Special City Council Meeting Agenda Packet 03-19-13

Embed Size (px)

Citation preview

  • 7/29/2019 Special City Council Meeting Agenda Packet 03-19-13

    1/115

    NOTICE OF SPECIAL CITY COUNCIL MEETING

    Tuesday, March 19, 2013 -- 4:30 pmCouncil Chambers

    East side of Monte Verde Street betweenOcean and Seventh Avenues

    Live video streaming available at:

    www.ci.carmel.ca.us

    Broadcast dateSunday, March 24, 2013

    8:00 a.m., MCAET Channel 26

    I . Call to OrderII. Roll CallI I I . Pledge of AllegianceIV. Orders of Council

    A. Receive and file the City of Carmel-by-the-Sea five-year financial forecast.B. Receive and review the City of Carmel-by-the-Sea Capital Improvement Plan and

    refer it to the Planning Commission to review for General Plan Consistency.

    C. Review citywide performance measures to be reported in the FY13-14 operatingplan and budget.

    V. Adjournment

    1

    http://www.ci.carmel.ca.us/http://www.ci.carmel.ca.us/http://www.ci.carmel.ca.us/
  • 7/29/2019 Special City Council Meeting Agenda Packet 03-19-13

    2/1152

  • 7/29/2019 Special City Council Meeting Agenda Packet 03-19-13

    3/115

    Fiscal Year 2013-2014

    City Council Budget Workshop

    Five Year Financial Forecast

    3

  • 7/29/2019 Special City Council Meeting Agenda Packet 03-19-13

    4/115

    City of Carmel-by-the-Sea

    City Council Budget Workshop

    Five Year Financial Forecast

    Presented Tuesday, March 19, 2013

    to the

    Carmel City Council

    Jason Burnett, Mayor

    Ken Talmage, Mayor Pro-Tem

    Victoria Beach, Councilmember

    Steve Hillyard, Councilmember

    Carrie Theis, Councilmember

    Office of the City Administrator

    4

  • 7/29/2019 Special City Council Meeting Agenda Packet 03-19-13

    5/115

    FINANCIAL FORECAST OVERVIEW

    This report highlights the financial context the City of Carmel-by-the-Sea is projected to face in the next

    five years. In general, this years five-year forecast is healthier than prior forecasts. The improved

    forecast is primarily attributed to the voters November 2012 approval of Measure D, a ten-year one-

    percent sales tax rate increase. In addition, but at a lower magnitude in the forecast than Measure D,the City continues to see strengthening economic conditions leading to increasing revenue projections

    during the forecast period.

    The General Fund is the focus of the forecast. It is the largest of the Citys funds and also is the fund that

    would be exposed to many risks and future liabilities including those unanticipated. The General Fund is

    the Citys primary fund and the backstop for required unfunded expenditures.

    Revenues are projected to rise gradually during the forecast period. The forecast anticipates increasing

    expenditures to maintain or enhance levels of service and meet the requirements of safely and cost

    effectively maintaining existing community assets and infrastructure.

    The five-year forecast shows a steady balance between revenues and expenditures. The forecast

    includes Measure D revenues and additional anticipated expenditure increases consistent with the

    Service Level Sustainability Plan. This gap is approximately $800,000 for Fiscal Year 2013-14 narrowing

    to balance by Fiscal Year 2017-18. The past action by the City Council to implement retirement reforms,

    debt service restructuring, and restructuring of the organization, coupled with Measure D, are providing

    anticipated enhancements in services, investment in our community, and improvements in future fiscal

    years.

    FIVE-YEAR FINANCIAL FORECAST

    Introduction and Summary

    The five-year forecast of discretionary General Fund revenues and their uses is intended to provide a

    context that may be helpful in weighing the financial consequences of current year decisions. The

    revenue projections focus on discretionary General Fund revenues. Discretionary revenue is derived

    from local taxes, especially property, transient occupancy, and sales taxes. On the expenditure side, the

    forecast projects the use of discretionary revenue for department operations, including salaries and

    benefits, capital improvements, and debt payment requirements.

    5

  • 7/29/2019 Special City Council Meeting Agenda Packet 03-19-13

    6/115

    This chart demonstrates a consistent balance providing future policy flexibility. The forecast revenue-

    expenditure gap is driven by:

    Measure D revenue of over $2 million annually during the forecast period; Growth in revenue as a result of the continuing strengthening of the economy; Increasing expenditures consistent with the 2012 Service Level Sustainability Plan which called

    for:

    o Increasing services by $407,000 annuallyo Increasing street and road maintenance by $584,000 annuallyo Increasing capital expenditures to reduce deferred maintenance and hazards by

    $458,000

    o Managing and reducing the Citys debt serviceo Managing the Citys reserves consistent with the City Councils 2013 revised financial

    policies

    Continued growth in base salary and benefit costs with forecast increases in medical programcosts, retirement rate costs, and as a result of the first salary plan update in thirteen years;

    Decreasing deferred maintenance and capital investment costs; An average 2.6% increase in the actuarial cost of funding existing retirement obligations with

    the adopted second tiers and the refinancing of the side-fund debt;

    12.7

    12.3 13.7 12.9

    14.2

    16.216.7

    17.217.7 18.1

    14.012.8 13.4

    14.2

    13.4

    15.4

    16.9 17.017.5 18.0

    10.0

    11.0

    12.0

    13.0

    14.0

    15.0

    16.0

    17.0

    18.019.0

    2008-09 2009-10 2010-11 2011-12 2012-13 2013-14 2014-15 2015-16 2016-17 2017-18

    Dollars

    (Millions)

    Five Year

    General Fund

    Revenue & Uses

    Discretionary Revenue Total General Fund Expenditures

    6

  • 7/29/2019 Special City Council Meeting Agenda Packet 03-19-13

    7/115

    Forecast Revenue Detail

    The revenue forecast projects Fiscal Year 2012-13 will see continued modest growth in the Citys

    discretionary revenues. Property taxes show increases for the upcoming fiscal year. Transient

    Occupancy Taxes and Sales Taxes have larger increases projected.

    The nation fell into a recession in the second half of 2008, following the real estate market crash and

    precipitated by the turmoil in the financial markets. Californias economy showed an even more

    troubled trend. Carmels revenue dropped by seven percent, or nearly $1 million, in Fiscal Year 2008-09

    compared to the year prior. Revenue has slowly rebounded and has now returned to pre-recession

    levels.

    Given historical revenue patterns and available forecasts for local and state economic data, an increase

    of 5.20% in discretionary revenues, net Measure D, is estimated in Fiscal Year 2013-14, compared to

    Fiscal Year 2012-13 budget. When including Measure D, Fiscal Year 2013-14 revenue is anticipated to

    increase by 20% from the previous year budget or 14.21% from current year estimates. Annual revenue

    growth rates continue to be projected at approximately 3.00% annually through Fiscal Year 2015-16 and

    in the 5% range for fiscal years 2016-17 and 2017-18.

    FIVE-YEAR FY 2012-1 3 through FY 201 7-18 DISCRETIONARY REVENUE PROJECTIONS

    in millions of dollars

    Revenue Source

    (Dollars in Millions)

    FY06-07

    Actu al

    FY07-08

    Act ual

    FY08-09

    Actu al

    FY09-10

    Act ual

    FY10-11

    Act ual

    FY 11-12

    Actu al

    FY 12-13

    Budget

    FY 12-13

    Estimate

    FY 13-14

    Projected

    FY 14-15

    Projected

    FY 15-16

    Projected

    FY 16-17

    Projected

    FY 17-18

    Projected

    PropertyTax $3.726 $3.867 $4.066 $4.189 $4.158 $4.265 $4.347 $4.510 $4.623 $4.715 $4.786 4.870 $4.967

    Transient OccupancyTax 4.209 4.395 3.787 3.799 4.003 4.178 4.463 4.560 4.742 4.885 5.056 5.207 $5.364

    Sales Tax 2.143 2.340 2.181 1.620 1.806 1.723 2.051 2.051 2.113 2.213 2.308 2.377 $2.446

    Measure D 0.490 2.113 2.213 2.308 2.377 $2.446

    Business License Tax 0.333 0.627 0.609 0.551 0.526 0.514 0.500 0.492 0.497 0.507 0.517 0.533 $0.551

    Fees and Permits 0.488 0.492 0.369 0.448 0.391 0.451 0.431 0.422 0.435 0.446 0.458 0.471 $0.483

    Interest, Rents, Parking Lots 0.694 0.633 0.386 0.250 0.235 0.237 0.229 0.229 0.231 0.234 0.237 0.241 $0.247

    Franchise Fees 0.466 0.426 0.467 0.453 0.477 0.407 0.513 0.513 0.523 0.534 0.544 0.555 $0.566

    Intergovernmental 0.376 0.369 0.382 0.387 0.459 0.369 0.072 0.378 0.386 0.393 0.401 0.409 $0.417

    Other Revenue & Sources 1.121 0.472 0.461 0.607 1.637 0.744 0.798 0.551 0.551 0.568 0.590 0.617 $0.645

    TOTAL 13.556 13.621 12.708 12.304 13.692 12.887 13.404 14.196 16.213 16.707 17.205 17.657 18.132

    Dollar Change Per Year $1.319 $0.065 -$0.913 -$0.404 $1.388 -$0.805 $0.517 $1.309 $2.017 $0.494 $0.499 $1.444 $1.425

    GROWTH RATES:

    PropertyTax 11.36 3.78 5.15 3.03 -0.74 2.56 1.93 5.75 2.50 2.00 1.50 1.75 2.00

    Transient OccupancyTax 8.51 4.42 -13.83 0.32 5.37 4.36 6.83 9.15 4.00 3.00 3.50 3.00 3.00

    Sales Tax -1.20 9.19 -6.79 -25.72 11.48 -4.61 19.06 19.06 3.00 4.75 4.30 3.00 2.90

    Measure D 3.00 4.75 4.30 3.00 2.90

    Business License Tax -19.95 88.29 -2.87 -9.52 -4.54 -2.21 -2.79 -4.35 1.00 2.00 2.00 3.00 3.50

    Fees and Permits -11.75 0.82 -25.00 21.41 -12.72 15.24 -4.35 -6.35 3.00 2.60 2.75 2.75 2.50

    Interest, Rents, Parking Lots 38.25 -8.79 -39.02 -35.23 -6.00 0.80 -3.33 -3.33 1.00 1.00 1.25 2.00 2.25

    Franchise Fees 17.09 -8.58 9.62 -3.00 5.30 -14.77 26.18 26.18 2.00 2.00 2.00 2.00 2.00

    Intergovernmental -8.96 -1.86 3.52 1.31 18.60 -19.62 -80.49 2.45 2.00 2.00 2.00 2.00 2.00

    Other Revenue & Sources 99.82 -57.89 -2.33 31.67 169.69 -54.53 7.21 -25.97 0.00 3.00 4.00 4.50 4.50

    TOTAL %Change from Prior Yr 10.78 0.48 -6.70 -3.18 11.28 -5.88 4.01 10.16 14.21 3.04 2.98 5.69 5.39

    7

  • 7/29/2019 Special City Council Meeting Agenda Packet 03-19-13

    8/115

    REVENUE PROJECTION ASSUMPTIONS

    Property Taxes

    Over the past five years, prior to Fiscal Year 2012-13, annual increases in the property tax revenues have

    averaged about 2.6%. The budgeted Fiscal Year 2012-13 increase is 1.93% compared to the previous

    years actual revenue. Proposition 13 allows an annual maximum increase of 2% on properties that

    have not declined below their assessed value. As a result of a number of properties, values in the City

    declined below their assessed valuation, a slow recovery in this revenue source was anticipated in Fiscal

    Year 2012-13. The latest data suggests an estimated increase of 5.75% compared to Fiscal Year 2011-12

    actual. The future growth rate forecasts a growth rate of 2.50% in Fiscal Year 2013-14, followed by an

    average increase of 1.8% in the following fiscal years.

    Transient Occupancy Tax

    This source of revenue is highly dependent on tourism and the availability of lodging in the City. The

    revenue is based on a 10% tax rate and is projected to increase by 4% in Fiscal Year 2013-14 comparedto the Fiscal Year 2012-13 estimate. Moderate growth is projected thereafter. The projected Fiscal Year

    2014-15 growth rate is 3.0% with a sustainable growth rate of 3.17% on average thereafter.

    Retail Sales Tax

    The sales tax began to rebound in late 2010 and early 2011 but remained somewhat volatile. The Fiscal

    Year 2012-13 budget and estimate are 19.06% higher than the prior year. Subsequent fiscal years show

    continued modest growth of sales tax as the economy continues to solidify. The projected Fiscal Year

    2013-14 growth rate is 3.00% with 3.74% average growth thereafter. Measure D is projected to mirror

    the Citys one-percent Bradley-Burns tax.

    Business License Tax

    Business license revenue growth has been in continued decline. Continued management of business

    license issuance and renewal is necessary to assure compliance. Outreach to the business community to

    support and explain the rules and process for obtaining a business license is a key component of

    compliance and assuring a level playing field in the business community between those that are

    obtaining the license and collecting and remitting and those that are not. The forecast projects one-

    percent growth in this revenue in Fiscal Year 2013-14 with inflationary growth thereafter. Additional

    revenue growth in this source may be possible with a successful outreach program.

    Fees and Permits

    This revenue category primarily includes building permit fees and planning permit fees. Parking and

    other permit revenues are also included in this category. Fee and permit revenue is volatile and

    dependent on economic conditions. While this revenue has experienced an average negative growth

    rate during the past six years, this revenue source is projected to have a positive growth rate during the

    forecast period as building permit activity rebounds.

    8

  • 7/29/2019 Special City Council Meeting Agenda Packet 03-19-13

    9/115

    Interest, Rents, Parking Lots

    This category broadly includes revenue from City assets including interest earnings on savings and

    investment, facility use and rent, and revenue from the north Sunset Center parking lot. This category

    has had an average negative growth rate of 15% for the six most recent years. The budget anticipates

    continued negative growth. Future growth rates are anticipated to be steady and modest averaging1.5% annually.

    Franchise Fees

    About 42% of these revenues come from the garbage collection franchise, 26% of these revenues come

    from cable television franchises, and the other 32% are from water, gas and electric utilities. Future

    growth rates are dependent on cable revenues and low inflation in prices for gas and electricity.

    Franchise fee revenues are projected to experience growth during the forecast period at approximately

    the rate of growth of the Consumer Price Index in the subsequent years. This revenue category may

    exceed forecast expectations or may be impacted by a renegotiated garbage franchise. Estimates will

    be revised if growth trends demonstrate a rate higher than inflation.

    Intergovernmental

    Intergovernmental revenue is both dependent on economic conditions and on State budget constraints.

    This category primarily includes vehicle license fee revenue. Statewide revenues from the vehicle

    license fee fund city and county services, but the State Legislature controls the tax rate and the

    allocation among local governments. In 2004, the Legislature permanently reduced the vehicle license

    fee tax rate and eliminated State general fund backfill to cities and counties. Cities and counties

    subsequently received additional transfers of property tax revenues in lieu of vehicle license fees. SB89

    of 2011 eliminated, effective July 1, 2011, vehicle license fee revenue allocated under CaliforniaRevenue and Taxation Code 11005 to cities. As a part of the Legislatures efforts to solve the States

    chronic budget problems, the bill shifted all city vehicle license fee revenues to fund law enforcement

    grants that previously had been paid by a temporary State tax and prior to that by the State general

    fund. The League of California Cities challenged this action in court as a Constitutional violation. Cities

    were instructed to expect zero vehicle license fee revenues in 2011-12 and in subsequent years unless

    and until there is a change in law. However, with the passage of Proposition 30, the State reimbursed

    vehicle license fee revenue to the City. It is unclear how predictable this revenue will be in the future

    but the forecast anticipates the revenue to continue being remitted to the City during the forecast

    period.

    Other Revenues

    This category has four main components: 1) Grants, 2) Transfers, 3) Charges for services, and 4) various

    miscellaneous revenues. Grant revenue is volatile from year to year. Transfers were more than $1

    million in Fiscal Year 2010-11 and more than $600,000 in Fiscal Year 2011-12 as the City utilized reserves

    to maintain service level and fund capital improvements. The Other Revenue category in the forecast

    assumes base-level revenue and does not include, in the forecast, significant transfers into the General

    9

  • 7/29/2019 Special City Council Meeting Agenda Packet 03-19-13

    10/115

    Fund or use of fund balance. Transfers may be completed that are project specific or are necessary to

    meet unanticipated expenditure requirements. Charges for service and various miscellaneous revenues

    are estimated to generate $200,000 annually going forward.

    FORECAST EXPENDITURE DETAIL

    The expenditure forecast depicts how the General Fund discretionary revenue is anticipated to be

    appropriated. Discretionary revenue is primarily spent as departmental base to fund operations. The

    remaining discretionary revenue is either invested in capital improvements for one-time needs or used

    to fund required debt service obligations. The forecast is comprised of three categories: 1) non-salary

    changes, 2) changes in debt payments, and 3) salary and benefit changes.

    in millions of dollars

    FY06-07

    Actual

    FY07-08

    Actual

    FY08-09

    Actual

    FY09-10

    Actual

    FY10-11

    Actual

    FY11-12

    Actual

    FY12-13

    Budget

    FY13-14

    Projected

    FY 14-15

    Projected

    FY 15-16

    Projected

    FY 16-17

    Projected

    FY 17-18

    Projected

    AverageAnnual

    Growth

    Departmental 10.893 11 .95 4 1 2.129 12 .1 20 11.87 3 1 1.931 12 .58 9 12.589 1 4.085 14 .4 28 14.87 3 15.421

    Capital Inves tments 1.017 1.288 0.076 1.056 1.454 0.000 0.500 0.984 0.984 0.984 0.984

    Debt Service and Obligations 0.759 0.797 0.566 0.604 0.513 0.815 0.815 0.815 1.464 1.176 1.104 1.101

    Non-Salary changes 0.165 0.040 0.050 0.050 0.050

    Change in debt payments 0.649 -0.288 -0.072 0.003 0.001

    Salary and benefit changes 0.681 0.591 0.467 0.495 0.408

    Annual Total 11.652 13 .768 13.983 12.800 13 .442 14.200 13 .404 15.400 16.876 17.033 17 .510 17.965

    BASEGROWTH RATES:

    TOTAL % Change from Prior Yr 0.1% 18.2% 1.6% -8.5% 5.0% 5.6% -5.6% 14.9% 25.9% 10.6% 13.7% 6.5% 7.33%

    Measure D Capital Contributions

    Measure D: Road Maintenance 0.300 0.284

    Measure D: Capital Improvements 0.458 0.200

    Non-Salary Cos t

    Fire Contract 0.854 1.768 0.035 0.040 0.050 0.050 0.050

    Ambulance 0.462 0.421 0.080

    SCC Contract 0.680 0.650 0.750 0.600 0.050

    Debt Service and Obligations

    Debt Service 0.513 0.513 0.513

    Pension Obligation Bonds 0.703 (0.004) (0.001) 0.003 0.001

    Lease Payments 0.302 0.302 (0.053) (0.284) (0.071)

    Salary & Benefit changes

    Salaries 0.434 0.254 (0.189) 0.444 (0.070) 0.090 (0.381) 0.553 0.391 0.264 0.277 0.175

    Health 0.153 0.048 0.001 0.025 0.032 0.018 (0.018) 0.132 0.081 0.089 0.098 0.108

    Retirement 0.102 0.083 (0.042) 0.131 0.000 0.042 (0.084) (0.091) 0.063 0.056 0.058 0.061

    Other (0.684) 0.536 0.331 (0.436) 0.082 0.151 (0.327) 0.087 0.056 0.059 0.061 0.064

    Total Annual GFC Increase 0.01 2.12 0.22 -1.18 0.64 0.76 -0.80 2.00 3.47 1.63 2.11 1.09

    Total Cumulative $ Change fromFY 06-07 Actual 2.12 2.33 1.15 1.79 2.55 1.75 3.75 5.22 5.38 5.86 6.31

    FIVE-YEAR FY 2012-13 thr ough 17-18 General Fund Expendit ures

    Gray information is included as part of thebasebudget abovebut areherefor historical detail

    10

  • 7/29/2019 Special City Council Meeting Agenda Packet 03-19-13

    11/115

    Total General Fund discretionary revenue is appropriated in three broad ways. First, in Fiscal Year 2012-

    13 the base budget for General Fund departments totals $12.6 million. Second, the budget would

    earmark funding for capital investment including deferred maintenance and a designation for future

    capital projects. However, the Fiscal Year 2011-12 budget did not allocate any discretionary revenue to

    capital improvement but instead invested in capital expenditures utilizing fund balance and earmarked

    revenues. Third, the remaining $815,000 is appropriated for debt service obligations.

    The Five-Year Expenditure Projections table includes both actual and projected numbers. The actual

    numbers, including those in the Adopted Fiscal Year 2012-13 Budget, are to the left of the vertical

    double line while forecast projections are to the right of the vertical double line. The top portion of the

    table includes aggregate numbers of the three uses of General Fund revenue. The details of that

    spending are at the bottom portion of the table. The numbers in the grey box are presented only for

    historical comparison and are part of the aggregate numbers in the top section of the table.

    Non-Salary

    Non-salary cost increases include shifts in the Citys use of funding to maintaining the Fire Departments

    level of service by entering into a contract agreement with the City of Monterey and to maintain the

    Citys fire-ambulance service by assuming responsibility for the function following the dissolution of the

    Carmel Regional Fire Ambulance Authority. The other non-salary cost increase projected in the forecast

    is to allocate funding on an ongoing basis to Sunset Center Inc. related to operating the Sunset Cultural

    Center.

    Debt Service

    Debt service payments are anticipated to slightly during the forecast period as vehicle lease payments

    end. The forecast projects a revised strategy for funding vehicle purchases moving from lease purchaseof vehicles back to a vehicle replacement purchase program. The forecast includes the increase in debt

    service related to the refinancing of the side fund obligation. The debt service for the pension obligation

    bond is approximately $700,000 annually, the certificate of participation payment for the Sunset Center

    improvements is $513,000 annually.

    Salary and Benefits

    The salary and benefit increases include anticipated personnel related expenditures. They are

    determined based on negotiated Memoranda of Understanding (MOUs), health insurance; retirement

    benefit cost projections, and mandated costs such as workers compensation and Social Security

    contributions. The assumptions behind these increases include: 1) certain net increase in FTE to enhanceservices in accordance with the Service Level Sustainability Plan and consistent with Measure D funding,

    2) no enhancements of health or retirement benefits, and 3) costs associated with salaries to remain

    relatively flat but with flexibility in the forecast for the City Council to act on a revision of the salary plan.

    11

  • 7/29/2019 Special City Council Meeting Agenda Packet 03-19-13

    12/115

    Employee health insurance costs have been rising at an average a rate of 2% over the past five years

    even with staffing reductions. The forecast projects health insurance costs will increase on an annual

    average rate of 10% as the City continues to implement cost avoidance and management strategies.

    The average annual increases in CalPERS retirement rates have been 7.31% since Fiscal Year 2005-06.

    The investment losses during Fiscal Year 2008-09 have a significant impact on the Fiscal Year 2012-13retirement rate paid by the City. Smoothing formulas enable the rates to increase more modestly in

    future years (5.25% average annual increases). The ameliorative measures already taken by the City

    Council provide downward pressure on the future growth rate. However, CalPERS has adopted a lower

    assumption rate which will cause rates to increase in Fiscal Year 2013-14. The side fund payment is no

    longer included in the retirement rate paid to CalPERS resulting in an annual decrease of over 10% in

    Fiscal Year 2013-14 compared to the prior fiscal year.

    Other salary and benefit costs include all personnel costs other than salaries, health insurance, and

    retirement rates. Medicare, workers compensation, life, and unemployment insurance premiums, and

    other MOU obligations are included in this category. The average annual growth rate has been 4.09%

    for the past six years. The total cost of these is approximately $1.3 million annually and the assumed

    growth rate is 4.5% annually.

    12

  • 7/29/2019 Special City Council Meeting Agenda Packet 03-19-13

    13/115

    FIVE YEAR 2013-2018

    FINANCIAL FORECAST

    3/19/2013

    Issued by the

    City Administrator

    13

  • 7/29/2019 Special City Council Meeting Agenda Packet 03-19-13

    14/115

    erview

    ecast

    Introduction

    The report includes five-year projections ofCity revenue and expenditures

    Designed to provide intermediate termfinancial information for the City Council

    In general, the forecast demonstrates the fiscacondition of the City can remain balanced

    The forecast anticipates increasingexpenditures to maintain or enhance levels ofservice and meet the requirements of safelyand cost effectively maintaining existingcommunity assets and infrastructure.

    erview

    14

  • 7/29/2019 Special City Council Meeting Agenda Packet 03-19-13

    15/115

    erview

    ecast

    Introduction

    The forecast is a tool to provide the City

    Council a context for decision making Helps to inform the public about expected

    service levels from the City

    Provides an overview of the Citys financial

    condition and integration of its various

    elements

    erview

    15

  • 7/29/2019 Special City Council Meeting Agenda Packet 03-19-13

    16/115

    erview

    ecast

    Summary of forecast

    Revenue are projected to keep pace with

    anticipated expenditures Increases in levels of service are consistent wit

    the Service Level Sustainability Plan

    The five-year forecast shows a steady balance

    between revenues and expenditures.

    ecast16

  • 7/29/2019 Special City Council Meeting Agenda Packet 03-19-13

    17/115

    17

  • 7/29/2019 Special City Council Meeting Agenda Packet 03-19-13

    18/115

    erview

    ecast

    Revenues

    Revenue is projected to have modest growth

    during the forecast period

    Big 3:

    Property tax average projected growth 1.95%

    TOT average projected growth 3.3%

    Sales tax average projected growth 3.59%

    Average revenue growth $480,000 annually

    ecast18

  • 7/29/2019 Special City Council Meeting Agenda Packet 03-19-13

    19/115

    erview

    ecast

    YEAR FY 2012-13 through FY 2017-18 DISCRETIONARY REVENUE PROJECTIONS

    ns of dollars

    Revenue Source

    (Dollars in Millions)

    FY06-07

    Act ual

    FY07-08

    Act ual

    FY08-09

    Act ual

    FY09-10

    Act ual

    FY10-11

    Act ual

    FY 11-12

    Act ual

    FY 12-13

    Budget

    FY 12-13

    Estimate

    FY 13-14

    Projected

    FY 14-15

    Projected

    FY 15-16

    Projected

    FY 16-17

    Projected

    y Tax $3.726 $3.867 $4.066 $4.189 $4.158 $4.265 $4.347 $4.510 $4.623 $4.715 $4.786 4.870

    nt Occupancy Tax 4.209 4.395 3.787 3.799 4.003 4.178 4.463 4.560 4.742 4.885 5.056 5.207

    Tax 2.143 2.340 2.181 1.620 1.806 1.723 2.051 2.051 2.113 2.213 2.308 2.377

    re D 0.490 2.113 2.213 2.308 2.377

    ss License Tax 0.333 0.627 0.609 0.551 0.526 0.514 0.500 0.492 0.497 0.507 0.517 0.533

    nd Permits 0.488 0.492 0.369 0.448 0.391 0.451 0.431 0.422 0.435 0.446 0.458 0.471

    , Rents, P arking Lots 0.694 0.633 0.386 0.250 0.235 0.237 0.229 0.229 0.231 0.234 0.237 0.241

    se Fees 0.466 0.426 0.467 0.453 0.477 0.407 0.513 0.513 0.523 0.534 0.544 0.555

    vernmental 0.376 0.369 0.382 0.387 0.459 0.369 0.072 0.378 0.386 0.393 0.401 0.409

    Revenue & Sources 1.121 0.472 0.461 0.607 1.637 0.744 0.798 0.551 0.551 0.568 0.590 0.617

    13.556 13.621 12.708 12.304 13.692 12.887 13.404 14.196 16.213 16.707 17.205 17.657

    Change Per Year $1.319 $0.065 -$0.913 -$0.404 $1.388 -$0.805 $0.517 $1.309 $2.017 $0.494 $0.499 $0.452

    H RATES:

    y Tax 11.36 3.78 5.15 3.03 -0.74 2.56 1.93 5.75 2.50 2.00 1.50 1.75

    nt Occupancy Tax 8.51 4.42 -13.83 0.32 5.37 4.36 6.83 9.15 4.00 3.00 3.50 3.00

    Tax -1.20 9.19 -6.79 -25.72 11.48 -4.61 19.06 19.06 3.00 4.75 4.30 3.00

    re D 3.00 4.75 4.30 3.00

    ss License Tax -19.95 88.29 -2.87 -9.52 -4.54 -2.21 -2.79 -4.35 1.00 2.00 2.00 3.00

    nd Permits -11.75 0.82 -25.00 21.41 -12.72 15.24 -4.35 -6.35 3.00 2.60 2.75 2.75

    , Rents, P arking Lots 38.25 -8.79 -39.02 -35.23 -6.00 0.80 -3.33 -3.33 1.00 1.00 1.25 2.00

    se Fees 17.09 -8.58 9.62 -3.00 5.30 -14.77 26.18 26.18 2.00 2.00 2.00 2.00

    vernmental -8.96 -1.86 3.52 1.31 18.60 -19.62 -80.49 2.45 2.00 2.00 2.00 2.00

    Revenue & Sources 99.82 -57.89 -2.33 31.67 169.69 -54.53 7.21 -25.97 0.00 3.00 4.00 4.50

    % Change from Prior Yr 10.78 0.48 -6.70 -3.18 11.28 -5.88 4.01 10.16 14.21 3.04 2.98 5.69

    19

  • 7/29/2019 Special City Council Meeting Agenda Packet 03-19-13

    20/115

    erview

    ecast

    Expenditures

    Debt service is anticipated to be $1.4 million

    annually decreasing to $1.1 million Sunset Center COP $513,000

    POB $700,000Vehicle leases decreasing to $0 from $302,000

    Measure D funding allocated to:

    Road maintenance: $584,000 Capital improvements: $458,000

    Service level enhancements: $407,000

    Refinancing the Side Fund debt: $700,000

    ecast20

  • 7/29/2019 Special City Council Meeting Agenda Packet 03-19-13

    21/115

    erview

    ecast21

  • 7/29/2019 Special City Council Meeting Agenda Packet 03-19-13

    22/11522

  • 7/29/2019 Special City Council Meeting Agenda Packet 03-19-13

    23/115

    City of Carmel-by-the-Sea

    Five Year Capital Improvement Plan

    July 1, 2013 June 30, 2018

    March 19, 2013

    23

    http://www.google.com/imgres?q=carmel+by+the+sea&hl=en&sa=X&rlz=1W1ADFA_enUS441&biw=1280&bih=849&tbm=isch&tbnid=CiVqTofGUP22UM:&imgrefurl=http://www.travelblog.org/North-America/United-States/California/Carmel-By-The-Sea/blog-565944.html&docid=dT9fyaBKsz44gM&imgurl=http://photos.travelblog.org/Photos/136349/565944/t/5842550-Carmel_by_the_Sea-0.jpg&w=300&h=200&ei=FkE-UYzBGaqqyAHMzYGQCQ&zoom=1&ved=1t:3588,r:96,s:0,i:445&iact=rc&dur=2230&page=5&tbnh=160&tbnw=236&start=89&ndsp=24&tx=164&ty=91
  • 7/29/2019 Special City Council Meeting Agenda Packet 03-19-13

    24/115

    Table of Contents

    Capital Budget Transmittal and Summary .................................................................................................. 1

    Summary of Projects by Department.......................................................................................................... 4

    Summary of Projects by Funding Source ..................................................................................................... 7

    Project Detail

    Administrative Services ........................................................................................................................... 10

    Software Upgrade ......................................................................................................................................... 10

    Voice over IP Telephone System ................................................................................................................... 11

    Website Update ............................................................................................................................................ 12

    Financial System Upgrades Cloud-based .................................................................................................... 13

    Legislative Management Suite ...................................................................................................................... 14

    Cloud-Based Human Resources/Payroll System ........................................................................................... 15

    Network Equipment ...................................................................................................................................... 16

    Network Spare Equipment ............................................................................................................................ 17

    Community Planning and Building .......................................................................................................... 18

    Energy Efficient Vehicle ................................................................................................................................. 18

    Permit Tracking software .............................................................................................................................. 19

    Del Mar Master Plan ..................................................................................................................................... 20

    Water Conservation Projects ........................................................................................................................ 21

    Library ..................................................................................................................................................... 22

    Park Branch Library carpeting ....................................................................................................................... 22

    Art Appraisal .................................................................................................................................................. 23

    Park Branch Library Painting - Interior .......................................................................................................... 24

    Park Branch Library Book Return .................................................................................................................. 25

    Park Branch Basement Restoration ............................................................................................................... 26

    Public Safety: Ambulance ....................................................................................................................... 27

    Ambulance Lease Purchase ........................................................................................................................... 27

    Replace Ambulance Vehicle .......................................................................................................................... 28

    Diesel Filter System ....................................................................................................................................... 29

    Self Contained Breathing Apparatus ............................................................................................................. 30

    Hydraulic Stretcher ........................................................................................................................................ 31

    Physio Control LifePak Cardiac Monitor/Defib .............................................................................................. 32

    24

  • 7/29/2019 Special City Council Meeting Agenda Packet 03-19-13

    25/115

    Public Safety: Fire ................................................................................................................................... 33

    Fire Engine 09/10 .......................................................................................................................................... 33

    Diesel Filter System ....................................................................................................................................... 34

    Self Contained Breathing Apparatus ............................................................................................................. 35

    Public Safety: Police ............................................................................................................................... 36

    Parking Vehicle Lease Purchase .................................................................................................................... 36

    Parking Scooter ............................................................................................................................................. 37

    Patrol Vehicles ............................................................................................................................................... 38

    GPS & License Plate recognition .................................................................................................................... 39

    Parking Management Study .......................................................................................................................... 40

    Kenwood Radio Purchase & Encryption ........................................................................................................ 41

    Public Services: Public Works .................................................................................................................. 42

    ASBS Dry Weather Diversion ......................................................................................................................... 42

    Street Sweeper Lease .................................................................................................................................... 43

    Street and Road Projects ............................................................................................................................... 44

    Paint/Sign Truck ............................................................................................................................................ 45

    Gardener Trucks ............................................................................................................................................ 46

    Dump Truck ................................................................................................................................................... 47

    Water Truck ................................................................................................................................................... 48

    Guadalupe to 5th Storm Drain ...................................................................................................................... 49

    Santa Fe & 4th Storm Drain ........................................................................................................................... 50

    Caterpillar Loader Lease Purchase ................................................................................................................ 51

    Bikeway Projects ........................................................................................................................................... 52

    Public Services: Facilities ......................................................................................................................... 53

    PD/PW Roof/Patio Replacement ................................................................................................................... 53

    PD/PW Re-Painting ........................................................................................................................................ 54

    PW Garage Roll-Up Door Replacement ......................................................................................................... 55

    PD HVAC Replacement and Re-Roof ............................................................................................................. 56

    Sunset Center Wood Patio Stage Replacement ............................................................................................ 57

    Sunset Center Bach Offices Building Re-Roof ................................................................................................ 58

    Sunset Center Planter Re-construction ......................................................................................................... 59

    Sunset Center Re-painting ............................................................................................................................. 60

    Harrison Memorial Library Re-painting Project ............................................................................................ 61

    Card Key Security System .............................................................................................................................. 62

    25

  • 7/29/2019 Special City Council Meeting Agenda Packet 03-19-13

    26/115

    Forest Theater Renovation ............................................................................................................................ 63

    City Hall Renovations..................................................................................................................................... 64

    Scout House Renovations .............................................................................................................................. 65

    Sunset Center Railing Replacement .............................................................................................................. 66

    Sunset Center Door Replacement ................................................................................................................. 67

    Public Services: Forest, Parks and Beach ................................................................................................ 68

    Tennis Court renovation ................................................................................................................................ 68

    F650/chipper ................................................................................................................................................. 69

    Beach stair maintenance ............................................................................................................................... 70

    Mission Trail Park water tank ........................................................................................................................ 71

    Beach fire baskets ......................................................................................................................................... 72

    Rio Park Improvements ................................................................................................................................. 73

    Scenic Rd. Restrooms .................................................................................................................................... 74

    Replace Forester Truck .................................................................................................................................. 75

    Waterfront Area Signs ................................................................................................................................... 76

    4th

    Avenue Irrigation Meter ........................................................................................................................... 77

    Dunes Habitat Restoration ............................................................................................................................ 78

    City Hall Cistern ............................................................................................................................................. 79

    Shoreline Assessment and Implementation .................................................................................................. 80

    Mission Trail Entrance ................................................................................................................................... 81

    Trash Can Refurbishment and Replacement ................................................................................................. 82

    26

  • 7/29/2019 Special City Council Meeting Agenda Packet 03-19-13

    27/115

    Honorable Mayor and Councilmembers:

    I am pleased to present the recommended Fiscal Year 2013-14 Capital Improvement Plan (CIP) for the

    City of Carmel-by-the-Sea for the period of July 1, 2013 through June 30, 2018. The CIP is a budgeting

    and strategic planning tool intended to address the Citys capital needs for a rolling five year period. This

    five-year program displays a continued shift in the types of projects funded, from building new facilitiesto rehabilitation, deferred maintenance, and replacement of existing capital items. The underlying

    strategy of the CIP is to plan for necessary land acquisition, construction and maintenance of public

    facilities necessary for the safe and efficient provision of public services in accordance with City policies

    and objectives adopted in the Citys General Plan.

    The City of Carmel-by-the-Sea's 5-Year Capital Improvement Program is a multi-year planning

    instrument for the construction of new and expansion, rehabilitation, or replacement of existing City

    owned assets. It provides a planned systematic approach to utilizing the Citys financial resources in the

    most responsive and efficient manner to meet its service and facility needs. The CIP includes estimates

    of all capital needs, and as such, provides the basis for setting priorities, reviewing schedules, developing

    funding policy for proposed improvements, monitoring and evaluating the progress of capital projects,

    and informing the public of projected capital improvements and unfunded needs. The CIP does not

    appropriate funds; rather, it serves as a budgeting tool, proposing Capital Budget appropriations to be

    recommended for adoption within the Citys fiscal year 2013-2014 Operating Plan and Budget.

    A Capital Improvement Plan is a guide toward the efficient and effective provision of public

    infrastructure and facilities. Programming capital facilities and improvements over time can promote

    better use of the Citys limited financial resources, reduce costs and assist in the coordination of public

    and private development. In addition, the planning process is valuable as a means of coordinating and

    taking advantage of joint planning and development of facilities and infrastructure where possible.

    Careful management of these assets keeps the City poised for flexible and responsive strategic planning

    that allows the City to proactively prepare the groundwork for capital projects so when funding

    opportunities arise, a plan is ready to be implemented. By looking beyond year-to-year budgeting and

    projecting what, where, when and how capital investments should be made, capital planning enables

    public organizations to maintain an effective level of service for the present and future population.

    While the program serves as the long range plan, it is reviewed and revised annually in conjunction with

    the budget. Priorities may be changed due to funding opportunities or circumstances that cause a more

    rapid deterioration of an asset.

    The CIP identifies 73 projects for the five-year period. The CIP identifies new facility construction,

    facility refurbishment, and infrastructure projects, and their respective funding sources, if any, to createa sound planning document. The program includes the design, construction, and major rehabilitation of

    capital improvements that have a long-term life span, and cost more than $10,000. With these projects,

    the City Council would be investing approximately $10.2 million over the next five years. This major

    investment in the Citys infrastructure represents a significant commitment to our communitys future

    and is made possible in great part from the communitys support of Measure D. Measure D revenue is

    planned to be a source of funding for 22 projects totaling nearly $4.2 million.

    27

  • 7/29/2019 Special City Council Meeting Agenda Packet 03-19-13

    28/115

    The CIP is primarily a planning document to assist in the Citys long-term planning. As such, is the

    projects and their scopes are subject to change from year to year as the needs of the community

    become more defined and projects move closer to final implementation. The adoption of the CIP is

    neither a commitment to a particular project nor a limitation to a particular cost. As a basic tool for

    scheduling anticipated capital projects, it is also a key element in planning and controlling future capital

    financing. For this reason, the CIP includes some unfunded projects in which needs have been

    identified, but specific solutions and funding have not been determined. When adopted, the CIP

    provides the framework for the Citys management team and the City Council with respect to

    investment planning, project planning and managing any debt.

    The 5-Year Capital Improvement Program for Fiscal Year 2013-2014 through 2017-2018 includes various

    projects for the benefit of the citizens of Carmel-by-the-Sea. Each of the projects meets some or all of

    the following criteria:

    Elimination of potentially hazardous or unsafe conditions and potential liabilities

    Replacement of high maintenance and inefficient/ineffective infrastructure Improvement to and/or creation of new services to the Public Outside agency regulatory requirements and mandates Stimulation of the local economy/eliminate blighted conditions Compliance with the City of Carmel-by-the-Sea General Plan Preservation of existing assets

    Each project is prioritized in accordance with the following priority label categories.

    Priority 1: The project is urgent and/or mandated, and must be completed quickly. The City could face

    severe consequences if the project is delayed, possibly impacting the health, safety, or welfare of the

    community, or having a significant impact on the financial well being of the City. The project must be

    initiated or financial/opportunity losses will result.

    Priority 2: The project is very important and addressing it is necessary. The project impacts safety, law

    enforcement, health, welfare, economic base, and/or quality of life in the community.

    Priority 3: The project is important and would enhance the quality of life and would provide a benefit to

    the community.

    Priority 4: The timing of the project is less important but completion of the project would improve the

    community providing cultural, recreational, and/or aesthetic effects.

    Priority 5: The project would be an improvement to the community, but need not be completed within a

    five-year CIP.

    The CIP includes a comprehensive listing of all projects contained in the Five-Year CIP and also projects

    beyond the Five-Year Period. Detailed project sheets are contained in the plan for all projects included in

    the CIP. Cost estimates have been developed for each project based on preliminary project descriptions,

    and include all estimated costs for land acquisition, permits and inspections, project management and

    28

  • 7/29/2019 Special City Council Meeting Agenda Packet 03-19-13

    29/115

    project engineering, consultant design, construction, utilities, information technology infrastructure and

    other associated project fees. Estimates are in todays dollars, and the future year projections have been

    adjusted for inflation.

    The operating budget impact of proposed capital projects, including personnel, operating expenditures,

    capital outlay, and debt service, as applicable, are identified on the project detail sheets and consideredin preparing the annual operating budget and Five-Year Financial Model.

    Ten projects were completed in Fiscal Year 2012-2013. These include:

    Citywide street and road resurfacing; Purchase of a Public Works Superintendent vehicle; Final payment of a lease purchase for the Fires utility vehicle; Purchase of a new copier for City Hall; Repair of the Public Works office flooring Resurfacing of the police station parking lot; Replacement of the Del Mar water storage tank; Fire station alerting system (pending); Police patrol vehicle purchases and audio/video equipment interface; Completion of the renovation of the City Hall garden;

    The schedule for Capital Improvement Projects is based on available funding, public benefit, and funding

    restrictions. This Five-Year Capital Improvement Plan (CIP) is submitted to the City Council to utilize in

    reviewing and prioritizing capital projects.

    Respectfully submitted,

    Jason Stilwell

    City Administrator

    29

  • 7/29/2019 Special City Council Meeting Agenda Packet 03-19-13

    30/115

    FY 2013-2014 Projects

    City of Carmel-by-the-Sea, CA

    PROJECTS BY DEPARTMENT

    '13/'14 '17/'18thru

    Total'13/'14 '14/'15 '15/'16 '16/'17 '17/'18Department Project# Priority

    Administrative Services

    ASD-1112-01 25,00025,000Windows Software Upgrade 4

    ASD-1213-03 54,00054,000Voice over IP Telephone System 2

    ASD-1213-04 70,00035,000 35,000Website Update 2

    ASD-1314-01 96,50052,100 11,100 11,100 11,100 11,100Financial System Upgrades - Cloud-based 1

    ASD-1314-02 63,49026,050 9,360 9,360 9,360 9,360Legislative Management Suite - Paperless Agenda 1

    ASD-1314-03 87,50017,500 17,500 17,500 17,500 17,500Cloud-Based Human Resources/Payroll System 1

    ASD-1314-04 25,5006,500 6,000 6,500 0 6,500Network Equipment 2

    ASD-1314-05 15,00010,000 5,000Network Spare/Replacement Equipment 2

    436,990147,150 97,960 69,460 37,960 84,460Administrative Services Total

    Community Planning & Bldg

    CPB-1112-02 25,00025,000Energy Efficient Vehicle 4

    CPB-1112-03 20,00020,000Permit Tracking software 2

    CPB-1213-02 25,00025,000Del Mar Master Plan - Phase II 5

    CPB-1314-01 30,00010,000 10,000 10,000Water Conservation Projects 5

    100,00030,000 35,000 35,000Community Planning & Bldg Total

    Library

    LIB-1112-01 43,00043,000Park Branch Library carpeting 4

    LIB-1213-01 18,00018,000Art Appraisal 3

    LIB-1213-03 18,00018,000Park Branch Library Painting - Interior 4

    LIB-1314-01 7,5007,500Park Branch Library Book Return 3

    LIB-1314-02 2,025,00010,000 2,015,000Park Branch Basement Restoration 1

    2,111,50035,500 2,015,000 61,000Library Total

    Safety: Ambulance

    AMB-1112-01 32,26132,261Ambulance Lease Purchase 1

    AMB-1213-01 150,000150,000Replace Ambulance Vehicle 5

    AMB-1213-03 8,0008,000Diesel Filter System 2

    AMB-1213-04 12,00012,000Self Contained Breathing Apparatus 1

    AMB-1314-01 17,14217,142Hydraulic Stretcher 2

    AMB-1314-02 28,01728,017Physio Control LifePak Cardiac Monitor/Defib 1

    247,42097,420 150,000Safety: Ambulance Total

    Safety: Fire

    FIRE-1112-03 211,65670,552 70,552 70,552Fire Engine Lease Purchase (09/10) 1

    FIRE-1213-01 12,50012,500Diesel Filter System 2

    FIRE-1213-04 18,00018,000Self Contained Breathing Apparatus 1

    242,156101,052 70,552 70,552Safety: Fire Total

    Safety: Police

    Page 430

  • 7/29/2019 Special City Council Meeting Agenda Packet 03-19-13

    31/115

    Total'13/'14 '14/'15 '15/'16 '16/'17 '17/'18Department Project# Priority

    POL-1213-01 11,32511,325Parking Vehicle lease purchase 2

    POL-1314-01 40,1840 40,184Parking Scooter 2

    POL-1314-02 364,00080,000 61,000 93,000 130,000Patrol Vehicles 2

    POL-1314-03 104,176104,176GPS & License Plate Recognition 4

    POL-1314-04 750,00050,000 700,000Parking Management Study 2

    POL-1314-05 104,000104,000Kenwood Radio Purchase & Encryption 1

    1,373,685165,325 820,184 61,000 197,176 130,000Safety: Police Total

    Services: Public Works

    CPB-1213-03 155,000155,000ASBS Dry Weather Diversion 1

    PW-1112-003 47,95447,954Street Sweeper Lease Purchase 2

    PW-1112-01 3,170,100634,100 634,000 634,000 634,000 634,000Street and Road Projects 1

    PW-1213-02 95,00095,000Paint/Sign Truck 1

    PW-1213-04 70,00035,000 35,000Gardener Trucks 3

    PW-1213-05 90,00090,000Dump Truck 3

    PW-1213-06 80,00080,000Water Truck 3

    PW-1213-07 300,000300,000Guadalupe to 5th Storm Drain 1

    PW-1213-08 300,000300,000Santa Fe & 4th Storm Drain 1

    PW-1213-09 44,52044,520Caterpillar Loader Lease Purchase 2

    PW-1314-01 700,000140,000 140,000 140,000 140,000 140,000Bikeway Projects 3

    5,052,5741,416,574 889,000 809,000 864,000 1,074,000Services: Public Works Total

    Services: Facilities

    FAC-1213-01 1,075,00075,000 1,000,000PD/PW Roof/Patio Replacement 1

    FAC-1213-02 27,00027,000PD/PW Re-Painting 5

    FAC-1213-03 10,00010,000PW Garage Roll-Up Door Replacement 3

    FAC-1213-04 400,00050,000 350,000PD HVAC Replacement and Re-Roof 1

    FAC-1213-08 10,00010,000Sunset Center Wood Patio Stage Replacement 3

    FAC-1213-09 25,00025,000Sunset Center Bach Offices Building Re-Roof 4

    FAC-1213-10 27,00027,000Sunset Center Planter Re-construction 2

    FAC-1213-14 25,00025,000Sunset Center Re-painting 3

    FAC-1213-16 28,00028,000Harrison Memorial Library Re-painting Project 3

    FAC-1213-20 25,00025,000Card Key Security System 5

    FAC-1213-21 1,150,000200,000 950,000Forest Theater Renovation 1

    FAC-1314-01 30,00030,000City Hall Renovations 3

    FAC-1314-02 400,00050,000 350,000Scout House Renovations 3

    FAC-1314-03 15,00015,000Sunset Center Railing Replacement 1

    FAC-1314-04 35,00035,000Sunset Center Door Replacement 3

    3,282,000330, 000 1,137 ,000 45 2,0 00 1, 363 ,000Services: Facilities Total

    Srvs: Forest, Parks, & Beach

    FPB-1112-03 55,00055,000Tennis Court Renovation 1

    FPB-1112-04 68,00068,000F650/chipper 3

    FPB-1213-01 120,00024,000 24,000 24,000 24,000 24,000Beach Stair Maintenance 1

    FPB-1213-02 35,00035,000Mission Trail Park Water Tank 3

    FPB-1213-04 23,0007,500 7,500 8,000Beach Fire Baskets 3

    FPB-1213-05 100,000100,000Rio Park Improvements 4

    FPB-1213-06 275,000275,000Scenic Rd. Restrooms 3

    FPB-1213-07 35,00035,000Replace Forester Truck 3

    FPB-1213-08 32,00032,000Waterfront Area Signs 3

    FPB-1314-01 20,00020,0004th Avenue Irrigation Meter 3

    FPB-1314-02 91,50024,500 16,000 16,000 16,000 19,000Dunes Habitat Restoration 3

    FPB-1314-03 25,00025,000City Hall Cistern 3

    FPB-1314-04 70,00020,000 15,000 15,000 10,000 10,000Shoreline Assessment and Implementation 2

    Page 531

  • 7/29/2019 Special City Council Meeting Agenda Packet 03-19-13

    32/115

    Total'13/'14 '14/'15 '15/'16 '16/'17 '17/'18Department Project# Priority

    FPB-1314-05 48,00048,000Mission Trail Entrance 2

    FPB-1314-06 30,00015,000 15,000Trash Can Refurbishment and Replacement n/a

    1,027,500606,500 177,500 132,500 58,000 53,000Srvs: Forest, Parks, & Beach Total

    GRAND TOTAL 13,873,8252,929,521 5,242,196 1,690,512 2,520,136 1,491,460

    Page 632

  • 7/29/2019 Special City Council Meeting Agenda Packet 03-19-13

    33/115

    FY 2013-2014 Projects

    City of Carmel-by-the-Sea, CA

    PROJECTS BY FUNDING SOURCE

    '13/'14 '17/'18thru

    TotalSource Project# Priority '13/'14 '14/'15 '15/'16 '16/'17 '17/'18

    Donor Opportunity

    FAC-1213-21 475,000475,000Forest Theater Renovation 1

    FAC-1314-02 175,000175,000Scout House Renovations 3

    FPB-1213-04 30,00010,000 10,000 10,000Beach Fire Baskets 3

    FPB-1213-06 175,000175,000Scenic Rd. Restrooms 3

    LIB-1314-01 7,5007,500Park Branch Library Book Return 3

    862,500182,500 10,000 10,000 660,000Donor Opportunity Total

    GF: Capital Improvements

    AMB-1112-01 32,26132,261Ambulance Lease Purchase 1

    AMB-1213-01 150,000150,000Replace Ambulance Vehicle 5

    AMB-1213-03 8,0008,000Diesel Filter System 2

    AMB-1314-01 17,14217,142Hydraulic Stretcher 2

    AMB-1314-02 28,01728,017Physio Control LifePak Cardiac Monitor/Defib 1

    ASD-1112-01 25,00025,000Windows Software Upgrade 4

    ASD-1213-03 54,00054,000Voice over IP Telephone System 2

    ASD-1314-01 96,50052,100 11,100 11,100 11,100 11,100Financial System Upgrades - Cloud-based 1

    ASD-1314-03 87,50017,500 17,500 17,500 17,500 17,500Cloud-Based Human Resources/Payroll System 1

    ASD-1314-04 25,5006,500 6,000 6,500 0 6,500Network Equipment 2

    ASD-1314-05 15,00010,000 5,000Network Spare/Replacement Equipment 2

    CPB-1213-03 35,00035,000ASBS Dry Weather Diversion 1

    FAC-1213-02 27,00027,000PD/PW Re-Painting 5FAC-1213-03 10,00010,000PW Garage Roll-Up Door Replacement 3

    FAC-1213-04 50,00050,000PD HVAC Replacement and Re-Roof 1

    FAC-1213-08 10,00010,000Sunset Center Wood Patio Stage Replacement 3

    FAC-1213-09 25,00025,000Sunset Center Bach Offices Building Re-Roof 4

    FAC-1213-10 27,00027,000Sunset Center Planter Re-construction 2

    FAC-1213-14 25,00025,000Sunset Center Re-painting 3

    FAC-1213-16 28,00028,000Harrison Memorial Library Re-painting Project 3

    FAC-1213-20 25,00025,000Card Key Security System 5

    FAC-1314-04 35,00035,000Sunset Center Door Replacement 3

    FIRE-1112-03 211,65670,552 70,552 70,552Fire Engine Lease Purchase (09/10) 1

    FIRE-1213-01 12,50012,500Diesel Filter System 2

    FPB-1112-04 68,00068,000F650/chipper 3

    FPB-1213-07 30,00030,000Replace Forester Truck 3

    FPB-1314-01 20,00020,0004th Avenue Irrigation Meter 3

    LIB-1213-01 18,00018,000Art Appraisal 3

    LIB-1213-03 18,00018,000Park Branch Library Painting - Interior 4

    LIB-1314-02 10,00010,000Park Branch Basement Restoration 1

    POL-1314-01 40,18440,184Parking Scooter 2

    POL-1314-02 364,00080,000 61,000 93,000 130,000Patrol Vehicles 2

    POL-1314-03 104,176104,176GPS & License Plate Recognition 4

    POL-1314-04 50,00050,000Parking Management Study 2

    PW-1112-003 47,95447,954Street Sweeper Lease Purchase 2

    Page 7

    33

  • 7/29/2019 Special City Council Meeting Agenda Packet 03-19-13

    34/115

    TotalSource Project# Priority '13/'14 '14/'15 '15/'16 '16/'17 '17/'18

    PW-1213-02 95,00095,000Paint/Sign Truck 1

    PW-1213-04 35,00035,000Gardener Trucks 3

    PW-1213-05 90,00090,000Dump Truck 3

    PW-1213-06 80,00080,000Water Truck 3

    PW-1213-07 300,000300,000Guadalupe to 5th Storm Drain 1

    PW-1213-09 44,52044,520Caterpillar Loader Lease Purchase 2

    2,474,910585,046 564,336 326,652 378,776 620,100GF: Capital Improvements Total

    Grants

    AMB-1213-04 12,00012,000Self Contained Breathing Apparatus 1

    CPB-1213-02 25,00025,000Del Mar Master Plan - Phase II 5

    CPB-1314-01 30,00010,000 10,000 10,000Water Conservation Projects 5

    FAC-1213-21 200,000200,000Forest Theater Renovation 1

    FAC-1314-02 175,000175,000Scout House Renovations 3

    FIRE-1213-04 18,00018,000Self Contained Breathing Apparatus 1

    FPB-1213-06 100,000100,000Scenic Rd. Restrooms 3

    FPB-1314-02 67,00016,000 16,000 16,000 19,000Dunes Habitat Restoration 3

    FPB-1314-03 25,00025,000City Hall Cistern 3

    FPB-1314-04 50,00015,000 15,000 10,000 10,000Shoreline Assessment and Implementation 2

    FPB-1314-06 10,0002,500 7,500Trash Can Refurbishment and Replacement n/a

    PW-1314-01 560,000140,000 140,000 140,000 140,000Bikeway Projects 3

    1,272,000367,500 213,500 181,000 341,000 169,000Grants Total

    Intergovernmental

    CPB-1213-03 120,000120,000ASBS Dry Weather Diversion 1

    120,000120,000Intergovernmental Total

    Measure D

    ASD-1213-04 70,00035,000 35,000Website Update 2

    ASD-1314-02 63,49026,050 9,360 9,360 9,360 9,360Legislative Management Suite - Paperless Agenda 1

    CPB-1112-03 20,00020,000Permit Tracking software 2

    FAC-1213-01 575,00075,000 500,000PD/PW Roof/Patio Replacement 1

    FAC-1213-04 350,000350,000PD HVAC Replacement and Re-Roof 1

    FAC-1213-21 475,000475,000Forest Theater Renovation 1

    FAC-1314-01 30,00030,000City Hall Renovations 3

    FAC-1314-03 15,00015,000Sunset Center Railing Replacement 1

    FPB-1112-03 55,00055,000Tennis Court Renovation 1

    FPB-1213-01 120,00024,000 24,000 24,000 24,000 24,000Beach Stair Maintenance 1

    FPB-1213-02 35,00035,000Mission Trail Park Water Tank 3

    FPB-1213-05 100,000100,000Rio Park Improvements 4

    FPB-1213-08 32,00032,000Waterfront Area Signs 3

    FPB-1314-02 24,50024,500Dunes Habitat Restoration 3FPB-1314-04 20,00020,000Shoreline Assessment and Implementation 2

    FPB-1314-05 48,00048,000Mission Trail Entrance 2

    LIB-1112-01 43,00043,000Park Branch Library carpeting 4

    LIB-1314-02 15,00015,000Park Branch Basement Restoration 1

    POL-1314-05 104,000104,000Kenwood Radio Purchase & Encryption 1

    PW-1112-01 1,812,400291,900 307,800 359,700 426,500 426,500Street and Road Projects 1

    PW-1213-04 35,00035,000Gardener Trucks 3

    PW-1314-01 140,000140,000Bikeway Projects 3

    Page 8

    34

  • 7/29/2019 Special City Council Meeting Agenda Packet 03-19-13

    35/115

    TotalSource Project# Priority '13/'14 '14/'15 '15/'16 '16/'17 '17/'18

    4,182,3901,008,450 923,160 821,060 934,860 494,860Measure D Total

    Road Impact Fund

    PW-1112-01 617,700202,200 176,200 124,300 57,500 57,500Street and Road Projects 1

    617,700202,200 176,200 124,300 57,500 57,500Road Impact Fund Total

    Traffic Safety

    PW-1112-01 740,000140,000 150,000 150,000 150,000 150,000Street and Road Projects 1

    740,000140,000 150,000 150,000 150,000 150,000Traffic Safety Total

    Unfunded

    CPB-1112-02 25,00025,000Energy Efficient Vehicle 4

    FAC-1213-01 500,000500,000PD/PW Roof/Patio Replacement 1

    FAC-1314-01 00 0 0City Hall Renovations 3

    FAC-1314-02 50,00050,000Scout House Renovations 3

    FPB-1314-06 35,00012,500 7,500 15,000Trash Can Refurbishment and Replacement n/a

    LIB-1314-02 2,000,0002,000,000Park Branch Basement Restoration 1

    POL-1314-04 700,000700,000Parking Management Study 2

    PW-1213-08 300,000300,000Santa Fe & 4th Storm Drain 1

    3,610,000312,500 3,207,500 90,000 0Unfunded Total

    13,879,5002,918,196 5,244,696 1,703,012 2,522,136 1,491,460GRAND TOTAL

    Page 9

    35

  • 7/29/2019 Special City Council Meeting Agenda Packet 03-19-13

    36/115

    FY 2013-2014 Projects

    City of Carmel-by-the-Sea, CA

    '13/'14 '17/'18thru

    Description

    Software upgrade utilizing technology that will allow the City to keep pace with evolving IT needs.

    Project # ASD-1112-01

    Priority 4 Less Important

    Justification

    The City would become more efficient and cost effective. Due to advancement in software, every 5 years is a proper expenditure.

    Budget Impact/Other

    No change

    Useful Life 5 years

    Project Name Software Upgrade

    Category Equipment: Computers

    Type Equipment

    Contact Admin Srvs Director

    Department Administrative Services

    Total Project Cost: $50,000

    Account #

    Total'13/'14 '14/'15 '15/'16 '16/'17 '17/'18Expenditures

    25,00025,000Equip/Vehicles/Furnishings

    25,000 25,000Total

    Future

    25,000

    Total

    Total'13/'14 '14/'15 '15/'16 '16/'17 '17/'18Funding Sources

    25,00025,000GF: Capital Improvements

    25,000 25,000Total

    Future

    25,000

    Total

    Page 10

    36

  • 7/29/2019 Special City Council Meeting Agenda Packet 03-19-13

    37/115

    FY 2013-2014 Projects

    City of Carmel-by-the-Sea, CA

    '13/'14 '17/'18thru

    Description

    Upgrade present telephone system to incorporate more recent technology to meet the needs of staff and the calling public. Currently researching

    available solutions. Feature set might include conference calling, web conferencing, voicemail transcription, call forwarding, fax service via

    internet, soft phone support (ability to use computer as phone), unified in-box (voice, e-mail, fax), presence management (identifies if callee is

    available and the best means of contacting them (phone, e-mail, IM) and a multitude of reporting options.

    System Requirements: Server, switches for power to the phone set, wiring, phone sets, software.

    Project # ASD-1213-03

    Priority 2 Very Important

    Justification

    Currently, the City's telephone system operates on a legacy centrex system, with switching provided by the "telephone company," the way

    telephone service has been provided for many years. By moving to a VOIP or other computer based solution, the City would be able to "unify"

    its communications (move all communications to computer-based communication) and develop more flexibility in communicating with each

    other and the public.

    The City would eventually save money on telephone service as we would need only a few outside lines rather than the 65 lines we have now.

    The placement of the funds in 2015 budget year is to allow the present Calnet2 contract to expire thus relieving the burden of AT&T penalties

    that are in the contract.

    Budget Impact/Other

    No change.

    Useful Life 8 years

    Project Name Voice over IP Telephone System

    Category Equipment: Computers

    Type Equipment

    Contact Admin Srvs Director

    Department Administrative Services

    Total Project Cost: $54,000

    Account #

    Total'13/'14 '14/'15 '15/'16 '16/'17 '17/'18Expenditures

    54,00054,000Equip/Vehicles/Furnishings

    54,000 54,000Total

    Total'13/'14 '14/'15 '15/'16 '16/'17 '17/'18Funding Sources

    54,00054,000GF: Capital Improvements

    54,000 54,000Total

    Page 11

    37

  • 7/29/2019 Special City Council Meeting Agenda Packet 03-19-13

    38/115

    FY 2013-2014 Projects

    City of Carmel-by-the-Sea, CA

    '13/'14 '17/'18thru

    Description

    Update the present website to the latest technology including social media.

    Project # ASD-1213-04

    Priority 2 Very Important

    Justification

    Provide better service to the world and the citizens of Carmel-by-the-Sea. The present website does not have the latest technology of social

    networking. This addition would make the website more user friendly and would improve emergency preparedness. The website would createan environment that will allow for simpler and cost effective updates

    Budget Impact/Other

    No change.

    Useful Life 5 years

    Project Name Website Update

    Category Equipment: Computers

    Type Equipment

    Contact Admin Srvs Director

    Department Administrative Services

    Total Project Cost: $70,000

    Account #

    Total'13/'14 '14/'15 '15/'16 '16/'17 '17/'18Expenditures

    70,00035,000 35,000Equip/Vehicles/Furnishings

    35,000 35,000 70,000Total

    Total'13/'14 '14/'15 '15/'16 '16/'17 '17/'18Funding Sources

    70,00035,000 35,000Measure D

    35,000 35,000 70,000Total

    Page 12

    38

  • 7/29/2019 Special City Council Meeting Agenda Packet 03-19-13

    39/115

    FY 2013-2014 Projects

    City of Carmel-by-the-Sea, CA

    '13/'14 '17/'18thru

    Description

    Replaces financial software that has been in use by the City for many years. The current software was developed in the 70's, and while it is still

    usable, its functionality is minimal, and doesn't take advantage of most of the technology advances of the last 20 years. The proposed new system

    is a fully integrated, self-serve system that will serve as the backbone for the financial portion of the overall IT infrastructure.

    The new system will be a fully integrated and comprehensive solution designed to address all facets of financial management including general

    ledger, audit trail, reconciliations and electronic transfers, purchasing integration, and permitting processes. The system will fully integrate with

    Human Resources and Payroll, as well as provide on-line documentation, workflow capability and supports e-government capabilities, i.e., more

    accessible, more convenient, more responsive, more cost effective and more geared toward customer satisfaction.

    Project # ASD-1314-01

    Priority 1 Critical

    Justification

    The existing accounting software is no longer being upgraded. The City continues to receive some support but the underlying software code is

    outdated. While it completes tasks that have been historically needed by the City (pays bills, makes deposits, keeps a basic set of books from

    which financial statements can be prepared, etc.), its structure is antiquated and does not provide City staff the ability to "slice and dice" our

    database to facilitate, collect and analyze information to make informed decisions more efficiently.

    A new system would have, among other things (1) the ability to be accessed remotely, (2) the ability to produce many more reports, along with

    the ability to design new reports, as needed, (3) the ability to keep track of City projects more effectively, (4) the ability to internally produce

    GASB 34 compliant financial statements, (5) the ability to integrate a document management system, (6) the ability to integrate with a complete

    Human Resources module with "self-serve" web portal access to City staff, (7) have a purchase order system that requires multi-level approval so

    that budget line items are not exceeded, among many other benefits detailed in the Description portion of this analysis.

    A new financial software system would address organizational performance through a structure that is responsive to meeting internal operational

    needs and objectives and the delivery of high-quality customer service by implementing (1) a rigid purchase order system that is budget-constrained and requires multiple levels of approval authority, (2) a system that can be accessed remotely by staff to assist customers/citizens

    with issues, and (3) a reporting system that would best suit the needs of City leaders and staff by providing information that is more complete

    and more timely than is currently possible.

    Budget Impact/Other

    The subscription model requires the payment of a fee annually to provide service.

    Useful Life 15 years

    Project Name Financial System Upgrades - Cloud-based

    Category Software: Subscriptions

    Type Software or Subscription

    Contact Admin Srvs Director

    Department Administrative Services

    Total Project Cost: $96,500

    Account # 01-99999

    Total'13/'14 '14/'15 '15/'16 '16/'17 '17/'18Expenditures

    96,50052,100 11,100 11,100 11,100 11,100Computer Software/Hardware

    52,100 11,100 11,100 11,100 11,100 96,500Total

    Total'13/'14 '14/'15 '15/'16 '16/'17 '17/'18Funding Sources

    96,50052,100 11,100 11,100 11,100 11,100GF: Capital Improvements

    52,100 11,100 11,100 11,100 11,100 96,500Total

    Page 13

    39

  • 7/29/2019 Special City Council Meeting Agenda Packet 03-19-13

    40/115

    FY 2013-2014 Projects

    City of Carmel-by-the-Sea, CA

    '13/'14 '17/'18thru

    Description

    Software that provides transition to automated and paperless agenda process. It streamlines agenda development, automatically notifies

    approvers, connects agenda data to remote devices (tablets, iPads, laptops) for remote access, allows for the collecting and storing of electronic

    documents in one repository (all automatically tagged and indexed), allows for easy tracking of agenda materials and attachments from inception

    through approvals and actions taken, and a much more streamlined approach to public records requests.

    Project # ASD-1314-02

    Priority 1 Critical

    Justification

    The implementation of a legislative management suite to bring automation, workflow management and document management to Council agenda

    arena assists the City become more streamlined and more transparent.

    The City's 2013 adopted objectives of Organizational Effectiveness and Fiscal Stability are both addressed via streamlining processes and

    providing more transparent processes. This type of system assists in streamlining processes by (1) providing remote access, (2) providing the

    ability to make online annotations and approvals of legislative documents, (3) providing automatic tagging and indexing of legislative

    documents, (4) reducing paper consumption, (5) and providing the ability for continuous workflow between Council sessions.

    This type of system would also help with making the City's processes more transparent to the public by providing more automated public records

    access and an easy to use, self serve, online legislative portal for the public.

    Budget Impact/Other

    Increase FY13-14 CIP expenditures by $26,050. and monthly operating expenses by $780. Offsetting these expenditures would be time saved by

    the City Clerk's office in managing legislative agendas, minutes and supporting documents.

    Useful Life 15 years

    Project Name Legislative Management Suite - Paperless Agenda

    Category Software: Subscriptions

    Type Software or Subscription

    Contact Admin Srvs Director

    Department Administrative Services

    Total Project Cost: $63,490

    Account # 01-89585

    Total'13/'14 '14/'15 '15/'16 '16/'17 '17/'18Expenditures

    63,49026,050 9,360 9,360 9,360 9,360Computer Software/Hardware

    26,050 9,360 9,360 9,360 9,360 63,490Total

    Total'13/'14 '14/'15 '15/'16 '16/'17 '17/'18Funding Sources

    63,49026,050 9,360 9,360 9,360 9,360Measure D

    26,050 9,360 9,360 9,360 9,360 63,490Total

    Page 14

    40

  • 7/29/2019 Special City Council Meeting Agenda Packet 03-19-13

    41/115

    FY 2013-2014 Projects

    City of Carmel-by-the-Sea, CA

    '13/'14 '17/'18thru

    Description

    This system incorporates complete payroll, time & attendance and human resources modules that also acts as an employee portal for managing

    and communicating information to City staff and decision makers.

    Implements self service for the purpose of enrolling in benefits progams, viewing pay information, and managing retirement information. This

    system will help managers conduct performance reviews, inform employees of vital information and eliminate re-keying of data into multiple

    systems.

    The HR module will allow HR personnel and managers to continually be up to date with employment issues, conduct workforce planning,

    provide applicant tracking and provides enrollment tools to reduce the amount of time and effort required for on-board employees. It will assistemployees to make online policy inquiries and other employment related inquiries, access benefits reporting and performance review data.

    Other services provided include COBRA administration, on-boarding and separation services, talent mangement and employee education

    management, screening and selection services, mandated reporting and regulatory compliance and ability to perform 360 evaluations

    Project # ASD-1314-03

    Priority 1 Critical

    Justification

    Currently one City employee spends between 10-12 hours per month in processing payroll and performing basic human resource, benefits

    reporting and administration. The amount of customer service given to employees is minimal. Additionally, department heads are responsible

    for supplying spreadsheet based timecards that need to be manually entered into the current payroll system, introducing the possibility of errors.

    The current system has minimal reporting capabilities. The new system will have the ability to perform HR analytics and assist departments with

    workforce management and planning.

    This system will address the City's adopted 2013 objective of Organizational Effectiveness via its initiative of meeting operational needs and

    objectives and delivering high-quality customer service, at the same time as addressing the Fiscal Stability objective through implementingprocess improvements in providing service and utilizing resources most effectively.

    Budget Impact/OtherThe annual cost of this system is approximately $17,500. This annual cost will be partially offset by approximately 30% ($5,800 per year)

    through freeing up current staff to perform other work. Net cost per year increase per year about $11,700.

    Useful Life 20 years

    Project Name Cloud-Based Human Resources/Payroll System

    Category Software: Subscriptions

    Type Software or Subscription

    Contact Admin Srvs Director

    Department Administrative Services

    Total Project Cost: $87,500

    Account # 01-99999

    Total'13/'14 '14/'15 '15/'16 '16/'17 '17/'18Expenditures

    87,50017,500 17,500 17,500 17,500 17,500Other

    17,500 17,500 17,500 17,500 17,500 87,500Total

    Total'13/'14 '14/'15 '15/'16 '16/'17 '17/'18Funding Sources

    87,50017,500 17,500 17,500 17,500 17,500GF: Capital Improvements

    17,500 17,500 17,500 17,500 17,500 87,500Total

    Page 15

    41

  • 7/29/2019 Special City Council Meeting Agenda Packet 03-19-13

    42/115

    FY 2013-2014 Projects

    City of Carmel-by-the-Sea, CA

    '13/'14 '17/'18thru

    Description

    This equipment includes hardware that will be required for both routine replacement as well as upgrading to cloud-based performance. This plan

    includes replacing and upgrading 9 switches, 2 broadband routers and 1 T-1 line over the next 5 years.

    Project # ASD-1314-04

    Priority 2 Very Important

    Justification

    In general, this equipment is required in order to implement the move from terrestrial-based computing to cloud-based computing. For efficient

    and effective implementation of cloud-based services, switches will need to have throughput at the 1Gb/sec rate, an upgrade from the current 50-100 Mb/sec. Moving to this throughput will also be sufficient to support the move from existing telephone system to Voice over IP (VOIP)

    technology in the future should it be implemented in the next 5-7 years.

    Budget Impact/Other

    Useful Life 5 years

    Project Name Network Equipment

    Category Equipment: Computers

    Type Equipment

    Contact Admin Srvs Director

    Department Administrative Services

    Total Project Cost: $25,500

    Account #

    Total'13/'14 '14/'15 '15/'16 '16/'17 '17/'18Expenditures

    25,5006,500 6,000 6,500 0 6,500Computer Software/Hardware

    6,500 6,000 6,500 0 6,500 25,500Total

    Total'13/'14 '14/'15 '15/'16 '16/'17 '17/'18Funding Sources

    25,5006,500 6,000 6,500 0 6,500GF: Capital Improvements

    6,500 6,000 6,500 0 6,500 25,500Total

    Page 16

    42

  • 7/29/2019 Special City Council Meeting Agenda Packet 03-19-13

    43/115

    FY 2013-2014 Projects

    City of Carmel-by-the-Sea, CA

    '13/'14 '17/'18thru

    Description

    Purchase of equipment/software that is outlined in IT Equipment Replacement Plan (ITERP). At this point, mostly includes web-enabled printers.

    Project # ASD-1314-05

    Priority 2 Very Important

    Justification

    As a part of the Information Technology Strategic Plan, the IT Equipment Replacement Plan calls for the replacement of hardware and software

    at the end of its effective life, as well as providing for a stock of certain equipment to act as an emergency safety measure in the event thatequipment or software fails unexpectedly. This capital expense is in line with the IT Equipment Replacement Plan as it has been modified to

    reflect changes in the IT Strategic Plan due to initiative of utilizing more cloud-based services.

    Budget Impact/Other

    Useful Life 5 years

    Project Name Network Spare/Replacement Equipment

    Category Equipment: Computers

    Type Equipment

    Contact Admin Srvs Director

    Department Administrative Services

    Total Project Cost: $15,000

    Account #

    Total'13/'14 '14/'15 '15/'16 '16/'17 '17/'18Expenditures

    15,00010,000 5,000Computer Software/Hardware

    10,000 5,000 15,000Total

    Total'13/'14 '14/'15 '15/'16 '16/'17 '17/'18Funding Sources

    15,00010,000 5,000GF: Capital Improvements

    10,000 5,000 15,000Total

    Page 17

    43

  • 7/29/2019 Special City Council Meeting Agenda Packet 03-19-13

    44/115

    FY 2013-2014 Projects

    City of Carmel-by-the-Sea, CA

    '13/'14 '17/'18thru

    Description

    This project is the purchase of a net new City vehicle to be assigned to the Community Planning and Building Department to be used by staff for

    tours, site visits, and code compliance.

    Project # CPB-1112-02

    Priority 4 Less Important

    Justification

    Community Planning and Building does not have access to a City vehicle or pool car. Staff utilizes personal vehicles for required transportation

    for City business and is reimbursed for fuel and vehicle wear and tear costs. The Department had a small electric vehicle in the past that wassurplused.

    Budget Impact/Other

    Adding a new vehicle to the fleet would result in additional fuel (if a fuel powered vehicle), maintenance expenses, and other vehicle related

    costs.

    Useful Life 10 years

    Project Name Energy Efficient Vehicle

    Category Vehicles

    Type Equipment

    Contact Comm. Planning & Bldg Dir

    Department Community Planning & Bldg

    Total Project Cost: $25,000

    Account #

    Total'13/'14 '14/'15 '15/'16 '16/'17 '17/'18Expenditures

    25,00025,000Equip/Vehicles/Furnishings

    25,000 25,000Total

    Total'13/'14 '14/'15 '15/'16 '16/'17 '17/'18Funding Sources

    25,00025,000Unfunded

    25,000 25,000Total

    TotalBudget Items '13/'14 '14/'15 '15/'16 '16/'17 '17/'18

    3,0001,000 1,000 1,000Maintenance

    1,000 1,000 1,000 3,000Total

    Page 18

    44

  • 7/29/2019 Special City Council Meeting Agenda Packet 03-19-13

    45/115

    FY 2013-2014 Projects

    City of Carmel-by-the-Sea, CA

    '13/'14 '17/'18thru

    Description

    Purchase of software to track building and planning permits, prepare inspection reports, and other reports for the Planning and Building

    Department. Permit tracking software will assist with tracking and managing all land use and community development activities, while speeding

    up the process and reducing errors. These activities include the issuance of planning and building permits, tracking of inspections, code

    enforcement and more. Ideally the software will interface with the software used for City administration.

    Project # CPB-1112-03

    Priority 2 Very Important

    Justification

    Planning permits are currently tracked through an outdated Microsoft Access program