:Jan 2014 PresentPosition: Supply Chain Senior Manager.Company Name:MIRACO-CARRIER (AIRCONDITIONING MANUFACTURER)Company Address:28Km -Cairo-Alex Desert Road - Aburawash Area - Egypt - Egypt, EgyptWork

Description:-Leading the following Depts.: Planning Purchasing (Foreign & Local). Logistics & Clearance Stores

-Insure production plan is complying with sales forecast.-Prevent material shortage or delay.-Changed 80% from our imported shipments from FOB to CFR to comply with our financial targets.-Decreasing the references having sole supplier by 75% (by adding new supplier).-eliminate suppliers with bad history (Quality or delivery) and replaced by new ones.- Achieve company cost reduction plan.-Comply with governmental & safety regulations to have safe storage conditions.-Launching & monitoring action plans to eliminate dead stock items by 2015 end.

Dates:Nov 2012 PresentPosition: Senior Manufacturing Manager.Company Name:MIRACO-CARRIER (AIRCONDITIONING MANUFACTURER)Company Address:28Km -Cairo-Alex Desert Road - Aburawash Area - Egypt - Egypt, EgyptWork Description:-Leading production & Maintenance team to achieve company targets.

-Start applying feeders control & scheduling processes to monitor and improve efficiency.

-Start spare parts & tools stock control program to decrease inventory level for those items to be aligned with company targets.

-To supervise & follow up daily actions taken to monitor and prevent assembly lines stoppages.

-Lead new layout changes to improve material handling & to reduce scrap.

Dates:Nov 2011 Oct 2012Position:

Plant Manager.Company Name:Gravena Factory Company Address:6th of October Work Description:--Overall responsibility for factory operations including: -Ensure sales requirements achieved within the target dates.-To support new product family launching by supervising the design & manufacturing phases of the new dies & fixtures supplier.-Developed controlled component ordering system to minimize factory stoppages due to purchased items delay.

Dates:May 2010 Nov 2011Position:

Refrigeration & Transicold Sales Mgr.Company Name:Miraco-Carrier (Air-conditioning Manufacturer)Company Address:28Km -Cairo-Alex Desert Road - Aburawash Area, EgyptWork Description:--Overall responsibility for maximizing divisional profitability according to the company financial plan. -To analyze the divisions distribution methods, pricing policies, credit policies, inventory adequacy and special customer services. Is also responsible to recommend improvement in these activities as necessary and assist in setting such recommendations into practice. -To analyze the divisions distribution methods, pricing policies, credit policies, inventory adequacy and special customer services. Is also responsible to recommend improvement in these activities as necessary and assist in setting such recommendations into practice. -To complete accurate analysis of market demand to decide on quantities and types of equipment to be purchased& follow up the logistics activities regarding those purchased items. -To complete accurate analysis of market demand to decide on quantities and types of equipment to be purchased. -To control inventory of the divisions products. This involves close monitoring of inventory to ensure it is within the stipulated norms and removal of dead stock and slow moving items under advice from accounts department.

Dates:Jan 2008 May 2010Position: Production Manager.Company Name:MIRACO-CARRIER (AIRCONDITIONING MANUFACTURER)Company Address:28Km -Cairo-Alex Desert Road - Aburawash Area - Egypt - Egypt, EgyptWork Description:-Leading production team in both assembly & feeder shops to achieve company targets.

-Improve productivity (team efforts resulted in 10% productivity improvements in 2008 compared with 2007 results)

-Achieve production plan ( 2008 results showing 35% increase of total production)

-Monitor & support EH&S activities.

-Apply lean standards in the factory.

-Improve material handling inside the factory.

-Improve visual control for all subassemblies from feeders to the lines.

-Decrease Line stoppage & apply RRCA to prevent repeating the same problem.

Dates:October 2000 Dec 2007Position: Planning Manager.Company Name:MIRACO-CARRIER (AIRCONDITIONING MANUFACTURER)Company Address:28Km -Cairo-Alex Desert Road - Aburawash Area - Egypt - Egypt, EgyptWork Description:-Leading both Material & Production planning Dept. to achieve company targets. -Material Planning Dept. is responsible forDaily follow up of MRP procurement proposals to be transferred to purchasing Dept. as Purchase Requisitions.Monitoring Inventory levels to achieve company turn over target. Generating weekly & monthly reports to monitor deliveries of raw materials.

- Production Planning Dept. is responsible for -Prepared the yearly, monthly, weekly production plans. -Daily follow up of the production plan. -Managed Finished products warehouse turnover. -Extensive involvement managing sales requirements at all levels Through weekly meetings with sales Dept. - Achieved Export sales On Time Delivery Targets. -Responsible for Developing detailed monthly production reports. -SAP key user for Production & Material Planning Module. Was responsible for the followings during & after a six months implementation project: Material master for all items in the company. Material Requirement Planning. Bill of materials of all company products. Master production scheduling. Training around 15 end users.

Dates:May 1999 - October 2000Position Assembly Lines Manufacturing EngineerCompany Name:MIRACO-CARRIER Company Address:28Km -Cairo-Alex Desert Road - Abu awash Area - Egypt, EgyptWork Description:-Leaded the assembling activities for a Global Carrier High Wall Indoor Unit; such as Line Design &its layout, time studies, handling equipments, contacting local suppliers for various components, etc (This was after 10 Days visit to Carrier factory in South Korea). -Saved around 150, 000 LE by creating a new technique in handling the Plastic parts from the supplier to our company. -Lead all assembling activities for a new Outdoor Unit, such as Line Design, handling equipments, time studies, etc.

-PDS (Product Delivery System) Coordinator for all assembly activities (assisting Carrier ETO, PDS director), this includes time studies, handling equipments, work flow studies, set-up reduction, Kanban, 5S , and all other PDS concepts.

-Participated in the creation of a new layout for the whole factory under supervision of the Assistant Managing Director for Manufacturing.

Dates:September 1997 - May 1999Position:

Sheet Metal Manufacturing EngineerCompany Name:Miraco-Carrier (Air-conditioning Manufacturer)Company Address:28Km -Cairo-Alex Desert Road - Aburawash Area, EgyptWork Description:-Leading all sheet metal activities for a new model, such as, supervising the Die maker, changing the design of some dies to suite our machines, ordering special CNC tooling, training workers tell reaching the final product phase, etc. -Leading the start up of a new CNC machine (56 Stations) & create all programs to start using it in production (this was after 2 weeks training in France). -Leading the start up of a new 350 Ton Press.

Dates:September 1994 - September 1997Position: Production EngineerCompany Name:IEC (Low Voltage & Electrical Control Panels Manufacturer)Company Address:6th of Oct., EgyptWork Description:Responsibilities: 1- Reporting to the Chairman of the company. 2- Running & supervising all production activities. 3- Leading a group of 20 technicians & workers. 4- Within few months I was able to design ATS & Power factor Correction And Star-Delta Panels 5- The biggest project for me in this company was to produce ATS control panels of 2500 A for residential towers.

Dates:December 1993 - September 1994Position: Process EngineerCompany Name:Jacobe De LafoneCompany Address:10th of Ramadan City, Industrial zone, EgyptWork Description:Time studies for casting & machining operations Modifying few jigs & fixtures.

Education Preview

Institution:Faculty of Engineering & Technology of HelwanLocation:Cairo, EgyptCompletion Date:May 1992Degree, Major:Bachelors, Production Engineering

Skills Preview SkillSkill LevelYears of ExperienceLast Used

OfficeExpertMore than 15 years1 month or less

AutoCADIntermediateMore than 10 yearsMore than 1 year

SAPExpertMore than 15 years1 month or less

Professional Trainings:(May 1998): FranceTwo weeks of Training in AMADA Training Center in Paris, This training was for CNC Machines Operations.

(September 2000): - ITO University, United technologies.

Quality Clinic Process Charts (QCPC)Relentless Root Cause analysis and Failure Analysis ClinicsThe Passport System & Market Feedback AnalysisTotal Productive MaintenanceMistake ProofingNew 5S(February 2000): Carrier Factory in Korea.Global carrier Hi wall Split system Assembly Line development, (Daewoo-Carrier)Revised the new moulds for the above-mentioned model.

(July 2008):

Leadership Skills.

(August 2004): Carrier Factory in Thailand.

Value Stream mapping training course

(August 2008): Leadership training..