Upload
others
View
1
Download
0
Embed Size (px)
Citation preview
B
R
E
W
S
T
E
R
G
A
R
D
E
N
S
B
R
A
C
E
W
E
L
L
R
O
A
D
D
A
L
G
A
R
N
O
G
A
R
D
E
N
S
M
I
T
R
E
W
A
Y
S
C
R
U
B
S
L
A
N
E
LC
LC
B
LC
Remove current parking
on Mitre Way between junctions with
Scrubs Lane and Bracewell Road
B
B
B
B
B
B
B
Remove bollards
2 No. new bollards
1 No. new bollard
Extended footway to
prevent cars parking
in front of cycle way
Removal of narrow cycle
track and repave to match
surrounding
M
I
T
R
E
W
A
Y
B
R
E
W
S
T
E
R
G
A
R
D
E
N
S
B
R
E
W
S
T
E
R
G
A
R
D
E
N
S
B
R
A
C
E
W
E
L
L
R
O
A
D
D
A
L
G
A
R
N
O
G
A
R
D
E
N
S
Quietway St. Mark's Road to East Acton
Bracewell Road
CV KI 13/11/2015 1:500
CONSULTATION
QSMR-CO-06-01-03 A
LOCALITY PLAN
N
0m 10m 20m10m
SCALE 1:500 at A3
0m 10m 20m10m
70 Cowcross Street London EC1M 6EJ
020 7017 2350 www.sustrans.org.uk
Drawing No:
Scale at A3:Drawn:
Project:
Title:
Date:Checked:
Status:
DescriptionRev Check Date
Revision:
sustransJOIN THE MOVEMENT
Drawn
AIncluding wayfinding IM
RR 05/05/2016
Notes:
1. Wayfinding line marking proposed as
shown
Key:
Extended/Resurfaced footway
Uncontrolled Crossing Tactile Paving
Quietway Route Alignment
Proposed Kerb
Existing Kerb
B
Proposed new bollard
Existing bollard to be removed
Proposed wayfinding logo
Existing Line Marking
Proposed white Line Marking
B
Proposed dropped Kerb
B
R
E
W
S
T
E
R
G
A
R
D
E
N
S
B
R
A
C
E
W
E
L
L
R
O
A
D
D
A
L
G
A
R
N
O
G
A
R
D
E
N
S
M
I
T
R
E
W
A
Y
S
C
R
U
B
S
L
A
N
E
L
A
T
I
M
E
R
R
O
A
D
N
O
R
T
H
P
O
L
E
R
O
A
D
L
A
T
I
M
E
R
R
O
A
D
N
O
R
T
H
P
O
L
E
R
O
A
D
LC
LC
B
LC
B
B
B
B
B
B
B
New two way cycle
lane segregated by
B
R
E
W
S
T
E
R
G
A
R
D
E
N
S
B
R
E
W
S
T
E
R
G
A
R
D
E
N
S
B
R
A
C
E
W
E
L
L
R
O
A
D
B
R
A
C
E
W
E
L
L
R
O
A
D
D
A
L
G
A
R
N
O
G
A
R
D
E
N
S
Quietway St. Mark's Road to East Acton
Bracewell Road
CV KI 13/11/2015 1:500
CONSULTATION
QSMR-CO-06-01-02 A
LOCALITY PLAN
N
0m 10m 20m10m
SCALE 1:500 at A3
0m 10m 20m10m
70 Cowcross Street London EC1M 6EJ
020 7017 2350 www.sustrans.org.uk
Drawing No:
Scale at A3:Drawn:
Project:
Title:
Date:Checked:
Status:
DescriptionRev Check Date
Revision:
sustransJOIN THE MOVEMENT
Drawn
AIncluding wayfinding IM
RR 05/05/2016
Key:
Quietway Route Alignment
Existing Kerb
Notes:
1. No changes to road layout proposed
2. All existing line markings to be
retained
3. Wayfinding line marking proposed as
shown
Proposed wayfinding logo
L
A
T
I
M
E
R
R
O
A
D
N
O
R
T
H
P
O
L
E
R
O
A
D
B
R
E
W
S
T
E
R
G
A
R
D
E
N
S
B
R
A
C
E
W
E
L
L
R
O
A
D
D
A
L
G
A
R
N
O
G
A
R
D
E
N
S
LC
L
B
LC
LC
LC
LC
N
O
R
T
H
P
O
L
E
R
O
A
D
L
A
T
I
M
E
R
R
O
A
D
B
R
A
C
E
W
E
L
L
R
O
A
D
B
R
E
W
S
T
E
R
G
A
R
D
E
N
S
1
.
5
'No waiting and loading at
any time' on northern side
of junction
2
.
4
3
.
0
5
.
9
4
.
3
Improve existing zebra
crossing with parallel
crossing
2
.
5
6
.
2
7
.
5
7
.
8
B
Build out footway and
install raised table
Remove parking spaces
2
.
4
Zebra crossing relocated
to West
Remove parking space
Build out footway and
install raised table
LC
L
B
LC
LC
LC
LC
1
.
5
2
.
4
3
.
0
5
.
9
4
.
3
2
.
5
6
.
2
7
.
5
7
.
8
B
2
.
4
70 Cowcross Street London EC1M 6EJ
020 7017 2350 www.sustrans.org.uk
Drawing No:
Scale at A3:Drawn:
Project:
Title:
Date:Checked:
Status:
DescriptionRev Drawn Date
Revision:
sustransJOIN THE MOVEMENT
© Crown copyright and database rights 2015 Ordnance Survey 100035971 / 0159\\london\shared\Quietways - Delivery Phase\03 Routes\943 St Marks Road - East Acton\03 Design\02 Concept\02 Working\QWME-C-GA.dwg
LOCALITY PLAN
N
0m 10m 20m10m
SCALE 1:500 at A3
0m 10m 20m10m
Key:
Extended Footway
Uncontrolled Crossing Tactile Paving
Controlled Crossing Tactile Paving
Quietway Route Alignment
Proposed Kerb
Yellow Line Marking
Existing Kerb
Proposed dropped Kerb
Raised Table
Walking/Cycling Space
Removed Parking Bay
Belisha Beacon
Corduroy Shared Space Tactile Paving
Notes:
1. Carriageway at the northern end of Latimer
Road narrowed and raised to reduce crossing
distance and facilitate access to parallel
crossing.
2. Carriageway at southern end of Bracewell
Road narrowed and raised to allow cyclists to
use parallel crossing.
3. Carriageway of North Pole Road narrowed in
vicinity of junction with Bracewell and North
Pole Road to improve parallel crossing.
4. Wayfinding signage to be designed and
installed on the approaches to the junction
from Latimer Road and Bracewell Road to
indicate that cyclists can cross North Pole
Road using the parallel crossing.
5. Existing zebra crossing on North Pole Road
relocated west and parrallel cycle crossing
introduced.
B
Bollard
Vehicle Body
Front Wheels
Rear Wheels
New sign and post
Quietway St. Mark's Road to East Acton
North Pole Road
Bracewell Rd / Latimer Rd
Option 3
JG ZS 04/04/2016 1:500
CONCEPT
QSMR-C-04-03-01 C
A Position zebra crossing amended IM 18/04/2016
B Extend Bracewell Rd build out IM 22/04/2015
C Raised tables added/extended RR 26/04/2016
New white Line Marking
Existing Line Marking Removed
W
E
S
T
V
I
E
W
C
L
O
S
E
LC
L
B
LC
LC
LC
LC
N
O
R
T
H
P
O
L
E
R
O
A
D
L
A
T
I
M
E
R
R
O
A
D
C
A
L
D
E
R
O
N
P
L
A
C
E
2
.
4
New two way cycle
lane segregated by
planters
B
R
E
W
S
T
E
R
G
A
R
D
E
N
S
B
R
A
C
E
W
E
L
L
R
O
A
D
L
A
T
I
M
E
R
R
O
A
D
N
O
R
T
H
P
O
L
E
R
O
A
D
L
A
T
I
M
E
R
R
O
A
D
N
O
R
T
H
P
O
L
E
R
O
A
D
Quietway St. Mark's Road to East Acton
Latimer Road
ZS KI 13/11/2015 1:500
CONSULTATION
QSMR-CO-05-01-04 A
LOCALITY PLAN
N
0m 10m 20m10m
SCALE 1:500 at A3
0m 10m 20m10m
70 Cowcross Street London EC1M 6EJ
020 7017 2350 www.sustrans.org.uk
Drawing No:
Scale at A3:Drawn:
Project:
Title:
Date:Checked:
Status:
DescriptionRev Check Date
Revision:
sustransJOIN THE MOVEMENT
Drawn
Notes:
1. No changes to road layout proposed
2. All existing line markings to be
retained
3. No proposed wayfindingin the layout
Key:
Quietway Route Alignment
Existing Kerb
A Review wayfinding IM RR 05/05/2016
L
A
T
I
M
E
R
R
O
A
D
W
E
S
T
V
I
E
W
C
L
O
S
E
L
A
T
I
M
E
R
P
L
A
C
E
L
A
T
I
M
E
R
R
O
A
D
L
A
T
I
M
E
R
R
O
A
D
N
O
R
T
H
P
O
L
E
R
O
A
D
W
E
S
T
V
I
E
W
C
L
O
S
E
L
A
T
I
M
E
R
R
O
A
D
N
O
R
T
H
P
O
L
E
R
O
A
D
N
O
R
T
H
P
O
L
E
R
O
A
D
L
A
T
I
M
E
R
R
O
A
D
C
A
L
D
E
R
O
N
P
L
A
C
E
Quietway St. Mark's Road to East Acton
Latimer Road
ZS KI 13/11/2015 1:500
CONSULTATION
QSMR-CO-05-01-03 A
LOCALITY PLAN
N
0m 10m 20m10m
SCALE 1:500 at A3
0m 10m 20m10m
70 Cowcross Street London EC1M 6EJ
020 7017 2350 www.sustrans.org.uk
Drawing No:
Scale at A3:Drawn:
Project:
Title:
Date:Checked:
Status:
DescriptionRev Check Date
Revision:
sustransJOIN THE MOVEMENT
Drawn
Notes:
1. No changes to road layout proposed
2. All existing line markings to be
retained
3. Wayfinding line marking proposed as
shown
Key:
Quietway Route Alignment
Existing Kerb
Proposed wayfinding logo
A Including wayfinding IM RR 05/05/2016
L
A
T
I
M
E
R
R
O
A
D
ST
AB
LE
W
AY
W
A
L
M
E
R
R
O
A
D
O
X
F
O
R
D
G
A
R
D
E
N
S
L
A
T
I
M
E
R
R
O
A
D
Quietway St. Mark's Road to East Acton
A40 underpass to
Latimer Road
ZS KI 13/11/2015 1:500
CONSULTATION
QSMR-CO-05-01-02 A
LOCALITY PLAN
N
0m 10m 20m10m
SCALE 1:500 at A3
0m 10m 20m10m
70 Cowcross Street London EC1M 6EJ
020 7017 2350 www.sustrans.org.uk
Drawing No:
Scale at A3:Drawn:
Project:
Title:
Date:Checked:
Status:
DescriptionRev Check Date
Revision:
sustransJOIN THE MOVEMENT
Drawn
Notes:
1. No changes to road layout proposed
2. All existing line markings to be
retained
3. No proposed wayfinding in the layout
Key:
Quietway Route Alignment
Existing Kerb
Proposed wayfinding logo
A Review wayfinding IM RR 05/05/2016
O
X
F
O
R
D
G
A
R
D
E
N
S
L
A
T
I
M
E
R
R
O
A
D
S
T
A
B
L
E
W
A
Y
LC
L
C
L
A
T
IM
E
R
R
O
A
D
S
IL
C
H
E
S
T
E
R
R
O
A
D
BR
AM
LE
Y R
OA
D
D
A
R
F
IE
L
D
W
A
Y
D
A
R
F
I
E
L
D
W
A
Y
ST
AB
LE
W
AY
W
A
L
M
E
R
R
O
A
D
O
X
F
O
R
D
G
A
R
D
E
N
S
L
A
T
I
M
E
R
R
O
A
D
Quietway St. Mark's Road to East Acton
A40 underpass to
Latimer Road
ZS KI 13/11/2015 1:500
CONSULTATION
QSMR-CO-05-01-01 A
LOCALITY PLAN
N
0m 10m 20m10m
SCALE 1:500 at A3
0m 10m 20m10m
70 Cowcross Street London EC1M 6EJ
020 7017 2350 www.sustrans.org.uk
Drawing No:
Scale at A3:Drawn:
Project:
Title:
Date:Checked:
Status:
DescriptionRev Check Date
Revision:
sustransJOIN THE MOVEMENT
Drawn
Notes:
1. No changes to road layout proposed
2. All existing line markings to be
retained
3. Wayfinding line marking proposed as
shown
Key:
Quietway Route Alignment
Existing Kerb
Proposed wayfinding logo
A Including wayfinding IM RR 05/05/2016
L
A
T
I
M
E
R
R
O
A
D
S
T
A
B
L
E
W
A
Y
LC
L
C
L
A
T
IM
E
R
R
O
A
D
A
40
W
ES
TW
AY
S
IL
C
H
E
S
T
E
R
R
O
A
D
BR
AM
LE
Y R
OA
D
D
A
R
F
IE
L
D
W
A
Y
D
A
R
F
I
E
L
D
W
A
Y
ST
AB
LE
W
AY
W
A
L
M
E
R
R
O
A
D
O
X
F
O
R
D
G
A
R
D
E
N
S
L
A
T
I
M
E
R
R
O
A
D
Quietway St. Mark's Road to East Acton
A40 underpass
ZS KI 13/11/2015 1:500
CONSULTATION
QSMR-CO-04-01-01 A
LOCALITY PLAN
N
0m 10m 20m10m
SCALE 1:500 at A3
0m 10m 20m10m
70 Cowcross Street London EC1M 6EJ
020 7017 2350 www.sustrans.org.uk
Drawing No:
Scale at A3:Drawn:
Project:
Title:
Date:Checked:
Status:
DescriptionRev Check Date
Revision:
sustransJOIN THE MOVEMENT
Drawn
Notes:
1. No changes to road layout proposed
2. All existing line markings to be
retained
3. Wayfinding line marking proposed as
shown
Key:
Quietway Route Alignment
Existing Kerb
Proposed wayfinding logo
A Including wayfinding IM RR 05/05/2016
D
A
R
F
I
E
L
D
W
A
Y
D
A
R
F
I
E
L
D
W
A
Y
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
S
IL
C
H
E
S
T
E
R
R
O
A
D
BR
AM
LE
Y R
OA
D
D
A
R
F
IE
L
D
W
A
Y
D
A
R
F
I
E
L
D
W
A
Y
ST
AB
LE
W
AY
W
A
L
M
E
R
R
O
A
D
O
X
F
O
R
D
G
A
R
D
E
N
S
Quietway St. Mark's Road to East Acton
Entry/Exit
into/out of A40 underpass
ZS KI 13/11/2015 1:500
CONSULTATION
QSMR-CO-03-01-01 A
LOCALITY PLAN
N
B
B
Existing bollard
Existing bollard to be removed
0m 10m 20m10m
SCALE 1:500 at A3
0m 10m 20m10m
70 Cowcross Street London EC1M 6EJ
020 7017 2350 www.sustrans.org.uk
Drawing No:
Scale at A3:Drawn:
Project:
Title:
Date:Checked:
Status:
DescriptionRev Check Date
Revision:
sustransJOIN THE MOVEMENT
Drawn
A Including wayfinding IM RR 05/05/2016
Notes:
1. The proposal includes to remove one
bollard to provide link with existing
cycle path under the Westway
2. No changes to road layout proposed
3. All existing line markings to be
retained
4. Wayfinding line marking proposed as
shown
Key:
Quietway Route Alignment
Existing Kerb
Proposed wayfinding logo
D
A
R
F
I
E
L
D
W
A
Y
D
A
R
F
IE
L
D
W
A
Y
D
A
R
F
I
E
L
D
W
A
Y
B
B
B
B
B
B
B
B
S
IL
C
H
E
S
T
E
R
R
O
A
D
BR
AM
LE
Y R
OA
D
D
A
R
F
IE
L
D
W
A
Y
D
A
R
F
I
E
L
D
W
A
Y
ST
AB
LE
W
AY
W
A
L
M
E
R
R
O
A
D
O
X
F
O
R
D
G
A
R
D
E
N
S
L
A
T
I
M
E
R
R
O
A
D
LOCALITY PLAN
N
Quietway St. Mark's Road to East Acton
Silchester Road to
Darfield Way
Crossing Bramley Road
IM KI 05/11/2015 1:500
CONSULTATION
QSMR-CO-02-01-02 A
70 Cowcross Street London EC1M 6EJ
020 7017 2350 www.sustrans.org.uk
Drawing No:
Scale at A3:Drawn:
Project:
Title:
Date:Checked:
Status:
DescriptionRev Check Date
Revision:
sustransJOIN THE MOVEMENT
Drawn
A Including wayfinding IM RR 05/05/2016
Key:
Quietway Route Alignment
Existing Kerb
Notes:
1. No changes to road layout proposed
2. All existing line markings to be
retained
3. Wayfinding line marking proposed as
shown
Proposed wayfinding logo
0m 10m 20m10m
SCALE 1:500 at A3
0m 10m 20m10m
S
IL
C
H
E
S
T
E
R
R
O
A
D
BR
AM
LE
Y R
OA
D
D
A
R
F
IE
L
D
W
A
Y
D
A
R
F
I
E
L
D
W
A
Y
ST
AB
LE
W
AY
W
A
L
M
E
R
R
O
A
D
O
X
F
O
R
D
G
A
R
D
E
N
S
S
IL
C
H
E
S
T
E
R
R
O
A
D
D
A
R
F
IE
L
D
W
A
Y
BR
AM
LE
Y R
OA
D
B
Quietway St. Mark's Road to East Acton
Silchester Road to
Darfield Way
Crossing Bramley Road
IM KI 05/11/2015 1:500
CONSULTATION
QSMR-CO-02-01-01 A
LOCALITY PLAN
Notes:
1. It is proposed to relocate the southern island
to slow traffic approaching the Quietway. The
lengthening also makes for a safe refuge for
cyclists.
2. Wayfinding line marking proposed as shown
Existing entry treatments
Extend and widen existing
island to slow down vehicles
turning into Silchester Rd
N
Existing refuge island
0m 10m 20m10m
SCALE 1:500 at A3
0m 10m 20m10m
Proposed Line Marking
70 Cowcross Street London EC1M 6EJ
020 7017 2350 www.sustrans.org.uk
Drawing No:
Scale at A3:Drawn:
Project:
Title:
Date:Checked:
Status:
DescriptionRev Check Date
Revision:
sustransJOIN THE MOVEMENT
Drawn
AIncluding wayfinding IM
RR 05/05/2016
Key:
Existing Kerb
Proposed wayfinding logo
Existing Line Marking
Uncontrolled Crossing Tactile Paving
Quietway Route Alignment
Proposed Kerb
Footway
S
T
.
M
A
R
K
'
S
R
O
A
D
L
A
N
C
A
S
T
E
R
R
O
A
D
R
U
S
T
O
N
M
E
W
S
S
IL
C
H
E
S
T
E
R
R
O
A
D
BR
AM
LE
Y R
OA
D
D
A
R
F
IE
L
D
W
A
Y
D
A
R
F
I
E
L
D
W
A
Y
S
T
M
A
R
K
S
R
O
A
D
S
IL
C
H
E
S
T
E
R
R
O
A
D
18m of residents' parking removed and
replaced with double yellow lines
Raised informal crossing and
new island
12m of residents' parking removed and
replaced with double yellow linesto provide
space for coach drop off/pick up
S
IL
C
H
E
S
T
E
R
R
O
A
D
Quietway St. Mark's Road to East Acton
Silchester Road
CV KI 19/01/2016 1:500
CONSULTATION
QSMR-CO-01a-01-02 A
LOCALITY PLAN
N
0m 10m 20m10m
SCALE 1:500 at A3
0m 10m 20m10m
Existing Line Marking
Parking Loss
Existing Tree
Proposed Line Marking
Yellow Line Marking
70 Cowcross Street London EC1M 6EJ
020 7017 2350 www.sustrans.org.uk
Drawing No:
Scale at A3:Drawn:
Project:
Title:
Date:Checked:
Status:
DescriptionRev Check Date
Revision:
sustransJOIN THE MOVEMENT
Drawn
AIncluding wayfinding IM
RR 05/05/2016
Key:
Quietway Route Alignment
Existing Kerb
Notes:
1. Wayfinding line marking proposed as
shown
Proposed wayfinding logo
S
T
.
M
A
R
K
'
S
R
O
A
D
L
A
N
C
A
S
T
E
R
R
O
A
D
R
U
S
T
O
N
M
E
W
S
S
IL
C
H
E
S
T
E
R
R
O
A
D
BR
AM
LE
Y R
OA
D
D
A
R
F
IE
L
D
W
A
Y
S
T
M
A
R
K
S
R
O
A
D
C
O
R
N
W
A
L
L
C
R
E
S
C
E
N
T
LC
LC
LC
LC
LC
LC
Raised zebra crossing with
widened island
18m of residents' parking removed and
replaced with double yellow lines
Raised informal crossing and
new island
12m of residents' parking removed and
replaced with double yellow linesto provide
space for coach drop off/pick up
L
A
N
C
A
S
T
E
R
R
O
A
D
S
IL
C
H
E
S
T
E
R
R
O
A
D
Remove 2 lines of
zig-zag linemarking
Create additional parking space
Quietway St. Mark's Road to East Acton
Silchester Road to
Lancaster Road
CV KI 19/01/2016 1:500
CONSULTATION
QSMR-CO-01a-01-01 A
LOCALITY PLAN
Key:
Existing Tree
Quietway Route Alignment
Existing Line Marking
Proposed Line Marking
Notes:
1. Widened islands are proposed to slow vehicle
speeds near school zone. Whereby the
southern raised islands creates an additional
informal pedestrian crossing.
2. Wayfinding line marking proposed as shown
N
0m 10m 20m10m
SCALE 1:500 at A3
0m 10m 20m10m
Yellow Line Marking
Raised Table
Uncontrolled Crossing Tactile Paving
Proposed Kerb
Footway
Parking Loss
70 Cowcross Street London EC1M 6EJ
020 7017 2350 www.sustrans.org.uk
Drawing No:
Scale at A3:Drawn:
Project:
Title:
Date:Checked:
Status:
DescriptionRev Check Date
Revision:
sustransJOIN THE MOVEMENT
Drawn
Existing Kerb
Proposed wayfinding logo
Belisha beacon
Parking Gain
Controlled Crossing Tactile Paving
A
Including wayfinding and
IM RR 05/05/2016
changes to concept design
S
T
.
M
A
R
K
'
S
R
O
A
D
L
A
N
C
A
S
T
E
R
R
O
A
D
R
U
S
T
O
N
M
E
W
S
S
IL
C
H
E
S
T
E
R
R
O
A
D
BR
AM
LE
Y R
OA
D
D
A
R
F
IE
L
D
W
A
Y
S
T
M
A
R
K
S
R
O
A
D
C
O
R
N
W
A
L
L
C
R
E
S
C
E
N
T
LC
B
B
LC
LC
Introduce right turn pocket
LC
Raised zebra crossing with
widened island
L
A
N
C
A
S
T
E
R
R
O
A
D
Remove 2 lines of
zig-zag linemarking
Create additional parking space
S
T
.
M
A
R
K
'
S
R
O
A
D
Quietway St. Mark's Road to East Acton
St. Mark's Road
to Lancaster Road
CV KI 13/11/2015 1:500
CONSULTATION
QSMR-CO-01-01-02 A
LOCALITY PLAN
N
0m 10m 20m10m
SCALE 1:500 at A3
0m 10m 20m10m
Existing Tree
Proposed Line Marking
Yellow Line Marking
Parking Gain
70 Cowcross Street London EC1M 6EJ
020 7017 2350 www.sustrans.org.uk
Drawing No:
Scale at A3:Drawn:
Project:
Title:
Date:Checked:
Status:
DescriptionRev Check Date
Revision:
sustransJOIN THE MOVEMENT
Drawn
AIncluding wayfinding IM
RR 05/05/2016
Key:
Quietway Route Alignment
Existing Kerb
Notes:
1. Wayfinding line marking proposed as
shown
Proposed wayfinding logo
S
T
.
M
A
R
K
'
S
R
O
A
D
L
A
N
C
A
S
T
E
R
R
O
A
D
R
U
S
T
O
N
M
E
W
S
S
IL
C
H
E
S
T
E
R
R
O
A
D
S
T
M
A
R
K
S
R
O
A
D
C
O
R
N
W
A
L
L
C
R
E
S
C
E
N
T
L
A
D
B
R
O
K
E
G
R
O
V
E
LC
B
B
B
LC
LC
LC
LC
Introduce right turn pocket
L
A
N
C
A
S
T
E
R
R
O
A
D
R
U
S
T
O
N
M
E
W
S
S
T
.
M
A
R
K
'
S
R
O
A
D
Former line markings re-marked and
controlled zone markings added
S
T
.
M
A
R
K
'
S
R
O
A
D
Quietway St. Mark's Road to East Acton
St. Mark's Road
to Lancaster Road
CV KI 13/11/2015 1:500
CONSULTATION
QSMR-CO-01-01-01 A
LOCALITY PLAN
Key:
Existing Tree
Quietway Route Alignment
Existing Line Marking
Proposed Line Marking
Notes:
1. Controlled zone markings amended and right
turn pocket introduced to allow cyclists to turn
right across Lancaster Road onto St. Mark's
Road.
2. Wayfinding line marking proposed as shown
N
0m 10m 20m10m
SCALE 1:500 at A3
0m 10m 20m10m
Yellow Line Marking
Existing Kerb
Proposed wayfinding logo
A Including wayfinding IM RR 05/05/2016
70 Cowcross Street London EC1M 6EJ
020 7017 2350 www.sustrans.org.uk
Drawing No:
Scale at A3:Drawn:
Project:
Title:
Date:Checked:
Status:
DescriptionRev Check Date
Revision:
sustransJOIN THE MOVEMENT
Drawn
1
t
o
6
U
p
p
e
r
C
l
a
r
e
n
d
o
n
W
a
l
k
C
a
m
e
l
f
o
r
d
1
8
1
t
o
4
01
t
o
1
9
P
l
a
y
g
r
o
u
n
d
T
h
o
m
a
s
D
a
r
b
y
C
o
n
v
e
n
t
T
a
l
b
o
t
G
r
o
v
e
H
o
u
s
e
C
o
u
r
t
1
t
o
4
5
t
o
1
0
C
o
u
r
t
P
o
m
e
r
o
y
1
t
o
4
5
U
p
p
e
r
T
a
l
b
o
t
W
a
l
k
T
a
l
b
o
t
W
a
l
k
P
r
i
m
a
r
y
S
c
h
o
o
l
W
a
l
k
T
h
o
m
a
s
J
o
n
e
s
2
6
1
t
o
6
1
t
o
1
2
El S
ub S
ta
3
3
1
7
1
3
t
o
3
6
3
1
7
t
o
1
2
C
o
r
n
w
a
l
l
C
r
e
s
c
e
n
t
C
o
r
n
w
a
l
l
C
r
e
s
c
e
n
t
S
t
M
a
r
k
s
R
o
a
d
(020) 7361 3374Telephone:
A1
Date
Drawn
Fax:
Drawing Number
Scale
Project
Title
Checked
Date
Rev
(020) 7361 2796
Chk
DEPARTMENT OF TRANSPORTATION
Description
The Royal Borough of Kensington and Chelsea
Rev By Date
Ca
d F
ile
:
DO NOT SCALE
© Crown copyright and database rights 2012.Ordnance Survey 100021668
Notes
AND HIGHWAYS
Town Hall, Hornton Street, London, W8 7NX
Traffic & Transportation Policy Service
X5015-CYGR-ODES-Q7-006 0
CENTRAL LONDON CYCLING GRID
RBKC QUIETWAY ROUTE PROPOSALS (ST MARK'S ROAD/CORNWALL CRESCENT)
1:250
EE
18.09.15
*\D
RA
WIN
GS
\....
St M
arks P
lace
Ble
nheim
Cre
scent
B
le
n
h
e
im
C
r
e
s
c
e
n
t
C
o
r
n
w
a
l
l
C
r
e
s
c
e
n
t
C
o
r
n
w
a
l
l
C
r
e
s
c
e
n
t
S
t
M
a
r
k
s
R
o
a
d
PROPOSED ENTRY
TREATMENT AT BLENHEIM
CRESCENT J/W
CORNWALL CRESCENT
2
6
1
t
o
9
9
5
7
0
6
0
C
e
n
t
r
e
6
2
T
r
a
i
n
i
n
g
8
7
7
7
4
3
3
3
1
2
a
2
b
1
7
3
1
2
109
H
o
u
s
e
A
d
v
a
n
c
e
4
2
5
0
3
13
1 to 12
E
l
B
a
n
k
Hudson H
ouse
S
u
b
S
t
a
111
11
36
4
53
101
40
97
1
95
6
5
10
38
99
89
93
91
(020) 7361 3374Telephone:
A1
Date
Drawn
Fax:
Drawing Number
Scale
Project
Title
Checked
Date
Rev
(020) 7361 2796
Chk
DEPARTMENT OF TRANSPORTATION
Description
The Royal Borough of Kensington and Chelsea
Rev By Date
Ca
d F
ile
:
DO NOT SCALE
© Crown copyright and database rights 2012.Ordnance Survey 100021668
Notes
AND HIGHWAYS
Town Hall, Hornton Street, London, W8 7NX
Traffic & Transportation Policy Service
X5015-CYGR-ODES-Q7-005 1
CENTRAL LONDON CYCLING GRID
RBKC QUIETWAY ROUTE PROPOSALS Q7
(BLENHEIM CRESCENT/ST MARK'S ROAD)
1:250
EE
18.09.15
*\D
RA
WIN
GS
\....
B
lenheim
C
rescent
Ladbroke G
rove
Ladbroke G
rove
B
lenheim
C
rescent
109
H
o
u
s
e
A
d
v
a
n
c
e
B
a
n
k
36
101
97
95
99
P
l
a
y
g
r
o
u
n
d
H
o
u
s
e
89
Mannin
g H
ouse
G
a
l
s
w
o
r
t
h
y
1
t
o
2
0
G
a
r
d
e
n
s
C
l
a
r
e
43
13 to 18
3
8
1 to 12
2
7
to
3
7
94
93
5
91
4
1
84
19 to 26
51
6
2
8
41
41b
26b
28
14
12
24
17
29
39
10
S
u
b
E
l
S
t
a
H
o
u
s
e
S
u
r
g
e
r
y
A
n
d
r
i
d
g
e
13
Surgery
D
a
y
C
e
n
t
r
e
1
2
(020) 7361 3374Telephone:
A1
Date
Drawn
Fax:
Drawing Number
Scale
Project
Title
Checked
Date
Rev
(020) 7361 2796
Chk
DEPARTMENT OF TRANSPORTATION
Description
The Royal Borough of Kensington and Chelsea
Rev By Date
Cad F
ile :
DO NOT SCALE
© Crown copyright and database rights 2012.Ordnance Survey 100021668
Notes
AND HIGHWAYS
Town Hall, Hornton Street, London, W8 7NX
Traffic & Transportation Policy Service
X5015-CYGR-ODES-Q7-004 1
CENTRAL LONDON CYCLING GRID
RBKC QUIETWAY ROUTE PROPOSALS (BLENHEIM CRES./LADBROKE GROVE)
1:250
EE
18.09.15
*\D
RA
WIN
GS
\....
1Remove proposed junction improvements
SL 26/1/16PW
P
l
a
y
g
r
o
u
n
d
61
126
188 to 192
P
l
a
y
g
r
o
u
n
d
16
17
53
to
H
o
u
s
e
A
n
d
r
i
d
g
e
Health C
entre
D
a
y
C
e
n
t
r
e
186
15b
193
29
1
27
H
a
l
l
P
H
198
2
203
199
14
204
P
e
n
i
e
l
C
h
a
p
e
l
C
i
n
e
m
a
191b
184a
196
1
37
197
2
15
184
P
H
132
170
26
189
PC
s
210
63
to
20
206
204
207
S
y
n
a
g
o
g
u
e
211
213
223a
209
194
1
202
223
196 to
221
198
14
9
13
27
8
C
olville S
quare
Ble
nheim
Cre
scent
Portobello R
oad
Portobello R
oad
Kensington P
ark R
oad
Kensington P
ark R
oad
B
lenheim
C
rescent
(020) 7361 3374Telephone:
A1
Date
Drawn
Fax:
Drawing Number
Scale
Project
Title
Checked
Date
Rev
(020) 7361 2796
Chk
DEPARTMENT OF TRANSPORTATION
Description
The Royal Borough of Kensington and Chelsea
Rev By Date
Ca
d F
ile
:
DO NOT SCALE
© Crown copyright and database rights 2012.Ordnance Survey 100021668
Notes
AND HIGHWAYS
Town Hall, Hornton Street, London, W8 7NX
Traffic & Transportation Policy Service
X5015-CYGR-ODES-Q7-003 0
CENTRAL LONDON CYCLING GRID
RBKC QUIETWAY ROUTE PROPOSALS
(BLENHEIM CRES./PORTOBELLO RD)
1:250
EE
18.09.15
*\D
RA
WIN
GS
\....
P
l
a
y
g
r
o
u
n
d
P
l
a
y
g
r
o
u
n
d
E
l
7
10
1 to 108
3
13
12
P
inehurst C
ourt
12
41
20
21
27
1
28
H
o
u
s
e
12 to 19
6
12 to 28
V
i
c
a
r
a
g
e
A
l
l
S
a
i
n
t
s
C
h
u
r
c
h
S
c
h
o
o
l
30
28
29
25
31
26
53
Pow
is
1 to 18
2
Court
Pow
is G
ardens
L
P
P
ow
is S
quare
Mount Diag. 960.2 on
existing lamp column
DYL TO BE INTRODUCED AT
BENDS TO IMPROVE VISIBILITY
(EXTENTS OF DYL TO BE
AGREED BY RBKC)
Clydesdale R
oad
T
alb
ot R
oad
C
olville S
quare
C
olville G
ardens
C
olville H
ouses
(020) 7361 3374Telephone:
A1
Date
Drawn
Fax:
Drawing Number
Scale
Project
Title
Checked
Date
Rev
(020) 7361 2796
Chk
DEPARTMENT OF TRANSPORTATION
Description
The Royal Borough of Kensington and Chelsea
Rev By Date
Ca
d F
ile
:
DO NOT SCALE
© Crown copyright and database rights 2012.Ordnance Survey 100021668
Notes
AND HIGHWAYS
Town Hall, Hornton Street, London, W8 7NX
Traffic & Transportation Policy Service
X5015-CYGR-ODES-Q7-002 0
CENTRAL LONDON CYCLING GRID
RBKC QUIETWAY ROUTE PROPOSALS (All Saints Church TALBOT ROAD)
1:250
EE
18.09.15
*\D
RA
WIN
GS
\....