    Sardar sarovar Narmada Nigam

    Limited

    S.Manish-09ac22

    T.Vinoth Kumar-09ac45

    K.Mangala- 09ac21

    M.Kowsalya Suganthi-09ac19

    K.Priyadarshini-09ac29

  • 8/7/2019 Sardar sarovar Narmada Nigam Limited

    2/43

    Sardar Sarovar Dam

  • 8/7/2019 Sardar sarovar Narmada Nigam Limited

    3/43

  • 8/7/2019 Sardar sarovar Narmada Nigam Limited

    4/43

    UNIDO approach

    Stage 1 Calculation offinancial profitability of the project measured at

    market prices.

    Financial profitability is indicated by the Net Present Value

    (NPV) of the project, which is measured by taking into

    account inputs (costs) and outputs (benefits) at market price.

    !

    !n

    1tt

    t outlayinitialk)(1

    CFNPV

  • 8/7/2019 Sardar sarovar Narmada Nigam Limited

    5/43

    Benefits in market price

    Electricity

    River bed power house and canal head powerhouse generates electricity with an installedcapacity of 1200 MW and 250 MWrespectively(58 crores)

    Fishery

    The project involves fresh water reservoirswhich supports fish culture and the incomefrom fishery amounts to 40 crores every year

  • 8/7/2019 Sardar sarovar Narmada Nigam Limited

    6/43

    Financial profitability

    Life time of the project=50 years

    Initial cost outlay=Rs.2106 crore

    Value of output every year=98 crores Discount rate is assumed as 10 percentage

    NPV= (98 crores-2106 crores)

    ------------------------------- =-11,34 crore

    (1+10)^50

  • 8/7/2019 Sardar sarovar Narmada Nigam Limited

    7/43

    Economic Benefit

    Stage 2

    The main economic benefit that arises out of Sardar Sarovarproject is listed as follows:

    Irrigation

    Flood control

    Water supply and urban developments

  • 8/7/2019 Sardar sarovar Narmada Nigam Limited

    8/43

    Irrigation and Flood control

    Irrigation Facilities

    18.45 lakhs ha. of land

    3112 villages of 73 talukas in 15 districts of Gujarat

    irrigate 75,000 ha. of land in the desert districts of Barmer

    and Jallore in Rajasthan

    37,500 ha. in the tribal hilly tract of Maharashtra.

  • 8/7/2019 Sardar sarovar Narmada Nigam Limited

    9/43

    Flood Control

    The Sardar Sarovar dam project provides flood

    protection to :

    210 villages

    Bharuch city

    4 lakhs people in Gujarat.

  • 8/7/2019 Sardar sarovar Narmada Nigam Limited

    10/43

    Water supply and Urban development

    The Sardar Sarovar project provides water facilities to :

    135 urban centres and 8215 villages

    18 millions of people in Gujarat

    villages affected by salinity and fluoride in North Gujarat will

    be benefited

    Industries

  • 8/7/2019 Sardar sarovar Narmada Nigam Limited

    11/43

    Calculation of Economic Benefit

    Benefit type Nature Social Benefit

    (in Rs)

    Irrigation and flood

    control

    Annual 834.42 crore

    Water supply and

    development Annual 1457.99 crore

  • 8/7/2019 Sardar sarovar Narmada Nigam Limited

    12/43

    Net present value of the project from the social angle is

    calculated as follows:

    Vt = Shadow price ofBenefit at time t = 2292.41 crore

    Ct = Shadow price of Operating Expenses at time t = 1601.5

    crore

    K = Social Discount Rate = 10% (assuming)

    T = Lifetime of the project = 50 years

    I0 = Initial cost at the start of the project = 2106 crore

  • 8/7/2019 Sardar sarovar Narmada Nigam Limited

    13/43

    Therefore,

    NPV = {(2292.41 1601.5)(PVFA 10%, 50) 2106}

    = {(690.91)(9.915)-2106)}

    = 4744.37 crore

  • 8/7/2019 Sardar sarovar Narmada Nigam Limited

    14/43

    Adjustment for the impact of the

    project on Savings & Investment

    STAGE 3

  • 8/7/2019 Sardar sarovar Narmada Nigam Limited

    15/43

    PURPOSE

    Determine the amount of income gained orlost because of the project by differentincome group other than business

    Evaluate the net impact of these gains andlosses on savings

    Measure the adjustment factor for saving and

    thus the adjusted values for savings impact Adjust the impact on savings to the net

    present value calculated in two stages

  • 8/7/2019 Sardar sarovar Narmada Nigam Limited

    16/43

    MEASUREMENT GAIN OR LOSS

    No of workers=5000

    Minimum wages=RS.110Wage paid by ssnnl=RS.100

    Gain of workers= (110-100)*5000

    = RS.50, 000 per day

  • 8/7/2019 Sardar sarovar Narmada Nigam Limited

    17/43

    Evaluation of net impact of savings

    Net Savings Impact of a project =

    Yi = change in income of group i as a result of

    the projectMPSi = marginal propensity to save of group i

    income gained or lost in income group

    Worker=RS.2175croresWorld Bank=RS.2018crores

  • 8/7/2019 Sardar sarovar Narmada Nigam Limited

    18/43

    Foreign exchange=-rs.29.81crores

    MPSw = 0.14, MPSwb= 0.21, MPSf= 0.1

    Net savings impact of a project

    ={0.14*2175+0.21*2018-0.1*29.81}

    =RS.725.299 crore

  • 8/7/2019 Sardar sarovar Narmada Nigam Limited

    19/43

    Adjusted factor for savings

    Mpc=0.75

    Mps=0.25

    average productivity of capital=17.6

    Consumption rate of interest=9.76

    AFs=0.75 * 17.6/9.76-(0.75*0.25)

    =1.378

  • 8/7/2019 Sardar sarovar Narmada Nigam Limited

    20/43

    Adjusted value of

    Saving = (net impact of saving *AFs)

    =725.299*1.378

    Adjusted value of saving =RS.999.46

    Adjusted net profit =999.46+4744.37

    =RS 5743.83 crore

  • 8/7/2019 Sardar sarovar Narmada Nigam Limited

    21/43

    Adjustment for the impact of the

    project on Income Distribution

    Stage 4

    It is calculated to know how the project influences

    the income

    A project can have various sources of income

    Using those sources the weight of the income can be

    determined

  • 8/7/2019 Sardar sarovar Narmada Nigam Limited

    22/43

    Methods ofCalculation ( 1 of 2 )

    To be considered,

    When only two groups are given

    When more than two groups are given

  • 8/7/2019 Sardar sarovar Narmada Nigam Limited

    23/43

    Methods ofCalculation ( 2 of 2 )

    If only two groups are involved:

    Bottom-up approach

    If more than two groups are involved:

    Weight is calculated using the elasticity of

    marginal utility of income

  • 8/7/2019 Sardar sarovar Narmada Nigam Limited

    24/43

    Calculation of Weight ofIncome

    The formula used is as follows:

    Where,

    wi = Weight of income at ci level

    Ci = Level of income of group i

    b = Base level of income that has a weight of 1.00

    n = Elasticity of the marginal utility of income

  • 8/7/2019 Sardar sarovar Narmada Nigam Limited

    25/43

    Project Calculations ( 1 of 4 )

    According to the project the following details are given:

    Three sources ofIncome are taken,

    1. Agricultural Production = Rs. 1600 cr

    2. Power Generation = Rs. 400 cr

    3. Water Supply = Rs. 175 cr

    The above incomes are taken as b = Base level of income

    that has a weight of 1.00

  • 8/7/2019 Sardar sarovar Narmada Nigam Limited

    26/43

    Project Calculations ( 2 of 4 )

    According to the project the following details are given:

    The total income of the project for a year (Ci) = Rs.2175 cr

    Elasticity of marginal utility of income (n) = 0.20*

    *Regarding the elasticity of marginal utility of income, it is not given. Therefore it is assumed to be 0.20

  • 8/7/2019 Sardar sarovar Narmada Nigam Limited

    27/43

    Project Calculations ( 3 of 4 )

    Income Distribution:

    1. Agricultural Production:

    Wi= (1600/2175).20

    = .94

    So, value of the impact of the project on agricultural production = ( 2175 * 0.94)

    = 2044.5 cr

    2. Power Generation:

    Wi= (400/2175).20

    = .71

    So, value of the impact of the project on agricultural production = ( 2175 * 0.71)

    = 1544.25 cr

  • 8/7/2019 Sardar sarovar Narmada Nigam Limited

    28/43

    Project Calculations ( 4 of 4 )

    Income Distribution:

    3. Water Supply:

    Wi= (175/2175).20

    = .60

    So, value of the impact of the project on agricultural production = ( 2175 * 0.60)

    = 1305 cr

  • 8/7/2019 Sardar sarovar Narmada Nigam Limited

    29/43

    Total Income Distribution

    Income Distribution Rs. (in crores)

    1.Agricultural

    Production

    2044.50

    2.Power Generation 1544.25

    3.Water Supply 1305

    Total 4893.75

  • 8/7/2019 Sardar sarovar Narmada Nigam Limited

    30/43

    Calculation of NPV

    NPV got from Stage III = 5743.83

    Adjusted NPV = 5743.83 + 0.049

    = 5743.879

  • 8/7/2019 Sardar sarovar Narmada Nigam Limited

    31/43

    Conclusion

    When taking the percentage of the incomes.

    It is found that the income from agriculture has

    73.56% impact

    18.39% is contributed by the power generation

    The least impact is done by water supply which is

    about 8.05%

  • 8/7/2019 Sardar sarovar Narmada Nigam Limited

    32/43

  • 8/7/2019 Sardar sarovar Narmada Nigam Limited

    33/43

  • 8/7/2019 Sardar sarovar Narmada Nigam Limited

    34/43

  • 8/7/2019 Sardar sarovar Narmada Nigam Limited

    35/43

  • 8/7/2019 Sardar sarovar Narmada Nigam Limited

    36/43

  • 8/7/2019 Sardar sarovar Narmada Nigam Limited

    37/43

  • 8/7/2019 Sardar sarovar Narmada Nigam Limited

    38/43

  • 8/7/2019 Sardar sarovar Narmada Nigam Limited

    39/43

  • 8/7/2019 Sardar sarovar Narmada Nigam Limited

    40/43

  • 8/7/2019 Sardar sarovar Narmada Nigam Limited

    41/43

  • 8/7/2019 Sardar sarovar Narmada Nigam Limited

    42/43

  • 8/7/2019 Sardar sarovar Narmada Nigam Limited

    43/43