Upload
raven-nutting
View
220
Download
0
Tags:
Embed Size (px)
Citation preview
Special requirements for certification GAZPROM
companies and suppliers worldwide
Maria Korolevathe director of Russian certification Technologies
the expert of QMS certification of GOST R, Quality Austria, IRCA, Military Register
With 17% of the global gas production, Gazprom Group is the leader among the world’s oil and gas companies. In 2008 Gazprom Group produced 549.7 billion cubic meters of gas.
Gazprom is a global energy company basically focused on geological exploration, production, transportation, storage, processing and marketing of gas and other hydrocarbons as well as electric power and heat energy production and distribution. The state owns a 50.002 per cent controlling stake in Gazprom.
With a view to improving of GAZPROM activity, its subsidiaries and GAZPROM suppliers:
The standards of GAZPROM for Quality management systems were maintained and put into operation by the Order of GAZPROM from 27.02.2006 since 24.07.2006.
STO Gazprom 9000-2006 «Quality management systems. Fundamentals and vocabulary»;
STO Gazprom 9001-2006 «Quality management systems. Requirements. 1st part. Common requirements»;
STO Gazprom 9001-2006 «Quality management systems. Requirements. 2nd part. Special requirements»;
STO Gazprom 9011-2006 «Quality management systems. Guidelines for quality management systems assessment».
STO GAZPROM STANDARDS SERIES 9000
Implementation and certification in accordance with STO Gazprom 9000 series is necessary to realization of contract and tender conditions
This standard complements and develops ISO 9000 conditions.
Certification bodies Certification bodies
Gazprom certification systemGazprom certification system
Subsidiary – accreditation body «Gazprom complektaciya»
Subsidiary – accreditation body «Gazprom complektaciya»
Certificate of notification
The presence of evaluated by authorized representative auditors
Notification conditions
Gazprom pererabotka is a powerful production complex of Russia
Acivities: processes of natural gas, gas condensate and oil processing and transportation, as well as the products of natural gas, gas condensate and oil processing; and also all connected supporting and production processes
The share of Gazprom dobycha Yamburg in the total gas production of Gazprom accounts for 40%, 31 % in Russian gas production. In 2010 the Company produced over 203 bcm of gas and over 1, 5 mln tons of gas condensate.
LLC “Gazprom transgaz Tchaikovsky” is one of the biggest companies of JSC “Gazprom” that is connected with transportaion of Natural gas on the territory of Perm Region, Udmurtia and Kirov Region of Russia; and also is connected with exploitation and repair of gas pipe line and gas-transport systems.
Main stages of supplier’s QMS assessment
Preliminary stage
Analysis of documentation
QMS audit in the company
Decision about the results of QMS assessment
Surveillance audit
Renewal audit
1 year
4 months
3 years
Preliminary stageRegistration of application
By making decision concerning the necessity of proceeding QMS certification in “Gazprom”
standardization system a supplier has to:
• acquaint with procedures and the order of conducting QMS assessment;
• to conduct QMS certification in accordance with scope, regulatory documentation and requirements supplier has to determine them;
• issue and send the application for Quality management system assessment in accordance with a set form to JSC “Gazprom”;
• prepare and send a set of documents including the information about company to JSC “Gazprom complektaciya”.
Preliminary stageRegistration of application
• Business - planning; • Design of a Quality – plan for the contract;• Analysis of production practicability and risk assessment;• Implementation of accounting system and analysis of quality costs;• Management of special specifications and responsible processes;• Designing and developing of products and production processes using analysis of potential non-conformities;• Implementation of statistic methods of data analysis;• Conducting QMS audits at least once in 6 months.
Additional requirements of STO Gazprom 9001-2006
Welcome to Russia!