Sustainable Outdoor SpaceIn Collaboration with:
North Bristol Community ProjectProject Introduction Meet The Team
Samuel Whatling
Structure / 3D Engineer
Specialisms:
→ 3D CAD
→ Structural Analysis
Jack Lewis
Project Leader / Safe Practices
Specialisms:
→ Project Management
→ Safety
Key Requirements
Timeline
Project Management
WK4
WK13Planning report deliverables for short,
mid and long term goals & delivered
initial proposals
WK7Requirement Formation & Planning
around Risk Mitigation
WK21Sign off and acceptance of the
short term plan from NBCP WK35Project Completion
WK6Meet with NBCP and discuss
Project and Deliverables
WK17Change of requirements and initial
scope
WK34Final Deliverables sent to NBCP
Mid-term plan & Long Term Proposal
Key Milestones within the
Project's Development
Team
Formation
Keshav Ooriah
Planning / Integration
Specialisms:
→ Communication
→ Technical Documents
Risk Assessment:A risk assessment matrix was created forthe customer to help mitigate key risks ofthe project. For example, when workingwith sharp objects, the mitigating action isinforming the customer to work with thedesignated PPE.
Initial Proposals: These proposals were generatedbased off the initial brief wereceived from the customer.
Short Term Plan:After discussing with the customer, a threestep approach was agreed in which wewould provide short, medium and longterm solutions.
The short term plan can be used by thecustomer to: Identify and segregate wastefrom items to be retained, segregation ofwaste for sustainable recycling, and safecodes of practice.
Due to a change in budget,these ideas were not suitable.The ideas generated werehowever used for furtherdevelopment of the project.
3D Model:During the design cycle, a 3D model was made sothat the engineering team could visualise the outdoorspace as is. This was detailed to the customer andused during concept generation phases as livechanges could be made in this environment to reflecta solution.
NBCP Floor Plans & Garden Layout:After meeting with the customer,we were informed that NBCP wereto meet with the council planningdepartment. The SOS team hadscale plans generated and providedto the customer the next day.Propositions were generated forbuilding positioning for long termproposals.
Structural Designs:As the project evolved over time,It was clear that NBCP wanted astructure that could be hand-built and erected by volunteers.Frame proposals were generatedwith supporting information inthe long term report.
Mid Term Report & Long Term Proposal:These reports inform the customer towards layingfoundations for structure, costing and structuraldesign ideas for long term development of the site.
Customer Communication
The space shall be user friendly and able to accommodate around 50 people.
The space shall be accessible to wheelchair users and all abilities.
Replace or repurpose the existing cabins to maximise usage and minimise waste.
The space shall include a community garden.
The space shall include a workshop area for the elderly.
SOS Deliverables & NBCP Future Implementations
NBCP is a registered charity with the core principal to promote well-being andto bring about positive personal and social change, fuelled by a team ofeducators, artists and youth & community practitioners. They run courses andworkshops such as drawing and painting classes, sewing classes , IT skills forover 50’s and Spanish classes on a regular basis.
NBCP expressed a wish to sustainably re-develop their outdoor space to enableclasses and workshops with the public, whilst also having an area in which theelderly community can use. This poster encompasses project progression,deliverables, goals reached and achievements made.
Tools &
Techniques
Communication
Face to face, Phone & Emails
Gantt Chart
Critical Path & Time Allocation
Configuration Management
Data Organisation and Distribution
Requirements Matrix
Tracking Requirements and Progress
Health & Safety
Risk Assessment
Project Mitigations
Planning for unforeseen circumstances
REQUIREMENTS PLANNING
Face to face meetings were the most effective and efficient way whencommunicating with NBCP.
Emails were used to define actions and minutes from each meeting held withNBCP. They were also used to set up meetings and inform of the project’sprogression.
Phone was used to clarify small details, such as timings for meetings ordates.