28
Catalog No. 66163 v4.0.0 255x193x203cm / 100”x76”x80” ASSEMBLY INSTRUCTIONS Silver Line/Green Line 6’x8’ Customer help and support line: 07-831-863-438

SSEMBLY INSTRUCTIONS A 6’x8’ Silver Line/Green … · IMPORTANT You must read these instructions carefully before you start to assemble this greenhouse. Please carry out the steps

  • Upload
    vudien

  • View
    217

  • Download
    0

Embed Size (px)

Citation preview

Page 1: SSEMBLY INSTRUCTIONS A 6’x8’ Silver Line/Green … · IMPORTANT You must read these instructions carefully before you start to assemble this greenhouse. Please carry out the steps

Catalog No. 66163 v4.0.0

255x193x203cm / 100”x76”x80”

ASSEMBLY INSTRUCTIONS

Silver Line/Green Line 6’x8’

Customer help and support line:07-831-863-438

Page 2: SSEMBLY INSTRUCTIONS A 6’x8’ Silver Line/Green … · IMPORTANT You must read these instructions carefully before you start to assemble this greenhouse. Please carry out the steps

IMPORTANT

You must read theseinstructions carefullybefore you start toassemble this greenhouse.

Please carry out the stepsin the order set out inthese instructions.

Do not tighten the screwsof the Greenhouse untilcomplet ing on theassembly of the panels.

Keep these instructions ina safe place for futurereference.

We strongly recommend the use

of work gloves during assembly .

Do not attempt to assemble the

greenhouse in windy or wet

conditions.

Do not touch overhead power

cables with the aluminum profiles.

Always wear shoes and safety

goggles when working with

extruded aluminum. Dispose of all

plastic bags safely - keep them out

of reach of small children. The

greenhouse must be positioned

and fixed on a flat level surface. Do

not lean against or push the

greenhouse during construction.

Keep children away from the

assembly area. Do not position your

greenhouse in an area exposed to

excessive wind.

Do not attempt to assemble this

greenhouse if you are tired, have

taken drugs or alcohol or if you are

prone to dizzy spells. If using a step

ladder or power tools ensure that

you follow the manufacturers safety

advice. Hot items such as recently

used grills, blowtorches etc. must

not be stored in the greenhouse.

Ensure there are no hidden pipes

or cables in the ground before

inserting the pegs.

Safety Advice

When your greenhouse needs to becleaned, use a mild detergentsolution and rinse with cold cleanwater. DO NOT use acetone, abrasivecleaners or other special detergentsto clean the clear panels.Replacement parts - contactCustomers service helpline at:For additional information please visitour web site: www.palram.com

4 The end of all profiles, pointed by an arrow, is always upward.

4 The oval hole in the crossbars A256 should always be assemble to the base of the greenhouse.

4 The front of the greenhouse is the wall including the door, and the back is the opposite wall.

4 Firmly connect the greenhouse to a leveled final position immediately after completion of the assembly.

4 If help is required seek professional advice whithin store.

4 Sort the parts and check against the contents parts list.

4 Carry out the assembly steps in the order set out in the instructions.

4 Screws 411 are to be assembled from the outside and nuts 412 from the inside of the greenhouse.

4 Close screws and nuts (411 & 412), 2- 3 turns only, do not fasten them until completion of the assembly, if not specified otherwise.

4 Prefix of the parts reference in the assembly instructions:

This is a multi-part assembly. Allow atleast 180 minutes for assembly process.Selecting a site - choose a sunny levelposition away from overhanging trees.If you are fixing your greenhouse directlyto a solid concrete foundation use thepre drilled holes in the metal basesupplied. The component parts shouldbe checked and laid out close at hand.Keep all small parts (screws etc.) in abowl so they do not get lost.Keep roof clear of snow and leaves.

Silicone sealant applicable to panels & Applicator

Tape measure

Work gloves

Plastic or rubber mallet

Lubricant Phillipshead Step ladder

Drill Large hammer

Scissors 2mm/0.08’’ metal drill bit

Tools & Equipment

Care & Maintenace

General Advice

A - Aluminum profiles and parts P5XX – Polycarbonate panels P3XX – Plastic parts. M – Metal parts 4XX – Screws, nuts, disks, etc.

Page 3: SSEMBLY INSTRUCTIONS A 6’x8’ Silver Line/Green … · IMPORTANT You must read these instructions carefully before you start to assemble this greenhouse. Please carry out the steps

Contents

A102 44.33/1126A103 62.40/1585A104 62.40/1585

1211

Item Inc./mm Qty.

A111 44.69/1135A112 44.69/1135A113 44.69/1142A114 44.69/1142A115 44.69/1142A116 44.69/1142

221111

A136 96.73/2457 2

A141 97/2463 1

A151 23.07/586 1

A162 49.07/1246 1

A173 59.65/1515 2

A174 24.17/614 1

A18224.17/614 1

A19224.17/614 1

A203 61.48/1560A204 61.48/1560

11

A21124.25/616 1

A222 48.82/1240 1

A260 24.84/630 1

A256 50.79/1290 8

A261 15.75/400 1

A271 23.07/586 1

A282 21.77/553 2

Item Inc./mm Qty. Item Inc./mm Qty. Item Inc./mm Qty.

A283 592/23.3 5

P502 44.69x24.09 1135x612

21

P513 22.64x24.09 575x612

1

P505 9.45x23.94 240x608

1

P512 23.62x21.65 600x550

1

P305 22/560P308 15.75/400

P311 44.09/1120P313 10.8/275P314 28.3/720P315 14.17/360

2646222

(2 spare)

Page 4: SSEMBLY INSTRUCTIONS A 6’x8’ Silver Line/Green … · IMPORTANT You must read these instructions carefully before you start to assemble this greenhouse. Please carry out the steps

M243 2

M244 2

Contents

P518 12.9x24.09 328x612

1

P516 25.79x24.09 666x612

1

P514 17.32x24.09 440x612

2

P515 17.32x24.09 440x612

2

Item Inc./mm Qty.

P324 4

P304 2

P306 1

P323 2

M307 4

447M8x0.63/M8x16

4

411M6x0.39/M6x10

95

412M6

100

421M4x0.63/M4x16

4

422M4

2

4458x1/5/M8x7

4

441M6x1.77/M6x45

1

4420.26/6.5

1

P333 1

ItemInc./mm Qty.

ItemInc./mm Qty.

ItemInc./mm Qty.

R303 59.6/1515 2

A284 2 P399 2

423M4

2

40080.6x0.16/16x4.2

6

SL

Page 5: SSEMBLY INSTRUCTIONS A 6’x8’ Silver Line/Green … · IMPORTANT You must read these instructions carefully before you start to assemble this greenhouse. Please carry out the steps

1 2

Be sure to bend in tabs of the base profiles M243 into a 90°angle before inserting the screws.Tighten firmly the screws 447 at the lower hole as seen in thelower picture.

Attach the sides of the base (M244) to the front and back basepieces (M243).Use the aluminum screws and nuts (411, 412) as shown. Tightennut completely.

M243M243

M243

M243

M244

447

(a)

411

411

411412

M243

Connectors

M244

M244

M243

Back Side

A244M244

(b)412

412

Page 6: SSEMBLY INSTRUCTIONS A 6’x8’ Silver Line/Green … · IMPORTANT You must read these instructions carefully before you start to assemble this greenhouse. Please carry out the steps

Pay attention to set the aluminum corners (A111,A112) according to the arrow showing top of theprofile.

NOTE: The nuts are to be from the inside. Do nottighten them until completion of the assembly, Ifnot specifically stated otherwise, this procedureapplies to all cases where screws and nuts 411,412 are to be used.

3 *Insert the screws from the outside, tighten nuts only 2-3 turns and leave loose.

A111 / 1 A112 / 1 A162 / 1

Back

(a)

A112

A112

A111

A111

A111A111

412412

411411

411

A162

Page 7: SSEMBLY INSTRUCTIONS A 6’x8’ Silver Line/Green … · IMPORTANT You must read these instructions carefully before you start to assemble this greenhouse. Please carry out the steps

a

4A *Insert the screws from the outside, tighten nuts only 2-3 turns and leave loose.

!!

a

a

From the outside

From the inside

Back

411

411

412

411

412

411

411

411

A256

A283

A103

A284

A103

A104

NOTE: Profiles A283 should be connected through theirlower grooves to profiles A111 and A112 (assembled onprevious step). Crossbars A256 are assembled from the inside.The upper groove of profile A283 will be used later on.

NOTE: The assembly of the back wall supports, three profilesA283 include three stages A, B and C.

NOTE: The slanted of the profiles should be parallel to thedownward slop of the roof.Insert two screws 411 in the groove of profile A103. Connectthe first one with nut 412 to the base together with thecrossbar A256. The oval holes must be connected to thebase of the greenhouse.

Stage A: Connect the second screw 411 to the middle holein the metal plate M284 and tighten with nut 412.Insert two screws 411 in the grooves in profile A283, connectthem to the metal plate M284 and tighten with nuts 412.

A

A256 / 1 A284 / 2 A283 / 3

Page 8: SSEMBLY INSTRUCTIONS A 6’x8’ Silver Line/Green … · IMPORTANT You must read these instructions carefully before you start to assemble this greenhouse. Please carry out the steps

Stage B: Connect thesecond screw 411 to themiddle hole with nut 412to metal plate M284 andtighten with nuts 412.Insert two screws 411 inthe grooves in profile A283and connect them to themetal plate M284 andtighten with nuts 412.

Stage C: Insert four screws411 into both grooves inboth ends of the middleprofile A283 and connectthem with nuts 412 to themetal plates M284.

Back

4B&C *Insert the screws from the outside, tighten nuts only 2-3 turns and leave loose.

From the inside

M284 M284

A283

A283

A283

A103

A104

412

412

cB

Back

A283

M284

411412

A283

A103

A104

M284

From the inside

A256

!BACK

!!

A103 / 1 A104 / 1 A256 / 1

NOTE: Profiles A283 should be connected through their lower grooves to profiles A111 and A112 (assembled on previous step). Crossbars A256 areassembled from the inside. The upper groove of profile A283 will be used later on.

NOTE: The assembly of the back wall supports, three profiles A283 include three stages A, B and C.

NOTE: The slanted of the profiles should beparallel to the downward slop of the roof.Insert two screws 411 in the groove of profileA104. Connect the first one with nut 412 tothe base together with the crossbar A256. Theoval holes must be connected to the base ofthe greenhouse.

A283 / 3

Page 9: SSEMBLY INSTRUCTIONS A 6’x8’ Silver Line/Green … · IMPORTANT You must read these instructions carefully before you start to assemble this greenhouse. Please carry out the steps

NOTE: The set includes two left andtwo right “gutter end cups” P324 andfour plugs. Assemble a plug in all four“gutter end cups” P324. Insert each oneof them into the gutters A136 ends.

NOTE: Leave the end cup open on theside you would like the water to drain. (a)

A136

(b)

(b)

5 *Insert the screws from the outside, tighten nuts only 2-3 turns and leave loose.

P324

P324

P324

A324 / 4 A136 / 2

Page 10: SSEMBLY INSTRUCTIONS A 6’x8’ Silver Line/Green … · IMPORTANT You must read these instructions carefully before you start to assemble this greenhouse. Please carry out the steps

Assemble the gutter A136 to the profiles (A111/A112) oneon each end.

NOTE: Assemble the crossbars A256 from the insidesimultaneously with the gutter A136 using the same screwsand nuts. The oval holes in A256 must be connected to thebase of the greenhouse.

6 *Insert the screws from the outside, tighten nuts only 2-3 turns and leave loose.

A136 / 2 A256 / 4 !

Back

A256

A256

A256

A256

A136

A136A256

A256

A256

A256

411

412

411

411

411

411

412

412

Page 11: SSEMBLY INSTRUCTIONS A 6’x8’ Silver Line/Green … · IMPORTANT You must read these instructions carefully before you start to assemble this greenhouse. Please carry out the steps

7 *Insert the screws from the outside, tighten nuts only 2-3 turns and leave loose.

Outside

Inside

Back

Front A256

412

411

412

411

412

412

A283A256

A283

A283

A256

A203

A204

Outside

Inside

411

411 Inside

Outside

!

Profiles A283 should be connected through theirlower grooves to profiles A111 and A112(assembled on previous step). At their other end,they should be connected to profiles A203 andA204 using two screws 411 and nuts 412 oneach end.NOTE: Assemble the crossbars A256simultaneously with the profiles A283 and profilesA111 and A112, using the same screws and nuts.The oval holes must be connected to the base ofthe greenhouse.

A256 / 2 A203 / 1 A204 / 1 A283 / 2

Page 12: SSEMBLY INSTRUCTIONS A 6’x8’ Silver Line/Green … · IMPORTANT You must read these instructions carefully before you start to assemble this greenhouse. Please carry out the steps

Aluminum profiles A113, A114 are to be connected at the front toaluminum profiles A283 using the upper grooves. Aluminum profilesA115, A116 are to be connected at the back to aluminum profileA283 - on its two sides using the upper grooves. Profiles A113,A114, A115, A116 are to be also connected Simulaneously toprofiles A136.

8 *Insert the screws from the outside, tighten nuts only 2-3 turns and leave loose.

A113 / 1 A114 / 1 A115 / 1 A116 / 1

A116

411

412

411411

411

411

412

412

412

A113

A283

411

A136

A136

A114

A115

Front Back

Back

Front A283

Page 13: SSEMBLY INSTRUCTIONS A 6’x8’ Silver Line/Green … · IMPORTANT You must read these instructions carefully before you start to assemble this greenhouse. Please carry out the steps

Assemble the main beam A141 UNDER A113, A114 at the FRONT,A115 and A116 at the BACK.Assemble profile A211, from the outside, to profiles A113, A114.

9 *Insert the screws from the outside, tighten nuts only 2-3 turns and leave loose.

411A141 / 1 A211 / 1

A141

411

412

411

412

A211

412

411

A136

Page 14: SSEMBLY INSTRUCTIONS A 6’x8’ Silver Line/Green … · IMPORTANT You must read these instructions carefully before you start to assemble this greenhouse. Please carry out the steps

Slide profile A102 on to the preassembled (to the base)screw 411. On the other end slide the head of screw411 into the groove on profiles A102, insert the screwinto predrilled holes in the gutter A136 and close (DONOT TIGHTEN) with nut 412.

NOTE: Repeat the above assembly procedure to all sixprofiles A102. You will have to add one screw 411 andnut 412 to each side of the base in order to assemblethe middle profi le A102 . (* See next step)

10 *Insert the screws from the outside, tighten nuts only 2-3 turns and leave loose.

412

411

A102A102

A102

412

412

(c)

(a)

b411

A102 / 6

A102

412411

Page 15: SSEMBLY INSTRUCTIONS A 6’x8’ Silver Line/Green … · IMPORTANT You must read these instructions carefully before you start to assemble this greenhouse. Please carry out the steps

Slide profile A102 on to the preassembled (to the base) screw 411. Onthe other end slide the head of screw 411 into the groove on profilesA102, insert the screw into predrilled holes in the gutter A136 and close(DO NOT TIGHTEN) with nut 412.

11 *Insert the screws from the outside, tighten nuts only 2-3 turns and leave loose.

412411

411

A102 / 6

(a) (b)

411

A102

A102

A102

412

411

411

412

Page 16: SSEMBLY INSTRUCTIONS A 6’x8’ Silver Line/Green … · IMPORTANT You must read these instructions carefully before you start to assemble this greenhouse. Please carry out the steps

NOTE: The vent in the roof canbe inserted replacing one ofthe middle sections panels.

In order to assemble the ventyou have to inser t anadditional screw 411(b) intotwo profile A102(b) on bothsides of the vent before youconnect i t . These twoadditional screws will be usedin the next step.

(b)

(a)

(a)

12 *Insert the screws from the outside, tighten nuts only 2-3 turns and leave loose.

(a)

(a)

(b)

411

412

412

411

411

411

412

412

412412

412

A102

A102

A102 / 6

Page 17: SSEMBLY INSTRUCTIONS A 6’x8’ Silver Line/Green … · IMPORTANT You must read these instructions carefully before you start to assemble this greenhouse. Please carry out the steps

Assemble aluminum profile A260 using the additional screws youinserted on the previous step.

Assemble aluminum profile A222 onto aluminum profile A211(a).Connect aluminum profile A222(b) and aluminum profile A261to profile A113(c).

13 14

A260

A102

412

A260

412

412

*Insert the screws from the outside, tighten nuts only 2-3 turns and leave loose.

(a)

(b)

(c)

412

442

441

A261

A222

A222

A260 / 1 A261 / 1 A222 / 1

Page 18: SSEMBLY INSTRUCTIONS A 6’x8’ Silver Line/Green … · IMPORTANT You must read these instructions carefully before you start to assemble this greenhouse. Please carry out the steps

15

Lay profiles A173, A174 and A174 on a flat surface as shown below.Connect and tighten all screws.

A192 / 1A174 / 1 A173 / 2

A174(c)

A174

4008

4008

4008

A192

A192

A173

4008

Page 19: SSEMBLY INSTRUCTIONS A 6’x8’ Silver Line/Green … · IMPORTANT You must read these instructions carefully before you start to assemble this greenhouse. Please carry out the steps

16 17

When inserting the panel to the door use a flat surface and if the paneldoes not fit properly, trim the lower and upper corners of the panel.Fit panel P502 into place. Make sure the panel fits into the grooves inprofiles A192 and A174.Fit panel P518 into the lower groove (a).Fit profile A182 in place. Make sure panel P518 fit into the groove inprofile A182(b). Tighten all screws.

NOTE: Make sure the grooves

on all both sides of the panel

are properly positioned along

the aluminum-extruded

profiles.

During the assembly of plastic

strips you must put pressure

on them until they snap into

place. Put the pressure at one

end of the platic strip and

continue all the way to the

other end.

C

D

A

B

C

B

A

D

P502 / 1 P518 / 1 P311 / 2

4008

P502

P518

b

a

A182

P502

4008

P311

P313

P313 / 2

P313

Page 20: SSEMBLY INSTRUCTIONS A 6’x8’ Silver Line/Green … · IMPORTANT You must read these instructions carefully before you start to assemble this greenhouse. Please carry out the steps

18 19

Connect the wheels P304 using screws 421 and self locking nuts 423. When inserting the rubberR303 a p p l y s omelubrication solution on thealuminum A171.

R303

P303 / 2

421

421

423

423

P304

421 / 2 423 / 2 P304 / 2

Page 21: SSEMBLY INSTRUCTIONS A 6’x8’ Silver Line/Green … · IMPORTANT You must read these instructions carefully before you start to assemble this greenhouse. Please carry out the steps

20

VENT SUBASSEMBLY

Assemble the handle A306 to profileA271 and tighten screws 421(a) and nuts422(a). Slide panel P512 into the groovein profile A151(b). Slide profiles A282 oneach side of panel P512 until they fit theholes on profile A151 ends and the twoholes on panel P512(c).Connect corners with screws 411 and nuts412.Slide the final profile A271 (with thehandle) until it fits the holes on both profilesA282 and the two holes on the panelP512(d). Connect corners with screws411 and nuts 412. Tighten all screws andnuts.

412

412

A282

A282

A151

A271

(b)

411

411

411

411

(c)

(c)

(d)

(b)

P512

A151 / 1 A282 / 1 A271 / 1 A306 / 1

422

A306

421

A271

(a)

Page 22: SSEMBLY INSTRUCTIONS A 6’x8’ Silver Line/Green … · IMPORTANT You must read these instructions carefully before you start to assemble this greenhouse. Please carry out the steps

21 22

The brackets A323 should be connected to profile A260 using screws445(a).

To install the vent on main bean aluminum profiles A141, hold it at anangle of 45° relative to the profile’s plane Slide it to the position betweenthe two roof aluminum profiles AI02(b). The handle A306 should rest onbrackets (A323) when the vent is in the closed position.In the open position, the vent can be secured in one of several angles, bycatching a selected hole in the handle with the protruding tip of bracketsA323.

P323 / 2 445 / 4

(a)

Inside

A260

445

A260

A323

(b)

A260

A141

A306

(b)

A141

Page 23: SSEMBLY INSTRUCTIONS A 6’x8’ Silver Line/Green … · IMPORTANT You must read these instructions carefully before you start to assemble this greenhouse. Please carry out the steps

23

Noise reduction elements assembly. Put one part of P317 in the

middle of each section of the wall and the roof as shown in the

picture below it will be used later on.

P317 / 21

P317

P317

P317

P317

Page 24: SSEMBLY INSTRUCTIONS A 6’x8’ Silver Line/Green … · IMPORTANT You must read these instructions carefully before you start to assemble this greenhouse. Please carry out the steps

24

Note: Make sure the panel is secure in P317 plastic holder (a). Make sure the grooves on both

sides of the panel are properly positioned along the aluminum – extruded profiles.

* See also next step.

During the assembly of the plastic strips you must put pressure on them until they snap into

place. Put the pressure at one end and continue all the way to the other end-using tool P333,

as shown below.

P333

P502

D

A

B

C

D

(b3)(b1) (b2)

(a) (b)

Page 25: SSEMBLY INSTRUCTIONS A 6’x8’ Silver Line/Green … · IMPORTANT You must read these instructions carefully before you start to assemble this greenhouse. Please carry out the steps

Pay special attention when assembling thetriangular polycarbonate sections (P505, P514a n d P51 5 ) . T h e p l a s t i c s t r i p s(P311,P312,P314,P315) should be installedonly after the polycarbonate panels (P505, P514,and P515, P516) are in position.* (see previous step)

25

P502 / 13 P514 / 2 P515 / 2 P516 / 1

P311 / 28 P308 / 6 P314 / 2 P315 / 2

P505 / 1

P502

P502

P502

P502

P502

P502

P502

P315

P515

P514

P515

P311x2

P502

P516

P315

P505

P514

1

2

3

5

4

6

7

9

10

11

12

13

14

15

18

17

16

19

8P311

P314

P314

P308

P308

P308

P311

Page 26: SSEMBLY INSTRUCTIONS A 6’x8’ Silver Line/Green … · IMPORTANT You must read these instructions carefully before you start to assemble this greenhouse. Please carry out the steps

When you mount the polycarbonate panels on the roof, insert the panelsby sliding them into the gutter and the plastic holde P317 assemblederlear. The plastic holder P317 must be pushed in the groove of thegutter.

26

(a)

(b)

P513

P311

P311

P311

P502

1

2

34

5

6

78

P502 / 7 P513 / 1 P311 / 16 P305 / 2

P513

Page 27: SSEMBLY INSTRUCTIONS A 6’x8’ Silver Line/Green … · IMPORTANT You must read these instructions carefully before you start to assemble this greenhouse. Please carry out the steps

27 28

Insert the door lower track A192 inside the special aluminum rail A162(a), simultaneously with the door wheels into the upper track A222. Afteryou assemble the door to its place, assemble screw and nut 411,412into the door stopper hole on profile A222(b).

NOTE: Make sure tofasten all screws and nuts.

(a)

(b)411

412

A222

Page 28: SSEMBLY INSTRUCTIONS A 6’x8’ Silver Line/Green … · IMPORTANT You must read these instructions carefully before you start to assemble this greenhouse. Please carry out the steps

M307

FIRMLY CONNECT thegreenhouse to leveledf i n a l p o s i t i o nIMMEDIATELY af tercompletion of theassembly, to withstandhigh winds effects.

The pegs M307 (spikes) areassembled from the inside ofthe greenhouse. Make sure touse the pre-punched notch inthe bottom of the base.

29

P399 / 2

P399

P399

PUSH HERE

CLICK