Page 1 of 2
OVERSEAS TECHNICAL ENGINEERING AND CONSTRUCTION PTE LTD.
DOC. NO. : 0
SHEET NO.BQ1301
I BILL OF QUANTITY (STRENGTHENING OF EXT'G COMBINED FOOTING)
LOCATION - GANTRY AT TP-11
1) OVERALL DIMENSION
LENGTH OF FOOTING = 7.20 mWIDTH OF EXT'G FOOTING = 1.60 mEXTENSION WIDTH OF FOOTING ON EACH SIDE = 0.80 mNOS. OF EXTENSION ON EACH FOOTING = 2.00 nos.NEW WIDTH OF FOOTING = 3.20 mTHICKNESS OF FOOTING = 0.70 mHEIGHT OF STUMP = 0.70 mSIZE OF STUMP = 0.50 mNOS. OF STUMP REQUIRED = 2.00 nos.
NOS. OF ANCHOR BOLTS CONSIDERED/STUMP = nos.
2) SUPERSTRUCTURE (STEEL STRUCTURE)
TOTAL STEEL WEIGHT REQUIRED 0 40 t
DESIGN SHEET
CONSIDERINGTHEBQOFEXTENDEDFOOTINGONLY
WIDTH
OFFOOTING
TOTAL STEEL WEIGHT REQUIRED = 0.40 tons.
3) SUBSTRUCTURE (CONCRETE FOUNDATION) GRADE- C 35
3.1) CONCRETE
CONC. VOLUME REQUIRED = 8.06 m3
LEAN CONC. THICKNESS = 0.050 mLEAN CONC. REQUIRED = 0.58 m3
SUB-BASE THICKNESS = 0.150 mSUB-BASE REQUIRED = 4.43 m3
3.2) REINFORCEMENT fy = 460 N/mm2
A) LONGITUDINAL BENDING REINFORCEMENTREBAR LENGTH = 8.60 mQTY. = 25 nos.REBAR SIZE = T 25 BarREBAR SPACING = 150 mmUNIT WEIGHT OF REBAR = 3.853 kg/mWEIGHT OF REBAR = 0.8395 Tons.
SIDE BARREBAR LENGTH = 17.60 mQTY. = 1 nos.REBAR SIZE = T 16 BarUNIT WEIGHT OF REBAR = 1.578 kg/mWEIGHT OF REBAR = 0.028 Tons.
Page 2 of 2
OVERSEAS TECHNICAL ENGINEERING AND CONSTRUCTION PTE LTD.
DOC. NO. : 0
SHEET NO.BQ1301
DESIGN SHEET
B) TRANSVERSE BENDING REINFORCEMENTREBAR LENGTH = 1.80 mQTY. = 98 nos.REBAR SIZE = T 25 BarREBAR SPACING = 150 mmUNIT WEIGHT OF REBAR = 3.853 kg/mWEIGHT OF REBAR = 0.6797 Tons.
C) TOTAL REBAR WEIGHT REQUIRED = 1.55 Tons.
3) EXCAVATION WORKESTIMATED EXCAVATION DEPTH = 1.100 mESTIMATED EXCAVATION VOLUME = 32.47 m3
4) FORMWORKSAREA REQUIRED = 17.60 m2
5) RE-SURFACING OF EXT'G ROAD
AREA OF RE-SURFACING OF EXT'G ROAD = 110 00 m2AREA OF RE-SURFACING OF EXT G ROAD 110.00 m
THICKNESS OF ASPHALT REQUIRED = 75.00 mmASPHALT VOLUME REQUIRED = 8.25 m3
II BQ SUMMARY
TOTAL NOS. OF FOUNDATION = 2 nos.SUPERSTRUCTURETOTAL STEEL WEIGHT REQUIRED = 0.80 tons.RE-SURFACING OF EXT'G ROADASPHALT VOLUME REQUIRED = 8.25 m3
SUBSTRUCTURETOTAL CONC. VOLUME REQUIRED = 16.13 m3
TOTAL LEAN CONC. REQUIRED = 1.15 m3
TOTAL SUB-BASE REQUIRED = 8.86 m3
TOTAL REBAR WEIGHT = 3.09 Tons.196 pcs
DEPTH OF ANCHOR PENETRATION = 150 mm64.94 m3
TOTAL FORMWORKS AREA REQUIRED = 35.20 m2
Note: 1) Footing shall be consider as spread footing type.
TOTAL NOS. OF T25 CHEMICAL ANCHOR =
TOTAL ESTIMATED EXCAVATION VOLUME =