Mt. Pleasant Library TOC-1 100% Printing: 20 March 2009 CORE Group, P.C. TABLE OF CONTENTS TABLE OF CONTENTS Division Section Title DIVISION 1 – GENERAL REQUIREMENTS 01100 Summary of Work 01230 Alternates 01250 Contract Modification Procedures 01270 Unit Prices 01290 Payment Procedures 01310 Project Management and Coordination 01320 Construction Progress Documentation 01322 Photographic Documentation 01330 Submittal Procedures 01351 Special Procedures for Historic Treatment 01352 LEED Requirements 01400 Quality Requirements 01420 References 01500 Temporary Facilities and Controls 01600 Product Requirements 01700 Execution Requirements 01732 Selective Demolition 01770 Closeout Procedures 01781 Project Record Documents 01782 Operation and Maintenance Data 01810 General Commissioning Requirements 01815 Commissioning of HVAC 01820 Demonstration and Training DIVISION 2 – SITEWORK 02200 Selective Site Demolition 02300 Earthwork 02370 Erosion and Sediment Control 02510 Water Distribution 02530 Sanitary Sewerage 02620 Subdrainage 02630 Storm Drainage 02751 Cement Concrete Pavement 02781 Exterior Stone Paving 02821 Chain-Link Fencing 02822 Metal Fences and Gates 02870 Site Furnishings 02920 Lawns and Grasses

Table of Contents Division Section Title

Embed Size (px)

DESCRIPTION

Construction Specifications - Division 1

Citation preview

Page 1: Table of Contents Division Section Title

Mt. Pleasant Library TOC-1 100% Printing: 20 March 2009 CORE Group, P.C. TABLE OF CONTENTS

TABLE OF CONTENTS

Division Section Title DIVISION 1 – GENERAL REQUIREMENTS 01100 Summary of Work 01230 Alternates 01250 Contract Modification Procedures 01270 Unit Prices 01290 Payment Procedures 01310 Project Management and Coordination 01320 Construction Progress Documentation 01322 Photographic Documentation 01330 Submittal Procedures 01351 Special Procedures for Historic Treatment 01352 LEED Requirements 01400 Quality Requirements 01420 References 01500 Temporary Facilities and Controls 01600 Product Requirements 01700 Execution Requirements 01732 Selective Demolition 01770 Closeout Procedures 01781 Project Record Documents 01782 Operation and Maintenance Data 01810 General Commissioning Requirements 01815 Commissioning of HVAC 01820 Demonstration and Training DIVISION 2 – SITEWORK 02200 Selective Site Demolition 02300 Earthwork 02370 Erosion and Sediment Control 02510 Water Distribution 02530 Sanitary Sewerage 02620 Subdrainage 02630 Storm Drainage 02751 Cement Concrete Pavement 02781 Exterior Stone Paving 02821 Chain-Link Fencing 02822 Metal Fences and Gates 02870 Site Furnishings 02920 Lawns and Grasses

Page 2: Table of Contents Division Section Title

Mt. Pleasant Library TOC-2 100% Printing: 20 March 2009 CORE Group, P.C. TABLE OF CONTENTS

02930 Exterior Plants DIVISION 3 – CONCRETE 03300 Cast-in-Place Concrete DIVISION 4 – MASONRY 04810 Unit Masonry Assemblies 04851 Dimension Stone Cladding DIVISION 5 – METALS 05120 Structural Steel 05310 Steel Deck 05500 Metal Fabrications 05501 Weathering Steel Site Walls 05511 Metal Stairs 05530 Gratings 05721 Ornamental Railings DIVISION 6 – WOOD AND PLASTICS 06105 Miscellaneous Carpentry 06402 Interior Architectural Woodwork DIVISION 7 – THERMAL AND MOISTURE PROTECTION 07131 Self-Adhering Sheet Waterproofing 07210 Building Insulation 07415 Composite Metal Wall Panels 07552 Styrene-Butadiene-Styrene (SBS) Modified Bitumen Membrane Roofing 07620 Sheet Metal Flashing and Trim 07272 Fluid-Applied Membrane Air Barriers 07842 Fire-Resistive Joint Systems 07920 Joint Sealants DIVISION 8 – DOORS AND WINDOWS 08110 Steel Doors and Frames 08212 Stile and Rail Wood Doors 08411 Aluminum-Framed Entrances and Storefronts 08520 Aluminum Windows

Page 3: Table of Contents Division Section Title

Mt. Pleasant Library TOC-3 100% Printing: 20 March 2009 CORE Group, P.C. TABLE OF CONTENTS

08630 Metal-Framed Skylights 08710 Door Hardware 08800 Glazing 08830 Mirrors 08911 Glazed Aluminum Curtain Walls DIVISION 9 – FINISHES 09111 Non-Load-Bearing Steel Framing 09210 Gypsum Plaster 09250 Gypsum Board 09310 Ceramic Tile 09380 Terra Cotta and Stone Tile 09629 Cork Flooring 09651 Resilient Floor Tile 09653 Resilient Wall Base and Accessories 09681 Carpet Tile 09852 Sound-Absorbing Wall Units 09912 Painting 09931 Wood Stains and Transparent Finishes 09992 Painting Restoration DIVISION 10 – SPECIALTIES 10155 Toilet Compartments 10200 Louvers 10265 Impact-Resistant Wall Protection 10801 Toilet and Bath Accessories DIVISION 11 – EQUIPMENT 11055 Through Wall Book and AV Drops 11056 Depressible Book Return Bins DIVISION 12 – FURNISHINGS 12484 Floor Mats and Frames DIVISION 13 – SPECIAL CONSTRUCTION 13730 Security Access 13845 Lighting Controls 13852 Digital, Addressable Fire-Alarm System

Page 4: Table of Contents Division Section Title

Mt. Pleasant Library TOC-4 100% Printing: 20 March 2009 CORE Group, P.C. TABLE OF CONTENTS

13915 Fire Suppression Piping 13921 Electric-Drive, Centrifugal Fire Pumps 13930 Wet-Pipe-Fire-Suppression Sprinklers DIVISION 14 – CONVEYING SYSTEMS 14215 Machine Room Less (MRL) Elevators DIVISION 15 – HVAC/PLUMBING 15053 Common Work Results for HVAC 15056 Common Motor Requirements for Fire-Suppression Equipment 15058 Common Motor Requirements for HVAC Equipment 15061 Hangers and Supports for Plumbing Piping and Equipment 15062 Hangers and Supports for HVAC Piping and Equipment 15071 Vibration Isolation 15076 Identification for Plumbing Piping and Equipment 15077 Identification for HVAC Piping and Equipment 15081 Fire-Suppression Systems Insulation 15082 Plumbing Insulation 15083 HVAC Insulation 15110 Valves 15111 General Duty Valves for Plumbing Piping 15126 Meters and Gages for Plumbing Piping 15140 Domestic Water Piping 15145 Domestic Water Piping Specialties 15150 Sanitary Waste and Vent Piping 15155 Sanitary Waste Piping Specialties 15160 Storm Drainage Piping 15165 Storm Drainage Piping Specialties 15181 Hydronic Piping 15185 Hydronic Pumps 15189 Water Treatment 15195 Facility Natural Gas Piping 15410 Plumbing Fixtures 15415 Drinking Fountains and Water Coolers 15446 Sump Pumps 15485 Electric Water Heaters 15513 Condensing Boilers 15629 Scroll Water Chillers 15640 Cooling Towers 15725 Modular Indoor Central-Station Air-Handling Units 15763 Fan-Coil units 15785 Air-to-Air Energy Recovery Equipment 15815 Metal Ducts 15820 Duct Accessories

Page 5: Table of Contents Division Section Title

Mt. Pleasant Library TOC-5 100% Printing: 20 March 2009 CORE Group, P.C. TABLE OF CONTENTS

15838 Power Ventilators 15900 HVAC Instrumentation and Controls 15950 Testing, Adjusting and Balancing 15940 Sequence of Operation 15995 Mechanical Systems Commissioning (LEED Project) DIVISION 16 – ELECTRICAL 16051 Common Work Results for Electrical 16055 Overcurrent Protective Device Coordination 16060 Grounding and Bonding 16073 Hangers and Supports for Electrical Systems 16075 Electrical Identification 16120 Conductors and Cables 16130 Raceways and Boxes 16140 Wiring Devices 16145 Lighting Control Devices 16410 Enclosed Switches 16441 Switchboards 16442 Panelboards 16491 Fuses 16511 Interior Lighting 16521 Exterior Lighting 16572 Modular Dimming Control 16714 Communications Equipment Room Fittings 16716 Communications Backbone Cabling 16717 Communications Horizontal Cabling 16718 Conductors and Cables for Electronic Safety and Security 16995 Electrical System Commissioning DIVISION 17 17100 Voice and Data Communication Cabling END TABLE OF CONTENTS

Page 6: Table of Contents Division Section Title

Mt. Pleasant Library 01100-1 20 Feburary 2009 CORE Group, P.C. SUMMARY OF WORK

SECTION 01100

PART 1 - GENERAL

SUMMARY OF WORK

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General Conditions to Construction Contract and other Division 1 Specification Sections, apply to this Section.

1.2 SUMMARY

A. Section includes:

1. Project information. 2. Work covered by Contract Documents. 3. Phased construction. 4. Work by Owner. 5. Work under separate contracts. 6. Future work. 7. Purchase contracts. 8. Owner-furnished products. 9. Contractor-furnished, Owner-installed products. 10. Access to site. 11. Coordination with occupants. 12. Work restrictions. 13. Specification and drawing conventions.

B. Related Section:

1. Division 1 Section "Temporary Facilities and Controls" for limitations and procedures governing temporary use of Owner's facilities.

1.3 PROJECT INFORMATION

A. Project Identification: Mt. Pleasant Library

1. Project Location: 3160 16th

Street, NW Washington DC 20010

Owner: DC Public Library 901 G Street, NW Washington DC 20001 Contact: Chris Wright Phone: 202-727-4913 Email: [email protected]

Page 7: Table of Contents Division Section Title

Mt. Pleasant Library 01100-2 20 Feburary 2009 CORE Group, P.C. SUMMARY OF WORK

Architect: CORE Group, PC 1010 Wisconsin Ave, NW Washington, DC 20007

Contact: Dale Stewart (Principal) David Cheney (Project Manager)

Dean Hutchinson Bill Young Phone: 202-466-6116 Email: [email protected] (Dale) [email protected] (David) [email protected] (Dean) [email protected] (Bill)

Landscape Architect: Oculus

2410 17th Street, Suite 201, NW Washington, DC 20009 Contact: Don Hoover (Principal) Phone: 202-588-5454 Email: [email protected]

MEP Engineer: Allen & Shariff Engineering

7061 Deepage Drive, Columbia, MD 21045 Contact: Dwayne S. Smith (Project Engineer) Phone: 410-381-7100 Email: [email protected]

Structural Engineer: ReStl Designers, Inc

1001 Connecticut Ave., NW, Suite 320, Washington, DC 20036 Contact: Al Jaber (Principal) Gary Frank (Project Engineer) Phone: 202-452-1103 Email: [email protected] [email protected]

Civil Engineer: A. Morton Thomas and Associates, Inc (AMT)

12750 Twinbrook Parkway, Rockville, MD 20852 Contact: James A. Taylor (Associate) William L. Gilbert (Project Manager) Phone: 301-881-2545 Email: [email protected] [email protected]

Lighting Design: MCLA: Architectural Lighting Design

1623 Wisconsin Avenue, Third Floor, Washington, DC 20007 Contact: Maureen Moran (Principal) Frank Feist (Designer) Phone: 202-298-8062 Email: [email protected]

Page 8: Table of Contents Division Section Title

Mt. Pleasant Library 01100-3 20 Feburary 2009 CORE Group, P.C. SUMMARY OF WORK

Specs: GENIS Design, P.C. 2320 20th

Contact: Tom Genis Street NW, Washington, DC 20009-1412

Phone: 202-674-5265 Email: [email protected]

1.4 WORK BY OWNER

A. General: Cooperate fully with Owner so work may be carried out smoothly, without interfering with or delaying work under this Contract or work by Owner. Coordinate the Work of this Contract with work performed by Owner.

B. Preceding Work: Owner will perform the following construction operations at Project site. Those operations are scheduled to be substantially complete before work under this Contract begins.

1.5 PURCHASE CONTRACTS

A. General: Owner has negotiated purchase contracts with suppliers of material and equipment to be incorporated into the Work. Owner will assign these purchase contracts to Contractor. Include costs for purchasing, receiving, handling, storage if required, and installation of material and equipment in the Contract Sum, unless otherwise noted.

1. Contractor's responsibilities are same as if Contractor had negotiated purchase contracts, including responsibility to renegotiate purchase and to execute final purchasing agreements.

1.6 CONTRACTOR-FURNISHED, OWNER-INSTALLED PRODUCTS

A. Contractor shall furnish products indicated. The Work includes unloading, handling, storing, and protecting Contractor-furnished products as directed and turning over to Owner at Project closeout.

1.7 ACCESS TO SITE

A. General: Contractor shall have full use of Project site for construction operations during construction period. Contractor's use of Project site is limited only by Owner's right to perform work or to retain other contractors on portions of Project.

B. Use of Site: Limit use of Project site to areas within the Contract limits indicated. Do not disturb portions of Project site beyond areas in which the Work is indicated.

1. Limits: Confine construction operations to property limits.

Page 9: Table of Contents Division Section Title

Mt. Pleasant Library 01100-4 20 Feburary 2009 CORE Group, P.C. SUMMARY OF WORK

1.8 SPECIFICATION AND DRAWING CONVENTIONS

A. Specification Content: The Specifications use certain conventions for the style of language and the intended meaning of certain terms, words, and phrases when used in particular situations. These conventions are as follows:

1. Imperative mood and streamlined language are generally used in the Specifications. The words "shall," "shall be," or "shall comply with," depending on the context, are implied where a colon (:) is used within a sentence or phrase.

2. Specification requirements are to be performed by Contractor unless specifically stated otherwise.

B. Division 1 General Requirements: Requirements of Sections in Division 1 apply to the Work of all Sections in the Specifications.

C. Drawing Coordination: Requirements for materials and products identified on the Drawings are described in detail in the Specifications. One or more of the following are used on the Drawings to identify materials and products:

1. Terminology: Materials and products are identified by the typical generic terms used in the individual Specifications Sections.

2. Abbreviations: Materials and products are identified by abbreviations published as both part of the U.S. National CAD Standard and scheduled on Drawings.

PART 2 - PRODUCTS (Not Used)

PART 3 - EXECUTION (Not Used)

END OF SECTION 01100

Page 10: Table of Contents Division Section Title

Mt. Pleasant Library 01230-1 20 Feburary 2009 CORE Group, P.C. ALTERNATES

SECTION 01230

PART 1 - GENERAL

ALTERNATES

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification Sections, apply to this Section.

1.2 SUMMARY

A. Section includes administrative and procedural requirements for alternates.

1.3 DEFINITIONS

A. Alternate: An amount proposed by bidders and stated on the Bid Form for certain work defined in the Bidding Requirements that may be added to or deducted from the base bid amount if Owner decides to accept a corresponding change either in the amount of construction to be completed or in the products, materials, equipment, systems, or installation methods described in the Contract Documents.

1. Alternates described in this Section are part of the Work only if enumerated in the Agreement.

2. The cost or credit for each alternate is the net addition to or deduction from the Contract Sum to incorporate alternate into the Work. No other adjustments are made to the Contract Sum.

1.4 PROCEDURES

A. Coordination: Modify or adjust affected adjacent work as necessary to completely integrate work of the alternate into Project.

1. Include as part of each alternate, miscellaneous devices, accessory objects, and similar items incidental to or required for a complete installation whether or not indicated as part of alternate.

B. Notification: Immediately following award of the Contract, notify each party involved, in writing, of the status of each alternate. Indicate if alternates have been accepted, rejected, or deferred for later consideration. Include a complete description of negotiated modifications to alternates.

C. Execute accepted alternates under the same conditions as other work of the Contract.

Page 11: Table of Contents Division Section Title

Mt. Pleasant Library 01230-2 20 Feburary 2009 CORE Group, P.C. ALTERNATES

D. Schedule: A schedule of alternates is included at the end of this Section. Specification Sections referenced in schedule contain requirements for materials necessary to achieve the work described under each alternate.

PART 2 - PRODUCTS (Not Used)

PART 3 - EXECUTION

3.1 SCHEDULE OF ALTERNATES

A. See Finish Schedules

END OF SECTION 01230

Page 12: Table of Contents Division Section Title

Mt. Pleasant Library 01250-1 20 Feburary 2009 CORE Group, P.C. CONTRACT MODIFICATION PROCEDURES

SECTION 01250

PART 1 - GENERAL

CONTRACT MODIFICATION PROCEDURES

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General Conditions to Construction Contract and other Division 1 Specification Sections, apply to this Section.

1.2 SUMMARY

A. Section includes administrative and procedural requirements for handling and processing Contract modifications.

B. Related Sections:

1. Division 1 Section "Product Requirements" for administrative procedures for handling requests for substitutions made after Contract award.

1.3 MINOR CHANGES IN THE WORK

A. Architect will issue, in a bulletin, supplemental instructions authorizing minor changes in the Work, not involving adjustment to the Contract Sum or the Contract Time, form included in the Project Manual.

1.4 PROPOSAL REQUESTS

A. Owner-Initiated Proposal Requests: Architect will issue a detailed description of proposed changes in the Work that may require adjustment to the Contract Sum or the Contract Time. If necessary, the description will include supplemental or revised Drawings and Specifications.

1. Proposal Requests in a bulletin issued by Architect are not instructions either to stop work in progress or to execute the proposed change.

2. Within time specified in Proposal Request after receipt of Proposal Request, submit a quotation estimating cost adjustments to the Contract Sum and the Contract Time necessary to execute the change.

a. Include a list of quantities of products required or eliminated and unit costs, with total amount of purchases and credits to be made. If requested, furnish survey data to substantiate quantities.

b. Indicate applicable taxes, delivery charges, equipment rental, and amounts of trade discounts.

c. Include costs of labor and supervision directly attributable to the change.

Page 13: Table of Contents Division Section Title

Mt. Pleasant Library 01250-2 20 Feburary 2009 CORE Group, P.C. CONTRACT MODIFICATION PROCEDURES

d. Include an updated Contractor's construction schedule that indicates the effect of the change, including, but not limited to, changes in activity duration, start and finish times, and activity relationship. Use available total float before requesting an extension of the Contract Time.

B. Contractor-Initiated Proposals: If latent or changed conditions require modifications to the Contract, Contractor may initiate a claim by submitting a request for a change to Architect.

1. Include a statement outlining reasons for the change and the effect of the change on the Work. Provide a complete description of the proposed change. Indicate the effect of the proposed change on the Contract Sum and the Contract Time.

2. Include a list of quantities of products required or eliminated and unit costs, with total amount of purchases and credits to be made. If requested, furnish survey data to substantiate quantities.

3. Indicate applicable taxes, delivery charges, equipment rental, and amounts of trade discounts.

4. Include costs of labor and supervision directly attributable to the change. 5. Include an updated Contractor's construction schedule that indicates the effect of the

change, including, but not limited to, changes in activity duration, start and finish times, and activity relationship. Use available total float before requesting an extension of the Contract Time.

6. Comply with requirements in Division 1 Section "Substitution Procedures" if the proposed change requires substitution of one product or system for product or system specified.

7. Proposal Request Form: Use form acceptable to Architect.

1.5 ADMINISTRATIVE CHANGE ORDERS

A. Allowance Adjustment: Refer to Division 1 Section "Allowances" for administrative procedures for preparation of Change Order Proposal for adjusting the Contract Sum to reflect actual costs of allowances.

B. Unit Price Adjustment: Refer to Division 1 Section "Unit Prices" for administrative procedures for preparation of Change Order Proposal for adjusting the Contract Sum to reflect measured scope of unit price work.

1.6 CHANGE ORDER PROCEDURES

A. On Owner's approval of a Proposal Request, Architect will issue a Change Order for signatures of Owner and Contractor on AIA Document G701.

1.7 CONSTRUCTION CHANGE DIRECTIVE

A. Construction Change Directive: Architect may issue a Construction Change Directive on AIA Document G714. Construction Change Directive instructs Contractor to proceed with a change in the Work, for subsequent inclusion in a Change Order.

Page 14: Table of Contents Division Section Title

Mt. Pleasant Library 01250-3 20 Feburary 2009 CORE Group, P.C. CONTRACT MODIFICATION PROCEDURES

1. Construction Change Directive contains a complete description of change in the Work. It also designates method to be followed to determine change in the Contract Sum or the Contract Time.

B. Documentation: Maintain detailed records on a time and material basis of work required by the Construction Change Directive.

1. After completion of change, submit an itemized account and supporting data necessary to substantiate cost and time adjustments to the Contract.

PART 2 - PRODUCTS (Not Used)

PART 3 - EXECUTION (Not Used)

END OF SECTION 01250

Page 15: Table of Contents Division Section Title

Mt. Pleasant Library 01270-1 20 Feburary 2009 CORE Group, P.C. UNIT PRICES

SECTION 01270

UNIT PRICES

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification Sections, apply to this Section.

1.2 SUMMARY

A. Section includes administrative and procedural requirements for unit prices.

B. Related Sections:

1. Division 1 Section "Contract Modification Procedures" for procedures for submitting and handling Change Orders.

2. Division 1 Section "Quality Requirements" for general testing and inspecting requirements.

1.3 DEFINITIONS

A. Unit price is an amount incorporated in the Agreement, applicable during the duration of the Work as a price per unit of measurement for materials, equipment, or services, or a portion of the Work, added to or deducted from the Contract Sum by appropriate modification, if the scope of Work or estimated quantities of Work required by the Contract Documents are increased or decreased.

1.4 PROCEDURES

A. Unit prices include all necessary material, plus cost for delivery, installation, insurance, applicable taxes, overhead, and profit.

B. Measurement and Payment: Refer to individual Specification Sections for work that requires establishment of unit prices. Methods of measurement and payment for unit prices are specified in those Sections.

C. Owner reserves the right to reject Contractor's measurement of work-in-place that involves use of established unit prices and to have this work measured, at Owner's expense, by an independent surveyor acceptable to Contractor.

Page 16: Table of Contents Division Section Title

Mt. Pleasant Library 01270-2 20 Feburary 2009 CORE Group, P.C. UNIT PRICES

D. List of Unit Prices: A schedule of unit prices is included in Part 3. Specification Sections referenced in the schedule contain requirements for materials described under each unit price.

PART 2 - PRODUCTS (Not Used)

PART 3 - EXECUTION

3.1 SCHEDULE OF UNIT PRICES

END OF SECTION 01270

Page 17: Table of Contents Division Section Title

Mt. Pleasant Library 01290-1 20 Feburary 2009 CORE Group, P.C. PAYMENT PROCEDURES

SECTION 01290

PART 1 - GENERAL

PAYMENT PROCEDURES

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General Conditions to Construction Contract and other Division 1 Specification Sections, apply to this Section.

1.2 SUMMARY

A. This Section specifies administrative and procedural requirements necessary to prepare and process Applications for Payment.

B. Related Sections:

1. Division 1 Section "Allowances" for procedural requirements governing the handling and processing of allowances.

2. Division 1 Section "Contract Modification Procedures" for administrative procedures for handling changes to the Contract.

3. Division 1 Section "Unit Prices" for administrative requirements governing the use of unit prices.

4. Division 1 Section "Construction Progress Documentation" for administrative requirements governing the preparation and submittal of Contractor's construction schedule.

5. Division 1 Section "Submittal Procedures" for administrative requirements governing the preparation and submittal of submittal schedule.

6. Division 1 Section "LEED Requirements" for administrative requirements governing submittal of cost breakdown information required for LEED documentation.

1.3 DEFINITIONS

A. Schedule of Values: A statement furnished by Contractor allocating portions of the Contract Sum to various portions of the Work and used as the basis for reviewing Contractor's Applications for Payment.

1.4 SCHEDULE OF VALUES

A. Coordination: Coordinate preparation of the schedule of values with preparation of Contractor's construction schedule.

1. Correlate line items in the schedule of values with other required administrative forms and schedules, including the following:

Page 18: Table of Contents Division Section Title

Mt. Pleasant Library 01290-2 20 Feburary 2009 CORE Group, P.C. PAYMENT PROCEDURES

a. Application for Payment forms with continuation sheets. b. Submittal schedule. c. Items required to be indicated as separate activities in Contractor's construction

schedule.

2. Submit the schedule of values to Architect at earliest possible date but no later than [seven] days before the date scheduled for submittal of initial Applications for Payment.

3. Subschedules for Phased Work: Where the Work is separated into phases requiring separately phased payments, provide subschedules showing values correlated with each phase of payment.

4. Subschedules for Separate Elements of Work: Where the Contractor's construction schedule defines separate elements of the Work, provide subschedules showing values correlated with each element.

B. Format and Content: Use the Project Manual table of contents as a guide to establish line items for the schedule of values. Provide at least one line item for each Specification Section.

1. Identification: Include the following Project identification on the schedule of values:

a. Project name and location. b. Name of Architect. c. Architect's project number. d. Contractor's name and address. e. Date of submittal.

2. Arrange schedule of values consistent with format of AIA Document G703. 3. Arrange the schedule of values in tabular form with separate columns to indicate the

following for each item listed:

a. Related Specification Section or Division. b. Description of the Work. c. Name of subcontractor. d. Name of manufacturer or fabricator. e. Name of supplier. f. Change Orders (numbers) that affect value. g. Dollar value of the following, as a percentage of the Contract Sum to nearest one-

hundredth percent, adjusted to total 100 percent.

1) Labor. 2) Materials. 3) Equipment.

4. Provide a breakdown of the Contract Sum in enough detail to facilitate continued evaluation of Applications for Payment and progress reports. Coordinate with the Project Manual table of contents. Provide multiple line items for principal subcontract amounts in excess of [five] percent of Contract Sum.

5. Round amounts to nearest whole dollar; total shall equal the Contract Sum. 6. Provide a separate line item in the schedule of values for each part of the Work where

Applications for Payment may include materials or equipment purchased or fabricated and stored, but not yet installed.

Page 19: Table of Contents Division Section Title

Mt. Pleasant Library 01290-3 20 Feburary 2009 CORE Group, P.C. PAYMENT PROCEDURES

a. Differentiate between items stored on-site and items stored off-site. If required, include evidence of insurance.

7. Provide separate line items in the schedule of values for initial cost of materials, for each subsequent stage of completion, and for total installed value of that part of the Work.

8. Allowances: Provide a separate line item in the schedule of values for each allowance. Show line-item value of unit-cost allowances, as a product of the unit cost, multiplied by measured quantity. Use information indicated in the Contract Documents to determine quantities.

9. Purchase Contracts: Provide a separate line item in the schedule of values for each purchase contract. Show line-item value of purchase contract. Indicate owner payments or deposits, if any, and balance to be paid by Contractor.

10. Each item in the schedule of values and Applications for Payment shall be complete. Include total cost and proportionate share of general overhead and profit for each item.

a. Temporary facilities and other major cost items that are not direct cost of actual work-in-place may be shown either as separate line items in the schedule of values or distributed as general overhead expense, at Contractor's option.

11. Schedule Updating: Update and resubmit the schedule of values before the next Applications for Payment when Change Orders or Construction Change Directives result in a change in the Contract Sum.

1.5 APPLICATIONS FOR PAYMENT

A. Each Application for Payment shall be consistent with previous applications and payments as certified by Architect and paid for by Owner.

1. Initial Application for Payment, Application for Payment at time of Substantial Completion, and final Application for Payment involve additional requirements.

B. Payment Application Times: The date for each progress payment is indicated in the Agreement between Owner and Contractor. The period of construction work covered by each Application for Payment is the period indicated in the Agreement.

C. Payment Application Times: Progress payments shall be submitted to Architect by the first day of the month. The period covered by each Application for Payment is one month, ending on the last day of the month.

1. Submit draft copy of Application for Payment seven days prior to due date for review by Architect.

D. Application for Payment Forms: Use AIA Document G702 and AIA Document G703 Retain one of first two paragraphs below if a standard industry form is not used.

E. Application Preparation: Complete every entry on form. Notarize and execute by a person authorized to sign legal documents on behalf of Contractor. Architect will return incomplete applications without action.

Page 20: Table of Contents Division Section Title

Mt. Pleasant Library 01290-4 20 Feburary 2009 CORE Group, P.C. PAYMENT PROCEDURES

1. Entries shall match data on the schedule of values and Contractor's construction schedule. Use updated schedules if revisions were made.

2. Include amounts for work completed following previous Application for Payment, whether or not payment has been received. Include only amounts for work completed at time of Application for Payment.

3. Include amounts of Change Orders and Construction Change Directives issued before last day of construction period covered by application.

4. Indicate separate amounts for work being carried out under Owner-requested project acceleration.

F. Stored Materials: Include in Application for Payment amounts applied for materials or equipment purchased or fabricated and stored, but not yet installed. Differentiate between items stored on-site and items stored off-site.

1. Provide certificate of insurance, evidence of transfer of title to Owner, and consent of surety to payment, for stored materials.

2. Provide supporting documentation that verifies amount requested, such as paid invoices. Match amount requested with amounts indicated on documentation; do not include overhead and profit on stored materials.

3. Provide summary documentation for stored materials indicating the following:

a. Materials previously stored and included in previous Applications for Payment. b. Work completed for this Application utilizing previously stored materials. c. Additional materials stored with this Application. d. Total materials remaining stored, including materials with this Application.

G. Transmittal: Submit three signed and notarized original copies of each Application for Payment to Architect by a method ensuring receipt within 24 hours. One copy shall include waivers of lien and similar attachments if required.

1. Transmit each copy with a transmittal form listing attachments and recording appropriate information about application.

H. Waivers of Mechanic's Lien: With each Application for Payment, submit waivers of mechanic's lien from entities lawfully entitled to file a mechanic's lien arising out of the Contract and related to the Work covered by the payment.

1. Submit partial waivers on each item for amount requested in previous application, after deduction for retainage, on each item.

2. When an application shows completion of an item, submit conditional final or full waivers.

3. Owner reserves the right to designate which entities involved in the Work must submit waivers.

4. Waiver Forms: Submit waivers of lien on forms, executed in a manner acceptable to Owner.

I. Waivers of Mechanic's Lien: With each Application for Payment, submit waivers of mechanic's liens from subcontractors, sub-subcontractors, and suppliers for construction period covered by the previous application.

Page 21: Table of Contents Division Section Title

Mt. Pleasant Library 01290-5 20 Feburary 2009 CORE Group, P.C. PAYMENT PROCEDURES

1. Submit partial waivers on each item for amount requested in previous application, after deduction for retainage, on each item.

2. When an application shows completion of an item, submit conditional final or full waivers.

3. Owner reserves the right to designate which entities involved in the Work must submit waivers.

4. Submit final Application for Payment with or preceded by conditional final waivers from every entity involved with performance of the Work covered by the application who is lawfully entitled to a lien.

5. Waiver Forms: Submit waivers of lien on forms, executed in a manner acceptable to Owner.

J. Initial Application for Payment: Administrative actions and submittals that must precede or coincide with submittal of first Application for Payment include the following:

1. List of subcontractors. 2. Schedule of values. 3. Contractor's construction schedule (preliminary if not final). 4. Combined Contractor's construction schedule (preliminary if not final) incorporating

Work of multiple contracts, with indication of acceptance of schedule by each Contractor. 5. Products list (preliminary if not final). 6. Schedule of unit prices. 7. Submittal schedule (preliminary if not final). 8. List of Contractor's staff assignments. 9. List of Contractor's principal consultants. 10. Copies of building permits. 11. Copies of authorizations and licenses from authorities having jurisdiction for

performance of the Work. 12. Initial progress report. 13. Report of preconstruction conference. 14. Certificates of insurance and insurance policies. 15. Performance and payment bonds. 16. Data needed to acquire Owner's insurance.

K. Application for Payment at Substantial Completion: After issuing the Certificate of Substantial Completion, submit an Application for Payment showing 100 percent completion for portion of the Work claimed as substantially complete.

1. Include documentation supporting claim that the Work is substantially complete and a statement showing an accounting of changes to the Contract Sum.

2. This application shall reflect Certificates of Partial Substantial Completion issued previously for Owner occupancy of designated portions of the Work.

L. Final Payment Application: Submit final Application for Payment with releases and supporting documentation not previously submitted and accepted, including, but not limited, to the following:

1. Evidence of completion of Project closeout requirements. 2. Insurance certificates for products and completed operations where required and proof

that taxes, fees, and similar obligations were paid. 3. Updated final statement, accounting for final changes to the Contract Sum.

Page 22: Table of Contents Division Section Title

Mt. Pleasant Library 01290-6 20 Feburary 2009 CORE Group, P.C. PAYMENT PROCEDURES

4. AIA Document G706, "Contractor's Affidavit of Payment of Debts and Claims." 5. AIA Document G706A, "Contractor's Affidavit of Release of Liens." 6. AIA Document G707, "Consent of Surety to Final Payment." 7. Evidence that claims have been settled. 8. Final meter readings for utilities, a measured record of stored fuel, and similar data as of

date of Substantial Completion or when Owner took possession of and assumed responsibility for corresponding elements of the Work.

9. Final liquidated damages settlement statement.

PART 2 - PRODUCTS (Not Used)

PART 3 - EXECUTION (Not Used)

END OF SECTION 01290

Page 23: Table of Contents Division Section Title

Mt. Pleasant Library 01310-1 20 Feburary 2009 CORE Group, P.C. PROJECT MANAGEMENT AND COORDINATION

SECTION 01310

PART 1 - GENERAL

PROJECT MANAGEMENT AND COORDINATION

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General Conditions to Construction Contract and other Division 1 Specification Sections, apply to this Section.

1.2 SUMMARY

A. Section includes administrative provisions for coordinating construction operations on Project including, but not limited to, the following:

1. General project coordination procedures. 2. Administrative and supervisory personnel. 3. Coordination drawings. 4. Requests for Information (RFIs). 5. Project Web site. 6. Project meetings.

B. Each contractor shall participate in coordination requirements. Certain areas of responsibility are assigned to a specific contractor.

C. Related Sections:

1. Division 1 Section "Summary of Multiple Contracts" for a description of the division of work among separate contracts and responsibility for coordination activities not in this Section.

2. Division 1 Section "Construction Progress Documentation" for preparing and submitting Contractor's construction schedule.

3. Division 1 Section "Execution Requirements" for procedures for coordinating general installation and field-engineering services, including establishment of benchmarks and control points.

4. Division 1 Section "Closeout Procedures" for coordinating closeout of the Contract. 5. Division 1 Section "General Commissioning Requirements" for coordinating the Work

with Owner's commissioning authority.

1.3 DEFINITIONS

A. RFI: Request from Owner, Architect, or Contractor seeking information from each other during construction.

Page 24: Table of Contents Division Section Title

Mt. Pleasant Library 01310-2 20 Feburary 2009 CORE Group, P.C. PROJECT MANAGEMENT AND COORDINATION

1.4 COORDINATION

A. Coordination: Coordinate construction operations included in different Sections of the Specifications to ensure efficient and orderly installation of each part of the Work. Coordinate construction operations, included in different Sections, that depend on each other for proper installation, connection, and operation.

1. Schedule construction operations in sequence required to obtain the best results where installation of one part of the Work depends on installation of other components, before or after its own installation.

2. Coordinate installation of different components to ensure maximum performance and accessibility for required maintenance, service, and repair.

3. Make adequate provisions to accommodate items scheduled for later installation.

B. Coordination: Each contractor shall coordinate its construction operations with those of other contractors and entities to ensure efficient and orderly installation of each part of the Work. Each contractor shall coordinate its operations with operations, included in different Sections, that depend on each other for proper installation, connection, and operation.

1. Schedule construction operations in sequence required to obtain the best results where installation of one part of the Work depends on installation of other components, before or after its own installation.

2. Coordinate installation of different components with other contractors to ensure maximum performance and accessibility for required maintenance, service, and repair.

3. Make adequate provisions to accommodate items scheduled for later installation.

C. Prepare memoranda for distribution to each party involved, outlining special procedures required for coordination. Include such items as required notices, reports, and list of attendees at meetings.

1. Prepare similar memoranda for Owner and separate contractors if coordination of their Work is required.

D. Administrative Procedures: Coordinate scheduling and timing of required administrative procedures with other construction activities [and activities of other contractors] to avoid conflicts and to ensure orderly progress of the Work. Such administrative activities include, but are not limited to, the following:

1. Preparation of Contractor's construction schedule. 2. Preparation of the schedule of values. 3. Installation and removal of temporary facilities and controls. 4. Delivery and processing of submittals. 5. Progress meetings. 6. Preinstallation conferences. 7. Project closeout activities. 8. Startup and adjustment of systems. 9. Project closeout activities.

E. Conservation: Coordinate construction activities to ensure that operations are carried out with consideration given to conservation of energy, water, and materials. Coordinate use of temporary utilities to minimize waste.

Page 25: Table of Contents Division Section Title

Mt. Pleasant Library 01310-3 20 Feburary 2009 CORE Group, P.C. PROJECT MANAGEMENT AND COORDINATION

1. Salvage materials and equipment involved in performance of, but not actually incorporated into, the Work. Refer to other Sections for disposition of salvaged materials that are designated as Owner's property.

1.5 KEY PERSONNEL

A. Key Personnel Names: Within [15] days of starting construction operations, submit a list of key personnel assignments, including superintendent and other personnel in attendance at Project site. Identify individuals and their duties and responsibilities; list addresses and telephone numbers, including home, office, and cellular telephone numbers and email addresses. Provide names, addresses, and telephone numbers of individuals assigned as standbys in the absence of individuals assigned to Project.

1. Post copies of list in project meeting room, in temporary field office, and by each temporary telephone. Keep list current at all times.

1.6 REQUESTS FOR INFORMATION (RFIs)

A. General: Immediately on discovery of the need for additional information or interpretation of the Contract Documents, Contractor shall prepare and submit an RFI in the form specified.

1. Architect will return RFIs submitted to Architect by other entities controlled by Contractor with no response.

2. Coordinate and submit RFIs in a prompt manner so as to avoid delays in Contractor's work or work of subcontractors.

B. Content of the RFI: Include a detailed, legible description of item needing information or interpretation and the following:

1. Project name. 2. Project number. 3. Date. 4. Name of Contractor. 5. Name of Architect. 6. RFI number, numbered sequentially. 7. RFI subject. 8. Specification Section number and title and related paragraphs, as appropriate. 9. Drawing number and detail references, as appropriate. 10. Field dimensions and conditions, as appropriate. 11. Contractor's suggested resolution. If Contractor's solution(s) impacts the Contract Time

or the Contract Sum, Contractor shall state impact in the RFI. 12. Contractor's signature. 13. Attachments: Include sketches, descriptions, measurements, photos, Product Data, Shop

Drawings, coordination drawings, and other information necessary to fully describe items needing interpretation.

a. Include dimensions, thicknesses, structural grid references, and details of affected materials, assemblies, and attachments on attached sketches.

Page 26: Table of Contents Division Section Title

Mt. Pleasant Library 01310-4 20 Feburary 2009 CORE Group, P.C. PROJECT MANAGEMENT AND COORDINATION

C. RFI Forms: AIA Document G716 (Software-generated form with substantially the same content as indicated above, acceptable to Architect).

D. Architect's Action: Architect will review each RFI, determine action required, and respond. Allow seven working days for Architect's response for each RFI. RFIs received by Architect after 1:00 p.m. will be considered as received the following working day.

1. The following RFIs will be returned without action:

a. Requests for approval of submittals. b. Requests for approval of substitutions. c. Requests for coordination information already indicated in the Contract

Documents. d. Requests for adjustments in the Contract Time or the Contract Sum. e. Requests for interpretation of Architect's actions on submittals. f. Incomplete RFIs or inaccurately prepared RFIs.

2. Architect's action may include a request for additional information, in which case Architect's time for response will date from time of receipt of additional information.

3. Architect's action on RFIs that may result in a change to the Contract Time or the Contract Sum may be eligible for Contractor to submit Change Proposal according to Division 1 Section "Contract Modification Procedures."

a. If Contractor believes the RFI response warrants change in the Contract Time or the Contract Sum, notify Architect in writing within [10] days of receipt of the RFI response.

E. On receipt of Architect's action, update the RFI log and immediately distribute the RFI response to affected parties. Review response and notify Architect within [seven] days if Contractor disagrees with response.

F. RFI Log: Prepare, maintain, and submit a tabular log of RFIs organized by the RFI number. Submit log biweekly. Use CSI Log Form 13.2B. or Software log with not less than the following:

1. Project name. 2. Name and address of Contractor. 3. Name and address of Architect. 4. RFI number including RFIs that were dropped and not submitted. 5. RFI description. 6. Date the RFI was submitted. 7. Date Architect's response was received. 8. Identification of related Minor Change in the Work, Construction Change Directive, and

Proposal Request, as appropriate. 9. Identification of related Field Order, Work Change Directive, and Proposal Request, as

appropriate.

Page 27: Table of Contents Division Section Title

Mt. Pleasant Library 01310-5 20 Feburary 2009 CORE Group, P.C. PROJECT MANAGEMENT AND COORDINATION

1.7 PROJECT MEETINGS

A. General: Schedule and conduct meetings and conferences at Project site, unless otherwise indicated.

1. Attendees: Inform participants and others involved, and individuals whose presence is required, of date and time of each meeting. Notify Owner and Architect of scheduled meeting dates and times.

2. Agenda: Prepare the meeting agenda. Distribute the agenda to all invited attendees. 3. Minutes: Entity responsible for conducting meeting will record significant discussions

and agreements achieved. Distribute the meeting minutes to everyone concerned, including Owner and Architect, within [three] days of the meeting.

B. Preconstruction Conference: Architect will schedule and conduct. Schedule and conduct a preconstruction conference before starting construction, at a time convenient to Owner and Architect, but no later than 15 days after execution of the Agreement.

1. Conduct the conference to review responsibilities and personnel assignments. 2. Attendees: Authorized representatives of Owner, Architect, and their consultants;

Contractor and its superintendent; major subcontractors; suppliers; and other concerned parties shall attend the conference. Participants at the conference shall be familiar with Project and authorized to conclude matters relating to the Work.

3. Agenda: Discuss items of significance that could affect progress, including the following:

a. Tentative construction schedule. b. Phasing. c. Critical work sequencing and long-lead items. d. Designation of key personnel and their duties. e. Lines of communications. f. Procedures for processing field decisions and Change Orders. g. Procedures for RFIs. h. Procedures for testing and inspecting. i. Procedures for processing Applications for Payment. j. Distribution of the Contract Documents. k. Submittal procedures. l. Sustainable design requirements. m. Preparation of record documents. n. Use of the premises. o. Work restrictions. p. Working hours. q. Owner's occupancy requirements. r. Responsibility for temporary facilities and controls. s. Procedures for moisture and mold control. t. Procedures for disruptions and shutdowns. u. Construction waste management and recycling. v. Parking availability. w. Office, work, and storage areas. x. Equipment deliveries and priorities. y. First aid. z. Security.

Page 28: Table of Contents Division Section Title

Mt. Pleasant Library 01310-6 20 Feburary 2009 CORE Group, P.C. PROJECT MANAGEMENT AND COORDINATION

aa. Progress cleaning.

4. Minutes: Entity responsible for conducting meeting will record and distribute meeting minutes.

C. Preinstallation Conferences: Conduct a preinstallation conference at Project site before each construction activity that requires coordination with other construction.

1. Attendees: Installer and representatives of manufacturers and fabricators involved in or affected by the installation and its coordination or integration with other materials and installations that have preceded or will follow, shall attend the meeting. Advise Architect of scheduled meeting dates.

2. Agenda: Review progress of other construction activities and preparations for the particular activity under consideration, including requirements for the following:

a. Contract Documents. b. Options. c. Related RFIs. d. Related Change Orders. e. Purchases. f. Deliveries. g. Submittals. h. Review of mockups. i. Possible conflicts. j. Compatibility problems. k. Time schedules. l. Weather limitations. m. Manufacturer's written recommendations. n. Warranty requirements. o. Compatibility of materials. p. Acceptability of substrates. q. Temporary facilities and controls. r. Space and access limitations. s. Regulations of authorities having jurisdiction. t. Testing and inspecting requirements. u. Installation procedures. v. Coordination with other work. w. Required performance results. x. Protection of adjacent work. y. Protection of construction and personnel.

3. Record significant conference discussions, agreements, and disagreements, including required corrective measures and actions.

4. Reporting: Distribute minutes of the meeting to each party present and to other parties requiring information.

5. Do not proceed with installation if the conference cannot be successfully concluded. Initiate whatever actions are necessary to resolve impediments to performance of the Work and reconvene the conference at earliest feasible date.

Page 29: Table of Contents Division Section Title

Mt. Pleasant Library 01310-7 20 Feburary 2009 CORE Group, P.C. PROJECT MANAGEMENT AND COORDINATION

D. Project Closeout Conference: Schedule and conduct a Project closeout conference, at a time convenient to Owner and Architect, but no later than [90] days prior to the scheduled date of Substantial Completion.

1. Conduct the conference to review requirements and responsibilities related to Project closeout.

2. Attendees: Authorized representatives of Owner, Architect, and their consultants; Contractor and its superintendent; major subcontractors; suppliers; and other concerned parties shall attend the meeting. Participants at the meeting shall be familiar with Project and authorized to conclude matters relating to the Work.

3. Agenda: Discuss items of significance that could affect or delay Project closeout, including the following:

a. Preparation of record documents. b. Procedures required prior to inspection for Substantial Completion and for final

inspection for acceptance. c. Submittal of written warranties. d. Requirements for preparing sustainable design documentation. e. Requirements for preparing operations and maintenance data. f. Requirements for demonstration and training. g. Preparation of Contractor's punch list. h. Procedures for processing Applications for Payment at Substantial Completion and

for final payment. i. Submittal procedures. j. Coordination of separate contracts. k. Owner's partial occupancy requirements. l. Installation of Owner's furniture, fixtures, and equipment. m. Responsibility for removing temporary facilities and controls.

4. Minutes: Entity conducting meeting will record and distribute meeting minutes.

E. Progress Meetings: Conduct progress meetings at biweekly intervals.

1. Coordinate dates of meetings with preparation of payment requests. 2. Attendees: In addition to representatives of Owner and Architect, each contractor,

subcontractor, supplier, and other entity concerned with current progress or involved in planning, coordination, or performance of future activities shall be represented at these meetings. All participants at the meeting shall be familiar with Project and authorized to conclude matters relating to the Work.

3. Agenda: Review and correct or approve minutes of previous progress meeting. Review other items of significance that could affect progress. Include topics for discussion as appropriate to status of Project.

a. Contractor's Construction Schedule: Review progress since the last meeting. Determine whether each activity is on time, ahead of schedule, or behind schedule, in relation to Contractor's construction schedule. Determine how construction behind schedule will be expedited; secure commitments from parties involved to do so. Discuss whether schedule revisions are required to ensure that current and subsequent activities will be completed within the Contract Time.

1) Review schedule for next period.

Page 30: Table of Contents Division Section Title

Mt. Pleasant Library 01310-8 20 Feburary 2009 CORE Group, P.C. PROJECT MANAGEMENT AND COORDINATION

b. Review present and future needs of each entity present, including the following:

1) Interface requirements. 2) Sequence of operations. 3) Status of submittals. 4) Deliveries. 5) Off-site fabrication. 6) Access. 7) Site utilization. 8) Temporary facilities and controls. 9) Progress cleaning. 10) Quality and work standards. 11) Status of correction of deficient items. 12) Field observations. 13) Status of RFIs. 14) Status of proposal requests. 15) Pending changes. 16) Status of Change Orders. 17) Pending claims and disputes. 18) Documentation of information for payment requests.

4. Minutes: Entity responsible for conducting the meeting will record and distribute the meeting minutes to each party present and to parties requiring information.

a. Schedule Updating: Revise Contractor's construction schedule after each progress meeting where revisions to the schedule have been made or recognized. Issue revised schedule concurrently with the report of each meeting.

PART 2 - PRODUCTS (Not Used)

PART 3 - EXECUTION (Not Used)

END OF SECTION 01310

Page 31: Table of Contents Division Section Title

Mt. Pleasant Library 01320-1 20 Feburary 2009 CORE Group, P.C. CONSTRUCTION PROGRESS DOCUMENTATION

SECTION 01320

PART 1 - GENERAL

CONSTRUCTION PROGRESS DOCUMENTATION

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General Conditions to Construction Contract and other Division 1 Specification Sections, apply to this Section.

1.2 SUMMARY

A. Section includes administrative and procedural requirements for documenting the progress of construction during performance of the Work, including the following:

1. Start-up construction schedule. 2. Contractor's construction schedule. 3. Daily construction reports. 4. Material location reports. 5. Field condition reports. 6. Special reports.

B. Related Sections:

1. Division 1 Section "Summary of Multiple Contracts" for preparing a combined Contractor's Construction Schedule.

2. Division 1 Section "Submittal Procedures" for submitting schedules and reports. 3. Division 1 Section "Quality Requirements" for submitting a schedule of tests and

inspections.

1.3 DEFINITIONS

A. Activity: A discrete part of a project that can be identified for planning, scheduling, monitoring, and controlling the construction project. Activities included in a construction schedule consume time and resources.

1. Critical Activity: An activity on the critical path that must start and finish on the planned early start and finish times.

2. Predecessor Activity: An activity that precedes another activity in the network. 3. Successor Activity: An activity that follows another activity in the network.

B. Cost Loading: The allocation of the schedule of values for the completion of an activity as scheduled. The sum of costs for all activities must equal the total Contract Sum, unless otherwise approved by Architect.

Page 32: Table of Contents Division Section Title

Mt. Pleasant Library 01320-2 20 Feburary 2009 CORE Group, P.C. CONSTRUCTION PROGRESS DOCUMENTATION

C. CPM: Critical path method, which is a method of planning and scheduling a construction project where activities are arranged based on activity relationships. Network calculations determine when activities can be performed and the critical path of the Project.

D. Critical Path: The longest connected chain of interdependent activities through the network schedule that establishes the minimum overall Project duration and contains no float.

E. Event: The starting or ending point of an activity.

F. Float: The measure of leeway in starting and completing an activity.

1. Float time is not for the exclusive use or benefit of either Owner or Contractor, but is a jointly owned, expiring Project resource available to both parties as needed to meet schedule milestones and Contract completion date.

2. Free float is the amount of time an activity can be delayed without adversely affecting the early start of the successor activity.

3. Total float is the measure of leeway in starting or completing an activity without adversely affecting the planned Project completion date.

G. Resource Loading: The allocation of manpower and equipment necessary for the completion of an activity as scheduled.

1.4 INFORMATIONAL SUBMITTALS

A. Format for Submittals: Submit required submittals in the following format:

1. PDF electronic file. 2. Three paper copies.

B. Start-up construction schedule.

1. Approval of cost-loaded start-up construction schedule will not constitute approval of schedule of values for cost-loaded activities.

C. Start-up Network Diagram: Of size required to display entire network for entire construction period. Show logic ties for activities.

D. Contractor's Construction Schedule: Initial schedule, of size required to display entire schedule for entire construction period.

1. Submit a working electronic copy of schedule, using software indicated, and labeled to comply with requirements for submittals. Include type of schedule (initial or updated) and date on label.

E. CPM Reports: Concurrent with CPM schedule, submit each of the following reports. Format for each activity in reports shall contain activity number, activity description, cost and resource loading, original duration, remaining duration, early start date, early finish date, late start date, late finish date, and total float in calendar days.

1. Activity Report: List of all activities sorted by activity number and then early start date, or actual start date if known.

Page 33: Table of Contents Division Section Title

Mt. Pleasant Library 01320-3 20 Feburary 2009 CORE Group, P.C. CONSTRUCTION PROGRESS DOCUMENTATION

2. Logic Report: List of preceding and succeeding activities for all activities, sorted in ascending order by activity number and then early start date, or actual start date if known.

3. Total Float Report: List of all activities sorted in ascending order of total float. 4. Earnings Report: Compilation of Contractor's total earnings from commencement of the

Work the Notice to Proceed until most recent Application for Payment.

F. Daily Construction Reports: Submit at monthly intervals.

G. Material Location Reports: Submit at monthly intervals.

H. Field Condition Reports: Submit at time of discovery of differing conditions.

I. Special Reports: Submit at time of unusual event.

J. Qualification Data: For scheduling consultant.

1.5 QUALITY ASSURANCE

A. Scheduling Consultant Qualifications: An experienced specialist in CPM scheduling and reporting, with capability of producing CPM reports and diagrams within 24 hours of Architect's request.

B. Prescheduling Conference: Conduct conference at Project site to comply with requirements in Division 1 Section "Project Management and Coordination." Review methods and procedures related to the preliminary construction schedule and Contractor's construction schedule, including, but not limited to, the following:

1. Review software limitations and content and format for reports. 2. Verify availability of qualified personnel needed to develop and update schedule. 3. Discuss constraints, including work stages and interim milestones. 4. Review time required for review of submittals and re-submittals. 5. Review requirements for tests and inspections by independent testing and inspecting

agencies. 6. Review time required for completion and startup procedures. 7. Review and finalize list of construction activities to be included in schedule. 8. Review submittal requirements and procedures. 9. Review procedures for updating schedule.

1.6 COORDINATION

A. Coordinate preparation and processing of schedules and reports with performance of construction activities and with scheduling and reporting of separate contractors.

B. Coordinate Contractor's construction schedule with the schedule of values, submittal schedule, progress reports, payment requests, and other required schedules and reports.

1. Secure time commitments for performing critical elements of the Work from entities involved.

Page 34: Table of Contents Division Section Title

Mt. Pleasant Library 01320-4 20 Feburary 2009 CORE Group, P.C. CONSTRUCTION PROGRESS DOCUMENTATION

2. Coordinate each construction activity in the network with other activities and schedule them in proper sequence.

PART 2 - PRODUCTS

2.1 CONTRACTOR'S CONSTRUCTION SCHEDULE, GENERAL

A. Time Frame: Extend schedule from date established for the Notice to Proceed to date of Final completion.

1. Contract completion date shall not be changed by submission of a schedule that shows an early completion date, unless specifically authorized by Change Order.

B. Activities: Treat each story or separate area as a separate numbered activity for each principal element of the Work. Comply with the following:

1. Activity Duration: Define activities so no activity is longer than [20] days, unless specifically allowed by Architect.

2. Procurement Activities: Include procurement process activities for the following long lead items and major items, requiring a cycle of more than 60 days, as separate activities in schedule. Procurement cycle activities include, but are not limited to, submittals, approvals, purchasing, fabrication, and delivery.

a. Contractor to provide list.

3. Submittal Review Time: Include review and resubmittal times indicated in Division 1 Section "Submittal Procedures" in schedule. Coordinate submittal review times in Contractor's construction schedule with submittal schedule.

4. Startup and Testing Time: Include not less than [15] days for startup and testing. 5. Substantial Completion: Indicate completion in advance of date established for

Substantial Completion, and allow time for Architect's administrative procedures necessary for certification of Substantial Completion.

6. Punch List and Final Completion: Include not more than [30] days for punch list and final completion.

C. Constraints: Include constraints and work restrictions indicated in the Contract Documents and as follows in schedule, and show how the sequence of the Work is affected.

1. Phasing: Arrange list of activities on schedule by phase. 2. Work under More Than One Contract: Include a separate activity for each contract. 3. Work by Owner: Include a separate activity for each portion of the Work performed by

Owner. 4. Products Ordered in Advance: Include a separate activity for each product. Include

delivery date indicated in Division 1 Section "Summary." Delivery dates indicated stipulate the earliest possible delivery date.

5. Owner-Furnished Products: Include a separate activity for each product. Include delivery date indicated in Division 1 Section "Summary." Delivery dates indicated stipulate the earliest possible delivery date.

6. Work Restrictions: Show the effect of the following items on the schedule:

Page 35: Table of Contents Division Section Title

Mt. Pleasant Library 01320-5 20 Feburary 2009 CORE Group, P.C. CONSTRUCTION PROGRESS DOCUMENTATION

a. Coordination with existing construction. b. Limitations of continued occupancies. c. Uninterruptible services. d. Partial occupancy before Substantial Completion. e. Use of premises restrictions. f. Provisions for future construction. g. Seasonal variations. h. Environmental control.

7. Work Stages: Indicate important stages of construction for each major portion of the Work, including, but not limited to, the following:

a. Subcontract awards. b. Submittals. c. Purchases. d. Mockups. e. Fabrication. f. Sample testing. g. Deliveries. h. Installation. i. Tests and inspections. j. Adjusting. k. Curing. l. Startup and placement into final use and operation.

8. Construction Areas: Identify each major area of construction for each major portion of the Work. Indicate where each construction activity within a major area must be sequenced or integrated with other construction activities to provide for the following:

a. Structural completion. b. Permanent space enclosure. c. Completion of mechanical installation. d. Completion of electrical installation. e. Substantial Completion.

D. Milestones: Include milestones indicated in the Contract Documents in schedule, including, but not limited to, the Notice to Proceed, Substantial Completion, and final completion.

E. Cost Correlation: At the head of schedule, provide a cost correlation line, indicating planned and actual costs. On the line, show dollar volume of the Work performed as of dates used for preparation of payment requests.

1. Refer to Division 1 Section "Payment Procedures" for cost reporting and payment procedures.

F. Upcoming Work Summary: Prepare summary report indicating activities scheduled to occur or commence prior to submittal of next schedule update. Summarize the following issues:

1. Unresolved issues. 2. Unanswered RFIs. 3. Rejected or unreturned submittals.

Page 36: Table of Contents Division Section Title

Mt. Pleasant Library 01320-6 20 Feburary 2009 CORE Group, P.C. CONSTRUCTION PROGRESS DOCUMENTATION

4. Notations on returned submittals.

G. Recovery Schedule: When periodic update indicates the Work is 14 or more calendar days behind the current approved schedule, submit a separate recovery schedule indicating means by which Contractor intends to regain compliance with the schedule. Indicate changes to working hours, working days, crew sizes, and equipment required to achieve compliance, and date by which recovery will be accomplished.

H. Computer Scheduling Software: Prepare schedules using current version of a program that has been developed specifically to manage construction schedules.

1. Utilize Microsoft Project Primavera or Prolog for Windows XP operating system.

2.2 START-UP CONSTRUCTION SCHEDULE

A. Bar-Chart Schedule: Submit start-up horizontal bar-chart-type construction schedule within seven days of date established for the Notice to Proceed.

B. Preparation: Indicate each significant construction activity separately. Identify first workday of each week with a continuous vertical line. Outline significant construction activities for first [90] days of construction. Include skeleton diagram for the remainder of the Work and a cash requirement prediction based on indicated activities.

2.3 CONTRACTOR'S CONSTRUCTION SCHEDULE (GANTT CHART)

A. Gantt-Chart Schedule: Submit a comprehensive, fully developed, horizontal Gantt-chart-type, Contractor's construction schedule within 30 days of date established for the Notice to Proceed. Base schedule on the start-up construction schedule and additional information received since the start of Project.

B. Preparation: Indicate each significant construction activity separately. Identify first workday of each week with a continuous vertical line.

1. For construction activities that require three months or longer to complete, indicate an estimated completion percentage in 10 percent increments within time bar.

2.4 REPORTS

A. Daily Construction Reports: Prepare a daily construction report recording the following information concerning events at Project site:

1. List of subcontractors at Project site. 2. List of separate contractors at Project site. 3. Approximate count of personnel at Project site. 4. Equipment at Project site. 5. Material deliveries. 6. High and low temperatures and general weather conditions, including presence of rain or

snow. 7. Accidents.

Page 37: Table of Contents Division Section Title

Mt. Pleasant Library 01320-7 20 Feburary 2009 CORE Group, P.C. CONSTRUCTION PROGRESS DOCUMENTATION

8. Meetings and significant decisions. 9. Unusual events (refer to special reports). 10. Stoppages, delays, shortages, and losses. 11. Meter readings and similar recordings. 12. Emergency procedures. 13. Orders and requests of authorities having jurisdiction. 14. Change Orders received and implemented. 15. [Construction] Change Directives received and implemented. 16. Services connected and disconnected. 17. Equipment or system tests and startups. 18. Partial completions and occupancies. 19. Substantial Completions authorized.

B. Material Location Reports: At [monthly] intervals, prepare and submit a comprehensive list of materials delivered to and stored at Project site. List shall be cumulative, showing materials previously reported plus items recently delivered. Include with list a statement of progress on and delivery dates for materials or items of equipment fabricated or stored away from Project site.

C. Field Condition Reports: Immediately on discovery of a difference between field conditions and the Contract Documents, prepare and submit a detailed report. Submit with a Request for Information. Include a detailed description of the differing conditions, together with recommendations for changing the Contract Documents.

2.5 SPECIAL REPORTS

A. General: Submit special reports directly to Owner within [one] day of an occurrence. Distribute copies of report to parties affected by the occurrence.

B. Reporting Unusual Events: When an event of an unusual and significant nature occurs at Project site, whether or not related directly to the Work, prepare and submit a special report. List chain of events, persons participating, response by Contractor's personnel, evaluation of results or effects, and similar pertinent information. Advise Owner in advance when these events are known or predictable.

PART 3 - EXECUTION

3.1 CONTRACTOR'S CONSTRUCTION SCHEDULE

A. Contractor's Construction Schedule Updating: At bi-weekly intervals, update schedule to reflect actual construction progress and activities. Issue schedule at each regularly scheduled progress meeting.

1. Revise schedule immediately after each meeting or other activity where revisions have been recognized or made. Issue updated schedule concurrently with the report of each such meeting.

2. Include a report with updated schedule that indicates every change, including, but not limited to, changes in logic, durations, actual starts and finishes, and activity durations.

Page 38: Table of Contents Division Section Title

Mt. Pleasant Library 01320-8 20 Feburary 2009 CORE Group, P.C. CONSTRUCTION PROGRESS DOCUMENTATION

3. As the Work progresses, indicate final completion percentage for each activity.

B. Distribution: Distribute copies of approved schedule to Architect, Owner, separate contractors, testing and inspecting agencies, and other parties identified by Contractor with a need-to-know schedule responsibility.

1. Post copies in Project meeting rooms and temporary field offices. 2. When revisions are made, distribute updated schedules to the same parties and post in the

same locations. Delete parties from distribution when they have completed their assigned portion of the Work and are no longer involved in performance of construction activities.

END OF SECTION 01320

Page 39: Table of Contents Division Section Title

Mt. Pleasant Library 01322-1 20 Feburary 2009 CORE Group, P.C. PHOTOGRAPHIC DOCUMENTATION

SECTION 01322

PART 1 - GENERAL

PHOTOGRAPHIC DOCUMENTATION

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General Conditions to Construction Contract and other Division 1 Specification Sections, apply to this Section.

1.2 SUMMARY

A. This Section includes administrative and procedural requirements for the following:

1. Preconstruction photographs. 2. Periodic construction photographs. 3. Final Completion construction photographs. 4. Preconstruction videotapes. 5. Periodic construction videotapes. 6. Time-lapse sequence construction videotapes.

B. Related Sections include the following:

1. Division 1 Section "Allowances" for requirements for photographic documentation provided under an allowance.

2. Division 1 Section "Unit Prices" for procedures for unit prices for extra photographs. 3. Division 1 Section "Submittal Procedures" for submitting photographic documentation. 4. Division 1 Section "Selective Demolition" for photographic documentation before

selective demolition operations commence. 5. Division 1 Section "Closeout Procedures" for submitting digital media as Project Record

Documents at Project closeout. 6. Division 1 Section "Demonstration and Training" for submitting videotapes of

demonstration of equipment and training of Owner's personnel. 7. Division 2 Section "Building Demolition" for photographic documentation before

building demolition operations commence.

1.3 UNIT PRICES

A. Basis for Bids: Base number of construction photographs on four photographs per month over the duration of Project.

Page 40: Table of Contents Division Section Title

Mt. Pleasant Library 01322-2 20 Feburary 2009 CORE Group, P.C. PHOTOGRAPHIC DOCUMENTATION

1.4 SUBMITTALS

A. Key Plan: Submit key plan of Project site and building with notation of vantage points marked for location and direction of each photograph. Indicate elevation or story of construction. Include same label information as corresponding set of photographs. 1. Digital Images: Submit a complete set of digital image electronic files as a Project

Record Document on CD-ROM. Identify electronic media with date photographs were taken. Submit images that have same aspect ratio as the sensor, un-cropped.

PART 2 - PRODUCTS

2.1 PHOTOGRAPHIC MEDIA

A. Digital Images: Provide images in .jpg format, produced by a digital camera with minimum sensor size of 4.0 megapixels, and at an image resolution of not less than 1024 by 768 pixels.

PART 3 - EXECUTION

3.1 CONSTRUCTION PHOTOGRAPHS

A. General: Take photographs using the maximum range of depth of field, and that are in focus, to clearly show the Work. Photographs with blurry or out-of-focus areas will not be accepted.

1. Maintain key plan with each set of construction photographs that identifies each photographic location, if not immediately identifiable from the photograph.

B. Digital Images: Submit digital images exactly as originally recorded in the digital camera, without alteration, manipulation, editing, or modifications using image-editing software.

1. Date and Time: Include date and time in filename for each image. 2. Field Office Images: Maintain one set of images on CD-ROM in the field office at

Project site, available at all times for reference. Identify images same as for those submitted to Architect.

C. Preconstruction Photographs: Before starting construction, take color, digital photographs of Project site and surrounding properties, including existing items to remain during construction, from different vantage points, as directed by Architect.

1. Flag excavation areas before taking construction photographs. 2. Take eight photographs to show existing conditions adjacent to property before starting

the Work. 3. Take eight photographs of existing buildings either on or adjoining property to accurately

record physical conditions at start of construction. 4. Take additional photographs as required to record settlement or cracking of adjacent

structures, pavements, and improvements.

D. Periodic Construction Photographs: Take 12 color, digital photographs weekly, with timing each month adjusted to coincide with the cutoff date associated with each Application for

Page 41: Table of Contents Division Section Title

Mt. Pleasant Library 01322-3 20 Feburary 2009 CORE Group, P.C. PHOTOGRAPHIC DOCUMENTATION

Payment. Select vantage points to show status of construction and progress since last photographs were taken.

E. Architect -Directed Construction Photographs: From time to time, Architect will instruct photographer about number and frequency of color, digital photographs and general directions on vantage points. Select actual vantage points and take photographs to show the status of construction and progress since last photographs were taken.

F. Time-Lapse Sequence Construction Photographs: Take Five color, digital photographs as indicated, to show status of construction and progress since last photographs were taken.

1. Frequency: Take photographs weekly, with timing each month adjusted to coincide with the cutoff date associated with each Application for Payment.

2. Vantage Points: Following suggestions by Architect and Contractor, photographer to select vantage points. During each of the following construction phases, take not less than [two] of the required shots from same vantage point each time to create a time-lapse sequence as follows:

a. Commencement of the Work, through completion of subgrade construction. b. Above-grade structural framing. c. Exterior building enclosure. d. Interior Work, through date of Substantial Completion.

END OF SECTION 01322

Page 42: Table of Contents Division Section Title

Mt. Pleasant Library 01330-1 19 December 2008 CORE Group, P.C. SUBMITTAL PROCEDURES

SECTION 01330

PART 1 - GENERAL

SUBMITTAL PROCEDURES

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General Conditions to Construction Contract and other Division 1 Specification Sections, apply to this Section.

1.2 SUMMARY

A. Section includes requirements for the submittal schedule and administrative and procedural requirements for submitting Shop Drawings, Product Data, Samples, and other submittals.

B. Related Sections:

1. Division 1 Section "Payment Procedures" for submitting Applications for Payment and the schedule of values.

2. Division 1 Section "Construction Progress Documentation" for submitting schedules and reports, including Contractor's construction schedule.

3. Division 1 Section "Project Record Documents" for submitting record Drawings, record Specifications, and record Product Data.

4. Division 1 Section "Operation and Maintenance Data" for submitting operation and maintenance manuals.

5. Division 1 Section "Demonstration and Training" for submitting video recordings of demonstration of equipment and training of Owner's personnel.

1.3 DEFINITIONS

A. Action Submittals: Written and graphic information and physical samples that require Architect's[ and Construction Manager's] responsive action. Action submittals are those submittals indicated in individual Specification Sections as action submittals.

B. Informational Submittals: Written and graphic information and physical samples that do not require Architect's[ and Construction Manager's] responsive action. Submittals may be rejected for not complying with requirements. Informational submittals are those submittals indicated in individual Specification Sections as informational submittals.

C. File Transfer Protocol (FTP): Communications protocol that enables transfer of files to and from another computer over a network and that serves as the basis for standard Internet protocols. An FTP site is a portion of a network located outside of network firewalls within which internal and external users are able to access files.

Page 43: Table of Contents Division Section Title

Mt. Pleasant Library 01330-1 19 December 2008 CORE Group, P.C. SUBMITTAL PROCEDURES

D. Portable Document Format (PDF): An open standard file format licensed by Adobe Systems used for representing documents in a device-independent and display resolution-independent fixed-layout document format.

1.4 ACTION SUBMITTALS

A. Submittal Schedule: Submit a schedule of submittals, arranged in chronological order by dates required by construction schedule. Include time required for review, ordering, manufacturing, fabrication, and delivery when establishing dates. Include additional time required for making corrections or modifications to submittals noted by the Architect and additional time for handling and reviewing submittals required by those corrections.

1. Coordinate submittal schedule with list of subcontracts, the schedule of values, and Contractor's construction schedule.

2. Initial Submittal: Submit concurrently with start-up construction schedule. Include submittals required during the first 60 days of construction. List those submittals required to maintain orderly progress of the Work and those required early because of long lead time for manufacture or fabrication.

3. Final Submittal: Submit concurrently with the first complete submittal of Contractor's construction schedule.

a. Submit revised submittal schedule to reflect changes in current status and timing for submittals.

4. Format: Arrange the following information in a tabular format:

a. Scheduled date for first submittal. b. Specification Section number and title. c. Submittal category: Action, informational. d. Name of subcontractor. e. Description of the Work covered. f. Scheduled date for Architect's final release or approval. g. Scheduled dates for purchasing. h. Scheduled dates for installation. i. Activity or event number.

1.5 SUBMITTAL ADMINISTRATIVE REQUIREMENTS

A. Architect's Digital Data Files: Electronic copies of CAD Drawings of the Contract Drawings will [not] be provided by Architect for Contractor's use in preparing submittals.

B. Coordination: Coordinate preparation and processing of submittals with performance of construction activities.

1. Coordinate each submittal with fabrication, purchasing, testing, delivery, other submittals, and related activities that require sequential activity.

2. Submit all submittal items required for each Specification Section concurrently unless partial submittals for portions of the Work are indicated on approved submittal schedule.

Page 44: Table of Contents Division Section Title

Mt. Pleasant Library 01330-1 19 December 2008 CORE Group, P.C. SUBMITTAL PROCEDURES

3. Submit action submittals and informational submittals required by the same Specification Section as separate packages under separate transmittals.

4. Coordinate transmittal of different types of submittals for related parts of the Work so processing will not be delayed because of need to review submittals concurrently for coordination.

a. Architect reserves the right to withhold action on a submittal requiring coordination with other submittals until related submittals are received.

C. Processing Time: Allow time for submittal review, including time for re-submittals, as follows. Time for review shall commence on Architect's receipt of submittal. No extension of the Contract Time will be authorized because of failure to transmit submittals enough in advance of the Work to permit processing, including re-submittals.

1. Initial Review: Allow 15 days for initial review of each submittal. Allow additional time if coordination with subsequent submittals is required. Architect will advise Contractor when a submittal being processed must be delayed for coordination.

2. Intermediate Review: If intermediate submittal is necessary, process it in same manner as initial submittal.

3. Re-submittal Review: Allow 15 days for review of each re-submittal. 4. Sequential Review: Where sequential review of submittals by Architect's consultants,

Owner, or other parties is indicated, allow 21 days for initial review of each submittal.

5. Concurrent Consultant Review: Where the Contract Documents indicate that submittals may be transmitted simultaneously to Architect and to Architect's consultants, allow [15] days for review of each submittal. Submittal will be returned to [Architect] before being returned to Contractor.

D. Identification and Information: Place a permanent label or title block on each paper copy submittal item for identification.

1. Indicate name of firm or entity that prepared each submittal on label or title block. 2. Provide a space approximately 6 by 8 inches (150 by 200 mm)

3. Include the following information for processing and recording action taken:

on label or beside title block to record Contractor's review and approval markings and action taken by Architect.

a. Project name. b. Date. c. Name of Architect. d. Name of Construction Manager. e. Name of Contractor. f. Name of subcontractor. g. Name of supplier. h. Name of manufacturer. i. Submittal number or other unique identifier, including revision identifier.

1) Submittal number shall use Specification Section number followed by a decimal point and then a sequential number (e.g., 06100.01). Re-submittals shall include an alphabetic suffix after another decimal point (e.g., 06100.01.A).

Page 45: Table of Contents Division Section Title

Mt. Pleasant Library 01330-1 19 December 2008 CORE Group, P.C. SUBMITTAL PROCEDURES

j. Number and title of appropriate Specification Section. k. Drawing number and detail references, as appropriate. l. Location(s) where product is to be installed, as appropriate. m. Other necessary identification.

E. Identification and Information: Identify and incorporate information in each electronic submittal file as follows:

1. Assemble complete submittal package into a single indexed file with links enabling navigation to each item.

2. Name file with submittal number or other unique identifier, including revision identifier.

a. File name shall use project identifier and Specification Section number followed by a decimal point and then a sequential number (e.g., LNHS-06100.01). Re-submittals shall include an alphabetic suffix after another decimal point (e.g., LNHS-06100.01.A).

3. Provide means for insertion to permanently record Contractor's review and approval markings and action taken by Architect.

4. Include the following information on an inserted cover sheet:

a. Project name. b. Date. c. Name and address of Architect. d. Name of Construction Manager. e. Name of Contractor. f. Name of firm or entity that prepared submittal. g. Name of subcontractor. h. Name of supplier. i. Name of manufacturer. j. Number and title of appropriate Specification Section. k. Drawing number and detail references, as appropriate. l. Location(s) where product is to be installed, as appropriate. m. Related physical samples submitted directly. n. Other necessary identification.

5. Include the following information as keywords in the electronic file metadata:

a. Project name. b. Number and title of appropriate Specification Section. c. Manufacturer name. d. Product name.

F. Options: Identify options requiring selection by the Architect.

G. Deviations: Identify deviations from the Contract Documents on submittals.

H. Additional Paper Copies: Unless additional copies are required for final submittal, and unless Architect observes noncompliance with provisions in the Contract Documents, initial submittal may serve as final submittal.

Page 46: Table of Contents Division Section Title

Mt. Pleasant Library 01330-1 19 December 2008 CORE Group, P.C. SUBMITTAL PROCEDURES

1. Submit one copy of submittal to concurrent reviewer in addition to specified number of copies to Architect.

I. Transmittal: Assemble each submittal individually and appropriately for transmittal and handling. Transmit each submittal using a transmittal form. Architect will discard submittals received from sources other than Contractor.

1. Transmittal Form: Use AIA Document G810 or CSI Form 12.1A Retain subparagraph above or first subparagraph below. Retain below if transmittal forms typically used by contractors are acceptable; otherwise, retain above. Above is more common.

2. Transmittal Form: Provide locations on form for the following information:

a. Project name. b. Date. c. Destination (To:). d. Source (From:). e. Names of subcontractor, manufacturer, and supplier. f. Category and type of submittal. g. Submittal purpose and description. h. Specification Section number and title. i. Indication of full or partial submittal. j. Drawing number and detail references, as appropriate. k. Transmittal number. l. Submittal and transmittal distribution record. m. Remarks. n. Signature of transmitter.

3. On an attached separate sheet, prepared on Contractor's letterhead, record relevant information, requests for data, revisions other than those requested by Architect on previous submittals, and deviations from requirements in the Contract Documents, including minor variations and limitations. Include same identification information as related submittal.

J. Re-submittals: Make re-submittals in same form and number of copies as initial submittal.

1. Note date and content of previous submittal. 2. Note date and content of revision in label or title block and clearly indicate extent of

revision. 3. Resubmit submittals until they are marked with approval notation from Architect's action

stamp.

K. Distribution: Furnish copies of final submittals to manufacturers, subcontractors, suppliers, fabricators, installers, authorities having jurisdiction, and others as necessary for performance of construction activities. Show distribution on transmittal forms.

L. Use for Construction: Use only final submittals that are marked with approval notation from Architect's action stamp.

Page 47: Table of Contents Division Section Title

Mt. Pleasant Library 01330-1 19 December 2008 CORE Group, P.C. SUBMITTAL PROCEDURES

PART 2 - PRODUCTS

2.1 SUBMITTAL PROCEDURES

A. General Submittal Procedure Requirements: Prepare and submit submittals required by individual Specification Sections. Types of submittals are indicated in individual Specification Sections.

1. Submit electronic submittals via email as PDF electronic files.

a. Architect will return annotated file. Annotate and retain one copy of file as an electronic Project record document file.

2. Action Submittals: Submit three paper copies of each submittal, unless otherwise indicated. Architect will return two copies.

3. Informational Submittals: Submit two paper copies of each submittal, unless otherwise indicated. Architect will not return copies.

4. Closeout Submittals and Maintenance Material Submittals: Comply with requirements specified in Division 1 Section "Closeout Procedures."

5. Certificates and Certifications Submittals: Provide a statement that includes signature of entity responsible for preparing certification. Certificates and certifications shall be signed by an officer or other individual authorized to sign documents on behalf of that entity.

a. Provide a digital signature with digital certificate on electronically-submitted certificates and certifications where indicated.

b. Provide a notarized statement on original paper copy certificates and certifications where indicated.

6. Test and Inspection Reports Submittals: Comply with requirements specified in Division 1 Section "Quality Requirements."

B. Product Data: Collect information into a single submittal for each element of construction and type of product or equipment.

1. If information must be specially prepared for submittal because standard published data are not suitable for use, submit as Shop Drawings, not as Product Data.

2. Mark each copy of each submittal to show which products and options are applicable. 3. Include the following information, as applicable:

a. Manufacturer's catalog cuts. b. Manufacturer's product specifications. c. Standard color charts. d. Statement of compliance with specified referenced standards. e. Testing by recognized testing agency. f. Application of testing agency labels and seals. g. Notation of coordination requirements. h. Availability and delivery time information.

4. For equipment, include the following in addition to the above, as applicable:

Page 48: Table of Contents Division Section Title

Mt. Pleasant Library 01330-1 19 December 2008 CORE Group, P.C. SUBMITTAL PROCEDURES

a. Wiring diagrams showing factory-installed wiring. b. Printed performance curves. c. Operational range diagrams. d. Clearances required to other construction, if not indicated on accompanying Shop

Drawings.

5. Submit Product Data before or concurrent with Samples. 6. Submit Product Data in the following format:

a. PDF electronic file. b. [Three] paper copies of Product Data, unless otherwise indicated. Architect will

return [two] copies.

C. Shop Drawings: Prepare Project-specific information, drawn accurately to scale. Do not base Shop Drawings on reproductions of the Contract Documents or standard printed data.

1. Preparation: Fully illustrate requirements in the Contract Documents. Include the following information, as applicable:

a. Identification of products. b. Schedules. c. Compliance with specified standards. d. Notation of coordination requirements. e. Notation of dimensions established by field measurement. f. Relationship and attachment to adjoining construction clearly indicated. g. Seal and signature of professional engineer if specified.

2. Sheet Size: Except for templates, patterns, and similar full-size drawings, submit Shop Drawings on sheets at least 8-1/2 by 11 inches (215 by 280 mm) but no larger than 30 by 42 inches

3. Submit Shop Drawings in the following format: (750 by 1067 mm)

a. PDF electronic file.

b. Three opaque copies of each submittal. Architect will retain two copies; remainder will be returned.

D. Samples: Submit Samples for review of kind, color, pattern, and texture for a check of these characteristics with other elements and for a comparison of these characteristics between submittal and actual component as delivered and installed.

1. Transmit Samples that contain multiple, related components such as accessories together in one submittal package.

2. Identification: Attach label on unexposed side of Samples that includes the following:

a. Generic description of Sample. b. Product name and name of manufacturer. c. Sample source. d. Number and title of applicable Specification Section.

Page 49: Table of Contents Division Section Title

Mt. Pleasant Library 01330-1 19 December 2008 CORE Group, P.C. SUBMITTAL PROCEDURES

3. Disposition: Maintain sets of approved Samples at Project site, available for quality-control comparisons throughout the course of construction activity. Sample sets may be used to determine final acceptance of construction associated with each set.

a. Samples that may be incorporated into the Work are indicated in individual Specification Sections. Such Samples must be in an undamaged condition at time of use.

b. Samples not incorporated into the Work, or otherwise designated as Owner's property, are the property of Contractor.

4. Samples for Initial Selection: Submit manufacturer's color charts consisting of units or sections of units showing the full range of colors, textures, and patterns available.

a. Number of Samples: Submit [three] full set(s) of available choices where color, pattern, texture, or similar characteristics are required to be selected from manufacturer's product line. Architect will return submittal with options selected.

5. Samples for Verification: Submit full-size units or Samples of size indicated, prepared from same material to be used for the Work, cured and finished in manner specified, and physically identical with material or product proposed for use, and that show full range of color and texture variations expected. Samples include, but are not limited to, the following: partial sections of manufactured or fabricated components; small cuts or containers of materials; complete units of repetitively used materials; swatches showing color, texture, and pattern; color range sets; and components used for independent testing and inspection.

a. Number of Samples: Submit three sets of Samples. Architect will retain [two] Sample sets; remainder will be returned. Mark up and retain one returned Sample set as a Project record sample.

1) Submit a single Sample where assembly details, workmanship, fabrication techniques, connections, operation, and other similar characteristics are to be demonstrated.

2) If variation in color, pattern, texture, or other characteristic is inherent in material or product represented by a Sample, submit at least three sets of paired units that show approximate limits of variations.

E. Contractor's Construction Schedule: Comply with requirements specified in Division 1 Section "Construction Progress Documentation."

F. Application for Payment: Comply with requirements specified in Division 1 Section "Payment Procedures."

G. Schedule of Values: Comply with requirements specified in Division 1 Section "Payment Procedures."

H. Subcontract List: Prepare a written summary identifying individuals or firms proposed for each portion of the Work, including those who are to furnish products or equipment fabricated to a special design. Include the following information in tabular form:

Page 50: Table of Contents Division Section Title

Mt. Pleasant Library 01330-1 19 December 2008 CORE Group, P.C. SUBMITTAL PROCEDURES

1. Name, address, and telephone number of entity performing subcontract or supplying products.

2. Number and title of related Specification Section(s) covered by subcontract. 3. Drawing number and detail references, as appropriate, covered by subcontract. 4. Submit subcontract list in the following format:

a. PDF electronic file. b. Number of Copies: Three paper copies of subcontractor list, unless otherwise

indicated. Architect will return two copies.

I. LEED Submittals: Comply with requirements specified in Division 1 Section "LEED Requirements."

1. Submit LEED submittals in the following format:

a. PDF electronic file. b. Three paper copies of LEED submittals, unless otherwise indicated.

J. Coordination Drawings: Comply with requirements specified in Division 1 Section "Project Management and Coordination."

K. Qualification Data: Prepare written information that demonstrates capabilities and experience of firm or person. Include lists of completed projects with project names and addresses, contact information of architects and owners, and other information specified.

L. Welding Certificates: Prepare written certification that welding procedures and personnel comply with requirements in the Contract Documents. Submit record of Welding Procedure Specification and Procedure Qualification Record on American Welding Society (AWS) forms. Include names of firms and personnel certified.

M. Installer Certificates: Submit written statements on manufacturer's letterhead certifying that Installer complies with requirements in the Contract Documents and, where required, is authorized by manufacturer for this specific Project.

N. Manufacturer Certificates: Submit written statements on manufacturer's letterhead certifying that manufacturer complies with requirements in the Contract Documents. Include evidence of manufacturing experience where required.

O. Product Certificates: Submit written statements on manufacturer's letterhead certifying that product complies with requirements in the Contract Documents.

P. Material Certificates: Submit written statements on manufacturer's letterhead certifying that material complies with requirements in the Contract Documents.

Q. Material Test Reports: Submit reports written by a qualified testing agency, on testing agency's standard form, indicating and interpreting test results of material for compliance with requirements in the Contract Documents.

R. Product Test Reports: Submit written reports indicating current product produced by manufacturer complies with requirements in the Contract Documents. Base reports on

Page 51: Table of Contents Division Section Title

Mt. Pleasant Library 01330-1 19 December 2008 CORE Group, P.C. SUBMITTAL PROCEDURES

evaluation of tests performed by manufacturer and witnessed by a qualified testing agency, or on comprehensive tests performed by a qualified testing agency.

S. Research Reports: Submit written evidence, from a model code organization acceptable to authorities having jurisdiction, that product complies with building code in effect for Project. Include the following information:

1. Name of evaluation organization. 2. Date of evaluation. 3. Time period when report is in effect. 4. Product and manufacturers' names. 5. Description of product. 6. Test procedures and results. 7. Limitations of use.

T. Schedule of Tests and Inspections: Comply with requirements specified in Division 1 Section "Quality Requirements."

U. Preconstruction Test Reports: Submit reports written by a qualified testing agency, on testing agency's standard form, indicating and interpreting results of tests performed before installation of product, for compliance with performance requirements in the Contract Documents.

V. Compatibility Test Reports: Submit reports written by a qualified testing agency, on testing agency's standard form, indicating and interpreting results of compatibility tests performed before installation of product. Include written recommendations for primers and substrate preparation needed for adhesion.

W. Field Test Reports: Submit reports indicating and interpreting results of field tests performed either during installation of product or after product is installed in its final location, for compliance with requirements in the Contract Documents.

X. Maintenance Data: Comply with requirements specified in Division 1 Section "Operation and Maintenance Data."

Y. Design Data: Prepare and submit written and graphic information, including, but not limited to, performance and design criteria, list of applicable codes and regulations, and calculations. Include list of assumptions and other performance and design criteria and a summary of loads. Include load diagrams if applicable. Provide name and version of software, if any, used for calculations. Include page numbers.

2.2 DELEGATED-DESIGN SERVICES

A. Performance and Design Criteria: Where professional design services or certifications by a design professional are specifically required of Contractor by the Contract Documents, provide products and systems complying with specific performance and design criteria indicated.

1. If criteria indicated are not sufficient to perform services or certification required, submit a written request for additional information to Architect.

Page 52: Table of Contents Division Section Title

Mt. Pleasant Library 01330-1 19 December 2008 CORE Group, P.C. SUBMITTAL PROCEDURES

B. Delegated-Design Services Certification: In addition to Shop Drawings, Product Data, and other required submittals, submit digitally-signed PDF electronic file and three paper copies of certificate, signed and sealed by the responsible design professional, for each product and system specifically assigned to Contractor to be designed or certified by a design professional.

1. Indicate that products and systems comply with performance and design criteria in the Contract Documents. Include list of codes, loads, and other factors used in performing these services.

PART 3 - EXECUTION

3.1 CONTRACTOR'S REVIEW

A. Action and Informational Submittals: Review each submittal and check for coordination with other Work of the Contract and for compliance with the Contract Documents. Note corrections and field dimensions. Mark with approval stamp before submitting to Architect.

B. Project Closeout and Maintenance/Material Submittals: Refer to requirements in Division 1 Section "Closeout Procedures."

C. Approval Stamp: Stamp each submittal with a uniform, approval stamp. Include Project name and location, submittal number, Specification Section title and number, name of reviewer, date of Contractor's approval, and statement certifying that submittal has been reviewed, checked, and approved for compliance with the Contract Documents.

3.2 ARCHITECT'S ACTION

A. General: Architect will not review submittals that do not bear Contractor's approval stamp and will return them without action.

B. Action Submittals: Architect will review each submittal, make marks to indicate corrections or modifications required, and return it. Architect will stamp each submittal with an action stamp and will mark stamp appropriately to indicate action.

C. Informational Submittals: Architect will review each submittal and will not return it, or will return it if it does not comply with requirements. Architect will forward each submittal to appropriate party.

D. Partial submittals prepared for a portion of the Work will be reviewed when use of partial submittals has received prior approval from Architect.

E. Incomplete submittals are not acceptable, will be considered nonresponsive, and will be returned without review.

F. Submittals not required by the Contract Documents may not be reviewed and may be discarded.

END OF SECTION 01330

Page 53: Table of Contents Division Section Title

Copyright 2007 AIA MASTERSPEC Full Length 11/07

SPECIAL PROCEDURES FOR HISTORIC TREATMENT 01351 - 1

SECTION 01351 -

PART 1 - GENERAL

SPECIAL PROCEDURES FOR HISTORIC TREATMENT

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification Sections, apply to this Section.

1.2 SUMMARY

A. Section includes general protection and treatment procedures for [designated historic spaces, areas, rooms, and surfaces in the] [the entire] Project and the following specific work:

1. Historic removal and dismantling. 2. Bird-excrement removal.

B. Related Sections:

1. Division 4 Section "Clay Masonry Restoration and Cleaning" for specific requirements for cleaning and repairing clay masonry.

2. Division 4 Section "Stone Restoration and Cleaning" for specific requirements for cleaning and repairing stone.

3. Division 5 Section "Historic Treatment of Ornamental Metal" for specific requirements for cleaning and repairing ornamental metal.

4. Division 8 Section "Historic Treatment of Wood Windows" for specific requirements for cleaning and repairing wood windows.

5. Division 9 Section "Painting Restoration" for specific requirements for stripping and repainting of decorative paint finishes.

1.3 DEFINITIONS

A. Consolidate: To strengthen loose or deteriorated materials in place.

B. Dismantle: To disassemble and detach items by hand from existing construction to the limits indicated, using small hand tools and small one-hand power tools, so as to protect nearby historic surfaces; and legally dispose of dismantled items off-site, unless indicated to be salvaged or reinstalled.

C. Existing to Remain: Existing items that are not to be removed or dismantled.

D. Historic: Spaces, areas, rooms, surfaces, materials, finishes, and overall appearance which are important to the successful [preservation] [rehabilitation] [restoration] [and] [reconstruction] as determined by the Architect. Designated historic [spaces] [areas] [rooms] [and] [surfaces] are [indicated on Drawings] [and] [generally described below] <Insert location>.

Page 54: Table of Contents Division Section Title

Copyright 2007 AIA MASTERSPEC Full Length 11/07

SPECIAL PROCEDURES FOR HISTORIC TREATMENT 01351 - 2

1. [Restoration Zones] [Grade 1 Areas] <Insert designation>: Areas of greatest architectural importance, integrity, and visibility; to be preserved and restored to the original, circa <Insert date>, design and finish as shown on Drawings:

2. [Renovation Zones] [Grade 2 Areas] <Insert designation>: Areas of significant architectural importance, integrity, and visibility; to be preserved and restored consistent with the remaining historic fabric and to the extent shown on Drawings:

3. [Alteration Zones] [Grade 3 Areas] <Insert designation>: Areas of slight architectural importance, integrity, and visibility; to leave any remaining original fabric untouched insofar as is consistent with accommodating modern uses for the building as shown on Drawings:

E. Match: To blend with adjacent construction and manifest no apparent difference in material type, species, cut, form, detail, color, grain, texture, or finish; as approved by the Architect.

F. Reconstruct: To remove existing item, replicate damaged or missing components, and reinstall in original position.

G. Refinish: To remove existing finishes to base material and apply new finish to match original, or as otherwise indicated.

H. Reinstall: To protect removed or dismantled item, repair and clean it as indicated for reuse, and reinstall it in original position, or where indicated.

I. Remove: Specifically for historic spaces, areas, rooms, and surfaces, the term means to detach an item from existing construction to the limits indicated, using hand tools and hand-operated power equipment, and legally dispose of it off-site, unless indicated to be salvaged or reinstalled.

J. Repair: To correct damage and defects, retaining existing materials, features, and finishes while employing as little new material as possible. Includes patching, piecing-in, splicing, consolidating, or otherwise reinforcing or upgrading materials.

K. Replace: To remove, duplicate, and reinstall entire item with new material. The original item is the pattern for creating duplicates unless otherwise indicated.

L. Replicate: To reproduce in exact detail, materials, and finish, unless otherwise indicated.

M. Reproduce: To fabricate a new item, accurate in detail to the original, and in either the same or a similar material as the original, unless otherwise indicated.

N. Restore: To consolidate, replicate, reproduce, repair, and refinish as required to achieve the indicated results.

O. Retain: To keep existing items that are not to be removed or dismantled.

P. Reversible: New construction work, treatments, or processes that can be removed or undone in the future without damaging historic materials, unless otherwise indicated.

Q. Salvage: To protect removed or dismantled items and deliver them to Owner[ ready for reuse].

Page 55: Table of Contents Division Section Title

Copyright 2007 AIA MASTERSPEC Full Length 11/07

SPECIAL PROCEDURES FOR HISTORIC TREATMENT 01351 - 3

R. Stabilize: To provide structural reinforcement of unsafe or deteriorated items while maintaining the essential form as it exists at present; also, to reestablish a weather-resistant enclosure.

S. Strip: To remove existing finish down to base material, unless otherwise indicated.

1.4 MATERIALS OWNERSHIP

A. Historic items, relics, and similar objects including, but not limited to, cornerstones and their contents, commemorative plaques and tablets, <Insert description of other items,> antiques, and other items of interest or value to Owner that may be encountered during removal and dismantling work remain Owner's property. Carefully dismantle and salvage each item or object.

B. Coordinate with Owner's [archaeologist] [historical adviser], who will establish special procedures for dismantling and salvage.

1.5 SUBMITTALS

A. Construction Schedule for Historic Treatments: Indicate for the entire Project the following for each activity to be performed in historic spaces, areas, and rooms, and on historic surfaces:

1. Detailed sequence of historic treatment work, with starting and ending dates, coordinated with Owner's continuing operations and other known work in progress.

2. Utility Services: Indicate how long utility services will be interrupted. Coordinate shutoff, capping, and continuation of utility services.

3. Use of elevator and stairs. 4. Coordination of Owner's and others' continuing occupancy of portions of existing

building and of Owner's partial occupancy of completed Work. 5. Equipment Data: List gross loaded weight, axle-load distribution, and wheel-base

dimension data for mobile and heavy equipment proposed for use. Do not use such equipment without Contractor's professional engineer's certification that the structure can support the imposed loadings without damage.

B. Qualification Data: For [historic removal and dismantling specialist] [historic removal and dismantling specialist's field supervisors] [historic removal and dismantling specialist's workers] [bird-excrement-removal specialist] [and] [industrial hygienist].

C. Preconstruction Documentation: Show preexisting conditions of adjoining construction and site improvements, including finish surfaces, that might be misconstrued as damage caused by historic treatment operations.

D. Historic Treatment Program: Submit before work begins.

E. Fire-Prevention Plan: Submit before work begins.

F. Inventory of Salvaged Items: After removal or dismantling work is complete, submit a list of items that have been salvaged.

Page 56: Table of Contents Division Section Title

Copyright 2007 AIA MASTERSPEC Full Length 11/07

SPECIAL PROCEDURES FOR HISTORIC TREATMENT 01351 - 4

1.6 QUALITY ASSURANCE

A. Historic Treatment Specialist Qualifications: An experienced firm regularly engaged in historic treatments similar in nature, materials, design, and extent to this work as specified in each section, and that has completed a minimum of [five] <Insert number> recent projects with a record of successful in-service performance that demonstrate the firm's qualifications to perform this work.

1. Field Supervisor Qualifications: Full-time supervisors experienced in historic treatment work similar in nature, material, design, and extent to that indicated for this Project. Supervisors shall be on Project site during times that historic treatment work is in progress.[ Supervisors shall not be changed during Project except for causes beyond the control of the specialist firm.]

2. Worker Qualification: Persons who are experienced in historic treatment work of types they will be performing.

B. Historic Removal and Dismantling Specialist Qualifications: A qualified historic treatment specialist. General selective demolition experience is not sufficient experience for historic removal and dismantling work.

C. Bird-Excrement-Removal Specialist Qualifications: A firm that employs personnel experienced and skilled in the processes and operations indicated.

D. Industrial Hygienist Qualifications: Certified as Industrial Hygienist by the American Board of Industrial Hygiene; having Bachelor's degree in industrial hygiene, public health, biological science, occupational health, or environmental and safety discipline; and experienced in work of types specified.

E. Historic Treatment Program: Prepare a written plan for historic treatment for the whole Project, including each phase or process and protection of surrounding materials during operations. Describe in detail materials, methods, and equipment to be used for each phase of work. Show compliance with indicated methods and procedures specified in this and other sections.

1. Dust and Noise Control: Include locations of proposed temporary dust- and noise-control partitions and means of egress from occupied areas coordinated with continuing on-site operations and other known work in progress.

2. Debris Hauling: Include plans clearly marked to show debris hauling routes, turning radii, and locations and details of temporary protective barriers.

F. Fire-Prevention Plan: Prepare a written plan for preventing fires during the Work, including placement of fire extinguishers, fire blankets, rag buckets, and other fire-prevention devices during each phase or process. Coordinate plan with Owner's fire-protection equipment and requirements. Include each fire watch's training, duties, and authority to enforce fire safety.

G. Mockups: Prepare mockups of specific historic treatment procedures specified in this Section to demonstrate aesthetic effects and set quality standards for materials and execution.

1. Typical Removal Work: Remove typical [wall area] [suspended ceiling assembly] <Insert description> as shown on Drawings.

Page 57: Table of Contents Division Section Title

Copyright 2007 AIA MASTERSPEC Full Length 11/07

SPECIAL PROCEDURES FOR HISTORIC TREATMENT 01351 - 5

2. Typical Dismantling Work: Dismantle typical [fluorescent lighting fixture from ornamental plaster surface] [historic light fixture] <Insert description> as shown on Drawings.

3. Bird-Excrement Removal: Remove typical accumulation of bird excrement from area as shown on Drawings.

4. Typical Removal Work: Remove an [approximately 50 sq. ft. (4.6 sq. m)

5. Typical Dismantling Work: Dismantle an [approximately

] <Insert dimension> area of typical [wall] [suspended ceiling assembly] <Insert description>, but not less than [10] <Insert quantity> adjacent whole [masonry] [stone] [ceiling tile] <Insert item> units:

50 sq. ft. (4.6 sq. m)

6. Bird-Excrement Removal: Remove excrement from an area [approximately

] <Insert dimension> area of typical [composition tile from mosaic tile substrate] <Insert description>, but not less than [10] <Insert quantity> adjacent whole [composition tile] <Insert item> units:

25 sq. ft. (2.3 sq. m)

a. Test chemicals and methods on samples of adjacent building materials for possible adverse reactions. Do not use chemicals and methods known to have deleterious effect.

] <Insert dimension> for each type of building [cornice] [coping] [wall] <Insert requirement> substrate material.

b. Allow a waiting period of not less than seven days after completion of removal work to permit a study of mockup for deleterious effects.

7. Exploratory Dismantling of [Marble and Travertine Flooring and Setting Bed] <Insert description>: Perform dismantling in the presence of the Architect.

a. Follow the procedure specified in Part 3 "Historic Removal and Dismantling" Article.

b. Dismantle 1 sq. ft. (0.09 sq. m) of the setting bed for each 2,500 sq. ft. (230 sq. m)

c. If the actual thickness of the setting bed is equal to or more than

of stone flooring. At each location, verify the actual thickness and nature of the setting bed.

1-3/4 inches (45 mm)

d. If the actual thickness of the setting bed is less than , continue the dismantling.

1-3/4 inches (45 mm)

8. Approval of mockups does not constitute approval of deviations from the Contract Documents contained in mockups unless Architect specifically approves such deviations in writing.

, continuation of the dismantling may be suspended by the Architect for re-evaluation.

H. Regulatory Requirements: Comply with governing EPA notification regulations before beginning removal and dismantling work. Comply with hauling and disposal regulations of authorities having jurisdiction.

I. Standards: Comply with ANSI/ASSE A10.6.

J. Historic Treatment Preconstruction Conference: Conduct conference at [Project site] <Insert location>.

Page 58: Table of Contents Division Section Title

Copyright 2007 AIA MASTERSPEC Full Length 11/07

SPECIAL PROCEDURES FOR HISTORIC TREATMENT 01351 - 6

1. General: Review methods and procedures related to historic treatment including, but not limited to, the following:

a. Review manufacturer's written instructions for precautions and effects of historic treatment procedures on materials, components, and vegetation.

b. Review and finalize historic treatment construction schedule; verify availability of materials, equipment, and facilities needed to make progress and avoid delays.

c. Review qualifications of personnel assigned to the work and assign duties. d. Review material application, work sequencing, tolerances, and required clearances. e. Review areas where existing construction is to remain and requires protection.

2. Removal and Dismantling:

a. Inspect and discuss condition of construction to be removed or dismantled. b. Review requirements of other work that relies on substrates exposed by removal

and dismantling work.

1.7 STORAGE AND PROTECTION OF HISTORIC MATERIALS

A. Salvaged Historic Materials:

1. Clean only loose debris from salvaged historic items unless more extensive cleaning is indicated.

2. Pack or crate items after cleaning; cushion against damage during handling. Label contents of containers.

3. Store items in a secure area until delivery to Owner. 4. Transport items to Owner's storage area [on-site] [off-site] [designated by Owner]

[indicated on Drawings]. 5. Protect items from damage during transport and storage.

B. Historic Materials for Reinstallation:

1. Repair and clean historic items as indicated and to functional condition for reuse. 2. Pack or crate items after cleaning and repairing; cushion against damage during handling.

Label contents of containers. 3. Protect items from damage during transport and storage. 4. Reinstall items in locations indicated. Comply with installation requirements for new

materials and equipment unless otherwise indicated. Provide connections, supports, and miscellaneous materials to make item functional for use indicated.

C. Existing Historic Materials to Remain: Protect construction indicated to remain against damage and soiling from construction work. Where permitted by Architect, items may be dismantled and taken to a suitable, protected storage location during construction work and reinstalled in their original locations after historic treatment and construction work in the vicinity is complete.

D. Storage and Protection: When taken from their existing locations, catalog and store historic items within a weathertight enclosure where they are protected from wetting by rain, snow, condensation, or ground water, and from freezing temperatures.

Page 59: Table of Contents Division Section Title

Copyright 2007 AIA MASTERSPEC Full Length 11/07

SPECIAL PROCEDURES FOR HISTORIC TREATMENT 01351 - 7

1. Identify each item with a nonpermanent mark to document its original location. Indicate original locations on plans elevations, sections, or photographs by annotating the identifying marks.

2. Secure stored materials to protect from theft.

1.8 PROJECT CONDITIONS

A. General Size Limitation in Historic Spaces: Materials, products, and equipment used for performing the Work and for transporting debris, materials, and products shall be of sizes that clear surfaces within historic spaces, areas, rooms, and openings, including temporary protection, by [12 inches (300 mm)

B. Owner will occupy portions of building immediately adjacent to removal and dismantling area. Conduct removal and dismantling work so Owner's operations will not be disrupted.

] <Insert dimension> or more.

C. Conditions existing at time of inspection for bidding purpose will be maintained by Owner as far as practical.

1. Before removal and dismantling, Owner will remove the following items:

a. <Insert items to be removed by Owner>.

D. Notify Architect of discrepancies between existing conditions and Drawings before proceeding with removal and dismantling work.

E. Hazardous Materials: It is not expected that hazardous materials will be encountered in the Work.

1. Hazardous materials [will be removed by Owner before start of the Work] [have been removed by Owner under a separate contract].

2. If materials suspected of containing hazardous materials are encountered, do not disturb; immediately notify Architect and Owner. Owner will remove hazardous materials under a separate contract.

a. In the case of asbestos, stop work in the area of potential hazard, shut off fans and other airhandlers ventilating the area, and rope off area until the questionable material is identified. Re-assign workers to continue work in unaffected areas. Resume work in the area of concern after safe working conditions are verified.

F. Hazardous Materials: It is unknown whether hazardous materials will be encountered in the Work.

1. If materials suspected of containing hazardous materials are encountered, do not disturb; immediately notify Architect and Owner. Owner will remove hazardous materials under a separate contract.

a. In the case of asbestos, stop work in the area of potential hazard, shut off fans and other airhandlers ventilating the area, and rope off area until the questionable material is identified. Re-assign workers to continue work in unaffected areas. Resume work in the area of concern after safe working conditions are verified.

Page 60: Table of Contents Division Section Title

Copyright 2007 AIA MASTERSPEC Full Length 11/07

SPECIAL PROCEDURES FOR HISTORIC TREATMENT 01351 - 8

G. Hazardous Materials: Hazardous materials are present in construction affected by removal and dismantling work. A report on the presence of hazardous materials is on file for review and use. Examine report to become aware of locations where hazardous materials are present.

1. Hazardous material remediation is specified elsewhere in the Contract Documents. 2. Do not disturb hazardous materials or items suspected of containing hazardous materials

except under procedures specified elsewhere in the Contract Documents. 3. If unanticipated asbestos is suspected, stop work in the area of potential hazard, shut off

fans and other airhandlers ventilating the area, and rope off area until the questionable material is identified. Re-assign workers to continue work in unaffected areas. Resume work in the area of concern after safe working conditions are verified.

H. Storage or sale of removed or dismantled items on-site is not permitted unless otherwise indicated.

1.9 COORDINATION

A. Coordinate historic treatment procedures in this section with public circulation patterns at Project site. Some work is near public circulation patterns [and active railroad track] <Insert item of concern>. Public circulation patterns cannot be closed off entirely, and in places can be only temporarily redirected around small areas of work.[ Railroad traffic will not be stopped.] Plan and execute the Work accordingly.

PART 2 - PRODUCTS - (Not Used)

PART 3 - EXECUTION

3.1 HISTORIC REMOVAL AND DISMANTLING SPECIALIST

A. Historic Removal and Dismantling Specialist Firms: Subject to compliance with requirements, have historic removal and dismantling performed by one of the following firms:

1. <Insert, in separate subparagraphs, names of historic removal and dismantling specialist firms>.

3.2 HISTORIC REMOVAL AND DISMANTLING EQUIPMENT

A. Removal Equipment: Use only hand-held tools except as follows or unless otherwise approved by the Architect on a case-by-case basis:

1. Light jackhammers are allowed subject to Architect's approval. 2. Large air hammers are not permitted.

B. Dismantling Equipment: Use manual, hand-held tools, except as follows or otherwise approved by the Architect on a case-by-case basis:

Page 61: Table of Contents Division Section Title

Copyright 2007 AIA MASTERSPEC Full Length 11/07

SPECIAL PROCEDURES FOR HISTORIC TREATMENT 01351 - 9

1. Hand-held power tools and cutting torches are permitted only as submitted in the historic treatment program. They must be adjustable so as to penetrate or cut only the thickness of material being removed.

2. Pry bars over 18 inches (450 mm) long and hammers weighing over 2 lb (0.9 kg)

3.3 EXAMINATION

are not permitted for dismantling work.

A. Preparation for Removal and Dismantling: Examine construction to be removed or dismantled to determine best methods to safely and effectively perform removal and dismantling work. Examine adjacent work to determine what protective measures will be necessary. Make explorations, probes, and inquiries as necessary to determine condition of construction to be removed or dismantled and location of utilities and services to remain that may be hidden by construction that is to be removed or dismantled.

1. Verify that affected utilities have been disconnected and capped. 2. Inventory and record the condition of items to be removed and dismantled for

reinstallation or salvage. 3. Before removal or dismantling of existing building elements that will be reproduced or

duplicated in final Work, make permanent record of measurements, materials, and construction details required to make exact reproduction.

4. Engage a professional engineer to survey condition of building to determine whether removing any element might result in structural deficiency or unplanned collapse of any portion of structure or adjacent structures as a result of removal and dismantling work.

B. Survey of Existing Conditions: Record existing conditions by use of [measured drawings] [preconstruction photographs] [and] [preconstruction videotapes] <Insert requirement>.

1. Comply with requirements specified in Division 1 Section "Photographic Documentation."

C. Perform surveys as the Work progresses to detect hazards resulting from historic treatment procedures.

3.4 PROTECTION, GENERAL

A. Ensure that supervisory personnel are on-site and on duty when historic treatment work begins and during its progress.

B. Protect persons, motor vehicles, surrounding surfaces of building, building site, plants, and surrounding buildings from harm resulting from historic treatment procedures.

1. Use only proven protection methods, appropriate to each area and surface being protected.

2. Provide barricades, barriers, and temporary directional signage to exclude public from areas where historic treatment work is being performed.

3. Erect temporary protective covers over walkways and at points of pedestrian and vehicular entrance and exit that must remain in service during course of historic treatment work.

Page 62: Table of Contents Division Section Title

Copyright 2007 AIA MASTERSPEC Full Length 11/07

SPECIAL PROCEDURES FOR HISTORIC TREATMENT 01351 - 10

4. Contain dust and debris generated by removal and dismantling work and prevent it from reaching the public or adjacent surfaces.

5. Provide shoring, bracing, and supports as necessary. Do not overload structural elements. 6. Protect floors and other surfaces along haul routes from damage, wear, and staining. 7. Provide supplemental sound-control treatment to isolate removal and dismantling work

from other areas of the building.

C. Temporary Protection of Historic Materials:

1. Protect existing historic materials with temporary protections and construction. Do not deface or remove existing materials.

2. Do not attach temporary protection to historic surfaces except as indicated as part of the historic treatment program and approved by Architect.

D. Comply with each product manufacturer's written instructions for protections and precautions. Protect against adverse effects of products and procedures on people and adjacent materials, components, and vegetation.

E. Utility and Communications Services:

1. Notify the Owner, Architect, and authorities having jurisdiction, owning or controlling wires, conduits, pipes, and other services affected by the historic treatment work before commencing operations.

2. Disconnect and cap pipes and services as required by authorities having jurisdiction, as required for the historic treatment work.

3. Maintain existing services unless otherwise indicated; keep in service, and protect against damage during operations. Provide temporary services during interruptions to existing utilities.

F. Existing Drains: Prior to the start of work in an area, test drainage system to ensure that it is functioning properly. Notify Architect immediately of inadequate drainage or blockage. Do not begin work in an area until the drainage system is in working order.

1. Prevent solids such as stone or mortar residue from entering the drainage system. Clean out drains and drain lines that become sluggish or blocked by sand or other materials resulting from historic treatment work.

2. Protect drains from pollutants. Block drains or filter out sediments, allowing only clean water to pass.

G. Existing Roofing: Prior to the start of work in an area, install roofing protection as indicated.

3.5 PROTECTION DURING APPLICATION OF CHEMICALS

A. Protect motor vehicles, surrounding surfaces of building being restored, building site, plants, and surrounding buildings from harm or damage resulting from applications of chemical cleaners and paint removers.

B. Cover adjacent surfaces with protective materials that are proven to resist chemicals selected for Project unless chemicals being used will not damage adjacent surfaces as indicated in historic treatment program. Use covering materials and masking agents that are waterproof, UV-

Page 63: Table of Contents Division Section Title

Copyright 2007 AIA MASTERSPEC Full Length 11/07

SPECIAL PROCEDURES FOR HISTORIC TREATMENT 01351 - 11

resistant, and will not stain or leave residue on surfaces to which they are applied. Apply protective materials according to manufacturer's written instructions. Do not apply liquid masking agents or adhesives to painted or porous surfaces. When no longer needed, promptly remove protective materials staining.

C. Do not apply chemicals during winds of sufficient force to spread them to unprotected surfaces.

D. Neutralize and collect alkaline and acid wastes and legally dispose of off Owner's property.

E. Collect and dispose of runoff from chemical operations by legal means and in a manner that prevents soil contamination, soil erosion, undermining of paving and foundations, damage to landscaping, or water penetration into building interior.

3.6 PROTECTION FROM FIRE

A. General: Follow fire-prevention plan and the following.

1. Comply with NFPA 241 requirements unless otherwise indicated.[ Perform duties entitled "Owner's Responsibility for Fire Protection."]

2. Remove and keep area free of combustibles including, rubbish, paper, waste, and chemicals, except to the degree necessary for the immediate work.

a. If combustible material cannot be removed, provide fire blankets to cover such materials.

3. Prohibit smoking by all persons within the Project work and staging areas[ except where specifically designated for smoking].

B. Heat-Generating Equipment and Combustible Materials: Comply with the following procedures while performing work with heat-generating equipment or highly combustible materials, including welding, torch-cutting, soldering, brazing, paint removal with heat, or other operations where open flames or implements utilizing high heat or combustible solvents and chemicals are anticipated.

1. Obtain Owner's approval for operations involving use of[ open-flame or] welding or other high-heat equipment.[ Use of open-flame equipment is not permitted] Notify Owner [at least seventy-two hours] <Insert requirement> before each occurrence, indicating location of such work.

2. As far as practical, restrict heat-generating equipment to shop areas or outside the building.

3. Do not perform work with heat-generating equipment in or near rooms or in areas where flammable liquids or explosive vapors are present or thought to be present. Use a combustible gas indicator test to ensure that the area is safe.

4. Use fireproof baffles to prevent flames, sparks, hot gasses, or other high-temperature material from reaching surrounding combustible material.

5. Prevent the spread of sparks and particles of hot metal through open windows, doors, holes, and cracks in floors, walls, ceilings, roofs, and other openings.

6. Fire Watch: Before working with heat-generating equipment or highly combustible materials, station personnel to serve as a fire watch at each location where such work is

Page 64: Table of Contents Division Section Title

Copyright 2007 AIA MASTERSPEC Full Length 11/07

SPECIAL PROCEDURES FOR HISTORIC TREATMENT 01351 - 12

performed. Fire watch personnel shall have the authority to enforce fire safety. Station fire watch according to NFPA 51B, NFPA 241, and as follows.

a. Train each fire watch in the proper operation of fire-control equipment and alarms. b. Prohibit fire-watch personnel from other work that would be a distraction from

fire-watch duties. c. Cease work with heat-generating equipment whenever fire-watch personnel are not

present. d. Have fire watch perform final fire-safety inspection each day beginning no sooner

than [30 minutes] <Insert time> after conclusion of work at[ each area of] the Project site to detect hidden or smoldering fires and to ensure that proper fire-prevention is maintained.

e. Maintain fire-watch personnel at [ each area of] the Project site until [60 minutes] <Insert time> after conclusion of daily work.

C. Fire Extinguishers, Fire Blankets, and Rag Buckets: Maintain fire extinguishers, fire blankets, and rag buckets for disposal of rags with combustible liquids. Maintain each as suitable for the type of fire risk in each work area. Ensure that nearby personnel and the fire watch are trained in fire-extinguisher and blanket operation.

D. Sprinklers: Where sprinkler protection exists and is functional, maintain it without interruption while operations are being performed. If operations are performed close to sprinklers, shield them temporarily with guards.

1. Remove temporary guards at the end of work shifts, whenever operations are paused, and when nearby work is completed.

3.7 GENERAL HISTORIC TREATMENT

A. Ensure that supervisory personnel are present when historic treatment work begins and during its progress.

B. Halt the process of deterioration and stabilize conditions, unless otherwise indicated. Perform work as indicated on Drawings. Follow the procedures in subparagraphs below and procedures approved in historic treatment program.

1. Retain as much existing material as possible; repair and consolidate rather than replace. 2. Use additional material or structure to reinforce, strengthen, prop, tie, and support

existing material or structure. 3. Use reversible processes wherever possible. 4. Use historically accurate repair and replacement materials and techniques unless

otherwise indicated. 5. Record existing work before each procedure (preconstruction) and progress during the

work with digital preconstruction documentation [photographs] [or] [videos]. Comply with requirements in Division 1 "Photographic Documentation."

C. Notify Architect of visible changes in the integrity of material or components whether due to environmental causes including biological attack, UV degradation, freezing, or thawing; or due to structural defects including cracks, movement, or distortion.

Page 65: Table of Contents Division Section Title

Copyright 2007 AIA MASTERSPEC Full Length 11/07

SPECIAL PROCEDURES FOR HISTORIC TREATMENT 01351 - 13

1. Do not proceed with the work in question until directed by Architect.

D. Where missing features are indicated to be repaired or replaced, provide features whose designs are based on accurate duplications rather than on conjectural designs, subject to the approval of Architect.

E. Where Work requires existing features to be removed or dismantled and reinstalled, perform these operations without damage to the material itself, to adjacent materials, or to the substrate.

F. Identify new and replacement materials and features with permanent marks hidden in the completed work to distinguish them from original materials. Record a legend of identification marks and the locations of the items on Record Drawings.

3.8 HISTORIC REMOVAL AND DISMANTLING

A. General: Have removal and dismantling work performed by a qualified historic removal and dismantling specialist. Ensure that historic removal and dismantling specialist's field supervisors are present when removal and dismantling work begins and during its progress.

B. Perform work in accordance with the historic treatment program[ and approved mockup(s)].

1. Provide supports or reinforcement for existing construction that becomes temporarily weakened by the work, until the work is completed.

2. Perform cutting by hand or with small power tools wherever possible. Cut holes and slots neatly to size required, with minimum disturbance of adjacent work.

3. Do not operate air compressors inside building, unless approved by Architect in each case.

4. Do not drill or cut columns, beams, joints, girders, structural slabs, or other structural supporting elements, without having Contractor's professional engineer's written approval for each location before such work is begun.

5. Do not use explosives.

C. Water-Mist Sprinkling: Use water-mist sprinkling and other wet methods to control dust only with adequate, approved procedures and equipment that ensure that such water will not create a hazard or adversely affect other building areas or materials.

D. Unacceptable Equipment: Keep equipment that is not permitted for historic removal or dismantling work away from the vicinity where such work is being performed.

E. Removing and Dismantling Items On or Near Historic Surfaces:

1. Use only dismantling tools and procedures within [12 inches (300 mm)

2. Unfasten items to be removed, in the opposite order from which they were installed.

] <Insert dimension> of historic surface. Do not use pry bars. Protect historic surface from contact with or damage by tools.

3. Support each item as it becomes loosened to prevent stress and damage to the historic surface.

4. Dismantle anchorages.

F. Masonry Walls:

Page 66: Table of Contents Division Section Title

Copyright 2007 AIA MASTERSPEC Full Length 11/07

SPECIAL PROCEDURES FOR HISTORIC TREATMENT 01351 - 14

1. Remove masonry carefully and erect temporary bracing and supports as needed to prevent unexpected collapse of materials being removed.

2. Dismantle top edge and sides before removing wall. Stop removal work and immediately inform the Architect if any structural elements above or adjacent to the work show signs of distress or dislocation during any phase of removal work.

3. Remove wall in easily managed pieces. 4. During removal, the Contractor is responsible for the stability of the partially remaining

wall. Notify the Architect of the condition of temporary bracing for wall if work is temporarily stopped during the wall's removal.

G. Steelwork:

1. Expose all structural steel for examination by the Architect and the Contractor's professional engineer before proceeding with removal or dismantling.

2. If any distress is shown by the structure during performance of the work, stop work and take immediate precautionary measures to ensure safety of the structure. Inform the Architect of the problem, steps taken, and proposed corrective actions.

3. Brace and support structural steel being removed and remaining during all phases of the work.

4. Concrete-Encased Steel: Where steel is known to be encased by concrete being removed, saw cut with blades that will cut no deeper than the thickness of the concrete cover with an adequate margin for error in the location of the steel. Isolate sections of concrete by saw cutting before beginning removal.

H. Loose Plaster: Identify loose, non-historic plaster and separate it from its substrate by tapping with a hammer and prying with a chisel or screwdriver. Do not use pry bars. Leave sound, firmly adhered plaster in place. Do not damage, remove, or dismantle historic plasterwork except where indicated or where it is an immediate hazard to personnel and as approved by the Architect.

I. Concrete Floor Surface Removal: Remove floor surfaces, fill, and topping, to the indicated lower elevations or cleavage planes as indicated on Drawings. Use dismantling methods when removing floor surfaces [12 inches (300 mm)

J. Marble and Travertine Flooring and Setting Bed Dismantling: Dismantle marble, travertine, and setting bed to the depth indicated.

] <Insert dimension> or less away from historic walls. Take away material to a uniform surface at the indicated level.

1. Caution: Immediately beneath the setting bed lie structural clay tile arches of the rooms below. Utilize only procedures and techniques that will ensure that the setting bed is dismantled without damage to the structural integrity of the tile arches. Do not cut, chip, or otherwise damage the surface of the tile arches for any reason.

2. Notify the Architect [15] [45] <Insert number> calendar days before performing dismantling operations on the setting bed. [Perform exploratory dismantling mockup specified in "Quality Assurance" Article, and obtain the Architect's permission before proceeding with the dismantling.] [Perform this dismantling work only in the presence of the Architect.]

3. Hours of Work: [12 midnight to 6 a.m.] <Insert requirement>, or as approved by the Architect.

4. Procedure: Revise procedure in nine subparagraphs below if directed in writing by Architect based upon exploratory mockup.

Page 67: Table of Contents Division Section Title

Copyright 2007 AIA MASTERSPEC Full Length 11/07

SPECIAL PROCEDURES FOR HISTORIC TREATMENT 01351 - 15

a. Saw cut marble and travertine joints with rigid guides to ensure straight, uniform cuts and to prevent over cutting into adjacent stones. Use thin saw blades so that stones can be reused. Replace with new any dismantled stones and adjacent stones if cut irregularly or otherwise damaged, at no additional cost to the Owner.

b. Gently loosen and pry stone free from setting bed. If a stone unit cannot be separated from the substrate, cut it up as necessary for removal and replace it.

c. Saw cut setting bed with parallel cuts 3 to 4 inches (75 to 100 mm) apart and of a maximum depth 1/4-inch (6 mm)

d. Using the sawed grooves, carefully chip out material to the limits shown.

above the bottom of the setting bed (the top of the structural tile arches).

e. Take away material to a uniform surface at the indicated level. f. Carefully monitor the progress of the saw cutting. If at any point the material

being cut changes in nature as evidenced by observations such as sounds generated by the cutting blade, resistance to cutting, and color of the dust, stop work in the immediate area, immediately notify the Architect of the condition, and assign workers to continue work elsewhere until the Architect issues instructions.

g. Where the actual thickness of the setting bed is more than 1-3/4 inches (45 mm)

h. If the actual thickness of the setting bed is less than

, continue the dismantling.

1-3/4 inches (45 mm)

i. Clean and dry surfaces for inspection by the Architect before beginning installation of new work.

, immediately notify the Architect. Continuation of the dismantling may be suspended by the Architect for re-evaluation.

5. If any damage to the structural clay tile arches of the rooms below has been caused, or is suspected to have been caused, by the dismantling work, attributable to Contractor's faulty procedure, mishap, or negligence, perform repair or replacement as directed by the Architect at no additional cost to the Owner.

K. Anchorages:

1. Remove anchorages associated with removed items. 2. Dismantle anchorages associated with dismantled items. 3. In non-historic surfaces, patch holes created by anchorage removal or dismantling in

accordance with the requirements for new work. 4. In historic surfaces, patch or repair holes created by anchorage removal or dismantling in

accordance with Section specific to the historic surface being patched.

3.9 BIRD-EXCREMENT REMOVAL

A. General: Before disturbing accumulated bird excrement, employ a qualified industrial hygienist to oversee the work. Follow procedures required by authorities having jurisdiction and recommended by industrial hygienist.

B. Removing Bird Excrement: Have bird-excrement removal work performed by a qualified bird-excrement removal specialist. [Remove exterior bird-excrement accumulations with building windows and other openings in the building closed or sealed off.] [Remove interior bird excrement with other parts of the building sealed off from work area and with windows and other openings to exterior areas accessible to the public closed or sealed off.]

Page 68: Table of Contents Division Section Title

Copyright 2007 AIA MASTERSPEC Full Length 11/07

SPECIAL PROCEDURES FOR HISTORIC TREATMENT 01351 - 16

1. Before removal, treat bird excrement to kill pathogens; dampen excrement to prevent particles becoming airborne.

2. Use only nonmetallic tools such as plastic spatulas and brushes with natural fiber or nylon bristles.

3. Collect excrement debris as it is removed and legally dispose of off-site. 4. Repeat removal procedure above where required to produce cleaning effect established

by mockup.

C. Removing Bird-Excrement Stain: Clean as required in section pertaining to cleaning substrate material from which bird excrement was removed.

3.10 HISTORIC REMOVAL AND DISMANTLING SCHEDULE

A. Existing [Items] [Construction] to Be [Removed] [Dismantled]: <Insert description of items and construction to be removed>.

B. Existing Items to Be [Removed] [Dismantled] and Salvaged: <Insert description of items to be dismantled and salvaged>.

C. Existing Items to Be [Removed] [Dismantled] and Reinstalled: <Insert description of items to be removed or dismantled and reinstalled>.

D. Existing Items to Remain: <Insert description of items to remain>.

END OF SECTION 01351

Page 69: Table of Contents Division Section Title

Mt. Pleasant Library 01352-1 20 Feburary 2009 CORE Group, P.C. LEED REQUIREMENTS

SECTION 01352

PART 1 - GENERAL

LEED REQUIREMENTS

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General Conditions to Construction Contract and other Division 1 Specification Sections, apply to this Section.

1.2 SUMMARY

A. Section includes general requirements and procedures for compliance with certain USGBC LEED prerequisites and credits needed for Project to obtain LEED-CS, Version 2.0.

1. Other LEED prerequisites and credits needed to obtain LEED certification depend on material selections and may not be specifically identified as LEED requirements. Compliance with requirements needed to obtain LEED prerequisites and credits may be used as one criterion to evaluate substitution requests and comparable product requests.

2. Additional LEED prerequisites and credits needed to obtain the indicated LEED certification depend on Architect's design and other aspects of Project that are not part of the Work of the Contract.

3. A copy of the LEED Project checklist is attached at the end of this Section for information only.

B. Related Sections:

1. Divisions 1 through 16 Sections for LEED requirements specific to the work of each of these Sections. Requirements may or may not include reference to LEED.

1.3 DEFINITIONS

A. Chain-of-Custody Certificates: Certificates signed by manufacturers certifying that wood used to make products was obtained from forests certified by an FSC-accredited certification body to comply with FSC STD-01-001, "FSC Principles and Criteria for Forest Stewardship." Certificates shall include evidence that manufacturer is certified for chain of custody by an FSC-FSC-accredited certification body.

B. LEED: Leadership in Energy & Environmental Design.

C. Rapidly Renewable Materials: Materials made from plants that are typically harvested within a 10-year or shorter cycle. Rapidly renewable materials include products made from bamboo, cotton, flax, jute, straw, sunflower seed hulls, vegetable oils, or wool.

D. Regional Materials: Materials that have been extracted, harvested, or recovered, as well as manufactured, within 500 miles (800 km) of Project site. If only a fraction of a product or

Page 70: Table of Contents Division Section Title

Mt. Pleasant Library 01352-2 20 Feburary 2009 CORE Group, P.C. LEED REQUIREMENTS

material is extracted/harvested/recovered and manufactured locally, then only that percentage (by weight) shall contribute to the regional value.

E. Regionally Manufactured Materials: Materials that are manufactured within a radius of 500 miles (800 km)

F. Regionally Extracted and Manufactured Materials: Regionally manufactured materials made from raw materials that are extracted, harvested, or recovered within a radius of

from Project site. Manufacturing refers to the final assembly of components into the building product that is installed at Project site.

500 miles (800 km)

G. Recycled Content: The recycled content value of a material assembly shall be determined by weight. The recycled fraction of the assembly is then multiplied by the cost of assembly to determine the recycled content value.

from Project site.

1. "Post-consumer" material is defined as waste material generated by households or by commercial, industrial, and institutional facilities in their role as end users of the product, which can no longer be used for its intended purpose.

2. "Pre-consumer" material is defined as material diverted from the waste stream during the manufacturing process. Excluded is reutilization of materials such as rework, regrind, or scrap generated in a process and capable of being reclaimed within the same process that generated it.

H. Recycled Content: The percentage by weight of constituents that have been recovered or otherwise diverted from the solid waste stream, either during the manufacturing process (pre-consumer), or after consumer use (post-consumer).

1. Spills and scraps from the original manufacturing process that are combined with other constituents after a minimal amount of reprocessing for use in further production of the same product are not recycled materials.

2. Discarded materials from one manufacturing process that are used as constituents in another manufacturing process are pre-consumer recycled materials.

1.4 SUBMITTALS

A. General: Submit additional LEED submittals required by other Specification Sections.

B. LEED submittals are in addition to other submittals. If submitted item is identical to that submitted to comply with other requirements, submit duplicate copies as a separate submittal to verify compliance with indicated LEED requirements.

C. Project Materials Cost Data: Provide statement indicating total cost for materials used for Project. Costs exclude labor, overhead, and profit. Include breakout of costs for the following categories of items:

1. Furniture. 2. Plumbing. 3. Mechanical. 4. Electrical. 5. Specialty items such as elevators and equipment.

Page 71: Table of Contents Division Section Title

Mt. Pleasant Library 01352-3 20 Feburary 2009 CORE Group, P.C. LEED REQUIREMENTS

6. Wood-based construction materials.

D. LEED Action Plans: Provide preliminary submittals within 60 days of date established for the Notice to Proceed indicating how the following requirements will be met:

1. Credit MR 2.1: Waste management plan complying with Division 1 Section "Construction Waste Management."

2. Credit MR 4.1: List of proposed materials with recycled content. Indicate cost, post-consumer recycled content, and pre-consumer recycled content for each product having recycled content.

3. Credit MR 5.1: List of proposed regional materials. Identify each regional material, including its source, cost, and the fraction by weight that is considered regional.

4. Credit MR 5.1: List of proposed regionally manufactured materials and regionally extracted and manufactured materials,

a. Identify each regionally manufactured material, including its source and cost. b. Identify each regionally extracted and manufactured material, including its source

and cost.

5. Credit MR 6: List of proposed certified wood products. Indicate each product containing certified wood, including its source and cost of certified wood products.

6. Credit EQ 3: Construction indoor-air-quality management plan.

E. LEED Progress Reports: Concurrent with each Application for Payment, submit reports comparing actual construction and purchasing activities with LEED action plans for the following:

1. Credit MR 2.1: Waste reduction progress reports complying with Division 1 Section "Construction Waste Management."

2. Credit MR 3: Salvaged and refurbished materials. 3. Credit MR 3.1: Salvaged and refurbished materials. 4. Credit MR 4.1: Recycled content. 5. Credit MR 5.1: Regional materials. 6. Credit MR 5.1: Regionally manufactured materials and regionally extracted and

manufactured materials. 7. Credit MR 6: Certified wood products.

F. LEED Documentation Submittals:

1. Credit EA 5.1: Product data and wiring diagrams for sensors and data collection system used to provide continuous metering of building energy-consumption performance over time.

2. Credit MR 2.1: Comply with Division 1 Section "Construction Waste Management." 3. Credit MR 4.1: Product data and certification letter indicating percentages by weight of

post-consumer and pre-consumer recycled content for products having recycled content. Include statement indicating costs for each product having recycled content.

4. Credit MR 5.1: Product data for regional materials indicating location and distance from Project of material manufacturer and point of extraction, harvest, or recovery for each raw material. Include statement indicating cost for each regional material and the fraction by weight that is considered regional.

Page 72: Table of Contents Division Section Title

Mt. Pleasant Library 01352-4 20 Feburary 2009 CORE Group, P.C. LEED REQUIREMENTS

5. Credit MR 5.1: Product data indicating location of material manufacturer for regionally manufactured materials. Include statement indicating cost for each regionally manufactured material and for each regionally extracted and manufactured material.

a. Include statement indicating distance from manufacturer to Project for each regionally manufactured material.

b. Include statement indicating location of and distance from Project to point of extraction, harvest, or recovery for each raw material used in regionally extracted and manufactured materials.

6. Credit MR 6: Product data and chain-of-custody certificates for products containing certified wood. Include statement indicating cost for each certified wood product.

7. Credit EQ 3:

a. Construction indoor-air-quality management plan. b. Product data for temporary filtration media. c. Product data for filtration media used during occupancy. d. Construction Documentation: Six photographs at three different times during the

construction period, along with a brief description of the SMACNA approach employed, documenting implementation of the indoor-air-quality management measures, such as protection of ducts and on-site stored or installed absorptive materials.

8. Credit EQ 4.1: Product data for adhesives and sealants used inside the weatherproofing system indicating VOC content of each product used. Indicate VOC content in g/L calculated according to 40 CFR 59, Subpart D.

9. Credit EQ 4.2: Product data for paints and coatings used inside the weatherproofing system indicating chemical composition and VOC content of each product used. Indicate VOC content in g/L calculated according to 40 CFR 59, Subpart D.

10. Credit EQ 4.4: Product data for products containing composite wood or agrifiber products or wood glues indicating that they do not contain urea-formaldehyde resin.

1.5 QUALITY ASSURANCE

A. LEED Coordinator: Engage an experienced LEED-Accredited Professional to coordinate LEED requirements. LEED coordinator may also serve as waste management coordinator.

PART 2 - PRODUCTS

2.1 SALVAGED AND REFURBISHED MATERIALS

2.2 RECYCLED CONTENT OF MATERIALS

A. Credit MR 4.1: Provide building materials with recycled content such that post-consumer recycled content plus one-half of pre-consumer recycled content constitutes a minimum of 10 percent of cost of materials used for Project.

Page 73: Table of Contents Division Section Title

Mt. Pleasant Library 01352-5 20 Feburary 2009 CORE Group, P.C. LEED REQUIREMENTS

1. Cost of post-consumer recycled content of an item shall be determined by dividing weight of post-consumer recycled content in the item by total weight of the item and multiplying by cost of the item.

2. Cost of pre-consumer recycled content of an item shall be determined by dividing weight of pre-consumer recycled content in the item by total weight of the item and multiplying by cost of the item.

3. Do not include furniture, plumbing, mechanical and electrical components, and specialty items such as elevators and equipment in the calculation.

2.3 REGIONAL MATERIALS

A. Credit MR 5.1: Provide a minimum of 10 percent of building materials (by cost) that are regional materials.

2.4 CERTIFIED WOOD

A. Credit MR 6: Provide a minimum of 50 percent (by cost) of wood-based materials that are produced from wood obtained from forests certified by an FSC-accredited certification body to comply with FSC STD-01-001, "FSC Principles and Criteria for Forest Stewardship."

1. Wood-based materials include, but are not limited to, the following materials when made from wood, engineered wood products, or wood-based panel products:

a. Rough carpentry. b. Miscellaneous carpentry. c. Heavy timber construction. d. Wood decking. e. Metal-plate-connected wood trusses. f. Structural glued-laminated timber. g. Finish carpentry. h. Architectural woodwork. i. Wood paneling. j. Wood veneer wall covering. k. Wood flooring. l. Wood lockers. m. Wood cabinets. n. Furniture.

2.5 LOW-EMITTING MATERIALS

A. Credit EQ 4.1: For field applications that are inside the weatherproofing system, use adhesives and sealants that comply with the following limits for VOC content when calculated according to 40 CFR 59, Subpart D:

1. Wood Glues: 30 g/L. 2. Metal to Metal Adhesives: 30 g/L. 3. Adhesives for Porous Materials (Except Wood): 50 g/L. 4. Subfloor Adhesives: 50 g/L.

Page 74: Table of Contents Division Section Title

Mt. Pleasant Library 01352-6 20 Feburary 2009 CORE Group, P.C. LEED REQUIREMENTS

5. Plastic Foam Adhesives: 50 g/L. 6. Carpet Adhesives: 50 g/L. 7. Carpet Pad Adhesives: 50 g/L. 8. VCT and Asphalt Tile Adhesives: 50 g/L. 9. Cove Base Adhesives: 50 g/L. 10. Gypsum Board and Panel Adhesives: 50 g/L. 11. Rubber Floor Adhesives: 60 g/L. 12. Ceramic Tile Adhesives: 65 g/L. 13. Multipurpose Construction Adhesives: 70 g/L. 14. Fiberglass Adhesives: 80 g/L. 15. Contact Adhesive: 80 g/L. 16. Structural Glazing Adhesives: 100 g/L. 17. Wood Flooring Adhesive: 100 g/L. 18. Structural Wood Member Adhesive: 140 g/L. 19. Special Purpose Contact Adhesive (contact adhesive that is used to bond melamine

covered board, metal, unsupported vinyl, Teflon, ultra-high molecular weight polyethylene, rubber or wood veneer 1/16 inch or less in thickness to any surface): 250 g/L.

20. Top and Trim Adhesive: 250 g/L. 21. Plastic Cement Welding Compounds: 250 g/L. 22. ABS Welding Compounds: 325 g/L. 23. CPVC Welding Compounds: 490 g/L. 24. PVC Welding Compounds: 510 g/L. 25. Adhesive Primer for Plastic: 550 g/L. 26. Plastic Cement Welding Compounds: 350 g/L. 27. ABS Welding Compounds: 400 g/L. 28. CPVC Welding Compounds: 490 g/L. 29. PVC Welding Compounds: 510 g/L. 30. Adhesive Primer for Plastic: 650 g/L. 31. Sheet Applied Rubber Lining Adhesive: 850 g/L. 32. Aerosol Adhesive, General Purpose Mist Spray: 65 percent by weight. 33. Aerosol Adhesive, General Purpose Web Spray: 55 percent by weight. 34. Special Purpose Aerosol Adhesive (All Types): 70 percent by weight. 35. Other Adhesives: 250 g/L. 36. Architectural Sealants: 250 g/L. 37. Nonmembrane Roof Sealants: 300 g/L. 38. Single-Ply Roof Membrane Sealants: 450 g/L. 39. Other Sealants: 420 g/L. 40. Sealant Primers for Nonporous Substrates: 250 g/L. 41. Sealant Primers for Porous Substrates: 775 g/L. 42. Modified Bituminous Sealant Primers: 500 g/L. 43. Other Sealant Primers: 750 g/L.

B. Credit EQ 4.2: For field applications that are inside the weatherproofing system, use paints and coatings that comply with the following limits for VOC content when calculated according to 40 CFR 59, Subpart D and the following chemical restrictions:

1. Flat Paints, Coatings, and Primers: VOC not more than 50 g/L. 2. Nonflat Paints, Coatings, and Primers: VOC not more than 150 g/L. 3. Anticorrosive and Antirust Paints Applied to Ferrous Metals: VOC not more than 250

g/L.

Page 75: Table of Contents Division Section Title

Mt. Pleasant Library 01352-7 20 Feburary 2009 CORE Group, P.C. LEED REQUIREMENTS

4. Clear Wood Finishes, Varnishes: VOC not more than 350 g/L. 5. Clear Wood Finishes, Lacquers: VOC not more than 550 g/L. 6. Floor Coatings: VOC not more than 100 g/L. 7. Shellacs, Clear: VOC not more than 730 g/L. 8. Shellacs, Pigmented: VOC not more than 550 g/L. 9. Stains: VOC not more than 250 g/L. 10. Flat Interior Topcoat Paints: VOC not more than 50 g/L. 11. Nonflat Interior Topcoat Paints: VOC not more than 150 g/L. 12. Anticorrosive and Antirust Paints Applied to Ferrous Metals: VOC not more than 250

g/L. 13. Clear Wood Finishes, Varnishes and Sanding Sealers: VOC not more than 350 g/L. 14. Clear Wood Finishes, Lacquers: VOC not more than 550 g/L. 15. Floor Coatings: VOC not more than 100 g/L. 16. Shellacs, Clear: VOC not more than 730 g/L. 17. Shellacs, Pigmented: VOC not more than 550 g/L. 18. Stains: VOC not more than 250 g/L. 19. Primers, Sealers, and Undercoaters: VOC not more than 200 g/L. 20. Dry-Fog Coatings: VOC not more than 400 g/L. 21. Zinc-Rich Industrial Maintenance Primers: VOC not more than 340 g/L. 22. Pretreatment Wash Primers: VOC not more than 420 g/L. 23. Aromatic Compounds: Paints and coatings shall not contain more than 1.0 percent by

weight total aromatic compounds (hydrocarbon compounds containing one or more benzene rings).

24. Restricted Components: Paints and coatings shall not contain any of the following:

a. Acrolein. b. Acrylonitrile. c. Antimony. d. Benzene. e. Butyl benzyl phthalate. f. Cadmium. g. Di (2-ethylhexyl) phthalate. h. Di-n-butyl phthalate. i. Di-n-octyl phthalate. j. 1,2-dichlorobenzene. k. Diethyl phthalate. l. Dimethyl phthalate. m. Ethylbenzene. n. Formaldehyde. o. Hexavalent chromium. p. Isophorone. q. Lead. r. Mercury. s. Methyl ethyl ketone. t. Methyl isobutyl ketone. u. Methylene chloride. v. Naphthalene. w. Toluene (methylbenzene). x. 1,1,1-trichloroethane. y. Vinyl chloride.

Page 76: Table of Contents Division Section Title

Mt. Pleasant Library 01352-8 20 Feburary 2009 CORE Group, P.C. LEED REQUIREMENTS

C. Credit EQ 4.4: Do not use composite wood or agrifiber products or adhesives that contain urea-formaldehyde resin.

PART 3 - EXECUTION

3.1 REFRIGERANT AND CLEAN-AGENT FIRE-EXTINGUISHING-AGENT REMOVAL

A. Prerequisite EA 3: Remove CFC-based refrigerants from existing HVAC&R equipment indicated to remain and replace with refrigerants that are not CFC based. Replace or adjust existing equipment to accommodate new refrigerant as described in Division 15 Sections.

B. Credit EA 4: Remove clean-agent fire-extinguishing agents that contain HCFCs or halons and replace with agent that does not contain HCFCs or halons. See Division 13 Section "Clean-Agent Extinguishing Systems" for additional requirements.

3.2 MEASUREMENT AND VERIFICATION

A. Credit EA 5.1: Implement measurement and verification plan consistent with Option D: Calibrated Simulation, Savings Estimation Method 2 in the EVO's "International Performance Measurement and Verification Protocol (IPMVP) Volume III: Concepts and Options for Determining Energy Savings in New Construction".

B. If not already in place, install metering equipment to measure energy usage. Monitor, record, and trend log measurements.

C. Evaluate energy performance and efficiency by comparing actual to predicted performance.

D. Measurement and verification period shall cover at least one year of postconstruction occupancy.

3.3 CONSTRUCTION WASTE MANAGEMENT

A. Credit MR 2.1: Comply with Division 1 Section "Construction Waste Management."

3.4 CONSTRUCTION INDOOR-AIR-QUALITY MANAGEMENT

A. Credit EQ 3: Comply with SMACNA's "SMACNA IAQ Guideline for Occupied Buildings under Construction."

1. If Owner authorizes use of permanent heating, cooling, and ventilating systems during construction period as specified in Division 1 Section "Temporary Facilities and Controls," install filter media having a MERV 8 according to ASHRAE 52.2 at each return-air inlet for the air-handling system used during construction.

2. Replace all air filters immediately prior to occupancy.

END OF SECTION 01352

Page 77: Table of Contents Division Section Title

Mt. Pleasant Library 01400-1 20 Feburary 2009 CORE Group, P.C. QUALITY REQUIREMENTS

SECTION 01400

PART 1 - GENERAL

QUALITY REQUIREMENTS

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General Conditions to Construction Contract and other Division 1 Specification Sections, apply to this Section.

1.2 SUMMARY

A. Section includes administrative and procedural requirements for quality assurance and quality control.

B. Testing and inspecting services are required to verify compliance with requirements specified or indicated. These services do not relieve Contractor of responsibility for compliance with the Contract Document requirements.

1. Specific quality-assurance and -control requirements for individual construction activities are specified in the Sections that specify those activities. Requirements in those Sections may also cover production of standard products.

2. Specified tests, inspections, and related actions do not limit Contractor's other quality-assurance and -control procedures that facilitate compliance with the Contract Document requirements.

3. Requirements for Contractor to provide quality-assurance and -control services required by Architect, Owner or authorities having jurisdiction are not limited by provisions of this Section.

C. Related Sections:

1. Division 1 Section "Allowances" for testing and inspecting allowances. 2. Division 1 Section "Construction Progress Documentation" for developing a schedule of

required tests and inspections. 3. Divisions 2 through 16 Sections for specific test and inspection requirements.

1.3 DEFINITIONS

A. Quality-Assurance Services: Activities, actions, and procedures performed before and during execution of the Work to guard against defects and deficiencies and substantiate that proposed construction will comply with requirements.

B. Quality-Control Services: Tests, inspections, procedures, and related actions during and after execution of the Work to evaluate that actual products incorporated into the Work and completed construction comply with requirements. Services do not include contract enforcement activities performed by Architect.

Page 78: Table of Contents Division Section Title

Mt. Pleasant Library 01400-2 20 Feburary 2009 CORE Group, P.C. QUALITY REQUIREMENTS

C. Mockups: Full size physical assemblies that are constructed on-site. Mockups are constructed to verify selections made under sample submittals; to demonstrate aesthetic effects and, where indicated, qualities of materials and execution; to review coordination, testing, or operation; to show interface between dissimilar materials; and to demonstrate compliance with specified installation tolerances. Mockups are not Samples. Unless otherwise indicated, approved mockups establish the standard by which the Work will be judged.

1. Laboratory Mockups: Full-size, physical assemblies constructed at testing facility to verify performance characteristics.

2. Integrated Exterior Mockups: Mockups of the exterior envelope erected separately from the building but on the project site, consisting of multiple products, assemblies and subassemblies.

3. Room Mockups: Mockups of typical interior spaces complete with wall, floor, and ceiling finishes, doors, windows, millwork, casework, specialties, furnishings and equipment, and lighting.

D. Preconstruction Testing: Tests and inspections performed specifically for the Project before products and materials are incorporated into the Work to verify performance or compliance with specified criteria.

E. Product Testing: Tests and inspections that are performed by an NRTL, an NVLAP, or a testing agency qualified to conduct product testing and acceptable to authorities having jurisdiction, to establish product performance and compliance with specified requirements.

F. Source Quality-Control Testing: Tests and inspections that are performed at the source, i.e., plant, mill, factory, or shop.

G. Field Quality-Control Testing: Tests and inspections that are performed on-site for installation of the Work and for completed Work.

H. Testing Agency: An entity engaged to perform specific tests, inspections, or both. Testing laboratory shall mean the same as testing agency.

I. Installer/Applicator/Erector: Contractor or another entity engaged by Contractor as an employee, Subcontractor, or Sub-subcontractor, to perform a particular construction operation, including installation, erection, application, and similar operations.

1. Use of trade-specific terminology in referring to a trade or entity does not require that certain construction activities be performed by accredited or unionized individuals, or that requirements specified apply exclusively to specific trade or trades.

J. Experienced: When used with an entity or individual, "experienced" means having successfully completed a minimum of [five] previous projects similar in nature, size, and extent to this Project; being familiar with special requirements indicated; and having complied with requirements of authorities having jurisdiction.

1.4 CONFLICTING REQUIREMENTS

A. Referenced Standards: If compliance with two or more standards is specified and the standards establish different or conflicting requirements for minimum quantities or quality levels, comply

Page 79: Table of Contents Division Section Title

Mt. Pleasant Library 01400-3 20 Feburary 2009 CORE Group, P.C. QUALITY REQUIREMENTS

with the most stringent requirement. Refer conflicting requirements that are different, but apparently equal, to Architect for a decision before proceeding.

B. Minimum Quantity or Quality Levels: The quantity or quality level shown or specified shall be the minimum provided or performed. The actual installation may comply exactly with the minimum quantity or quality specified, or it may exceed the minimum within reasonable limits. To comply with these requirements, indicated numeric values are minimum or maximum, as appropriate, for the context of requirements. Refer uncertainties to Architect for a decision before proceeding.

1.5 ACTION SUBMITTALS

A. Shop Drawings: For integrated exterior mockups, provide plans, sections, and elevations, indicating materials and size of mockup construction.

1. Indicate manufacturer and model number of individual components. 2. Provide axonometric drawings for conditions difficult to illustrate in two dimensions.

1.6 INFORMATIONAL SUBMITTALS

A. Contractor's Quality-Control Plan: For quality-assurance and quality-control activities and responsibilities.

B. Contractor's Quality-Control Manager Qualifications: For supervisory personnel.

C. Contractor's Statement of Responsibility: When required by authorities having jurisdiction, submit copy of written statement of responsibility sent to authorities having jurisdiction before starting work on the following systems.

1. Seismic-force resisting system, designated seismic system, or component listed in the designated seismic system quality assurance plan prepared by the Architect.

2. Main wind-force resisting system or a wind-resisting component listed in the wind-force-resisting system quality assurance plan prepared by the Architect.

D. Testing Agency Qualifications: For testing agencies specified in "Quality Assurance" Article to demonstrate their capabilities and experience. Include proof of qualifications in the form of a recent report on the inspection of the testing agency by a recognized authority.

E. Schedule of Tests and Inspections: Prepare in tabular form and include the following:

1. Specification Section number and title. 2. Entity responsible for performing tests and inspections. 3. Description of test and inspection. 4. Identification of applicable standards. 5. Identification of test and inspection methods. 6. Number of tests and inspections required. 7. Time schedule or time span for tests and inspections. 8. Requirements for obtaining samples. 9. Unique characteristics of each quality-control service.

Page 80: Table of Contents Division Section Title

Mt. Pleasant Library 01400-4 20 Feburary 2009 CORE Group, P.C. QUALITY REQUIREMENTS

1.7 CONTRACTOR'S QUALITY-CONTROL PLAN

A. Quality-Control Plan, General: Submit quality-control plan within 10 days of Notice to Proceed, and not less than five days prior to preconstruction conference. Submit in format acceptable to Architect. Identify personnel, procedures, controls, instructions, tests, records, and forms to be used to carry out Contractor's quality-assurance and quality-control responsibilities. Coordinate with Contractor's construction schedule.

B. Quality-Control Personnel Qualifications: Engage qualified full-time personnel trained and experienced in managing and executing quality-assurance and quality-control procedures similar in nature and extent to those required for Project.

1. Project quality-control manager may also serve as Project superintendent

C. Submittal Procedure: Describe procedures for ensuring compliance with requirements through review and management of submittal process. Indicate qualifications of personnel responsible for submittal review.

D. Testing and Inspection: Include in quality-control plan a comprehensive schedule of Work requiring testing or inspection, including the following:

1. Contractor-performed tests and inspections including subcontractor-performed tests and inspections. Include required tests and inspections and Contractor-elected tests and inspections.

2. Special inspections required by authorities having jurisdiction and indicated on the "Statement of Special Inspections."

3. Owner-performed tests and inspections indicated in the Contract Documents.

E. Continuous Inspection of Workmanship: Describe process for continuous inspection during construction to identify and correct deficiencies in workmanship in addition to testing and inspection specified. Indicate types of corrective actions to be required to bring work into compliance with standards of workmanship established by Contract requirements and approved mockups.

F. Monitoring and Documentation: Maintain testing and inspection reports including log of approved and rejected results. Include work Architect has indicated as nonconforming or defective. Indicate corrective actions taken to bring nonconforming work into compliance with requirements. Comply with requirements of authorities having jurisdiction.

1.8 REPORTS AND DOCUMENTS

A. Test and Inspection Reports: Prepare and submit certified written reports specified in other Sections. Include the following:

1. Date of issue. 2. Project title and number. 3. Name, address, and telephone number of testing agency. 4. Dates and locations of samples and tests or inspections. 5. Names of individuals making tests and inspections. 6. Description of the Work and test and inspection method.

Page 81: Table of Contents Division Section Title

Mt. Pleasant Library 01400-5 20 Feburary 2009 CORE Group, P.C. QUALITY REQUIREMENTS

7. Identification of product and Specification Section. 8. Complete test or inspection data. 9. Test and inspection results and an interpretation of test results. 10. Record of temperature and weather conditions at time of sample taking and testing and

inspecting. 11. Comments or professional opinion on whether tested or inspected Work complies with

the Contract Document requirements. 12. Name and signature of laboratory inspector. 13. Recommendations on retesting and reinspecting.

B. Manufacturer's Technical Representative's Field Reports: Prepare written information documenting manufacturer's technical representative's tests and inspections specified in other Sections. Include the following:

1. Name, address, and telephone number of technical representative making report. 2. Statement on condition of substrates and their acceptability for installation of product. 3. Statement that products at Project site comply with requirements. 4. Summary of installation procedures being followed, whether they comply with

requirements and, if not, what corrective action was taken. 5. Results of operational and other tests and a statement of whether observed performance

complies with requirements. 6. Statement whether conditions, products, and installation will affect warranty. 7. Other required items indicated in individual Specification Sections.

C. Factory-Authorized Service Representative's Reports: Prepare written information documenting manufacturer's factory-authorized service representative's tests and inspections specified in other Sections. Include the following:

1. Name, address, and telephone number of factory-authorized service representative making report.

2. Statement that equipment complies with requirements. 3. Results of operational and other tests and a statement of whether observed performance

complies with requirements. 4. Statement whether conditions, products, and installation will affect warranty. 5. Other required items indicated in individual Specification Sections.

D. Permits, Licenses, and Certificates: For Owner's records, submit copies of permits, licenses, certifications, inspection reports, releases, jurisdictional settlements, notices, receipts for fee payments, judgments, correspondence, records, and similar documents, established for compliance with standards and regulations bearing on performance of the Work.

1.9 QUALITY ASSURANCE

A. General: Qualifications paragraphs in this article establish the minimum qualification levels required; individual Specification Sections specify additional requirements.

B. Manufacturer Qualifications: A firm experienced in manufacturing products or systems similar to those indicated for this Project and with a record of successful in-service performance, as well as sufficient production capacity to produce required units.

Page 82: Table of Contents Division Section Title

Mt. Pleasant Library 01400-6 20 Feburary 2009 CORE Group, P.C. QUALITY REQUIREMENTS

C. Fabricator Qualifications: A firm experienced in producing products similar to those indicated for this Project and with a record of successful in-service performance, as well as sufficient production capacity to produce required units.

D. Installer Qualifications: A firm or individual experienced in installing, erecting, or assembling work similar in material, design, and extent to that indicated for this Project, whose work has resulted in construction with a record of successful in-service performance.

E. Professional Engineer Qualifications: A professional engineer who is legally qualified to practice in jurisdiction where Project is located and who is experienced in providing engineering services of the kind indicated. Engineering services are defined as those performed for installations of the system, assembly, or product that are similar to those indicated for this Project in material, design, and extent.

F. Specialists: Certain Specification Sections require that specific construction activities shall be performed by entities who are recognized experts in those operations. Specialists shall satisfy qualification requirements indicated and shall be engaged for the activities indicated.

1. Requirements of authorities having jurisdiction shall supersede requirements for specialists.

G. Testing Agency Qualifications: An NRTL, an NVLAP, or an independent agency with the experience and capability to conduct testing and inspecting indicated, as documented according to [ASTM E 329] and with additional qualifications specified in individual Sections; and where required by authorities having jurisdiction, that is acceptable to authorities.

1. NRTL: A nationally recognized testing laboratory according to 29 CFR 1910.7. 2. NVLAP: A testing agency accredited according to NIST's National Voluntary

Laboratory Accreditation Program.

H. Manufacturer's Technical Representative Qualifications: An authorized representative of manufacturer who is trained and approved by manufacturer to observe and inspect installation of manufacturer's products that are similar in material, design, and extent to those indicated for this Project.

I. Factory-Authorized Service Representative Qualifications: An authorized representative of manufacturer who is trained and approved by manufacturer to inspect installation of manufacturer's products that are similar in material, design, and extent to those indicated for this Project.

J. Preconstruction Testing: Where testing agency is indicated to perform preconstruction testing for compliance with specified requirements for performance and test methods, comply with the following:

1. Contractor responsibilities include the following:

a. Provide test specimens representative of proposed products and construction. b. Submit specimens in a timely manner with sufficient time for testing and analyzing

results to prevent delaying the Work.

Page 83: Table of Contents Division Section Title

Mt. Pleasant Library 01400-7 20 Feburary 2009 CORE Group, P.C. QUALITY REQUIREMENTS

c. Provide sizes and configurations of test assemblies, mockups, and laboratory mockups to adequately demonstrate capability of products to comply with performance requirements.

d. Build site-assembled test assemblies and mockups using installers who will perform same tasks for Project.

e. Build laboratory mockups at testing facility using personnel, products, and methods of construction indicated for the completed Work.

f. When testing is complete, remove test specimens, assemblies, mockups; do not reuse products on Project.

2. Testing Agency Responsibilities: Submit a certified written report of each test, inspection, and similar quality-assurance service to Architect, with copy to Contractor. Interpret tests and inspections and state in each report whether tested and inspected work complies with or deviates from the Contract Documents.

K. Mockups: Before installing portions of the Work requiring mockups, build mockups for each form of construction and finish required to comply with the following requirements, using materials indicated for the completed Work:

1. Build mockups in location and of size indicated or, if not indicated, as directed by Architect.

2. Notify Architect [seven] days in advance of dates and times when mockups will be constructed.

3. Employ supervisory personnel who will oversee mockup construction. Employ workers that will be employed during the construction at the Project.

4. Demonstrate the proposed range of aesthetic effects and workmanship. 5. Obtain Architect's approval of mockups before starting work, fabrication, or construction.

a. Allow [seven] days for initial review and each re-review of each mockup.

6. Maintain mockups during construction in an undisturbed condition as a standard for judging the completed Work.

7. Demolish and remove mockups when directed, unless otherwise indicated.

L. Integrated Exterior Mockups: Construct integrated exterior mockup [as indicated on Drawings]. Coordinate installation of exterior envelope materials and products for which mockups are required in individual specification sections, along with supporting materials.

1.10

1.11 QUALITY CONTROL

A. Owner Responsibilities: Where quality-control services are indicated as Owner's responsibility, Owner will engage a qualified testing agency to perform these services.

1. Owner will furnish Contractor with names, addresses, and telephone numbers of testing agencies engaged and a description of types of testing and inspecting they are engaged to perform.

Page 84: Table of Contents Division Section Title

Mt. Pleasant Library 01400-8 20 Feburary 2009 CORE Group, P.C. QUALITY REQUIREMENTS

2. Payment for these services will be made from testing and inspecting allowances, as authorized by Change Orders.

3. Costs for retesting and re-inspecting construction that replaces or is necessitated by work that failed to comply with the Contract Documents will be charged to Contractor, and the Contract Sum will be adjusted by Change Order.

B. Contractor Responsibilities: Tests and inspections not explicitly assigned to Owner are Contractor's responsibility. Perform additional quality-control activities required to verify that the Work complies with requirements, whether specified or not.

1. Unless otherwise indicated, provide quality-control services specified and those required by authorities having jurisdiction. Perform quality-control services required of Contractor by authorities having jurisdiction, whether specified or not.

2. Where services are indicated as Contractor's responsibility, engage a qualified testing agency to perform these quality-control services.

a. Contractor shall not employ same entity engaged by Owner, unless agreed to in writing by Owner.

3. Notify testing agencies at least [24] hours in advance of time when Work that requires testing or inspecting will be performed.

4. Where quality-control services are indicated as Contractor's responsibility, submit a certified written report, in duplicate, of each quality-control service.

5. Testing and inspecting requested by Contractor and not required by the Contract Documents are Contractor's responsibility.

6. Submit additional copies of each written report directly to authorities having jurisdiction, when they so direct.

C. Manufacturer's Field Services: Where indicated, engage a factory-authorized service representative to inspect field-assembled components and equipment installation, including service connections. Report results in writing as specified in Division 1 Section "Submittal Procedures."

D. Manufacturer's Technical Services: Where indicated, engage a manufacturer's technical representative to observe and inspect the Work. Manufacturer's technical representative's services include participation in preinstallation conferences, examination of substrates and conditions, verification of materials, observation of Installer activities, inspection of completed portions of the Work, and submittal of written reports.

E. Retesting/Reinspecting: Regardless of whether original tests or inspections were Contractor's responsibility, provide quality-control services, including retesting and reinspecting, for construction that replaced Work that failed to comply with the Contract Documents.

F. Testing Agency Responsibilities: Cooperate with Architect and Contractor in performance of duties. Provide qualified personnel to perform required tests and inspections.

1. Notify Architect and Contractor promptly of irregularities or deficiencies observed in the Work during performance of its services.

2. Determine the location from which test samples will be taken and in which in-situ tests are conducted.

Page 85: Table of Contents Division Section Title

Mt. Pleasant Library 01400-9 20 Feburary 2009 CORE Group, P.C. QUALITY REQUIREMENTS

3. Conduct and interpret tests and inspections and state in each report whether tested and inspected work complies with or deviates from requirements.

4. Submit a certified written report, in duplicate, of each test, inspection, and similar quality-control service through Contractor.

5. Do not release, revoke, alter, or increase the Contract Document requirements or approve or accept any portion of the Work.

6. Do not perform any duties of Contractor.

G. Associated Services: Cooperate with agencies performing required tests, inspections, and similar quality-control services, and provide reasonable auxiliary services as requested. Notify agency sufficiently in advance of operations to permit assignment of personnel. Provide the following:

1. Access to the Work. 2. Incidental labor and facilities necessary to facilitate tests and inspections. 3. Adequate quantities of representative samples of materials that require testing and

inspecting. Assist agency in obtaining samples. 4. Facilities for storage and field curing of test samples. 5. Delivery of samples to testing agencies. 6. Preliminary design mix proposed for use for material mixes that require control by testing

agency. 7. Security and protection for samples and for testing and inspecting equipment at Project

site.

H. Coordination: Coordinate sequence of activities to accommodate required quality-assurance and -control services with a minimum of delay and to avoid necessity of removing and replacing construction to accommodate testing and inspecting.

1. Schedule times for tests, inspections, obtaining samples, and similar activities.

PART 2 - PRODUCTS (Not Used)

PART 3 - EXECUTION

3.1 ACCEPTABLE TESTING AGENCIES

A. Contractor to submit a list of firms acceptable to owner to perform designated tests and inspections.

3.2 TEST AND INSPECTION LOG

A. Prepare a record of tests and inspections. Include the following:

1. Date test or inspection was conducted. 2. Description of the Work tested or inspected. 3. Date test or inspection results were transmitted to Architect. 4. Identification of testing agency or special inspector conducting test or inspection.

Page 86: Table of Contents Division Section Title

Mt. Pleasant Library 01400-10 20 Feburary 2009 CORE Group, P.C. QUALITY REQUIREMENTS

B. Maintain log at Project site. Post changes and modifications as they occur. Provide access to test and inspection log for Architect's reference during normal working hours.

3.3 REPAIR AND PROTECTION

A. General: On completion of testing, inspecting, sample taking, and similar services, repair damaged construction and restore substrates and finishes.

1. Provide materials and comply with installation requirements specified in other Specification Sections or matching existing substrates and finishes. Restore patched areas and extend restoration into adjoining areas with durable seams that are as invisible as possible. Comply with the Contract Document requirements for cutting and patching in Division 1 Section "Execution Requirements."

B. Protect construction exposed by or for quality-control service activities.

C. Repair and protection are Contractor's responsibility, regardless of the assignment of responsibility for quality-control services.

END OF SECTION 01400

Page 87: Table of Contents Division Section Title

Mt. Pleasant Library 01420-1 20 Feburary 2009 CORE Group, P.C. REFERENCES

SECTION 01420

PART 1 - GENERAL

REFERENCES

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification Sections, apply to this Section.

1.2 DEFINITIONS

A. General: Basic Contract definitions are included in the Conditions of the Contract.

B. "Approved": When used to convey Architect's action on Contractor's submittals, applications, and requests, "approved" is limited to Architect's duties and responsibilities as stated in the Conditions of the Contract.

C. "Directed": A command or instruction by Architect. Other terms including "requested," "authorized," "selected," "required," and "permitted" have the same meaning as "directed."

D. "Indicated": Requirements expressed by graphic representations or in written form on Drawings, in Specifications, and in other Contract Documents. Other terms including "shown," "noted," "scheduled," and "specified" have the same meaning as "indicated."

E. "Regulations": Laws, ordinances, statutes, and lawful orders issued by authorities having jurisdiction, and rules, conventions, and agreements within the construction industry that control performance of the Work.

F. "Furnish": Supply and deliver to Project site, ready for unloading, unpacking, assembly, installation, and similar operations.

G. "Install": Operations at Project site including unloading, temporarily storing, unpacking, assembling, erecting, placing, anchoring, applying, working to dimension, finishing, curing, protecting, cleaning, and similar operations.

H. "Provide": Furnish and install, complete and ready for the intended use.

I. "Project Site": Space available for performing construction activities. The extent of Project site is shown on Drawings and may or may not be identical with the description of the land on which Project is to be built.

1.3 INDUSTRY STANDARDS

A. Applicability of Standards: Unless the Contract Documents include more stringent requirements, applicable construction industry standards have the same force and effect as if

Page 88: Table of Contents Division Section Title

Mt. Pleasant Library 01420-2 20 Feburary 2009 CORE Group, P.C. REFERENCES

bound or copied directly into the Contract Documents to the extent referenced. Such standards are made a part of the Contract Documents by reference.

B. Publication Dates: Comply with standards in effect as of date of the Contract Documents unless otherwise indicated.

C. Copies of Standards: Each entity engaged in construction on Project should be familiar with industry standards applicable to its construction activity. Copies of applicable standards are not bound with the Contract Documents.

1. Where copies of standards are needed to perform a required construction activity, obtain copies directly from publication source.

1.4 ABBREVIATIONS AND ACRONYMS

A. Industry Organizations: Where abbreviations and acronyms are used in Specifications or other Contract Documents, they shall mean the recognized name of the entities indicated in Thomson Gale's "Encyclopedia of Associations" or in Columbia Books' "National Trade & Professional Associations of the U.S."

B. Industry Organizations: Where abbreviations and acronyms are used in Specifications or other Contract Documents, they shall mean the recognized name of the entities in the following list. Names, telephone numbers, and Web sites are subject to change and are believed to be accurate and up-to-date as of the date of the Contract Documents.

PRIVATE tbl1 AA Aluminum Association, Inc. (The) (703) 358-2960 www.aluminum.org AAADM American Association of Automatic Door Manufacturers (216) 241-7333 www.aaadm.com AABC Associated Air Balance Council (202) 737-0202 www.aabchq.com AAMA American Architectural Manufacturers Association (847) 303-5664 www.aamanet.org AASHTO American Association of State Highway and Transportation

Officials (202) 624-5800

www.transportation.org AATCC American Association of Textile Chemists and Colorists (919) 549-8141 www.aatcc.org ABAA Air Barrier Association of America (866) 956-5888 www.airbarrier.org ABMA American Bearing Manufacturers Association (202) 367-1155 www.abma-dc.org

Page 89: Table of Contents Division Section Title

Mt. Pleasant Library 01420-3 20 Feburary 2009 CORE Group, P.C. REFERENCES

ACI American Concrete Institute (248) 848-3700 www.concrete.org ACPA American Concrete Pipe Association (972) 506-7216 www.concrete-pipe.org AEIC Association of Edison Illuminating Companies, Inc. (The) (205) 257-2530 www.aeic.org AF&PA American Forest & Paper Association (800) 878-8878 www.afandpa.org (202) 463-2700 AGA American Gas Association (202) 824-7000 www.aga.org AGC Associated General Contractors of America (The) (703) 548-3118 www.agc.org AHA American Hardboard Association (Now part of CPA) AHAM Association of Home Appliance Manufacturers (202) 872-5955 www.aham.org AI Asphalt Institute (859) 288-4960 www.asphaltinstitute.org AIA American Institute of Architects (The) (800) 242-3837 www.aia.org (202) 626-7300 AISC American Institute of Steel Construction (800) 644-2400 www.aisc.org (312) 670-2400 AISI American Iron and Steel Institute (202) 452-7100 www.steel.org AITC American Institute of Timber Construction (303) 792-9559 www.aitc-glulam.org ALCA Associated Landscape Contractors of America (Now PLANET - Professional Landcare Network) ALSC American Lumber Standard Committee, Incorporated (301) 972-1700 www.alsc.org AMCA Air Movement and Control Association International, Inc. (847) 394-0150 www.amca.org ANSI American National Standards Institute (202) 293-8020 www.ansi.org

Page 90: Table of Contents Division Section Title

Mt. Pleasant Library 01420-4 20 Feburary 2009 CORE Group, P.C. REFERENCES

AOSA Association of Official Seed Analysts, Inc. (405) 780-7372 www.aosaseed.com APA Architectural Precast Association (239) 454-6989 www.archprecast.org APA APA - The Engineered Wood Association (253) 565-6600 www.apawood.org APA EWS APA - The Engineered Wood Association; Engineered Wood

Systems

(See APA - The Engineered Wood Association) API American Petroleum Institute (202) 682-8000 www.api.org ARI Air-Conditioning & Refrigeration Institute (703) 524-8800 www.ari.org ARMA Asphalt Roofing Manufacturers Association (202) 207-0917 www.asphaltroofing.org ASCE American Society of Civil Engineers (800) 548-2723 www.asce.org (703) 295-6300 ASCE/SEI American Society of Civil Engineers/Structural Engineering

Institute

(See ASCE) ASHRAE American Society of Heating, Refrigerating and Air-

Conditioning Engineers (800) 527-4723

www.ashrae.org (404) 636-8400 ASME ASME International (800) 843-2763 (American Society of Mechanical Engineers International) (973) 882-1170 www.asme.org ASSE American Society of Sanitary Engineering (440) 835-3040 www.asse-plumbing.org ASTM ASTM International (610) 832-9500 (American Society for Testing and Materials International) www.astm.org AWCI Association of the Wall and Ceiling Industry (703) 534-8300 www.awci.org AWCMA American Window Covering Manufacturers Association (Now WCMA) AWI Architectural Woodwork Institute (571) 323-3636

Page 91: Table of Contents Division Section Title

Mt. Pleasant Library 01420-5 20 Feburary 2009 CORE Group, P.C. REFERENCES

www.awinet.org AWPA American Wood Protection Association (205) 733-4077 (Formerly: American Wood Preservers' Association) www.awpa.com AWS American Welding Society (800) 443-9353 www.aws.org (305) 443-9353 AWWA American Water Works Association (800) 926-7337 www.awwa.org (303) 794-7711 BHMA Builders Hardware Manufacturers Association (212) 297-2122 www.buildershardware.com BIA Brick Industry Association (The) (703) 620-0010 www.bia.org BICSI BICSI, Inc. (800) 242-7405 www.bicsi.org (813) 979-1991 BIFMA BIFMA International (616) 285-3963 (Business and Institutional Furniture Manufacturer's Association

International)

www.bifma.com BISSC Baking Industry Sanitation Standards Committee (866) 342-4772 www.bissc.org BWF Badminton World Federation 6-03-9283 7155 (Formerly: IBF - International Badminton Federation) www.internationalbadminton.org CCC Carpet Cushion Council (610) 527-3880 www.carpetcushion.org CDA Copper Development Association (800) 232-3282 www.copper.org (212) 251-7200 CEA Canadian Electricity Association (613) 230-9263 www.canelect.ca CEA Consumer Electronics Association (866) 858-1555 www.ce.org (703) 907-7600 CFFA Chemical Fabrics & Film Association, Inc. (216) 241-7333 www.chemicalfabricsandfilm.com CGA Compressed Gas Association (703) 788-2700 www.cganet.com

Page 92: Table of Contents Division Section Title

Mt. Pleasant Library 01420-6 20 Feburary 2009 CORE Group, P.C. REFERENCES

CIMA Cellulose Insulation Manufacturers Association (888) 881-2462 www.cellulose.org (937) 222-2462 CISCA Ceilings & Interior Systems Construction Association (630) 584-1919 www.cisca.org CISPI Cast Iron Soil Pipe Institute (423) 892-0137 www.cispi.org CLFMI Chain Link Fence Manufacturers Institute (301) 596-2583 www.chainlinkinfo.org CRRC Cool Roof Rating Council (866) 465-2523 www.coolroofs.org (510) 485-7175 CPA Composite Panel Association (301) 670-0604 www.pbmdf.com CPPA Corrugated Polyethylene Pipe Association (800) 510-2772 www.cppa-info.org (202) 462-9607 CRI Carpet and Rug Institute (The) (800) 882-8846 www.carpet-rug.com (706) 278-3176 CRSI Concrete Reinforcing Steel Institute (847) 517-1200 www.crsi.org CSA Canadian Standards Association (800) 463-6727 (416) 747-4000 CSA CSA International (866) 797-4272 (Formerly: IAS - International Approval Services) (416) 747-4000 www.csa-international.org CSI Cast Stone Institute (717) 272-3744 www.caststone.org CSI Construction Specifications Institute (The) (800) 689-2900 www.csinet.org (703) 684-0300 CSSB Cedar Shake & Shingle Bureau (604) 820-7700 www.cedarbureau.org CTI Cooling Technology Institute (281) 583-4087 (Formerly: Cooling Tower Institute) www.cti.org DHI Door and Hardware Institute (703) 222-2010 www.dhi.org EIA Electronic Industries Alliance (703) 907-7500

Page 93: Table of Contents Division Section Title

Mt. Pleasant Library 01420-7 20 Feburary 2009 CORE Group, P.C. REFERENCES

www.eia.org EIMA EIFS Industry Members Association (800) 294-3462 www.eima.com (770) 968-7945 EJCDC Engineers Joint Contract Documents Committee (703) 295-5000 www.ejdc.org EJMA Expansion Joint Manufacturers Association, Inc. (914) 332-0040 www.ejma.org ESD ESD Association (315) 339-6937 (Electrostatic Discharge Association) www.esda.org ETL SEMCO Intertek ETL SEMCO (800) 967-5352 (Formerly: ITS - Intertek Testing Service NA) www.intertek.com FIBA Federation Internationale de Basketball 41 22 545 00 00 (The International Basketball Federation) www.fiba.com FIVB Federation Internationale de Volleyball 41 21 345 35 35 (The International Volleyball Federation) www.fivb.ch FM Approvals FM Approvals LLC (781) 762-4300 www.fmglobal.com FM Global FM Global (401) 275-3000 (Formerly: FMG - FM Global) www.fmglobal.com FMRC Factory Mutual Research (Now FM Global) FRSA Florida Roofing, Sheet Metal & Air Conditioning Contractors

Association, Inc. (407) 671-3772

www.floridaroof.com FSA Fluid Sealing Association (610) 971-4850 www.fluidsealing.com FSC Forest Stewardship Council 49 228 367 66 0 www.fsc.org GA Gypsum Association (202) 289-5440 www.gypsum.org GANA Glass Association of North America (785) 271-0208

Page 94: Table of Contents Division Section Title

Mt. Pleasant Library 01420-8 20 Feburary 2009 CORE Group, P.C. REFERENCES

www.glasswebsite.com GRI (Part of GSI) GS Green Seal (202) 872-6400 www.greenseal.org GSI Geosynthetic Institute (610) 522-8440 www.geosynthetic-institute.org HI Hydraulic Institute (973) 267-9700 www.pumps.org HI Hydronics Institute (908) 464-8200 www.gamanet.org HMMA Hollow Metal Manufacturers Association (Part of NAAMM) HPVA Hardwood Plywood & Veneer Association (703) 435-2900 www.hpva.org HPW H. P. White Laboratory, Inc. (410) 838-6550 www.hpwhite.com IAS International Approval Services (Now CSA International) IBF International Badminton Federation (Now BWF) ICEA Insulated Cable Engineers Association, Inc. (770) 830-0369 www.icea.net ICRI International Concrete Repair Institute, Inc. (847) 827-0830 www.icri.org IEC International Electrotechnical Commission 41 22 919 02 11 www.iec.ch IEEE Institute of Electrical and Electronics Engineers, Inc. (The) (212) 419-7900 www.ieee.org IESNA Illuminating Engineering Society of North America (212) 248-5000 www.iesna.org IEST Institute of Environmental Sciences and Technology (847) 255-1561 www.iest.org IGCC Insulating Glass Certification Council (315) 646-2234 www.igcc.org

Page 95: Table of Contents Division Section Title

Mt. Pleasant Library 01420-9 20 Feburary 2009 CORE Group, P.C. REFERENCES

IGMA Insulating Glass Manufacturers Alliance (613) 233-1510 www.igmaonline.org ILI Indiana Limestone Institute of America, Inc. (812) 275-4426 www.iliai.com ISO International Organization for Standardization 41 22 749 01 11 www.iso.ch Available from ANSI (202) 293-8020 www.ansi.org ISSFA International Solid Surface Fabricators Association (877) 464-7732 www.issfa.net (702) 567-8150 ITS Intertek Testing Service NA (Now ETL SEMCO) ITU International Telecommunication Union 41 22 730 51 11 www.itu.int/home KCMA Kitchen Cabinet Manufacturers Association (703) 264-1690 www.kcma.org LMA Laminating Materials Association (Now part of CPA) LPI Lightning Protection Institute (800) 488-6864 www.lightning.org MBMA Metal Building Manufacturers Association (216) 241-7333 www.mbma.com MFMA Maple Flooring Manufacturers Association, Inc. (888) 480-9138 www.maplefloor.org MFMA Metal Framing Manufacturers Association, Inc. (312) 644-6610 www.metalframingmfg.org MH Material Handling (Now MHIA) MHIA Material Handling Industry of America (800) 345-1815 www.mhia.org (704) 676-1190 MIA Marble Institute of America (440) 250-9222 www.marble-institute.com MPI Master Painters Institute (888) 674-8937 www.paintinfo.com (604) 298-7578

Page 96: Table of Contents Division Section Title

Mt. Pleasant Library 01420-10 20 Feburary 2009 CORE Group, P.C. REFERENCES

MSS Manufacturers Standardization Society of The Valve and Fittings

Industry Inc. (703) 281-6613

www.mss-hq.com NAAMM National Association of Architectural Metal Manufacturers (630) 942-6591 www.naamm.org NACE NACE International (800) 797-6623 (National Association of Corrosion Engineers International) (281) 228-6200 www.nace.org NADCA National Air Duct Cleaners Association (202) 737-2926 www.nadca.com NAGWS National Association for Girls and Women in Sport (800) 213-7193,

ext. 453 www.aahperd.org/nagws/ NAIMA North American Insulation Manufacturers Association (703) 684-0084 www.naima.org NBGQA National Building Granite Quarries Association, Inc. (800) 557-2848 www.nbgqa.com NCAA National Collegiate Athletic Association (The) (317) 917-6222 www.ncaa.org NCMA National Concrete Masonry Association (703) 713-1900 www.ncma.org NCPI National Clay Pipe Institute (262) 248-9094 www.ncpi.org NCTA National Cable & Telecommunications Association (202) 775-2300 www.ncta.com NEBB National Environmental Balancing Bureau (301) 977-3698 www.nebb.org NECA National Electrical Contractors Association (301) 657-3110 www.necanet.org NeLMA Northeastern Lumber Manufacturers' Association (207) 829-6901 www.nelma.org NEMA National Electrical Manufacturers Association (703) 841-3200 www.nema.org NETA InterNational Electrical Testing Association (888) 300-6382 www.netaworld.org (269) 488-6382

Page 97: Table of Contents Division Section Title

Mt. Pleasant Library 01420-11 20 Feburary 2009 CORE Group, P.C. REFERENCES

NFHS National Federation of State High School Associations (317) 972-6900 www.nfhs.org NFPA NFPA (800) 344-3555 (National Fire Protection Association) (617) 770-3000 www.nfpa.org NFRC National Fenestration Rating Council (301) 589-1776 www.nfrc.org NGA National Glass Association (866) 342-5642 www.glass.org (703) 442-4890 NHLA National Hardwood Lumber Association (800) 933-0318 www.natlhardwood.org (901) 377-1818 NLGA National Lumber Grades Authority (604) 524-2393 www.nlga.org NOFMA NOFMA: The Wood Flooring Manufacturers Association (901) 526-5016 (Formerly: National Oak Flooring Manufacturers Association) www.nofma.com NOMMA National Ornamental & Miscellaneous Metals Association (888) 516-8585 www.nomma.org NRCA National Roofing Contractors Association (800) 323-9545 www.nrca.net (847) 299-9070 NRMCA National Ready Mixed Concrete Association (888) 846-7622 www.nrmca.org (301) 587-1400 NSF NSF International (800) 673-6275 (National Sanitation Foundation International) (734) 769-8010 www.nsf.org NSSGA National Stone, Sand & Gravel Association (800) 342-1415 www.nssga.org (703) 525-8788 NTMA National Terrazzo & Mosaic Association, Inc. (The) (800) 323-9736 www.ntma.com (540) 751-0930 NTRMA National Tile Roofing Manufacturers Association (Now TRI) NWWDA National Wood Window and Door Association (Now WDMA) OPL Omega Point Laboratories, Inc. (Now ITS)

Page 98: Table of Contents Division Section Title

Mt. Pleasant Library 01420-12 20 Feburary 2009 CORE Group, P.C. REFERENCES

PCI Precast/Prestressed Concrete Institute (312) 786-0300 www.pci.org PDCA Painting & Decorating Contractors of America (800) 332-7322 www.pdca.com (314) 514-7322 PDI Plumbing & Drainage Institute (800) 589-8956 www.pdionline.org (978) 557-0720 PGI PVC Geomembrane Institute (217) 333-3929 http://pgi-tp.ce.uiuc.edu PLANET Professional Landcare Network (800) 395-2522 (Formerly: ACLA - Associated Landscape Contractors of

America) (703) 736-9666

www.landcarenetwork.org PTI Post-Tensioning Institute (602) 870-7540 www.post-tensioning.org RCSC Research Council on Structural Connections www.boltcouncil.org RFCI Resilient Floor Covering Institute (301) 340-8580 www.rfci.com RIS Redwood Inspection Service (888) 225-7339 www.redwoodinspection.com (415) 382-0662 SAE SAE International (877) 606-7323 www.sae.org (724) 776-4841 SDI Steel Deck Institute (847) 458-4647 www.sdi.org SDI Steel Door Institute (440) 899-0010 www.steeldoor.org SEFA Scientific Equipment and Furniture Association (877) 294-5424 www.sefalabs.com (516) 294-5424 SEI/ASCE Structural Engineering Institute/American Society of Civil

Engineers

(See ASCE) SGCC Safety Glazing Certification Council (315) 646-2234 www.sgcc.org SIA Security Industry Association (866) 817-8888 www.siaonline.org (703) 683-2075

Page 99: Table of Contents Division Section Title

Mt. Pleasant Library 01420-13 20 Feburary 2009 CORE Group, P.C. REFERENCES

SIGMA Sealed Insulating Glass Manufacturers Association (Now IGMA) SJI Steel Joist Institute (843) 626-1995 www.steeljoist.org SMA Screen Manufacturers Association (561) 533-0991 www.smacentral.org SMACNA Sheet Metal and Air Conditioning Contractors' (703) 803-2980 National Association www.smacna.org SMPTE Society of Motion Picture and Television Engineers (914) 761-1100 www.smpte.org SPFA Spray Polyurethane Foam Alliance (800) 523-6154 (Formerly: SPI/SPFD - The Society of the Plastics Industry,

Inc.; Spray Polyurethane Foam Division)

www.sprayfoam.org SPIB Southern Pine Inspection Bureau (The) (850) 434-2611 www.spib.org SPRI Single Ply Roofing Industry (781) 647-7026 www.spri.org SSINA Specialty Steel Industry of North America (800) 982-0355 www.ssina.com (202) 342-8630 SSPC SSPC: The Society for Protective Coatings (877) 281-7772 www.sspc.org (412) 281-2331 STI Steel Tank Institute (847) 438-8265 www.steeltank.com SWI Steel Window Institute (216) 241-7333 www.steelwindows.com SWRI Sealant, Waterproofing, & Restoration Institute (816) 472-7974 www.swrionline.org TCA Tile Council of America, Inc. (Now TCNA) TCNA Tile Council of North America, Inc. (864) 646-8453 www.tileusa.com TIA/EIA Telecommunications Industry Association/Electronic Industries

Alliance (703) 907-7700

Page 100: Table of Contents Division Section Title

Mt. Pleasant Library 01420-14 20 Feburary 2009 CORE Group, P.C. REFERENCES

www.tiaonline.org TMS The Masonry Society (303) 939-9700 www.masonrysociety.org TPI Truss Plate Institute, Inc. (703) 683-1010 www.tpinst.org TPI Turfgrass Producers International (800) 405-8873 www.turfgrasssod.org (847) 649-5555 TRI Tile Roofing Institute (312) 670-4177 www.tileroofing.org UL Underwriters Laboratories Inc. (877) 854-3577 www.ul.com (847) 272-8800 UNI Uni-Bell PVC Pipe Association (972) 243-3902 www.uni-bell.org USAV USA Volleyball (888) 786-5539 www.usavolleyball.org (719) 228-6800 USGBC U.S. Green Building Council (800) 795-1747 www.usgbc.org USITT United States Institute for Theatre Technology, Inc. (800) 938-7488 www.usitt.org (315) 463-6463 WASTEC Waste Equipment Technology Association (800) 424-2869 www.wastec.org (202) 244-4700 WCLIB West Coast Lumber Inspection Bureau (800) 283-1486 www.wclib.org (503) 639-0651 WCMA Window Covering Manufacturers Association (212) 297-2122 www.wcmanet.org WCSC Window Covering Safety Council (800) 506-4636 (Formerly: WCMA - Window Covering Manufacturers

Association) (212) 297-2109

www.windowcoverings.org WDMA Window & Door Manufacturers Association (800) 223-2301 (Formerly: NWWDA - National Wood Window and Door

Association) (847) 299-5200

www.wdma.com WI Woodwork Institute (Formerly: WIC - Woodwork Institute of

California) (916) 372-9943

www.wicnet.org

Page 101: Table of Contents Division Section Title

Mt. Pleasant Library 01420-15 20 Feburary 2009 CORE Group, P.C. REFERENCES

WIC Woodwork Institute of California (Now WI) WMMPA Wood Moulding & Millwork Producers Association (800) 550-7889 www.wmmpa.com (530) 661-9591 WSRCA Western States Roofing Contractors Association (800) 725-0333 www.wsrca.com (650) 570-5441 WWPA Western Wood Products Association (503) 224-3930 www.wwpa.org

C. Code Agencies: Where abbreviations and acronyms are used in Specifications or other Contract Documents, they shall mean the recognized name of the entities in the following list. Names, telephone numbers, and Web sites are subject to change and are believed to be accurate and up-to-date as of the date of the Contract Documents.

PRIVATE tbl2 IAPMO International Association of Plumbing and Mechanical Officials (909) 472-4100 www.iapmo.org ICC International Code Council (888) 422-7233 www.iccsafe.org ICC-ES ICC Evaluation Service, Inc. (800) 423-6587 www.icc-es.org (562) 699-0543 UBC Uniform Building Code (See ICC)

D. Federal Government Agencies: Where abbreviations and acronyms are used in Specifications or other Contract Documents, they shall mean the recognized name of the entities in the following list. Names, telephone numbers, and Web sites are subject to change and are believed to be accurate and up-to-date as of the date of the Contract Documents.

PRIVATE tbl3 CE Army Corps of Engineers (202) 761-0011 www.usace.army.mil CPSC Consumer Product Safety Commission (800) 638-2772 www.cpsc.gov (301) 504-7923 DOC Department of Commerce (202) 482-2000 www.commerce.gov DOD Department of Defense (215) 697-6257 http://.dodssp.daps.dla.mil DOE Department of Energy (202) 586-9220 www.energy.gov EPA Environmental Protection Agency (202) 272-0167

Page 102: Table of Contents Division Section Title

Mt. Pleasant Library 01420-16 20 Feburary 2009 CORE Group, P.C. REFERENCES

www.epa.gov FAA Federal Aviation Administration (866) 835-5322 www.faa.gov FCC Federal Communications Commission (888) 225-5322 www.fcc.gov FDA Food and Drug Administration (888) 463-6332 www.fda.gov GSA General Services Administration (800) 488-3111 www.gsa.gov HUD Department of Housing and Urban Development (202) 708-1112 www.hud.gov LBL Lawrence Berkeley National Laboratory (510) 486-4000 www.lbl.gov NCHRP National Cooperative Highway Research Program (See TRB) NIST National Institute of Standards and Technology (301) 975-6478 www.nist.gov OSHA Occupational Safety & Health Administration (800) 321-6742 www.osha.gov (202) 693-1999 PBS Public Buildings Service (See GSA) PHS Office of Public Health and Science (202) 690-7694 www.osophs.dhhs.gov/ophs RUS Rural Utilities Service (202) 720-9540 (See USDA) SD State Department (202) 647-4000 www.state.gov TRB Transportation Research Board (202) 334-2934 http://gulliver.trb.org USDA Department of Agriculture (202) 720-2791 www.usda.gov USPS Postal Service (202) 268-2000 www.usps.com

Page 103: Table of Contents Division Section Title

Mt. Pleasant Library 01420-17 20 Feburary 2009 CORE Group, P.C. REFERENCES

E. Standards and Regulations: Where abbreviations and acronyms are used in Specifications or other Contract Documents, they shall mean the recognized name of the standards and regulations in the following list. Names, telephone numbers, and Web sites are subject to change and are believed to be accurate and up-to-date as of the date of the Contract Documents.

PRIVATE tbl4 ADAAG Americans with Disabilities Act (ADA) (800) 872-2253 Architectural Barriers Act (ABA) (202) 272-0080 Accessibility Guidelines for Buildings and Facilities Available from U.S. Access Board www.access-board.gov CFR Code of Federal Regulations (866) 512-1800 Available from Government Printing Office (202) 512-1800 www.gpoaccess.gov/cfr/index.html DOD Department of Defense Military Specifications and Standards (215) 697-2664 Available from Department of Defense Single Stock Point http://dodssp.daps.dla.mil DSCC Defense Supply Center Columbus (See FS) FED-STD Federal Standard (See FS) FS Federal Specification (215) 697-2664 Available from Department of Defense Single Stock Point http://dodssp.daps.dla.mil Available from Defense Standardization Program www.dps.dla.mil Available from General Services Administration (202) 619-8925 www.gsa.gov Available from National Institute of Building Sciences (202) 289-7800 www.wbdg.org/ccb FTMS Federal Test Method Standard (See FS) MIL (See MILSPEC) MIL-STD (See MILSPEC) MILSPEC Military Specification and Standards (215) 697-2664 Available from Department of Defense Single Stock Point http://dodssp.daps.dla.mil UFAS Uniform Federal Accessibility Standards (800) 872-2253 Available from Access Board (202) 272-0080

Page 104: Table of Contents Division Section Title

Mt. Pleasant Library 01420-18 20 Feburary 2009 CORE Group, P.C. REFERENCES

www.access-board.gov

F. State Government Agencies: Where abbreviations and acronyms are used in Specifications or other Contract Documents, they shall mean the recognized name of the entities in the following list. Names, telephone numbers, and Web sites are subject to change and are believed to be accurate and up-to-date as of the date of the Contract Documents.

PRIVATE tbl5 CBHF State of California, Department of Consumer Affairs Bureau of Home

Furnishings and Thermal Insulation (800) 952-5210

www.dca.ca.gov/bhfti (916) 574-2041 CCR California Code of Regulations (916) 323-6815 www.calregs.com CPUC California Public Utilities Commission (415) 703-2782 www.cpuc.ca.gov TFS Texas Forest Service (979) 458-6650 Forest Resource Development http://txforestservice.tamu.edu

PART 2 - PRODUCTS (Not Used)

PART 3 - EXECUTION (Not Used)

END OF SECTION 01420

Page 105: Table of Contents Division Section Title

Mt. Pleasant Library 01500-1 20 Feburary 2009 CORE Group, P.C. TEMPORARY FACILITIES AND CONTROLS

SECTION 01500

PART 1 - GENERAL

TEMPORARY FACILITIES AND CONTROLS

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General Conditions to Construction Contract and other Division 1 Specification Sections, apply to this Section.

1.2 SUMMARY

A. Section includes requirements for temporary utilities, support facilities, and security and protection facilities.

B. Related Sections:

1. Division 1 Section "Summary" for limitations on work restrictions and utility interruptions.

2. Division 2 Section "Dewatering" for disposal of ground water at Project site. 3. Division 2 Section "Cement Concrete Pavement" for construction and maintenance of

cement concrete pavement for temporary roads and paved areas.

1.3 USE CHARGES

A. General: Installation and removal of and use charges for temporary facilities shall be included in the Contract Sum unless otherwise indicated. Allow other entities to use temporary services and facilities without cost, including, but not limited to Architect testing agencies, and authorities having jurisdiction.

B. Sewer Service: Pay sewer service use charges for sewer usage by all entities for construction operations.

C. Water Service: Pay water service use charges for water used by all entities for construction operations.

D. Electric Power Service: electric power service use charges for electricity used by all entities for construction operations.

1.4 INFORMATIONAL SUBMITTALS

A. Site Plan: Show temporary facilities, utility hookups, staging areas, and parking areas for construction personnel.

Page 106: Table of Contents Division Section Title

Mt. Pleasant Library 01500-2 20 Feburary 2009 CORE Group, P.C. TEMPORARY FACILITIES AND CONTROLS

B. Erosion- and Sedimentation-Control Plan: Show compliance with requirements of EPA Construction General Permit or authorities having jurisdiction, whichever is more stringent.

C. Moisture-Protection Plan: Describe procedures and controls for protecting materials and construction from water absorption and damage, including delivery, handling, and storage provisions for materials subject to water absorption or water damage, discarding water-damaged materials, protocols for mitigating water intrusion into completed Work, and replacing water damaged Work.

1. Indicate sequencing of work that requires water, such as sprayed fire-resistive materials, plastering, and terrazzo grinding, and describe plans for dealing with water from these operations. Show procedures for verifying that wet construction has dried sufficiently to permit installation of finish materials.

D. Dust-Control and HVAC-Control Plan: Submit coordination drawing and narrative that indicates the dust-control and HVAC-control measures proposed for use, proposed locations, and proposed time frame for their operation. Identify further options if proposed measures are later determined to be inadequate. Include the following:

1. Locations of dust-control partitions at each phase of the work. 2. HVAC system isolation schematic drawing. 3. Location of proposed air filtration system discharge. 4. Other dust-control measures. 5. Waste management plan.

1.5 QUALITY ASSURANCE

A. Electric Service: Comply with NECA, NEMA, and UL standards and regulations for temporary electric service. Install service to comply with NFPA 70.

B. Tests and Inspections: Arrange for authorities having jurisdiction to test and inspect each temporary utility before use. Obtain required certifications and permits.

C. Accessible Temporary Egress: Comply with applicable provisions in the U.S. Architectural & Transportation Barriers Compliance Board's ADA-ABA Accessibility Guidelines.

1.6 PROJECT CONDITIONS

A. Temporary Use of Permanent Facilities: Engage installer of each permanent service to assume responsibility for operation, maintenance, and protection of each permanent service during its use as a construction facility before Owner's acceptance, regardless of previously assigned responsibilities.

Page 107: Table of Contents Division Section Title

Mt. Pleasant Library 01500-3 20 Feburary 2009 CORE Group, P.C. TEMPORARY FACILITIES AND CONTROLS

PART 2 - PRODUCTS

2.1 MATERIALS

A. Chain-Link Fencing: Minimum 2-inch (50-mm), 0.148-inch- (3.8-mm-) thick, galvanized steel, chain-link fabric fencing; minimum 6 feet (1.8 m) high with galvanized steel pipe posts; minimum 2-3/8-inch- (60-mm-) OD line posts and 2-7/8-inch- (73-mm-) OD corner and pull posts[, with 1-5/8-inch- (42-mm-)

B. Wood Enclosure Fence: Plywood,

OD top rails] [, with galvanized barbed-wire top strand].

6 feet (1.8 m)]8 feet (2.4 m) high, framed with four 2-by-4-inch (50-by-100-mm) rails, with preservative-treated wood posts spaced not more than 8 feet (2.4 m)

C. Polyethylene Sheet: Reinforced, fire-resistive sheet,

apart.

10 mils (0.25 mm)

D. Dust Control Adhesive-Surface Walk-off Mats: Provide mats minimum

minimum thickness, with flame-spread rating of 15 or less per ASTM E 84.

36 by 60 inches (914 by 1624 mm)

E. Insulation: Unfaced mineral-fiber blanket, manufactured from glass, slag wool, or rock wool; with maximum flame-spread and smoke-developed indexes of 25 and 50, respectively.

.

2.2 TEMPORARY FACILITIES

A. Field Offices, General: Prefabricated or mobile units with serviceable finishes, temperature controls, and foundations adequate for normal loading.

B. Common-Use Field Office: Of sufficient size to accommodate needs of Owner, Architect and construction personnel office activities and to accommodate project meetings specified in other Division 1 Sections. Keep office clean and orderly. Furnish and equip offices as follows:

1. Furniture required for Project-site documents including file cabinets, plan tables, plan racks, and bookcases.

2. Conference room of sufficient size to accommodate meetings of [10] individuals. Provide electrical power service and 120-V ac duplex receptacles, with not less than 1 receptacle on each wall. Furnish room with conference table, chairs, and 4-foot- (1.2-m-)

3. Drinking water and private toilet.

square tack and marker boards.

4. Coffee machine and supplies. 5. Heating and cooling equipment necessary to maintain a uniform indoor temperature of 68

to 72 deg F (20 to 22 deg C)6. Lighting fixtures capable of maintaining average illumination of

. 20 fc (215 lx)

C. Storage and Fabrication Sheds: Provide sheds sized, furnished, and equipped to accommodate materials and equipment for construction operations.

at desk height.

1. Store combustible materials apart from building.

Page 108: Table of Contents Division Section Title

Mt. Pleasant Library 01500-4 20 Feburary 2009 CORE Group, P.C. TEMPORARY FACILITIES AND CONTROLS

2.3 EQUIPMENT

A. Fire Extinguishers: Portable, UL rated; with class and extinguishing agent as required by locations and classes of fire exposures.

B. HVAC Equipment: Unless Owner authorizes use of permanent HVAC system, provide vented, self-contained, liquid-propane-gas or fuel-oil heaters with individual space thermostatic control.

1. Use of gasoline-burning space heaters, open-flame heaters, or salamander-type heating units is prohibited.

2. Heating Units: Listed and labeled for type of fuel being consumed, by a testing agency acceptable to authorities having jurisdiction, and marked for intended use.

3. Permanent HVAC System: If Owner authorizes use of permanent HVAC system for temporary use during construction, provide filter with MERV of [8] at each return air grille in system and remove at end of construction and clean HVAC system as required in Division 1 Section "Closeout Procedures".

C. Air Filtration Units: HEPA primary and secondary filter-equipped portable units with four-stage filtration. Provide single switch for emergency shutoff. Configure to run continuously.

PART 3 - EXECUTION

3.1 INSTALLATION, GENERAL

A. Locate facilities where they will serve Project adequately and result in minimum interference with performance of the Work. Relocate and modify facilities as required by progress of the Work.

1. Locate facilities to limit site disturbance as specified in Division 1 Section "Summary."

B. Provide each facility ready for use when needed to avoid delay. Do not remove until facilities are no longer needed or are replaced by authorized use of completed permanent facilities.

3.2 TEMPORARY UTILITY INSTALLATION

A. General: Install temporary service or connect to existing service.

1. Arrange with utility company, Owner, and existing users for time when service can be interrupted, if necessary, to make connections for temporary services.

B. Sewers and Drainage: Provide temporary utilities to remove effluent lawfully.

1. Connect temporary sewers to [municipal system] as directed by authorities having jurisdiction.

C. Water Service: Install water service and distribution piping in sizes and pressures adequate for construction.

Page 109: Table of Contents Division Section Title

Mt. Pleasant Library 01500-5 20 Feburary 2009 CORE Group, P.C. TEMPORARY FACILITIES AND CONTROLS

D. Water Service: Connect to Owner's existing water service facilities. Clean and maintain water service facilities in a condition acceptable to Owner. At Substantial Completion, restore these facilities to condition existing before initial use.

E. Sanitary Facilities: Provide temporary toilets, wash facilities, and drinking water for use of construction personnel. Comply with requirements of authorities having jurisdiction for type, number, location, operation, and maintenance of fixtures and facilities.

1. Toilets: Use of Owner's existing toilet facilities will be permitted, as long as facilities are cleaned and maintained in a condition acceptable to Owner. At Substantial Completion, restore these facilities to condition existing before initial use.

F. Heating and Cooling: Provide temporary heating and cooling required by construction activities for curing or drying of completed installations or for protecting installed construction from adverse effects of low temperatures or high humidity. Select equipment that will not have a harmful effect on completed installations or elements being installed.

G. Isolation of Work Areas in Occupied Facilities: Prevent dust, fumes, and odors from entering occupied areas.

1. Prior to commencing work, isolate the HVAC system in area where work is to be performed in accordance with approved coordination drawings.

a. Disconnect supply and return ductwork in work area from HVAC systems servicing occupied areas.

b. Maintain negative air pressure within work area using HEPA-equipped air filtration units, starting with commencement of temporary partition construction, and continuing until removal of temporary partitions is complete.

2. Maintain dust partitions during the Work. Use vacuum collection attachments on dust-producing equipment. Isolate limited work within occupied areas using portable dust containment devices.

3. Perform daily construction cleanup and final cleanup using approved, HEPA-filter-equipped vacuum equipment.

H. Ventilation and Humidity Control: Provide temporary ventilation required by construction activities for curing or drying of completed installations or for protecting installed construction from adverse effects of high humidity. Select equipment that will not have a harmful effect on completed installations or elements being installed. Coordinate ventilation requirements to produce ambient condition required and minimize energy consumption.

1. Provide dehumidification systems when required to reduce substrate moisture levels to level required to allow installation or application of finishes.

I. Electric Power Service: Connect to Owner's existing electric power service. Maintain equipment in a condition acceptable to Owner.

J. Electric Power Service: Provide electric power service and distribution system of sufficient size, capacity, and power characteristics required for construction operations.

1. Install electric power service [overhead] unless otherwise indicated.

Page 110: Table of Contents Division Section Title

Mt. Pleasant Library 01500-6 20 Feburary 2009 CORE Group, P.C. TEMPORARY FACILITIES AND CONTROLS

2. Connect temporary service to Owner's existing power source, as directed by Owner.

K. Lighting: Provide temporary lighting with local switching that provides adequate illumination for construction operations, observations, inspections, and traffic conditions.

1. Install and operate temporary lighting that fulfills security and protection requirements without operating entire system.

2. Install lighting for Project identification sign.

L. Telephone Service: Provide temporary telephone service in common-use facilities for use by all construction personnel. Install [two] telephone line(s) for each field office.

1. Provide additional telephone lines for the following:

a. Provide a dedicated telephone line for each facsimile machine in each field office.

2. At each telephone, post a list of important telephone numbers.

a. Police and fire departments. b. Ambulance service. c. Contractor's home office. d. Architect's office. e. Engineers' offices. f. Owner's office. g. Principal subcontractors' field and home offices.

3. Provide superintendent with cellular telephone or portable two-way radio for use when away from field office.

M. General: Comply with the following:

1. Provide construction for temporary offices, shops, and sheds located within construction area or within 30 feet (9 m)

2. Maintain support facilities until Architect schedules Substantial Completion inspection. Remove before Substantial Completion. Personnel remaining after Substantial Completion will be permitted to use permanent facilities, under conditions acceptable to Owner.

of building lines that is noncombustible according to ASTM E 136. Comply with NFPA 241.

N. Temporary Roads and Paved Areas: Construct and maintain temporary roads and paved areas adequate for construction operations. Locate temporary roads and paved areas [within construction limits indicated] on Drawings.

1. Provide dust-control treatment that is nonpolluting and nontracking. Reapply treatment as required to minimize dust.

O. Temporary Use of Permanent Roads and Paved Areas: Locate temporary roads and paved areas in same location as permanent roads and paved areas. Construct and maintain temporary roads and paved areas adequate for construction operations. Extend temporary roads and paved areas, within construction limits indicated, as necessary for construction operations.

Page 111: Table of Contents Division Section Title

Mt. Pleasant Library 01500-7 20 Feburary 2009 CORE Group, P.C. TEMPORARY FACILITIES AND CONTROLS

1. Coordinate elevations of temporary roads and paved areas with permanent roads and paved areas.

2. Prepare subgrade and install subbase and base for temporary roads and paved areas according to Division 2 Section "Earthwork."

3. Recondition base after temporary use, including removing contaminated material, regrading, proofrolling, compacting, and testing.

4. Delay installation of final course of permanent hot-mix asphalt pavement until immediately before Substantial Completion. Repair hot-mix asphalt base-course pavement before installation of final course according to Division 2 Section "Asphalt Paving."

P. Traffic Controls: Comply with requirements of authorities having jurisdiction.

1. Protect existing site improvements to remain including curbs, pavement, and utilities. 2. Maintain access for fire-fighting equipment and access to fire hydrants.

Q. Parking: [Provide temporary] parking areas for construction personnel.

R. Dewatering Facilities and Drains: Comply with requirements of authorities having jurisdiction. Maintain Project site, excavations, and construction free of water.

1. Dispose of rainwater in a lawful manner that will not result in flooding Project or adjoining properties nor endanger permanent Work or temporary facilities.

2. Remove snow and ice as required to minimize accumulations.

S. Project Signs: Provide Project signs as indicated. Unauthorized signs are not permitted.

1. Identification Signs: Provide Project identification signs as indicated on Drawings. 2. Temporary Signs: Provide other signs as indicated and as required to inform public and

individuals seeking entrance to Project.

a. Provide temporary, directional signs for construction personnel and visitors.

3. Maintain and touchup signs so they are legible at all times.

T. Waste Disposal Facilities: Comply with requirements specified in Division 1 Section "Construction Waste Management."

U. Waste Disposal Facilities: Provide waste-collection containers in sizes adequate to handle waste from construction operations. Comply with requirements of authorities having jurisdiction. Comply with Division 1 Section "Execution Requirements" for progress cleaning requirements.

V. Lifts and Hoists: Provide facilities necessary for hoisting materials and personnel.

1. Truck cranes and similar devices used for hoisting materials are considered "tools and equipment" and not temporary facilities.

W. Temporary Elevator Use: Use of elevators is not permitted Retain first paragraph below if existing elevator use will be permitted. Indicate location of Owner's existing elevators permitted to be used in Division 1 Section "Summary" or show on Drawings.

Page 112: Table of Contents Division Section Title

Mt. Pleasant Library 01500-8 20 Feburary 2009 CORE Group, P.C. TEMPORARY FACILITIES AND CONTROLS

X. Temporary Stairs: Until permanent stairs are available, provide temporary stairs where ladders are not adequate.

Y. Existing Stair Usage: Use of Owner's existing stairs will be permitted, provided stairs are cleaned and maintained in a condition acceptable to Owner. At Substantial Completion, restore stairs to condition existing before initial use.

1. Provide protective coverings, barriers, devices, signs, or other procedures to protect stairs and to maintain means of egress. If stairs become damaged, restore damaged areas so no evidence remains of correction work.

Z. Temporary Use of Permanent Stairs: Use of new stairs for construction traffic will be permitted, provided stairs are protected and finishes restored to new condition at time of Substantial Completion.

3.3 SECURITY AND PROTECTION FACILITIES INSTALLATION

A. Environmental Protection: Provide protection, operate temporary facilities, and conduct construction as required to comply with environmental regulations and that minimize possible air, waterway, and subsoil contamination or pollution or other undesirable effects.

1. Comply with work restrictions specified in Division 1 Section "Summary."

B. Temporary Erosion and Sedimentation Control: Comply with requirements of 2003 EPA Construction General Permit or authorities having jurisdiction, whichever is more stringent and]requirements specified in Division 2 Section "Site Clearing."

C. Temporary Erosion and Sedimentation Control: Provide measures to prevent soil erosion and discharge of soil-bearing water runoff and airborne dust to undisturbed areas and to adjacent properties and walkways, according to erosion- and sedimentation-control Drawings requirements of 2003 EPA Construction General Permit or authorities having jurisdiction, whichever is more stringent.

1. Verify that flows of water redirected from construction areas or generated by construction activity do not enter or cross tree- or plant- protection zones.

2. Inspect, repair, and maintain erosion- and sedimentation-control measures during construction until permanent vegetation has been established.

3. Clean, repair, and restore adjoining properties and roads affected by erosion and sedimentation from the project site during the course of the project.

4. Remove erosion and sedimentation controls and restore and stabilize areas disturbed during removal.

D. Stormwater Control: Comply with requirements of authorities having jurisdiction. Provide barriers in and around excavations and subgrade construction to prevent flooding by runoff of stormwater from heavy rains.

E. Tree and Plant Protection: Comply with requirements specified in Division 2 Section "Tree Protection and Trimming."

Page 113: Table of Contents Division Section Title

Mt. Pleasant Library 01500-9 20 Feburary 2009 CORE Group, P.C. TEMPORARY FACILITIES AND CONTROLS

F. Tree and Plant Protection: Install temporary fencing located as indicated or outside the drip line of trees to protect vegetation from damage from construction operations. Protect tree root systems from damage, flooding, and erosion.

G. Pest Control: Engage pest-control service to recommend practices to minimize attraction and harboring of rodents, roaches, and other pests and to perform extermination and control procedures at regular intervals so Project will be free of pests and their residues at Substantial Completion. Obtain extended warranty for Owner. Perform control operations lawfully, using environmentally safe materials.

H. Site Enclosure Fence: Before construction operations begin, furnish and install site enclosure fence in a manner that will prevent people and animals from easily entering site except by entrance gates.

1. Extent of Fence: As required to enclose entire Project site or portion determined sufficient to accommodate construction operations.

2. Maintain security by limiting number of keys and restricting distribution to authorized personnel. Furnish one set of keys to Owner.

I. Security Enclosure and Lockup: Install temporary enclosure around partially completed areas of construction. Provide lockable entrances to prevent unauthorized entrance, vandalism, theft, and similar violations of security. Lock entrances at end of each work day.

J. Barricades, Warning Signs, and Lights: Comply with requirements of authorities having jurisdiction for erecting structurally adequate barricades, including warning signs and lighting.

K. Temporary Egress: Maintain temporary egress from existing occupied facilities as indicated and as required by authorities having jurisdiction.

L. Covered Walkway: Erect protective, covered walkway for passage of individuals through or adjacent to Project site. Coordinate with entrance gates, other facilities, and obstructions. Comply with regulations of authorities having jurisdiction and requirements indicated on Drawings.

1. Construct covered walkways using scaffold or shoring framing. 2. Provide overhead decking, protective enclosure walls, handrails, barricades, warning

signs, exit signs, lights, safe and well-drained walkways, and similar provisions for protection and safe passage.

3. Paint and maintain appearance of walkway for duration of the Work.

M. Temporary Enclosures: Provide temporary enclosures for protection of construction, in progress and completed, from exposure, foul weather, other construction operations, and similar activities. Provide temporary weathertight enclosure for building exterior.

1. Where heating or cooling is needed and permanent enclosure is not complete, insulate temporary enclosures.

Page 114: Table of Contents Division Section Title

Mt. Pleasant Library 01500-10 20 Feburary 2009 CORE Group, P.C. TEMPORARY FACILITIES AND CONTROLS

3.4 MOISTURE AND MOLD CONTROL

A. Contractor's Moisture-Protection Plan: Avoid trapping water in finished work. Document visible signs of mold that may appear during construction.

B. Exposed Construction Phase: Before installation of weather barriers, when materials are subject to wetting and exposure and to airborne mold spores, protect as follows:

1. Protect porous materials from water damage. 2. Protect stored and installed material from flowing or standing water. 3. Keep porous and organic materials from coming into prolonged contact with concrete. 4. Remove standing water from decks. 5. Keep deck openings covered or dammed.

C. Partially Enclosed Construction Phase: After installation of weather barriers but before full enclosure and conditioning of building, when installed materials are still subject to infiltration of moisture and ambient mold spores, protect as follows:

1. Do not load or install drywall or other porous materials or components, or items with high organic content, into partially enclosed building.

2. Keep interior spaces reasonably clean and protected from water damage. 3. Periodically collect and remove waste containing cellulose or other organic matter. 4. Discard or replace water-damaged material. 5. Do not install material that is wet. 6. Discard, replace or clean stored or installed material that begins to grow mold. 7. Perform work in a sequence that allows any wet materials adequate time to dry before

enclosing the material in drywall or other interior finishes.

D. Controlled Construction Phase of Construction: After completing and sealing of the building enclosure but prior to the full operation of permanent HVAC systems, maintain as follows:

1. Control moisture and humidity inside building by maintaining effective dry-in conditions. 2. Use permanent HVAC system to control humidity. 3. Comply with manufacturer's written instructions for temperature, relative humidity, and

exposure to water limits.

a. Hygroscopic materials that may support mold growth, including wood and gypsum-based products, that become wet during the course of construction and remain wet for [48] hours are considered defective.

b. Measure moisture content of materials that have been exposed to moisture during construction operations or after installation. Record daily readings over a forty-eight hour period. Identify materials containing moisture levels higher than allowed. Report findings in writing to Architect.

c. Remove materials that can not be completely restored to their manufactured moisture level within [48] hours.

3.5 OPERATION, TERMINATION, AND REMOVAL

A. Supervision: Enforce strict discipline in use of temporary facilities. To minimize waste and abuse, limit availability of temporary facilities to essential and intended uses.

Page 115: Table of Contents Division Section Title

Mt. Pleasant Library 01500-11 20 Feburary 2009 CORE Group, P.C. TEMPORARY FACILITIES AND CONTROLS

B. Maintenance: Maintain facilities in good operating condition until removal.

1. Maintain operation of temporary enclosures, heating, cooling, humidity control, ventilation, and similar facilities on a 24-hour basis where required to achieve indicated results and to avoid possibility of damage.

C. Operate Project-identification-sign lighting daily from dusk until 12:00 midnight.

D. Temporary Facility Changeover: Do not change over from using temporary security and protection facilities to permanent facilities until Substantial Completion.

E. Termination and Removal: Remove each temporary facility when need for its service has ended, when it has been replaced by authorized use of a permanent facility, or no later than Substantial Completion. Complete or, if necessary, restore permanent construction that may have been delayed because of interference with temporary facility. Repair damaged Work, clean exposed surfaces, and replace construction that cannot be satisfactorily repaired.

1. Materials and facilities that constitute temporary facilities are property of Contractor. Owner reserves right to take possession of Project identification signs.

2. Remove temporary roads and paved areas not intended for or acceptable for integration into permanent construction. Where area is intended for landscape development, remove soil and aggregate fill that do not comply with requirements for fill or subsoil. Remove materials contaminated with road oil, asphalt and other petrochemical compounds, and other substances that might impair growth of plant materials or lawns. Repair or replace street paving, curbs, and sidewalks at temporary entrances, as required by authorities having jurisdiction.

3. At Substantial Completion, repair, renovate, and clean permanent facilities used during construction period. Comply with final cleaning requirements specified in Division 1 Section "Closeout Procedures."

END OF SECTION 01500

Page 116: Table of Contents Division Section Title

Mt. Pleasant Library 01600-1 20 Feburary 2009 CORE Group, P.C. PRODUCT REQUIREMENTS

SECTION 01600

PART 1 - GENERAL

PRODUCT REQUIREMENTS

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General Conditions to Construction Contract and other Division 1 Specification Sections, apply to this Section.

1.2 SUMMARY

A. Section includes administrative and procedural requirements for selection of products for use in Project; product delivery, storage, and handling; manufacturers' standard warranties on products; special warranties; and comparable products.

B. Related Sections:

1. Division 1 Section "Allowances" for products selected under an allowance. 2. Division 1 Section "Alternates" for products selected under an alternate. 3. Division 1 Section "Substitution Procedures" for requests for substitutions. 4. Division 1 Section "References" for applicable industry standards for products specified.

1.3 DEFINITIONS

A. Products: Items obtained for incorporating into the Work, whether purchased for Project or taken from previously purchased stock. The term "product" includes the terms "material," "equipment," "system," and terms of similar intent.

1. Named Products: Items identified by manufacturer's product name, including make or model number or other designation shown or listed in manufacturer's published product literature, that is current as of date of the Contract Documents.

2. New Products: Items that have not previously been incorporated into another project or facility. Products salvaged or recycled from other projects are not considered new products.

3. Comparable Product: Product that is demonstrated and approved through submittal process to have the indicated qualities related to type, function, dimension, in-service performance, physical properties, appearance, and other characteristics that equal or exceed those of specified product.

B. Basis-of-Design Product Specification: A specification in which a specific manufacturer's product is named and accompanied by the words "basis-of-design product," including make or model number or other designation, to establish the significant qualities related to type, function, dimension, in-service performance, physical properties, appearance, and other characteristics for purposes of evaluating comparable products of additional manufacturers named in the specification.

Page 117: Table of Contents Division Section Title

Mt. Pleasant Library 01600-2 20 Feburary 2009 CORE Group, P.C. PRODUCT REQUIREMENTS

1.4 ACTION SUBMITTALS

A. Comparable Product Requests: Submit request for consideration of each comparable product. Identify product or fabrication or installation method to be replaced. Include Specification Section number and title and Drawing numbers and titles.

1. Include data to indicate compliance with the requirements specified in "Comparable Products" Article.

2. Architect's Action: If necessary, Architect will request additional information or documentation for evaluation within one week of receipt of a comparable product request. Architect will notify Contractor of approval or rejection of proposed comparable product request within [15] days of receipt of request, or [seven] days of receipt of additional information or documentation, whichever is later.

a. Form of Approval: As specified in Division 1 Section "Submittal Procedures." b. Use product specified if Architect does not issue a decision on use of a comparable

product request within time allocated.

B. Basis-of-Design Product Specification Submittal: Comply with requirements in Division 1 Section "Submittal Procedures." Show compliance with requirements.

1.5 QUALITY ASSURANCE

A. Compatibility of Options: If Contractor is given option of selecting between two or more products for use on Project, select product compatible with products previously selected, even if previously selected products were also options.

1. Each contractor is responsible for providing products and construction methods compatible with products and construction methods of other contractors.

2. If a dispute arises between contractors over concurrently selectable but incompatible products, Architect will determine which products shall be used.

1.6 PRODUCT DELIVERY, STORAGE, AND HANDLING

A. Deliver, store, and handle products using means and methods that will prevent damage, deterioration, and loss, including theft and vandalism. Comply with manufacturer's written instructions.

B. Delivery and Handling:

1. Schedule delivery to minimize long-term storage at Project site and to prevent overcrowding of construction spaces.

2. Coordinate delivery with installation time to ensure minimum holding time for items that are flammable, hazardous, easily damaged, or sensitive to deterioration, theft, and other losses.

3. Deliver products to Project site in an undamaged condition in manufacturer's original sealed container or other packaging system, complete with labels and instructions for handling, storing, unpacking, protecting, and installing.

Page 118: Table of Contents Division Section Title

Mt. Pleasant Library 01600-3 20 Feburary 2009 CORE Group, P.C. PRODUCT REQUIREMENTS

4. Inspect products on delivery to determine compliance with the Contract Documents and to determine that products are undamaged and properly protected.

C. Storage:

1. Store products to allow for inspection and measurement of quantity or counting of units. 2. Store materials in a manner that will not endanger Project structure. 3. Store products that are subject to damage by the elements, under cover in a weathertight

enclosure above ground, with ventilation adequate to prevent condensation. 4. Store foam plastic from exposure to sunlight, except to extent necessary for period of

installation and concealment. 5. Comply with product manufacturer's written instructions for temperature, humidity,

ventilation, and weather-protection requirements for storage. 6. Protect stored products from damage and liquids from freezing. 7. Provide a secure location and enclosure at Project site for storage of materials and

equipment by Owner's construction forces. Coordinate location with Owner.

1.7 PRODUCT WARRANTIES

A. Warranties specified in other Sections shall be in addition to, and run concurrent with, other warranties required by the Contract Documents. Manufacturer's disclaimers and limitations on product warranties do not relieve Contractor of obligations under requirements of the Contract Documents.

1. Manufacturer's Warranty: Written warranty furnished by individual manufacturer for a particular product and specifically endorsed by manufacturer to Owner.

2. Special Warranty: Written warranty required by the Contract Documents to provide specific rights for Owner.

B. Special Warranties: Prepare a written document that contains appropriate terms and identification, ready for execution.

1. Manufacturer's Standard Form: Modified to include Project-specific information and properly executed.

2. Specified Form: When specified forms are included with the Specifications, prepare a written document using indicated form properly executed.

3. Refer to Divisions 2 through 16. Sections for specific content requirements and particular requirements for submitting special warranties.

C. Submittal Time: Comply with requirements in Division 1 Section "Closeout Procedures."

PART 2 - PRODUCTS

2.1 PRODUCT SELECTION PROCEDURES

A. General Product Requirements: Provide products that comply with the Contract Documents, are undamaged and, unless otherwise indicated, are new at time of installation.

Page 119: Table of Contents Division Section Title

Mt. Pleasant Library 01600-4 20 Feburary 2009 CORE Group, P.C. PRODUCT REQUIREMENTS

1. Provide products complete with accessories, trim, finish, fasteners, and other items needed for a complete installation and indicated use and effect.

2. Standard Products: If available, and unless custom products or nonstandard options are specified, provide standard products of types that have been produced and used successfully in similar situations on other projects.

3. Owner reserves the right to limit selection to products with warranties not in conflict with requirements of the Contract Documents.

4. Where products are accompanied by the term "as selected," Architect will make selection.

5. Descriptive, performance, and reference standard requirements in the Specifications establish salient characteristics of products.

6. Or Equal: For products specified by name and accompanied by the term "or equal," or "or approved equal," or "or approved," comply with requirements in "Comparable Products" Article to obtain approval for use of an unnamed product.

B. Product Selection Procedures:

1. Product: Where Specifications name a single manufacturer and product, provide the named product that complies with requirements. Comparable products or substitutions for Contractor's convenience will not be considered.

2. Manufacturer/Source: Where Specifications name a single manufacturer or source, provide a product by the named manufacturer or source that complies with requirements. Comparable products or substitutions for Contractor's convenience will not be considered.

3. Products:

a. Restricted List: Where Specifications include a list of names of both manufacturers and products, provide one of the products listed that complies with requirements. Comparable products or substitutions for Contractor's convenience will not be considered, unless otherwise indicated.

b. Non-restricted List: Where Specifications include a list of names of both available manufacturers and products, provide one of the products listed, or an unnamed product, that complies with requirements. Comply with requirements in "Comparable Products" Article for consideration of an unnamed product.

4. Manufacturers:

a. Restricted List: Where Specifications include a list of manufacturers' names, provide a product by one of the manufacturers listed that complies with requirements. Comparable products or substitutions for Contractor's convenience will not be considered , unless otherwise indicated.

b. Nonrestricted List: Where Specifications include a list of available manufacturers, provide a product by one of the manufacturers listed, or a product by an unnamed manufacturer, that complies with requirements. Comply with requirements in "Comparable Products" Article for consideration of an unnamed manufacturer's product.

5. Basis-of-Design Product: Where Specifications name a product, or refer to a product indicated on Drawings, and include a list of manufacturers, provide the specified or indicated product or a comparable product by one of the other named manufacturers. Drawings and Specifications indicate sizes, profiles, dimensions, and other characteristics

Page 120: Table of Contents Division Section Title

Mt. Pleasant Library 01600-5 20 Feburary 2009 CORE Group, P.C. PRODUCT REQUIREMENTS

that are based on the product named. Comply with requirements in "Comparable Products" Article for consideration of an unnamed product by one of the other named manufacturers.

C. Visual Matching Specification: Where Specifications require "match Architect's sample", provide a product that complies with requirements and matches Architect's sample. Architect's decision will be final on whether a proposed product matches.

1. If no product available within specified category matches and complies with other specified requirements, comply with requirements in Division 1 Section "Substitution Procedures" for proposal of product.

D. Visual Selection Specification: Where Specifications include the phrase "as selected by Architect from manufacturer's full range" or similar phrase, select a product that complies with requirements. Architect will select color, gloss, pattern, density, or texture from manufacturer's product line that includes both standard and premium items.

2.2 COMPARABLE PRODUCTS

A. Conditions for Consideration: Architect will consider Contractor's request for comparable product when the following conditions are satisfied. If the following conditions are not satisfied, Architect may return requests without action, except to record noncompliance with these requirements:

1. Evidence that the proposed product does not require revisions to the Contract Documents, that it is consistent with the Contract Documents and will produce the indicated results, and that it is compatible with other portions of the Work.

2. Detailed comparison of significant qualities of proposed product with those named in the Specifications. Significant qualities include attributes such as performance, weight, size, durability, visual effect, and specific features and requirements indicated.

3. Evidence that proposed product provides specified warranty. 4. List of similar installations for completed projects with project names and addresses and

names and addresses of architects and owners, if requested. 5. Samples, if requested.

PART 3 - EXECUTION (Not Used)

END OF SECTION 01600

Page 121: Table of Contents Division Section Title

Mt. Pleasant Library 01700-1 20 Feburary 2009 CORE Group, P.C. EXECUTION REQUIREMENTS

SECTION 01700

PART 1 - GENERAL

EXECUTION REQUIREMENTS

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General Conditions to Construction Contract and other Division 1 Specification Sections, apply to this Section.

1.2 SUMMARY

A. Section includes general administrative and procedural requirements governing execution of the Work including, but not limited to, the following:

1. Construction layout. 2. Field engineering and surveying. 3. Installation of the Work. 4. Cutting and patching. 5. Coordination of Owner-installed products. 6. Progress cleaning. 7. Starting and adjusting. 8. Protection of installed construction. 9. Correction of the Work.

B. Related Sections:

1. Division 1 Section "Submittal Procedures" for submitting surveys. 2. Division 1 Section "Selective Demolition" for demolition and removal of selected

portions of the building. 3. Division 1 Section "Closeout Procedures" for submitting final property survey with

Project Record Documents, recording of Owner-accepted deviations from indicated lines and levels, and final cleaning.

4. Division 7 Section "Through-Penetration Firestop Systems" for patching penetrations in fire-rated construction.

1.3 DEFINITIONS

A. Cutting: Removal of in-place construction necessary to permit installation or performance of other work.

B. Patching: Fitting and repair work required to restore construction to original conditions after installation of other work.

Page 122: Table of Contents Division Section Title

Mt. Pleasant Library 01700-2 20 Feburary 2009 CORE Group, P.C. EXECUTION REQUIREMENTS

1.4 INFORMATIONAL SUBMITTALS

A. Qualification Data: For land surveyor.

B. Certificates: Submit certificate signed by land surveyor certifying that location and elevation of improvements comply with requirements.

C. Cutting and Patching Plan: Submit plan describing procedures at least [10] days prior to the time cutting and patching will be performed. Include the following information:

1. Extent: Describe reason for and extent of each occurrence of cutting and patching. 2. Changes to In-Place Construction: Describe anticipated results. Include changes to

structural elements and operating components as well as changes in building appearance and other significant visual elements.

3. Products: List products to be used for patching and firms or entities that will perform patching work.

4. Dates: Indicate when cutting and patching will be performed. 5. Utilities and Mechanical and Electrical Systems: List services and systems that cutting

and patching procedures will disturb or affect. List services and systems that will be relocated and those that will be temporarily out of service. Indicate how long services and systems will be disrupted.

D. Landfill Receipts: Submit copy of receipts issued by a landfill facility, licensed to accept hazardous materials, for hazardous waste disposal.

E. Certified Surveys: Submit two copies signed by land surveyor.

F. Final Property Survey: Submit 10 copies showing the Work performed and record survey data.

1.5 QUALITY ASSURANCE

A. Land Surveyor Qualifications: A professional land surveyor who is legally qualified to practice in jurisdiction where Project is located and who is experienced in providing land-surveying services of the kind indicated.

B. Cutting and Patching: Comply with requirements for and limitations on cutting and patching of construction elements.

1. Structural Elements: When cutting and patching structural elements, notify Architect of locations and details of cutting and await directions from the Architect before proceeding. Shore, brace, and support structural element during cutting and patching. Do not cut and patch structural elements in a manner that could change their load-carrying capacity or increase deflection

2. Operational Elements: Do not cut and patch operating elements and related components in a manner that results in reducing their capacity to perform as intended or that results in increased maintenance or decreased operational life or safety. Operational elements include the following:

a. Primary operational systems and equipment.

Page 123: Table of Contents Division Section Title

Mt. Pleasant Library 01700-3 20 Feburary 2009 CORE Group, P.C. EXECUTION REQUIREMENTS

b. Fire separation assemblies. c. Air or smoke barriers. d. Fire-suppression systems. e. Mechanical systems piping and ducts. f. Control systems. g. Communication systems. h. Conveying systems. i. Electrical wiring systems. j. Operating systems of special construction.

3. Other Construction Elements: Do not cut and patch other construction elements or components in a manner that could change their load-carrying capacity, that results in reducing their capacity to perform as intended, or that results in increased maintenance or decreased operational life or safety. Other construction elements include but are not limited to the following:

a. Water, moisture, or vapor barriers. b. Membranes and flashings. c. Exterior curtain-wall construction. d. Equipment supports. e. Piping, ductwork, vessels, and equipment. f. Noise- and vibration-control elements and systems.

4. Visual Elements: Do not cut and patch construction in a manner that results in visual evidence of cutting and patching. Do not cut and patch exposed construction in a manner that would, in Architect's opinion, reduce the building's aesthetic qualities. Remove and replace construction that has been cut and patched in a visually unsatisfactory manner.

C. Cutting and Patching Conference: Before proceeding, meet at Project site with parties involved in cutting and patching, including mechanical and electrical trades. Review areas of potential interference and conflict. Coordinate procedures and resolve potential conflicts before proceeding.

D. Manufacturer's Installation Instructions: Obtain and maintain on-site manufacturer's written recommendations and instructions for installation of products and equipment.

1.6 WARRANTY

A. Existing Warranties: Remove, replace, patch, and repair materials and surfaces cut or damaged during installation or cutting and patching operations, by methods and with materials so as not to void existing warranties.

PART 2 - PRODUCTS

2.1 MATERIALS

A. General: Comply with requirements specified in other Sections.

Page 124: Table of Contents Division Section Title

Mt. Pleasant Library 01700-4 20 Feburary 2009 CORE Group, P.C. EXECUTION REQUIREMENTS

1. For projects requiring compliance with sustainable design and construction practices and procedures, utilize products for patching that comply with requirements of Division 1 Section "LEED Requirements."

B. In-Place Materials: Use materials for patching identical to in-place materials. For exposed surfaces, use materials that visually match in-place adjacent surfaces to the fullest extent possible.

1. If identical materials are unavailable or cannot be used, use materials that, when installed, will provide a match acceptable to the Architect for the visual and functional performance of in-place materials.

PART 3 - EXECUTION

3.1 EXAMINATION

A. Existing Conditions: The existence and location of underground and other utilities and construction indicated as existing are not guaranteed. Before beginning site-work, investigate and verify the existence and location of underground utilities, mechanical and electrical systems, and other construction affecting the Work.

1. Before construction, verify the location and invert elevation at points of connection of sanitary sewer, storm sewer, and water-service piping; underground electrical services, and other utilities.

2. Furnish location data for work related to Project that must be performed by public utilities serving Project site.

B. Examination and Acceptance of Conditions: Before proceeding with each component of the Work, examine substrates, areas, and conditions, with Installer or Applicator present where indicated, for compliance with requirements for installation tolerances and other conditions affecting performance. Record observations.

1. Written Report: Where a written report listing conditions detrimental to performance of the Work is required by other Sections, include the following:

a. Description of the Work. b. List of detrimental conditions, including substrates. c. List of unacceptable installation tolerances. d. Recommended corrections.

2. Verify compatibility with and suitability of substrates, including compatibility with existing finishes or primers.

3. Examine roughing-in for mechanical and electrical systems to verify actual locations of connections before equipment and fixture installation.

4. Examine walls, floors, and roofs for suitable conditions where products and systems are to be installed.

5. Proceed with installation only after unsatisfactory conditions have been corrected. Proceeding with the Work indicates acceptance of surfaces and conditions.

Page 125: Table of Contents Division Section Title

Mt. Pleasant Library 01700-5 20 Feburary 2009 CORE Group, P.C. EXECUTION REQUIREMENTS

3.2 PREPARATION

A. Existing Utility Information: Furnish information to local utility that is necessary to adjust, move, or relocate existing utility structures, utility poles, lines, services, or other utility appurtenances located in or affected by construction. Coordinate with authorities having jurisdiction.

B. Field Measurements: Take field measurements as required to fit the Work properly. Recheck measurements before installing each product. Where portions of the Work are indicated to fit to other construction, verify dimensions of other construction by field measurements before fabrication. Coordinate fabrication schedule with construction progress to avoid delaying the Work.

C. Space Requirements: Verify space requirements and dimensions of items shown diagrammatically on Drawings.

D. Review of Contract Documents and Field Conditions: Immediately on discovery of the need for clarification of the Contract Documents caused by differing field conditions outside the control of the Contractor, submit a request for information to Architect according to requirements in Division 1 Section "Project Management and Coordination."

E. Surface and Substrate Preparation: Comply with manufacturer's recommendations for preparation of substrates to receive subsequent work.

3.3 CONSTRUCTION LAYOUT

A. Verification: Before proceeding to lay out the Work, verify layout information shown on Drawings, in relation to the property survey and existing benchmarks. If discrepancies are discovered, notify Architect promptly.

B. General: Engage a land surveyor to lay out the Work using accepted surveying practices.

1. Establish benchmarks and control points to set lines and levels at each story of construction and elsewhere as needed to locate each element of Project.

2. Establish dimensions within tolerances indicated. Do not scale Drawings to obtain required dimensions.

3. Inform installers of lines and levels to which they must comply. 4. Check the location, level and plumb, of every major element as the Work progresses. 5. Notify Architect when deviations from required lines and levels exceed allowable

tolerances. 6. Close site surveys with an error of closure equal to or less than the standard established

by authorities having jurisdiction.

C. Site Improvements: Locate and lay out site improvements, including pavements, grading, fill and topsoil placement, utility slopes, and rim and invert elevations.

D. Building Lines and Levels: Locate and lay out control lines and levels for structures, building foundations, column grids, and floor levels, including those required for mechanical and electrical work. Transfer survey markings and elevations for use with control lines and levels. Level foundations and piers from two or more locations.

Page 126: Table of Contents Division Section Title

Mt. Pleasant Library 01700-6 20 Feburary 2009 CORE Group, P.C. EXECUTION REQUIREMENTS

E. Record Log: Maintain a log of layout control work. Record deviations from required lines and levels. Include beginning and ending dates and times of surveys, weather conditions, name and duty of each survey party member, and types of instruments and tapes used. Make the log available for reference by Architect.

3.4 FIELD ENGINEERING

A. Identification: Owner will identify existing benchmarks, control points, and property corners.

B. Reference Points: Locate existing permanent benchmarks, control points, and similar reference points before beginning the Work. Preserve and protect permanent benchmarks and control points during construction operations.

1. Do not change or relocate existing benchmarks or control points without prior written approval of Architect. Report lost or destroyed permanent benchmarks or control points promptly. Report the need to relocate permanent benchmarks or control points to Architect before proceeding.

2. Replace lost or destroyed permanent benchmarks and control points promptly. Base replacements on the original survey control points.

C. Benchmarks: Establish and maintain a minimum of [two] permanent benchmarks on Project site, referenced to data established by survey control points. Comply with authorities having jurisdiction for type and size of benchmark.

1. Record benchmark locations, with horizontal and vertical data, on Project Record Documents.

2. Where the actual location or elevation of layout points cannot be marked, provide temporary reference points sufficient to locate the Work.

3. Remove temporary reference points when no longer needed. Restore marked construction to its original condition.

D. Certified Survey: On completion of foundation walls, major site improvements, and other work requiring field-engineering services, prepare a certified survey showing dimensions, locations, angles, and elevations of construction and site-work.

E. Final Property Survey: Engage a land surveyor to prepare a final property survey showing significant features (real property) for Project. Include on the survey a certification, signed by land surveyor that principal metes, bounds, lines, and levels of Project are accurately positioned as shown on the survey.

1. Show boundary lines, monuments, streets, site improvements and utilities, existing improvements and significant vegetation, adjoining properties, acreage, grade contours, and the distance and bearing from a site corner to a legal point.

2. Recording: At Substantial Completion, have the final property survey recorded by or with authorities having jurisdiction as the official "property survey."

Page 127: Table of Contents Division Section Title

Mt. Pleasant Library 01700-7 20 Feburary 2009 CORE Group, P.C. EXECUTION REQUIREMENTS

3.5 INSTALLATION

A. General: Locate the Work and components of the Work accurately, in correct alignment and elevation, as indicated.

1. Make vertical work plumb and make horizontal work level. 2. Where space is limited, install components to maximize space available for maintenance

and ease of removal for replacement. 3. Conceal pipes, ducts, and wiring in finished areas, unless otherwise indicated. 4. Maintain minimum headroom clearance of 96 inches (2440 mm) in occupied spaces and

90 inches (2300 mm)

B. Comply with manufacturer's written instructions and recommendations for installing products in applications indicated.

in unoccupied spaces.

C. Install products at the time and under conditions that will ensure the best possible results. Maintain conditions required for product performance until Substantial Completion.

D. Conduct construction operations so no part of the Work is subjected to damaging operations or loading in excess of that expected during normal conditions of occupancy.

E. Tools and Equipment: Do not use tools or equipment that produce harmful noise levels.

F. Templates: Obtain and distribute to the parties involved templates for work specified to be factory prepared and field installed. Check Shop Drawings of other work to confirm that adequate provisions are made for locating and installing products to comply with indicated requirements.

G. Attachment: Provide blocking and attachment plates and anchors and fasteners of adequate size and number to securely anchor each component in place, accurately located and aligned with other portions of the Work. Where size and type of attachments are not indicated, verify size and type required for load conditions.

1. Mounting Heights: Where mounting heights are not indicated, mount components at heights directed by Architect.

2. Allow for building movement, including thermal expansion and contraction. 3. Coordinate installation of anchorages. Furnish setting drawings, templates, and

directions for installing anchorages, including sleeves, concrete inserts, anchor bolts, and items with integral anchors, that are to be embedded in concrete or masonry. Deliver such items to Project site in time for installation.

H. Joints: Make joints of uniform width. Where joint locations in exposed work are not indicated, arrange joints for the best visual effect. Fit exposed connections together to form hairline joints.

I. Hazardous Materials: Use products, cleaners, and installation materials that are not considered hazardous.

Page 128: Table of Contents Division Section Title

Mt. Pleasant Library 01700-8 20 Feburary 2009 CORE Group, P.C. EXECUTION REQUIREMENTS

3.6 CUTTING AND PATCHING

A. Cutting and Patching, General: Employ skilled workers to perform cutting and patching. Proceed with cutting and patching at the earliest feasible time, and complete without delay.

1. Cut in-place construction to provide for installation of other components or performance of other construction, and subsequently patch as required to restore surfaces to their original condition.

B. Temporary Support: Provide temporary support of work to be cut.

C. Protection: Protect in-place construction during cutting and patching to prevent damage. Provide protection from adverse weather conditions for portions of Project that might be exposed during cutting and patching operations.

D. Adjacent Occupied Areas: Where interference with use of adjoining areas or interruption of free passage to adjoining areas is unavoidable, coordinate cutting and patching in accordance with requirements of Division 1 Section "Summary."

E. Existing Utility Services and Mechanical/Electrical Systems: Where existing services/systems are required to be removed, relocated, or abandoned, bypass such services/systems before cutting to [prevent] interruption to occupied areas.

F. Cutting: Cut in-place construction by sawing, drilling, breaking, chipping, grinding, and similar operations, including excavation, using methods least likely to damage elements retained or adjoining construction. If possible, review proposed procedures with original Installer; comply with original Installer's written recommendations.

1. In general, use hand or small power tools designed for sawing and grinding, not hammering and chopping. Cut holes and slots neatly to minimum size required, and with minimum disturbance of adjacent surfaces. Temporarily cover openings when not in use.

2. Finished Surfaces: Cut or drill from the exposed or finished side into concealed surfaces. 3. Concrete and Masonry: Cut using a cutting machine, such as an abrasive saw or a

diamond-core drill. 4. Excavating and Backfilling: Comply with requirements in applicable Division 2 Sections

where required by cutting and patching operations. 5. Mechanical and Electrical Services: Cut off pipe or conduit in walls or partitions to be

removed. Cap, valve, or plug and seal remaining portion of pipe or conduit to prevent entrance of moisture or other foreign matter after cutting.

6. Proceed with patching after construction operations requiring cutting are complete.

G. Patching: Patch construction by filling, repairing, refinishing, closing up, and similar operations following performance of other work. Patch with durable seams that are as invisible as practicable. Provide materials and comply with installation requirements specified in other Sections, where applicable.

1. Inspection: Where feasible, test and inspect patched areas after completion to demonstrate physical integrity of installation.

2. Exposed Finishes: Restore exposed finishes of patched areas and extend finish restoration into retained adjoining construction in a manner that will minimize evidence of patching and refinishing.

Page 129: Table of Contents Division Section Title

Mt. Pleasant Library 01700-9 20 Feburary 2009 CORE Group, P.C. EXECUTION REQUIREMENTS

a. Clean piping, conduit, and similar features before applying paint or other finishing materials.

b. Restore damaged pipe covering to its original condition.

3. Floors and Walls: Where walls or partitions that are removed extend one finished area into another, patch and repair floor and wall surfaces in the new space. Provide an even surface of uniform finish, color, texture, and appearance. Remove in-place floor and wall coverings and replace with new materials, if necessary, to achieve uniform color and appearance.

a. Where patching occurs in a painted surface, prepare substrate and apply primer and intermediate paint coats appropriate for substrate over the patch, and apply final paint coat over entire unbroken surface containing the patch. Provide additional coats until patch blends with adjacent surfaces.

4. Ceilings: Patch, repair, or rehang in-place ceilings as necessary to provide an even-plane surface of uniform appearance.

5. Exterior Building Enclosure: Patch components in a manner that restores enclosure to a weathertight condition.

H. Cleaning: Clean areas and spaces where cutting and patching are performed. Remove paint, mortar, oils, putty, and similar materials from adjacent finished surfaces.

3.7 OWNER-INSTALLED PRODUCTS

A. Site Access: Provide access to Project site for Owner's construction personnel.

B. Coordination: Coordinate construction and operations of the Work with work performed by Owner's construction personnel.

1. Construction Schedule: Inform Owner of Contractor's preferred construction schedule for Owner's portion of the Work. Adjust construction schedule based on a mutually agreeable timetable. Notify Owner if changes to schedule are required due to differences in actual construction progress.

2. Preinstallation Conferences: Include Owner's construction personnel at preinstallation conferences covering portions of the Work that are to receive Owner's work. Attend preinstallation conferences conducted by Owner's construction personnel if portions of the Work depend on Owner's construction.

3.8 PROGRESS CLEANING

A. General: Clean Project site and work areas daily, including common areas. Enforce requirements strictly. Dispose of materials lawfully.

1. Comply with requirements in NFPA 241 for removal of combustible waste materials and debris.

2. Do not hold waste materials more than seven days during normal weather or three days if the temperature is expected to rise above 80 deg F (27 deg C).

Page 130: Table of Contents Division Section Title

Mt. Pleasant Library 01700-10 20 Feburary 2009 CORE Group, P.C. EXECUTION REQUIREMENTS

3. Containerize hazardous and unsanitary waste materials separately from other waste. Mark containers appropriately and dispose of legally, according to regulations.

a. Utilize containers intended for holding waste materials of type to be stored.

4. Coordinate progress cleaning for joint-use areas where more than one installer has worked.

B. Site: Maintain Project site free of waste materials and debris.

C. Work Areas: Clean areas where work is in progress to the level of cleanliness necessary for proper execution of the Work.

1. Remove liquid spills promptly. 2. Where dust would impair proper execution of the Work, broom-clean or vacuum the

entire work area, as appropriate.

D. Installed Work: Keep installed work clean. Clean installed surfaces according to written instructions of manufacturer or fabricator of product installed, using only cleaning materials specifically recommended. If specific cleaning materials are not recommended, use cleaning materials that are not hazardous to health or property and that will not damage exposed surfaces.

E. Concealed Spaces: Remove debris from concealed spaces before enclosing the space.

F. Exposed Surfaces in Finished Areas: Clean exposed surfaces and protect as necessary to ensure freedom from damage and deterioration at time of Substantial Completion.

G. Waste Disposal: Do not bury or burn waste materials on-site. Do not wash waste materials down sewers or into waterways. Comply with waste disposal requirements in Division 1 Section "Temporary Facilities and Controls." Three paragraphs below reduce or eliminate the need for similar provisions in other Sections. Insert other provisions needed because of unusual Project conditions. Specify unusual provisions for specific work in the individual Section.

H. During handling and installation, clean and protect construction in progress and adjoining materials already in place. Apply protective covering where required to ensure protection from damage or deterioration at Substantial Completion.

I. Clean and provide maintenance on completed construction as frequently as necessary through the remainder of the construction period. Adjust and lubricate operable components to ensure operability without damaging effects.

J. Limiting Exposures: Supervise construction operations to assure that no part of the construction, completed or in progress, is subject to harmful, dangerous, damaging, or otherwise deleterious exposure during the construction period.

3.9 STARTING AND ADJUSTING

A. Coordinate startup and adjusting of equipment and operating components with requirements in Division 1 Section "General Commissioning Requirements."

Page 131: Table of Contents Division Section Title

Mt. Pleasant Library 01700-11 20 Feburary 2009 CORE Group, P.C. EXECUTION REQUIREMENTS

B. Start equipment and operating components to confirm proper operation. Remove malfunctioning units, replace with new units, and retest.

C. Adjust equipment for proper operation. Adjust operating components for proper operation without binding.

D. Test each piece of equipment to verify proper operation. Test and adjust controls and safeties. Replace damaged and malfunctioning controls and equipment.

E. Manufacturer's Field Service: Comply with qualification requirements in Division 1 Section "Quality Requirements."

3.10 PROTECTION OF INSTALLED CONSTRUCTION

A. Provide final protection and maintain conditions that ensure installed Work is without damage or deterioration at time of Substantial Completion.

B. Comply with manufacturer's written instructions for temperature and relative humidity.

3.11 CORRECTION OF THE WORK

A. Repair or remove and replace defective construction. Restore damaged substrates and finishes.

1. Repairing includes replacing defective parts, refinishing damaged surfaces, touching up with matching materials, and properly adjusting operating equipment.

B. Restore permanent facilities used during construction to their specified condition.

C. Remove and replace damaged surfaces that are exposed to view if surfaces cannot be repaired without visible evidence of repair.

D. Repair components that do not operate properly. Remove and replace operating components that cannot be repaired.

E. Remove and replace chipped, scratched, and broken glass or reflective surfaces.

END OF SECTION 01700

Page 132: Table of Contents Division Section Title

Copyright 2008 AIA MASTERSPEC Full Length 11/08

SELECTIVE DEMOLITION 01732 - 1

SECTION 01732 -

PART 1 - GENERAL

SELECTIVE DEMOLITION

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section.

1.2 SUMMARY

A. Section Includes:

1. Demolition and removal of selected portions of building or structure. 2. Demolition and removal of selected site elements. 3. Salvage of existing items to be reused or recycled.

B. Related Requirements:

1. Division 1 Section "Summary" for restrictions on the use of the premises, Owner-occupancy requirements, and phasing requirements.

2. Division 1 Section "Special Procedures for Historic Treatment" for historic removal and dismantling.

3. Division 1 Section "Execution Requirements" for cutting and patching procedures. 4. Division 2 Section "Site Clearing" for site clearing and removal of above- and below-

grade improvements. 5. Division 2 Section "Tree Protection and Trimming" for temporary protection of existing

trees and plants that are affected by selective demolition.

1.3 DEFINITIONS

A. Remove: Detach items from existing construction and legally dispose of them off-site unless indicated to be removed and salvaged or removed and reinstalled.

B. Remove and Salvage: Carefully detach from existing construction, in a manner to prevent damage, and deliver to Owner[ ready for reuse].

C. Remove and Reinstall: Detach items from existing construction, prepare for reuse, and reinstall where indicated.

D. Existing to Remain: Existing items of construction that are not to be permanently removed and that are not otherwise indicated to be removed, removed and salvaged, or removed and reinstalled.

Page 133: Table of Contents Division Section Title

Copyright 2008 AIA MASTERSPEC Full Length 11/08

SELECTIVE DEMOLITION 01732 - 2

1.4 MATERIALS OWNERSHIP

A. Unless otherwise indicated, demolition waste becomes property of Contractor.

B. Historic items, relics, antiques, and similar objects including, but not limited to, cornerstones and their contents, commemorative plaques and tablets, and other items of interest or value to Owner that may be uncovered during demolition remain the property of Owner.

1. Carefully salvage in a manner to prevent damage and promptly return to Owner.

1.5 PREINSTALLATION MEETINGS

A. Predemolition Conference: Conduct conference at [Project site] <Insert location>.

1. Inspect and discuss condition of construction to be selectively demolished. 2. Review structural load limitations of existing structure. 3. Review and finalize selective demolition schedule and verify availability of materials,

demolition personnel, equipment, and facilities needed to make progress and avoid delays.

4. Review requirements of work performed by other trades that rely on substrates exposed by selective demolition operations.

5. Review areas where existing construction is to remain and requires protection. 6. <Insert agenda items>.

1.6 INFORMATIONAL SUBMITTALS

A. Qualification Data: For refrigerant recovery technician.

B. Proposed Protection Measures: Submit report, including drawings, that indicates the measures proposed for protecting individuals and property [, for environmental protection] [, for dust control] [and] [, for noise control]. Indicate proposed locations and construction of barriers.

C. Schedule of Selective Demolition Activities: Indicate the following:

1. Detailed sequence of selective demolition and removal work, with starting and ending dates for each activity. Ensure Owner's [building manager's] [and] [other tenants'] on-site operations are uninterrupted.

2. Interruption of utility services. Indicate how long utility services will be interrupted. 3. Coordination for shutoff, capping, and continuation of utility services. 4. Use of elevator and stairs. 5. Coordination of Owner's continuing occupancy of portions of existing building and of

Owner's partial occupancy of completed Work.

D. Inventory: Submit a list of items to be removed and salvaged and deliver to Owner prior to start of demolition.

E. Predemolition Photographs or Video: Submit before Work begins.

F. Statement of Refrigerant Recovery: Signed by refrigerant recovery technician responsible for recovering refrigerant, stating that all refrigerant that was present was recovered and that

Page 134: Table of Contents Division Section Title

Copyright 2008 AIA MASTERSPEC Full Length 11/08

SELECTIVE DEMOLITION 01732 - 3

recovery was performed according to EPA regulations. Include name and address of technician and date refrigerant was recovered.

G. Warranties: Documentation indicated that existing warranties are still in effect after completion of selective demolition.

1.7 CLOSEOUT SUBMITTALS

A. Inventory: Submit a list of items that have been removed and salvaged.

B. Landfill Records: Indicate receipt and acceptance of hazardous wastes by a landfill facility licensed to accept hazardous wastes.

1.8 QUALITY ASSURANCE

A. Refrigerant Recovery Technician Qualifications: Certified by an EPA-approved certification program.

1.9 FIELD CONDITIONS

A. Owner will occupy portions of building immediately adjacent to selective demolition area. Conduct selective demolition so Owner's operations will not be disrupted.

B. Conditions existing at time of inspection for bidding purpose will be maintained by Owner as far as practical.

1. Before selective demolition, Owner will remove the following items:

a. <Insert items to be removed by Owner>.

C. Notify Architect of discrepancies between existing conditions and Drawings before proceeding with selective demolition.

D. Hazardous Materials: It is not expected that hazardous materials will be encountered in the Work.

1. Hazardous materials will be removed by Owner before start of the Work. 2. If suspected hazardous materials are encountered, do not disturb; immediately notify

Architect and Owner. Hazardous materials will be removed by Owner under a separate contract.

E. Hazardous Materials: Hazardous materials are present in buildings and structures to be selectively demolished. A report on the presence of hazardous materials is on file for review and use. Examine report to become aware of locations where hazardous materials are present.

1. Hazardous material remediation is specified elsewhere in the Contract Documents. 2. Do not disturb hazardous materials or items suspected of containing hazardous materials

except under procedures specified elsewhere in the Contract Documents.

Page 135: Table of Contents Division Section Title

Copyright 2008 AIA MASTERSPEC Full Length 11/08

SELECTIVE DEMOLITION 01732 - 4

3. Owner will provide material safety data sheets for suspected hazardous materials that are known to be present in buildings and structures to be selectively demolished because of building operations or processes performed there.

F. Historic Areas: Demolition and hauling equipment and other materials shall be of sizes that clear surfaces within historic spaces, areas, rooms, and openings, including temporary protection, by [12 inches (300 mm)] <Insert dimension> or more.

G. Storage or sale of removed items or materials on-site is not permitted.

H. Utility Service: Maintain existing utilities indicated to remain in service and protect them against damage during selective demolition operations.

1. Maintain fire-protection facilities in service during selective demolition operations.

1.10 WARRANTY

A. Existing Warranties: Remove, replace, patch, and repair materials and surfaces cut or damaged during selective demolition, by methods and with materials so as not to void existing warranties. Notify warrantor before proceeding. Existing warranties include the following:

1. <Insert warranted system>.

B. Notify warrantor on completion of selective demolition, and obtain documentation verifying that existing system has been inspected and warranty remains in effect. Submit documentation at Project closeout.

PART 2 - PRODUCTS

2.1 PEFORMANCE REQUIREMENTS

A. Regulatory Requirements: Comply with governing EPA notification regulations before beginning selective demolition. Comply with hauling and disposal regulations of authorities having jurisdiction.

B. Standards: Comply with ANSI/ASSE A10.6 and NFPA 241.

C. LEED Requirements for Building Reuse:

1. Credit MR 1.1[ and Credit MR 1.2]: Maintain existing building structure (including structural floor and roof decking) and envelope (exterior skin and framing, excluding window assemblies and nonstructural roofing material) not indicated to be demolished; do not demolish such existing construction beyond indicated limits.

2. Credit MR 1.3: Maintain existing interior nonstructural elements (interior walls, doors, floor coverings, and ceiling systems) not indicated to be demolished; do not demolish such existing construction beyond indicated limits.

3. Credit MR 1.2[ and Credit MR 1.3]: Maintain existing nonshell, nonstructural components (walls, flooring, and ceilings) not indicated to be demolished; do not demolish such existing construction beyond indicated limits.

Page 136: Table of Contents Division Section Title

Copyright 2008 AIA MASTERSPEC Full Length 11/08

SELECTIVE DEMOLITION 01732 - 5

PART 3 - EXECUTION

3.1 EXAMINATION

A. Verify that utilities have been disconnected and capped before starting selective demolition operations.

B. Review record documents of existing construction provided by Owner. Owner does not guarantee that existing conditions are same as those indicated in record documents.

C. Survey existing conditions and correlate with requirements indicated to determine extent of selective demolition required.

D. When unanticipated mechanical, electrical, or structural elements that conflict with intended function or design are encountered, investigate and measure the nature and extent of conflict. Promptly submit a written report to Architect.

E. [Perform] [Engage a professional engineer to perform] an engineering survey of condition of building to determine whether removing any element might result in structural deficiency or unplanned collapse of any portion of structure or adjacent structures during selective building demolition operations.

1. Perform surveys as the Work progresses to detect hazards resulting from selective demolition activities.

2. Steel Tendons: Locate tensioned steel tendons and include recommendations for de-tensioning.

F. Survey of Existing Conditions: Record existing conditions by use of [measured drawings] [preconstruction photographs] [preconstruction videotapes] [and] [templates].

1. Comply with requirements specified in Division 1 Section "Photographic Documentation."

2. Inventory and record the condition of items to be removed and salvaged. Provide [photographs] [or] [video] of conditions that might be misconstrued as damage caused by salvage operations.

3. Before selective demolition or removal of existing building elements that will be reproduced or duplicated in final Work, make permanent record of measurements, materials, and construction details required to make exact reproduction.

3.2 UTILITY SERVICES AND MECHANICAL/ELECTRICAL SYSTEMS

A. Existing Services/Systems to Remain: Maintain services/systems indicated to remain and protect them against damage.

1. Comply with requirements for existing services/systems interruptions specified in Division 1 Section "Summary."

Page 137: Table of Contents Division Section Title

Copyright 2008 AIA MASTERSPEC Full Length 11/08

SELECTIVE DEMOLITION 01732 - 6

B. Existing Services/Systems to Be Removed, Relocated, or Abandoned: Locate, identify, disconnect, and seal or cap off indicated utility services and mechanical/electrical systems serving areas to be selectively demolished.

1. [Owner] [Building manager] will arrange to shut off indicated services/systems when requested by Contractor.

2. Arrange to shut off indicated utilities with utility companies. 3. If services/systems are required to be removed, relocated, or abandoned, provide

temporary services/systems that bypass area of selective demolition and that maintain continuity of services/systems to other parts of building.

4. Disconnect, demolish, and remove fire-suppression systems, plumbing, and HVAC systems, equipment, and components indicated to be removed.

a. Piping to Be Removed: Remove portion of piping indicated to be removed and cap or plug remaining piping with same or compatible piping material.

b. Piping to Be Abandoned in Place: Drain piping and cap or plug piping with same or compatible piping material.

c. Equipment to Be Removed: Disconnect and cap services and remove equipment. d. Equipment to Be Removed and Reinstalled: Disconnect and cap services and

remove, clean, and store equipment; when appropriate, reinstall, reconnect, and make equipment operational.

e. Equipment to Be Removed and Salvaged: Disconnect and cap services and remove equipment and deliver to Owner.

f. Ducts to Be Removed: Remove portion of ducts indicated to be removed and plug remaining ducts with same or compatible ductwork material.

g. Ducts to Be Abandoned in Place: Cap or plug ducts with same or compatible ductwork material.

C. Refrigerant: Remove refrigerant from mechanical equipment to be selectively demolished according to 40 CFR 82 and regulations of authorities having jurisdiction.

3.3 PREPARATION

A. Site Access and Temporary Controls: Conduct selective demolition and debris-removal operations to ensure minimum interference with roads, streets, walks, walkways, and other adjacent occupied and used facilities.

1. Comply with requirements for access and protection specified in Division 1 Section "Temporary Facilities and Controls."

B. Temporary Facilities: Provide temporary barricades and other protection required to prevent injury to people and damage to adjacent buildings and facilities to remain.

1. Provide protection to ensure safe passage of people around selective demolition area and to and from occupied portions of building.

2. Provide temporary weather protection, during interval between selective demolition of existing construction on exterior surfaces and new construction, to prevent water leakage and damage to structure and interior areas.

3. Protect walls, ceilings, floors, and other existing finish work that are to remain or that are exposed during selective demolition operations.

Page 138: Table of Contents Division Section Title

Copyright 2008 AIA MASTERSPEC Full Length 11/08

SELECTIVE DEMOLITION 01732 - 7

4. Cover and protect furniture, furnishings, and equipment that have not been removed. 5. Comply with requirements for temporary enclosures, dust control, heating, and cooling

specified in Division 1 Section "Temporary Facilities and Controls."

C. Temporary Shoring: Provide and maintain shoring, bracing, and structural supports as required to preserve stability and prevent movement, settlement, or collapse of construction and finishes to remain, and to prevent unexpected or uncontrolled movement or collapse of construction being demolished.

1. Strengthen or add new supports when required during progress of selective demolition.

3.4 SELECTIVE DEMOLITION, GENERAL

A. General: Demolish and remove existing construction only to the extent required by new construction and as indicated. Use methods required to complete the Work within limitations of governing regulations and as follows:

1. Proceed with selective demolition systematically, from higher to lower level. Complete selective demolition operations above each floor or tier before disturbing supporting members on the next lower level.

2. Neatly cut openings and holes plumb, square, and true to dimensions required. Use cutting methods least likely to damage construction to remain or adjoining construction. Use hand tools or small power tools designed for sawing or grinding, not hammering and chopping, to minimize disturbance of adjacent surfaces. Temporarily cover openings to remain.

3. Cut or drill from the exposed or finished side into concealed surfaces to avoid marring existing finished surfaces.

4. Do not use cutting torches until work area is cleared of flammable materials. At concealed spaces, such as duct and pipe interiors, verify condition and contents of hidden space before starting flame-cutting operations. Maintain[ fire watch and] portable fire-suppression devices during flame-cutting operations.

5. Maintain adequate ventilation when using cutting torches. 6. Remove decayed, vermin-infested, or otherwise dangerous or unsuitable materials and

promptly dispose of off-site. 7. Remove structural framing members and lower to ground by method suitable to avoid

free fall and to prevent ground impact or dust generation. 8. Locate selective demolition equipment and remove debris and materials so as not to

impose excessive loads on supporting walls, floors, or framing. 9. Dispose of demolished items and materials promptly.[ Comply with requirements in

Division 1 Section "Construction Waste Management."]

B. Work in Historic Areas: Selective demolition may be performed only in areas of the Project that are not designated as historic. In historic spaces, areas, and rooms or on historic surfaces, the terms "demolish" or "remove" shall mean historic "removal" or "dismantling" as specified in Division 1 Section "Special Procedures for Historic Treatment."

C. Reuse of Building Elements: Project has been designed to result in end-of-Project rates for reuse of building elements as follows. Do not demolish building elements beyond what is indicated on Drawings without Architect's approval.

Page 139: Table of Contents Division Section Title

Copyright 2008 AIA MASTERSPEC Full Length 11/08

SELECTIVE DEMOLITION 01732 - 8

1. Building Structure and Shell: [75] [100] percent. 2. Nonshell Elements: 50 percent. 3. Nonshell Elements: [40] [60] percent.

D. Removed and Salvaged Items:

1. Clean salvaged items. 2. Pack or crate items after cleaning. Identify contents of containers. 3. Store items in a secure area until delivery to Owner. 4. Transport items to Owner's storage area [on-site] [off-site] [designated by Owner]

[indicated on Drawings]. 5. Protect items from damage during transport and storage.

E. Removed and Reinstalled Items:

1. Clean and repair items to functional condition adequate for intended reuse. 2. Pack or crate items after cleaning and repairing. Identify contents of containers. 3. Protect items from damage during transport and storage. 4. Reinstall items in locations indicated. Comply with installation requirements for new

materials and equipment. Provide connections, supports, and miscellaneous materials necessary to make item functional for use indicated.

F. Existing Items to Remain: Protect construction indicated to remain against damage and soiling during selective demolition. When permitted by Architect, items may be removed to a suitable, protected storage location during selective demolition[ and cleaned] and reinstalled in their original locations after selective demolition operations are complete.

3.5 SELECTIVE DEMOLITION PROCEDURES FOR SPECIFIC MATERIALS

A. Concrete: Demolish in small sections. Using power-driven saw, cut concrete to a depth of at least 3/4 inch (19 mm)

B. Concrete: Demolish in sections. Cut concrete full depth at junctures with construction to remain and at regular intervals using power-driven saw, then remove concrete between saw cuts.

at junctures with construction to remain. Dislodge concrete from reinforcement at perimeter of areas being demolished, cut reinforcement, and then remove remainder of concrete. Neatly trim openings to dimensions indicated.

C. Masonry: Demolish in small sections. Cut masonry at junctures with construction to remain, using power-driven saw, then remove masonry between saw cuts.

D. Concrete Slabs-on-Grade: Saw-cut perimeter of area to be demolished, then break up and remove.

E. Resilient Floor Coverings: Remove floor coverings and adhesive according to recommendations in RFCI's "Recommended Work Practices for the Removal of Resilient Floor Coverings."[ Do not use methods requiring solvent-based adhesive strippers.]

Page 140: Table of Contents Division Section Title

Copyright 2008 AIA MASTERSPEC Full Length 11/08

SELECTIVE DEMOLITION 01732 - 9

F. Roofing: Remove no more existing roofing than what can be covered in one day by new roofing and so that building interior remains watertight and weathertight. See Division 7 Section "<Insert Section name>" for new roofing requirements.

1. Remove existing roof membrane, flashings, copings, and roof accessories. 2. Remove existing roofing system down to substrate.

3.6 DISPOSAL OF DEMOLISHED MATERIALS

A. General: Except for items or materials indicated to be[ recycled,] reused, salvaged, reinstalled, or otherwise indicated to remain Owner's property, remove demolished materials from Project site[ and legally dispose of them in an EPA-approved landfill].

1. Do not allow demolished materials to accumulate on-site. 2. Remove and transport debris in a manner that will prevent spillage on adjacent surfaces

and areas. 3. Remove debris from elevated portions of building by chute, hoist, or other device that

will convey debris to grade level in a controlled descent. 4. Comply with requirements specified in Division 1 Section "Construction Waste

Management."

B. Burning: Do not burn demolished materials.

C. Burning: Burning of demolished materials will be permitted[ only at designated areas on Owner's property,] provided required permits are obtained. Provide full-time monitoring for burning materials until fires are extinguished.

D. Disposal: Transport demolished materials and dispose of at designated spoil areas on Owner's property.

E. Disposal: Transport demolished materials off Owner's property and legally dispose of them.

3.7 CLEANING

A. Clean adjacent structures and improvements of dust, dirt, and debris caused by selective demolition operations. Return adjacent areas to condition existing before selective demolition operations began.

3.8 SELECTIVE DEMOLITION SCHEDULE

A. Existing [Items] [Construction] to Be Removed: <Insert description of items and construction to be removed>.

B. Existing Items to Be Removed and Salvaged: <Insert description of items to be removed and salvaged>.

C. Existing Items to Be Removed and Reinstalled: <Insert description of items to be removed and reinstalled>.

Page 141: Table of Contents Division Section Title

Copyright 2008 AIA MASTERSPEC Full Length 11/08

SELECTIVE DEMOLITION 01732 - 10

D. Existing Items to Remain: <Insert description of items to remain>.

END OF SECTION 01732

Page 142: Table of Contents Division Section Title

Mt. Pleasant Library 01770-1 20 Feburary 2009 CORE Group, P.C. CLOSEOUT PROCEDURES

SECTION 01770

PART 1 - GENERAL

CLOSEOUT PROCEDURES

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General Conditions to Construction Contract and other Division 1 Specification Sections, apply to this Section.

1.2 SUMMARY

A. Section includes administrative and procedural requirements for contract closeout, including, but not limited to, the following:

1. Substantial Completion procedures. 2. Final completion procedures. 3. Warranties. 4. Final cleaning.

B. Related Sections:

1. Division 1 Section "Photographic Documentation" for submitting final completion construction photographic documentation.

2. Division 1 Section "Execution Requirements" for progress cleaning of Project site. 3. Division 1 Section "Project Record Documents" for submitting Record Drawings, Record

Specifications, and Record Product Data. 4. Division 1 Section "Operation and Maintenance Data" for operation and maintenance

manual requirements. 5. Division 1 Section "Demonstration and Training" for requirements for instructing

Owner's personnel. 6. Divisions 2 through 16 Sections for specific closeout and special cleaning requirements

for the Work in those Sections.

1.3 SUBSTANTIAL COMPLETION

A. Preliminary Procedures: Before requesting inspection for determining date of Substantial Completion, complete the following. List items below that are incomplete with request.

1. Prepare a list of items to be completed and corrected (punch list), the value of items on the list, and reasons why the Work is not complete.

2. Advise Owner of pending insurance changeover requirements. 3. Submit specific warranties, workmanship bonds, maintenance service agreements, final

certifications, and similar documents.

Page 143: Table of Contents Division Section Title

Mt. Pleasant Library 01770-2 20 Feburary 2009 CORE Group, P.C. CLOSEOUT PROCEDURES

4. Obtain and submit releases permitting Owner unrestricted use of the Work and access to services and utilities. Include occupancy permits, operating certificates, and similar releases.

5. Prepare and submit Project Record Documents, operation and maintenance manuals, final completion construction photographic documentation, damage or settlement surveys, property surveys, and similar final record information.

6. Deliver tools, spare parts, extra materials, and similar items to location designated by Owner. Label with manufacturer's name and model number where applicable.

7. Make final changeover of permanent locks and deliver keys to Owner. Advise Owner's personnel of changeover in security provisions.

8. Complete startup testing of systems. 9. Submit test/adjust/balance records. 10. Terminate and remove temporary facilities from Project site, along with mockups,

construction tools, and similar elements. 11. Advise Owner of changeover in heat and other utilities. 12. Submit changeover information related to Owner's occupancy, use, operation, and

maintenance. 13. Complete final cleaning requirements, including touchup painting. 14. Touch up and otherwise repair and restore marred exposed finishes to eliminate visual

defects.

B. Inspection: Submit a written request for inspection for Substantial Completion. On receipt of request, Architect will either proceed with inspection or notify Contractor of unfulfilled requirements. Architect will prepare the Certificate of Substantial Completion after inspection or will notify Contractor of items, either on Contractor's list or additional items identified by Architect, that must be completed or corrected before certificate will be issued.

1. Reinspection: Request reinspection when the Work identified in previous inspections as incomplete is completed or corrected.

2. Results of completed inspection will form the basis of requirements for final completion.

1.4 FINAL COMPLETION

A. Preliminary Procedures: Before requesting final inspection for determining final completion, complete the following:

1. Submit a final Application for Payment according to Division 1 Section "Payment Procedures."

2. Submit certified copy of Architect's Substantial Completion inspection list of items to be completed or corrected (punch list), endorsed and dated by Architect. The certified copy of the list shall state that each item has been completed or otherwise resolved for acceptance.

3. Submit evidence of final, continuing insurance coverage complying with insurance requirements.

4. Submit pest-control final inspection report and warranty. 5. Instruct Owner's personnel in operation, adjustment, and maintenance of products,

equipment, and systems.[ Submit demonstration and training video recordings.]

B. Inspection: Submit a written request for final inspection for acceptance. On receipt of request, Architect will either proceed with inspection or notify Contractor of unfulfilled requirements.

Page 144: Table of Contents Division Section Title

Mt. Pleasant Library 01770-3 20 Feburary 2009 CORE Group, P.C. CLOSEOUT PROCEDURES

Architect will prepare a final Certificate for Payment after inspection or will notify Contractor of construction that must be completed or corrected before certificate will be issued.

1. Reinspection: Request reinspection when the Work identified in previous inspections as incomplete is completed or corrected.

1.5 LIST OF INCOMPLETE ITEMS (PUNCH LIST)

A. Organization of List: Include name and identification of each space and area affected by construction operations for incomplete items and items needing correction including, if necessary, areas disturbed by Contractor that are outside the limits of construction.[ Use CSI Form 14.1A.]

1. Organize list of spaces in sequential order. 2. Organize items applying to each space by major element, including categories for ceiling,

individual walls, floors, equipment, and building systems. 3. Include the following information at the top of each page:

a. Project name. b. Date. c. Name of Architect. d. Name of Contractor. e. Page number.

4. Submit list of incomplete items in the following format:

a. PDF electronic file. b. [Three] paper copies of product schedule or list, unless otherwise indicated.

Architect will return [two] copies.

1.6 WARRANTIES

A. Submittal Time: Submit written warranties on request of Architect for designated portions of the Work where commencement of warranties other than date of Substantial Completion is indicated.

B. Partial Occupancy: Submit properly executed warranties within [15] days of completion of designated portions of the Work that are completed and occupied or used by Owner during construction period by separate agreement with Contractor.

C. Organize warranty documents into an orderly sequence based on the table of contents of the Project Manual.

1. Bind warranties and bonds in heavy-duty, three-ring, vinyl-covered, loose-leaf binders, thickness as necessary to accommodate contents, and sized to receive 8-1/2-by-11-inch (215-by-280-mm)

2. Provide heavy paper dividers with plastic-covered tabs for each separate warranty. Mark tab to identify the product or installation. Provide a typed description of the product or

paper.

Page 145: Table of Contents Division Section Title

Mt. Pleasant Library 01770-4 20 Feburary 2009 CORE Group, P.C. CLOSEOUT PROCEDURES

installation, including the name of the product and the name, address, and telephone number of Installer.

3. Identify each binder on the front and spine with the typed or printed title "WARRANTIES," Project name, and name of Contractor.

4. Scan warranties and bonds and assemble complete warranty and bond submittal package into a single indexed electronic PDF file with links enabling navigation to each item. Provide table of contents at beginning of document.

D. Provide additional copies of each warranty to include in operation and maintenance manuals.

PART 2 - PRODUCTS

2.1 MATERIALS

A. Cleaning Agents: Use cleaning materials and agents recommended by manufacturer or fabricator of the surface to be cleaned. Do not use cleaning agents that are potentially hazardous to health or property or that might damage finished surfaces.

1. Use cleaning products that meet Green Seal GS-37, or if GS-37 is not applicable, use products that comply with the California Code of Regulations maximum allowable VOC levels.

PART 3 - EXECUTION

3.1 FINAL CLEANING

A. General: Perform final cleaning. Conduct cleaning and waste-removal operations to comply with local laws and ordinances and Federal and local environmental and antipollution regulations.

B. Cleaning: Employ experienced workers or professional cleaners for final cleaning. Clean each surface or unit to condition expected in an average commercial building cleaning and maintenance program. Comply with manufacturer's written instructions.

1. Complete the following cleaning operations before requesting inspection for certification of Substantial Completion for entire Project or for a portion of Project:

a. Clean Project site, yard, and grounds, in areas disturbed by construction activities, including landscape development areas, of rubbish, waste material, litter, and other foreign substances.

b. Sweep paved areas broom clean. Remove petrochemical spills, stains, and other foreign deposits.

c. Rake grounds that are neither planted nor paved to a smooth, even-textured surface.

d. Remove tools, construction equipment, machinery, and surplus material from Project site.

e. Remove snow and ice to provide safe access to building.

Page 146: Table of Contents Division Section Title

Mt. Pleasant Library 01770-5 20 Feburary 2009 CORE Group, P.C. CLOSEOUT PROCEDURES

f. Clean exposed exterior and interior hard-surfaced finishes to a dirt-free condition, free of stains, films, and similar foreign substances. Avoid disturbing natural weathering of exterior surfaces. Restore reflective surfaces to their original condition.

g. Remove debris and surface dust from limited access spaces, including roofs, plenums, shafts, trenches, equipment vaults, manholes, attics, and similar spaces.

h. Sweep concrete floors broom clean in unoccupied spaces. i. Vacuum carpet and similar soft surfaces, removing debris and excess nap;

shampoo if visible soil or stains remain. j. Clean transparent materials, including mirrors and glass in doors and windows.

Remove glazing compounds and other noticeable, vision-obscuring materials. Replace chipped or broken glass and other damaged transparent materials. Polish mirrors and glass, taking care not to scratch surfaces.

k. Remove labels that are not permanent. l. Touch up and otherwise repair and restore marred, exposed finishes and surfaces.

Replace finishes and surfaces that cannot be satisfactorily repaired or restored or that already show evidence of repair or restoration.

1) Do not paint over "UL" and other required labels and identification, including mechanical and electrical nameplates.

m. Wipe surfaces of mechanical and electrical equipment[, elevator equipment,] and similar equipment. Remove excess lubrication, paint and mortar droppings, and other foreign substances.

n. Replace parts subject to operating conditions during construction that may impede operation or reduce longevity.

o. Clean plumbing fixtures to a sanitary condition, free of stains, including stains resulting from water exposure.

p. Replace disposable air filters and clean permanent air filters. Clean exposed surfaces of diffusers, registers, and grills.

q. Clean ducts, blowers, and coils if units were operated without filters during construction or that display contamination with particulate matter upon inspection.

1) Clean HVAC system in compliance with NADCA Standard 1992-01. Provide written report upon completion of cleaning.

r. Clean light fixtures, lamps, globes, and reflectors to function with full efficiency. Replace burned-out bulbs, and those noticeably dimmed by hours of use, and defective and noisy starters in fluorescent and mercury vapor fixtures to comply with requirements for new fixtures.

s. Leave Project clean and ready for occupancy.

C. Pest Control: Engage an experienced, licensed exterminator to make a final inspection and rid Project of rodents, insects, and other pests. Prepare a report.

D. Construction Waste Disposal: Comply with waste disposal requirements in [Division 1 Section "Temporary Facilities and Controls."]

E. END OF SECTION 01770

Page 147: Table of Contents Division Section Title

Mt. Pleasant Library 01781-1 20 Feburary 2009 CORE Group, P.C. PROJECT RECORD DOCUMENTS

SECTION 01781

PART 1 - GENERAL

PROJECT RECORD DOCUMENTS

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification Sections, apply to this Section.

1.2 SUMMARY

A. This Section includes administrative and procedural requirements for Project Record Documents, including the following:

1. Record Drawings. 2. Record Specifications. 3. Record Product Data.

B. Related Sections include the following:

1. Division 1 Section "Summary of Multiple Contracts" for coordinating Project Record Documents covering the Work of multiple contracts.

2. Division 1 Section "Closeout Procedures" for general closeout procedures. 3. Division 1 Section "Operation and Maintenance Data" for operation and maintenance

manual requirements. 4. Divisions 2 through 16 Sections for specific requirements for Project Record Documents

of the Work in those Sections.

1.3 SUBMITTALS

A. Record Drawings: Comply with the following:

1. Number of Copies: Submit [one] set(s) of marked-up Record Prints. 2. Number of Copies: Submit copies of Record Drawings as follows:

a. Initial Submittal: Submit [one] set(s) of marked-up Record Prints. Architect will initial and date each [plot] and mark whether general scope of changes, additional information recorded, and quality of drafting are acceptable. Architect will return [plots] and prints for organizing into sets, printing, binding, and final submittal.

b. Final Submittal: Submit [three] set(s) of marked-up Record Prints. Print each Drawing, whether or not changes and additional information were recorded.

B. Record Specifications: Submit [three copies] of Project's Specifications, including addenda and contract modifications.

Page 148: Table of Contents Division Section Title

Mt. Pleasant Library 01781-2 20 Feburary 2009 CORE Group, P.C. PROJECT RECORD DOCUMENTS

C. Record Product Data: Submit [three copies] of each Product Data submittal.

1. Where Record Product Data is required as part of operation and maintenance manuals, submit marked-up Product Data as an insert in manual instead of submittal as Record Product Data.

PART 2 - PRODUCTS

2.1 RECORD DRAWINGS

A. Record Prints: Maintain one set of blue- or black-line white prints of the Contract Drawings and Shop Drawings.

1. Preparation: Mark Record Prints to show the actual installation where installation varies from that shown originally. Require individual or entity who obtained record data, whether individual or entity is Installer, subcontractor, or similar entity, to prepare the marked-up Record Prints.

a. Give particular attention to information on concealed elements that would be difficult to identify or measure and record later.

b. Accurately record information in an understandable drawing technique. c. Record data as soon as possible after obtaining it. Record and check the markup

before enclosing concealed installations.

2. Content: Types of items requiring marking include, but are not limited to, the following:

a. Dimensional changes to Drawings. b. Revisions to details shown on Drawings. c. Depths of foundations below first floor. d. Locations and depths of underground utilities. e. Revisions to routing of piping and conduits. f. Revisions to electrical circuitry. g. Actual equipment locations. h. Duct size and routing. i. Locations of concealed internal utilities. j. Changes made by Change Order or [Construction] [Work] Change Directive. k. Changes made following Architect's written orders. l. Details not on the original Contract Drawings. m. Field records for variable and concealed conditions. n. Record information on the Work that is shown only schematically.

3. Mark the Contract Drawings or Shop Drawings, whichever is most capable of showing actual physical conditions, completely and accurately. If Shop Drawings are marked, show cross-reference on the Contract Drawings.

4. Mark record sets with erasable, red-colored pencil. Use other colors to distinguish between changes for different categories of the Work at same location.

5. Mark important additional information that was either shown schematically or omitted from original Drawings.

Page 149: Table of Contents Division Section Title

Mt. Pleasant Library 01781-3 20 Feburary 2009 CORE Group, P.C. PROJECT RECORD DOCUMENTS

6. Note Construction Change Directive numbers, alternate numbers, Change Order numbers, and similar identification, where applicable.

B. Newly Prepared Record Drawings: Prepare new Drawings instead of preparing Record Drawings where Architect determines that neither the original Contract Drawings nor Shop Drawings are suitable to show actual installation.

1. New Drawings may be required when a Change Order is issued as a result of accepting an alternate, substitution, or other modification.

2. Consult Architect for proper scale and scope of detailing and notations required to record the actual physical installation and its relation to other construction. Integrate newly prepared Record Drawings into Record Drawing sets; comply with procedures for formatting, organizing, copying, binding, and submitting.

C. Format: Identify and date each Record Drawing; include the designation "PROJECT RECORD DRAWING" in a prominent location.

1. Record Prints: Organize Record Prints and newly prepared Record Drawings into manageable sets. Bind each set with durable paper cover sheets. Include identification on cover sheets.

2. Identification: As follows:

a. Project name. b. Date. c. Designation "PROJECT RECORD DRAWINGS." d. Name of Architect. e. Name of Contractor.

2.2 RECORD SPECIFICATIONS

A. Preparation: Mark Specifications to indicate the actual product installation where installation varies from that indicated in Specifications, addenda, and contract modifications.

1. Give particular attention to information on concealed products and installations that cannot be readily identified and recorded later.

2. Mark copy with the proprietary name and model number of products, materials, and equipment furnished, including substitutions and product options selected.

3. Record the name of manufacturer, supplier, Installer, and other information necessary to provide a record of selections made.

4. For each principal product, indicate whether Record Product Data has been submitted in operation and maintenance manuals instead of submitted as Record Product Data.

5. Note related Change Orders [, Record Product Data,] and Record Drawings where applicable.

2.3 RECORD PRODUCT DATA

A. Preparation: Mark Product Data to indicate the actual product installation where installation varies substantially from that indicated in Product Data submittal.

Page 150: Table of Contents Division Section Title

Mt. Pleasant Library 01781-4 20 Feburary 2009 CORE Group, P.C. PROJECT RECORD DOCUMENTS

1. Give particular attention to information on concealed products and installations that cannot be readily identified and recorded later.

2. Include significant changes in the product delivered to Project site and changes in manufacturer's written instructions for installation.

3. Note related Change Orders[, Record Specifications,] and Record Drawings where applicable.

2.4 MISCELLANEOUS RECORD SUBMITTALS

A. Assemble miscellaneous records required by other Specification Sections for miscellaneous record keeping and submittal in connection with actual performance of the Work. Bind or file miscellaneous records and identify each, ready for continued use and reference.

PART 3 - EXECUTION

3.1 RECORDING AND MAINTENANCE

A. Recording: Maintain one copy of each submittal during the construction period for Project Record Document purposes. Post changes and modifications to Project Record Documents as they occur; do not wait until the end of Project.

B. Maintenance of Record Documents and Samples: Store Record Documents and Samples in the field office apart from the Contract Documents used for construction. Do not use Project Record Documents for construction purposes. Maintain Record Documents in good order and in a clean, dry, legible condition, protected from deterioration and loss. Provide access to Project Record Documents for Architect's reference during normal working hours.

END OF SECTION 01781

Page 151: Table of Contents Division Section Title

Mt. Pleasant Library 01782-1 20 Feburary 2009 CORE Group, P.C. OPERATION AND MAINTENANCE DATA

SECTION 01782

PART 1 - GENERAL

OPERATION AND MAINTENANCE DATA

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General Conditions to Construction Contract and other Division 1 Specification Sections, apply to this Section.

1.2 SUMMARY

A. This Section includes administrative and procedural requirements for preparing operation and maintenance manuals, including the following:

1. Operation and maintenance documentation directory. 2. Emergency manuals. 3. Operation manuals for systems, subsystems, and equipment. 4. Maintenance manuals for the care and maintenance of [products, materials, and finishes]

[systems and equipment].

B. Related Sections include the following:

1. Division 1 Section "Summary of Multiple Contracts" for coordinating operation and maintenance manuals covering the Work of multiple contracts.

2. Division 1 Section "Submittal Procedures" for submitting copies of submittals for operation and maintenance manuals.

3. Division 1 Section "Closeout Procedures" for submitting operation and maintenance manuals.

4. Division 1 Section "Project Record Documents" for preparing Record Drawings for operation and maintenance manuals.

5. Divisions 2 through 16 Sections for specific operation and maintenance manual requirements for the Work in those Sections.

1.3 DEFINITIONS

A. System: An organized collection of parts, equipment, or subsystems united by regular interaction.

B. Subsystem: A portion of a system with characteristics similar to a system.

1.4 SUBMITTALS

A. Initial Submittal: Submit [2] draft copies of each manual at least [15] days before requesting inspection for Substantial Completion. Include a complete operation and maintenance

Page 152: Table of Contents Division Section Title

Mt. Pleasant Library 01782-2 20 Feburary 2009 CORE Group, P.C. OPERATION AND MAINTENANCE DATA

directory. Architect will return [one copy] of draft and mark whether general scope and content of manual are acceptable.

B. Final Submittal: Submit [three copies] of each manual in final form at least [15] days before final inspection. Architect will return copy with comments within [15] days after final inspection.

1. Correct or modify each manual to comply with Architect's comments. Submit [3] copies of each corrected manual within [15] days of receipt of Architect's comments.

1.5 COORDINATION

A. Where operation and maintenance documentation includes information on installations by more than one factory-authorized service representative, assemble and coordinate information furnished by representatives and prepare manuals.

PART 2 - PRODUCTS

2.1 OPERATION AND MAINTENANCE DOCUMENTATION DIRECTORY

A. Organization: Include a section in the directory for each of the following:

1. List of documents. 2. List of systems. 3. List of equipment. 4. Table of contents.

B. List of Systems and Subsystems: List systems alphabetically. Include references to operation and maintenance manuals that contain information about each system.

C. List of Equipment: List equipment for each system, organized alphabetically by system. For pieces of equipment not part of system, list alphabetically in separate list.

D. Tables of Contents: Include a table of contents for each emergency, operation, and maintenance manual.

E. Identification: In the documentation directory and in each operation and maintenance manual, identify each system, subsystem, and piece of equipment with same designation used in the Contract Documents. If no designation exists, assign a designation according to ASHRAE Guideline 4, "Preparation of Operating and Maintenance Documentation for Building Systems."

2.2 MANUALS, GENERAL

A. Organization: Unless otherwise indicated, organize each manual into a separate section for each system and subsystem, and a separate section for each piece of equipment not part of a system. Each manual shall contain the following materials, in the order listed:

Page 153: Table of Contents Division Section Title

Mt. Pleasant Library 01782-3 20 Feburary 2009 CORE Group, P.C. OPERATION AND MAINTENANCE DATA

1. Title page. 2. Table of contents. 3. Manual contents.

B. Title Page: Enclose title page in transparent plastic sleeve. Include the following information:

1. Subject matter included in manual. 2. Name and address of Project. 3. Name and address of Owner. 4. Date of submittal. 5. Name, address, and telephone number of Contractor. 6. Name and address of Architect. 7. Cross-reference to related systems in other operation and maintenance manuals.

C. Table of Contents: List each product included in manual, identified by product name, indexed to the content of the volume, and cross-referenced to Specification Section number in Project Manual.

1. If operation or maintenance documentation requires more than one volume to accommodate data, include comprehensive table of contents for all volumes in each volume of the set.

D. Manual Contents: Organize into sets of manageable size. Arrange contents alphabetically by system, subsystem, and equipment. If possible, assemble instructions for subsystems, equipment, and components of one system into a single binder.

1. Binders: Heavy-duty, 3-ring, vinyl-covered, loose-leaf binders, in thickness necessary to accommodate contents, sized to hold 8-1/2-by-11-inch (215-by-280-mm)

a. If two or more binders are necessary to accommodate data of a system, organize data in each binder into groupings by subsystem and related components. Cross-reference other binders if necessary to provide essential information for proper operation or maintenance of equipment or system.

paper; with clear plastic sleeve on spine to hold label describing contents and with pockets inside covers to hold folded oversize sheets.

b. Identify each binder on front and spine, with printed title "OPERATION AND MAINTENANCE MANUAL," Project title or name, and subject matter of contents. Indicate volume number for multiple-volume sets.

2. Dividers: Heavy-paper dividers with plastic-covered tabs for each section. Mark each tab to indicate contents. Include typed list of products and major components of equipment included in the section on each divider, cross-referenced to Specification Section number and title of Project Manual.

3. Protective Plastic Sleeves: Transparent plastic sleeves designed to enclose diagnostic software diskettes for computerized electronic equipment.

4. Supplementary Text: Prepared on 8-1/2-by-11-inch (215-by-280-mm)5. Drawings: Attach reinforced, punched binder tabs on drawings and bind with text.

white bond paper.

a. If oversize drawings are necessary, fold drawings to same size as text pages and use as foldouts.

Page 154: Table of Contents Division Section Title

Mt. Pleasant Library 01782-4 20 Feburary 2009 CORE Group, P.C. OPERATION AND MAINTENANCE DATA

b. If drawings are too large to be used as foldouts, fold and place drawings in labeled envelopes and bind envelopes in rear of manual. At appropriate locations in manual, insert typewritten pages indicating drawing titles, descriptions of contents, and drawing locations.

2.3 EMERGENCY MANUALS

A. Content: Organize manual into a separate section for each of the following:

1. Type of emergency. 2. Emergency instructions. 3. Emergency procedures.

B. Type of Emergency: Where applicable for each type of emergency indicated below, include instructions and procedures for each system, subsystem, piece of equipment, and component:

1. Fire. 2. Flood. 3. Gas leak. 4. Water leak. 5. Power failure. 6. Water outage. 7. System, subsystem, or equipment failure. 8. Chemical release or spill.

C. Emergency Instructions: Describe and explain warnings, trouble indications, error messages, and similar codes and signals. Include responsibilities of Owner's operating personnel for notification of Installer, supplier, and manufacturer to maintain warranties.

D. Emergency Procedures: Include the following, as applicable:

1. Instructions on stopping. 2. Shutdown instructions for each type of emergency. 3. Operating instructions for conditions outside normal operating limits. 4. Required sequences for electric or electronic systems. 5. Special operating instructions and procedures.

2.4 OPERATION MANUALS

A. Content: In addition to requirements in this Section, include operation data required in individual Specification Sections and the following information:

1. System, subsystem, and equipment descriptions. 2. Performance and design criteria if Contractor is delegated design responsibility. 3. Operating standards. 4. Operating procedures. 5. Operating logs. 6. Wiring diagrams. 7. Control diagrams.

Page 155: Table of Contents Division Section Title

Mt. Pleasant Library 01782-5 20 Feburary 2009 CORE Group, P.C. OPERATION AND MAINTENANCE DATA

8. Piped system diagrams. 9. Precautions against improper use. 10. License requirements including inspection and renewal dates.

B. Descriptions: Include the following:

1. Product name and model number. 2. Manufacturer's name. 3. Equipment identification with serial number of each component. 4. Equipment function. 5. Operating characteristics. 6. Limiting conditions. 7. Performance curves. 8. Engineering data and tests. 9. Complete nomenclature and number of replacement parts.

C. Operating Procedures: Include the following, as applicable:

1. Startup procedures. 2. Equipment or system break-in procedures. 3. Routine and normal operating instructions. 4. Regulation and control procedures. 5. Instructions on stopping. 6. Normal shutdown instructions. 7. Seasonal and weekend operating instructions. 8. Required sequences for electric or electronic systems. 9. Special operating instructions and procedures.

D. Systems and Equipment Controls: Describe the sequence of operation, and diagram controls as installed.

E. Piped Systems: Diagram piping as installed, and identify color-coding where required for identification.

2.5 PRODUCT MAINTENANCE MANUAL

A. Content: Organize manual into a separate section for each product, material, and finish. Include source information, product information, maintenance procedures, repair materials and sources, and warranties and bonds, as described below.

B. Source Information: List each product included in manual, identified by product name and arranged to match manual's table of contents. For each product, list name, address, and telephone number of Installer or supplier and maintenance service agent, and cross-reference Specification Section number and title in Project Manual.

C. Product Information: Include the following, as applicable:

1. Product name and model number. 2. Manufacturer's name. 3. Color, pattern, and texture.

Page 156: Table of Contents Division Section Title

Mt. Pleasant Library 01782-6 20 Feburary 2009 CORE Group, P.C. OPERATION AND MAINTENANCE DATA

4. Material and chemical composition. 5. Reordering information for specially manufactured products.

D. Maintenance Procedures: Include manufacturer's written recommendations and the following:

1. Inspection procedures. 2. Types of cleaning agents to be used and methods of cleaning. 3. List of cleaning agents and methods of cleaning detrimental to product. 4. Schedule for routine cleaning and maintenance. 5. Repair instructions.

E. Repair Materials and Sources: Include lists of materials and local sources of materials and related services.

F. Warranties and Bonds: Include copies of warranties and bonds and lists of circumstances and conditions that would affect validity of warranties or bonds.

1. Include procedures to follow and required notifications for warranty claims.

2.6 SYSTEMS AND EQUIPMENT MAINTENANCE MANUAL

A. Content: For each system, subsystem, and piece of equipment not part of a system, include source information, manufacturers' maintenance documentation, maintenance procedures, maintenance and service schedules, spare parts list and source information, maintenance service contracts, and warranty and bond information, as described below.

B. Source Information: List each system, subsystem, and piece of equipment included in manual, identified by product name and arranged to match manual's table of contents. For each product, list name, address, and telephone number of Installer or supplier and maintenance service agent, and cross-reference Specification Section number and title in Project Manual.

C. Manufacturers' Maintenance Documentation: Manufacturers' maintenance documentation including the following information for each component part or piece of equipment:

1. Standard printed maintenance instructions and bulletins. 2. Drawings, diagrams, and instructions required for maintenance, including disassembly

and component removal, replacement, and assembly. 3. Identification and nomenclature of parts and components. 4. List of items recommended to be stocked as spare parts.

D. Maintenance Procedures: Include the following information and items that detail essential maintenance procedures:

1. Test and inspection instructions. 2. Troubleshooting guide. 3. Precautions against improper maintenance. 4. Disassembly; component removal, repair, and replacement; and reassembly instructions. 5. Aligning, adjusting, and checking instructions. 6. Demonstration and training videotape, if available.

Page 157: Table of Contents Division Section Title

Mt. Pleasant Library 01782-7 20 Feburary 2009 CORE Group, P.C. OPERATION AND MAINTENANCE DATA

E. Maintenance and Service Schedules: Include service and lubrication requirements, list of required lubricants for equipment, and separate schedules for preventive and routine maintenance and service with standard time allotment.

1. Scheduled Maintenance and Service: Tabulate actions for daily, weekly, monthly, quarterly, semiannual, and annual frequencies.

2. Maintenance and Service Record: Include manufacturers' forms for recording maintenance.

F. Spare Parts List and Source Information: Include lists of replacement and repair parts, with parts identified and cross-referenced to manufacturers' maintenance documentation and local sources of maintenance materials and related services.

G. Maintenance Service Contracts: Include copies of maintenance agreements with name and telephone number of service agent.

H. Warranties and Bonds: Include copies of warranties and bonds and lists of circumstances and conditions that would affect validity of warranties or bonds.

1. Include procedures to follow and required notifications for warranty claims.

PART 3 - EXECUTION

3.1 MANUAL PREPARATION

A. Operation and Maintenance Documentation Directory: Prepare a separate manual that provides an organized reference to emergency, operation, and maintenance manuals.

B. Emergency Manual: Assemble a complete set of emergency information indicating procedures for use by emergency personnel and by Owner's operating personnel for types of emergencies indicated.

C. Product Maintenance Manual: Assemble a complete set of maintenance data indicating care and maintenance of each product, material, and finish incorporated into the Work.

D. Operation and Maintenance Manuals: Assemble a complete set of operation and maintenance data indicating operation and maintenance of each system, subsystem, and piece of equipment not part of a system.

1. Engage a factory-authorized service representative to assemble and prepare information for each system, subsystem, and piece of equipment not part of a system.

2. Prepare a separate manual for each system and subsystem, in the form of an instructional manual for use by Owner's operating personnel.

E. Manufacturers' Data: Where manuals contain manufacturers' standard printed data, include only sheets pertinent to product or component installed. Mark each sheet to identify each product or component incorporated into the Work. If data include more than one item in a tabular format, identify each item using appropriate references from the Contract Documents. Identify data applicable to the Work and delete references to information not applicable.

Page 158: Table of Contents Division Section Title

Mt. Pleasant Library 01782-8 20 Feburary 2009 CORE Group, P.C. OPERATION AND MAINTENANCE DATA

1. Prepare supplementary text if manufacturers' standard printed data are not available and where the information is necessary for proper operation and maintenance of equipment or systems.

F. Drawings: Prepare drawings supplementing manufacturers' printed data to illustrate the relationship of component parts of equipment and systems and to illustrate control sequence and flow diagrams. Coordinate these drawings with information contained in Record Drawings to ensure correct illustration of completed installation.

1. Do not use original Project Record Documents as part of operation and maintenance manuals.

2. Comply with requirements of newly prepared Record Drawings in Division 1 Section "Project Record Documents."

G. Comply with Division 1 Section "Closeout Procedures" for schedule for submitting operation and maintenance documentation.

END OF SECTION 01782

Page 159: Table of Contents Division Section Title

Mt. Pleasant Library 01810-1 4 December 2009 Allen & Shariff Engineering GENERAL COMMISSIONING REQUIREMENTS

SECTION 01810

PART 1 - GENERAL

GENERAL COMMISSIONING REQUIREMENTS

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification Sections, apply to this Section.

B. OPR and BoD documentation are included by reference for information only.

1.2 SUMMARY

A. Section includes general requirements that apply to implementation of commissioning without regard to specific systems, assemblies, or components.

B. Related Sections: 1. Division 15 “Mechanical Systems Commissioning”. 2. Division 16 “ Electrical Systems Commissioning”.

1.3 DEFINITIONS

A. BoD: Basis of Design. A document that records concepts, calculations, decisions, and product selections used to meet the OPR and to satisfy applicable regulatory requirements, standards, and guidelines. The document includes both narrative descriptions and lists of individual items that support the design process.

B. Commissioning Plan: A document that outlines the organization, schedule, allocation of resources, and documentation requirements of the commissioning process.

C. CxA, CA: Commissioning Authority.

D. OPR: Owner's Project Requirements. A document that details the functional requirements of a project and the expectations of how it will be used and operated. These include Project goals, measurable performance criteria, cost considerations, benchmarks, success criteria, and supporting information.

E. Systems, Subsystems, Equipment, and Components: Where these terms are used together or separately, they shall mean "as-built" systems, subsystems, equipment, and components.

Page 160: Table of Contents Division Section Title

Mt. Pleasant Library 01810-2 4 December 2009 Allen & Shariff Engineering GENERAL COMMISSIONING REQUIREMENTS

1.4 COMMISSIONING TEAM

A. Members Appointed by Contractor: Individuals, each having the authority to act on behalf of the entity he or she represents, explicitly organized to implement the commissioning process through coordinated action. The commissioning team shall consist of, but not be limited to, representatives of Contractor, including Project superintendent and subcontractors, installers, suppliers, and specialists deemed appropriate by the CxA.

B. Members Appointed by Owner:

1. CxA: The designated person, company, or entity that plans, schedules, and coordinates the commissioning team to implement the commissioning process. Owner will engage the CxA under a separate contract.

2. Representatives of the facility user and operation and maintenance personnel. 3. Architect and engineering design professionals.

1.5 OWNER'S RESPONSIBILITIES

A. Provide the OPR documentation to the CxA and Contractor for information and use.

B. Assign operation and maintenance personnel and schedule them to participate in commissioning team activities.

C. Provide the BoD documentation, prepared by Architect and approved by Owner, to the CxA and Contractor for use in developing the commissioning plan, systems manual, and operation and maintenance training plan.

1.6 CONTRACTOR'S RESPONSIBILITIES

A. Contractor shall assign representatives with expertise and authority to act on its behalf and shall schedule them to participate in and perform commissioning process activities including, but not limited to, the following:

1. Evaluate performance deficiencies identified in test reports and, in collaboration with entity responsible for system and equipment installation, recommend corrective action.

2. Cooperate with the CxA for resolution of issues recorded in the Issues Log. 3. Attend commissioning team meetings held on a monthly or as required by CxA basis. 4. Integrate and coordinate commissioning process activities with construction schedule. 5. Create construction checklists (equipment start-up) and submit to the CxA for review,

comment. Contractor is to document and sign each piece of equipment at start-up of equipment is preformed.

6. Complete paper as well as electronic construction checklists as Work is completed and provide to the Commissioning Authority on a bi-weekly basis.

7. Review and accept commissioning process test procedures (functional testing) provided by the Commissioning Authority.

8. Complete commissioning process test procedures.

Page 161: Table of Contents Division Section Title

Mt. Pleasant Library 01810-3 4 December 2009 Allen & Shariff Engineering GENERAL COMMISSIONING REQUIREMENTS

1.7 CxA'S RESPONSIBILITIES

A. Organize and lead the commissioning team.

B. Provide commissioning plan.

C. Review OPR & BOD

D. Convene commissioning team meetings.

E. Provide Project-specific construction checklists and commissioning process test procedures. Contractor to submit start-up checklists, and manufactures start-up documents, and assist in the creation of all test proceedures.

F. Verify the execution of commissioning process activities using random sampling. The sampling rate may vary from 1 to 100 percent. Verification will include, but is not limited to, equipment submittals, construction checklists, training, operating and maintenance data, tests, and test reports to verify compliance with the OPR. When a random sample does not meet the requirement, the CxA will report the failure in the Issues Log.

G. Prepare and maintain the Issues Log.

H. Prepare and maintain completed construction checklist log.

I. Witness systems, assemblies, equipment, and component startup.

J. Compile test data, inspection reports, and certificates, and include them in the Cx Report

Page 162: Table of Contents Division Section Title

Mt. Pleasant Library 01810-4 4 December 2009 Allen & Shariff Engineering GENERAL COMMISSIONING REQUIREMENTS

PART 2 - EXECUTION Commissioning Plan Fundamental Building Systems Commissioning

LEED CS 2.0, EA Prerequisite 1

Project:

Mt. Pleasant Library 3160 16th

Washington, DC 200001 St. NW

Prepared by:

ALLEN & SHARIFF CORPORATION 7061 Deepage Drive • Columbia, Maryland 21045

Phone: 410-381-7100 • Fax: 410-381-7110

Commissioning Authority Warren Isaac, LEED AP, CxA

Direct 443-545-1059

March 18, 2009

Page 163: Table of Contents Division Section Title

Mt. Pleasant Library 01810-5 4 December 2009 Allen & Shariff Engineering GENERAL COMMISSIONING REQUIREMENTS

Table of Content 1. Overview 1.1 Abbreviations and Definitions 1.2 Purpose of the Commissioning Plan 1.3 Commissioning Scope 1.4 Commissioned Systems 2. General Building Information 3. Construction / Cx Team Data 4. Roles and Responsibilities 4.1 Cx Team Members 4.2 General Management Plan 4.3 General Descriptions of Roles 5. Commissioning Process 5.1 Commissioning Scoping Meeting 5.2 Final Commissioning Plan—Construction Phase 5.3 Site Observation 5.4 Meetings 5.5 Management Protocols 5.6 Progress Reporting and Logs 5.7 N/A 5.8 Prefunctional Checklists, Tests and Startup 5.9 Development of Functional Test and Verification Procedures 5.10 Execution of Functional Testing Procedures 5.11 O&M Manuals 5.12 Training 5.13 Warranty period 6. N/A 7. Schedule 7.1 General Issues 7.2 Project Schedule 8. LEED Functional Commissioning Outline

Page 164: Table of Contents Division Section Title

Mt. Pleasant Library 01810-6 4 December 2009 Allen & Shariff Engineering GENERAL COMMISSIONING REQUIREMENTS

1. Overview 1.1 Abbreviations and Definitions

The following are common abbreviations used in this document. A/E- Architect and design engineers FT- Functional performance test CA or CxA

Commissioning authority GC or CM General contractor

CC- Controls contractor MC- Mechanical contractor CM or GC

Construction Manager Mfr- Manufacturer

Cx- Commissioning PC- Prefunctional checklist Cx Plan- Commissioning Plan document Subs- Subcontractors to General EC- Electrical contractor TAB- Test and balance contractor

1.2 Purpose of The Commissioning Plan

The purpose of the commissioning plan is to provide direction for the commissioning process, particularly providing resolution for issues and providing details that cannot be, or were not, fully developed during design, such as scheduling, participation of various parties of this particular project, actual lines of reporting and approvals, coordination, etc. This plan does not provide a detailed explanation of required testing procedures. The detailed testing requirements and procedures will be developed from the equipment manufacturers start-up procedures and recommendations and from the project specifications.

1.3 Commissioning Scope

Commissioning is a systematic process of ensuring that all building systems perform interactively accord-ing to the design intent and the owner’s operational needs. The commissioning process for a LEED project focuses on the performance of systems related to LEED prerequisites and credits. Commissioning during the construction of this project is intended to achieve the following specific objec-tives: According to the Contract Documents:

• Ensure that applicable equipment and systems are installed properly and receive adequate start-up and operational checkout by installing contractors.

• Verify and document proper performance of equipment and systems. • Ensure that O&M documentation left on site is complete.

1.4 Commissioned Systems The following systems will be commissioned in this project. All general references to equipment in this document refer only to equipment that is to be commissioned.

Page 165: Table of Contents Division Section Title

Mt. Pleasant Library 01810-7 4 December 2009 Allen & Shariff Engineering GENERAL COMMISSIONING REQUIREMENTS

AHU 1-4 ERV-1 Chillers Chilled & Hot WaterHydronic Systems, including Cooling Towers, Pumping Systems and associated

Piping Exhaust Fans 1-6 Domestic Hot Water Systems

2. General Building Information Project: Mt. Pleasant Library

Location: 3160 16th

Building Type: Library and Meeting Rooms

St. NW, Washington DC

Number of stories: 3 Levels

Const. Period:

3. Construction/Cx Team Data (primary parties)

Team Member Company, Address &

Contact Names

Contact Information

Owner

Owners Representative

General Contractor

Site Contact

Commissioning Company Allen & Shariff Corporation 7061 Deepage Drive Columbia, MD 21045

Fax: 410-381-7110

Commissioning Authority Warren Isaac Office: 443-656-1056 Cell: 410-340-5363 [email protected]

Page 166: Table of Contents Division Section Title

Mt. Pleasant Library 01810-8 4 December 2009 Allen & Shariff Engineering GENERAL COMMISSIONING REQUIREMENTS

Architect & Planners

Core Architecture Design 1010 Wisconsin Ave. NW Suite 405 Washington, DC 20007

Office 202-466-6116 Fax 202-466-6235

Project Manager

MEP Designers & Engineers

Allen & Shariff Engineering 7061 Deepage Drive Columbia, MD 21045

Office 410-381-7100

Project Manager Dwayne Smith, PE, CxA, LEED AP

Dwayne Smith Office 443-545-1112 [email protected]

Mechanical Contractor

Site Contact

Plumbing Contractor

Site Contact

Electrical Contractor

Site Contact

TAB Contractor

Site Contact

BAS/ATC Contractor

Site Contact

Page 167: Table of Contents Division Section Title

Mt. Pleasant Library 01810-9 4 December 2009 Allen & Shariff Engineering GENERAL COMMISSIONING REQUIREMENTS

4. Roles and Responsibilities 4.1 Team Members

The members of the commissioning team consist of the Owner’s representative, CxA, assigned members of the GC, A/E (particularly the mechanical engineer), the mechanical contractor, plumbing contractor, and any other installing subcontractors or suppliers of equipment. If known, the Owner’s building engineer is also a member of the commissioning team.

All contractor personnel on the commissioning team are to make themselves familiar with LEED Prerequisite 1 EA commissioning process. 4.2 General Management Plan

The CxA was hired by the Owner directly. In general, the CxA coordinates the commissioning activities and reports to the Owner. The CxA’s responsibilities, along with all other contractors’ commissioning responsibilities are detailed in the Cx plan and specifications. The Specifications will take precedence over this Cx Plan. All members work together to fulfill their contracted responsibilities and meet the objectives of the Contract Documents. Refer to the management protocols section below.

4.3 General Descriptions of Roles General descriptions of the commissioning roles are as follows:

CxA : Coordinates the Cx process, writes tests, oversees and documents performance tests GC : Facilitates the Cx process, ensures that Subs perform their responsibilities and

integrates Cx into the construction process and schedule Subs : Demonstrate proper system performance and provide all necessary equipment for

testing A/E : Perform construction observation, approve O&M manuals and assist in resolving

problems Mfr. : The equipment manufacturers and vendors provide documentation to facilitate the

commissioning work and perform contracted startup

5. Commissioning Process This section sequentially details the commissioning process by commissioning task or activity.

5.1 Commissioning Scoping Meeting

A commissioning scoping meeting is planned and conducted by the CxA. In attendance are the repre-sentatives of the Owner, GC, A/E and the mechanical and plumbing contractors. At the meeting, com-missioning parties are introduced, the commissioning process is reviewed, and management and reporting lines are determined. The flow of documents, how much submittal data the CxA will receive, etc. are also discussed. The Cx Plan is reviewed, process questions are addressed, lines of reporting and communica-

Page 168: Table of Contents Division Section Title

Mt. Pleasant Library 01810-10 4 December 2009 Allen & Shariff Engineering GENERAL COMMISSIONING REQUIREMENTS

tions determined and the work products list is discussed. Also covered are the general list of each party’s responsibilities, which party is responsible to develop the startup plan for each piece of equipment and the proposed commissioning schedule. The outcome of the meeting is increased understanding by all parties of the commissioning process and their respective responsibilities. The meeting provides the CxA addi-tional information needed to finalize or modify the Cx Plan, including the commissioning schedule. Prior to this meeting the CxA is given all drawings and specifications and the construction schedule by trade. The CxA keeps notes from the meeting and distributes them to each team member.

5.2 Final Commissioning Plan--Construction Phase

The CxA finalizes the Cx Plan using the information gathered from the scoping meeting. The initial commissioning schedule is also developed along with a detailed timeline. The timeline is fine-tuned as construction progresses. In particular, 60 days prior to startup of the primary equipment, the CxA meets with the GC and develops a detailed commissioning schedule. The CxA approves the commissioning plan. 5.3 Site Observation

The CxA, and CM if applicable, makes periodic visits to the site, as necessary, to witness equipment and system installations. 5.4 Meetings

The CxA attends selected planning and job-site meetings in order to remain informed on construction progress and to update parties involved in commissioning. The GC provides the CxA with information regarding substitutions, change orders and any Architect’s Supplemental Instructions (ASI) that may af-fect commissioning equipment, systems or the commissioning schedule. The CxA may review construc-tion-meeting minutes, change orders or ASI's for the same purpose. Later during construction, necessary meetings between various commissioning team parties will be scheduled by the CxA, through the GC, as required. 5.5 Management Protocols The following protocols will be used on this project.

Issue

For requests for information (RFI) or formal documentation requests:

Protocol

The CxA goes first: __x_ direct to A/E, ___through the GC,

For minor or verbal information and clarifications:

The CxA goes direct to the informed party.

For notifying contractors of deficien-cies:

The CxA documents deficiencies through the GC, but may dis-cuss deficiency issues with contractors prior to notifying the GC.

For scheduling functional tests or training:

The CxA may provide input for some coordination of training and testing, but does not do any scheduling.

For scheduling commissioning meet-ings:

The CxA selects the date and schedules through the: __x_GC. ___The CxA schedules and notifies attendees directly.

Page 169: Table of Contents Division Section Title

Mt. Pleasant Library 01810-11 4 December 2009 Allen & Shariff Engineering GENERAL COMMISSIONING REQUIREMENTS

For making a request for significant changes:

The CxA has no authority to issue change orders.

For making small changes in specified sequences of operations:

The CxA may not

make changes to specified sequences without approval from the A/E.

Subcontractors disagreeing with re-quests or interpretations by the CxA shall:

Try and resolve with the CxA first. Then work through GC who will work with CxA directly to resolve the situation.

5.6 Progress Reporting and Logs

At the beginning of construction, the GC provides the CxA with monthly progress reports. Thirty (30) days prior to the startup of the first piece of major equipment, the frequency of progress reports is in-creased to twice per month, until startup is completed. Thirty (30) days before Prefunctional or Functional testing of equipment begins, weekly progress reports are required until testing and all non-conformance issues are resolved. The CxA may adjust the reporting frequency as needed. The progress reports con-tain: an update of the schedule with list of requested schedule changes and new items added to the sche-dule, a list of new and outstanding deficiencies, a description of commissioning progress corresponding to the plan, etc. The CxA keeps a log of all commissioning-related issues that require current or future at-tention. The CxA regularly communicates with all members of the commissioning team, keeping them apprised of commissioning progress and scheduling issues through memos, progress reports, etc.. The CxA will keep all commissioning materials in an organized notebook.

5.7 Not used 5.8 Prefunctional Checklists, Tests and Startup

Prefunctional checklists (PC) are important to ensure that the equipment and systems are connected and operational, and that Functional Performance Testing may proceed without unnecessary delays. Each piece of equipment receives full prefunctional checkout by the Contractor. No sampling strategies are used. In general, the prefunctional testing for a given system must be successfully completed prior to formal functional performance testing of equipment or subsystems of the given system. Prefunctional checklists are primarily static inspections and procedures to prepare the equipment or sys-tem for initial operation (e.g., oil levels OK, fan belt tension, labels affixed, gages in place, sensor calibra-tion, etc.). However, some prefunctional checklist items entail simple testing of the function of a compo-nent, a piece of equipment or system (such as measuring the voltage imbalance on a three phase pump motor of a chiller system). The word prefunctional refers to before

Contractors typically already perform some, if not many, of the prefunctional checklist items the commis-sioning authority will recommend. However, few contractors document in writing the execution of these checklist items. This project requires that the procedures be documented in writing by the installing tech-nician. The CxA does not witness much of the prefunctional check listing, except for testing of larger or more critical pieces of equipment and some spot-checking. CONTRACTOR IS TO SUBMIT TO THE CxA THEIR PREFUNCTIONAL STARTUP DOCUMENT FORMS FOR REVIEW AND COMMENT PRIOR TO STARTING SYSTEMS.

functional testing. Prefunctional checklists augment and are combined with the manufacturer’s start-up checklist.

Page 170: Table of Contents Division Section Title

Mt. Pleasant Library 01810-12 4 December 2009 Allen & Shariff Engineering GENERAL COMMISSIONING REQUIREMENTS

5.8.1 Start-up Plan The CxA assists the commissioning team members responsible for startup in developing detailed start-up plans for all equipment. The parties responsible for each part of startup and initial checkout are noted on the prefunctional checklists. The following procedures will be used for this project: (the contractor is responsible for the plan devel-opment):

1. The CxA adapts and enhances, if necessary, the representative prefunctional checklists (PC) and procedures, and assists to develop original lists when necessary.

2. The CxA transmits them to the GC who designates which trade or contractor is responsible to fill out each line item (mark in the “Contr” column) on the Prefunctional Checklist from the CxA. The GC then transmits the checklist to the responsible Subs.

3. The Sub designated to develop the Start-up Plan obtains manufacturer installation, start-up and checkout data, including actual field checkout sheets used by the field technicians.

4. The Sub copies all pages with important instructional data and procedures (not covered in manufacturer field checkout sheets) from the start-up and checkout manuals and adds a signa-ture line in the column by each procedure.

5. The copied pages from (4), along with the prefunctional checklist provided by the GC (origi-nally from the CxA) and the manufacturer field checkout sheets become the “Start-up and Checkout Plan.”

6. For systems that may not have adequate manufacturer start-up and checkout procedures, par-ticularly for components being integrated with other equipment, the Sub should provide the added necessary detail and documenting format to the CxA for approval, prior to execution.

7. The Sub transmits the full Start-up Plan to the CxA for review and approval. 8. The CxA reviews and approves the procedures and the format for documenting them and not-

ing any procedures that need to be added, and conveys to the CM. The CM then transmits the full start-up plan to the Subs for their review and use. (This usually means that the Prefunc-tional Checklist, alone, will go to more than one Sub, while the full plan will go to the prima-ry installing contractor.)

5.8.2 Execution of Checklists and Startup Four weeks prior to startup, the Subs and vendors schedule startup and initial checkout with the GC and CxA. The startup and initial checkout are directed and executed by the Sub or vendor. The CxA, and GC if necessary, observes, at minimum, the procedures for each piece of primary equipment, unless there are multiples. For components of equipment, (e.g., condensing units), the CxA observes a portion of the pre-functional and start-up procedures. To document the process of startup and checkout, the site technician performing the line item task initials and dates each paragraph of procedures in the “Startup Plan” and checks off items on the prefunctional and manufacturer field checkout sheets, as they are completed. On-ly individuals having direct knowledge of a line item being completed shall check or initial the forms. The Subs and vendors execute the checklists and tests and submit a signed copy of the completed start-up and prefunctional tests and checklists to the CxA. The CxA may review prefunctional checklists in progress, as necessary.

5.8.3 Sampling Strategy for CxA Observation of Prefunctional Checkout and Startup A small percentage of equipment as determined by the CxA shall be witnessed during prefunctional checkout and startup. This is at the CxA discretion.

Page 171: Table of Contents Division Section Title

Mt. Pleasant Library 01810-13 4 December 2009 Allen & Shariff Engineering GENERAL COMMISSIONING REQUIREMENTS

5.8.4 Deficiencies and Non-Conformance The Subs clearly list any outstanding items of the initial start-up and prefunctional procedures that were not completed successfully at the bottom of the procedures form or on an attached sheet. The procedures form and deficiencies are provided to the CxA within two days of test completion. The CxA works with the Contractors, Subs and vendors to correct and retest deficiencies or uncompleted items, involving the CM and others as necessary. The installing Subs or vendors correct all areas that are deficient or incom-plete according to the checklists and tests. The CM recommends approval of the startup and initial checkout of each system to the CxA when complete.

5.8.5 TAB The TAB contractor submits the outline of the TAB plan and approach to the CxA and the controls con-tractor four weeks prior to starting the TAB. The CxA reviews the plan and approach for understanding and coordination issues and may comment, but does not “approve.” The TAB submits weekly written reports of discrepancies, contract interpretation requests and lists of completed tests to the CxA and GC. This facilitates quicker resolution of problems and will result in a more complete TAB before functional testing begins. A checklist form for reviewing the TAB plan is provided as one of the prefunctional checklists. TAB work will not begin until the control system has been prefunctionally tested.

5.8.6 Controls Checkout Plan The controls contractor develops and submits a written step-by-step plan to the CxA which describes the process they intend to follow in checking out the control system and the forms on which they will docu-ment the process. The controls contractor will also meet with the TAB contractor prior to the start of TAB and review the TAB plan to determine the capabilities of the control system for use in TAB. The controls contractor shall also provide a technician qualified to operate the controls to assist the TAB con-tractor in performing TAB. All CxA-required controls prefunctional checklists, calibrations, start-up and selected functional tests of the system shall be completed and approved by the GC prior to TAB. The controls contractor shall execute the tests and trend logs assigned to them for mechanical system testing as assigned to them. 5.9 Development of Functional Test and Verification Procedures

5.9.1 Overview Functional testing is the dynamic testing of systems (rather than just components) under full operation. Systems are tested under various modes, such as during low cooling or heating loads, high loads, compo-nent failures, unoccupied, varying outside air temperatures, fire alarm, power failure, etc. The systems are run through all of the control system’s sequences of operation and components are verified to be res-ponding as the sequences state. The commissioning authority develops the functional test procedures in a sequential written form, coordinates, oversees and documents the actual testing, which is performed by the installing contractor or vendor. The CxA only is to witness and document the testing. All hands on is performed by the contractor or their subs. Contractor is to supply all test equipment necessary to perform the functional testing as outlined by the CxA.

5.9.2 Scope of Testing (Additional) All specific testing requirements are to be included in the bid documents per the original specifications. Any additional equipment testing required by the CxA, which is not included in the original contract is to be handled per project PCO procedures.

Page 172: Table of Contents Division Section Title

Mt. Pleasant Library 01810-14 4 December 2009 Allen & Shariff Engineering GENERAL COMMISSIONING REQUIREMENTS

5.9.3 Development Process Before test procedures are written, the CxA obtains all requested documentation and a current list of change orders affecting equipment or systems, including an updated points list, control sequences and set points. The CxA develops specific test procedures to verify proper operation of each piece of equipment and system, using the testing requirements and the representative test procedure. The GC obtains clarifi-cation, as needed, from contractors and the A/E regarding sequences and operation to develop these tests. Prior to execution, the GC provides a copy of the primary equipment tests to the installing Sub to the CxA who reviews the tests for feasibility, safety, warranty and equipment protection. Blank copies of the pro-cedures are input into the O&M manuals by the GC, for later use by operations staff. Functional testing and verification may be achieved by manual testing (persons manipulate the equipment and observe per-formance) or by monitoring the performance and analyzing the results using the control system’s trend log capabilities or by stand-alone data loggers. The CxA follows the uses judgment where needed to de-termine which method is most appropriate, but the final decision as to the testing approach is with the CxA.

5.9.4 Testing Plan Overview To provide the contractors with a better idea of where functional testing lies in the schedule, what issues are preventing the start of testing, which contractors are needed for each test and how much time might be expected from them, Form for Commissioning Functional Testing Plan Overview, is used. This form is filled out after most equipment has been started up and when functional testing dates are not too far off. The form is provided to the Contractors to assist in moving more efficiently to functional testing. 5.10 Execution of Functional Testing Procedures

5.10.1 Overview and Process The CxA schedules functional tests through the GC and affected Subs. For any given system, prior to performing functional testing, the CxA waits until the prefunctional checklist has been submitted with the necessary signatures, confirming that the system is ready for functional testing. The CxA oversees and witnesses the functional testing as necessary, of equipment and systems according to the Cx Plan. The Subs execute the tests. The control system is tested before it is used to verify performance of other components or systems. The air balancing is completed before functional testing of air-related systems. Testing proceeds from components to subsystems to systems and finally to interlocks and connections between systems.

5.10.2 Deficiencies and Retesting The CxA documents the results of the test. Corrections of minor deficiencies identified are made during the tests at the discretion of the CxA. The CxA records the results of the test on the procedure or test form. Deficiencies or non-conformance issues are noted and reported to the GC through (Commissioning Corrective Action Report). Subs correct deficiencies, notify the GC and return the form certifying correc-tion. The GC schedules retesting. Decisions regarding deficiencies and corrections are made at as low a level as possible, preferably between GC and Sub. For areas in dispute, final authority, besides the Own-er’s, resides with the CxA and A/E. The GC recommends acceptance of each test to the CxA. The GC gives final approval on each test in writing. In the event that any scheduled equipment or system start-ups or functional performance tests are terminated more than once because the CxA or me-chanical engineer discover deficient or incomplete work, or due to the non-attendance of required contractor or supplier personnel, the contractor or subcontractor responsible for the termination shall also be responsible for paying reasonable costs of time and travel expenses for the representa-tives who were physically present for the purpose of witnessing the start-up or test.

Page 173: Table of Contents Division Section Title

Mt. Pleasant Library 01810-15 4 December 2009 Allen & Shariff Engineering GENERAL COMMISSIONING REQUIREMENTS

5.10.3 Facility Staff Participation The Owner’s facilities operating staff are encouraged to attend and participate in the testing process. The contractor is to document a list of personnel present to witness functional testing. This form does not de-scribe their involvement in formal training. The GC will notify the CxA of who will attend, and then no-tify the facility staff when the commissioning events will occur.

5.10.4 Sampling Multiple identical pieces of non-life-safety or otherwise non-critical equipment may be functionally tested using a sampling strategy. The CxA shall determine this sampling per past sampling success. 5.11 O&M Manuals

5.11.1 Standard O&M Manuals The CxA reviews the O&M manuals, documentation and redline as-builts for systems that were commis-sioned to verify compliance with the Specifications. The CxA recommends approval and acceptance of these sections of the O&M manuals to the GC. The CxA also reviews each equipment warranty and veri-fies that all requirements to keep the warranty valid are clearly stated.

5.11.2 Commissioning Record The CxA will compile, organize and index the commissioning data into labeled, indexed and tabbed, three-ring binders and deliver it to the A/E, to be included with the O&M manuals. The correspondence, meeting minutes and progress reports, miscellaneous notes, etc. kept in the Commissioning Record Book during construction will not be retained into this record and the O&M manuals.

5.12 Training and Orientation of Owner Personnel 5.12.1 Training and documentation is not part of LEED fundamental commissioning, but is to be carried out in its entirety per the project plans and specifications. 5.13 Warranty Period

During the warranty period, seasonal testing and other deferred testing required is completed. The GC coordinates this activity. Tests are executed and deficiencies corrected by the appropriate Subs, witnessed by facilities staff and or the CxA. Any final adjustments to the O&M manuals and as-builts due to the testing are made. In addition the GC will return to the project approximately 10 months into the warranty period. During this visit(s) the GC will review with facility staff the current building operation and the condition of outstanding issues related to the original and seasonal commissioning. The GC will also in-terview facility staff and identify problems or concerns they have operating the building as originally in-tended. The GC will make suggestions for improvements and for recording these changes in the O&M manuals. The GC will identify areas that may come under warranty or under the original construction contract. The GC will also assist facility staff in developing reports and documents and requests for ser-vices to remedy outstanding problems.

Page 174: Table of Contents Division Section Title

Mt. Pleasant Library 01810-16 4 December 2009 Allen & Shariff Engineering GENERAL COMMISSIONING REQUIREMENTS

6. N/A

7. Schedule 7.1 General Issues

The following sequential priorities are followed: 1. Equipment is not “temporarily” started (for heating or cooling), until pre-start checklist items and all

manufacturers pre-start procedures are completed and moisture, dust and other environmental and building integrity issues have been addressed.

2. Functional testing is not begun until prefunctional and start-up and TAB is completed, for a given system.

3. The controls system and equipment it controls are not functionally tested until all points have been calibrated and pre-functional testing completed.

4. TAB is not performed until the controls system has been sufficiently functionally tested and approved by the CxA for TAB work.

5. TAB is not performed until the envelope is completely enclosed and ceiling complete, unless the re-turn is ducted.

7.2 Project Schedule

The initial commissioning schedule is summarized in Table 7-1. A more detailed schedule shall be developed during the course of the project.

Table 7-1. Initial Commissioning Schedule Summary

TO BE COORDINATED WITH GC

Task / Activity Estimated Start Date

Estimated End Date Initial scoping meeting and final plan Submittals obtained and reviewed Ongoing by CxA ** Begin construction Cx site visits Prefunctional forms developed and distributed Startup and initial checkout plans meeting Startup and initial checkout executed Functional test forms submitted to contractor Functional performance testing O&M documentation review and verification Upon Receipt Training and training verification N/A Final commissioning report Ongoing by CxA Seasonal testing, (If Necessary)

Page 175: Table of Contents Division Section Title

Mt. Pleasant Library 01810-17 4 December 2009 Allen & Shariff Engineering GENERAL COMMISSIONING REQUIREMENTS

8. LEED Fundamental Commissioning Outline: General: The systems outlined in the specifications, project documents, and commissioning plan are to be fully verified as functional working systems through the effort of the commissioning team with the leadership of the Cx authority. The Cx process shall begin with a review and comment of the design concept, and continue through the final operational verifications. The system design review by the CxA is indented as a cursory review of the overall systems design to verify that it meets the LEED criteria outlined for this project. The owner project requirements (OPR), and the MEP bases of design (BOD) shall be reviewed for their intent and compatibility. All design issues or recommendations shall be forwarded to the design team for their review and action as deemed appro-priate. As the project enters the construction phase the Cx authority shall meet with the Cx team, which shall consist of but is not limited to the following professionals and tradesmen. The commissioning is led by the Commissioning Authority (CxA), whom is acting on the owner’s behalf, and is the lead person of the Cx team. Owners Representative (OR), which may in some cases be the CxA Building Operational Personnel (BOP), Design Engineers (EA), Architect (AE) General Contractor (GC) Mechanical Contractor (MC) Electrical Contractor (EC) TAB Contractor (TAB) Building Automation System Contractor (BAS) Other professionals or tradesmen that may be necessary for the particular portion or scope of the project. The intent is to have qualified personnel as members of the Cx team who have the authority to ex-ecute the commissioning plan and who are dedicated to the LEED process and the owner’s objectives rel-ative to sustainability and green building design. The construction process is the phase of the project, which obviously receives the majority of at-tention during commissioning. A brief description of the intended process is to follow. Equipment out-lined in the Cx process is used for commissioning process description only, and may not represent the actual/installed MEP devises and equipment used on this project. The description is generic in nature and is intended to create an understanding of the general construction commissioning process for the refe-renced project. A general description of the Cx activities from the design phase through the construction and acceptance phases is outlined for a general understanding of the commissioning LEED CS 2.0 prerequisite and en-hanced commissioning activities required for this project. It is to be understood that the commissioning process requires a total team effort to be successful. Early Construction Phase: During the early stages of construction, the CxA or commissioning team member(s) chosen by the CxA, shall review the equipment submittals as they relate to the BOD and LEED requirements. The CxA

Page 176: Table of Contents Division Section Title

Mt. Pleasant Library 01810-18 4 December 2009 Allen & Shariff Engineering GENERAL COMMISSIONING REQUIREMENTS

submittal review responsibilities are limited to LEED Cx requirements, with the final action/disposition being the responsibility of the design team and/or owner. The general contractor (GC) is to create a construction schedule during this phase of construction, and issue the schedule to the entire commissioning team for review and comment. The schedule is to be reeva-luated by the GC and owner on a monthly (or more frequent) basis and submitted to the commissioning team for review and Cx scheduling coordination purposes. During the later part of this phase, the first of a series of commissioning meetings is to take place. The first commissioning meeting shall be referred to as the commissioning “Kick Off “meeting. The kick off meeting is to include a brief discussion of the commissioning plan, selection of the Cx team members and review and discussion of the project schedule. The GC, through the direction of the CxA, shall have the responsibility of scheduling all meetings throughout the entire construction and Cx process. Construction Phase: The construction phase is the project evolvement from early construction to the start of the acceptance phase. During the construction phase, the CxA shall schedule commissioning meetings as necessary through the GC. Meetings are to take place only in the event that the commissioning process is not being followed properly, or if scheduling issues arise. A meeting shall be scheduled just prior to contractor start-ing equipment designated as “Commissioned Equipment “(such as, HVAC , major electrical and plumb-ing systems) for the first time. In lieu of non scheduled Cx meetings, most ongoing Cx related issues may be addressed via phone conferences with the CxA. Meeting minutes generated from non-commissioning meetings are to be submitted to the CxA within one week of the meeting. Minutes of scheduled commis-sioning meetings shall be the responsibility of the CxA or someone appointed by the CxA. During construction, MEP systems testing is to be verified by designated member of the Cx team and associated record documents shall be signed by both the contractor and the designated Cx team witness and shall be submitted to the CxA within one week of testing. The test record shall be reviewed and in-serted in the final commissioning report by the CxA. Test documents may also be required to be submit-ted to the design engineer as specified. Prior to startup of equipment, which is part of the construction phase, the contractor is to submit man-ufacturer’s startup procedure documents to the CxA for review and comment. Further startup proce-dures/requirements may be submitted from the CxA to the contractor in the form of prefunctional test documents. This process is intended to ensure proper and safe system startup in preparation for successful functional testing, which will take place during the acceptance phase of the project. It is of the greatest importance that the contractor complete all startup document checklists for EACH piece of equipment and submit them to the CxA within one week of successful equipment startup. Once the equipment has been successfully started, and startup documents submitted to the CxA, the control contractor is to perform the point to point checkout of the BAS system. The control contractor is then to assist the TAB contractor in total system balance as outlined in the construction documents. Prior to the BAS and the TAB contractor verification process, they are to submit their verification procedures narrative to the CxA for review and comment. At the completion of the TAB system verification, the TAB contractor is to also submit a copy of the balance report to the CxA for review. The CxA shall wit-ness portions of the equipment startup and BAS/TAB verification processes’ on an unannounced basis, and submit any issues that arise in writing to the architect for distribution. At this juncture of the project, the building should be 98% complete and close to readiness for occupancy. The commissioning process should now to move to the acceptance phase. Construction Acceptance Phase: As we enter the acceptance phase of the project the building should be basically ready for occupancy. Normal building utilities services are to be completely functional, and the contractor’s and architect’s punch lists should be close to completion. The contractors shall have submitted all required documents and verified readiness for systems functional testing. (Note: CxA is to receive all required startup docu-

Page 177: Table of Contents Division Section Title

Mt. Pleasant Library 01810-19 4 December 2009 Allen & Shariff Engineering GENERAL COMMISSIONING REQUIREMENTS

ments at least three weeks prior to functional testing to allow adequate time for the creation of the func-tional testing documents) The CxA shall then create the functional test procedures for all systems outlined in the commission-ing plan and specifications. Functional testing shall include all normal, emergency, and failure modes of operation. Functional testing shall verify all control point to point operations and the TAB results on a random sampling basis. The CxA shall only witness and document the functional testing. The appointed commissioning team contractor technician or factory representative, shall perform the actual testing of the systems. This may require multiple commissioning team members, such as, contractor technicians from the mechanical, electrical, BAS, TAB, GC, ect., as needed for each system to be tested. Some systems under functional testing may require only a portion of the systems to be tested, such as, multiple small systems like VAV’s or small split D/X equipment. These systems shall be tested on a representative sam-pling basis of total systems of the same type. These systems shall be tested at the discretion of the CxA until a satisfactory quantity of systems is successfully demonstrated. It is recommended that building maintenance personnel be present during functional testing to aid in their knowledge of operation of the systems. Systems, which cannot be satisfactorily functionally tested due to weather conditions, are to be rescheduled at a date and time that is more advantages for testing. All Cx team members are required to perform such seasonal testing as part of this Cx project. CxA shall prepare and submit final Cx report documenting the Cx process up to this point.

END OF Cx Plan

Page 178: Table of Contents Division Section Title

Mt. Pleasant Library 01815-1 20 Feburary 2009 CORE Group, P.C. COMMISSIONING OF HVAC

SECTION 01815

PART 1 - GENERAL

COMMISSIONING OF HVAC

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General Conditions to Construction Contract and other Division 1 Specification Sections, apply to this Section.

1.2 SUMMARY

A. Section includes commissioning process requirements for HVAC&R systems, assemblies, and equipment.

B. Related Sections:

1. Division 1 Section "General Commissioning Requirements" for general commissioning process requirements.

1.3 DEFINITIONS

A. Commissioning Plan: A document that outlines the organization, schedule, allocation of resources, and documentation requirements of the commissioning process.

B. CxA: Commissioning Authority.

C. HVAC&R: Heating, Ventilating, Air Conditioning, and Refrigeration.

D. Systems, Subsystems, Equipment, and Components: Where these terms are used together or separately, they shall mean "as-built" systems, subsystems, equipment, and components.

1.4 ALLOWANCES

A. Labor, instrumentation, tools, and equipment costs for technicians for the performance of commissioning testing are covered by the "Schedule of Allowances" Article in Division 1 Section "Allowances."

1.5 UNIT PRICES

A. Commissioning testing allowance may be adjusted up or down by the "List of Unit Prices" Article in Division 1 Section "Unit Prices" when actual man-hours are computed at the end of commissioning testing.

Page 179: Table of Contents Division Section Title

Mt. Pleasant Library 01815-2 20 Feburary 2009 CORE Group, P.C. COMMISSIONING OF HVAC

1.6 CONTRACTOR'S RESPONSIBILITIES

A. Perform commissioning tests at the direction of the CxA.

B. Attend construction phase controls coordination meeting.

C. Attend testing, adjusting, and balancing review and coordination meeting.

D. Participate in HVAC&R systems, assemblies, equipment, and component maintenance orientation and inspection as directed by the CxA.

E. Provide information requested by the CxA for final commissioning documentation.

F. Provide measuring instruments and logging devices to record test data, and provide data acquisition equipment to record data for the complete range of testing for the required test period.

1.7 CxA'S RESPONSIBILITIES

A. Provide Project-specific construction checklists and commissioning process test procedures for actual HVAC&R systems, assemblies, equipment, and components to be furnished and installed as part of the construction contract.

B. Direct commissioning testing.

C. Verify testing, adjusting, and balancing of Work are complete.

D. Provide test data, inspection reports, and certificates in Systems Manual.

1.8 COMMISSIONING DOCUMENTATION

A. Provide the following information to the CxA for inclusion in the commissioning plan:

1. Plan for delivery and review of submittals, systems manuals, and other documents and reports.

2. Identification of installed systems, assemblies, equipment, and components including design changes that occurred during the construction phase.

3. Process and schedule for completing construction checklists and manufacturer's prestart and startup checklists for HVAC&R systems, assemblies, equipment, and components to be verified and tested.

4. Certificate of completion certifying that installation, prestart checks, and startup procedures have been completed.

5. Certificate of readiness certifying that HVAC&R systems, subsystems, equipment, and associated controls are ready for testing.

6. Test and inspection reports and certificates. 7. Corrective action documents. 8. Verification of testing, adjusting, and balancing reports.

Page 180: Table of Contents Division Section Title

Mt. Pleasant Library 01815-3 20 Feburary 2009 CORE Group, P.C. COMMISSIONING OF HVAC

1.9 SUBMITTALS

A. Certificates of readiness.

B. Certificates of completion of installation, prestart, and startup activities.

PART 2 - PRODUCTS (Not Used)

PART 3 - EXECUTION

3.1 TESTING PREPARATION

A. Certify that HVAC&R systems, subsystems, and equipment have been installed, calibrated, and started and are operating according to the Contract Documents.

B. Certify that HVAC&R instrumentation and control systems have been completed and calibrated, that they are operating according to the Contract Documents, and that pretest set points have been recorded.

C. Certify that testing, adjusting, and balancing procedures have been completed and that testing, adjusting, and balancing reports have been submitted, discrepancies corrected, and corrective work approved.

D. Set systems, subsystems, and equipment into operating mode to be tested (e.g., normal shutdown, normal auto position, normal manual position, unoccupied cycle, emergency power, and alarm conditions).

E. Inspect and verify the position of each device and interlock identified on checklists.

F. Check safety cutouts, alarms, and interlocks with smoke control and life-safety systems during each mode of operation.

G. Testing Instrumentation: Install measuring instruments and logging devices to record test data as directed by the CxA.

3.2 Testing AND BALANCING VERIFICATION

A. Prior to performance of testing and balancing Work, provide copies of reports, sample forms, checklists, and certificates to the CxA.

B. Notify the CxA at least [10] days in advance of testing and balancing Work, and provide access for the CxA to witness testing and balancing Work.

C. Provide technicians, instrumentation, and tools to verify testing and balancing of HVAC&R systems at the direction of the CxA.

1. The CxA will notify testing and balancing Contractor 10 days in advance of the date of field verification. Notice will not include data points to be verified.

Page 181: Table of Contents Division Section Title

Mt. Pleasant Library 01815-4 20 Feburary 2009 CORE Group, P.C. COMMISSIONING OF HVAC

2. The testing and balancing Contractor shall use the same instruments (by model and serial number) that were used when original data were collected.

3. Failure of an item includes, other than sound, a deviation of more than 10 percent. Failure of more than 10 percent of selected items shall result in rejection of final testing, adjusting, and balancing report. For sound pressure readings, a deviation of 3 dB shall result in rejection of final testing. Variations in background noise must be considered.

4. Remedy the deficiency and notify the CxA so verification of failed portions can be performed.

3.3 GENERAL TESTING REQUIREMENTS

A. Provide technicians, instrumentation, and tools to perform commissioning test at the direction of the CxA.

B. Scope of HVAC&R testing shall include entire HVAC&R installation, from central equipment for heat generation and refrigeration through distribution systems to each conditioned space. Testing shall include measuring capacities and effectiveness of operational and control functions.

C. Test all operating modes, interlocks, control responses, and responses to abnormal or emergency conditions, and verify proper response of building automation system controllers and sensors.

D. The CxA along with the HVAC&R Contractor testing and balancing Contractor and HVAC&R Instrumentation and Control Contractor shall prepare detailed testing plans, procedures, and checklists for HVAC&R systems, subsystems, and equipment.

E. Tests will be performed using design conditions whenever possible.

F. Simulated conditions may need to be imposed using an artificial load when it is not practical to test under design conditions. Before simulating conditions, calibrate testing instruments. Provide equipment to simulate loads. Set simulated conditions as directed by the CxA and document simulated conditions and methods of simulation. After tests, return settings to normal operating conditions.

G. The CxA may direct that set points be altered when simulating conditions is not practical.

H. The CxA may direct that sensor values be altered with a signal generator when design or simulating conditions and altering set points are not practical.

I. If tests cannot be completed because of a deficiency outside the scope of the HVAC&R system, document the deficiency and report it to the Owner. After deficiencies are resolved, reschedule tests.

J. If the testing plan indicates specific seasonal testing, complete appropriate initial performance tests and documentation and schedule seasonal tests.

Page 182: Table of Contents Division Section Title

Mt. Pleasant Library 01815-5 20 Feburary 2009 CORE Group, P.C. COMMISSIONING OF HVAC

3.4 HVAC&R SYSTEMS, SUBSYSTEMS, AND EQUIPMENT TESTING PROCEDURES

A. Boiler Testing and Acceptance Procedures: Testing requirements are specified in Division 15 boiler Sections. Provide submittals, test data, inspector record, and boiler certification to the CxA.

B. HVAC&R Instrumentation and Control System Testing: Field testing plans and testing requirements are specified in Division 15 Sections "HVAC Instrumentation and Controls" and "Sequence of Operation." Assist the CxA with preparation of testing plans.

C. Pipe system cleaning, flushing, hydrostatic tests, and chemical treatment requirements are specified in Division 15 piping Sections. HVAC&R Contractor shall prepare a pipe system cleaning, flushing, and hydrostatic testing plan. Provide cleaning, flushing, testing, and treating plan and final reports to the CxA. Plan shall include the following:

1. Sequence of testing and testing procedures for each section of pipe to be tested, identified by pipe zone or sector identification marker. Markers shall be keyed to Drawings for each pipe sector, showing the physical location of each designated pipe test section. Drawings keyed to pipe zones or sectors shall be formatted to allow each section of piping to be physically located and identified when referred to in pipe system cleaning, flushing, hydrostatic testing, and chemical treatment plan.

2. Description of equipment for flushing operations. 3. Minimum flushing water velocity. 4. Tracking checklist for managing and ensuring that all pipe sections have been cleaned,

flushed, hydrostatically tested, and chemically treated.

D. Energy Supply System Testing: Provide technicians, instrumentation, tools, and equipment to test performance of oil gas coal steam hot-water systems and equipment at the direction of the CxA. The CxA shall determine the sequence of testing and testing procedures for each equipment item and pipe section to be tested.

E. Refrigeration System Testing: Provide technicians, instrumentation, tools, and equipment to test performance of chillers, cooling towers, refrigerant compressors and condensers, heat pumps, and other refrigeration systems. The CxA shall determine the sequence of testing and testing procedures for each equipment item and pipe section to be tested.

F. HVAC&R Distribution System Testing: Provide technicians, instrumentation, tools, and equipment to test performance of air, steam, and hydronic distribution systems; special exhaust; and other distribution systems, including HVAC&R terminal equipment and unitary equipment.

G. Vibration and Sound Tests: Provide technicians, instrumentation, tools, and equipment to test performance of vibration isolation and seismic controls.

END OF SECTION 01815

Page 183: Table of Contents Division Section Title

Mt. Pleasant Library 01820-1 20 Feburary 2009 CORE Group, P.C. DEMONSTRATION AND TRAINING

SECTION 01820

PART 1 - GENERAL

DEMONSTRATION AND TRAINING

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification Sections, apply to this Section.

1.2 SUMMARY

A. This Section includes administrative and procedural requirements for instructing Owner's personnel, including the following:

1. Demonstration of operation of systems, subsystems, and equipment. 2. Training in operation and maintenance of systems, subsystems, and equipment. 3. Demonstration and training videotapes.

B. Related Sections include the following:

1. Division 1 Section "Allowances" for administrative and procedural requirements for demonstration and training allowances.

2. Division 1 Section "Project Management and Coordination" for requirements for preinstruction conferences.

3. Divisions 2 through 16 Sections for specific requirements for demonstration and training for products in those Sections.

C. Allowances: Furnish demonstration and training instruction time under the Demonstration and Training Allowance as specified in Division 1 Section "Allowances."

D. Unit Price for Instruction Time: Length of instruction time will be measured by actual time spent performing demonstration and training in required location. No payment will be made for time spent assembling educational materials, setting up, or cleaning up.

1.3 SUBMITTALS

A. Instruction Program: Submit [two] copies of outline of instructional program for demonstration and training, including a schedule of proposed dates, times, length of instruction time, and instructors' names for each training module. Include learning objective and outline for each training module.

1. At completion of training, submit [one] complete training manual(s) for Owner's use.

B. Qualification Data: For [facilitator].

Page 184: Table of Contents Division Section Title

Mt. Pleasant Library 01820-2 20 Feburary 2009 CORE Group, P.C. DEMONSTRATION AND TRAINING

C. Attendance Record: For each training module, submit list of participants and length of instruction time.

D. Evaluations: For each participant and for each training module, submit results and documentation of performance-based test.

E. Demonstration and Training Videotapes: Submit [two] copies within [seven] days of end of each training module.

1. Identification: On each copy, provide an applied label with the following information:

a. Name of Project. b. Name and address of photographer. c. Name of Architect. d. Name of Contractor. e. Date videotape was recorded. f. Description of vantage point, indicating location, direction (by compass point), and

elevation or story of construction.

2. Transcript: Prepared on 8-1/2-by-11-inch (215-by-280-mm)

1.4 QUALITY ASSURANCE

paper, punched and bound in heavy-duty, 3-ring, vinyl-covered binders. Mark appropriate identification on front and spine of each binder. Include a cover sheet with same label information as the corresponding videotape. Include name of Project and date of videotape on each page.

A. Facilitator Qualifications: A firm or individual experienced in training or educating maintenance personnel in a training program similar in content and extent to that indicated for this Project, and whose work has resulted in training or education with a record of successful learning performance.

B. Instructor Qualifications: A factory-authorized service representative, complying with requirements in Division 1 Section "Quality Requirements," experienced in operation and maintenance procedures and training.

C. Photographer Qualifications: A professional photographer who is experienced photographing construction projects.

D. Preinstruction Conference: Conduct conference at Project site to comply with requirements in Division 1 Section "Project Management and Coordination." Review methods and procedures related to demonstration and training including, but not limited to, the following:

1. Inspect and discuss locations and other facilities required for instruction. 2. Review and finalize instruction schedule and verify availability of educational materials,

instructors' personnel, audiovisual equipment, and facilities needed to avoid delays. 3. Review required content of instruction. 4. For instruction that must occur outside, review weather and forecasted weather conditions

and procedures to follow if conditions are unfavorable.

Page 185: Table of Contents Division Section Title

Mt. Pleasant Library 01820-3 20 Feburary 2009 CORE Group, P.C. DEMONSTRATION AND TRAINING

1.5 COORDINATION

A. Coordinate instruction schedule with Owner's operations. Adjust schedule as required to minimize disrupting Owner's operations.

B. Coordinate instructors, including providing notification of dates, times, length of instruction time, and course content.

C. Coordinate content of training modules with content of approved emergency, operation, and maintenance manuals. Do not submit instruction program until operation and maintenance data has been reviewed and approved by Architect.

PART 2 - PRODUCTS

2.1 INSTRUCTION PROGRAM

A. Program Structure: Develop an instruction program that includes individual training modules for each system and equipment not part of a system, as required by individual Specification Sections, and as follows:

1. Motorized doors, including [overhead coiling doors] [overhead coiling grilles] [and] [automatic entrance doors].

2. Equipment, including [loading dock equipment] [waste compactors]. 3. Fire-protection systems, including [fire alarm] [fire pumps] [and] [fire-extinguishing

systems]. 4. Intrusion detection systems. 5. Conveying systems, including [elevators]. 6. Medical equipment, including medical gas equipment and piping. 7. Heat generation, including [boilers] [feedwater equipment] [pumps] [steam distribution

piping] [and] [water distribution piping]. 8. Refrigeration systems, including [chillers] [cooling towers] [condensers] [pumps] [and]

[distribution piping]. 9. HVAC systems, including [air-handling equipment] [air distribution systems] [and]

[terminal equipment and devices]. 10. HVAC instrumentation and controls. 11. Electrical service and distribution, including [transformers] [switchboards] [panelboards]

[uninterruptible power supplies] [and] [motor controls]. 12. Packaged engine generators, including transfer switches. 13. Lighting equipment and controls. 14. Communication systems, including [intercommunication] [surveillance] [clocks and

programming] [voice and data] equipment.

B. Training Modules: Develop a learning objective and teaching outline for each module. Include a description of specific skills and knowledge that participant is expected to master. For each module, include instruction for the following:

1. Basis of System Design, Operational Requirements, and Criteria: Include the following:

a. System, subsystem, and equipment descriptions.

Page 186: Table of Contents Division Section Title

Mt. Pleasant Library 01820-4 20 Feburary 2009 CORE Group, P.C. DEMONSTRATION AND TRAINING

b. Performance and design criteria if Contractor is delegated design responsibility. c. Operating standards. d. Regulatory requirements. e. Equipment function. f. Operating characteristics. g. Limiting conditions. h. Performance curves.

2. Documentation: Review the following items in detail:

a. Emergency manuals. b. Operations manuals. c. Maintenance manuals. d. Project Record Documents. e. Identification systems. f. Warranties and bonds. g. Maintenance service agreements and similar continuing commitments.

3. Emergencies: Include the following, as applicable:

a. Instructions on meaning of warnings, trouble indications, and error messages. b. Instructions on stopping. c. Shutdown instructions for each type of emergency. d. Operating instructions for conditions outside of normal operating limits. e. Sequences for electric or electronic systems. f. Special operating instructions and procedures.

4. Operations: Include the following, as applicable:

a. Startup procedures. b. Equipment or system break-in procedures. c. Routine and normal operating instructions. d. Regulation and control procedures. e. Control sequences. f. Safety procedures. g. Instructions on stopping. h. Normal shutdown instructions. i. Operating procedures for emergencies. j. Operating procedures for system, subsystem, or equipment failure. k. Seasonal and weekend operating instructions. l. Required sequences for electric or electronic systems. m. Special operating instructions and procedures.

5. Adjustments: Include the following:

a. Alignments. b. Checking adjustments. c. Noise and vibration adjustments. d. Economy and efficiency adjustments.

6. Troubleshooting: Include the following:

Page 187: Table of Contents Division Section Title

Mt. Pleasant Library 01820-5 20 Feburary 2009 CORE Group, P.C. DEMONSTRATION AND TRAINING

a. Diagnostic instructions. b. Test and inspection procedures.

7. Maintenance: Include the following:

a. Inspection procedures. b. Types of cleaning agents to be used and methods of cleaning. c. List of cleaning agents and methods of cleaning detrimental to product. d. Procedures for routine cleaning e. Procedures for preventive maintenance. f. Procedures for routine maintenance. g. Instruction on use of special tools.

8. Repairs: Include the following:

a. Diagnosis instructions. b. Repair instructions. c. Disassembly; component removal, repair, and replacement; and reassembly

instructions. d. Instructions for identifying parts and components. e. Review of spare parts needed for operation and maintenance.

PART 3 - EXECUTION

3.1 PREPARATION

A. Assemble educational materials necessary for instruction, including documentation and training module. Assemble training modules into a combined training manual.

B. Set up instructional equipment at instruction location.

3.2 INSTRUCTION

A. Facilitator: Engage a qualified facilitator to prepare instruction program and training modules, to coordinate instructors, and to coordinate between Contractor and Owner for number of participants, instruction times, and location.

B. Engage qualified instructors to instruct Owner's personnel to adjust, operate, and maintain systems, subsystems, and equipment not part of a system.

1. Architect will furnish an instructor to describe basis of system design, operational requirements, criteria, and regulatory requirements.

2. Owner will furnish an instructor to describe Owner's operational philosophy. 3. Owner will furnish Contractor with names and positions of participants.

C. Scheduling: Provide instruction at mutually agreed on times. For equipment that requires seasonal operation, provide similar instruction at start of each season.

Page 188: Table of Contents Division Section Title

Mt. Pleasant Library 01820-6 20 Feburary 2009 CORE Group, P.C. DEMONSTRATION AND TRAINING

1. Schedule training with Owner[, through Architect,] with at least [seven] days' advance notice.

D. Evaluation: At conclusion of each training module, assess and document each participant's mastery of module by use of [a written] performance-based test.

E. Cleanup: Collect used and leftover educational materials and [remove from Project site]. Remove instructional equipment. Restore systems and equipment to condition existing before initial training use.

3.3 DEMONSTRATION AND TRAINING VIDEOTAPES

A. General: Engage a qualified commercial photographer to record demonstration and training videotapes. Record each training module separately. Include classroom instructions and demonstrations, board diagrams, and other visual aids, but not student practice.

1. At beginning of each training module, record each chart containing learning objective and lesson outline.

B. Videotape Format: Provide high-quality VHS color videotape in full-size cassettes.

C. Recording: Mount camera on tripod before starting recording, unless otherwise necessary to show area of demonstration and training. Display continuous running time.

D. Narration: Describe scenes on videotape by [audio narration by microphone while] videotape is recorded. Include description of items being viewed. Describe vantage point, indicating location, direction (by compass point), and elevation or story of construction.

E. Transcript: Provide a typewritten transcript of the narration. Display images and running time captured from videotape opposite the corresponding narration segment.

END OF SECTION 01820