Page 1 of 23 Project: Grain Based Distillery Unit (60 KLPD) and CPP (2.5 MV), Village Bakra, Tehsil Beri, District- Jhajjar, Haryana. Half-yearly Compliance Report of EC (EC No. J-11011/317/2010-IA II (I) Dated 12/10/2011) Conditions Vardan EnviroLab,D-142,Sushant Lok-lll,Golf Course Road,Sector 57,Gurgaon SIX-MONTHLY ENVIRONMENTAL COMPLIANCE REPORT OF STIPULATED CONDITIONS OF ENVIRONMENTAL CLEARANCE (October 2013 to March 2014) FOR Grain Based Distillery Unit (60 KLD) and CPP (2.5 MW) Village- Bakra, Tehsil Beri, District- Jhajjar, Haryana. For Submission to: Ministry of Environment and Forests (MoEF) Submitted by: M/s A.D.S Spirit Pvt. Ltd. A-19, First Floor, Narain Industrial Area Phase-1, New Delhi-110028

SIX-MONTHLY ENVIRONMENTAL COMPLIANCE REPORT OF …nromoef.gov.in/SMPR/13102014/227.pdf · Half-yearly Compliance Report of EC ... Project: Grain Based ... conveyance of chemicals/materials,multi

  • Upload
    donhi

  • View
    217

  • Download
    0

Embed Size (px)

Citation preview

Page 1: SIX-MONTHLY ENVIRONMENTAL COMPLIANCE REPORT OF …nromoef.gov.in/SMPR/13102014/227.pdf · Half-yearly Compliance Report of EC ... Project: Grain Based ... conveyance of chemicals/materials,multi

Page 1 of 23 Project: Grain Based Distillery Unit (60 KLPD) and CPP (2.5 MV), Village Bakra, Tehsil Beri, District- Jhajjar,

Haryana. Half-yearly Compliance Report of EC (EC No. –J-11011/317/2010-IA II (I) Dated 12/10/2011) Conditions

Vardan EnviroLab,D-142,Sushant Lok-lll,Golf Course Road,Sector 57,Gurgaon

SIX-MONTHLY ENVIRONMENTAL COMPLIANCE REPORT OF

STIPULATED CONDITIONS OF ENVIRONMENTAL CLEARANCE

(October 2013 to March 2014)

FOR

Grain Based Distillery Unit (60 KLD) and CPP (2.5 MW)

Village- Bakra, Tehsil – Beri, District- Jhajjar, Haryana.

For Submission to:

Ministry of Environment and Forests (MoEF)

Submitted by:

M/s A.D.S Spirit Pvt. Ltd.

A-19, First Floor, Narain Industrial Area

Phase-1, New Delhi-110028

Page 2: SIX-MONTHLY ENVIRONMENTAL COMPLIANCE REPORT OF …nromoef.gov.in/SMPR/13102014/227.pdf · Half-yearly Compliance Report of EC ... Project: Grain Based ... conveyance of chemicals/materials,multi

Page 2 of 23 Project: Grain Based Distillery Unit (60 KLPD) and CPP (2.5 MV), Village Bakra, Tehsil Beri, District- Jhajjar,

Haryana. Half-yearly Compliance Report of EC (EC No. –J-11011/317/2010-IA II (I) Dated 12/10/2011) Conditions

Vardan EnviroLab,D-142,Sushant Lok-lll,Golf Course Road,Sector 57,Gurgaon

Description Page No.

Chapter 1 Compliance of Stipulated Conditions of Environmental Clearance

Part A Specific Conditions for buildings in operational phase 3-5

Part B General Conditions 6-8

Chapter 2 Details of Environmental Monitoring

2.0 Introduction 9

2.1 Ambient Air Quality Monitoring 9

2.1.1 Ambient Air Quality Monitoring Stations 9

2.1.2 Ambient Air Quality Monitoring Methodology 9

2.1.3 Ambient Air Quality Monitoring Results 10

2.1.4 Discussion on Ambient Air Quality in the Study Area 11

2.1.5 Stack Emission Monitoring 12

2.2 Ambient Noise Monitoring 13

2.2.1 Ambient Noise Monitoring Locations 13

2.2.2 Methodology of Noise Monitoring 13

2.2.3 Ambient Noise Monitoring Results 13

2.2.4 Discussion on Ambient Noise Levels in the Study Area 14

2.3 Drinking water Quality Monitoring 15

2.3.1 Drinking water Quality Monitoring Locations 15

2.3.2 Methodology of Drinking water Quality Monitoring 15

2.3.3 Drinking water Quality Monitoring Results 16-17

2.3.4 Discussion on Drinking water Quality in the Study Area 17

2.4 Waste water 18

2.4.1 Waste Water Quality Monitoring Location 18

2.4.2 Waste water Result 18

2.5 Soil Monitoring 19

2.5.1 Soil Monitoring Locations 19

2.5.2 Methodology of Soil Monitoring 19

2.5.3 Soil Monitoring Results 20

2.5.4 Discussion on Soil Characteristics in the Study Area 20

Figures

2.1 Location-wise Variation of Ambient Air Quality 11

2.2 Location-wise Variation of Ambient Noise Levels 14

Page 3: SIX-MONTHLY ENVIRONMENTAL COMPLIANCE REPORT OF …nromoef.gov.in/SMPR/13102014/227.pdf · Half-yearly Compliance Report of EC ... Project: Grain Based ... conveyance of chemicals/materials,multi

Page 3 of 23 Project: Grain Based Distillery Unit (60 KLPD) and CPP (2.5 MV), Village Bakra, Tehsil Beri, District- Jhajjar,

Haryana. Half-yearly Compliance Report of EC (EC No. –J-11011/317/2010-IA II (I) Dated 12/10/2011) Conditions

Vardan EnviroLab,D-142,Sushant Lok-lll,Golf Course Road,Sector 57,Gurgaon

CHAPTER-1

PART A – SPECIFIC CONDITIONS

S. No. Conditions of Environmental Clearance Status of Compliance

i. Environmental Clearance accorded is for Grain based

distillery unit (60 KLPD) only and no Molasses based

Distillery unit shall be operated without prior

permission from the Ministry.

The distillery obtained the Consent to operate

from Haryana Pollution Control board vide

letter No. 2777414 JHACTO338917 dated 01-

02-2014 under Water Act and Air Act for grain

based operation only, whenever we will go for

molasses based operation than we will take

prior permission from the ministry. Consent to

operate fro grain based production is enclosed

as Annexure-1.

ii. Efforts shall be made to reduce PM10 levels in the

ambient air and a time bound action plan shall be

submitted. Bag filter along with stack of adequate

height shall be provided to boiler to control particulate

emission within 100 mg/Nm3. At no time, the emission

levels shall go beyond the prescribed standards. In the

event of failure of any pollution control system

adopted by the unit, the respective unit shall not be

restarted until the control measures are rectified to

achieve the desired efficiency.

Adequate measures like green belt &

plantations, water sprinkling on haul roads and

unpaved areas on regular basis being under

taken to reduce the PM10 level below ambient

air quality standards. ESP and bag filters have

been installed to minimize the particulate

emissions. 45 meters height & 1 meter dia.

Stack is provided. Green belt, plantation, water

sprinkling and Stack photographs are enclosed

as Annexure- 2. Stack results are enclosed as

Annexure- 3.

iii. The National Ambient Air Quality Emission Standards

issued by the Ministry vide G.S.R. No. 826(E) dated

16th

November, 2009 shall be followed.

The ambient air quality monitoring was carried

out on April, 2014 & results are enclosed as

Annexure- 4. It depicts that the results are well

within the Permissible limits.

iv. Pucca approach road to project site shall be constructed

prior to commencing construction activity of the main

distillery so as to avoid fugitive emissions.

Pucca roads within the premises and approach

for road preparation are under process and

water sprinkling also done at regular basis to

avoid fugitive emissions.

v. In Plant, control measures for checking fugitive

emissions from all the vulnerable sources shall be

provided. Fugitive emissions shall be controlled by

providing closed storage, closed handling &

conveyance of chemicals/materials,multi cyclone

separator and water sprinkling system. Dust

suppression system including water sprinkling system

shall be provided at loading and unloading areas to

control dust emissions. Fugitive emissions in the work

zone environment, product, raw materials storage area

etc. shall be regularly monitored and records should be

maintained. The emissions shall conform to the limits

proposed by Haryana State Pollution Control Board

(HSPCB)

For the control of fugitive emission regular

water sprinkling being done in the operation

phase. In the operational phase closed storage,

closed handling & conveyance of

chemicals/materials, multi cyclone separator

and water sprinkling systems are being

provided. Some measures being taken for

control of fugitive emission are given below:

1. Covered Transportation.

2. Materials are in moist form for

transportation.

3. Internal and approach road are pucca

road

4. Storage is fully covered.

5. Water sprinkling being done on

regular basis.

vi. The gaseous emissions from DG Set shall be dispersed

through adequate stack height as per CPCB guidelines.

Acoustic enclosure shall be provided to the DG sets to

Two numbers of DG Sets of 750 KVA & 500

KVA with acoustic enclosure and stack height

as per CPCB guidelines are in operation.

Page 4: SIX-MONTHLY ENVIRONMENTAL COMPLIANCE REPORT OF …nromoef.gov.in/SMPR/13102014/227.pdf · Half-yearly Compliance Report of EC ... Project: Grain Based ... conveyance of chemicals/materials,multi

Page 4 of 23 Project: Grain Based Distillery Unit (60 KLPD) and CPP (2.5 MV), Village Bakra, Tehsil Beri, District- Jhajjar,

Haryana. Half-yearly Compliance Report of EC (EC No. –J-11011/317/2010-IA II (I) Dated 12/10/2011) Conditions

Vardan EnviroLab,D-142,Sushant Lok-lll,Golf Course Road,Sector 57,Gurgaon

mitigate the noise pollution.

vii. The Company shall upload the status of compliance of

the stipulated environmental clearance conditions,

including results of monitored data on its website and

shall update the same periodically. It Shall

simultaneously be sent to the Regional Office of

MoEF, the respective zonal office of CPCB and the

HPSCB. The levels of PM10,SO2,NOX,CO AND HC

(Methane) in ambient air shall be monitored and

displayed at a convenient location near the main gate

of the company and at important public places.

The Monitoring results along with Compliance

report are being uploaded on our website and

updated timely and sent to the concerned

authorities on regular basis.

Display board at main gate is under process.

AAQM results will be displayed on display

board at main gate and will be regularly

updated.

viii. Total fresh water requirement from ground water

source shall not exceed 10 KL/KL of alcohol (i.e. 600

m3/day) for distillery unit and 230 m

3/day for

cogeneration unit (2.5 MW) and prior permission for

drawl of water shall be obtained from the concerned

authorities. A copy of water permission from

concerned Authority shall be submitted to the

Ministry’s Regional Office at Bhopal. No ground water

shall be used.

Total fresh water requirement is estimated to be

830 m3/day which will be met by ground water

& recycled water. Permission for withdrawal of

900 m3/day of water has already been obtained

from the Central Ground Water Authority vide

CGWA Letter No. 21-

9410/NWR/CGWA/2011-961 dated 28 July,

2011 enclosed as Annexure- 5.

ix. Explore the possibility to use canal water instead of

ground water. Further, water consumption shall be

reduced by adopting 3 R’s (Reduce, Reuse and

Recycle) concept in the process.

Only ground water is being used and we are

adopting the zero effluent discharge concepts

for waste water minimization.

x. Spent wash generation shall not exceed 6Kl/Kl of

Alcohol. Spent wash shall be treated through decanter

and concentrated in multi-effect evaporator (MEE) to

form DWGS. Spentlees, effluent from bottle washing,

utilities and cogeneration unit shall be treated in

effluent treatment plant (ETP) and water quality of

treated effluent shall meet the norms prescribed by

CPCB/SPCB and recycled in the process and for green

belt development. Treated effluent shall be

recycled/reused within the factory premises.

The plant is running on grain based mode only.

No spent wash is being generated, only dry

cake is being used which is being used as

cattle feed and sold to authorized vendors.

After treatment the treated waste water is being

used for green belt & plantation development

and reused in process.

xi. No Effluent from distillery and co-generation power

plant shall be discharged outside the factory premises

and “Zero” discharge concept shall be maintained.

Unit is operating on Zero Discharge concept.

Liquid effluent is subjected to multi effect

evaporation & condensation is entirely recycled

back to process.

xii. Process effluent/any wastewater shall not be allowed to

mix with storm water. Storm water drain shall be

passed through guard pond.

Separate lines constructed for the discharge of

process effluent and storm water.

xiii. Spent wash should be stored in impervious lagoon with

HDPE lining as per CPCB guidelines and shall be kept

in proper conditions to prevent ground water pollution.

Storage capacity of spent wash lagoon should be for 5

days.

No lagoons are required as the plant is

operating on grain based mode only and no

spent wash is generated

xiv. Adequate numbers of ground water quality monitoring

stations by providing piezometers around the project

area shall be put up. Sampling and trend analysis

monitoring must be made on monthly basis and report

submitted to SPCB and this Ministry. The ground

water quality monitoring for pH, BOD, COD,

Chloride, sulphate and total dissolved solids shall be

monitored and report submitted to the Ministry’s

Ground water samples from different locations

were collected and results are attached as

Annexure- 6. The monitoring results along

with compliance report are being submitted to

concerned authorities on regularly basis.

Page 5: SIX-MONTHLY ENVIRONMENTAL COMPLIANCE REPORT OF …nromoef.gov.in/SMPR/13102014/227.pdf · Half-yearly Compliance Report of EC ... Project: Grain Based ... conveyance of chemicals/materials,multi

Page 5 of 23 Project: Grain Based Distillery Unit (60 KLPD) and CPP (2.5 MV), Village Bakra, Tehsil Beri, District- Jhajjar,

Haryana. Half-yearly Compliance Report of EC (EC No. –J-11011/317/2010-IA II (I) Dated 12/10/2011) Conditions

Vardan EnviroLab,D-142,Sushant Lok-lll,Golf Course Road,Sector 57,Gurgaon

Regional Office at Chandigarh and HSPCB

xv. No storage of wet cake shall be done at site. An

Additional dryer shall be installed so that at any time

wet cake is not sold then wet cake shall be converted

into dry cake by operating additional dryer.

Only dry cake is being generated, which is

being sold as cattle feed .Copy of agreement of

Cattle feed sold to vendor is enclosed as

Annexure-6.

xvi. Rice husk storage shall be done in such a way that it

does not get air borne of fly around due to wind. As

proposed, rice husk & coal storage yard shall be

properly covered.

Covered storage sheds are provided for the

storage of rice husk.

xvii. Boiler ash shall be stored separately as per CPCB

guidelines so that it shall not adversely affect the air

quality, becoming air borne by wind or water regime

during rainy season by flowing alongwith the storm

water. Direct exposure of workers to fly ash & dust

shall be avoided.

No storage has been made for boiler ash as

total generated ash is being sold to brick

manufacturer.

xviii. Proper utilization of fly ash shall be ensured as per Fly

Ash Notification, 1999 as amendment in 2003. Fly ash

shall be provided to cement and brick manufacturers

for further utilization.

The ash from Bag House is

pneumatically handled by ash

handling system and dry ash is

collected in silo.

The ash from the boiler is being

utilized by nearby brick

manufacturers. Ash sold to the brick

manufacturer copy of agreement of

the ADS Spirits with vendor is

enclosed is enclosed as Annexure-7.

xix. Fire fighting system shall be as per the norms and

cover all areas where alcohol is produced, handled and

stored. Provision of foam system for firefighting shall

be made to control fire from the alcohol storage tank.

All the fire extinguishing media such as water,

dry chemicals, CO2, sand, dolomite etc. are

being kept in vital locations.

xx. Risk Assessment shall be carried out to assess the fire

and explosion risk due to storage of alcohol and report

submitted to the Ministry and its Regional Office at

Chandigarh within six months.

Risk Assessment study has been done during

the impact assessment study.

xxi. Occupational health surveillance programme shall be

undertaken as regular exercise for all the employees.

The first aid facilities in the occupational health centre

shall be strengthened and the regular medical test

records of each employee shall be maintained

separately.

Occupational health surveillance programme is

being taken as regular exercise for all the

employees and all records are maintained.

Medical record of the employees is enclosed as

Annexure-8

xxii. Dedicated parking facility for loading and unloading of

material shall be provided in the factory premises. Unit

shall develop and implement good traffic management

system for their incoming and outgoing vehicles to

avoid congestion on the public road.

Dedicated parking facility for loading and

unloading of material has been provided in the

factory premises. Good traffic management

system is being implemented for incoming and

outgoing vehicles to avoid congestion on the

public road.

xxiii. As proposed, green belt shall be developed in 5 acres

out of acres and plantation shall be done as per the

CPCB guidelines in consultation with DFO. Thick

greenbelt with suitable plant species shall be developed

around the proposed distillery to mitigate the odour

problem.

1.Total green belt area with no of plant : 339 &

grass

2.Total No. of sampling Planted : 339

3.Species Name : Black Fikas, Ashoka, Palm,

Pila

4.% Survival Rate :97

xxiv. All the issues raised during the public

hearing/consultation meeting held on 26th

May, 2011

shall be satisfactorily implemented.

Public Hearing issues will be implemented.

Page 6: SIX-MONTHLY ENVIRONMENTAL COMPLIANCE REPORT OF …nromoef.gov.in/SMPR/13102014/227.pdf · Half-yearly Compliance Report of EC ... Project: Grain Based ... conveyance of chemicals/materials,multi

Page 6 of 23 Project: Grain Based Distillery Unit (60 KLPD) and CPP (2.5 MV), Village Bakra, Tehsil Beri, District- Jhajjar,

Haryana. Half-yearly Compliance Report of EC (EC No. –J-11011/317/2010-IA II (I) Dated 12/10/2011) Conditions

Vardan EnviroLab,D-142,Sushant Lok-lll,Golf Course Road,Sector 57,Gurgaon

xxv. Provisions shall be made for the housing for the

construction labour within the site with all necessary

infrastructure and facilities such as fuel for cooking,

mobile toilets, safe drinking water, medical health care,

crèche etc. The housing may be in the form of

temporary structure to be removed after the completion

of the project. All the construction wastes shall be

managed so that there is no impact on the surrounding

environment.

Presently the plant is in operation phase.

Page 7: SIX-MONTHLY ENVIRONMENTAL COMPLIANCE REPORT OF …nromoef.gov.in/SMPR/13102014/227.pdf · Half-yearly Compliance Report of EC ... Project: Grain Based ... conveyance of chemicals/materials,multi

Page 7 of 23 Project: Grain Based Distillery Unit (60 KLPD) and CPP (2.5 MV), Village Bakra, Tehsil Beri, District- Jhajjar,

Haryana. Half-yearly Compliance Report of EC (EC No. –J-11011/317/2010-IA II (I) Dated 12/10/2011) Conditions

Vardan EnviroLab,D-142,Sushant Lok-lll,Golf Course Road,Sector 57,Gurgaon

PART B – GENERAL CONDITIONS

S. No. Conditions of Environmental Clearance Status of Compliance

I. The project authorities shall strictly adhere to the stipulations made by the Haryana State Pollution Control Board.

Noted and we are complying the conditions

stipulated in Consent to Operate.

II. No further expansion or modifications in the plant shall be carried out without prior approval of the Ministry of Environment and Forests. In case of deviations or alterations in the project proposal from those submitted to this Ministry for clearance, a fresh reference shall be made to the Ministry to assess the adequacy of conditions imposed and to add additional environmental protection measures required, if any.

No further expansion or modifications in the plant

will be carried out without prior approval of the

Ministry of Environment and Forests.

III. The locations of ambient air quality monitoring stations shall be decided in consultation with the Haryana State Pollution Control Board (HSPCB) and it shall be ensured that at least one station is installed in the upwind and downwind direction as well as where maximum ground level concentrations are anticipated.

We have already informed to regional office of

HSPCB regarding selection of Ambient Air

Quality Monitoring station. Copy of letter is

enclosed as Annexure-9.

IV. The overall noise levels in and around the plant area shall be kept well within the standards by providing noise control measures including acoustic hoods, silencers, enclosure etc. on all sources of noise generation. The ambient noise levels shall conform to the standards prescribed under Environment (Protection) Act, 1986 Rules,1989 viz. 75dBA (day time) and 70dBA (night time).

Same shall be complied. Following measures are

being adopted.

Acoustic enclosure for turbine & DG sets

are being used.

Green belt development (plantation of

dense tress across the boundary and in

plant premises) will help in reducing

noise levels in the plant as a result of

attenuation of noise generated due to

plant operations and transportation.

Earmuffs are being used while running

the equipments of the plant.

The noise level monitoring has been

carried out and results are enclosed as

Annexure-10

V. The company shall harvest rainwater from the roof-tops of the buildings and storm water drains to recharge the ground water and use the same water for the process activities of the project conserve fresh water.

Rainwater is being utilized for augmentation of

ground water recharge through scientifically

design rain water harvesting system.

VI. The company shall obtain Authorization for collection,

storage and disposal of hazardous waste under the Hazardous

Waste (Management, Handling and Trans-boundary

Movement) Rules, 2008 and its amendment time to time and

prior permission from HSPCB shall be obtained for disposal

of solid/ hazardous waste including boiler ash.

No Hazardous waste is being genetrate from our

plant, so permission for the same is not required.

VII. During transfer of materials, spillages shall be avoided and

garland drains be constructed to avoid mixing of accidental

spillages with domestic wastewater and storm water drains.

There will be “Zero Effluent Discharge

from the proposed distillery unit.

Liquid effluent being subjected to

multiple effect evaporation and

condensate being entirely recycled back to

Page 8: SIX-MONTHLY ENVIRONMENTAL COMPLIANCE REPORT OF …nromoef.gov.in/SMPR/13102014/227.pdf · Half-yearly Compliance Report of EC ... Project: Grain Based ... conveyance of chemicals/materials,multi

Page 8 of 23 Project: Grain Based Distillery Unit (60 KLPD) and CPP (2.5 MV), Village Bakra, Tehsil Beri, District- Jhajjar,

Haryana. Half-yearly Compliance Report of EC (EC No. –J-11011/317/2010-IA II (I) Dated 12/10/2011) Conditions

Vardan EnviroLab,D-142,Sushant Lok-lll,Golf Course Road,Sector 57,Gurgaon

S. No. Conditions of Environmental Clearance Status of Compliance

process.

We have made the separate drains for

liquid effluent and storm water.

VIII. Usage of personnel protection equipments by all

employees/workers shall be ensured.

Personnel protection Equipments like Face shield

Helmets, Rubber Gumboots, Goggles, Medical

facilities etc. are being provided to every

employees.

IX. Training shall be imparted to all employees on safety and

health aspects of chemicals handling. Pre-employment and

routine periodical medical examinations for all employees

shall be undertaken on regular basis. Training to all

employees on handling of chemicals shall be imparted.

Production of ethanol involves storage handling

and use of several chemicals. Some of these

chemicals are toxic and hazardous in nature.

Information about these chemicals is therefore

important for the safety of the employees and the

plant.

Therefore, safety measures dealing with these

chemicals are of vital importance and are being

followed judiciously.

1. In order to ensure good health of workers

regular health check-up of the plant

workers are being carried out.

2. Occupational health surveillance

programme is being taken as a regular

exercise for all the employees and their

records are maintained.

3. Safety precautions are being displayed

within the premises on the banners,

boards etc.

4. Both On-site & Off-site emergency

preparedness plan has been drawn.

X. The company shall also comply with all environmental

protection measures and safeguards proposed in the project

report submitted to the Ministry. All the recommendations

made in the EIA/EMP in respect of environmental

management, risk mitigation measures and public hearing

relating to the project shall be submitted.

We will ensure that specific environmental

protection measures and proposed safeguards are

adopted.

XI. The company shall undertake CSR activities and all relevant

measures for improving the socio-economic conditions of the

surrounding area.

Company will take following CSR activity and

development of Socio economic condition of the

area:

Kuccha road being constructed to pucca

road leading to plant site.

Funding plantation programme in the

surrounding villages.

Arrangement of medical camps

especially for family planning in the

villages of the study area.

XII. The Company shall undertake eco-developmental measures

including community welfare measures in the project area for

the overall improvement of the environment.

Agreed and will comply the same.

XIII. A separate Environmental Management Cell equipped with

full fledged laboratory facilities shall be set up to carry out

the Environmental Management and Monitoring Functions.

We are in the process of providing Environment

Management cell equipped with full fledged

laboratory facilities to carry out the

Page 9: SIX-MONTHLY ENVIRONMENTAL COMPLIANCE REPORT OF …nromoef.gov.in/SMPR/13102014/227.pdf · Half-yearly Compliance Report of EC ... Project: Grain Based ... conveyance of chemicals/materials,multi

Page 9 of 23 Project: Grain Based Distillery Unit (60 KLPD) and CPP (2.5 MV), Village Bakra, Tehsil Beri, District- Jhajjar,

Haryana. Half-yearly Compliance Report of EC (EC No. –J-11011/317/2010-IA II (I) Dated 12/10/2011) Conditions

Vardan EnviroLab,D-142,Sushant Lok-lll,Golf Course Road,Sector 57,Gurgaon

S. No. Conditions of Environmental Clearance Status of Compliance

Environmental Management and Monitoring

functions.

XIV. As Proposed, the company shall earmark sufficient funds

towards capital costs and recurring cost per annum to

implement the conditions stipulated by the Ministry of

Environment and Forests as well as the State Government

along with the implementation schedule for all the conditions

stipulated herein. The funds so earmarked for environment

management/ pollution control measures shall not be diverted

for any other purpose.

As proposed fund will be invested. Funds break-

up is enclosed as Annexure-11 and we will

ensure that this fund is diverted for any other

purpose.

XV. A copy of the clearance letter shall be sent by the project

proponent to the concerned Panchayat, Zila Parishad/

Municipal Corporation, Urban Local Body and the local

NGO, If any, from who suggestions/representations, if any,

were received while processing the proposal.

We have already sent clearance letter to the

concerned authorities as required.

XVI. The Project Proponent shall also submit six monthly reports

on the status of compliance of the stipulated Environmental

Clearance Conditions including results of monitored

data(both in hard copies as well as by e-mail) to the

respective regional office of MoEF, the respective Zonal

Office of CPCB and the Haryana State Pollution Control

Board. A copy of Environmental Clearance and six monthly

compliance status report shall be posted on the website of the

company

A copy of six monthly compliance status reports

is uploaded at every six month at our website:

www.adsspirits.com. And the same is sent to the

concerned authorities on six monthly basis.

XVII. The Environmental statement for each financial year ending

31st March in Form V as is mandated shall be submitted to

the Haryana State Pollution Control Board as prescribed

under the Environmental (Protection) Rules,1986, as

amended subsequently, shall also be put on the website of the

company along with the status of the compliance of

Environmental Clearance conditions and shall also be sent to

the Chandigarh Regional Offices of MoEF by e-mail.

We are submitting the environmental statement

report of financial years to the concerned

authorities.

XVIII. The Project Proponent shall inform the public that the project

has been accorded environmental clearance by the Ministry

and copies of the clearance letter are available with the

SPCB/Committee and may also be seen at the website of the

Ministry at http://envfor.nic.in This shall be advertised within

seven days from the date of the issue of the clearance letter,

at least in the two local newspaper that are widely circulated

in the region of which one shall be in the vernacular language

of the locality concerned and a copy of the same shall be

forwarded to the concerned Regional Office of the Ministry.

EC Advertisement has already been published in

news papers.

XIX. The Project authorities shall inform the Regional Office as

well as the Ministry, the date of financial closure and the

final approval of the project by the concerned authorities and

the date of start of the project.

Complied.

8.0 The Ministry may revoke or suspend the clearance, if

implementation of any of the above condition is not

satisfactory.

Agreed and Noted.

9.0 The Ministry reserves the right to stipulate additional

conditions, if found necessary. The Company in a time bound

manner will implement these conditions.

Agreed and Noted.

Page 10: SIX-MONTHLY ENVIRONMENTAL COMPLIANCE REPORT OF …nromoef.gov.in/SMPR/13102014/227.pdf · Half-yearly Compliance Report of EC ... Project: Grain Based ... conveyance of chemicals/materials,multi

Page 10 of 23 Project: Grain Based Distillery Unit (60 KLPD) and CPP (2.5 MV), Village Bakra, Tehsil Beri, District- Jhajjar,

Haryana. Half-yearly Compliance Report of EC (EC No. –J-11011/317/2010-IA II (I) Dated 12/10/2011) Conditions

Vardan EnviroLab,D-142,Sushant Lok-lll,Golf Course Road,Sector 57,Gurgaon

S. No. Conditions of Environmental Clearance Status of Compliance

10.0 The Above conditions will be enforced, inter-alia under the

provisions of the Water (Prevention & Control of Pollution)

Act,1974, Air (Prevention & Control of Pollution) Act,1981,

The Environment (Protection) Act, 1986, Hazardous Waste

(Management, Handling and Trans boundary Movement)

Rules, 2008 and the Public Liability Insurance Act, 1991

along with their amendments and rules.

We are complying with Consent to Operate under

Air and Water Act & other environmental

Acts/Rules.

Page 11: SIX-MONTHLY ENVIRONMENTAL COMPLIANCE REPORT OF …nromoef.gov.in/SMPR/13102014/227.pdf · Half-yearly Compliance Report of EC ... Project: Grain Based ... conveyance of chemicals/materials,multi

Page 11 of 23 Project: Grain Based Distillery Unit (60 KLPD) and CPP (2.5 MV), Village Bakra, Tehsil Beri, District- Jhajjar,

Haryana. Half-yearly Compliance Report of EC (EC No. –J-11011/317/2010-IA II (I) Dated 12/10/2011) Conditions

Vardan EnviroLab,D-142,Sushant Lok-lll,Golf Course Road,Sector 57,Gurgaon

CHAPTER- 2

Details of Environmental Monitoring

2.1 AMBIENT AIR QUALITY MONITORING

2.1.1 Ambient Air Quality Monitoring Stations

Ambient air quality monitoring has been carried out at 1 location; near Main Gate of the project site. This

will enable to have a comparative analytical understanding about air quality and the changes in the air

environment in the study area with respect to the condition prevailing. The location of the ambient air

quality monitoring stations is given in Table 2.1.

Table 2.1 Details of Ambient Air Quality Monitoring Stations

S. No. Location Code Location Name/ Description

1 AAQ-1 Near Main Gate

AAQ-1: Near Main Gate

The sampler was placed near Main gate and was free from any obstructions. Surroundings of the sampling

site represent industrial environmental setting

2.1.2 Ambient Air Quality Monitoring Methodology

Monitoring was conducted in respect of the following parameters:

Particulate Matter 2.5 (PM 2.5)

Particulate Matter 10 (PM 10)

Sulphur Dioxide (SO2)

Oxides of Nitrogen (NOx)

Carbon Monoxide (CO)

Ammonia (NH3)

Lead (Pb)

Benzene (C6H6)

Benzo(a)pyrene

Ozone (O3)

Arsenic (As)

Nickel (Ni)

The duration of sampling of PM 2.5, PM10, SO2 and NOx was 24 hourly continuous sampling per day and

CO was sampled for 8 hours continuous, thrice in 24 hour duration monitoring. The monitoring was

conducted for one day at the location. This is to allow a comparison with the National Ambient Air Quality

Standards.

Page 12: SIX-MONTHLY ENVIRONMENTAL COMPLIANCE REPORT OF …nromoef.gov.in/SMPR/13102014/227.pdf · Half-yearly Compliance Report of EC ... Project: Grain Based ... conveyance of chemicals/materials,multi

Page 12 of 23 Project: Grain Based Distillery Unit (60 KLPD) and CPP (2.5 MV), Village Bakra, Tehsil Beri, District- Jhajjar,

Haryana. Half-yearly Compliance Report of EC (EC No. –J-11011/317/2010-IA II (I) Dated 12/10/2011) Conditions

Vardan EnviroLab,D-142,Sushant Lok-lll,Golf Course Road,Sector 57,Gurgaon

The air samples were analyzed as per standard methods specified by Central Pollution Control Board

(CPCB) and IS: 5182. The techniques used for ambient air quality monitoring and minimum detectable levels

are given in Table 2.2.

Fine Particulate Sampler instruments have been used for monitoring Particulate Matter 2.5 (PM2.5 i.e. <2.5

microns), and Respirable Dust Sampler was used for sampling Respirable fraction (<10 microns), gaseous

pollutants like SO2, and NOx. Bladder and Aspirator bags were used for collection Carbon

Monoxide samples. Gas Chromatography techniques have been used for the estimation of CO.

Table 2.2 Techniques used for Ambient Air Quality Monitoring

2.1.3

S.

No. Parameter Technique Technical Protocol

1 Particulate Matter 2.5 Fine Particulate Sampler,

Gravimetric Method CPCB/MoEF Guidelines

2 Particulate Matter 10

Respirable Dust Sampler, with

cyclone separator, Gravimetric

Method

IS-5182 (Part-23)

3 Sulphur dioxide Modified West and Gaeke IS-5182 (Part- II)

4 Oxides of Nitrogen Jacob & Hochheiser IS-5182 (Part-VI)

5 Carbon Monoxide Gas Chromatography IS-5182 (Part-X)

6 Ammonia Distillation Method IS: 11255 (P-6), 1999

7 Lead Atomic Absorption Spectro-

photometer IS: 5182 (P-22), 2004

8 Benzene Gas Chromatography IS: 5182 (P-11), 2006

9 Benzo(a)pyrene Gas Chromatography CPCB Guideline

10 Ozone Colorimetry IS: 5182 (P-9), 1974

11 Arsenic Atomic Absorption Spectro-

photometer IS: 5182 (P-22), 2004

12 Nickel Atomic Absorption Spectro-

photometer IS: 5182 (P-22), 2004

Page 13: SIX-MONTHLY ENVIRONMENTAL COMPLIANCE REPORT OF …nromoef.gov.in/SMPR/13102014/227.pdf · Half-yearly Compliance Report of EC ... Project: Grain Based ... conveyance of chemicals/materials,multi

Page 13 of 23 Project: Grain Based Distillery Unit (60 KLPD) and CPP (2.5 MV), Village Bakra, Tehsil Beri, District- Jhajjar,

Haryana. Half-yearly Compliance Report of EC (EC No. –J-11011/317/2010-IA II (I) Dated 12/10/2011) Conditions

Vardan EnviroLab,D-142,Sushant Lok-lll,Golf Course Road,Sector 57,Gurgaon

Ambient Air Quality Monitoring Results

The detailed on-site monitoring results of PM 2.5, PM 10, SO2, NOx and CO are presented in Table 2.3.

Table 2.3 Ambient Air Quality Monitoring Results

Parameter AAQ1 NAAQS*

Particulate Matter (PM2.5) 44.55 60

Particulate Matter(PM10) 91.48 100

Nitrogen Dioxide(NO2) 24.30 80

Sulphur Dioxide(SO2) 14.33 80

Carbon Monoxide(CO) 0.60 4

Ammonia (NH3) 1.81 400

Lead (Pb) <0.02 1

Benzene(C6H6) , g/m3 <0.05 05

Benzo(a)pyrene, ng/m3 ND* 01

Ozone (O3) , g/m3 <1.0 180

Arsenic As, ng/ m3 <0.50 6

Nickel Ni, ng/ m3 <0.50 20

*ND – Not Detected

Page 14: SIX-MONTHLY ENVIRONMENTAL COMPLIANCE REPORT OF …nromoef.gov.in/SMPR/13102014/227.pdf · Half-yearly Compliance Report of EC ... Project: Grain Based ... conveyance of chemicals/materials,multi

Page 14 of 23 Project: Grain Based Distillery Unit (60 KLPD) and CPP (2.5 MV), Village Bakra, Tehsil Beri, District- Jhajjar,

Haryana. Half-yearly Compliance Report of EC (EC No. –J-11011/317/2010-IA II (I) Dated 12/10/2011) Conditions

Vardan EnviroLab,D-142,Sushant Lok-lll,Golf Course Road,Sector 57,Gurgaon

Figure 2.1 Location-wise Variation of Ambient Air Quality

2.1.4 Discussion on Ambient Air Quality in the Study Area

PM 2.5 levels at the project site are within the permissible limit of 100 μg/m3 and the PM10 levels are too within

the limit 60 μg/m3 in all the sites. SO2, NOx and CO was observed within the corresponding stipulated limits

(Limit for SO2 and NOx: 80 g/m3 and limit for CO: 4.0 g/m

3) at the monitoring location. Station wise

variation of ambient air quality parameters has been pictorially shown in Figure 2.1

0

50

100

150

200

250

300

350

400

450

PM2.5 PM10 NO2 SO2 CO NH3

AAQ1

Limits

Page 15: SIX-MONTHLY ENVIRONMENTAL COMPLIANCE REPORT OF …nromoef.gov.in/SMPR/13102014/227.pdf · Half-yearly Compliance Report of EC ... Project: Grain Based ... conveyance of chemicals/materials,multi

Page 15 of 23 Project: Grain Based Distillery Unit (60 KLPD) and CPP (2.5 MV), Village Bakra, Tehsil Beri, District- Jhajjar,

Haryana. Half-yearly Compliance Report of EC (EC No. –J-11011/317/2010-IA II (I) Dated 12/10/2011) Conditions

Vardan EnviroLab,D-142,Sushant Lok-lll,Golf Course Road,Sector 57,Gurgaon

2.1.5 Stack Emission Monitoring

Table 2.4 Details of Stack Monitoring Stations

S. No. Location Code Location Name

1 BS1 Boiler

Table 2.5 Stack Monitoring Results

Location- BS1

S. No. Parameters Results Units Test Methods

1. Particulate Matter (PM) 82.40 mg/Nm3 Gravimetric method

2. Oxides of Nitrogen (NO2) 10.80 mg/Nm3 PDA Method

3. Sulphur Dioxide (SO2) 58.70 mg/Nm3 Titrimetric method

4. Carbon Monoxide (CO) 10.70 mg/Nm3 IS 13270 by Orsat

app. 1992.

5. Non Methane Hydro Carbon

(NMHC) 3.80 mg/Nm3 GC Method

Page 16: SIX-MONTHLY ENVIRONMENTAL COMPLIANCE REPORT OF …nromoef.gov.in/SMPR/13102014/227.pdf · Half-yearly Compliance Report of EC ... Project: Grain Based ... conveyance of chemicals/materials,multi

Page 16 of 23 Project: Grain Based Distillery Unit (60 KLPD) and CPP (2.5 MV), Village Bakra, Tehsil Beri, District- Jhajjar,

Haryana. Half-yearly Compliance Report of EC (EC No. –J-11011/317/2010-IA II (I) Dated 12/10/2011) Conditions

Vardan EnviroLab,D-142,Sushant Lok-lll,Golf Course Road,Sector 57,Gurgaon

2.2 AMBIENT NOISE MONITORING

2.2.1 Ambient Noise Monitoring Locations

The main objective of noise monitoring in the study area is to assess the present ambient noise levels near

project site due to various construction allied activities and increased vehicular movement. A preliminary

reconnaissance survey has been undertaken to identify the major noise generating sources in the area.

Ambient noise monitoring was conducted at 1 location as given in Table 2.6.

Table 2.6 Details of Ambient Noise Monitoring Stations

S. No. Location Code Location Name/ Description

1 N1 Near Main Gate

2.2.2 Methodology of Noise Monitoring

Noise levels were measured using sound level meter.

Noise level monitoring was carried out continuously for 24-hours with one hour interval starting at 06:00

hrs to 06:00 hrs next day. The noise levels were monitored on working days only. During each hour Leq

were directly computed by the instrument based on the sound pressure levels. Monitoring was carried out at

‘A’ response and fast mode.

2.2.3 Ambient Noise Monitoring Results

The location wise ambient noise monitoring results is summarized in Table 2.7. The location-wise

variation of noise levels are graphically presented in Figure 2.2.

Table 2.7 Ambient Noise Monitoring Results

S.

No. Parameters

Test Result dB (A)

Day Time (6:00 am to 10:00 pm)

Night Time (10:00 pm to 06:00 am)

1. Leq 57.45 50.32

2. Lmin 48.80 44.60

3. Lmax 64.50 58.40

CPCB Limits in dB(A) Leq ( Industrial area)

During Day Time

(6:00 am to 10:00 pm)

During Night Time

(10:00 pm to 06:00 am)

75.00 70.00

Page 17: SIX-MONTHLY ENVIRONMENTAL COMPLIANCE REPORT OF …nromoef.gov.in/SMPR/13102014/227.pdf · Half-yearly Compliance Report of EC ... Project: Grain Based ... conveyance of chemicals/materials,multi

Page 17 of 23 Project: Grain Based Distillery Unit (60 KLPD) and CPP (2.5 MV), Village Bakra, Tehsil Beri, District- Jhajjar,

Haryana. Half-yearly Compliance Report of EC (EC No. –J-11011/317/2010-IA II (I) Dated 12/10/2011) Conditions

Vardan EnviroLab,D-142,Sushant Lok-lll,Golf Course Road,Sector 57,Gurgaon

Figure 2.2 Location-wise Variation of Ambient Noise Levels

2.2.4 Discussion on Ambient Noise Levels in the Study Area

Day Time Noise Levels (Lday):

The day time noise level at all the locations were found to within limits prescribed for industrial area i.e. 75 db

(A).

Night Time Noise Levels (Lnight):

The night time noise level at all the locations were found to within limit prescribed for industrial area i.e. 70

dB (A).

0

10

20

30

40

50

60

70

80

Leq Lmin Lmax Limit

N1 Day Time

N1 Night Time

Page 18: SIX-MONTHLY ENVIRONMENTAL COMPLIANCE REPORT OF …nromoef.gov.in/SMPR/13102014/227.pdf · Half-yearly Compliance Report of EC ... Project: Grain Based ... conveyance of chemicals/materials,multi

Page 18 of 23 Project: Grain Based Distillery Unit (60 KLPD) and CPP (2.5 MV), Village Bakra, Tehsil Beri, District- Jhajjar,

Haryana. Half-yearly Compliance Report of EC (EC No. –J-11011/317/2010-IA II (I) Dated 12/10/2011) Conditions

Vardan EnviroLab,D-142,Sushant Lok-lll,Golf Course Road,Sector 57,Gurgaon

2.3 GROUND WATER QUALITY MONITORING

2.3.1 Ground water Quality Monitoring Locations

Keeping in view the importance of ground water, sample of ground water was collected from the project

site for the assessment of impacts of the project on the groundwater quality.

Water sample was collected from the project site. The sample was analyzed for various parameters to compare

with the standards for Ground water as per IS: 10500 for Groundwater sources. The details of water sampling

locations are given in Table 2.8.

Table2.8 Details of Water Quality Monitoring Station

S. No. Location Code Location Name/ Description

1. GW 1 Project Site

2.3.2 Methodology of ground water Quality Monitoring

Sampling of ground water was carried out on April, 2014. Samples were collected as grab sample and

sampling forms are filled in as per the sampling plan. The preservative sample were properly added to

preserve as per standard operating procedures (SOP) and stored immediately in ice boxes, which were ensured

for appropriate temperatures. Sample for chemical analysis was collected in polyethylene carboys. Sample

collected for metal content were acidified to <2 pH with 1 ml HNO3. A sample for bacteriological analysis

was collected in sterilized glass bottles.

Soon after the completion of sampling, chain of custody sheets for the samples are filled in and then they were

transported by road to Vardan Enviro Lab, Gurgaon for further analysis. Proper care was taken during packing

and transportation of samples. All the samples reached the central laboratory within the holding times for

different parameters. After ensuring the same the samples were forwarded immediately for analysis.

The samples were analyzed as per the standard procedures specified in 'Standard Methods for the Examination

of Water and Wastewater' published by American Public Health Association (APHA) and CPCB. The

analytical techniques and the test methods adopted for testing of ground water are given in Table 2.9..

Page 19: SIX-MONTHLY ENVIRONMENTAL COMPLIANCE REPORT OF …nromoef.gov.in/SMPR/13102014/227.pdf · Half-yearly Compliance Report of EC ... Project: Grain Based ... conveyance of chemicals/materials,multi

Page 19 of 23 Project: Grain Based Distillery Unit (60 KLPD) and CPP (2.5 MV), Village Bakra, Tehsil Beri, District- Jhajjar,

Haryana. Half-yearly Compliance Report of EC (EC No. –J-11011/317/2010-IA II (I) Dated 12/10/2011) Conditions

Vardan EnviroLab,D-142,Sushant Lok-lll,Golf Course Road,Sector 57,Gurgaon

2.3.3 Ground water Quality Monitoring Results

The detailed Ground water quality monitoring results are presented in Table 2.9.

Table 2.9 Ground water Quality Monitoring Results

S.

No. Parameter Result Test-Method

Limits of IS:10500 -2012

Desirable

limit

(Max.)

Permissible

limit in the

Absence of

Alternate

Source (Max.)

1. pH (at 25 0C) 7.84 APHA 22nd Edition, 4500-H+ B 6.5 to 8.5 No Relaxation

2. Colour (Hazen Unit) <5.0 APHA 22nd Edition, 2120 B 5 25

3. Turbidity (NTU) <1.0 APHA 22nd Edition, 2130 (B) 5 10

4. Odour Agreeable APHA 22nd Edition, 2150 Agreeable -

5. Taste Agreeable APHA 22nd Edition, 2160 Agreeable -

6. Chloride as Cl (mg/l) 168.40 APHA 22nd Edition, 4500-Cl- B 250 1000

7. Total Hardness as CaCO3 (mg/l) 420.50 APHA 22nd Edition, 2340 C 300 600

8. Calcium as Ca (mg/l) 102.70 APHA 22nd Edition, 3500 Ca B 75 200

9. Sulphate as SO4 (mg/l) 71.50 APHA 22nd Edition, 4500 E 200 400

10. Total Dissolved Solids (mg/l) 668.30 APHA 22nd Edition, 2540 C 500 2000

11. Alkalinity as CaCO3, (mg/l) 345.20 APHA 22nd Edition, 2320 B 200 600

12. Iron as Fe (mg/l) 0.24 APHA 22nd Edition, 3500-Fe B 0.3 1.0

13. Fluoride as F (mg/l) 0.71 APHA 22nd Edition, 4500-F- D 1.0 1.5

14. Residual free Chlorine (mg/l) <0.02 APHA 22nd Edition, 3500 Cl- B 0.2 -

15. Magnesium as Mg (mg/l) 39.92 APHA 22nd Edition, 2340 B 30 100

16 Zinc as Zn (mg/l) <0.01 APHA 22nd Edition, 3111 B 5 15

17. Nitrate as NO3 (mg/l) 1.68 IS : 3025 (P-34) 1988 45 No Relaxation

18. Lead as Pb (mg/l) <0.02 APHA 22nd Edition, 3111 B 0.05 No Relaxation

19. Total Kjehldal Nitrogen 2.65 IS : 3025-1964 (13) - -

20. Nickel (as Nil) <0.02 APHA 3111B 0.05 -

21. Chromium Total (as Cr) <0.02 APHA 3111B 0.05 No Relaxation

22. Copper (as Cu) <0.02 APHA 3111B 0.05 1.5

23. Mercury (as Hg) <0.001 APHA 5530 D 0.001 No Relaxation

24. Phenolic Compounds <0.001 APHA 3112B 0.001 0.002

25. Cyanide (as CN) <0.02 APHA 4500 CN C 0.05 No Relaxation

26. Cadmium (as Cd) <0.01 IS 3025 Part-59 0.01 No Relaxation

27. Manganese (as Mn) <0.02 APHA 3111 B 0.1 0.3

28. Selenium (as Se) <0.01 IS 3025 Part 56 0.01 No Relaxation

29. Arsenic (as As) <0.01 APHA 3114 B 0.01 No Relaxation

30. Boron (as B) <0.02 APHA 4500 B 8 1 5

31. Total Coliform <2/100ml IS: 1622:1981 - 10.00

32. E. Coli Absent IS: 1622:1981 - -

Page 20: SIX-MONTHLY ENVIRONMENTAL COMPLIANCE REPORT OF …nromoef.gov.in/SMPR/13102014/227.pdf · Half-yearly Compliance Report of EC ... Project: Grain Based ... conveyance of chemicals/materials,multi

Page 20 of 23 Project: Grain Based Distillery Unit (60 KLPD) and CPP (2.5 MV), Village Bakra, Tehsil Beri, District- Jhajjar,

Haryana. Half-yearly Compliance Report of EC (EC No. –J-11011/317/2010-IA II (I) Dated 12/10/2011) Conditions

Vardan EnviroLab,D-142,Sushant Lok-lll,Golf Course Road,Sector 57,Gurgaon

2.3.4 Discussion on Ground water Quality in the Study Area

The ground water quality in the project area is observed to be alkaline in nature with total alkalinity is 345

mg/L against desirable limit of 200 mg/L, however, alkalinity is less than the permissible limit of 600 mg/L.

Total dissolved solids in the drinking water is 420.50 mg/l which is also less than the limit of 500 mg/L.

However, remaining parameters are within the CPCB prescribed limits.

Page 21: SIX-MONTHLY ENVIRONMENTAL COMPLIANCE REPORT OF …nromoef.gov.in/SMPR/13102014/227.pdf · Half-yearly Compliance Report of EC ... Project: Grain Based ... conveyance of chemicals/materials,multi

Page 21 of 23 Project: Grain Based Distillery Unit (60 KLPD) and CPP (2.5 MV), Village Bakra, Tehsil Beri, District- Jhajjar,

Haryana. Half-yearly Compliance Report of EC (EC No. –J-11011/317/2010-IA II (I) Dated 12/10/2011) Conditions

Vardan EnviroLab,D-142,Sushant Lok-lll,Golf Course Road,Sector 57,Gurgaon

2.4 Waste Water

2.4.1 Waste Water Quality Monitoring Locations

Sample of waste water was collected from the project site for the assessment of impacts of the project on discharge

point.

Waste water sample was collected from factory ETP & STP location. The details of waste water sampling locations are

given in Table 2.10

Table 2.10 Details of Waste Water Quality Monitoring

S. No. Location Code Location Name/ Description

1. WW 1 From the ETP Outlet

2.4.2 Waste water result

Table: 2.11 STP Outlet Result

S. No. Parameter Protocol Result

1. pH (at 25 0C) APHA 22

nd Edition, 4500-H

+ B 8.12

2. COD (mg/l) APHA 22nd

Edition, 5220 B 67.42

3. BOD (3 Days at 27 0c) (mg/l)

IS 3025,P-44,1999

(Reaffirmed 2003) 23.20

4. Total Suspended Solids (mg/l) APHA 22nd

Edition, 2540 D 8.00

5. Oil and Grease (mg/l) APHA 22nd

Edition, 5220 E <0.40

Page 22: SIX-MONTHLY ENVIRONMENTAL COMPLIANCE REPORT OF …nromoef.gov.in/SMPR/13102014/227.pdf · Half-yearly Compliance Report of EC ... Project: Grain Based ... conveyance of chemicals/materials,multi

Page 22 of 23 Project: Grain Based Distillery Unit (60 KLPD) and CPP (2.5 MV), Village Bakra, Tehsil Beri, District- Jhajjar,

Haryana. Half-yearly Compliance Report of EC (EC No. –J-11011/317/2010-IA II (I) Dated 12/10/2011) Conditions

Vardan EnviroLab,D-142,Sushant Lok-lll,Golf Course Road,Sector 57,Gurgaon

2.4 SOIL MONITORING

2.4.1 Soil Monitoring Locations

The objective of the soil monitoring is to identify the impacts of ongoing project activities on soil quality

and also predict impacts, which have arisen due to execution of various constructions allied activities.

Accordingly, a study of assessment of the soil quality has been carried out.

To assess impacts of ongoing project activities on the soil in the area, the Physico-chemical characteristics

of soils were examined by obtaining soil samples from selected points and analysis of the same. Single

sample of soil was collected from the project site for studying soil characteristics, the location of which is

listed in Table 2.12.

Table 2.12 Details of Soil Quality Monitoring Location

S. No. Location Code Location Name/ Description

1. S1 Near Canteen

2.4.2 Methodology of Soil Monitoring

The sampling has been done in line with IS: 2720 & Methods of Soil Analysis, Part-1, 2nd edition, 1986 of

American Society for Agronomy and Soil Science Society of America. The homogenized samples were

analyzed for physical and chemical characteristics (physical, chemical and heavy metal concentrations).

The soil samples were collected in the month of April, 2014.

The samples have been analyzed as per the established scientific methods for Physico-chemical parameters.

The heavy metals have been analyzed by using Atomic Absorption Spectro-photometer.

Page 23: SIX-MONTHLY ENVIRONMENTAL COMPLIANCE REPORT OF …nromoef.gov.in/SMPR/13102014/227.pdf · Half-yearly Compliance Report of EC ... Project: Grain Based ... conveyance of chemicals/materials,multi

Page 23 of 23 Project: Grain Based Distillery Unit (60 KLPD) and CPP (2.5 MV), Village Bakra, Tehsil Beri, District- Jhajjar,

Haryana. Half-yearly Compliance Report of EC (EC No. –J-11011/317/2010-IA II (I) Dated 12/10/2011) Conditions

Vardan EnviroLab,D-142,Sushant Lok-lll,Golf Course Road,Sector 57,Gurgaon

2.4.3 Soil Monitoring Results

Single sample of soil is collected from the site to check the quality of soil of the study area .The Physico-

chemical characteristics of the soil, as obtained from the analysis of the soil sample, are presented in Table

2.13.

Table 2.13 Physico-Chemical Characteristics of Soil in the Study Area

2.4.4 Discussion on Soil Characteristics in the Study Area

The soil in study area is characterized by moderate organic content. The soil quality in the project area has

not been affected by the project activities.

S. No. Parameter Result Test-Method

1. \ 8.09 IS : 2720 (P-26,1987)

2. Conductivity (mS/ cm) (1:2 soil water sus.) 0.56 IS14767-2000 Reaffirmed 2006

3. Bulk density (gm/cc) 1.40 USDA Method

4. Soil Texture Silty Loam USDA Method

5. Color Brownish USDA Method

6. Water holding capacity (%) 31.42 USDA Method

7. Chloride (mg/100g) 27.37 USDA Method

8. Calcium (mg/100g) 24.84 USDA Method

9. Sodium (mg/100g) 7.34 USDA Method

10. Potassium (kg/hec) 168.20 USDA Method

11. Magnesium (mg/100g) 1.63 USDA Method

12. Organic Matter (%) 0.11 IS:2720 (P-22, 1972)

13. Available Nitrogen as (kg/hec) 212.38 IS:14684, 1999

14. Phosphorus (kg/hec) 87.86 USDA, APHA-4500PC

15. Zinc (mg/100g) 4.23 APHA-3030D, APHA-3111B

16. Lead (mg/100g) 1.01 APHA-3030D, APHA-3111B

17. Copper as Cu (mg/100g) 3.65 APHA-3030D, APHA-3111B

18. Mangnese as Mn (mg/100g) 16.58 APHA-3030D, APHA-3111B

19. Chromium as Cr (mg/100g) 0.98 APHA-3030D, APHA-3111B

20. Cadmium as Cd (mg/100g) 1.89 APHA-3030D, APHA-3111B