S2 Proposed Rail Program LTC2013

Embed Size (px)

Citation preview

  • 7/29/2019 S2 Proposed Rail Program LTC2013

    1/19

    STATEWIDE RAIL SYSTEM

    Dean Goodell

    Intermodal Transportation Manager

    February 2013

  • 7/29/2019 S2 Proposed Rail Program LTC2013

    2/19

    2

    OVERVIEW

    Louisiana Rail System

    Priority Rail Projects Next Steps

  • 7/29/2019 S2 Proposed Rail Program LTC2013

    3/19

    3

    LOUISIANA FREIGHT RAIL

    SYSTEM 2,750 route miles of track 6 Class-1 Railroads 11 Short Line Railroads 2,912 Employees $300 Million in wages Major Freight Categories

    Chemicals, Coal, and

    Petroleum Products Paper, Wood, and Farm

    Products

    Concrete/Stone

    Source: Association of American Railroads

  • 7/29/2019 S2 Proposed Rail Program LTC2013

    4/19

    4

    LOUISIANA PASSENGER RAIL

    SERVICE

    Three long distancetrains operate inLouisiana

    Sunset Limited City of New Orleans Crescent

    Two of the routes are inthe Gulf Coast High

    Speed Rail Corridor Seven (7) rail stations 245,500 Louisiana passengers in 2011 Amtrak operates on Class-1 railroad tracks

  • 7/29/2019 S2 Proposed Rail Program LTC2013

    5/19

    5

    STATEWIDE RAIL SYSTEM

    PLAN MAY 2003

    Addressed only ShortLine Railroad needs

    Identified projectstotaling $102.5 Million

    Rail Plan update is

    currently underway

  • 7/29/2019 S2 Proposed Rail Program LTC2013

    6/19

    Class-1: $496.8 million

    Short Line: $526.5 million

    Passenger: $ 8.9 million

    6

    STATEWIDE RAIL INFRASTRUCTURE NEEDS

  • 7/29/2019 S2 Proposed Rail Program LTC2013

    7/19

    7

    CLASS-1 PROJECT

    New Orleans

    Rail Gateway Project

  • 7/29/2019 S2 Proposed Rail Program LTC2013

    8/19

    8

    NEW ORLEANS RAIL GATEWAY

    Connects 6 Class-1 railroads

    21+ Highway-Rail Crossings 13 Yards, including 6 Intermodal

    (rail-truck) 10 Interlocking junctions Two major bridges one movable

  • 7/29/2019 S2 Proposed Rail Program LTC2013

    9/19

    9

    NEW ORLEANS RAIL GATEWAY

    Back Belt Alternative

  • 7/29/2019 S2 Proposed Rail Program LTC2013

    10/19

    10

    NEW ORLEANS RAIL GATEWAY

    Middle Belt Alternative

  • 7/29/2019 S2 Proposed Rail Program LTC2013

    11/19

    11

    NEW ORLEANS RAIL GATEWAY

    Front Belt Alternative

  • 7/29/2019 S2 Proposed Rail Program LTC2013

    12/19

    12

    NEW ORLEANS RAIL GATEWAY

    Couplet Alternative

  • 7/29/2019 S2 Proposed Rail Program LTC2013

    13/19

    Feasibility Study completed in 2007

    Environmental Study to be completedby end of 2014

    Construction to begin when funding is

    secured

    13

    NEW ORLEANS RAIL GATEWAY

  • 7/29/2019 S2 Proposed Rail Program LTC2013

    14/19

    14

    ALM DSRRLNW

    TIBR LDRRAKDN

    Purpose: Upgrade track and

    bridge capacity to safely

    operate the new industry

    standard for railcars

    weighing 286,000 pounds on

    six Short Line Railroads

    Includes six short line railroads

    serving 18 parishes and

    more than 100 companies

    UPGRADE TRACK FOR 286,000 LB RAILCARS

    SHORT LINE PROJECT

  • 7/29/2019 S2 Proposed Rail Program LTC2013

    15/19

    15

    UPGRADE TRACK FOR 286,000 LB

    RAILCARS

    Benefits: Increase freight

    capacity, reduce shipping costs,

    stimulate economic growth,

    improve safe transport of Hazmat

  • 7/29/2019 S2 Proposed Rail Program LTC2013

    16/19

    LA 23 Rail Relocation Relocate railroad track from LA 23

    to Peters Road

    Will remove trains from majorroads

    Environmental Study beginning

    16

    SHORT LINE PROJECT

  • 7/29/2019 S2 Proposed Rail Program LTC2013

    17/19

    ADA Upgrades to ThreePassenger Stations

    Schriever, New Iberia, and

    Lake Charles Stations are City Owned

    17

    PASSENGER RAIL PROJECT

    Schriever

    New Iberia

    Lake Charles

  • 7/29/2019 S2 Proposed Rail Program LTC2013

    18/19

    New Orleans Rail Gateway Program

    Complete EIS in 2014

    Secure funding for construction

    Seek funding for Short Line improvements

    Assist with the LA-23 Rail Relocation where

    appropriate

    Partner with cities to upgrade Train Station

    18

    NEXT STEPS

  • 7/29/2019 S2 Proposed Rail Program LTC2013

    19/19

    19

    QUESTIONS?