2
IB-G Quick Reference Guide SD-402/062017 MOUNTING INSTRUCTIONS 1 Snap-In Plastic Track (Included with IB-G) Screw track in place. (Screws NOT included.) Insert IB-G, top first, then snap in bottom by pressing on the terminal strip (Do not press on the LED’s or other components.) Screw IB-G to standoffs. (Screws NOT included.) Non-metallic Standoffs (Not included with IB-G) Screw standoffs in place (8-32 thread or smaller). 2.5” 2.5” center to center center to center SETUP IB-G 2 Install jumper to set control signal. 0-10V 4-20mA 300Ω 4-20mA 600Ω 4-20mA 1000Ω 4-20mA 1200Ω •••• •••• ••• ••• •• •• •• •• ••• ••• •••• •••• Do not touch.

Sporlan Subcool OCntrol Quick Reference Guide IB-G RefGuide.pdfload Bulletin 100-50-2.1. Title: Sporlan Subcool OCntrol Quick Reference Guide Author: Bill Wolz Created Date: 6/15/2017

  • Upload
    others

  • View
    15

  • Download
    2

Embed Size (px)

Citation preview

Page 1: Sporlan Subcool OCntrol Quick Reference Guide IB-G RefGuide.pdfload Bulletin 100-50-2.1. Title: Sporlan Subcool OCntrol Quick Reference Guide Author: Bill Wolz Created Date: 6/15/2017

IB-GQuick Reference GuideSD-402/062017

MOUNTING INSTRUCTIONS1

Snap-In Plastic Track (Included with IB-G)

Screw track in place. (Screws NOT included.)

Insert IB-G, top first, then snap in bottom by pressing on the terminal strip (Do not press on the LED’s or other components.)

Screw IB-G to standoffs. (Screws NOT included.)

Non-metallic Standoffs (Not included with IB-G)

Screw standoffs in place (8-32 thread or smaller).

2.5”

2.5”

center to center

center to center

SETUP IB-G2

Install jumper to set control signal.

0-10V 4-20mA 300Ω 4-20mA 600Ω 4-20mA 1000Ω 4-20mA 1200Ω

•••••

•••••

•••••

•••••

•••••

•••••

•••••

•••••

•••••

•••••

Do not touch.

Page 2: Sporlan Subcool OCntrol Quick Reference Guide IB-G RefGuide.pdfload Bulletin 100-50-2.1. Title: Sporlan Subcool OCntrol Quick Reference Guide Author: Bill Wolz Created Date: 6/15/2017

Parker Hannifin CorporationSporlan Division206 Lange Drive • Washington, MO 63090 USAphone 636 239 1111 • fax 636 239 9130www.sporlan.com

SD-402 / 062017© 2017 Parker Hannifin Corporation.

SETUP IB-G

WIRE IB-G

3

4

Set dip switches for valve type and operation.

1596 steps / Bipolar

6386 steps / Bipolar

2500 steps / Bipolar

500 steps / Unipolar

3193 steps / Bipolar

1596 steps / Unipolar

Note: The selection of “unipolar” will override dip switch No. 7: (1) 200 pps for “1596” step valves. (2) 30 pps for “500” step valves. Details of the other settings (5 valve direction, 6 responsive time, 7 valve opening/closing speed, and 8 close valve) can be found in the IB-G I/O manual.

WARNING: Do not apply power to the IB-G until wiring is complete, and remove power before making any wiring changes.

S+S-OPNCLSREFBWGR24V+24V-

4-20mA or 0-10VControl Signal

Digital InputsBlack wire

Win

din

g A

Winding B

M

White wire

Green wire

Red wire

Power

Bipolar Valve Unipolar Valve

S+S-OPNCLSREFBWGR24V+24V-

4-20mA or 0-10VControl Signal

Digital Inputs

Orange wire

Grey wire

M

Yellow wire

Black wire

Red wire

Power

A1

B1B2

A2

Notes: Transformer requirements: One stepper motor valve per IB-G (30 VA per IB-G board). Two stepper motor valves per IB-G (40VA per IB-G board). Only one unipolar valve can be driven per IB-G. Power supply requirements: One leg of the 24V supply must be connected to all of the IB-G boards at the “24V+” terminal. The other leg of the 24V supply must be connected to all of the IB-G boards at the “24V-” terminal. 3.5 in.-lbs. maximum torque on all screw terminals.

Sporlan IB-G Installation and Operation ManualFor detailed instructions, scan this QR code or go towww.sporlanonline.com/electronic-controls and down-load Bulletin 100-50-2.1.