Scheme location
32
A2 Bean gyratory north
M25 junction 2 and A2
A2 Bean gyratory south
A296 Roman Road and Bean Lane roundabout
A2 Ebbsfleet gyratory west
B259 Southfleet Road and A2260 Ebbsfleet gateway roundabout
A2 Pepperhill junction
A2 Ebbsfleet gyratory east
IntroductionWe are proposing to improve the A2 junctions at Bean and Ebbsfleet. The improvements are committed within the Road Investment Strategy, subject to other financial contributions from local developers. The improvements are considered necessary to support the level of development proposed for Kent Thameside.
Why is the scheme needed?Without improvements to these junctions, significant future traffic congestion will result, which will have an adverse impact on the A2 and will constrain economic development and housing growth in the area.
The scheme’s benefits � Support economic development including
jobs and housing growth in North Kent.
� Increases capacity on the road network to accommodate future growth.
� Smooths traffic and improves journey times at both junctions.
� Increases capacity for all road users without endangering safety.
� Improves safety for all road users.
� Provides better facilities for non-motorised users such as cyclists, pedestrians and equestrians.
� Provides better access to public transport.
� Minimise environmental impact.
Public consultationWe held a pubic consultation between 18 January 2017 and 1 March 2017 to gather feedback on our proposals. The consultation involved public exhibitions and presentations around Dartford and Gravesend, a website with information about the project, and information delivered to over 74,000 homes in the area. The consultation materials and the supporting technical reports set out the rationale for having one proposal for each junction.
We held 5 public events for local residents and stakeholders. Members of the public and organisations were invited to comment on a variety of aspects of the project, including the junction improvements at Bean, the junction improvements at Ebbsfleet, and the scheme overall.
Responses to public consultation
A total of 169 responses to the consultation were received. The majority of people agreed with the need to improve the junctions and supported our proposals. One of the most common concerns expressed at the public consultation was that the consultation included only one proposal at each junction. However, our assessments have shown that only Option 5 at Bean and Option 1 at Ebbsfleet can deliver the objectives and provide the best value for money within the scheme budget.
Comments from stakeholders
Stakeholders reiterated the concerns expressed during the public consultation and commented on the use of traffic lights at the roundabouts. As a result, we will continue to review the use of traffic lights as the scheme progresses.
There were concerns that The London Resort development (formerly known as London Paramount) was excluded from our scheme assessments. The London Resort still needs to go through the statutory planning process and we will continue to collaborate with the developers, the London Resort Company Holdings, on the development of the entertainment centre.
The preferred route
The options presented at consultation will be taken forward as the preferred route. Our assessments show that the scheme will improve journey times, improve safety and support local economic growth.
Options Development Construction
1Option
identification
2Option
selection
3Preliminary
design
4Statutory
procedures & powers
5Construction preparation
6Construction
commissioning & handover
7Close out
Project initiated
Options for public
consultation
Community consultation & application for development
consent
Examination by Planning Inspectorate & decision by Secretary of
StateCommitment to construct
2020
Road opened
Close outPreferred route announcement summer 2017
Next stepsThe timeline below shows what will happen at each stage of the scheme. We are currently at the end of stage 2. Following the announcement of the preferred route, we will carry out surveys and investigations to allow us to design the scheme in more detail.
There will be another opportunity for you to have your say on the designs and plans for this project with a second public consultation planned for early next year.
We currently expect work to start on site no later than March 2020.
A 2
Und
Ward Bdy
feD
Prospect
Darenth Wood
1
2
Black Horse
ETL
55.8m
11
2
Place
28a
16
35
House
Denehole
13
1
Pond
6
Cottage
1614
2
15
Stone
30
35
Stone
BEAN LANE
18
48.2m
36
69.1m10
70.2m
BEACON DRIVE
7
Gardens
40
LB
14
7
46
Cottage
Bean Farm
LB
Watling
55.5m
Stone
1
Darenth Wood
13
28b
StoneDenehole
1
Brickfield
Cottages
Ashwood Place
16
1
Earth
wor
k
Denehole
1
New
Ightham Cottages
46.9m
11
8Hope Cottages
11
5
Stone
Thrift
ETL
6
Track
71.4m
A 296
Oakwood
Allotment
Bean House
DRUDGEO
N WAY
FOXW
OO
D ROAD
8
22
Shellbank
Playing Field
Stone
23
29
Clisha
28
Lodge
Path (um)
Stone
Pond
Earthwork
TURNER R
OAD
ROMAN ROAD
Stone
Shopping Centre
WIN
TERGARDEN C
RESCENT
BLUEWATER PARKWAY
46.3m
A 296
Lake
Tunnels
B 25
5
Earthwork
Bluewater
LIME TREE AVENUE
East Village
43.1m
Ramp
El Sub Sta
ETL
53.3m
Rose Gallery
Bus Station
Ramp
Ramp
40
2
House
29
Cottage
5
Hop
per
52.7m
Playground
21
28
7
Woodbine
62.5m
Flint
77.1m
53
21
63
Conveyors
Caravan
DO
OWYAL
C
22
58
1
59
1
105
31
Blue
57
Oakdene
Barnfield
11
32 69.1mBlue House
Bean
18
Stone
55
39
73
10
ETL
12
31
The Thrift
Cottages40
33
22
85.4m
1
House
PAGE CLOSE
14
(covered)
SCHOOL LANE
Merry Chest
Con
veyo
r
69
El Sub Sta
47
20
Stone
71
85
DRUDGEO
N WAY
81
Tank
BEACO
N D
RIVE
58.2m
57
48
22
15
52
93
ROAD
113
STO
NE
LANE
FB
19
Pond
61
13
68
Timber Yard
LB1
SANDY
Subway
(PH)
13
26
49
AVENUE
Pond
Hopper
Cottages
ETL
52
Tanks
A 2
67
LAN
E
The
Con
veyo
r
07
44
73
1
9
Reservoir
47
7
2
63
Surgery
59
2
4
41
ROMAN
Cottage
3
53El Sub Sta
WO
OD
Pond
Royal Oak
Mast
Stonewood
1
Site
62
50
25
Drain
39
42
64
75
1
Tanks
7
52
65
Cottage
46
123
36
53
30
27
Path
(um
)
27
31
97
4539
BRAMBLE
2
37
26
46
45
Drain
109
50
34
2
TCB
7779
57
8
Pond
Pond
Pond
Tank
Pond
Pond
Drain
Tank
Pond
Con
veyo
r
Pond
niarD
Works
Pond
Weighbridge
Lodg
e
Rotterdam
Hazelw
ood
Conveyor
Con
veyo
r
Drain
Gantrys
Gantrys
Gantrys
Mast
6
127
StonewoodCottages
1
4
Old Stable Yard
Playground
A 2
A 2
A 2
A 2
Gantry
Gantry
Communication Mast
Mast (Telecommunication)
Trac
k
Con
veyo
rs Con
veyo
r
Gantry
Gantry
Water
Track
Gantry Post
Pump
ED & Ward BdyDef
BS
BS
BS
Def
ED &
War
d Bd
y
CR ED & Ward Bdy
ED & Ward Bdy
Def
Def
ED & Ward Bdy
Und
Def
BS
Thames Walk
6
N
Improved road
Key
Existing sign and signal gantry retained
New sign and signal gantry
Existing sign and signal gantry removed
© Crown copyright and database rights 2017 OS 100030649 54
A296
B25
5
Traffic signal control on
roundabout
Properties and land required
New bridge for southbound
traffic
Traffic signal control on
roundabout
Existing bridge retained
Additional slip road for
eastbound traffic
Hard shoulder removed to provide
narrow lanes
Slip road closed to direct traffic to B255
The majority of people agreed with our proposals to improve the Bean junction.
Concerns were raised relating to the removal of the slip road from the B255 to the A296. As a result, we will reconsider the link between the B255 and the A296 during the preliminary design.
Preferred route: A2 Bean junction
ETL
Northfleet West Grid Sub Station
Track
32.0m
33.8m
Pond
ETL
WATLING STREET
ROMAN ROAD
Path (um)
(course of)
Shaft
ETL
ETL
PARK
COR
NER
ROAD
Trac
k
Water Works
Northfleet West
ETL
Grid Sub Station
Track
Path (um)
Disman
tled R
ailway
Lyndhurst
VAGNIACAE
(site of)
Springhead
27.3m
ROMAN SETTLEMENT
WATLING STREET
Springhead House
ETL
ETL
Cottage
17.5m
ROMAN TEMPLES
(course of)
Centre
Path
A 2
(site of)
ETL
Helinside
ROMAN ROAD
STATION ROAD
13.8m
21.5m
ETLTrac
k
Vagniac
Ebbsfleet
The
25.4m
Nurseries
Garden
Northfleet West
29.0m
El
Ebbs
fleet
30.7m
Path
(um
)
Sludge Lagoons
Path (um)
Grid Sub Station
Tanks
Sewage Works
Pumping
Sub Sta
SOU
THFLEET R
OAD
ETL
Station
Dismantled Railw
ay
Sloping masonry
Drain Sewage
A1
J9
Enterprise
H3
Park
El Sub Sta
J1E
C3
H1
V3
J1F
R
D1
Springhead
B2
D4
I3
V2
S
V1
El Sub Sta
C6
A2
C4
LB
C2
J1K
G1
J2
E2
I1
D9
G3
A3
C1
B4
F4
V4
B3
Depot
W
Orchard House
J6
B1
D5
E1
J1A
H6
H4
F6
F3
F1
C5
ROMANBURIAL GROUND
PEPPERHILL LA
NE
47
HALL
ROAD
NEW
BAR
N R
OAD
(site of)
20.6m
Tank
ROMAN TEMPLE
19.0m
Northfleet East Grid Sub Station
El Sub Sta
Pond
THAMES WAY
Silo
FB
Silo
FB
Track
Drain
Drain
Drain
Tank
El Sub Sta
El Sub Sta
El Sub Sta
Gantry
Gantry
Pond
Gantry
Tanks
Mast
Tunnel
B 262
Mast
Tunnel
A 2
A 2
A 2
A 2
The Observatory
SL
SL
SL
Lighting TowerLighting Tower
Gantry
Trac
k
Gantry
Shelter
Playground
9
Playground
FLEMING COURT
1
22 to 32
34 to 52
SPRINGHEAD PARKWAY
BONHAM W
AY
2 to 20
27 to 45
Gantry
Gantry
Transfer Station
Waste
A 2
1
6
LISTER DRIVE
7
1
14
2
FOXHOUNDS LANE
A 2260
El Sub Sta
El Sub Sta
El Sub Sta
11
1
1
5 2
8
13
54 to 72
74 to 90
92 to 108
14
110 to 126
18
30
56 to 72
21
to16
32
4325
to 4
147
38 to 48
1
13
52
2620
2 to
18
El Sub Sta
DefED & Ward BdyUnd
CO
CS
Def
Und
Def
Co Const, CP & ED Bdy
ED & Ward Bdy
Def
COCS
Co
Con
st, C
P, a
nd E
D B
dy
Def
COCS
Def
War
d Bd
yCR
Ward Bdy
Ward Bdy
Def
ED & Ward Bdy
Co C
onst, CP & ED
Bdy
Def
TYLER CLOSE
SPRINGHEAD PARKWAY
DAR
WIN
RIS
E
WEL
LESL
EY C
OR
NER 14
2
2325
272919
14
2
166
19
8
154
2
174
Ps
TOURTEL YARD
FIELDEN TERRACE
128 to 152
6
PlayArea
1
J7
Ps
WELLS COURT
16 to
32
El Sub Sta
29
11
13
176
190
1
19
HINDMARSH CRESCENT
11to27
2to 12
Path (um)
Shelter
Mast
12
3
2933
17
4
Line Of Posts
Filling Station
THAC
KERA
Y DR
IVE
El Sub Sta
Eastgate
141
(Hall)
Improved road
Key
Existing sign and signal gantry retained
New sign and signal gantry
Existing sign and signal gantry removed
76
More respondents agreed with the scheme at Ebbsfleet Junction than disagreed. Given that there is currently less traffic congestion experienced at Ebbsfleet than Bean, the public are less convinced by the need to improve the Ebbsfleet junction. However, the predicted traffic flows are such that improvements will be necessary due to the proposed housing development in the area.
© Crown copyright and database rights 2017 OS 100030649
B259
A2260
Traffic signal control on
roundabout
Eastbound on slip road widened
Road between roundabouts widened to dual carriageway
Existing roundabout enlarged
Off slip roads retained
Traffic signal control on roundabout
On slip road widened
Existing roundabout enlarged
Preferred route: A2 Ebbsfleet junction
© Crown copyright 2017.You may re-use this information (not including logos) free of charge in any format or medium, under the terms of the Open Government Licence. To view this licence: visit www.nationalarchives.gov.uk/doc/open-government-licence/write to the Information Policy Team, The National Archives, Kew, London TW9 4DU, or email [email protected].
This document is also available on our website at www.gov.uk/highways
If you have any enquiries about this publication email [email protected] or call 0300 123 5000*. Please quote the Highways England publications code PR59/17.
Highways England Creative S170201
*Calls to 03 numbers cost no more than a national rate call to an 01 or 02 number and must count towards any inclusive minutes in the same way as 01 and 02 calls. These rules apply to calls from any type of line including mobile, BT, other fixed line or payphone. Calls may be recorded or monitored.
Printed on paper from well-managed forests and other controlled sources.
Registered office Bridge House, 1 Walnut Tree Close, Guildford GU1 4LZHighways England Company Limited registered in England and Wales number 09346363
If you need help accessing this or any other Highways England information,please call 0300 123 5000 and we will help you.
Further informationInformation about the project, and to receive updates about the scheme via our newsletter, are available online at:
www.highways.gov.uk/a2be
You can let us know your views or questions by contacting the project team using the following email and address:
� email: [email protected]
� write to: Freepost A2 Bean & Ebbsfleet junction improvements
� call: 0300 123 5000 (24 hours)
� website: www.highways.gov.uk/a2be