Upload
others
View
2
Download
0
Embed Size (px)
Citation preview
Confidential | © 2017 by Epiroc. All rights reserved.
Ready for the future
Confidential | © 2017 by Epiroc. All rights reserved.
Epiroc & Atlas Copco
2
Confidential | © 2017 by Epiroc. All rights reserved.
Mining and Rock Excavation Service
Rock Drilling ToolsRocktec
Underground Rock Excavation Surface and Exploration Drilling
Hydraulic Attachment Tools
Drilling Solutions
Divisions
Confidential | © 2017 by Epiroc. All rights reserved.
Emissions and Legislation
4
Confidential | © 2017 by Epiroc. All rights reserved.
Potential energy savings with a reduced ventilation.
Ventilation is normally the biggest energy cost for a mine.
Based om fan affinity laws
Confidential | © 2017 by Epiroc. All rights reserved.
Confidential | © 2017 by Epiroc. All rights reserved.
Zero diesel particulate matter
Zero toxic gases
Reduced heat and noise
Confidential | © 2017 by Epiroc. All rights reserved. 8
Confidential | © 2017 by Epiroc. All rights reserved.
Costs increase with depthIncreased rock pressure
Longer transportsLarger infrastructure
Increased temperature
Confidential | © 2017 by Epiroc. All rights reserved.
Nothing is constant but change
• New legislation, rules, standards.
• Environmental aspects– Global warming
– CO2
• Safety and health– Diesel particulate matter (DPM)
– Nitrous oxide gases (NOX)
10
Confidential | © 2017 by Epiroc. All rights reserved.
Confidential | © 2017 by Epiroc. All rights reserved.A mine is a system – total operational cost is important
Confidential | © 2017 by Epiroc. All rights reserved.
Electrification, where to start?
13
Confidential | © 2017 by Epiroc. All rights reserved.
Scooptram ST7 Battery
14
Confidential | © 2017 by Epiroc. All rights reserved.
Underground trucks
15
Confidential | © 2017 by Epiroc. All rights reserved.
Underground drills
16
Confidential | © 2017 by Epiroc. All rights reserved.
WHAT'S NEXT? Are we prepared for electrification?
Confidential | © 2017 by Epiroc. All rights reserved.
Vision: All machines can use the same infrastructure
• Standardization of infrastructure
• Today there is no standardization
• GMSG – BEV Guideline– V1, this is a problem.
– V2, recommend a standard?
• CCS – 2– The only suitable standard from automotive
– OEM Independent
– 350kW capability
– Epiroc will use CCS – 2, starting gen 2
18
Confidential | © 2017 by Epiroc. All rights reserved.
United. Inspired.Performance unites us, innovation inspires us,
and commitment drives us to keep moving forward.
Count on Epiroc to deliver the solutions you need
to succeed today and the technology to lead tomorrow.
epiroc.com