The Federal Democratic Republic of Ethiopia
Standard Bidding Document (SBD)
For Procurement of Works
For National Competitive Biddings (NCB)
Subject of Procurement Construction of
preparator sc!ool
Procurement "eference Number
#$B%CW%NCB%&FB No '%*'
Project Name ++++++++++++++++++++++++++
Date of &ssue of Bidding Documents
,ddis ,baba- September *'
Note to Public Bodies:
• The information contained within the brackets is in the form of .idden te/t (Hidden text:
Character formatting that allows you to show or hide specified text !icrosoft "ordindicates hidden text by underlining it with a dotted line#$ and will not print unless the
print option is flagged The hidden text doesn%t need to be deleted
• To &iew hidden text on the screen$ click S!o0%.ide on the Standard toolbar (Toolbar:
' bar with buttons and options that you use to carry out commands or
• To &iew hidden text click #ptions on the 1ools menu$ click the 2ie0 tab$ and then select
the .idden te/t check box under Formatting marks
• To see hidden text in a printed document$ click the Print on the File menu )nder Printclick #ptions and than select the .idden te/t check box under &nclude 0it! document
• To omit hidden text in a printed document$ click #ptions on the 1ools menu$ click the
Print tab$ and then clear the .idden te/t check box under &nclude 0it! document
8/20/2019 SBD Works (NCB)_ November-Final 5 Prep 22
2/144
The Federal Democratic Republic of Ethiopia
Bidding Document
1able of Contents
Part 1Bidding Procedures I
Section 1. *nstructions to Bidders *
Section 2. Bid +ata ,heet **
Section 3. -&aluation !ethodology and Criteria ***
Section 4. Bidding .orms */
Section 5. -ligible Countries /
Part 2Schedule of Requirement I
Section 6. ,chedule of 0e1uirements /*
Part !"ontract II
Section 7. 2eneral Conditions of Contract /**
Section 8. ,pecial Conditions of Contract /***
Section 9. Contract .orms *3
SBD3Works (NCB) 3 Prepared b t!e FPP, (2ersion - ,ugust *)
+ocument: Bidding +ocument Page i
8/20/2019 SBD Works (NCB)_ November-Final 5 Prep 22
3/144
Part 1# Bidding Procedures Section 1# Instructions to Bidders
Part 1 Bidding ProceduresSection 1$ &nstructions to Bidders
1able of Clauses
%$ &eneral 1
1. *ntroduction 4
2. ,ource of .unds 5
3. .raud$ Corruption and Complaints Pro&isions 5
4. -ligible Bidders 6
5. -ligible !aterials$ -1uipment and ,er&ices 7
6. Conflict of *nterest 7
B$ "ontents of Bidding Documents '
7. Bidding +ocuments 8
8. "ritten 9uestions Clarification of Bidding +ocuments ;
9. !odification to Bidding +ocuments ;
10. Pre
8/20/2019 SBD Works (NCB)_ November-Final 5 Prep 22
4/144
Part 1# Bidding Procedures Section 1# Instructions to Bidders
E$ E*aluation and "omparison of Bids 1'
29. Confidentiality 48
30. Clarification of Bids 48
31. 0esponsi&eness of Bids 48
32. Nonconformities and missions 4;
33. +ubious price 1uotations and errors in calculation 4;
34. !argin of Preference 4=
35. Con&ersion to ,ingle Currency 4=
36. Preliminary -xamination of Bids 4=
37. >egal$ Professional$ Technical$ and .inancial 'dmissibility of Bids 4?
38. -&aluation of Bids 5
39. Comparison of Bids 5
40. Post
8/20/2019 SBD Works (NCB)_ November-Final 5 Prep 22
5/144
Part 1# Bidding Procedures Section 1# Instructions to Bidders
Section I. Instructions to Bidders
%$ 4eneral
1$ &ntroduction
44 The Public Body indicated in the Bid +ata ,heet (B+,# is the Contracting 'uthority for this
procurement process and it is bound by the rules go&erning public procurement in the .ederal+emocratic 0epublic of -thiopia *t has the powers and duties to conclude a Contract for the
pro&ision of "orks 'ccordingly$ this procurement process is being conducted in accordance
with the recent editions of the -thiopian .ederal 2o&ernment Procurement and Property'dministration Proclamation and Public Procurement +irecti&e under the procurement method
indicated in the B+,
45 By the issue of this Bidding +ocuments the Public Body in&ites interested Candidates to submit
their Bids with a &iew to entering into Contract with the Public Body for the pro&ision of "orkswhich general description is pro&ided in the B+, The "orks that are subDect of this
procurement process are more particularly specified in ,ection ;$ ,chedule of 0e1uirements
upon the basis of the information supplied in and in accordance with this Bidding +ocuments
46 -ach Bidder may only submit one Bid$ either indi&idually or as a partner in Doint &enture 'Bidder who submits or participates in more than one Bid (other than as a subcontractor or in
cases of alternati&es that ha&e been permitted or re1uested# will cause all the Bids with the
Bidder%s participation to be dis1ualified
47 The procurement reference number and number of lots of this Bidding +ocuments are pro&ided
in the B+, *f Bids are being in&ited for indi&idual contracts (lots# the Bidder may submit a Bid
for one lot only$ se&eral or all of the lots -ach lot will form a separate contract and the
1uantities indicated for different lots will be indi&isible The Bidder must offer the whole of the
1uantity or 1uantities indicated for each lot
48 This ,ection 4$ *nstructions to Bidders shall not form a part of the Contract These instructions
are intended to assist Bidders in the preparation of their Bids
4; The Public Body is not bound to accept any Bid$ and reser&es the right to annul the selection
process at any time prior to Contract award$ without thereby incurring any liability to the
Bidders
4= The Public Body retains ownership of all Bids submitted in response to this Bidding
+ocuments Conse1uently$ Bidders ha&e no right to ha&e their Bids returned to them except late
Bids
4? *n submitting a Bid$ the Bidder accepts in full and without restriction this Bidding +ocuments
as the sole basis of this procurement procedure$ whate&er his own conditions of sale may be$
which he hereby wai&es Bidders are expected to examine carefully and comply with all
instructions$ forms$ contract pro&isions and specifications contained in this Bidding +ocuments
.ailure to submit a Bid containing all the re1uired information and documentation within the
deadline specified may lead to the reDection of the Bid No account can be taken of any
reser&ation in the Bid as regards the Bidding +ocuments any reser&ation will result in the
immediate reDection of the Bid without further e&aluation
4@ The permitted method of communication shall be in writing Throughout these Bidding
+ocuments the term Ein writingE means communicated in written form and deli&ered against
receipt
SBD3Works (NCB) 3 Prepared b t!e FPP, (2ersion - ,ugust *)
+ocument: *nstructions to Bidders Page 4 of 56 *ssued by:
8/20/2019 SBD Works (NCB)_ November-Final 5 Prep 22
6/144
Part 1# Bidding Procedures Section 1# Instructions to Bidders
2$ Source of Funds
54 The Public Body has an appro&ed budget toward the cost of the procurement described in the
,ection ;$ ,chedule of 0e1uirement The Public Body intends to use these funds to place aContract for which these Bidding +ocuments are issued
55 Payments will be made directly by the Public Body and will be subDect in all respects to theterms and conditions of the resulting Contract placed by the Public Body
!$ Fraud- Corruption and Complaints Provisions
64 The 2o&ernment of the .ederal +emocratic 0epublic of -thiopia (herein after called the
2o&ernment# represented by the Public Procurement and Property 'dministration 'gency
(herein after called the 'gency# re1uires Contracting 'uthorities$ as well as Bidders to obser&e
the highest standards of ethics during the procurement and the execution of contracts *n pursuance of this policy$ the 2o&ernment:
(a# +efines$ for the purposes of this pro&ision$ the terms set forth below as follows:
(i# FCorrupt practiceG is the offering$ gi&ing$ recei&ing or soliciting$ directly or
indirectly$ of any thing of &alue to influence improperly the action of a public
official in the procurement process or in contract execution
(ii# F.raudulent practiceG is any act or omission$ including misrepresentation$ that
knowingly or recklessly misleads$ or attempts to mislead$ a party to obtain
financial or other benefit or to a&oid an obligation
(iii# FCollusi&e practicesG is a scheme or arrangement between two or more parties$
with or without the knowledge of the Public Body$ designed to establish prices at
artificial$ nonist of
+ebarred Bidders is a&ailable on the 'gencys "ebsite httpwwwppago&et
65 *n pursuit of the policy defined in ,ub
8/20/2019 SBD Works (NCB)_ November-Final 5 Prep 22
7/144
Part 1# Bidding Procedures Section 1# Instructions to Bidders
"orks if it at any time determines that corrupt or fraudulent practices were engaged in by
representati&es of the Public Body or of a Bidder during the procurement or the execution of
that contract
66 "here it is pro&ed that the Bidder has gi&en or has offered to gi&e inducement or bribe to an
official or procurement staff of the Public Body to influence the result of the Bid in his fa&or
shall be dis1ualified from the Bid$ prohibited from participating in any future public procurement and the bid security deposited by them shall be forfeited
67 Bidders are re1uired to indicate their acceptance of the pro&isions on fraud and corruption$ as
defined in this clause through the statement in the Bid ,ubmission ,heet
68 *n further pursuance of this policy$ Bidders shall permit the 'gency to inspect their accounts
and records and other documents relating to the submission of Bids and contract performance$
and to ha&e them audited by auditors appointed by the 'gency
6; ,ubDect to the recent editions of the Public Procurement Proclamation and Procurement
+irecti&e$ a candidate or a Bidder aggrie&ed or is likely to be aggrie&ed on account of the
Public Body re1uesting a Bid not complying with the pro&isions of the Proclamation or Procurement +irecti&e in conducting a Bid proceeding may present complaint to the head of the
Public Body to ha&e the Bid proceeding re&iewed or in&estigated 'ny complaint must be
submitted in writing to the head of the Public Body$ within fi&e working days from the date the
Bidder knew$ or should ha&e known$ of the circumstances gi&ing rise to the complaint *f the
head of the Public Body does not issue a decision within ten working days after submission of
complaint$ or the candidate or the Bidder is not satisfied with the decision$ it may submit a
complaint to the Board within fi&e working days from the date on which the decision has been
or should ha&e been communicated to the candidate or the Bidder by the Public Body The
Boards decision is binding for both parties
,$ $ligible Bidders
74 ' Bidder may be a natural person$ pri&ate$ public or go&ernment
8/20/2019 SBD Works (NCB)_ November-Final 5 Prep 22
8/144
Part 1# Bidding Procedures Section 1# Instructions to Bidders
76 ' Bidder that has been debarred from participating in public procurement in accordance with
*TB Clause 64 (c#$ at the date of the deadline for Bid submission or thereafter$ shall be
dis1ualified
77 2o&ernment
8/20/2019 SBD Works (NCB)_ November-Final 5 Prep 22
9/144
Part 1# Bidding Procedures Section 1# Instructions to Bidders
puts them in a position to ha&e access to information about or influence on the bid of
another Bidder$ or influence the decisions of the Public Body regarding this bidding
process or
(e# ' Bidder participates in more than one bid in this bidding process Participation by a
Bidder in more than one Bid will result in the dis1ualification of all Bids in which such
Bidder is in&ol&ed Howe&er$ this does not limit the inclusion of the same subcontractor in more than one bid or
(f# ' Bidder participated as a consultant in the preparation of the design or ,chedule of
0e1uirements of the works that are the subDect of the bid
(g# ' Bidder that has a business or family relationship with a member of the Public Body%s
staff who is directly or indirectly in&ol&ed in any part of (i# the preparation of the
,chedule of 0e1uirements of the assignment$ (ii# the selection process for such
assignment$ or (iii# super&ision of the Contract$ may not be awarded a Contract$ unless
the conflict stemming from this relationship has been resol&ed in a manner acceptable to
the Public Body throughout the procurement process and the execution of the Contract
(h# ' Bidder or any of its affiliates has been hired (or is proposed to be hired# by the Public
Body as -ngineer for the Contract implementation
B$ Contents of Bidding Documents
1$ Bidding Documents
44 The Bidding +ocuments consist of Parts 4$ 5$ and 6$ which include all the ,ections indicated
below$ and should be read in conDunction with any 'ddenda issued in accordance with *TB
Clause @
Part Bidding Procedures
•,ection 4 *nstructions to Bidders (*TB#
•,ection 5 Bid +ata ,heet (B+,#
•,ection 6 -&aluation !ethodology and Criteria
•,ection 7 Bidding .orms
•,ection 8 -ligible Countries
Part Sc!edule of "e6uirements
•,ection ; ,chedule of 0e1uirements
Part ' Contract
•,ection = 2eneral Conditions of Contract (2CC#
•,ection ? ,pecial Conditions of Contract (,CC#
•,ection @ Contract .orms
7=8 The *n&itation to Bid is not part of the Bidding +ocument *n case of discrepancies between the
*n&itation to Bid and the Bidding +ocuments listed in *TB Clause ;4 abo&e$ said Bidding+ocuments will take precedence
7=; The Public Body is not responsible for the incompleteness of the Bidding +ocuments and their
addenda$ if they were not obtained directly from the Public Body Bidders who did not obtain
the Bidding +ocuments directly from the Public Body will be reDected during e&aluation
45 The Bidder is expected to examine all instructions$ forms$ terms$ and specifications in the
Bidding +ocuments .ailure to furnish all information or documentation re1uired by the
SBD3Works (NCB) 3 Prepared b t!e FPP, (2ersion - ,ugust *)
+ocument: *nstructions to Bidders Page 8 of 56 *ssued by:
8/20/2019 SBD Works (NCB)_ November-Final 5 Prep 22
10/144
Part 1# Bidding Procedures Section 1# Instructions to Bidders
Bidding +ocuments may result in the reDection of the Bid
2$ Written 7uestions % Clarification of Bidding Documents
54 The Bidder re1uiring any clarification of the Bidding +ocuments shall contact the Public Body
in writing at the Public Body%s address indicated in the B+, The Public Body will respond in
writing to any re1uest for clarification$ pro&ided that such re1uest is recei&ed no later than ten(4# days prior to the deadline for submission of Bids The Public Body shall forward copies of
its response to all Bidders who ha&e recei&ed the Bidding +ocuments directly from it$ including
a description of the in1uiry but without reference to the identity of the prospecti&e Bidder
initiating the re1uest ,hould the Public Body deem it necessary to amend the Bidding
+ocuments as a result of a clarification$ it shall do so following the procedure under *TB Clause
@ and ,ub
8/20/2019 SBD Works (NCB)_ November-Final 5 Prep 22
11/144
Part 1# Bidding Procedures Section 1# Instructions to Bidders
prospecti&e Bidders
77 The Public Body in&ites all prospecti&e Bidders to submit their 1uestions re1uest for
clarification by time and date and to the address indicated in the B+, Clauses ?4 and ?5
78 The Pre
8/20/2019 SBD Works (NCB)_ November-Final 5 Prep 22
12/144
Part 1# Bidding Procedures Section 1# Instructions to Bidders
and opened at the same time
6? Public Body shall allow adDustment of prices 1uoted by the Bidder in case current price
information is a&ailable from the Public Procurement and Property 'dministration 'gency or the Central ,tatistical 'gency
6@ 0e1uest for price adDustment may be filed after expiration of period specified in the B+, inaccordance with the 2CC
64 'll duties$ taxes$ and other le&ies payable by the Contractor under the Contract$ or for any other
cause$ as of the date 5? days prior to the deadline for submission of bids$ shall be included in
the rates and prices and the total Bid price submitted by the Bidder
644 "here a foreign Bidder plans to use local inputs to satisfy the re1uired obDect of procurement
under the Contract the portion of the total Contract price representing such local cost shall be
expressed in -TB
645 *f so indicated in B+, ,ub
8/20/2019 SBD Works (NCB)_ November-Final 5 Prep 22
13/144
Part 1# Bidding Procedures Section 1# Instructions to Bidders
88 *t is desirable that the maDority of the proposed professional staff is permanent employees of the
Bidder or has an extended and stable working relationship with the Bidder
-$ 1ec!nical 7ualifications- Competence- and $/perience of t!e Bidder
;4 The Bidder must present a description of its company and organiIation$ with appropriate
reference to any parent company and subsidiaries The Bidder shall also include detailsdemonstrating the Bidder%s experience and ability in pro&iding the "orks listed in ,ection ;$
,chedule of 0e1uirements 'lso$ Bidder shall include a description of how it plans to manage
the "orks included in this Bidding +ocuments in addition to its other ongoing proDects
;5 This information shall be included in a separate form entitled Bidders Certification of Compliance that is furnished in ,ection 7$ Bidding .orms
;6 's a proof of satisfactory execution of contracts the Bidder must pro&ide Certificates of
satisfactory execution of pre&ious contracts andor experience pro&ided by the other contracting
party to the contracts concerned in number and within the period specified in the B+, for
similar siIedtype contracts with a budget of at least that of this contract$ unless otherwise
specified in the B+,$ including contact information for &erification and inspection so as to
pro&ide due diligence Contact information should include$ at a minimum: name$ function$address$ e
8/20/2019 SBD Works (NCB)_ November-Final 5 Prep 22
14/144
Part 1# Bidding Procedures Section 1# Instructions to Bidders
(b# ther documents as stated in the B+,
.$ 9oint 2enture or Consortium
?4 *f Bidder is a Doint &enture or consortium of two or more entities$ the Bid must be single with
the obDect of securing a single contract authoriIed person must sign the Bid and will be Dointly
and se&erally liable for the Bid and any contract Those entities must designate one of their
members to act as the leader with authority to bind the Doint &enture or consortium Thecomposition of the Doint &enture or consortium must not be altered without the prior consent in
writing of the Public Body
?5 The Bid may be signed by the representati&e of the Doint &enture or consortium only if he has
been expressly so authoriIed in writing by the members of the Doint &enture or consortium$ and
the authoriIing contract$ notarial act or deed must be submitted to the Public Body 'll
signatures to the authoriIing instrument must be certified in accordance with the national laws
and regulations of each party comprising the Doint &enture or consortium together with the
powers of attorney establishing$ in writing$ that the signatories to the Bid are empowered to
enter into commitments on behalf of the members of the Doint &enture or consortium -ach
member of such Doint &enture or consortium must pro&e to the satisfaction of the Public Body
that they comply with the necessary legal$ professional$ technical and financial re1uirementsand ha&e the wherewithal to carry out the contract effecti&ely
/$ ,lternative Bids
@4 )nless otherwise indicated in the B+,$ alternati&e Bids shall not be considered
@5 *f permitted in B+,$ the Public Body may consider alternati&e technical solutions prior to the
notification of the successful Bidder pro&ided that the Bidder:
(a# Has submitted Bid in accordance with the Bidding +ocument as issued and
(b# Has submitted Bid based on alternati&e(s# to the Bidding +ocument as issued
(c# Has included with the Bid a demonstration of the ad&antages of the alternati&e technical
solution o&er the initial solution$ including a 1uantifiable Dustification of any economic
andor technical ad&antages and(d# Has included with the Bid sufficient descripti&e information for a complete e&aluation of
the proposed alternati&e technical solution by the Public Body$ including calculations$
technical specifications$ breakdown of prices$ proposed work methods and other rele&ant
details
@6 nly the technical alternati&e(s#$ if any$ of the lowest e&aluated Bidder conforming to the basic
technical re1uirements shall be considered by the Public Body
@7 *n e&aluating a Bid containing an alternati&e technical solution the Public Body may use any
e&aluationaward criteria as indicated in the B+, and ,ection 6$ -&aluation !ethodology and
Criteria
@8 'lternati&e Bids not re1uested by the Public Body shall be reDected10$ Period of 2alidit of Bids
44 Bids shall remain &alid for the period specified in the B+, after the Bid submission deadline
prescribed by the Public Body ' Bid &alid for a shorter period may be reDected by the Public
Body as non
8/20/2019 SBD Works (NCB)_ November-Final 5 Prep 22
15/144
Part 1# Bidding Procedures Section 1# Instructions to Bidders
shall be made in writing
46 Bidders who are not willing to extend their Bid &alidity period for whate&er reason shall be
dis1ualified from the bid without ha&ing forfeited their bid security
47 Bidders agreeing to the Public Body%s re1uest for extension of their Bid &alidity period ha&e to
express in writing their agreement to such re1uest Bidders who agree to such extension shallconfirm that they maintain the a&ailability of the Professional staff nominated in the Bid$ or in
their confirmation of extension of &alidity of the Bid$ Bidders could submit new staff inreplacement$ who would be considered in the final e&aluation for contract award ,imilarly$
they ha&e to amend the &alidity period of their bid security on the basis of the extension of the
Bid &alidity period they ha&e agreed to$ or alternati&ely$ furnish new bid security to co&er the
extended period
48 ' Bidder not agreeing to extend the &alidity period of hisits bid security shall be treated as a
Bidder refusing the Public Body%s re1uest for extension of Bid &alidity period$ and as such$
shall be dis1ualified from further bid proceeding
11$ Bid Securit
444 )nless otherwise specified in the B+,$ the Bidder shall furnish as part of its Bid$ a bid securityin original form and in the amount and currency specified in the B+, ' copy of bid security$ if
submitted without original form$ shall not be accepted
445 The bid security shall be$ at the Bidder%s option$ in any of the following forms:
(a# 'n unconditional Bank 2uarantee
(b# 'n irre&ocable >etter of Credit
(c# Cash$ check certified by a reputable bank or financial institution$ or payable order
all from a reputable source from any eligible country ,ecurities issued by foreign banks or
financial institutions shall be counter
8/20/2019 SBD Works (NCB)_ November-Final 5 Prep 22
16/144
Part 1# Bidding Procedures Section 1# Instructions to Bidders
(a# *f a Bidder withdraws its Bid during the period of bid &alidity specified by the Bidder on
the Bid ,ubmission ,heet$ except as pro&ided in *TB ,ub
8/20/2019 SBD Works (NCB)_ November-Final 5 Prep 22
17/144
Part 1# Bidding Procedures Section 1# Instructions to Bidders
(g# +omestic Bidders$ indi&idually or in Doint &entures$ applying for eligibility for a =K<
percent margin of domestic preference shall supply all information re1uired to satisfy the
criteria for eligibility as described in *TB 67
(h# *n the case of a bid submitted by a Doint &enture (A/#$ the .orm +ata on Aoint /entures$
the 'greement go&erning the formation of Doint &enture$ or letter of intent to form A/$
including a draft agreement$ in accordance with *TB Clause 4?5$ indicating at least the parts of the "orks to be executed by the respecti&e partners and
(i# 'ny other document or information re1uired to be completed and submitted by Bidders$
as specified in the B+,
1!$ Format and Signing of Bid
464 The Bidder shall prepare one original of the documents comprising the bid as described in *TB
Clause 55 and clearly mark it F0*2*N'>G 'lternati&e bids$ if permitted in accordance with
*TB 4@$ shall be clearly marked '>T-0N'T*/- *n addition$ the Bidder shall submit copies of
the bid$ in the number specified in the B+, and clearly mark each of them FCPLG *n the
e&ent of any discrepancy between the original and the copies$ the original shall pre&ail *f
re1uired in B+,$ Bidders shall be re1uired to submit bid documents in two en&elopes
containing the technical and financial proposals separately465 The original and all copies of the bid shall be typed or written in indelible ink and shall be
signed by a person duly authoriIed to sign on behalf of the Bidder This authoriIation shall
consist of a written statement by a power of attorney (or notary statement$ etc# pro&ing that the
person$ who signed the bid on behalf of the companyDoint &entureconsortium is duly
authoriIed to do so and it shall be attached to the bid The name and position held by each
person signing the authoriIation must be typed or printed below the signature 'll pages of the
bid$ except for nonG and FCPLG These en&elopes containing the original and thecopies shall then be enclosed in one single en&elope
45 The inner and outer en&elopes shall:
(a# Be addressed to the Public Body in accordance with *TB ,ub
8/20/2019 SBD Works (NCB)_ November-Final 5 Prep 22
18/144
Part 1# Bidding Procedures Section 1# Instructions to Bidders
2$ Deadline for Submission of Bids
54 Bidders may always submit their bids by registered post or by hand Bids must be recei&ed by
the Public Body at the address and no later than the date and time indicated in the B+,
55 The Public Body may$ at its discretion$ extend the deadline for the submission of Bids by
amending the Bidding +ocuments in accordance with *TB Clause @$ in which case all rights andobligations of the Public Body and Bidders pre&iously subDect to the deadline shall thereafter be
subDect to the deadline as extended
!$ 8ate Bids
64 The Public Body shall not consider any Bid that arri&es after the deadline for submission of
Bids$ in accordance with *TB Clause 58 'ny Bid recei&ed by the Public Body after the
deadline for submission of Bids shall be declared late$ reDected$ and returned unopened to theBidder
,$ Wit!dra0al- Substitution- and 5odification of Bids
74 ' Bidder may withdraw$ substitute$ or modify its Bid after it has been submitted by sending a
written notice$ duly signed by an authoriIed representati&e$ and shall include a copy of theauthoriIation in accordance with *TB ,ub
8/20/2019 SBD Works (NCB)_ November-Final 5 Prep 22
19/144
Part 1# Bidding Procedures Section 1# Instructions to Bidders
authoriIation to re1uest the modification and is read out at Bid opening nly en&elopes that are
opened and read out at Bid opening shall be considered further
86 'll outer en&elopes shall be opened one at a time$ reading out: the name of the Bidder$ the
presence of a bid security$ if re1uired and any other salient points of the Bid as the Public Body
may consider appropriate nly discounts and alternati&e offers read out at bid opening shall beconsidered for e&aluation No Bid shall be reDected at Bid opening except for late Bids$ in
accordance with *TB ,ub
8/20/2019 SBD Works (NCB)_ November-Final 5 Prep 22
20/144
Part 1# Bidding Procedures Section 1# Instructions to Bidders
specifications of the Bidding +ocuments without material de&iation$ reser&ation$ or omission
' material de&iation$ reser&ation$ or omission is one that:
(a# *f accepted$ would$
(i# 'ffects in any substantial way the scope$ 1uality$ or performance of the "orks
specified in the Contract or
(ii# >imits in any substantial way$ inconsistent with the Bidding +ocuments$ the
Public Body%s rights or the Bidder%s obligations under the Contract or
(b# *f rectified would unfairly affect the competiti&e position of other Bidders presenting
substantially responsi&e Bid
66 *f a Bid is not substantially responsi&e to the salient re1uirements of the Bidding +ocuments it
shall be reDected by the Public Body and may not subse1uently be made responsi&e by the
Bidder by correction of the material de&iation$ reser&ation$ or omission
67 +ecisions to the effect that a bid is not substantially responsi&e t must be duly Dustified in thee&aluation minutes
68 *f only one Bid meets all salient re1uirements of the Bidding +ocuments and is not otherwise
dis1ualified$ the Public Body may still complete the full e&aluation of that Bid and sign contract
with that Bidder if the Bid submitted by such Bidder is satisfactory to the Public Body and the
price offered by the Bidder is comparable to or less than the market price of the re1uired obDect
of procurement
,$ Nonconformities and #missions
74 Pro&ided that a Bid is substantially responsi&e$ the Public Body may wai&e any non
8/20/2019 SBD Works (NCB)_ November-Final 5 Prep 22
21/144
Part 1# Bidding Procedures Section 1# Instructions to Bidders
(c# *f there is a discrepancy between words and figures$ the amount in words shall pre&ail$
unless the amount expressed in words is related to an arithmetic error$ in which case the
amount in figures shall pre&ail subDect to (a# and (b# abo&e
85 The Public Body shall correct the detected errors in calculation and notify the Bidder in writing
of the corrections made without any delay$ re1uesting the Bidder to confirm that he accepts the
correction of the calculation error within the period specified in B+, from the date on whichthe notice was recei&ed The corrections shall be clearly indicated in the Bid
86 *f the Bidder that submitted the lowest e&aluated Bid does not accept the correction of errors$ its
Bid shall be dis1ualified
-$ 5argin of Preference
;4 Preference shall be granted to local construction companies
;5 The margin of preference to be so granted to local construction companies and applied when
comparing prices during e&aluation of Bids shall be =8 J
;6 >ocal companies engaged in construction shall pro&ide all e&idence necessary to pro&e that they
meet the following conditions to 1ualify for the preference:
(a# The company has to be incorporated in -thiopia
(b# !ore than fifty per cent of the company%s capital stock has to be held by -thiopiannatural or Duridical persons
(c# !ore than fifty per cent of members of the board of the company ha&e to be -thiopian
nationals
(d# 't least fifty per cent of the key staff of the company has to be -thiopian Nationals
;7 Preference shall be gi&en to small and micro enterprises established under the rele&ant law by a
margin of 6J when such enterprises compete with local Bidders in national competiti&e
bidding
;8 "hen small and micro enterprises participate in international competiti&e bidding$ only the preference granted to local companies as per ,ub
8/20/2019 SBD Works (NCB)_ November-Final 5 Prep 22
22/144
Part 1# Bidding Procedures Section 1# Instructions to Bidders
companyDoint &entureconsortium$ is duly authoriIed to do so (*TB ,ub
8/20/2019 SBD Works (NCB)_ November-Final 5 Prep 22
23/144
Part 1# Bidding Procedures Section 1# Instructions to Bidders
(a# Bidder has failed to submit rele&ant professional practice certificates$ if re1uired in B+,
Clause 78(b#(i
(b# Bidder has failed to pro&ide in the Bidder Certification of Compliance .orm information
related to its professional 1ualification and capability for the period specified in the B+,
Clause 484
(c# Bidder has failed to demonstrate in its Technical Proposal that it will ha&e the personnelfor the key positions that meet re1uirements stipulated in ,ection 6$ -&aluation
!ethodology and Criteria
(d# Bidder has failed to pro&ide C/s of the Professional staff signed by the staff themsel&es
or by the authoriIed representati&e of the Professional ,taff
@7 1ec!nical admissibilit
The Public Body may determine Bid as not responsi&e when:
(a# Bidder has failed to pro&ide in the Bidder Certification of Compliance .orm information
about maDor rele&ant contracts successfully completed in the number and period
specified in ,ection 6$ -&aluation !ethodology and Criteria
(b# Bidder has failed to submit Certificates of satisfactory execution of contracts pro&ided by
contracting parties to the contracts successfully completed in the period and budget as
specified in the B+, Clause 4;6 with a budget of at least that of this contract
(c# Bidder has failed to pro&ide in the Bidder Certification of Compliance .orm information
about contracts similar to the proposed "orks in the number$ &alue$ and period specified
in ,ection 6$ -&aluation !ethodology and Criteria
(d# Bidder has failed to pro&ide in the Bidder Certification of Compliance .orm information
about non
8/20/2019 SBD Works (NCB)_ November-Final 5 Prep 22
24/144
Part 1# Bidding Procedures Section 1# Instructions to Bidders
re1uired in ,ection 6$ -&aluation !ethodology and Criteria
10$ $valuation of Bids
44 The Public Body shall e&aluate each Bid that has been determined$ up to this stage of the
e&aluation$ to be substantially responsi&e
45 The Public Body shall e&aluate the Bids on the basis of their responsi&eness to the ,chedule of 0e1uirements$ applying the e&aluation criteria$ sub
8/20/2019 SBD Works (NCB)_ November-Final 5 Prep 22
25/144
Part 1# Bidding Procedures Section 1# Instructions to Bidders
12$ Post36ualification $valuation
454 'fter identifying the successful Bidder by e&aluating the Bid documents against the criteria set
forth in this Bidding +ocuments the Public Body shall conduct post 1ualification e&aluation toestablish the current 1ualification of the successful Bidder where it feels that it has to be
ascertained
455 ,uch post 1ualification e&aluation of the successful Bidder may relate to submission of thedocumentary e&idence specified in *TB Clause 6=$ unless satisfactory documents are already
included in the Bid$ concerning its current legal$ professional$ technical$ and financial standing
and conformity to the re1uirements stated in this Bidding +ocuments
456 *f the successful bidder fails to pro&ide this documentary proof within 48 calendar days
following the Public Bodys re1uest or if the successful bidder is found to ha&e pro&ided false
information its Bid shall be dis1ualified$ in which e&ent the Public Body shall proceed to the
next lowest e&aluated Bid to make a similar determination of that Bidder%s capabilities to
perform satisfactorily
1!$ ,cceptance or "ejection of Bids
464 The Public Body reser&es the right to accept or reDect any bid$ and to annul the bidding processand reDect all bids at any time prior to contract award$ without thereby incurring any liability to
Bidders
1,$ "e3advertising Bids
474 The Public Body may issue *n&itation for -xpression of *nterest for a second time under the
following circumstances:
(a# "here the *n&itation for -xpression of *nterest has been unsuccessful$ namely where no
1ualitati&ely or financially worthwhile Bids ha&e been recei&ed
(b# "here the best price offered by a Bidder is significantly higher than the market price
estimate of the obDect of procurement made by the Public Body prior to the issuance of
the *n&itation for -xpression of *nterest
(c# "here it is concluded that non compliance with the rules and procedures go&erning Bids
prescribed by the Proclamation and Procurement +irecti&e led to the failure of the
*n&itation for -xpression of *nterest to attract more than one Bidder$ or where it is
belie&ed that modifying the Bidding +ocuments could attract ade1uate number of
Bidders
(d# Circumstances of .orce !aDeure render normal implementation of the Contract
impossible
F$ ,0ard of Contract
1$ ,0ard Criteria
44 The Public Body shall award the Contract to the Bidder whose Bid has been determined to be
the lowest e&aluated Bid and is substantially responsi&e to the Bidding +ocuments$ pro&ided
further that the Bidder is determined to be 1ualified to perform the Contract satisfactorily
45 *f Bids are being in&ited for indi&idual contracts (lots# Contracts will be awarded lot by lot$ but
the Public Body may select the most fa&orable o&erall solution after taking account of any
discounts offered
46 *f the Bidder is awarded more than one lot$ a single contract may be concluded co&ering all
those lots
SBD3Works (NCB) 3 Prepared b t!e FPP, (2ersion - ,ugust *)
+ocument: *nstructions to Bidders Page 54 of 56 *ssued by:
8/20/2019 SBD Works (NCB)_ November-Final 5 Prep 22
26/144
Part 1# Bidding Procedures Section 1# Instructions to Bidders
2$ "ig!t to 2ar 7uantities at 1ime of ,0ard
54 't the time the Contract is awarded$ the Public Body reser&es the right to increase or decrease
the 1uantity of "orks originally specified in ,ection ;$ ,chedule of 0e1uirement$ pro&ided thisdoes not exceed the percentages indicated in the B+,$ and without any change in the unit prices
or other terms and conditions of the Bid and the Bidding +ocuments
!$ ,nnouncing and ,0arding of t!e Successful Bidder
64 Prior to expiry of the period of Bid &alidity$ the Public Body shall notify in writing the result of
a Bid e&aluation to all Bidders alike at the same time
65 The letter of notification to be disclosed to the unsuccessful bidders on the technical e&aluation
shall state the reason why they did not succeed in their Bid and the identity of the successful
Bidder
66 ' letter of award to be sent by the Public Body to a successful Bidder shall not constitute a
contract between him and the Public Body ' contract shall be deemed to ha&e been concluded
between the Public Body and the successful Bidder only where a contract containing detailed
pro&isions go&erning the execution of the procurement in issue is signed
67 ' letter of contract award to be sent to a successful Bidder may contain the followinginformation:
(a# That the Public Body has accepted his Bid
(b# The total contract price
(c# The list of items and their respecti&e unit price
(d# The amount of the performance security the successful Bidder is re1uired to furnish andthe deadline for pro&iding such security
,$ Signing of Contract
74 Promptly after notification of the proposed contract award the Public Body shall send the
successful Bidder the Contract
75 "ithin fifteen (48# days of receipt of the notification of award$ the successful Bidder shall sign$
date$ and return it to the Public Body the Contract
76 The Public Body shall not sign a contract before se&en working days from the date Bidders are
notified of the result of their Bid or of any complaint against the bid proceeding
'$ Performance Securit
84 "ithin fifteen (48# days from signing the Contract the successful Bidder shall furnish the
performance security in accordance with the 2CC$ subDect to *TB Clause 6?;$ using for that
purpose the Performance ,ecurity .orm included in ,ection @$ Contract .orms$ or another form
acceptable to the Public Body
85 *f the performance security furnished by the successful local Bidder is in the form of a bond$ itshall be issued by a bonding or insurance company that has been determined by the successful
Bidder to be acceptable to the Public Body ' foreign institution pro&iding a bond shall ha&e a
correspondent financial institution located in the .ederal +emocratic 0epublic of -thiopia
SBD3Works (NCB) 3 Prepared b t!e FPP, (2ersion - ,ugust *)
+ocument: *nstructions to Bidders Page 55 of 56 *ssued by:
8/20/2019 SBD Works (NCB)_ November-Final 5 Prep 22
27/144
Part 1# Bidding Procedures Section 1# Instructions to Bidders
86 .ailure of the successful Bidder to submit the abo&e
8/20/2019 SBD Works (NCB)_ November-Final 5 Prep 22
28/144
Part 1# Bidding Procedures Section 2# Bid Data Sheet
Section 2$ Bid Data S!eet
1able of Contents
%$ &eneral 1
B$ "ontents of Bidding Documents 2
"$ Preparation of Bids 2
D$ Submission and )pening of Bids !
E$ E*aluation and "omparison of Bids ,
F$ %+ard of "ontract ,
SBD3Works (NCB) 3 Prepared b t!e FPP, (2ersion - ,ugust *)
+ocument: Bid +ata ,heet ,ection ** of *3 *ssued by:
8/20/2019 SBD Works (NCB)_ November-Final 5 Prep 22
29/144
Part 1# Bidding Procedures Section 2# Bid Data Sheet
&nstructions to
Bidders (&1B)
referenceData rele*ant to ITB
%$ 4eneral
&1B
8/20/2019 SBD Works (NCB)_ November-Final 5 Prep 22
30/144
Part 1# Bidding Procedures Section 2# Bid Data Sheet
B$ Contents of Bidding Documents
&1B @-***
8/20/2019 SBD Works (NCB)_ November-Final 5 Prep 22
31/144
Part 1# Bidding Procedures Section 2# Bid Data Sheet
&1B ?*-***
8/20/2019 SBD Works (NCB)_ November-Final 5 Prep 22
32/144
Part 1# Bidding Procedures Section 2# Bid Data Sheet
&1B @
8/20/2019 SBD Works (NCB)_ November-Final 5 Prep 22
33/144
Part 1# Bidding Procedures Section !# E*aluation ethodologand "riteria
Section !$ $valuation 5et!odolog andCriteria
1able of Contents
%$ 3egal4 Professional4 Technical4 and Financial 5uali6cation"riteria 1
1. >egal 9ualification of the Bidder 4
2. Professional 9ualifications and Capability of the Bidder 5
3. Technical 9ualifications$ Competence$ and -xperience of the Bidder 6
4..inancial ,tanding of the Bidder 7
B$ E*aluation of Bids '
1. +etermining the ,uccessful Bid 8
2. -&aluation of the Technical Proposal $rror Bookmark not defined<
3. -&aluation and Comparison of Bid Price $rror Bookmark not defined<
4. +omestic Preference 8
5. -&aluation of !ultiple Contracts 8
6. Completion Time ;
7. Technical 'lternati&es ;
SBD3Works (NCB) 3 Prepared b t!e FPP, (2ersion - ,ugust *)
+ocument: -&aluation !ethodology and Criteria ,ection *** of *3 *ssued by romia -ducation Bureau
8/20/2019 SBD Works (NCB)_ November-Final 5 Prep 22
34/144
Part 1# Bidding Procedures Section !# E*aluation ethodologand "riteria
This section$ read in conDunction with ,ection 4$ *nstructions to Bidders and ,ection 5$ Bid +ata ,heet$ contains all the factors$ methods andcriteria that the Public Body shall use to e&aluate a bid and determine whether a Bidder has the re1uired 1ualifications No other factors$ methods
or criteria shall be used The Bidder shall pro&ide all the information re1uested in the forms included in ,ection7$ Bidding .orms
The Bids shall be examined to confirm that all documentary e&idence establishing the Bidders 1ualifications re1uested in *TB Clause 55 ha&e
been pro&ided
'fter confirming the Bids comprise all mandatory documentary e&idence establishing the Bidders 1ualification the Public Body will rule on thelegal$ technical$ professional$ and financial admissibility of each bid$ classifying it as compliant or non
8/20/2019 SBD Works (NCB)_ November-Final 5 Prep 22
35/144
Part 1# Bidding Procedures Section !# E*aluation ethodologand "riteria
F,C1#"
C"&1$"&,
"e6uirement
Bidder
Documentation
"e6uiredSingle $ntit
9oint 2enture- Consortium or ,ssociation
,ll Partners
Combined$ac! Partner
,t 8east #ne
Partner
business organiIation
registration certificate
business organiIation registration certificate
issued by the country of establishment in
accordance with *TB Clause 7;
re1uirement re1uirement re1uirement with attachments
4; /'T registration
certificate
Ha&ing been submitted /'T registrationcertificate issued by the tax authority (in case
of contract &alue of Birr 4$ and
abo&e# in accordance with *TB Clause 7;
!ust meet
re1uirement
!ust meet
re1uirement
!ust meet
re1uirementna
Bid ,ubmission ,heet
with attachments
4= /alid tax clearance
certificate
Ha&ing been submitted &alid tax clearance
certificate issued by the tax authority
(+omestic Bidders nly# in accordance with
*TB Clause 7;
!ust meet
re1uirement
!ust meet
re1uirement
!ust meet
re1uirementna
Bid ,ubmission ,heet
with attachments
4? 2o&ernment wned
-ntity
Compliance with conditions of *TB Clause
77
!ust meet
re1uirement
!ust meet
re1uirement
!ust meet
re1uirementna
Bidder Certification
of Compliance with
attachments
2$ Professional 7ualifications and Capabilit of t!e Bidder
54 Number of staff >
point
't least 8 staff currently works for the
Bidder
!ust meet
re1uirement
!ust meet
re1uirementna na
Bidder Certification
of Compliance
55 Personnel for the key
positions > points
'mong the staff mentioned in ,ubisence >
points
8/20/2019 SBD Works (NCB)_ November-Final 5 Prep 22
36/144
Part 1# Bidding Procedures Section !# E*aluation ethodologand "riteria
F,C1#"
C"&1$"&,
"e6uirement
Bidder
Documentation
"e6uiredSingle $ntit
9oint 2enture- Consortium or ,ssociation
,ll Partners
Combined$ac! Partner
,t 8east #ne
Partner
* points
least ne contracts with a budget of at
least that of this contract in the past .i&e 8
years
re1uirement re1uirementof Compliance with
attachments
65 ,pecific experience
> points
The Bidder has successfully participated ascontractor or subcontractor$ in at least 10o
contracts within the last .i&e 8 years$ each
with a &alue of at least >-***-***
8/20/2019 SBD Works (NCB)_ November-Final 5 Prep 22
37/144
Part 1# Bidding Procedures Section !# E*aluation ethodologand "riteria
F,C1#"
C"&1$"&,
"e6uirement
Bidder
Documentation
"e6uiredSingle $ntit
9oint 2enture- Consortium or ,ssociation
,ll Partners
Combined$ac! Partner
,t 8east #ne
Partner
( = Points for pickup
E points for D%1ruck)
hereafter:
certificate
No< $6uipment 1pe and C!aracteristics 5inimum Number "e6uired
4 ne pickup ( capacity of ;1ts# 4
5 ne dump truck ( carrying capacity of =m6# 4
,$ Financial Standing of t!e Bidder
74 Historical .inancial
Performance
* points
,ubmission of audited balance sheets and
other financial statements as re1uired in the
B+, Clause 4=$ for the last three 6 years to
demonstrate the current soundness of the
Bidders financial position and its
prospecti&e long term profitability
!ust meet
re1uirementna
!ust meet
re1uirementna
Bidder Certification
of Compliance with
attachments
75 '&erage 'nnual
Turno&er
> point
The a&erage annual turno&er calculated as
total certified payments recei&ed for
contracts in progress or completed within
the last Five > years must exceed
>-***-***
8/20/2019 SBD Works (NCB)_ November-Final 5 Prep 22
38/144
Part 1# Bidding Procedures Section !# E*aluation ethodologand "riteria
B$ $valuation of Bids
1$ Determining t!e Successful Bid
'ccording to the methodology defined in the Public Procurement Proclamation and +irecti&e thePublic Body shall select the successful Bid by applying the following method:
%$ The Bid that is found to be substantially responsi&e to the professional$ technical$ andfinancial 1ualification re1uirements$ technically compliant in relation to the technical
specifications$ and with the lowest price
%$ 1!e Bid 0it! t!e 8o0est Price
44 The bids shall be examined to confirm that all documentary e&idence establishing the
Bidders 1ualifications re1uested in *TB Clause 56 ha&e been pro&ided
45 'fter confirming the bids comprise all mandatory documentary e&idence establishing the
Bidders 1ualification the Public Body will rule on the legal$ technical$ professional$ and
financial admissibility of each bid$ classifying it as compliant or non
8/20/2019 SBD Works (NCB)_ November-Final 5 Prep 22
39/144
Part 1# Bidding Procedures Section !# E*aluation ethodologand "riteria
(a# e&aluate only lots or contracts that include at least the percentages of items per lot
and 1uantity per item as specified in *TB 4645
(b# take into account:
(i# the lowest
8/20/2019 SBD Works (NCB)_ November-Final 5 Prep 22
40/144
Part 1# Bidding Procedures Section ,# Bidding Forms
Section ,$ Bidding Forms
1able of Contents
%$ Bid Submission Sheet 1B$ Bidder "erti6cation of "ompliance ,
1. 2eneral *nformation 'bout the Bidder 7
2. .inancial ,tanding 7
3. Bidders rganiIation 8
4. Technical 9ualifications$ Competence$ and -xperience in the Procurement bDect 8
5. Historical Contract Nonump
8/20/2019 SBD Works (NCB)_ November-Final 5 Prep 22
41/144
Part 1# Bidding Procedures Section ,# Bidding Forms
8/20/2019 SBD Works (NCB)_ November-Final 5 Prep 22
42/144
Part 1# Bidding Procedures Section ,# Bidding Forms
%$ Bid Submission S!eetPlace and Date
Procurement "eference NumberA
1oA
,ddis ,baba
$t!iopia
SB5&11$D BG4A
Complete 8egal Name and ,ddress of t!e Seat of
t!e BidderNationalit
8eader'
5ember
$tc H
*n response to your Bidding +ocuments for the abo&e Procurement Number:$ we$ the
undersigned$ hereby declare that:
(a# "e ha&e examined and accept in full the content of the Bidding +ocuments for the$Procurement Number: "e hereby accept its pro&isions in their entirety$ without reser&ation
or restriction
(b# "e hereby declare that all the information and statements made in this Bid are true andaccept that any misinterpretation contained in it may lead to our dis1ualification
(c# "e$ the undersigned$ offer to execute in conformity with the Bidding +ocuments dated thefollowing "orks :
(d# The total price of our Bid$ excluding any discounts offered in item (e# below is:
(e# The discounts offered and the methodology for their application are:
)nconditional +iscounts: *f our bid is accepted$ the following discounts shall apply
!ethodology of 'pplication of the +iscounts: The discounts shall be applied using the
following method:
Conditional +iscounts: *f our bid(s# are accepted$ the following discounts shall apply
!ethodology of 'pplication of the +iscounts: The discounts shall be applied using the
following method:
(f# ur Bid shall be &alid for a period of @ days from the date fixed for the Bid submissiondeadline in accordance with the Bidding +ocuments$ and it shall remain binding upon us and
may be accepted at any time before expiry of that period
(g# The prices in this bid ha&e been arri&ed at independently$ without$ for the purpose of restricting competition$ any consultation$ communication$ or agreement with any other
bidder or competitor relating to:
i Those prices
4 ne signed original Bid ,ubmission .orm must be supplied together with the number of copies specified in the
*nstruction to Bidders5 Country in which the legal entity is registered6 'dddelete additional lines for members as appropriate Note that a subcontractor is not considered to be a member for
the purposes of this bidding procedure *f this Bid is being submitted by an indi&idual Bidder$ the name of the Bidder should be entered as EleaderE and all other lines should be deleted
SBD3 Works (NCB) 3 Prepared b t!e FPP, (2ersion - ,ugust *)
+ocument: Bidding .orms Page 4 of 5@ *ssued byromia -ducation Bureau
8/20/2019 SBD Works (NCB)_ November-Final 5 Prep 22
43/144
Part 1# Bidding Procedures Section ,# Bidding Forms
ii The intention to submit a bid or
iii The methods or factors used to calculate the prices offered
(h# The prices in this bid ha&e not been and will not be knowingly disclosed by the $ directly or indirectly$ to any other bidder or competitor before bid opening
(i# "e$ including any subcontractors for any part of the contract resulting from this procurement
process$ are eligible to participate in public procurement in accordance with *TB Clause 74and ha&e not been debarred by a decision of the Public Procurement and Property
'dministration 'gency from participating in public procurements for breach of our obligation under pre&ious contract
(D# "e are not insol&ent$ in recei&ership$ bankrupt or being wound up$ not ha&e had our businessacti&ities suspended and not be the subDect of legal proceedings for any of the foregoing
(k# "e ha&e fulfilled our obligations to pay taxes according to -thiopian Tax laws
(l# "e ha&e read and understood the pro&isions on fraud and corruption in 2CC Clause 8 andconfirm and assure to the Public Body that we will not engage oursel&es into these e&il
practices during the procurement process and the execution of any resulting contract
(m# "e ha&e not committed an act of embeIIlement$ fraud or conni&ance with other Bidders
(n# "e ha&e not gi&en or ha&e been offered to gi&e inducement or bribe to an official or procurement staff of the to influence the result of the Bid in our fa&or
(o# "e are not participating$ as Bidders$ in more than one bid in this bidding process$ other thanalternati&e bids in accordance with the Bidding +ocument
(p# "e do not ha&e any conflict of interest and ha&e not participated in the preparation of theoriginal ,chedule of 0e1uirements for the Public Body
(1# *f our bid is accepted$ we commit to submit a performance security in accordance with the2CC Clause 8? of the Bidding +ocuments$ in the amount of for the due performance of the
Contract
(r# "e$ including any subcontractors or suppliers for any part of the Contract$ ha&e nationalities
from eligible countries O(s# "e will inform the immediately if there is any change in the abo&e circumstances at any
stage during the implementation of the contract "e also fully recogniIe and accept that any
inaccurate or incomplete information deliberately pro&ided in this Bid may result in our
exclusion from this and other contracts funded by the 2o&ernment of the .ederal +emocratic
0epublic of -thiopia
(t# "e understand that this Bid$ together with your written acceptance thereof included in your notification of award$ shall not constitute a binding contract between us$ until a formalcontract is prepared and executed
(u# "e understand that you reser&e the right to reDect any or all Bids that you may recei&e
Name
*n the capacity of ,igned
+uly authoriIed to sign the Bid for and on behalf of
+ated on insert dayO day of O$ 5
,ttac!mentsA
4 /alid trade license indicating the stream of business in which the is engaged5 /'T registration certificate issued by the tax authority
6 ' &alid tax clearance certificate issued by the tax authority
SBD3 Works (NCB) 3 Prepared b t!e FPP, (2ersion - ,ugust *)
+ocument: Bidding .orms Page 5 of 5@ *ssued byromia -ducation Bureau
8/20/2019 SBD Works (NCB)_ November-Final 5 Prep 22
44/144
Part 1# Bidding Procedures Section ,# Bidding Forms
7 Business organiIation registration certificate or trade license issued by the country of
establishment
8 0ele&ant professional practice certificates
; Bid ,ecurity and
= ther documents re1uested by the Public Body
SBD3 Works (NCB) 3 Prepared b t!e FPP, (2ersion - ,ugust *)
+ocument: Bidding .orms Page 6 of 5@ *ssued byromia -ducation Bureau
8/20/2019 SBD Works (NCB)_ November-Final 5 Prep 22
45/144
Part 1# Bidding Procedures Section ,# Bidding Forms
B$ Bidder Certification of Compliance=
Place and Date
Procurement "eference NumberA
1oA
,ddis ,baba
$t!iopia
1$ 4eneral &nformation ,bout t!e Bidder
Bidder%s >egal Name:
*n case of Aoint /enture$ legal
name of each party:
Place of 0egistration:
>egal 'ddress in Country of 0egistration:
'uthoriIed 0epresentati&e
*nformation
Name:
Position:
'ddress:
Telephone.ax:
-
8/20/2019 SBD Works (NCB)_ November-Final 5 Prep 22
46/144
Part 1# Bidding Procedures Section ,# Bidding Forms
Gear Gear 8ast Gear Current Gear ,verage
,< &nformation from Balance S!eet
4Total 'ssets
5 Total >iabilities
* Net /alue (4
8/20/2019 SBD Works (NCB)_ November-Final 5 Prep 22
47/144
Part 1# Bidding Procedures Section ,# Bidding Forms
Name of
project%kind
of 0orks
2alue of
Works
Period
of
Contract
Percentage
of Works
Completed
Client and
Place
Prime
Contractor (P)
or
Subcontractor
(S)
Final acceptance
issuedK
,< &n .ome Countr
Les: Not Let No:Les: Not Let No:
Les: Not Let No:
B< ,broad
Les: Not Let No:
Les: Not Let No:
Les: Not Let No:
Specific $/perience
Name of
project%kind
of 0orks
2alue of
Works
Period
of
Contract
Percentage
of Works
Completed
Client and
Place
Prime
Contractor (P)
or
Subcontractor
(S)
Final acceptance
issuedK
,< &n .ome Countr
Les: Not Let No:
Les: Not Let No:
Les: Not Let No:
B< ,broad
Les: Not Let No:
Les: Not Let No:
Les: Not Let No:
The Clients Certificates concerning the satisfactory execution of contract are attached to this
document
SBD3 Works (NCB) 3 Prepared b t!e FPP, (2ersion - ,ugust *)
+ocument: Bidding .orms Page ; of 5@ *ssued byromia -ducation Bureau
8/20/2019 SBD Works (NCB)_ November-Final 5 Prep 22
48/144
Part 1# Bidding Procedures Section ,# Bidding Forms
'$ .istorical Contract Non3Performance
Non3Performing Contracts in accordance 0it! Section '- $valuation and 7ualification Criteria
Contract non
8/20/2019 SBD Works (NCB)_ November-Final 5 Prep 22
49/144
Part 1# Bidding Procedures Section ,# Bidding Forms
($ Professional 7ualifications and Capabilities
*n order to proof our professional 1ualifications and capability the following table contains
personnel statistics for the current and the two pre&ious years
,veragemanpo0er
Gear before last 8ast ear 1!is ear
#verall
Specialists
in1ec!nical
,rea
#verall
Specialists
in1ec!nical
,rea
#verall Specialistsin 1ec!nical
,rea
Permanent
1emporar
1#1,8
.$ Comments and Suggestions on t!e Sc!edule of "e6uirements
/$ 7ualit ,ssurance % 5anagerial and Control Procedures
10$ Furt!er &nformation
11$ BidderIs ,udit ,genc
12$ Bank ,ccount Number and Bank ,ddress
The bank account into which payment should be made and bank address are the following: Name
*n the capacity of
,igned
+uly authoriIed to sign the Bid for and on behalf of +ated on insert dayO day of O$ 5
'ttachments:
4 ,tatement issued by a power of attorney authoriIing the signatory of the Bid and all related
documentation
5 Certificates of satisfactory execution of contracts pro&ided by contracting parties to the
contracts successfully completed in the course of the past years$ as re1uired in the B+,$6 'udited financial statements
7 +ocuments re1uired as proof of the Bidders financial standing$ as listed in the B+,
SBD3 Works (NCB) 3 Prepared b t!e FPP, (2ersion - ,ugust *)
+ocument: Bidding .orms Page ? of 5@ *ssued byromia -ducation Bureau
8/20/2019 SBD Works (NCB)_ November-Final 5 Prep 22
50/144
Part 1# Bidding Procedures Section ,# Bidding Forms
"$ Financial #ffer 3nit Price Contract
1$ Bill of 7uantities
Place and Date
Procurement "eference No
8/20/2019 SBD Works (NCB)_ November-Final 5 Prep 22
51/144
Part 1# Bidding Procedures Section ,# Bidding Forms
Bill
No<Description of Works
Specificatio
n "eference
ni
t7uantit Price in ,mount in
>5 day
>6 day
>7 day
>8 day
1otal Da0ork Provisional Sum
Name:
*n the capacity of
,igned:
+uly authoriIed to sign the Bill of 9uantities for and on behalf of
+ated on insert dayO day of O$ 5
SBD3 Works (NCB) 3 Prepared b t!e FPP, (2ersion - ,ugust *)
+ocument: Bidding .orms Page 4 of 5@ *ssued byromia -ducation Bureau
8/20/2019 SBD Works (NCB)_ November-Final 5 Prep 22
52/144
Part 1# Bidding Procedures Section ,# Bidding Forms
2$ Detailed Breakdo0n of Prices
%$ Breakdo0n of t!e basic prices for labor (converted into currenc indicated in SCC)
No< 7ualification 5ont!l Pa(1= .ourl Pa(2= #vertime(!=Social Securit
Contributions(
,=
1ravel 1ime('=.ourl 1otal
(=L>LL?)
' = > ? @
,,
,'
,=
,>
,
,?
,@
The abo&e list is gi&en by way of example and is not exhausti&e(4# ,alary if the employee is paid monthly(5# Hourly pay if the employee is paid hourly$ otherwise monthly salary di&ided by the legal working hours (hoursmonth#(6# '&erage cost of o&ertime$ ie hourly pay times the o&ertime coefficient
'&erage coefficient to be applied to the salary to take account of o&ertime (R total gross salarygross salary without o&ertime#(7# Percentage of the social security contributions (including social welfare$ lea&e$ etc# times the gross salary (this percentage may &ary
according to the category of employee#
(8# '&erage monthly or daily tra&el time di&ided by the number of daily or monthly legal working hours
Name:*n the capacity of
,igned:
+uly authoriIed to sign the Bill of 9uantities for and on behalf of
+ated on insert dayO day of O$ 5
SBD3 Works (NCB) 3 Prepared b t!e FPP, (2ersion - ,ugust *)
+ocument: Bidding .orms Page 44 of 5@ *ssued byromia -ducation Bureau
8/20/2019 SBD Works (NCB)_ November-Final 5 Prep 22
53/144
Part 1# Bidding Procedures Section ,# Bidding Forms
B$ Breakdo0n of basic suppl prices for materials and consumables(converted into currenc indicated in SCC)
No< Descriptionni
t#rigin(1=
nit Price
#rigin(2=1ransport to
Site(!=
1a/- Duties
and #t!er
C!arges(,=
8osses 1otal(-=
>'?-?(?/= 2alue('=
' = > ? @ *
B 3
B m3
B' m3
B= T
B> kg
B m5
B? kg
B@
This list is not exhausti&e(4# 2eographical location of the Contractor or 1uarry(5# ,upply or cost price at the 1uarry or on deli&ery in the country(6# Cost price of transport from the 1uarry or deli&ery to the ,ite(7# To be borne by the Contractor(8# 'ny losses or breakages to be determined by the Bidder(;# Basic prices for supply of materials: R 5+6+7+9
Name:*n the capacity of
,igned:
+uly authoriIed to sign the Bill of 9uantities for and on behalf of
+ated on insert dayO day of O$ 5
SBD3 Works (NCB) 3 Prepared b t!e FPP, (2ersion - ,ugust *)
+ocument: Bidding .orms Page 45 of 5@ *ssued byromia -ducation Bureau
8/20/2019 SBD Works (NCB)_ November-Final 5 Prep 22
54/144
Part 1# Bidding Procedures Section ,# Bidding Forms
"$ Breakdo0n of basic !ourl prices for e6uipment (converted into currenc indicated in SCC)
No< DescriptionPurc!a
se Date
"eplac
em
2alue
("2)(1=
Duties-
1a/es(2=
"2 L
1a/es(!=
>,?'=
No<
Das
seful
8ife(,=
Dep< %
Da('=
>- ; (=
Fuel
Cost %
Da>-=
8ubric
ant
Cost %
Da>(=
Spare
Parts
Cost %
Da>.=
8abor
Cost %
Da>/=
1otal
%Da>10=
,verage
Dail
Working
1ime>11=
1otal %
.our>12=
' = > ? @ * ' = >
C
C
C'
C=
C>
C
(4# 0eplacement /alue (0/# R -stimated purchase price (excl tax# of a piece of e1uipment of same kind$ but new$ purchased in the countryscapital at the end of machine life span
(5# +uties and taxes charged to the Contractor at the purchase date(6# 7S8(7# Number of depreciation years by number of days worked per year(8# +aily depreciation R ; =(;# '&erage daily fuel consumption (the cost of the fuel is gi&en with tax#(=# +aily cost of lubricants (the cost of the lubricant is gi&en with tax#(?# +aily cost of spare parts (the cost of the spare parts is gi&en with tax#(@# !anpower price (manday#
(4# +aily basic prices of piece of e1uipment R ?S@S4S44S45(44# Hours of operations (a&erage#
(45# Hourly operational price of piece of e1uipment R 44 4
Name:*n the capacity of
,igned:
+uly authoriIed to sign the Bill of 9uantities for and on behalf of
+ated on insert dayO day of O$ 5
SBD3 Works (NCB) 3 Prepared b t!e FPP, (2ersion - ,ugust *)
+ocument: Bidding .orms Page 46 of 5@ *ssued byromia -ducation Bureau
8/20/2019 SBD Works (NCB)_ November-Final 5 Prep 22
55/144
Part 1# Bidding Procedures Section ,# Bidding Forms
D$ Breakdo0n of unit prices in t!e price sc!edule (converted into currenc indicated in SCC)
Bill No: utput per day:
9uantities foreseen:
Components of
t!e Bill
7uantit
or
time
using
!our%da
ni
t
$6uipment 8abor
1#1,8S
Currenc%Da
(?L)Depreciation
Currenc%.our
5aintenance
Currenc%.our
Fuel %
8ubricants
Currenc%.our
1otal
Currenc%Da
(=L>L)
nit Price1otal
Currenc%Da
' = > ? @ *
8abor
5aterials
$6uipment
1otal (Currenc%Da)A
Net Cost A
Name:
*n the capacity of
,igned:
+uly authoriIed to sign the Bill of 9uantities for and on behalf of
+ated on insert dayO day of O$ 5
SBD3 Works (NCB) 3 Prepared b t!e FPP, (2ersion - ,ugust *)
+ocument: Bidding .orms Page 47 of 5@ *ssued byromia -ducation Bureau
8/20/2019 SBD Works (NCB)_ November-Final 5 Prep 22
56/144
Part 1# Bidding Procedures Section ,# Bidding Forms
E$ Detailed Breakdo0n of Site Costs (converted into currenc indicated in SCC)
No< 5eans Deploed Number Basic Price1otal net Cost
('L=)
' = >
, 3abor
,,
,'
,=
Subtotal 3abor#
B aterials
B
B
B'
B=
Subtotal aterials#
C Equipment
C
C
C'
C=
Subtotal Equipment#
D #t!er
D
D
Subtotal )ther#
&E@ER%3 T)T%3#
Name:
*n the capacity of
,igned:
+uly authoriIed to sign the Bill of 9uantities for and on behalf of
+ated on insert dayO day of O$ 5
SBD3 Works (NCB) 3 Prepared b t!e FPP, (2ersion - ,ugust *)
+ocument: Bidding .orms Page 56 of 5@ *ssued byromia -ducation Bureau
8/20/2019 SBD Works (NCB)_ November-Final 5 Prep 22
57/144
Part 1# Bidding Procedures Section ,# Bidding Forms
D$ 1ec!nical ProposalPlace and Date
Procurement "eference No
8/20/2019 SBD Works (NCB)_ November-Final 5 Prep 22
58/144
Part 1# Bidding Procedures Section ,# Bidding Forms
No<D$SC"&P1N
(tpe%make%model)
Po0er
%
capaci
t
No of
units
,ge
(ears
)
Source of e6uipmentCurrent
8ocation
wned 0ented >eased
wned 0ented >eased
wned 0ented >eased
wned 0ented >eased
B< 2e!icles and 1rucks
wned 0ented >eased
wned 0ented >eased
wned 0ented >eased
wned 0ented >eased
C #t!er Plant
wned 0ented >eased
wned 0ented >eased
wned 0ented >eased
The following information shall be pro&ided only for e1uipment not owned by the Bidder
#0ner
Name of o0nerA
,ddress of o0nerA
1elep!oneA Contact name and titleA
Fa/A $mail addressA
,greements
Details of rental % lease % manufacture agreementsA
!$ Work Plan and Site #rganiJation
,$ 5et!od Statement
'$ 5obiliJation Sc!edule
-$ Construction Sc!edule
Work intended to be
subcontracted
Name and details of
subcontractors
2alue of subcontract
as percentage of t!e
total cost of t!e
project
$/perience in similar
0ork (details to be
specified)
SBD3 Works (NCB) 3 Prepared b t!e FPP, (2ersion - ,ugust *)
+ocument: Bidding .orms Page 58 of 5@ *ssued byromia -ducation Bureau
8/20/2019 SBD Works (NCB)_ November-Final 5 Prep 22
59/144
Part 1# Bidding Procedures Section ,# Bidding Forms
Work intended to be
subcontracted
Name and details of
subcontractors
2alue of subcontract
as percentage of t!e
total cost of t!e
project
$/perience in similar
0ork (details to be
specified)
($ #t!ers
Name
*n the capacity of
,igned
+uly authoriIed to sign the Bid for and on behalf of
+ated on insert dayO day of O$ 5
'ttachments:
4 C/s of the proposed personnel signed by the staff themsel&es or by the authoriIed
representati&e of the proposed staff
5 +esign +ocuments and +rawings (.orm C of ,ection ;#
SBD3 Works (NCB) 3 Prepared b t!e FPP, (2ersion - ,ugust *)
+ocument: Bidding .orms Page 5; of 5@ *ssued byromia -ducation Bureau
8/20/2019 SBD Works (NCB)_ November-Final 5 Prep 22
60/144
Part 1# Bidding Procedures Section ,# Bidding Forms
E$ Curriculum 2itae for Proposed Personnel< Proposed Position:
< Name of Firm:
'< Name of Staff :
=< Date of Birt!A NationalitA
>< $ducation:
< 5embers!ip of Professional ,ssociations:
?< #t!er 1raining:
@< Countries of Work $/perience:
< 8anguages:
*< $mploment "ecord:From: 1o:
$mploerA
Positions !eldA
< Detailed 1asks ,ssignedA < Work ndertaken t!at Best &llustrates Capabilit to
.andle t!e 1asks ,ssignedA
Name of assignment or proDect:
Lear:
>ocation:
Client:
!ain proDect features:
Positions held:
'cti&ities performed:
'< CertificationA
*$ the undersigned$ certify that to the best of my knowledge and belief$ this C/ correctly
describes myself$ my 1ualifications$ and my experience * understand that any willful
misstatement described herein may lead to my dis1ualification or dismissal$ if engaged +ate:
.ull name of authoriIed representati&e:
SBD3 Works (NCB) 3 Prepared b t!e FPP, (2ersion - ,ugust *)
+ocument: Bidding .orms Page 5= of 5@ *ssued byromia -ducation Bureau
8/20/2019 SBD Works (NCB)_ November-Final 5 Prep 22
61/144
Part 1# Bidding Procedures Section ,# Bidding Forms
F$ Form 3 Data on 9oint 2enture%ConsortiumDateA
Procurement "eference NumberA,lternative NoA
< Name of 9oint 2enture%Consortium
<
5anaging BoardIs ,ddress
P Box:
,treet 'ddress:
TownCity:
Post Code:
Country:
Telephone:
.acsimile:
-ead member
<
,greement governing t!e formation of t!e joint venture%consortium
+ate of signature
Place
?<
Proposed proportion of
responsibilities between members (in
J# with indication of the type of the
works to be performed by each
Name*n the capacity of
,igned
+uly authoriIed to sign the bid for and on behalf of +ated on insert dayO day of O$ 5
SBD3 Works (NCB) 3 Prepared b t!e FPP, (2ersion - ,ugust *)
+ocument: Bidding .orms Page 5? of 5@ *ssued byromia -ducation Bureau
8/20/2019 SBD Works (NCB)_ November-Final 5 Prep 22
62/144
Part 1# Bidding Procedures Section ,# Bidding Forms
&$ Bid Securit
DateA
Procurement "eference NumberA
,lternative NoA
1oA
"hereas (hereinafter Fthe BidderG# has submitted its Bid dated for Procurement reference
Number for the supply of $ hereinafter called Fthe BidG
UN" '>> P-P>- by these presents that "- $ of ha&ing our registered office at (hereinafter
Fthe 2uarantorG#$ are bound unto (hereinafter Fthe Public BodyG# in the sum of (specif t!e
amount and currenc in figures#$ for which payment well and truly to be made to the
aforementioned Public Body$ the 2uarantor binds itself$ its successors or assignees by these
presents ,ealed with the Common ,eal of this 2uarantor this O day of $
TH- CN+*T*N, of this obligation are the following:
4 *f the Bidder withdraws its Bid during the period of Bid &alidity specified by the Bidder
in the Bid ,ubmission ,heet$ except as pro&ided in *TB ,ub
8/20/2019 SBD Works (NCB)_ November-Final 5 Prep 22
63/144
Part 1# Bidding Procedures Section '# Eligible "ountries
Section '$ $ligible Countries
%$ $ligible Countries
Procurement "eference NumberA
4oods supplied and Works provided under t!e Contract ma originate from an countr
e/cept ifA
(a# 's a matter of law or official regulation$ the 2o&ernment of the .ederal +emocratic
0epublic of -thiopia prohibits commercial relations with that country$ pro&ided that
the 2o&ernment of the .ederal +emocratic 0epublic of -thiopia is satisfied that such
exclusion does not preclude effecti&e competition for the pro&ision of goods or relatedser&ices re1uired or
By an act of compliance with a decision of the )nited Nations ,ecurity Council taken under
Chapter /** of the Charter of the )nited Nations$ the 2o&ernment of the .ederal +emocratic
0epublic of -thiopia prohibits any import of 2oods from that country or any payments to personsor entities in that country
SBD3Works (NCB) 3 Prepared b t!e FPP, (2ersion - ,ugust *)
+ocument: -ligible Countries ,ection / of *3 *ssued by:
8/20/2019 SBD Works (NCB)_ November-Final 5 Prep 22
64/144
Part 2# Schedule of RequirementsSection -# Schedule of Requirements
Part 2 Schedule of
RequirementSection -$ Sc!edule of "e6uirements
1able of Contents
%$ Scope of Aors 1
B$ Technical Speci6cation 1
1. Preamble to ,chedule of 0ates 42. 2eneral 0e1uirements 5
3. Protection of the -n&ironment "orks 6
4. -1ui&alency of ,tandards and Codes 6
5. ProDect ,ign Boards 6
6. "ork *tem ,pecifications 6
"$ Design Documents and Dra+ings -
1. >ist of +rawings 'ttached ;
2. >ist of +esign +ocuments '&ailable =
D$ Bill of 5uantities or %cti*it Schedule .1. Preamble ?
2. Terms 0elating to Payments @
3. Pricing @
4. Completing the Bill of 9uantities @
5. +escription of )nit Prices @
6. Bill of 9uantities or 'cti&ity ,chedule 4
SBD3Works (NCB) 3 Prepared b t!e FPP, (2ersion - ,ugust *)
+ocument: ,chedule of 0e1uirements ,ection /* of *3 *ssued by:
8/20/2019 SBD Works (NCB)_ November-Final 5 Prep 22
65/144
Part 2# Schedule of RequirementsSection -# Schedule of Requirements
%$ Scope of Works
Construction of Different Blocks of Preparator sc!ool
SBD3Works (NCB) 3 Prepared b t!e FPP, (2ersion - ,ugust *)
+ocument: ,chedule of 0e1uirements Page 4 of 44 *ssued by:
8/20/2019 SBD Works (NCB)_ November-Final 5 Prep 22
66/144
Part 2# Schedule of RequirementsSection -# Schedule of Requirements
B$ 1ec!nical Specification
1$ Preamble to Sc!edule of "ates
44 *t is a general principle throughout this ,pecification that the payment for each work item
is inclusi&e of all operations$ resources and inputs necessary to complete the work *tem
The cost of operations or works not included in the ,pecifications or the Bill of 9uantities$
but are all necessary for the completion of the "orks$ shall be deemed to included withinother items
45 *n the ,chedule of 0ates the *tem numbers$ headings and item descriptions identify the
work co&ered by the respecti&e items The exact nature and extent of the work is to be
ascertained by reference to the "orks description$ ,pecifications and Conditions of
Contract The rates and prices entered in the ,chedule of 0ates shall be deemed to be the
full inclusi&e &alue of the work including the following$ unless expressly stated otherwise:
(a# The pro&ision$ storage$ transport$ handling$ use$ distribution$ and maintenance of all
materials$ plant$ e1uipment$ machinery and tools including all costs$ charges$ dues$
demurrage or other outlays in&ol&ed in carriage and importation$ including waste
and deli&ery to ,ite and the Network$
(a# The pro&ision$ storage$ transport$ use$ handling$ distribution and maintenance of all
consumable stores$ fuel$ water and electricity$
(b# Temporary "orks$
(c# -stablishment charges including temporary accommodation at indi&idual sites$
o&erheads and profit$
(d# 'll risks$ liabilities$ contingencies$ insurance and obligations imposed or implied by
the Contract$
(e# 'ttendance and transport for sampling and testing carried out by the -ngineer%s0epresentati&e$ supplying results of tests carried out by the Contractor and pro&iding
test certificates$
(f# 'waiting appro&als and or consents$
(g# Tra&eling to$ between and from different locations within the Network$
(h# The pro&ision and care of all staff and labor and their payment$ accommodation$
transport$ fares and other re1uirements including .irst 'id$ welfare and safety
re1uirements$
(i# ,etting out$ including the location and preser&ation of sur&ey markers$ measurement
and super&ision$
(D# The opening operation and reinstatement upon completion of all 1uarries and borrow
pits$
(k# The construction and maintenance of the temporary di&ersion routes as re1uired$ the
control of traffic$ and the pro&ision of temporary road signs as described or otherwise necessary for the safe performance of the "orks$
(l# *nDury caused to the works under construction$ plant$ materials and consumable
stores by weather$
(m# Co
8/20/2019 SBD Works (NCB)_ November-Final 5 Prep 22
67/144
Part 2# Schedule of RequirementsSection -# Schedule of Requirements
47 )nless expressly stated otherwise the Contractor shall allow in his rates and prices for
carrying out the works at any location within the Network$ for setting up at each ,ite and
for mo&ement between ,ites
48 The Contractor shall allow for the items in the ,chedule of 0ates being used only once$ a
number of times or not at all and in any 1uantity during the currency of the Contract4; "here the ,chedule of 0ates includes separate pay items depending on work 1uantity$ this
shall be on the basis of the 1uantity of each work *tem instructed by a single "orks rder
4= The final measurement of 1uantity against each item on a "orks rder shall be computed
net to two decimal places from the dimensions stated in the Contract unless statedotherwise in the ,pecifications or stated on the "orks rder
4? The measured 1uantity for each item of work executed by the Contractor in accordance
with the Contract shall be measured net and no allowance will be made for waste$ bulking$
shrinkage$ increase or decrease of &olume due to compacting or to the pro&ision of workingspace
4@ "here in the Contract a choice of alternati&es is permitted$ the scheduled description and
the rates and prices inserted shall be deemed to co&er any of the permitted alternati&e
materials or designs the Contractor may elect to use
44 The ,chedule of 0ates does not include or infer any preength
8/20/2019 SBD Works (NCB)_ November-Final 5 Prep 22
68/144
8/20/2019 SBD Works (NCB)_ November-Final 5 Prep 22
69/144
Part 2# Schedule of RequirementsSection -# Schedule of Requirements
(e# 5easurement and Pament V describes in what units and how the accomplished work is
to be measured for the application of unit payment rates The units of measurement used arethose of the *nternational ,ystem of )nits (,*# No other units may be used for measurements$
pricing$ detail drawings etc ('ny units not mentioned in the technical documentation must also
be expressed in terms of the ,*# 'bbre&iations used in the specification are to be interpreted as
follows:mm means millimeter ! means hour
m means meter 8ump sum
mmO means s1uare millimeter km means kilometer
mO means s1uare meter l means liter
m means cubic meter means per cent
kg means kilogram N
8/20/2019 SBD Works (NCB)_ November-Final 5 Prep 22
70/144
Part 2# Schedule of RequirementsSection -# Schedule of Requirements
&tem No
8/20/2019 SBD Works (NCB)_ November-Final 5 Prep 22
71/144
Part 2# Schedule of RequirementsSection -# Schedule of Requirements
&tem No
8/20/2019 SBD Works (NCB)_ November-Final 5 Prep 22
72/144
Part 2# Schedule of RequirementsSection -# Schedule of Requirements
"$ Design Documents and Dra0ings
1$ 8ist of Dra0ings ,ttac!ed
Procurement "eference NumberA
8ist of Dra0ings ,ttac!ed
No< Dra0ing 1itle Purpose
2$ 8ist of Design Documents ,vailable
Procurement "eference NumberA
No Designer Design No Design name Date
4
5
6
7
+rawings are a&ailable for inspection from at the following address:
Person in c!argeA
1el