Stormwater ManagementWilliam Taylor

New Hampshire Wastewater Control Association

June 13, 2013

Page 3: Stormwater Management William Taylor New Hampshire Wastewater Control Association June 13, 2013

3

Legislative History

Before 1987 stormwater was not generally regulated

Water Quality Act of 1987 required NPDES permitting of certain stormwater discharges byExisting permitted facilities Industrial activitiesLarge and medium MS4sOthers as determined by permitting authority

Page 4: Stormwater Management William Taylor New Hampshire Wastewater Control Association June 13, 2013

4

Residual Designation Authority (RDAs)

Stormwater discharges not otherwise required to obtain a permit can be designated as requiring a permit under certain conditions. 40 CFR § 122.26(a)(D).

Page 5: Stormwater Management William Taylor New Hampshire Wastewater Control Association June 13, 2013

5

RDAs in Region 1

• Charles River RDA o Pollutant – Phosphoruso Draft permits – 2008 and 2010o Final permit not issuedo 2 acre IC threshold

• Long Creek RDAo Metals, solids, temperature, chlorideso Permit issued in 2009o 1 acre IC threshold

• Burlington/Lake Champlaino Pollutant - phosphoruso Permit issued in 2009o 1 acre IC threshold

Page 6: Stormwater Management William Taylor New Hampshire Wastewater Control Association June 13, 2013

6

Page 7: Stormwater Management William Taylor New Hampshire Wastewater Control Association June 13, 2013

7

Long Creek Watershed

Long Creek is 1 of 31 urban impaired streams in Maine

Impairment due to:High water temperaturesHigh pollutant loads (toxics, PAH, chlorides)Stream channel instability and sedimentationStressed/degraded habitats

Page 8: Stormwater Management William Taylor New Hampshire Wastewater Control Association June 13, 2013

8

Watershed Statistics

Total Watershed Acreage = 2240 (3.5 sq miles)Total Impervious Acreage = 739 (33%)

Total Miles of Streams ~ 10 miles

Page 9: Stormwater Management William Taylor New Hampshire Wastewater Control Association June 13, 2013

9

Page 10: Stormwater Management William Taylor New Hampshire Wastewater Control Association June 13, 2013

10

Section 303(d) List – 2000

Community-Based Restoration Project Convened

US EPA Grant to Establish Watershed Group and Begin Development of Management Plan

TMDL DeferredManagement Plan Completed 2009

Page 11: Stormwater Management William Taylor New Hampshire Wastewater Control Association June 13, 2013

11

Residual Designation Petition

CLF filed an RDA petition with EPA in March 2008

Requested a determination that:• Certain unpermitted stormwater discharges are

contributing to violations of water quality standards in Long Creek.

• Therefore, these “contributing discharges” require a NPDES permit in order to restore and protect the water quality of Long Creek.

Page 12: Stormwater Management William Taylor New Hampshire Wastewater Control Association June 13, 2013

12

EPA’s Designation Decision

Final decision to designate published on 10/28/09

Requires permits for discharges from property with at least 1 acre of impervious surface

Maine DEP to administer permit program

Page 13: Stormwater Management William Taylor New Hampshire Wastewater Control Association June 13, 2013

13

Permitting RequirementsUnder RDA

About 120 parcels with more than 1 acre of impervious surface – pavement, rooftops, etc.

Owners of parcels less than 1 acre are not currently required to obtain a permit

Page 14: Stormwater Management William Taylor New Hampshire Wastewater Control Association June 13, 2013

14

Options for Landowners

Challenge RDA Decision No Precedent Forum Costs No Permit Shield – No TMDL State Authority to Regulate Existing Sources

Basis for Appeal? Arbitrary 1 Acre Threshold Already Permitted

Page 15: Stormwater Management William Taylor New Hampshire Wastewater Control Association June 13, 2013

15

Options for Landowners

Proceed with Permit Development Under RDA and Obtain Permit Shield

Continue Implementing Management Plan and Restore Long Creek

Page 16: Stormwater Management William Taylor New Hampshire Wastewater Control Association June 13, 2013

16

Permitting Options

Long Creek General PermitMust Participate in and Comply with Long

Creek Watershed Management PlanEnter into Agreement with Management

DistrictMake payments ($3,000 per acre per year)Grant EasementsComply with Monitoring and Housekeeping

RequirementsFive year permit

Page 17: Stormwater Management William Taylor New Hampshire Wastewater Control Association June 13, 2013

17

Assessment Statistics

o $3,000/impervious acre/yearo Credits provided for stormwater treatment

and good housekeeping activities on own parcel

Page 18: Stormwater Management William Taylor New Hampshire Wastewater Control Association June 13, 2013

18

Interlocal Agreement ProvidesLegal Structure

• Long Creek Watershed Management District established through interlocal agreement between watershed municipalities

• Interlocal agreement allows for public and private governing board members who will be protected under Tort Law

Page 19: Stormwater Management William Taylor New Hampshire Wastewater Control Association June 13, 2013

19

Goal: Meet Water QualityStandards by 2020

Treat 150 impervious acres• 26.33 acres treated (18%)

Implement stream habitat mitigation• 2 out of 10 sites completed

Implement non-structural measures• Good housekeeping – in progress• Targeted education – in progress

Page 20: Stormwater Management William Taylor New Hampshire Wastewater Control Association June 13, 2013

20

Monitoring Summary

The data collected to date suggest the following: Temperature and dissolved oxygen are

issues in the upper portion of the watershed.

Chloride is an issue in the south and north branches.

Metals and nutrients are issues throughout the watershed.

Water quantity is a known issue throughout the watershed and is being analyzed further.

Page 21: Stormwater Management William Taylor New Hampshire Wastewater Control Association June 13, 2013

Merrill’s Wharf254 Commercial StreetPortland, ME 04101

William Taylor, [email protected]