    Highway Inventory

    for State Systems

  • 7/29/2019 S53 Highway Inventory LTC2013

    2/24

    2010 FHWA Official

    Mandated Inventory HPMS- 280 Page -67 Items

    with various attributes

    MIRE - 185 Page -106 Items

    and attributes

    Pavement Management,

    Safety, HPMS & Highway

    Inventory GIS Format

  • 7/29/2019 S53 Highway Inventory LTC2013

    3/24

    Transform Existing Order

    Data

    a. Altered Data: Format, Collection Items &

    Attributes

    Collection Methods

    b. Required New and/or Missing Data Items

    c. Innovative Time Based Solution

    d. Set Protocols for all Assets & Unique

    Geometry

  • 7/29/2019 S53 Highway Inventory LTC2013

    4/24

    Required Data Vs. Existing Data

    Swappable Data 1-Way, Divided Guard Rail

    Non-Existing DataCurbed, Parking

    Incompatible

    Content Divided>30

  • 7/29/2019 S53 Highway Inventory LTC2013

    5/24

    Solution

    Emulate Pavement Management Model

    1995-2013 Used Imagery to Collect, Catalog,

    Measure, Report, & Map Distress Data

    Unite a Asset Inventory Collection Contract

    Through PMS

    Using the Same Images & Surveyor SoftwareAvailable from the same Vendor

  • 7/29/2019 S53 Highway Inventory LTC2013

    6/24

    The Plan

    One Time Contract Collection for Assets

    All State & Local Road Assets

    Maintain Data

    Project Tracking

    Surveyor Software

    Internal Field CollectionsUnique RequestRealignments

    Distribute & Manage Through GIS Mapping

    Products

  • 7/29/2019 S53 Highway Inventory LTC2013

    7/24

    Opportunity

    Integrate Disparate Data Silos

    Update Server System

    Refine & Improve Collection Methods

    Create More Efficient Work Flows

    Better Serve Agency Needs & Accessibility

  • 7/29/2019 S53 Highway Inventory LTC2013

    8/24

    Implementation

    Contract

    Prioritize List Of Collection Items Based on HPMS/MIRE that

    would satisfy both & benefit the agency most

    QA/QC Program for images & data

    Upon Final Acceptance

    Integrate Data into Surface Type Log &Geo-feature Database

    Maintenance Customize Surveyor for Highway Inventory

    Project Tracking

    Internal Field Collections

  • 7/29/2019 S53 Highway Inventory LTC2013

    9/24

    Highway Assets List, Protocols, &

    QA/QC

    Mileage Data (Location & Length)

    Rail Road Crossings

    Grade Crossing

    Posted Speed Limits

    Sidewalks Sight Distance

    Vertical and Horizontal Curve

    Lane Width & Surface Type

    Shoulder Width & Type

    Median Width & Type Locations of Bridges

    Curb

    Intersections

    Local and Cultural Features such Churches, Hospitals, Police Stations, andCemeteries

  • 7/29/2019 S53 Highway Inventory LTC2013

    10/24

    QA/QC

    Visual Checks-

    Electronic Queries

    Comparison between previous data & current data

    Data from Surface Type Log

    Existing Data Pavement Management System

    (Even though contains different formats, purpose,

    & measurement reporting

    can be used to assistin locating errors)

    Master Structure File

  • 7/29/2019 S53 Highway Inventory LTC2013

    11/24

    Visual Referencing

    Image - Correct route &

    Location

    GPS Point - Accurate

  • 7/29/2019 S53 Highway Inventory LTC2013

    12/24

    Electronic QueriesComparisons with Existing Data

    Bridge Comparisons of Summed Length

    Horizontal / Vertical Curve Data- Differences in Average Slope & Average

    Deflection

    Lane width Differences in Average Lane Width >2

    Median Comparisons of locations from/to, lengths, & widths

  • 7/29/2019 S53 Highway Inventory LTC2013

    13/24

    Surface Type Comparisons of Type, Summed Lengths >0.10,

    Begin/End Log miles to Existing Data

    Shoulder - Comparisons of Type, Summed Lengths >0.10, Width,

    Begin/End Log miles to Existing Data

    Electronic QueriesComparisons with Existing Data

  • 7/29/2019 S53 Highway Inventory LTC2013

    14/24

    Updating Surface Type Log

    Data Comparison to STL

    Pinpoint Areas to Update

    Transfer from Mainframeinto required HPMS GIS

    Format

  • 7/29/2019 S53 Highway Inventory LTC2013

    15/24

    Integrating Data into Surface

    Type Log (STL)

    Matching Naming

    Conventions

    Creating

    Customized Feature

    Layers

    Running

    Comparison Queriesto Populate Missing

    Data or Replace /

    Update New Data

  • 7/29/2019 S53 Highway Inventory LTC2013

    16/24

    Project Tracking

    Primary Source for Database Maintenance-Tracking Construction Projects

    Beginning of the Year Project Projection List

    Department Notifications

    Ladotd Intranet Websites

  • 7/29/2019 S53 Highway Inventory LTC2013

    17/24

    Projection Lists

    Follow the Money

    LETTS State System -6 mo. Prior year 6 mo.

    Incoming

    TIMEDScheduled Projects STIP Off System

  • 7/29/2019 S53 Highway Inventory LTC2013

    18/24

    Department Notifications

    Internal Websites

    Notice of

    Contract

    Execution

    Notice to

    Proceed

    Final

    Acceptance

    >70%

    Complete

  • 7/29/2019 S53 Highway Inventory LTC2013

    19/24

    Customizing Surveyor For

    Database Management Create Completed

    Construction List

    Check against Digital ImageDeliveries

    Using Project 863-02-0024

    as Example

    Resurface &New Bridge

  • 7/29/2019 S53 Highway Inventory LTC2013

    20/24

    Surveyor Software

    Surveyor Works

    using a MS Access

    Database

    Set up CustomizedDatabase through

    Asset Inventory

    Set up based on STL

    Structure Route-

    Section-Subsectionbut with New HPMS

    Format

  • 7/29/2019 S53 Highway Inventory LTC2013

    21/24

    Surveyor Software

    Uses Visidata

    Images

    Click Beginning

    Measure Lane

    Median -Shoulder Widths

    Select Surface

    Types, Median

    Types from Drop

    Down Menus Click Subsection

    Location

    Add

  • 7/29/2019 S53 Highway Inventory LTC2013

    22/24

    Updated STL Using Surveyor

    View Inventory

    Window

    Completed,

    Updated with

    Image Path &

    Lat/Long

    Ready to go in

    GIS

    MS Access DB

    Can Convert toDB2 or Other

    Formats

  • 7/29/2019 S53 Highway Inventory LTC2013

    23/24

    Assets as Individual Features

    New Bridge on

    Project 863-02-

    0024

    Length of Bridge

    on Plans 270

    LengthMeasured in

    Office Surveyor

    286

    Difference of 16

    feet

    Measured By

    Vendor 274

    Difference of 4

    feet

  • 7/29/2019 S53 Highway Inventory LTC2013

    24/24

    Summary

    Digital Imagery

    Technology & Software

    Training

    CustomizableDatabases

    New Formats &

    Requirements

    Solutions for Today &Future Challenges

    Makes Adaptation Easy