DEC. 2015 [[SIX MONTHLY COMPLIANCE REPORT OF GROUP HOUSING PROJECT AT SECTOR 77, GURGAON, HARYANA]] M/s JANPRIYA BUILDESTATE PVT. LTD. S. No. CHAPTER 3 ENVIRONMENTAL COMPLIANCE STATUS Name of the project: Group Housing Project at Sector 77, Gurgaon, Haryana EC letter no.: SEIAA/HR/2012/257 Dated 30th August, 2012 Period of Compliance report: April 2015 to September 2015 Conditions Status of Compliance PART A - Specific Conditions: Construction Phase:- I. “Consent for Establishment” shall be obtained from Haryana State Pollution Control Board under Air and Water Act and a copy shall be submitted to the SEIAA, Haryana before the start of any construction work at site. Consent to Establish has been obtained and copy of the same is attached as Annexure-II. II. A first aid room as proposed in the project report shall be provided both during construction and operation phase of the project. During construction phase, a first aid room has been provided on site for the workers. A doctor has been appointed temporarily on site to deal with the workers. MOU has been signed with Shri Radhey Hospital and Trauma Centre for emergency situations. Copy of the MoU has been attached as Annexure III. The same will be followed during operation phase.

CHAPTER 3 ENVIRONMENTAL COMPLIANCE …nromoef.gov.in/SMPR/12012016/2.pdfDEC. 2015 [[SIX MONTHLY COMPLIANCE REPORT OF GROUP HOUSING PROJECT AT SECTOR 77, GURGAON, HARYANA]] M/s JANPRIYA

  • Upload
    donhu

  • View
    217

  • Download
    2

Embed Size (px)

Citation preview

Page 1: CHAPTER 3 ENVIRONMENTAL COMPLIANCE …nromoef.gov.in/SMPR/12012016/2.pdfDEC. 2015 [[SIX MONTHLY COMPLIANCE REPORT OF GROUP HOUSING PROJECT AT SECTOR 77, GURGAON, HARYANA]] M/s JANPRIYA

DEC. 2015 [[SIX MONTHLY COMPLIANCE REPORT OF GROUP HOUSING PROJECT AT SECTOR 77, GURGAON, HARYANA]]

M/s JANPRIYA BUILDESTATE PVT. LTD.

S. No.

CHAPTER 3 ENVIRONMENTAL COMPLIANCE STATUS

Name of the project: Group Housing Project at Sector 77, Gurgaon, Haryana

EC letter no.: SEIAA/HR/2012/257 Dated 30th August, 2012

Period of Compliance report: April 2015 to September 2015

Conditions Status of Compliance

PART A - Specific Conditions: Construction Phase:-

I. “Consent for Establishment” shall

be obtained from Haryana State

Pollution Control Board under Air

and Water Act and a copy shall be

submitted to the SEIAA, Haryana

before the start of any construction

work at site.

Consent to Establish has been

obtained and copy of the same

is attached as Annexure-II.

II. A first aid room as proposed in the

project report shall be provided both

during construction and operation

phase of the project.

During construction phase, a

first aid room has been provided

on site for the workers. A doctor

has been appointed temporarily

on site to deal with the workers.

MOU has been signed with Shri

Radhey Hospital and Trauma

Centre for emergency situations.

Copy of the MoU has been

attached as Annexure III. The

same will be followed during

operation phase.

Page 2: CHAPTER 3 ENVIRONMENTAL COMPLIANCE …nromoef.gov.in/SMPR/12012016/2.pdfDEC. 2015 [[SIX MONTHLY COMPLIANCE REPORT OF GROUP HOUSING PROJECT AT SECTOR 77, GURGAON, HARYANA]] M/s JANPRIYA

DEC. 2015 [[SIX MONTHLY COMPLIANCE REPORT OF GROUP HOUSING PROJECT AT SECTOR 77, GURGAON, HARYANA]]

M/s JANPRIYA BUILDESTATE PVT. LTD.

III. Adequate drinking water and

sanitary facilities should be

provided for construction workers at

the site. Provision should be made

for mobile toilets. Open defecation

by the labours is strictly prohibited.

The safe disposal of waste water and

solid wastes generated during the

construction phase should be

ensured.

Drinking water facility for

workers is being provided by

private water tankers from

HUDA. Bills for the same are

attached as Annexure-IV.

Sufficient arrangements for

toilets and bathing have been

provided on site. Mobile toilets

are available for workers on site.

Wastewater is disposed through

soak pit.

IV. All the top soil excavated during

construction activities should be

stored for use in

horticulture/landscape development

within the project site.

Excavated muck is being stored

at an isolated place within the

campus and will be utilized in

Greenbelt development and

leveling.

V. Disposal of muck during

construction phase should not

create any adverse effect on the

neighboring communities and be

disposed off taking the necessary

precautions for general safety and

health aspects of people, only in

approved sites with the approval of

competent authority.

The construction material is

stored within the project area.

No excavated muck has been

disposed off outside the project

premises and is stored at an

assigned location within the site

boundary. No Human

settlement is present nearby

Regular water sprinkling is

being done to avoid any such

problem.

Page 3: CHAPTER 3 ENVIRONMENTAL COMPLIANCE …nromoef.gov.in/SMPR/12012016/2.pdfDEC. 2015 [[SIX MONTHLY COMPLIANCE REPORT OF GROUP HOUSING PROJECT AT SECTOR 77, GURGAON, HARYANA]] M/s JANPRIYA

DEC. 2015 [[SIX MONTHLY COMPLIANCE REPORT OF GROUP HOUSING PROJECT AT SECTOR 77, GURGAON, HARYANA]]

M/s JANPRIYA BUILDESTATE PVT. LTD.

VI. Construction spoils, including

bituminous material and other

hazardous materials, must not be

allowed to contaminate

watercourses and the dump sites for

such material must be secured so

that they should not leach into the

ground water and any hazardous

waste generated during

construction phase, should be

disposed off as per applicable rules

and norms with necessary approval

of the Haryana State Pollution

Control Board.

Construction spoils including

bituminous material and other

hazardous material is being

kept at secured place. Proper

provision for dumping of waste

is ensured. All the hazardous

waste like spent oils and used

oil etc. are being sold to the

waste oil recycler authorized by

Haryana State Pollution Control

Board.

VII. The diesel generator sets to be used

during construction phase should

be low sulphur diesel type and

should conform to Environment

(Protection) Rules prescribed for air

and noise emission standards.

DG sets are being used for the

event of power failure only and

are running on low Sulphur

diesel and are conforming to

Environment (Protection) Rules

prescribed for air and noise

emission standards.

VIII. The diesel required for operating DG

sets shall be stored in underground

tanks and if required, clearance

from Chief Controller of Explosives

shall be taken.

As DG set is being used at the

time of power failure so diesel is

being purchased daily on

consumption basis. In operation

phase diesel generators will be

used having ample capacity. If

required permission from Chief

Page 4: CHAPTER 3 ENVIRONMENTAL COMPLIANCE …nromoef.gov.in/SMPR/12012016/2.pdfDEC. 2015 [[SIX MONTHLY COMPLIANCE REPORT OF GROUP HOUSING PROJECT AT SECTOR 77, GURGAON, HARYANA]] M/s JANPRIYA

DEC. 2015 [[SIX MONTHLY COMPLIANCE REPORT OF GROUP HOUSING PROJECT AT SECTOR 77, GURGAON, HARYANA]]

M/s JANPRIYA BUILDESTATE PVT. LTD.

Controller of Explosives will be

obtained.

IX. Ambient noise levels should

conform to residential standards

both during day and night.

Incremental pollution loads on the

ambient air and noise quality

should be closely monitored during

construction phase. Adequate

measures should be taken to reduce

ambient air and noise level during

construction phase, so as to

conform to the stipulated residential

standards.

Ambient noise and air

standards were closely

monitored and all results are

found below the standards

specified by CPCB. Reports are

attached as Annexure-V and

Monitoring Analysis is

incorporated in Chapter 4.

Measures to reduce ambient air

and noise level during

construction phase are being

followed as per the proposal

submitted to SEIAA, Haryana.

Water sprinkling is being done

twice using 24 KLD water.

X. Fly ash should be used as building

material in the construction as per

the provisions of Fly Ash

Notification of September, 1999 and

amended as on 27th

Agreed. Fly ash bricks and CLC

blocks are being used in

construction as per the

provisions of fly ash notification

of September, 1999 and as

amended on 27

August, 2003 th August, 2003.

XI. Ready mixed concrete must be used

in building construction.

Agreed. Ready mixed concrete is

being used in building

construction. RMC plant has

been installed on site.

XII. Storm water control and its re-use

as per CGWB and BIS standards for

Agreed. Storm water control and

its reuse will be maintained as

Page 5: CHAPTER 3 ENVIRONMENTAL COMPLIANCE …nromoef.gov.in/SMPR/12012016/2.pdfDEC. 2015 [[SIX MONTHLY COMPLIANCE REPORT OF GROUP HOUSING PROJECT AT SECTOR 77, GURGAON, HARYANA]] M/s JANPRIYA

DEC. 2015 [[SIX MONTHLY COMPLIANCE REPORT OF GROUP HOUSING PROJECT AT SECTOR 77, GURGAON, HARYANA]]

M/s JANPRIYA BUILDESTATE PVT. LTD.

various applications should be

ensured.

per Central Ground Water

Board and BIS standards for

various applications.

XIII Water demand during construction

should be reduced by use of pre-

mixed concrete, curing agents and

other best practices as referred.

Water demand during

construction phase is being

reduced by using premixed

concrete and curing agents.

XIII. In view of the severe constraints in

water supply augmentation in the

region and sustainability of water

resource the developer will submit

NOC from CGWA specifying water

extraction quantities and assurance

from HUDA/ utility provider

indicating source of water-potable

and non-potable. Assurance is

required for both construction and

operation stages separately. It shall

be submitted to SEIAA/ R.O. MOEF

Chandigarh before the start of

construction

No ground water extraction is

being done during construction

phase and the same will be

followed during operation phase.

Water for construction is being

taken from STP of HSIIDC. For

drinking and other domestic

purpose, water is being supplied

by HUDA. Copy of challan from

HSIIDC STP is attached as

Annexure VI.

XV Roof should meet prescriptive

requirement as per Energy

Conservation Building Code by

using appropriate thermal

insulation material to fulfill

requirement.

Agreed. Building is being

designed & constructed as per

the National Building Code &

Energy Conservation building

Code.

Page 6: CHAPTER 3 ENVIRONMENTAL COMPLIANCE …nromoef.gov.in/SMPR/12012016/2.pdfDEC. 2015 [[SIX MONTHLY COMPLIANCE REPORT OF GROUP HOUSING PROJECT AT SECTOR 77, GURGAON, HARYANA]] M/s JANPRIYA

DEC. 2015 [[SIX MONTHLY COMPLIANCE REPORT OF GROUP HOUSING PROJECT AT SECTOR 77, GURGAON, HARYANA]]

M/s JANPRIYA BUILDESTATE PVT. LTD.

XVI Opaque wall should meet

prescriptive requirement as per

Energy Conservation Building Code

which is proposed to be mandatory

for all air conditioned spaces while

it is inspirational for non-air-

conditioned spaces by use of

appropriate thermal insulation

material to fulfill requirement.

Agreed. Opaque wall will meet

prescriptive requirement as per

Energy Conservation Building

Code for all air conditioned

spaces while it is aspirational

for non-air conditioned spaces

by use of appropriate thermal

insulation to fulfill requirement.

XVII The approval of the competent

authority shall be obtained for

structural safety of the building on

account of earthquake, adequacy of

firefighting equipment, etc. as per

National Building Code including

protection measures from lightening

etc. If any forestland is involved in

the proposed site, clearance under

Forest Conservation Act shall be

taken from the competent Authority.

a) To deal with any fire related

accident, firefighting facility of

single handed hydrant valve,

long hose reel, and portable fire

extinguisher is being provided.

b) The project falls under

seismic active Zone IV

indicating high damage risk

zone. The buildings are being

designed as earthquake

resistant and comply with the

required IS specifications.

Structural safety of the building

due to earthquake, adequacy of

firefighting equipment, etc. as

per the National Building Code

2005 including protection

measures from lightening etc.

c) No forest land is involved in

the project site.

Page 7: CHAPTER 3 ENVIRONMENTAL COMPLIANCE …nromoef.gov.in/SMPR/12012016/2.pdfDEC. 2015 [[SIX MONTHLY COMPLIANCE REPORT OF GROUP HOUSING PROJECT AT SECTOR 77, GURGAON, HARYANA]] M/s JANPRIYA

DEC. 2015 [[SIX MONTHLY COMPLIANCE REPORT OF GROUP HOUSING PROJECT AT SECTOR 77, GURGAON, HARYANA]]

M/s JANPRIYA BUILDESTATE PVT. LTD.

XVIII. Overexploited groundwater and

impending severe shortage of water

supply in the region requires the

developer to redraw the water and

energy conservation plan. Developer

shall submit details of good

practices that have been included in

the project to reduce the overall

footprint of the proposed

development including detailed

water balance along with source

and quantities of potable and non-

potable water requirement

(including water requirement during

construction phase) incorporating

water efficiency/ saving measures

as well as water reuse/ recycling

within 3 months to the SEIAA,

Haryana and R.O. MOEF, GOI,

Chandigarh before the start of

construction.

Water efficient fixtures will be

used to reduce daily water

requirement. Water efficiency/

saving measures along with

water balance diagram have

already been submitted to

SEIAA, Haryana.

XIX. The project proponent shall

construct 16 nos. rain water

harvesting pits for recharging the

ground water within the project

premises. Rain water harvesting pits

shall be designed to make

provisions for silting chamber and

removal of floating matter before

a) 16 rain water harvesting

pits (i.e. 1 pit/acre) have

been proposed for

artificial recharging the

ground water within the

project premises. 8 Rain

water harvesting pits have

already been constructed.

Page 8: CHAPTER 3 ENVIRONMENTAL COMPLIANCE …nromoef.gov.in/SMPR/12012016/2.pdfDEC. 2015 [[SIX MONTHLY COMPLIANCE REPORT OF GROUP HOUSING PROJECT AT SECTOR 77, GURGAON, HARYANA]] M/s JANPRIYA

DEC. 2015 [[SIX MONTHLY COMPLIANCE REPORT OF GROUP HOUSING PROJECT AT SECTOR 77, GURGAON, HARYANA]]

M/s JANPRIYA BUILDESTATE PVT. LTD.

entering harvesting pit.

Maintenance budget and persons

responsible for maintenance must

be provided. Care shall also be

taken care that contaminated water

do not enter any RWH pit.

b) Persons have been hired

for maintenance of rain

water harvesting pits.

c) Care is being taken so

that contaminated water

does not enter any RWH

pit.

XX. The project proponent shall provide

minimum one hydraulic ladder of

sufficient length for escape of people

in case of fire.

This will be followed.

XXI The project proponent shall submit

assurance from DHBVN for supply

of 5658 KW of power supply before

the start of construction. In no case

project will be operational solely on

generators without any power

supply from any external power

utility.

Agreed. Power requirement is

being supplied by DHBVN.

Application regarding the

intimation of required power

load has been given to DHBVN.

XXII Detail calculation of power load and

ultimate power load of the project

shall be submitted to DHBVN under

intimation to SEIAA, Haryana before

the start of construction. Provisions

shall be made for electrical

infrastructure in the licensed area.

Agreed. Detailed calculation

regarding power load and

ultimate power has already been

submitted to DHBVN under

intimation to SEIAA, Haryana

before the start of construction.

Page 9: CHAPTER 3 ENVIRONMENTAL COMPLIANCE …nromoef.gov.in/SMPR/12012016/2.pdfDEC. 2015 [[SIX MONTHLY COMPLIANCE REPORT OF GROUP HOUSING PROJECT AT SECTOR 77, GURGAON, HARYANA]] M/s JANPRIYA

DEC. 2015 [[SIX MONTHLY COMPLIANCE REPORT OF GROUP HOUSING PROJECT AT SECTOR 77, GURGAON, HARYANA]]

M/s JANPRIYA BUILDESTATE PVT. LTD.

XXIII The project proponent shall obtain

NOC from nearest fire station before

the start of construction.

Fire Scheme has been approved

and is attached as Annexure

VII.

XXIV The project proponent shall not

raise any construction in the

natural land

depression/Nallah/water course

and shall ensure that the natural

flow from the nallah/water course is

not obstructed.

There is no natural land

depression/ Nallah/ water

course in the project site.

Natural flow during rainy

season will not be obstructed as

weep holes are being provided to

avoid any such obstruction.

XXV The project proponent shall keep

the plinth level of the building

blocks sufficiently above the level of

the approach road to the Group

Housing project as per the

prescribed by-laws. Levels of the

other areas in the Group Housing

Projects shall also be kept suitably

so as to avoid flooding.

Plinth level of the building

blocks has been made

sufficiently above the level of the

approach road. Level of the

other areas will be kept suitably

above the approach road level to

avoid flooding.

XXVI Construction shall be carried out so

that density of population does not

exceed as approved by Directorate

General Town and Country Planning

Department, Haryana.

Agreed. Construction is being

carried out as per plans

approved by DTCP, Haryana

XXVII The project proponent shall submit

an affidavit that with the declaration

that ground water will not be used

No ground water is being

utilized in the construction

work. Only treated water is

Page 10: CHAPTER 3 ENVIRONMENTAL COMPLIANCE …nromoef.gov.in/SMPR/12012016/2.pdfDEC. 2015 [[SIX MONTHLY COMPLIANCE REPORT OF GROUP HOUSING PROJECT AT SECTOR 77, GURGAON, HARYANA]] M/s JANPRIYA

DEC. 2015 [[SIX MONTHLY COMPLIANCE REPORT OF GROUP HOUSING PROJECT AT SECTOR 77, GURGAON, HARYANA]]

M/s JANPRIYA BUILDESTATE PVT. LTD.

for construction and only treated

water should be used for

construction.

being used. Affidavit regarding

the same has already been

submitted along with previous

compliance report.

XXVIII The project proponent shall design

the water supply system @135 lpcd

instead of 86 lpcd including savings

due to use of treated water.

Accordingly the requirement of

water supply and water balance

diagram be prepared and submitted

to SEIAA Haryana before start of

construction. Sewage and STP

capacity shall be suitably increased

accordingly

Water calculations have been

done using daily water

requirement for residents as

135 lpcd instead of 86 lpcd.

Water Balance Diagram showing

the same has already been

submitted to SEIAA along with

Form –I, Form-IA, Conceptual

plan and other supporting

documents as prescribed by

SEIAA, Haryana.

XXIX That the project proponent shall

provide water bodies of size of 5% of

the net project areas as stipulated

and ordered by Ministry of

Environment and Forests,

Government of India

This will be followed.

PART A- SPECIFIC CONDITIONS : Operation Phase

I The Sewage Treatment Plant (STP)

shall be installed for the treatment

of the sewage to the prescribed

standards including odor and

treated effluent will be recycled to

a) STP of capacity 500 KLD is

being installed at the site for

treatment of waste water of 387

KLD.

b) Trained and skillful persons

Page 11: CHAPTER 3 ENVIRONMENTAL COMPLIANCE …nromoef.gov.in/SMPR/12012016/2.pdfDEC. 2015 [[SIX MONTHLY COMPLIANCE REPORT OF GROUP HOUSING PROJECT AT SECTOR 77, GURGAON, HARYANA]] M/s JANPRIYA

DEC. 2015 [[SIX MONTHLY COMPLIANCE REPORT OF GROUP HOUSING PROJECT AT SECTOR 77, GURGAON, HARYANA]]

M/s JANPRIYA BUILDESTATE PVT. LTD.

achieve zero exit discharge. The

installation of the STP should be

certified by an independent expert

and a report in this regard shall be

submitted to the SEIAA, Haryana

before the project is commissioned

for operation. Tertiary treatment of

waste water is mandatory.

Discharge of treated sewage shall

conform to the norms and

standards of HSPCB, Panchkula.

will be deputed for handling and

management of STP.

c) Treated effluent will be reused

in flushing, horticulture and DG

cooling etc. Dual plumbing plan

will be adopted for the same.

II Separation of the grey and black

water should be done by the use of

dual plumbing line. Treatment of

100% grey water by decentralized

treatment should be done ensuring

that the re-circulated water should

have BOD maximum upto 10 ppm

and the recycled water will be used

for flushing, gardening and DG set

cooling and running of foundation

in the water body to achieve zero

exit discharge.

Dual Plumbing line will be

provided for the separation of

the grey and black water

generated from site. Dual

plumbing plan has already been

submitted to SEIAA, Haryana.

Waste water generated during

operation phase will be treated

in STP and treated water from

STP will be recycled to

maximum extent, through dual

plumbing piping system and will

be used for flushing, gardening

and DG set cooling.

III For disinfection of the treated

wastewater ultra violet radiation or

ozonization process should be used.

Ultraviolet technology is

proposed for tertiary treatment.

Page 12: CHAPTER 3 ENVIRONMENTAL COMPLIANCE …nromoef.gov.in/SMPR/12012016/2.pdfDEC. 2015 [[SIX MONTHLY COMPLIANCE REPORT OF GROUP HOUSING PROJECT AT SECTOR 77, GURGAON, HARYANA]] M/s JANPRIYA

DEC. 2015 [[SIX MONTHLY COMPLIANCE REPORT OF GROUP HOUSING PROJECT AT SECTOR 77, GURGAON, HARYANA]]

M/s JANPRIYA BUILDESTATE PVT. LTD.

IV The solid waste generated should be

properly collected and segregated.

Bio-degradable waste will be

decomposed at site and dry/ inert

solid waste should be disposed off to

be approved sites for land filling

after recovering recyclable material.

During the operational phase,

2491.40 kg/day of solid waste

will be generated and collected

in colored bins (green, blue and

dark grey) separate for bio-

degradable and non-

biodegradable are proposed to

be provided at the strategic

locations within the site and will

be done according to solid waste

management plan submitted

earlier.

a) Biodegradable waste will be

composted by using organic

waste converter at the site

earmarked within the project

area.

b) Dry/inert solid waste will be

disposed off to the approved

sites for land filling after

recovering recyclable material.

V Diesel power generating sets

proposed as source of backup power

for lifts, common area illumination

and for domestic use should be of

enclosed type and conform to rules

made under the Environment

a) DG Sets will be used as

backup power and mainly

lift, common area and for

domestic use area. DG

sets are proposed for STP

so that it may run in the

Page 13: CHAPTER 3 ENVIRONMENTAL COMPLIANCE …nromoef.gov.in/SMPR/12012016/2.pdfDEC. 2015 [[SIX MONTHLY COMPLIANCE REPORT OF GROUP HOUSING PROJECT AT SECTOR 77, GURGAON, HARYANA]] M/s JANPRIYA

DEC. 2015 [[SIX MONTHLY COMPLIANCE REPORT OF GROUP HOUSING PROJECT AT SECTOR 77, GURGAON, HARYANA]]

M/s JANPRIYA BUILDESTATE PVT. LTD.

(Protection) Act, 1986. The location

of the DG sets should be in the

basement as promised by the

project proponent with appropriate

stack height i.e. above the roof level

as per CPCB norms. The diesel used

for DG sets should be of low

sulphurcontents (maximum upto

0.25%)

condition of power failure

also.

b) The height of DG Stacks

will be raised at least 6m

above the roof level within

the project site.

c) To avoid noise pollution

acoustic enclosure over

the DG Set will be placed

as per rules made under

the Environment

(Protection) Act, 1986.

d) The diesel used for DG

sets will be taken from

filling station for high

speed diesel.

VI Ambient Noise Level should be

controlled to ensure that it does not

exceed the prescribed standards

both within and at the boundary of

the proposed Group Housing

Complex.

Agreed. Ambient noise level will

be controlled by regular

maintenance of vehicles and

green belt development.

VII The project proponent should

maintain at least 23% as green

cover area for tree plantation

especially all around the periphery

of the project and on the road sides

preferably with local species so as to

Agreed. 38.27% green cover area

has been proposed for green belt

development (23% for tree

plantation all around the

periphery of the project & on the

road sides, and 15.3% for

Page 14: CHAPTER 3 ENVIRONMENTAL COMPLIANCE …nromoef.gov.in/SMPR/12012016/2.pdfDEC. 2015 [[SIX MONTHLY COMPLIANCE REPORT OF GROUP HOUSING PROJECT AT SECTOR 77, GURGAON, HARYANA]] M/s JANPRIYA

DEC. 2015 [[SIX MONTHLY COMPLIANCE REPORT OF GROUP HOUSING PROJECT AT SECTOR 77, GURGAON, HARYANA]]

M/s JANPRIYA BUILDESTATE PVT. LTD.

provide protection against

particulates and noise.The 15.3%

open spaces inside the plot should

be preferably landscaped and

covered with vegetation/grass,

herbs and shrubs. Only locally

available plant species shall be

used.

organized green spaces inside

the plot). The open spaces

inside the plot will be preferably

landscaped and covered with

vegetation/grass, herbs and

shrubs. Only locally available

plant species will be used.

Landscape plan has been

submitted with previous

compliance report.

VIII Weep holes in the compound front

walls shall be provided to ensure

natural drainage of rain water in the

catchments area during the

monsoon period.

Agreed.

IX Rainwater harvesting for roof run-

off and surface run-off, as per plan

submitted should be implemented.

Before recharging the surface run-

off, pre-treatment through

sedimentation tanks must be done

to remove suspended matter, oil and

grease. The bore well for rainwater

recharging should be kept at least 5

mts above the highest ground water

table. Care should be taken that the

contaminated water does not enter

Rainwater harvesting as per

plan for roof run-off and surface

run-off will be implemented.

Suspended matter, oil and

grease will be removed by

treatment before recharging

with surface run-off. The bore

well for recharge will be kept at

least 5 mts above the highest

ground water table.

Page 15: CHAPTER 3 ENVIRONMENTAL COMPLIANCE …nromoef.gov.in/SMPR/12012016/2.pdfDEC. 2015 [[SIX MONTHLY COMPLIANCE REPORT OF GROUP HOUSING PROJECT AT SECTOR 77, GURGAON, HARYANA]] M/s JANPRIYA

DEC. 2015 [[SIX MONTHLY COMPLIANCE REPORT OF GROUP HOUSING PROJECT AT SECTOR 77, GURGAON, HARYANA]]

M/s JANPRIYA BUILDESTATE PVT. LTD.

any RWH pit.

X The ground water level and its

quality should be monitored

regularly in consultation with

Central Ground Water Authority.

No ground water extraction will

be done.

XI There should be no traffic

congestion near the entry and exist

points from the roads adjoining the

proposed project site. Parking

should be fully internalized and no

public space should be utilized.

Parking will be completely

internalized and no public space

will be utilized. Bell shaped

entry and exit points will be

provided to minimize traffic

congestion.

XII A report on the energy conservation

measures conforming to energy

conservation norms finalize by

Bureau of Energy Efficiency should

be prepared incorporating details

about building materials &

technology; R & U factors etc. and

submit to the SEIAA in three

months time.

Report on energy conservation

measure conforming to energy

conservation norms finalized by

BEE which will include details

of building materials and

technology, R & U factors etc

has already been submitted to

SEIAA.

XIII Energy conservation measures like

installation of CFLs/TFLs for

lighting the areas outside the

building should be integral part of

the project design and should be in

place before project commissioning,

used CFLs and TFLs should be

properly collected and disposed

a) LEDs & CFLs will be used at

most of the locations inside the

project & near boundary wall as

a measure of energy

conservation.

b) Solar lights are proposed for

open spaces, common area and

Page 16: CHAPTER 3 ENVIRONMENTAL COMPLIANCE …nromoef.gov.in/SMPR/12012016/2.pdfDEC. 2015 [[SIX MONTHLY COMPLIANCE REPORT OF GROUP HOUSING PROJECT AT SECTOR 77, GURGAON, HARYANA]] M/s JANPRIYA

DEC. 2015 [[SIX MONTHLY COMPLIANCE REPORT OF GROUP HOUSING PROJECT AT SECTOR 77, GURGAON, HARYANA]]

M/s JANPRIYA BUILDESTATE PVT. LTD.

off/sent for recycling as per the

prevailing guidelines/rules of the

regulatory authority to avoid

mercury contamination. Use of solar

panels must be adapted to the

maximum extent possible for energy

conservation.

landscape area.

c) Used CFLs and TFLs will be

properly collected and disposed

off by giving this waste to the

recyclers authorized by Haryana

State Pollution Control Board,

an agreement will be signed

with the recycler for the same

XIV The solid waste generated should be

properly collected and segregated as

per the requirement of the MSW

Rules, 2000 and as amended from

time to time. The bio-degradable

waste should be composted by

vermin-composting at the site

earmarked within the project area

and dry/inert solid waste should be

disposed off to the approved sites

for land filling after recovering

recyclable material.

a) The solid waste generated will

be collected and segregated as

per the requirement of the MSW

Rules, 2000.

b) Bio-degradable waste will be

composted by using organic

waste converter at the site

earmarked within the project

area.

c) Dry/inert solid waste will be

disposed off to the approved

sites for land filling after

recovering recyclable material.

XV The provision of the solar water

heating system shall be as per

norms specified by HAREDA and

shall be made operational in each

building block.

Solar water heating system will

be provided in each tower as per

HAREDA norms.

XVI The project proponent shall use the There is no bore well on the site

Page 17: CHAPTER 3 ENVIRONMENTAL COMPLIANCE …nromoef.gov.in/SMPR/12012016/2.pdfDEC. 2015 [[SIX MONTHLY COMPLIANCE REPORT OF GROUP HOUSING PROJECT AT SECTOR 77, GURGAON, HARYANA]] M/s JANPRIYA

DEC. 2015 [[SIX MONTHLY COMPLIANCE REPORT OF GROUP HOUSING PROJECT AT SECTOR 77, GURGAON, HARYANA]]

M/s JANPRIYA BUILDESTATE PVT. LTD.

water from already existing tube

wells for domestic purposes only

and that too after getting prior

permission from CGWA.

and water will be taken from

HUDA only.

XVII The traffic plan and parking plan

proposed by the PP should be

adhered to meticulously with

further scope of additional parking

for further requirement. There

should be no traffic congestion near

the entry and exit points from the

roads adjoining the proposed project

site. Parking should be fully

internalized and no public space

should be used.

Agreed. There will be no traffic

congestion near the entry and

exit points from the roads

adjoining the proposed project

site. Bell shaped entry and exit

points will be provided. Parking

will be fully internalized and no

public space should be used.

Traffic circulation cum Parking

plan is enclosed as Annexure-

VIII.

XVIII The project shall be operationalized

only once HUDA will provide

domestic water supply system in the

area.

This will be followed.

XIX Operation and maintenance of STP,

solid waste management and

Electrical Infrastructure shall be

ensured even after the completion of

sell.

Agreed. Operation and

maintenance of STP, solid waste

management and electrical

infrastructure, and pollution

control measures will be

ensured for lifetime as contract

will be done by various agencies

and all these conditions will be

Page 18: CHAPTER 3 ENVIRONMENTAL COMPLIANCE …nromoef.gov.in/SMPR/12012016/2.pdfDEC. 2015 [[SIX MONTHLY COMPLIANCE REPORT OF GROUP HOUSING PROJECT AT SECTOR 77, GURGAON, HARYANA]] M/s JANPRIYA

DEC. 2015 [[SIX MONTHLY COMPLIANCE REPORT OF GROUP HOUSING PROJECT AT SECTOR 77, GURGAON, HARYANA]]

M/s JANPRIYA BUILDESTATE PVT. LTD.

mentioned in the MoU signed

with RWA at the time of handing

over the project.

XX Different types of Wastes should be

disposed off as per the provisions of

Municipal Solid Waste, biochemical

waste, Hazardous waste, e- waste,

batteries and plastic rules made

under Environment Protection Act,

1986.

a) Different type of solid waste

will be collected in colored bins

(green, blue and dark grey)

separate for bio-degradable and

non-biodegradable are proposed

to be provided at the strategic

locations within the site and will

be done according to solid waste

management plan submitted too

SEIAA, Haryana.

b) Biodegradable waste will be

subjected to composting. The

inert solid waste will be

transported to a local Solid

Waste dumping site.

c) E-waste and battery waste

will be disposed of as per

existing E-waste Management

Rules 2011 and Batteries

Management Rules 2001.

XXI Standards for discharge of

Environmental pollutants as

enshrined in various schedules of

rule 3 of Environment Protection

Rule 1986 shall be strictly complied

Air Pollution: Only source of

air pollution will be DG Set.

Stack height will be kept 6m

above the highest roof level for

better dispersion of pollutant

Page 19: CHAPTER 3 ENVIRONMENTAL COMPLIANCE …nromoef.gov.in/SMPR/12012016/2.pdfDEC. 2015 [[SIX MONTHLY COMPLIANCE REPORT OF GROUP HOUSING PROJECT AT SECTOR 77, GURGAON, HARYANA]] M/s JANPRIYA

DEC. 2015 [[SIX MONTHLY COMPLIANCE REPORT OF GROUP HOUSING PROJECT AT SECTOR 77, GURGAON, HARYANA]]

M/s JANPRIYA BUILDESTATE PVT. LTD.

with generated from DG sets.

Noise Pollution: Only source of

noise pollution will be DG Set,

enclosure and silencers will be

provided on the DG Set to

reduce the noise to impact the

surroundings. Further use of

horns with jarring sounds, and

noisy trucks with damaged

exhaust pipes to be banned.

Soil Pollution: Landscaping will

be done properly.

Water Pollution: STP of

capacity 500 KLD is being

installed in first phase and

treated effluent will be reused in

horticulture and flushing

through dual plumbing lines

and as per requirement it will be

used in Construction of second

phase also.

PART-B GENERAL CONDITIONS

I The project Proponent shall ensure

the commitments made in Form -1,

Form- 1A, EIA/ EMP and other

documents submitted to SEIAA for

the protection of environment and

proposed environmental safeguards

Agreed.

Page 20: CHAPTER 3 ENVIRONMENTAL COMPLIANCE …nromoef.gov.in/SMPR/12012016/2.pdfDEC. 2015 [[SIX MONTHLY COMPLIANCE REPORT OF GROUP HOUSING PROJECT AT SECTOR 77, GURGAON, HARYANA]] M/s JANPRIYA

DEC. 2015 [[SIX MONTHLY COMPLIANCE REPORT OF GROUP HOUSING PROJECT AT SECTOR 77, GURGAON, HARYANA]]

M/s JANPRIYA BUILDESTATE PVT. LTD.

are complied with in letter and

spirit.

II Six monthly compliance reports

should be submitted to the Haryana

State Pollution Control Board and

Regional Office, MOEF, GOI,

Northern Region, Chandigarh and a

copy to the SEIAA Panchkula,

Haryana.

Agreed. Six monthly compliance

reports are being regularly

submitted to Haryana State

Pollution Control Board and

Regional Office, MOEF, GOI,

Northern Region, Chandigarh

and a copy to the Regulatory

Authority of Haryana.

III The SEIAA, Haryana reserves the

right to add additional safeguard

measure subsequently, if found

necessary. Environmental Clearance

granted will be revoked if it is found

that false information has been

given for getting approval of this

project. SEIAA reserves the right to

revoke the clearance if conditions

stipulated are not implemented to

the satisfaction of SEIAA/ MoEF.

Agreed. The SEIAA Haryana

reserves the right to add

additional safeguard measure

subsequently, if found

necessary.

IV Under the provisions of

Environment (Protection) Act, 1986,

legal action shall be initiated

against the Project Proponent if it

was found that construction of the

project has been started before

obtaining Environment Clearance.

Agreed.

Page 21: CHAPTER 3 ENVIRONMENTAL COMPLIANCE …nromoef.gov.in/SMPR/12012016/2.pdfDEC. 2015 [[SIX MONTHLY COMPLIANCE REPORT OF GROUP HOUSING PROJECT AT SECTOR 77, GURGAON, HARYANA]] M/s JANPRIYA

DEC. 2015 [[SIX MONTHLY COMPLIANCE REPORT OF GROUP HOUSING PROJECT AT SECTOR 77, GURGAON, HARYANA]]

M/s JANPRIYA BUILDESTATE PVT. LTD.

V The project Proponent shall not

violate any judicial orders/

pronouncements issued by the

Hon’ble Supreme Court/ High

Courts.

Agreed.

VI All other statutory clearances such

as the approvals for storage of diesel

from Chief Controller of Explosives,

Fire Department, Civil Aviation

Department, Forest Conservation

Act, 1980 and Wildlife (Protection)

Act, 1972, PLPA, 1900, Forest Act,

1927 etc. shall be obtained, as

applicable by project proponents

from the respective authorities prior

to construction of the project

Agreed.

a) Approval of firefighting

scheme from Municipal

Corporation has been

granted and is attached

as Annexure VII.

b) Aravali NOC from DC has

been obtained and is

attached Annexure IX.

c) NOC from Airport

authority of India is

attached as Annexure X.

VII The project proponent shall obtain

NOC under Aravali Notification from

CEC of Hon’ble Supreme court

regarding coverage under Aravali

Notification.

NOC under Aravali Notification

via DC is enclosed Annexure

IX.

VIII The project Proponent should

inform the public that the project

has been accorded Environment

Clearance by the SEIAA and copies

of the clearance letter are available

Advertisement has been

published in the newspaper

stating that project has

accorded Environmental

Clearance and same has been

Page 22: CHAPTER 3 ENVIRONMENTAL COMPLIANCE …nromoef.gov.in/SMPR/12012016/2.pdfDEC. 2015 [[SIX MONTHLY COMPLIANCE REPORT OF GROUP HOUSING PROJECT AT SECTOR 77, GURGAON, HARYANA]] M/s JANPRIYA

DEC. 2015 [[SIX MONTHLY COMPLIANCE REPORT OF GROUP HOUSING PROJECT AT SECTOR 77, GURGAON, HARYANA]]

M/s JANPRIYA BUILDESTATE PVT. LTD.

with State Pollution Control Board

and SEIAA. This should be

advertised within 7 days from the

date of issue of the Environment

Clearance Letter at least in 2 local

newspapers that are widely

circulated in the region and the

copy of the same should be

forwarded to SEIAA Haryana. A

copy of Environment Clearance

conditions shall also be put on

project proponent’s website for

public awareness.

forwarded to SEIAA, Haryana

and submitted with previous

compliance report.

IX Any appeal against this

Environment Clearance shall lie

with the National Green Tribunal, if

preferred, within a period of 30 days

as prescribed under section 16 of

the National Green Tribunal Act,

2010.

Agreed.

X The project Proponent shall put in

place Corporate Environment Policy

as mentioned in MoEF, GoI OM No.

J-11013/41/2006-IA II (I) dated

26.4.2012 within 3 months period.

This will be followed.

XI If later found that build-up area as

defined in MOEF letter F.No. 19-

Agreed

Page 23: CHAPTER 3 ENVIRONMENTAL COMPLIANCE …nromoef.gov.in/SMPR/12012016/2.pdfDEC. 2015 [[SIX MONTHLY COMPLIANCE REPORT OF GROUP HOUSING PROJECT AT SECTOR 77, GURGAON, HARYANA]] M/s JANPRIYA

DEC. 2015 [[SIX MONTHLY COMPLIANCE REPORT OF GROUP HOUSING PROJECT AT SECTOR 77, GURGAON, HARYANA]]

M/s JANPRIYA BUILDESTATE PVT. LTD.

127/2011-IA-III dated 02.04.2012 is

more than stated area, EC shall be

revoked