The scheme we are consulting on © Crown copyright and database rights 2018 OS 100030649 Zone of enhanced enviornmental screening mitigation Key Improved road Existing sign and signal gantry retained New sign and signal gantry Existing sign and signal gantry removed -x-x-x-x-x-x- -x-x-x-x-x-x- -x-x-x-x-x- -x-x-x-x-x- -x-x-x-x- INSET Zone of enhanced environmental screening mitigation Hard shoulder removed to provide narrow lanes Additional slip road for eastbound traffic B255/A296 slip road - two options being reviewed: keep open or close Roundabout moved away from Hope Cottages since last consultation Traffic signal control on roundabout Construction compound location New bridge for southbound traffic Existing bridge retained Properties and land required Swanscombe bridge Gantry signage being amended DCO red line boundary extended to include safe working zones, construction compound and environmental mitigation A2 West of Bean Junction Traffic signal control on roundabout Possible amendments to previous design Eastern Quarry New ponds Grass A2 DCO red line boundary 7 6 Scheme details: Bean junction The existing layout is retained with the current roundabouts enlarged and controlled by traffic lights. There will be a new bridge over the A2 for southbound traffic (situated to the east of the existing Bean Lane overbridge, which will be retained for northbound traffic) and a new slip road on to the A2 for eastbound traffic.

Scheme details: Bean junction - Amazon Web Services

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Scheme details: Bean junction - Amazon Web Services

The scheme we are consulting on

© Crown copyright and database rights 2018 OS 100030649

Zone of enhanced enviornmental screening mitigation

A2 Bean Junction

KeyImproved road

Existing sign and signalgantry retained

New sign and signal gantry

Existing sign and signalgantry removed

-x-x-x-x-x-x-

-x-x-x-x-x-x-

-x-x-x-x-x-

-x-x-x-x-x-

-x-x-x-x-

INSET

Zone of enhanced environmental screening mitigation

Hard shoulder removed to provide narrow lanes

Additional slip road for eastbound traffic

B255/A296 slip road- two options being reviewed:keep open or close

Roundabout moved awayfrom Hope Cottages sincelast consultation

Traffic signal control on roundabout

Construction compound location

New bridge for southbound traffic

Existing bridge retained

Properties and land required

Swanscombe bridge

Gantry signage being amended

DCO red line boundary extended to include safe working zones, construction compound and environmental mitigation

A2 West ofBean Junction

Traffic signal control on roundabout

Possible amendments to previous design

Eastern Quarry

New ponds

Grass

A2

DCO red line boundary

76

Scheme details: Bean junctionThe existing layout is retained with the current roundabouts enlarged and controlled by traffic lights. There will be a new bridge over the A2 for southbound traffic (situated to the east of the existing Bean Lane overbridge, which will be retained for northbound traffic) and a new slip road on to the A2 for eastbound traffic.