LEGEND - PIPING
REFER DESCRIPTIONDOMESTIC COLD WATER PIPING
DOMESTIC HOT WATER PIPING
DOMESTIC HOT WATER RECIRC. PIPING
VENT PIPINGV
SANITARY PIPING ABOVE FLOOR
SANITARY PIPING BELOW FLOOR
GAS PIPINGG
FORCE MAINFM
STORM PIPING ABOVE FLOOR
STORM PIPING BELOW FLOOR
S
S
CONDENSATE PIPINGC
PUMPED DISCHARGE PIPINGPD
TEMPERED WATER PIPINGT
CAPPED PIPE
FLOOR DRAINFD
FUNNEL FLOOR DRAIN
HUB DRAINHD
ROOF DRAINRD
CLEAN OUT (IN FLOOR)CO
CO CLEAN OUT (IN LINE OR STACK)
FLANGE
M WATER METER
GAS METER
PIPE DOWN
PIPE UP
ISOLATION VALVE
HOSE BIB C/W VACUUM BREAKERHB
THROTTILING VALVE
STRAINER
WH WALL HYDRANT
BACK WATER VALVEBWV
VENT THROUGH ROOFVTR
CHECK VALVE
3-WAY VALVE
S TEMPERATURE AND PRESSURE RELIEF VALVE
SOLENOID VALVE
PRESSURE GAUGEP
T THERMOMETER
PIPE TEE
PORTABLE FIRE EXTINGUISHER (WALL HUNG / SURFACE MOUNTED)
PORTABLE FIRE EXTINGUISHER IN CABINET
FEX
FEC
TEE
ELBOW - 90°
ELBOW - 45°
WYE
REDUCER / INCREASER
UNION
PUMP
VERTICAL INLINE PUMP
3-WAY CONTROL VALVE
2-WAY CONTROL VALVE
CIRCUT BALANCING VALVECBV
SAFETY (S) OR RELIEF (R) VALVE
DC DRAIN COCK
FFD
OR
M
POST HYDRANTPH
GRAY / NON-POTABLE WATERGW
LEGEND - HVAC
REFER DESCRIPTIONPOSITIVE PRESSURE (SUPPLY) DUCT UP
POSITIVE PRESSURE (SUPPLY) DUCT UP
NEGATIVE PRESSURE (RETURN/EXHAUST) DUCT UP
NEW DUCT WORK
FLEXIBLE DUCTWORK APPROVAL REQ. FOR USE (1500mm MAX.)
CROSSHATCHING ON DUCTWORK INDICATES 1" (25mm) DUCT LINING AS SPECIFIED
FIRE DAMPERFD
MOTORIZED DAMPERMD
BALANCING DAMPERBD
SUPPLY AIR DIFFUSER (SQUARE)
SUPPLY AIR DIFFUSER (LAMINAR FLOW)
LINEAR OR SLOT DIFFUSER WITH PLENUM
SIDEWALL GRILLE
RETURN/EXHAUST GRILLE
FULL RADIUS DUCT CONNECTION
TAP-IN DUCT CONNECTION
ROUND DUCT CONNECTION
TURNING VANES
VOLUME DAMPERVD
SPLITTER DAMPERSP
OPEN ENDED DUCT COMPLETE WITH SCREEN
THERMOSTAT / SENSOR
OED
T
UNDERCUTUC
S OCCUPANCY SENSOR
T THERMOSTAT c/w TAMPERPROOF COVER
CAPCAP
SILENCER
CROSS TALK SILENCER
POSITIVE PRESSURE (SUPPLY) DUCT DOWN
NEGATIVE PRESSURE (RETURN/EXHAUST) DUCT DOWN
THERMAL INSULATION
GENERAL NOTES:
1. PERFORM ALL WORK IN ACCORDANCE WITH ALL APPLICABLE CODES, STANDARDS ANDBULLETINS, ETC., LATEST EDITIONS, AND TO THE LOCAL AUTHORITIES REQUIREMENTS.
2. IT IS THE CONTRACTOR’S RESPONSIBILITY TO VERIFY AND CHECK THE EXISTING CONSTRUCTIONPRIOR TO AND DURING CONSTRUCTION. ANY CHANGES AND/OR DISCREPANCIES SHALL BEREPORTED AND REVIEWED BY THE ENGINEER AND/OR PROJECT MANAGER PRIOR TOPROCEEDING.
3. THE DRAWINGS SHALL BE READ IN CONJUNCTION WITH THE SPECIFICATIONS AND THEDOCUMENTS PERTAINING TO THE WORK OF OTHER TRADES.
4. OBTAIN EXACT DIMENSIONS FROM SITE MEASUREMENTS. DO NOT SCALE THESE DRAWINGS.
5. PENETRATIONS OF EITHER THE FIRE OR SMOKE BARRIERS SHALL BE SLEEVED AND SEALEDAGAINST THE PASSAGE OF FLAME AND/OR SMOKE WITH A SUITABLE NON-COMBUSTIBLEMATERIAL EQUAL TO THE CONSTRUCTION PENETRATED.
6. CHECK AND VERIFY THE LOCATIONS OF ALL PIPES, DUCTS, AND EQUIPMENT WITH THE WORK OFOTHER TRADES TO PREVENT INTERFERENCE. REMOVAL AND RELOCATION OF ANY SUCH WORKINTERFERING WITH THE WORK OF OTHER TRADES IS THE RESPONSIBILITY OF THE MECHANICALTRADE(S), UNLESS OTHERWISE APPROVED IN WRITING.
7. PROVIDE ACCESS DOORS AS REQUIRED FOR ALL CONCEALED SERVICEABLE COMPONENTS,LOCATED ABOVE, BEHIND OR BELOW INACCESSIBLE CONSTRUCTION.
8. PROVIDE A CLEANOUT AT THE BOTTOM OF EVERY SANITARY AND STORM STACK THAT CONNECTSTO A HORIZONTAL PIPE.
9. ALL PLUMBING FIXTURES AND DRAINS SHALL BE TRAPPED AND VENTED IN ACCORDANCE WITHTHE ONTARIO BUILDING CODE, PART 7.
10. CONTRACTOR SHALL PROVIDE TRAP SEAL PRIMERS AS SPECIFIED. COORDINATE PRIMERREQUIREMENT WITH OTHER TRADES AS REQUIRED.
PROJECT
CLIENT
CONSULTANT
KEY PLAN
ISSUE/REVISION
SHEET NUMBER
SHEET TITLE
PROJECT NUMBER
ISSUED FOR TENDER
Last
Plo
tted:
File
nam
e:
Printed on ___% Post-ConsumerRecycled Content Paper
Proj
ect M
anag
emen
t Ini
tials
:Des
igne
r:C
heck
ed:
Appr
oved
:IS
O A
1 59
4mm
x 8
41m
m
2345
12345
D
C
B
A
1
ELGIN AREA WATERSUPPLY SYSTEM
AECOM250 York Street, Suite 410London, Ontario N6A 6K2519.676.0510 tel 519.673.5975 faxwww.aecom.com
235 North Centre Road, Suite 200 LondonOntario N5X 4E7519.930.3505 tel 519.474.0451 faxwww.watersupply.london.ca
2013-10-090
10/4
/201
3 9:
15:0
9 AM
C:\U
sers
\koh
lers
\Doc
umen
ts\R
evit
Loca
l File
s\60
2464
77-M
OD
-30-
0000
-M-C
F_ko
hler
s.rv
t
MANAGEMENT
43665 Dexter Line
FACILITY
RESIDUALS
Central Elgin, Ontario N0L 2L0
ELGIN AREA WATER TREATMENT PLANT
MECHANICAL GENERAL NOTESAND LEGENDS
M600
60246477
Che
cker
Des
igne
rAp
prov
er
I/R DATE DESCRIPTION
60246477-Elgin RMF_M600s_2013-10-04_Rev0 For TENDER.pdf
1
3
4
5
A B C
2
D
FEX
FEX
COABOVE
FD3ABOVE
FD3ABOVE
CO
COABOVE
FD3ABOVE
FD3ABOVE
CO
S1ABOVE
S2ABOVE
75ø @2.00%
PENETRATION LINKSEAL
75ø @1.00%
100Ø SANITARY UP
32Ø DCWS RISERS UP
NEW 150Ø INCOMINGWATER SERVICE BYGENERAL TRADES
M
INCOMING WATER SERVICE.REFER TO SCHEMATIC ONDRAWING No. M611
BACKWASH EQUALIZATIONBASIN 1
BACKWASH EQUALIZATIONBASIN 2
CLARIFIER SLUDGEEQUALIZATION TANK No. 2
CLARIFIER SLUDGEEQUALIZATION TANK No. 1
THICKENED SLUDGE TANKNo. 2
THICKENED SLUDGE TANKNo. 1
601
603COABOVE75ø @2.00%
NOTES:
-ALL PIPING LOCATED WITHIN PROCESS TANKSSHALL BE PVC PIPE WITH SOLVENT WELDEDFITTINGS, AS SPECIFIED, AND SHALL BECONCRETE ENCASEDFD3
ABOVE
FD3ABOVE
DENOTES OPENINGABOVE
CO
CO
CO
INVERT AT BUILDINGWALL 211.560+-.
FINISHED FLOORELEVATION 204.55+-
75ø @2.00% 75ø @2.00%
FD3ABOVE
BY DIVISION 15
1500 MAX. BY GENERAL TRADES
EST. LOAD 2.1LPS(33.5 FIXTURE UNITS)
100ø @1.00%
PROJECT
CLIENT
CONSULTANT
KEY PLAN
ISSUE/REVISION
SHEET NUMBER
SHEET TITLE
PROJECT NUMBER
ISSUED FOR TENDER
Last
Plo
tted:
File
nam
e:
Printed on ___% Post-ConsumerRecycled Content Paper
Proj
ect M
anag
emen
t Ini
tials
:Des
igne
r:C
heck
ed:
Appr
oved
:IS
O A
1 59
4mm
x 8
41m
m
2345
12345
D
C
B
A
1
ELGIN AREA WATERSUPPLY SYSTEM
AECOM250 York Street, Suite 410London, Ontario N6A 6K2519.676.0510 tel 519.673.5975 faxwww.aecom.com
235 North Centre Road, Suite 200 LondonOntario N5X 4E7519.930.3505 tel 519.474.0451 faxwww.watersupply.london.ca
2013-10-090
10/4
/201
3 9:
15:1
2 AM
C:\U
sers
\koh
lers
\Doc
umen
ts\R
evit
Loca
l File
s\60
2464
77-M
OD
-30-
0000
-M-C
F_ko
hler
s.rv
t
MANAGEMENT
43665 Dexter Line
FACILITY
RESIDUALS
Central Elgin, Ontario N0L 2L0
ELGIN AREA WATER TREATMENT PLANT
MECHANICAL LOWER FLOOR PLAN- PLUMBING AND DRAINAGE
M601
60246477
Che
cker
Des
igne
rAp
prov
er
SCALE: 1 : 100M601 REF: D613
1 LOWER FLOOR-PLUMBING AND DRAINAGE
ROOM SCHEDULENumber Name601 PUMP GALLERY602 STAIR WELL No.1603 STAIR WELL No.2604 SLUDGE THICKENER605 POLYMER STORAGE AND
MAKEUP ROOM606 STORAGE ROOM607 ELECTRICAL ROOM608 CONTROL ROOM AND LAB609 JANITORY/STORAGE ROOM610 LAB STORAGE ROOM611 WAITING ROOM612 WC613 WC614 TRUCK BAY615 DECHLORINATION ROOM616 THICKENER ROOM617 CENTRIFUGE ROOM618 STORAGE ROOM
N
0mm
2500 5000
SCALE: 1:100
I/R DATE DESCRIPTION
60246477-Elgin RMF_M600s_2013-10-04_Rev0 For TENDER.pdf
1
3
4
5
A B C
2
D
FEX
FEX
FEX
FEX
FEX
FEX
FEX
FEX
S2CO
FD3
DENOTES MEZZANINEABOVE
FD3
FD3
19ø 32ø 32ø 19ø 32ø 32ø
CO
100Ø SANITARY DOWN
GWH
S1
P-1
E1
E3
UH-5
UH-1
IFR-1
IFR-2
FEX
607
606
608610
609
611
612
613
605
604
615
614
603
CO
CO
ROUTE 32Ø DCWSAND DHWS ALONG WALL
UH-3
UH-4
L1
W-1
L1
W-1
FD3
FD3
G
G
G
G
G
G
50Ø, 13.8 KPa (2 PSI) NATURALGAS RISER UP
100Ø NATURAL GASRISER UP THROUGH ROOF
50ø
50ø
50ø19ø
75Ø NATURAL GASRISER UP THROUGHROOF
75ø
50ø
32ø
32ø
50ø
50ø
65ø
50Ø NATURAL GAS
CO
CBV(3.8LPM)
CBV(3.8LPM)
32Ø DCWS DOWN
EXTENT OF DENOTESOPENING ABOVE
FD3
MNEW NATURAL GAS METER ANDREGULATOR ASSEMBLY TO THELOCAL AUTHORITY REQUIREMENTS.COORDINATE INSTALLATION ASREQUIRED. ESTIMATED LOAD1127.6 KW (3851.0 MBH)
FEX
75ø
50ø
50ø
50ø
G
PWH-3
PWH-2
PWH-1
65ø
E2
65ø
T
19ø19ø25ø
UH-2
CO
PROJECT
CLIENT
CONSULTANT
KEY PLAN
ISSUE/REVISION
SHEET NUMBER
SHEET TITLE
PROJECT NUMBER
ISSUED FOR TENDER
Last
Plo
tted:
File
nam
e:
Printed on ___% Post-ConsumerRecycled Content Paper
Proj
ect M
anag
emen
t Ini
tials
:Des
igne
r:C
heck
ed:
Appr
oved
:IS
O A
1 59
4mm
x 8
41m
m
2345
12345
D
C
B
A
1
ELGIN AREA WATERSUPPLY SYSTEM
AECOM250 York Street, Suite 410London, Ontario N6A 6K2519.676.0510 tel 519.673.5975 faxwww.aecom.com
235 North Centre Road, Suite 200 LondonOntario N5X 4E7519.930.3505 tel 519.474.0451 faxwww.watersupply.london.ca
2013-10-090
10/4
/201
3 9:
15:1
6 AM
C:\U
sers
\koh
lers
\Doc
umen
ts\R
evit
Loca
l File
s\60
2464
77-M
OD
-30-
0000
-M-C
F_ko
hler
s.rv
t
MANAGEMENT
43665 Dexter Line
FACILITY
RESIDUALS
Central Elgin, Ontario N0L 2L0
ELGIN AREA WATER TREATMENT PLANT
MECHANICAL MAIN FLOOR PLAN -PLUMBING AND DRAINAGE
M602
60246477
Che
cker
Des
igne
rAp
prov
er
SCALE: 1 : 100M602 REF: D613
1 MAIN FLOOR-PLUMBING AND DRAINAGE
ROOM SCHEDULENumber Name601 PUMP GALLERY602 STAIR WELL No.1603 STAIR WELL No.2604 SLUDGE THICKENER605 POLYMER STORAGE AND
MAKEUP ROOM606 STORAGE ROOM607 ELECTRICAL ROOM608 CONTROL ROOM AND LAB609 JANITORY/STORAGE ROOM610 LAB STORAGE ROOM611 WAITING ROOM612 WC613 WC614 TRUCK BAY615 DECHLORINATION ROOM616 THICKENER ROOM617 CENTRIFUGE ROOM618 STORAGE ROOM
N
0mm
2500 5000
SCALE: 1:100
I/R DATE DESCRIPTION
60246477-Elgin RMF_M600s_2013-10-04_Rev0 For TENDER.pdf
1
3
4
5
A B C
2
D
RTU-2
RTU-3
IFR-4
IFR-3
MUA-1
EF-1EF-2
617
603
616
G G G G
GG
G G
32ø
32ø
50ø
G
G
G
50Ø NATURAL GASRISER DOWN
G (13.8KPa) (13.8KPa) (13.8KPa)
1800
MIN
.
32ø
50ø 32ø 32ø 32ø 32ø
75ø
19ø
19ø25ø19ø
19ø 25ø
19ø19ø
(13.
8KP
a)
PRV-5PRV-4
PRV-3PRV-2
PRV-1
100Ø LOW PRESSURE NATURALGAS RISER DOWN
75Ø LOW PRESSURE NATURALGAS RISER DOWN
PRV-6
50Ø, 13.8 KPa NATURALGAS RISER THROUGHPARAPET
FEX
FEX
FEX
FEX
RTU-1
PROJECT
CLIENT
CONSULTANT
KEY PLAN
ISSUE/REVISION
SHEET NUMBER
SHEET TITLE
PROJECT NUMBER
ISSUED FOR TENDER
Last
Plo
tted:
File
nam
e:
Printed on ___% Post-ConsumerRecycled Content Paper
Proj
ect M
anag
emen
t Ini
tials
:Des
igne
r:C
heck
ed:
Appr
oved
:IS
O A
1 59
4mm
x 8
41m
m
2345
12345
D
C
B
A
1
ELGIN AREA WATERSUPPLY SYSTEM
AECOM250 York Street, Suite 410London, Ontario N6A 6K2519.676.0510 tel 519.673.5975 faxwww.aecom.com
235 North Centre Road, Suite 200 LondonOntario N5X 4E7519.930.3505 tel 519.474.0451 faxwww.watersupply.london.ca
2013-10-090
10/4
/201
3 9:
15:2
1 AM
C:\U
sers
\koh
lers
\Doc
umen
ts\R
evit
Loca
l File
s\60
2464
77-M
OD
-30-
0000
-M-C
F_ko
hler
s.rv
t
MANAGEMENT
43665 Dexter Line
FACILITY
RESIDUALS
Central Elgin, Ontario N0L 2L0
ELGIN AREA WATER TREATMENT PLANT
MECHANICAL UPPER FLOOR -PLUMBING AND DRAINAGE
M603
60246477
Che
cker
Des
igne
rAp
prov
er
SCALE: 1 : 100M603 REF: D613
1 UPPER FLOOR-PLUMBING AND DRAINAGE
ROOM SCHEDULENumber Name601 PUMP GALLERY602 STAIR WELL No.1603 STAIR WELL No.2604 SLUDGE THICKENER605 POLYMER STORAGE AND
MAKEUP ROOM606 STORAGE ROOM607 ELECTRICAL ROOM608 CONTROL ROOM AND LAB609 JANITORY/STORAGE ROOM610 LAB STORAGE ROOM611 WAITING ROOM612 WC613 WC614 TRUCK BAY615 DECHLORINATION ROOM616 THICKENER ROOM617 CENTRIFUGE ROOM618 STORAGE ROOM
N
0mm
2500 5000
SCALE: 1:100
I/R DATE DESCRIPTION
60246477-Elgin RMF_M600s_2013-10-04_Rev0 For TENDER.pdf
1
3
4
5
A B C
2
D
F2543 AT 300mm A.F.F.L
F2543 AT 5000mm A.F.F.L
FD650x300 EXHAUST DUCT UP
FD
B11085
B11085
1000x350 SUPPLY DUCT UP
1000x350
T MUA-1
TEMPERATURE SENSORWITH INSULATED SUB-BASE
FD
F2543AT 5000mm A.F.F.L
F2543AT 300mm A.F.F.L
650x300
650x300 EXHAUST DUCT UP
601
603
BACKWASH EQUALIZATIONBASIN 1
BACKWASH EQUALIZATIONBASIN 2
CLARIFIER SLUDGEEQUALIZATION TANK No. 2
CLARIFIER SLUDGEEQUALIZATION TANK No. 1
THICKENED SLUDGE TANKNo. 2
THICKENED SLUDGE TANKNo. 1
WALL MOUNTED OCCUPANCYSENSOR (TYPICAL)
PROJECT
CLIENT
CONSULTANT
KEY PLAN
ISSUE/REVISION
SHEET NUMBER
SHEET TITLE
PROJECT NUMBER
ISSUED FOR TENDER
Last
Plo
tted:
File
nam
e:
Printed on ___% Post-ConsumerRecycled Content Paper
Proj
ect M
anag
emen
t Ini
tials
:Des
igne
r:C
heck
ed:
Appr
oved
:IS
O A
1 59
4mm
x 8
41m
m
2345
12345
D
C
B
A
1
ELGIN AREA WATERSUPPLY SYSTEM
AECOM250 York Street, Suite 410London, Ontario N6A 6K2519.676.0510 tel 519.673.5975 faxwww.aecom.com
235 North Centre Road, Suite 200 LondonOntario N5X 4E7519.930.3505 tel 519.474.0451 faxwww.watersupply.london.ca
2013-10-090
10/4
/201
3 9:
15:2
4 AM
C:\U
sers
\koh
lers
\Doc
umen
ts\R
evit
Loca
l File
s\60
2464
77-M
OD
-30-
0000
-M-C
F_ko
hler
s.rv
t
MANAGEMENT
43665 Dexter Line
FACILITY
RESIDUALS
Central Elgin, Ontario N0L 2L0
ELGIN AREA WATER TREATMENT PLANT
MECHANICAL LOWER FLOORPLAN- HVAC
M604
60246477
Che
cker
Des
igne
rAp
prov
er
SCALE: 1 : 100M604 REF: D613
1 LOWER FLOOR-HVAC
ROOM SCHEDULENumber Name601 PUMP GALLERY602 STAIR WELL No.1603 STAIR WELL No.2604 SLUDGE THICKENER605 POLYMER STORAGE AND
MAKEUP ROOM606 STORAGE ROOM607 ELECTRICAL ROOM608 CONTROL ROOM AND LAB609 JANITORY/STORAGE ROOM610 LAB STORAGE ROOM611 WAITING ROOM612 WC613 WC614 TRUCK BAY615 DECHLORINATION ROOM616 THICKENER ROOM617 CENTRIFUGE ROOM618 STORAGE ROOM
N
0mm
2500 5000
SCALE: 1:100
I/R DATE DESCRIPTION
60246477-Elgin RMF_M600s_2013-10-04_Rev0 For TENDER.pdf
1
3
4
5
A B C
2
D
DENOTES MEZZANINEABOVE
EF-9 EF-5
EF-12
IFR-1
IFR-2
EF-4
F31994
950x350 EXHAUSTDUCT DOWNF3
1994950x350 EXHAUSTDUCT DOWN
AT 300mmA.F.F.L
AT 300mmA.F.F.L
OA OA
L43976
L43976
MD MD
EAEA EA EA
650x
30065
0x30
0
650x300 EXHAUSTDUCT DOWN TOLOWER LEVEL
650x300 EXHAUSTDUCT DOWN TOLOWER LEVEL
150Ø COMBUSTIBLE AIRINTAKE AND FLUE GASVENT UP
EF-3
EA
F1165
AT 300mmA.F.F.L
OA
L1165
AT 2400mmA.F.F.L
MD
100Ø COMBUSTION AIRINTAKE AND FLUE GASVENT
CONCENTRIC ADAPTERBOX (TYP.)
TS CL2
150Ø COMBUSTION AIRINTAKE AND FLUE GASVENT (FIRE WRAPPED)
CONCENTRIC ADAPTERBOX (TYP.)
B2236
B2236
B2236
B2236
350ø 350ø
E3944
BD BD
600x250 RETURN AND450x300 SUPPLY DUCTSUP TO RTU-2
1650x300 DUCTUP TO MUA-1
FD
1000x350
FD
1000x350 DUCT DOWNTO LOWER LEVEL
E41276
900x300
400ø
B2319
900x300 RETURN AND700x350 SUPPLY DUCTSUP TO RTU-3
T
RTU-3
E271
200x200 GENERALEXHAUST UP TO EF-1
200x200 SANITARYEXHAUST UP TO EF-2
A2135
A294
A148
200ø
300x250
150ø
150ø
150ø
300x250
200ø
200x100
200x200
200x100UC
UC
UC
UC
OED SVTRTU-1
FD
FD
E1218
E228
E228
BD BD
G194
600x250 RETURN AND450x300 SUPPLY DUCTSUP TO RTU-1
TS NOX
OUTDOOR AIRVENT CAP (TYP.)
100ø
100ø
EA
OA
OA
L21015
L21015
F22030
AT 300mmA.F.F.L
950x350 EXHAUSTDUCT DOWN
WALL THIMBLE(TYP.)
FLUE GAS VENTTERMINAL (TYP.)
MD
MD
TS NOX
FF-2
FF-1
3KW
3KW
UH-5
UH-1
100ø
100ø
605
607608
609
610 611
612
613
603
615
614
604
606
UH-4
E1218
150Ø COMBUSTION AIRINTAKE AND FLUE GASVENT
150Ø COMBUSTION AIRINTAKE AND FLUE GASVENT
UH-3
GWH
A124
100ø100ø
CONCENTRIC ADAPTERBOX (TYP.)
BD
BDBD
A2135
BD BD
B2319
B2319
B2295
BD
BD
S CO
S CO
WALL MOUNTED OCCUPANCYSENSOR (TYPICAL)
T
T
EF1 SPEEDCONTROLLER
T
THERMOSTAT WITHINSULATE SUB-BASE(TYP.)
RTU-2
600x300
PWH-3
PWH-2
PWH-1
125mmØ CONCENTRICVENT (TYP. OF 3)
FD
FD
FD
UH-2
400ø
BD FD
A124
UC
250x200
PROJECT
CLIENT
CONSULTANT
KEY PLAN
ISSUE/REVISION
SHEET NUMBER
SHEET TITLE
PROJECT NUMBER
ISSUED FOR TENDER
Last
Plo
tted:
File
nam
e:
Printed on ___% Post-ConsumerRecycled Content Paper
Proj
ect M
anag
emen
t Ini
tials
:Des
igne
r:C
heck
ed:
Appr
oved
:IS
O A
1 59
4mm
x 8
41m
m
2345
12345
D
C
B
A
1
ELGIN AREA WATERSUPPLY SYSTEM
AECOM250 York Street, Suite 410London, Ontario N6A 6K2519.676.0510 tel 519.673.5975 faxwww.aecom.com
235 North Centre Road, Suite 200 LondonOntario N5X 4E7519.930.3505 tel 519.474.0451 faxwww.watersupply.london.ca
2013-10-090
10/4
/201
3 9:
15:2
9 AM
C:\U
sers
\koh
lers
\Doc
umen
ts\R
evit
Loca
l File
s\60
2464
77-M
OD
-30-
0000
-M-C
F_ko
hler
s.rv
t
MANAGEMENT
43665 Dexter Line
FACILITY
RESIDUALS
Central Elgin, Ontario N0L 2L0
ELGIN AREA WATER TREATMENT PLANT
MECHANICAL MAIN FLOOR PLAN -HVAC
M605
60246477
Che
cker
Des
igne
rAp
prov
er
SCALE: 1 : 100M605 REF: D613
1 MAIN FLOOR-HVAC
ROOM SCHEDULENumber Name601 PUMP GALLERY602 STAIR WELL No.1603 STAIR WELL No.2604 SLUDGE THICKENER605 POLYMER STORAGE AND
MAKEUP ROOM606 STORAGE ROOM607 ELECTRICAL ROOM608 CONTROL ROOM AND LAB609 JANITORY/STORAGE ROOM610 LAB STORAGE ROOM611 WAITING ROOM612 WC613 WC614 TRUCK BAY615 DECHLORINATION ROOM616 THICKENER ROOM617 CENTRIFUGE ROOM618 STORAGE ROOM
N
0mm
2500 5000
SCALE: 1:100
I/R DATE DESCRIPTION
60246477-Elgin RMF_M600s_2013-10-04_Rev0 For TENDER.pdf
1
3
4
5
A B C
2
D
RTU-3
RTU-2
DS-1 DS-2 DS-3
OA
106 LPSMIN.
OA35 LPSMIN.
OA59 LPSMIN.
OA
MUA-1
100ø
100ø
OUTDOOR AIRVENT CAP (TYP.)
EF-10
EF-11ABOVE
ABOVE
1994OED
1994OED
EF-7ABOVE
1652OED
EF-6ABOVE
1652OED
EF-2EF-1
900
MIN
. (TY
P)
IFR-3
IFR-4
200Ø CONCENTRICVENT TERMINATION
150Ø COMBUSTION AIRINTAKE AND FLUE GAS VENT (FIRE WRAPPED)DOWN, CONCENTRIC ADAPTER BOX AND200Ø CONCENTRIC VENT UP
T
OA
OA
L31652
L31652
MD
MD100ø
100ø
T
603616
617
150Ø CONCENTRICVENT TERMINATION
WALL MOUNTED OCCUPANCYSENSOR (TYPICAL)
RTU-1
PROJECT
CLIENT
CONSULTANT
KEY PLAN
ISSUE/REVISION
SHEET NUMBER
SHEET TITLE
PROJECT NUMBER
ISSUED FOR TENDER
Last
Plo
tted:
File
nam
e:
Printed on ___% Post-ConsumerRecycled Content Paper
Proj
ect M
anag
emen
t Ini
tials
:Des
igne
r:C
heck
ed:
Appr
oved
:IS
O A
1 59
4mm
x 8
41m
m
2345
12345
D
C
B
A
1
ELGIN AREA WATERSUPPLY SYSTEM
AECOM250 York Street, Suite 410London, Ontario N6A 6K2519.676.0510 tel 519.673.5975 faxwww.aecom.com
235 North Centre Road, Suite 200 LondonOntario N5X 4E7519.930.3505 tel 519.474.0451 faxwww.watersupply.london.ca
2013-10-090
10/4
/201
3 9:
15:3
5 AM
C:\U
sers
\koh
lers
\Doc
umen
ts\R
evit
Loca
l File
s\60
2464
77-M
OD
-30-
0000
-M-C
F_ko
hler
s.rv
t
MANAGEMENT
43665 Dexter Line
FACILITY
RESIDUALS
Central Elgin, Ontario N0L 2L0
ELGIN AREA WATER TREATMENT PLANT
MECHANICAL UPPER FLOOR PLAN- HVAC
M606
60246477
Che
cker
Des
igne
rAp
prov
er
SCALE: 1 : 100M606 REF: D613
1 UPPER FLOOR-HVAC
ROOM SCHEDULENumber Name601 PUMP GALLERY602 STAIR WELL No.1603 STAIR WELL No.2604 SLUDGE THICKENER605 POLYMER STORAGE AND
MAKEUP ROOM606 STORAGE ROOM607 ELECTRICAL ROOM608 CONTROL ROOM AND LAB609 JANITORY/STORAGE ROOM610 LAB STORAGE ROOM611 WAITING ROOM612 WC613 WC614 TRUCK BAY615 DECHLORINATION ROOM616 THICKENER ROOM617 CENTRIFUGE ROOM618 STORAGE ROOM
N
0mm
2500 5000
SCALE: 1:100
I/R DATE DESCRIPTION
60246477-Elgin RMF_M600s_2013-10-04_Rev0 For TENDER.pdf
DESTRATIFICATION FAN SCHEDULE
TAG LOCATION MANUF. MODEL FAN TYPE MOTORRPM
NOMINALMOTORPOWER POWER MOCP
OPER.WT. LBS
/ KgCONTROLLED BY ACCESSORIES
W HP
DS-1 DS-2DS-3
THICKENER[616] BIG ASS FANS POWERFOIL
X2.0 2.4M (8'-0")Ø 113MAXIMUM 746 1.00 208/3/60 10.0 269 / 122 DIGITAL WALL KEYPAD SAFETY YELLOW WINGLET, MILL FINISH ALUMINUM AND SMART
SENSE 365
DIFFUSER, REGISTER & GRILLE SCHEDULETAG BASIS OF DESIGN
MANUFACTURER MODEL APPLICATIONSIZE NECK SIZE AIR FLOW
NC RANGE ACCESSORIES / COLOURMM INS MM INS LPS CFM
A1 KRUEGER 51400-04-06-F12-12x12-00-44
4 WAY CEILINGDIFFUSER 300x300 12x12 150Ø 6Ø UP TO
83UP TO
175 30 MAX. 4 CONE, WHITE, ALUMINUM CEILING DIFFUSER
A2 KRUEGER 51400-04-08-F23-24x24-00-44
4 WAY PANELMOUNTED CEILING
DIFFUSER600x600 24x24 200Ø 8Ø 87 - 142 185 - 300 30 MAX. 4 CONE, WHITE, PANEL MOUNTED, ALUMINUM CEILING DIFFUSER
B1 KRUEGER 5880-H-36-12-F22-NONE-01-02-00-10
DUCT MOUNTEDSUPPLY AIR GRILLE 900x300 36x12 - - UP TO 1,180 UP TO 2,500 40 MAX. DOUBLE DEFLECTION, 19MM SPACING, ALUMINUM SIDEWALL
GRILLE, ALUMINUM OPPOSED BLADE DAMPER
B2 KRUEGER DMGDR-H-20-08-X-01-81 DUCT MOUNTEDSUPPLY AIR GRILLE 500x200 20x8 - - UP TO 413 UP TO
875 40 MAX. DOUBLE DEFLECTION, 19MM SPACING, ALUMINUM SIDEWALLGRILLE, EXTRACTOR, (X = 14 & 16)
E1 KRUEGER EG5-24-06-FTB-NONE-44 CEILING RETURN AIRGRILLE 600x150 24x6 - - UP TO 319 UP TO 675 30 MAX. ALUMINUM EGG CRATE RETURN WITH CHANNEL FRAME
E2 KRUEGER EGC5-06-06-F23-12x24-00-00-00-44
CEILING EXHAUST AIRGRILLE 150x150 6x6 - - UP TO
94UP TO
200 30 MAX. ALUMINUM PANEL MOUNTED, EGG CRATE RETURN
E3 KRUEGER EGC5-24-24-F22-NONE-03-00-04-10
DUCT MOUNTEDRETURN GRILLE 600x600 24x24 - - 944 2,000 40 MAX. ALUMINUM EGG CRATE RETURN, KNURLED FASTENERS, 25MM
FILTER FRAME AND FILTERS
E4 KRUEGER EGC5-30-30-F22-NONE-03-00-04-10
DUCT MOUNTEDRETURN GRILLE 750x750 30x30 - - 1,276 2,700 40 MAX. ALUMINUM EGG CRATE RETURN, KNURLED FASTENERS, 25MM
FILTER FRAME AND FILTERS
F1 KRUEGER AFS580-HZ-10-10-F22-NONE-01-15-00-10
DUCT MOUNTEDEXHAUST GRILLE 250X250 10X10 - - 165 350 40 MAX. FIXED ALUMINUM, SINGLE DEFLECTION, 19MM SPACING, 0°
DEFLECTION, ALUMINUM OPPOSED BLADE DAMPER
F2 KRUEGER AFS580-HZ-24-12-F22-NONE-01-15-00-10
DUCT MOUNTEDEXHAUST GRILLE 600x450 24x16 - - 543 1,150 40 MAX. FIXED ALUMINUM, SINGLE DEFLECTION, 19MM SPACING, 0°
DEFLECTION, ALUMINUM OPPOSED BLADE DAMPER
F3 KRUEGER AFS580-HZ-36-24-F22-NONE-01-15-00-10
DUCT MOUNTEDEXHAUST GRILLE 900x600 36x24 - - UP TO 2,018 UP TO 4,275 40 MAX. FIXED ALUMINUM, SINGLE DEFLECTION, 19MM SPACING, 0°
DEFLECTION, ALUMINUM OPPOSED BLADE DAMPER
DOMESTIC WATER HEATER SCHEDULE
TAG LOCATION MANUFACTURER MODEL TYPETEMP. RISE FLOW
FUELGAS INLETPRESSURE INPUT EFFICIENCY OPER. WT.
ELECTRICAL REMARKSC F LPS GPM kPA IN WC kW BTUH PERCENT Kg LBS
GWHJANITORY /STORAGE
[609]JOHN WOOD JWT-910 TANKLESS,
DIRECT VENT 27 80 0.50 7.6 NATURALGAS
1.3 5.0
111.4 380,000 80.2 51 112 115 / 1 / 60
VERTICAL CONCENTRIC VENT & INTAKEKITS, DIRECT VENT CONVERSION KIT,BACKFLOW PREVENTER, RAIN CAPS ANDVERTICAL DRAIN TEE
TO TO
2.6 10.5
EXHAUST FAN SCHEDULE
TAG LOCATION FUNCTION MANUF. MODEL FAN TYPEMAXIMUMCAPACITY
MINIMUMCAPACITY STATIC PRESSURE FAN
RPMMOTOR
RPM
NOMINAL MOTORPOWER POWER SOUND
DATA CONTROLLED BY ACCESSORIESLPS CFM LPS CFM Pa IN WC W HP
EF-1 LOW ROOF CONTROL ROOM [608]GENERAL EXHAUST PENNBARRY DOMEX
DX08SDIRECT DRIVECENTRIFUGAL 71 150 71 150 31 0.13 N/A 1,300 15 0.02 120/1/60 2.2
SONES MANUAL SPEED CONTROLLERVIBRATION ISOLATION, WEATHERPROOF SAFETY DISCONNECT,SPEED CONTROLLER, 350MM A.F.R. PREFABRICATED ROOF CURB,ALUMINUM BIRD SCREEN AND GRAVITY BACKDRAFT DAMPER.
EF-2 LOW ROOFSERVICE ROOM [609], W/R [611]
& W/R [612] SANITARYEXHAUST
PENNBARRY DOMEXDX08S
DIRECT DRIVECENTRIFUGAL 85 180 85 180 24 0.10 N/A 1,300 15 0.02 120/1/60 2.2
SONESINTERLOCKED WITH SPACE
LIGHTING BY DIV. 16
VIBRATION ISOLATION, WEATHERPROOF SAFETY DISCONNECT, UNITMOUNTED SPEED CONTROLLER, TIME DELAY RELAY, 350MM A.F.R.PREFABRICATED ROOF CURB, ALUMINUM BIRD SCREEN ANDGRAVITY BACKDRAFT DAMPER.
EF-3 DECHLOR. ROOM[615]
DECHLORONATION ROOM [614]GENERAL EXHAUST PENNBARRY FUMEX
WFX08BBELT DRIVE
CENTRIFUGAL 165 350 83 175 36 0.14 765 1,725 187 0.25 575/3/60 5.8SONES
CONTINUOUS LOW SPEEDOPERATION, HIGH SPEED
UPON GAS (CL2) DETECTION
WALL MOUNTING KIT, VARIABLE FREQUENCY DRIVE, BELTTENSIONER, ALUMINUM BIRD SCREEN, AND WEATHERPROOFSAFETY DISCONNECT SWITCH.
EF-4EF-5
THICKENERROOM[604]
PUMP GALLERY [601] GENERALEXHAUST PENNBARRY FUMEX
WFX13BBELT DRIVE
CENTRIFUGAL 1,086 2,300 543 1,150 58 0.23 1,408 1,725 560 0.75 575/3/60 16.9 SONES
CONTINUOUS LOW SPEEDOPERATION, HIGH SPEED
UPON OCCUPANCY SENSORACTIVATION
WALL MOUNTING KIT, VARIABLE FREQUENCY DRIVE, BELTTENSIONER, ALUMINUM BIRD SCREEN, AND WEATHERPROOFSAFETY DISCONNECT SWITCH.
EF-6EF-7 HIGH ROOF CENTRIFUGE ROOM [616]
GENERAL EXHAUST PENNBARRY DOMEXDX14B
BELT DRIVECENTRIFUGAL 1,652 3,500 826 1,750 3 0.01 1,287 1,725 560 0.75 575/3/60 18.7
SONES
CONTINUOUS LOW SPEEDOPERATION, HIGH SPEED
UPON OCCUPANCY SENSORACTIVATION
VIBRATION ISOLATION, VARIABLE FREQUENCY, DRIVE BELTTENSIONER, ALUMINUM BIRD SCREEN, WEATHERPROOF SAFETYDISCONNECT SWITCH, 350MM A.F.R. PREFABRICATED ROOF CURB.
EF-8EF-9
THICKENERROOM[604]
PROCESS AREA [604] LOWLEVEL GENERAL EXHAUST PENNBARRY FUMEX
WFX16BBELT DRIVE
CENTRIFUGAL 1,994 4,225 997 2,113 38 0.15 1,116 1,725 1119 1.50 575/3/60 19.9 SONES
CONTINUOUS LOW SPEEDOPERATION, HIGH SPEED
UPON OCCUPANCY SENSORACTIVATION
WALL MOUNTING KIT, VARIABLE FREQUENCY DRIVE, BELTTENSIONER, ALUMINUM BIRD SCREEN, AND WEATHERPROOFSAFETY DISCONNECT SWITCH.
EF-10EF-11 MIDDLE ROOF PROCESS AREA [604] HIGH
LEVEL GENERAL EXHAUST PENNBARRY DOMEXDX16B
BELT DRIVECENTRIFUGAL 1,994 4,225 997 2,113 3 0.01 1,015 1,725 746 1.00 575/3/60 17.9 SONES
CONTINUOUS LOW SPEEDOPERATION, HIGH SPEED
UPON OCCUPANCY SENSORACTIVATION
VIBRATION ISOLATION, VARIABLE FREQUENCY, DRIVE BELTTENSIONER, ALUMINUM BIRD SCREEN, WEATHERPROOF SAFETYDISCONNECT SWITCH, 350MM A.F.R. PREFABRICATED ROOF CURB.
EF-12 TRUCK LOADING[614]
TRUCK BAY [613] GENERALEXHAUST PENNBARRY FUMEX
WFX16BBELT DRIVE
CENTRIFUGAL 2,030 4,300 1,015 2,150 38 0.15 1,136 1,725 1119 1.50 575/3/60 19.9 SONESCONTINUOUS LOW SPEEDOPERATION, HIGH SPEED
UPON GAS DETECTION
WALL MOUNTING KIT, VARIABLE FREQUENCY DRIVE, BELTTENSIONER, ALUMINUM BIRD SCREEN, AND WEATHERPROOFSAFETY DISCONNECT SWITCH.
LPS
LPS
LPS
LPS
LPS
LPS
LPS
LPS
LPS
LPS
LPS
KRUEGER 5600A-12-12-00-10 DOOR GRILLE 300x300 12x12 - - UP TO 130 UP TO 275 30 MAX. ALUMINUM DOOR GRILLE, DOUBLE FLAT FRAME, NO SCREWHOLESLPS
G1
PWH-2POLYMER
ROOM[605]
JOHN WOOD JWT-910 TANKLESS,DIRECT VENT 28.7 85 0.40 7.1 NATURAL
GAS 111.4 380,000 80.2 51 112 115 / 1 / 60
HORIZONTAL CONCENTRIC VENT & INTAKEKITS, DIRECT VENT CONVERSION KIT,BACKFLOW PREVENTER, AND EASY-LINKSYSTEM
TO TO
2.6 10.5
PWH-1
PWH-3
1.3 5.0
LOUVRE SCHEDULETAG BASIS OF DESIGN
MANUFACTURER MODEL APPLICATION FREE AREASIZE VELOCITY AIR FLOW
ACCESSORIES / COLOURMM INS MPS FPM LPS CFM
L1 VENTEX 2425STORMPROOF
OUTDOOR INTAKELOUVRE 53% 500x500 20x20 <2.0 <400 165 350
ALUMINUM BIRDSCREEN, EXTENDED SLEEVES, FILTER RACKS, ANDFILTERS (25MM DISPOSABLE)
COLOUR: NATURAL BRICK (TO CONFIRMED IN SHOPDRAWING SUBMISSION PHASE)
L2 VENTEX 2425STORMPROOF
OUTDOOR INTAKELOUVRE 53% 900x1200 36x48 <2.0 <400 1,015 2,150
L3 VENTEX 2425STORMPROOF
OUTDOOR INTAKELOUVRE 53% 900x1800 36x72 <2.0 <400 1,652 3,500
L4 VENTEX 2425STORMPROOF
OUTDOOR INTAKELOUVRE 53% 2400x1600 96x64 <2.0 <400 3,976 8,425
NATURAL GAS FIRED INFRARED HEATER
TAG LOCATION MANUFACTURER MODEL
CAPACITY
POWER FLAOPER. WT.
REMARKSINPUT OUTPUT
KW MBH KW BTUH Kg LBS
IFR-1IFR-2
TRUCK LOADING[614] ROBERTS GORDON VANTAGE
HE-150 43.9 150.0 35.1 120.0 115V / 1PH 4.8 140.6 310HEAT EXCHANGER TUBING (3.0M ALUMI-THERMTUBING, 12.0M HEAT TREATED ALUMINIZED STEEL,STAINLESS STEEL REFLECTORS, SIDE REFLECTORSAND END CAPS, FRESH AIR INTAKE & VENT TERMINAL ANDCAPS, VENT ADAPTER, WALLTHIMBLE, AND FLEX HOSE.
IFR-3IFR-4
CENTRIFUGE[617] ROBERTS GORDON VANTAGE
HE-150 43.9 150.0 35.1 120.0 115V / 1PH 4.8 140.6 310
THRU-THE-BASE ELECTRICAL CONNECTION, HINGEDACCESS PANELS, BACnet COMPATIBLE CONTROLLER,VARIABLE FREQUENCY DRIVE, AND 350MM A.F.R.PREFABRICATED ROOF CURB
1543700575/3/6030:1MODUL.64.018.0-6.0-21.0373.0109.2450.0131.810265.002.80
15/15FC
DIDW0.942172300 /
46001086 /2171
ENGINEERED AIRDJE60MUA-1
LBSKGMOCPFLAPOWERSUPPLY800040002000100050025012563FDBCDBFDBCDBMBHkWMBHkWINS.W.C.PaCFMLPS
STAGESLATEATOUTPUTINPUTFAN
SPEEDRPM
MOTORSIZEHP
BHPFAN TYPEESPAIR VOLUME REMARKS/ACCESSORIES
OPERATING WEIGHTELECTRICALSOUND POWER
HEATING PERFORMANCESUPPLY FAN
MANUFACTURER / MODELTAG
MAKE-UP AIR UNIT SCHEDULE
12.3 207277778183858583
PROJECT
CLIENT
CONSULTANT
KEY PLAN
ISSUE/REVISION
SHEET NUMBER
SHEET TITLE
PROJECT NUMBER
ISSUED FOR TENDER
Last
Plo
tted:
File
nam
e:
Printed on ___% Post-ConsumerRecycled Content Paper
Proj
ect M
anag
emen
t Ini
tials
:Des
igne
r:C
heck
ed:
Appr
oved
:IS
O A
1 59
4mm
x 8
41m
m
2345
12345
D
C
B
A
1
ELGIN AREA WATERSUPPLY SYSTEM
AECOM250 York Street, Suite 410London, Ontario N6A 6K2519.676.0510 tel 519.673.5975 faxwww.aecom.com
235 North Centre Road, Suite 200 LondonOntario N5X 4E7519.930.3505 tel 519.474.0451 faxwww.watersupply.london.ca
2013-10-090
10/4
/201
3 9:
15:3
8 AM
C:\U
sers
\koh
lers
\Doc
umen
ts\R
evit
Loca
l File
s\60
2464
77-M
OD
-30-
0000
-M-C
F_ko
hler
s.rv
t
MANAGEMENT
43665 Dexter Line
FACILITY
RESIDUALS
Central Elgin, Ontario N0L 2L0
ELGIN AREA WATER TREATMENT PLANT
MECHANICAL SCHEDULES
M607
60246477
Che
cker
Des
igne
rAp
prov
er
I/R DATE DESCRIPTION
60246477-Elgin RMF_M600s_2013-10-04_Rev0 For TENDER.pdf
NATURAL GAS FIRED UNIT HEATER SCHEDULE
TAG LOCATION MANUFACTURER/ MODEL
AIR FLOWCAPACITY
MOTORSIZEHP
MOTORSPEED RPM
POWERSUPPLY FLA
OPERATING WEIGHTREMARKS / ACCESSORIESINPUT OUTPUT
LPS CFM KW MBH KW MBH KG LBS
UH-1 DECHLOR.ROOM[615]
REZNORUDAS-45 297 629 13.2 45.0 10.9 37.4 0.03 1550 115/1/60 2.4 27.2 60.0 STAINLESS STEEL HEAT EXCHANGER, TWO STAGE
NATURAL GAS VALVE, VIBRATION ISOLATION,HORIZONTAL OR VERTICAL VENT KIT (AS PERDRAWINGS), CONCENTRIC ADAPTER, AND DOWNTURNNOZZLES
UH-2UH-3UH-4UH-5
THICKENERROOM[604]
REZNORUDAS-350 2116 4483 102.5 350.0 85.1 290.5 0.50 1050 115/1/60 11.0 133.8 295.0
ROOFTOP UNIT SCHEDULE
TAG MANUFACTURER / MODEL
SUPPLY FAN COOLING PERFORMANCE HEATING PERFORMANCE
SOUND POWERAIR VOLUME ESP
FAN TYPE BHPMOTOR
SIZEHP
FANSPEED
RPM
SENSIBLE TOTAL EAT LATREFRIG. SEER /
EER
INPUT OUTPUT EAT LATSTAGES
LPS CFM Pa INS.W.C. kW MBH kW MBH CDB /CWB
FDB /FWB
CDB /CWB
FDB /FWB kW MBH kW MBH CDB FDB CDB FDB RATING 63 125 250 500 1000 2000 4000 8000
RTU-1CARRIER
WEATHERMASTER48HCDA04E0M5-2B3F
472 1000 53 0.23 DIFC10x10 0.25 0.50
730DIRECTTAP 3
8.0 27.3 11.2 38.4 28/19 82/66 14/13 58/56 R410a 15.00 /12.50 21.1 72.0 16.4 56.0 13.0 55.0 31.0 87.0 2 76.0 78.2 78.0 74.2 73.3 70.6 66.0 62.4 56.9
RTU-2CARRIER
WEATHERMASTER48HCDB05A2M5-2B3F
944 2000 75 0.33 DIFC10x10 1.02 1.50 1,090
BELT 12.9 44.0 16.1 55.1 28/19 82/66 14/13 58/56 R410a 15.60 /13.00 21.1 72.0 16.4 56.0 13.0 55.0 31.0 87.0 2 78.0 84.7 83.6 77.1 74.6 72.3 68.3 64.7 60.9
RTU-3CARRIER
WEATHERMASTER48HCDB07A1M5-2B3F
1274 2700 89 0.39 DIFC10x10 1.08 1.5 656
BELT 29.2 61.9 37.9 80.3 28/19 82/66 14/13 58/56 R410a - /12.00 21.1 72.0 27.8 59.0 13.0 55.0 31.0 87.0 2 82.0 90.1 82.6 81.0 79.4 77.0 73.0 70.4 66.7
PUMP SCHEDULE
TAG LOCATION FUNCTION TYPE MANUFACTURER MODEL MEDIUMFLOW HEAD MOTOR MOTOR
RPM POWEROPER. WT.
REMARKSLPM GPM M FT kW HP Kg LBS
P-1 SERVICE ROOM[609]
DOMESTIC HOTWATER
RECIRCULATIONIN-LINE
CIRCULATOR S. A. ARMSTRONG ASTRO 50B-TA POTABLEWATER 7.6 2.0 5.6 18.4 0.037 0.05 2800 115/1/60 3.4 7.4 AQUASTAT AND TIMER
ELECTRICAL OPERATING WEIGHTREMARKS/ACCESSORIES
POWERSUPPLY FLA MOCP KG LBS
575/3/60 8.7 15.0 344 758
THRU-THE-BASE ELECTRICAL CONNECTION, HINGEDACCESS PANELS, HAIL GUARD, BACnet COMPATIBLECONTROLLER, DIFFERENTIAL TEMPERATUREECONOMIZER, BAROMETRIC RELIEF, WEATHERPROOFNON-FUSED DISCONNECT SWITCH, AND 350MM A.F.R.PREFABRICATED ROOF CURB
575/3/60 9.0 15.0 409 901
THRU-THE-BASE ELECTRICAL CONNECTION, HINGEDACCESS PANELS, HUMIDI-MIZER, HAIL GUARD, BACnetCOMPATIBLE CONTROLLER, DIFFERENTIALTEMPERATURE ECONOMIZER, BAROMETRIC RELIEF,WEATHERPROOF NON-FUSED DISCONNECT SWITCH,AND 350MM A.F.R. PREFABRICATED ROOF CURB
575/3/60 13.0 20.0 534 1178
THRU-THE-BASE ELECTRICAL CONNECTION, HINGEDACCESS PANELS, HUMIDI-MIZER, HAIL GUARD, BACnetCOMPATIBLE CONTROLLER, DIFFERENTIALTEMPERATURE ECONOMIZER, BAROMETRIC RELIEF,WEATHERPROOF NON-FUSED DISCONNECT SWITCH,AND 350MM A.F.R. PREFABRICATED ROOF CURB
ROOFTOP UNIT SCHEDULE cont`d
ELECTRIC FORCE FLOW HEATER SCHEDULETAG LOCATION MANUFACTURER MODEL
AIR FLOW CAPACITY POWERREMARKS
LPS CFM KW MBH V/PH/Hz HP
FF-1 STAIR NO. 1[602] OUELLET OAS03036 241 510 3.0 10.2 575/3/60 0.03 WALL MOUNT BRACKET, DISCONNECT SWITCH, AND
WALL THERMOSTAT
FF-2 STAIR NO. 2[603] OUELLET OAS03036 241 510 3.0 10.2 575/3/60 0.03 WALL MOUNT BRACKET, DISCONNECT SWITCH, AND
WALL THERMOSTAT
PLUMBING FIXTURE CONNECTION SCHEDULETAG FIXTURE NAME
SANITARY VENT DCWS DHWS TEMPERED NON-POTABLEREMARKS
MM INS MM INS MM INS MM INS MM INS MM INS
W1 FLUSH VALVEWATERCLOSET 75 3.00 38 1.50 25 1 - - - - - -
L1 WALL HUNG LAVATORY 32 1.25 32 1.25 13 0.50 13 0.50 13 0.5 - -
S2 ONE COMPARTMENTSTAINLESS STEEL SINK 38 1.50 32 1.25 13 0.50 13 0.50 - - - -
S1 SERVICE SINK 75 3.00 38 1.50 19 0.75 19 0.75 - - - -
E1 EMERGENCY EYE/FACEWASH 32 1.25 - - 19 0.75 19 0.75 19 0.75 - -
E2 & E3 EMERGENCY EYE/FACEWASH - - - - 32 & 19 1.25 &
0.75 32 & 19 1.25 &0.75 32 & 19 1.25 &
0.75 - -
FD2 FLOOR DRAIN 50 2.00 - - - - - - - - - - ALL FLOOR DRAINS SHALL BE GANG TRAPPEDPER FLOOR LEVEL IN ACCORDANE WITHO.B.C. 7.4.5.1.(3). EACH GANG TRAP SHALLINCLUDE A TRAP SEAL PRIMER.FD3 / FFD3 FLOOR DRAIN & FUNNEL
FLOOR DRAIN 75 3.00 - - - - - - - - - -
SANITARY TO SERVICE SINK S1
PRESSURE REGULATOR SCHEDULE
TAGFLOW RATE
M /HR CFH3
INLET PRESSURE
kPa PSI
OUTLET PRESSURE
kPa INS. W.C.
MANUFACTURER(CANADIAN METER)
PRV-1
PRV-2
PRV-3
PRV-4
PRV-5
PRV-6
53.4 1885.0
2.0 72.0
12.7 450.0
2.0 72.0
2.0 72.0
21.1 1680.0
13.8 2.0 3.5 14.0 1813C: 38Ø OUTLET, 13mm ORIFICE
1813C: 19Ø OUTLET, 5mm ORIFICE
1813C: 19Ø OUTLET, 8mm ORIFICE
1813C: 19Ø OUTLET, 5mm ORIFICE
1813C: 19Ø OUTLET, 5mm ORIFICE
1813C: 38Ø OUTLET, 13mm ORIFICE
13.8 2.0 3.5 14.0
13.8 2.0 3.5 14.0
13.8 2.0 3.5 14.0
13.8 2.0 3.5 14.0
13.8 2.0 3.5 14.0
OUTDOORAIR VOLUME
LPS CFM
57 120
101 215
31 65
PROJECT
CLIENT
CONSULTANT
KEY PLAN
ISSUE/REVISION
SHEET NUMBER
SHEET TITLE
PROJECT NUMBER
ISSUED FOR TENDER
Last
Plo
tted:
File
nam
e:
Printed on ___% Post-ConsumerRecycled Content Paper
Proj
ect M
anag
emen
t Ini
tials
:Des
igne
r:C
heck
ed:
Appr
oved
:IS
O A
1 59
4mm
x 8
41m
m
2345
12345
D
C
B
A
1
ELGIN AREA WATERSUPPLY SYSTEM
AECOM250 York Street, Suite 410London, Ontario N6A 6K2519.676.0510 tel 519.673.5975 faxwww.aecom.com
235 North Centre Road, Suite 200 LondonOntario N5X 4E7519.930.3505 tel 519.474.0451 faxwww.watersupply.london.ca
2013-10-090
10/4
/201
3 9:
15:4
1 AM
C:\U
sers
\koh
lers
\Doc
umen
ts\R
evit
Loca
l File
s\60
2464
77-M
OD
-30-
0000
-M-C
F_ko
hler
s.rv
t
MANAGEMENT
43665 Dexter Line
FACILITY
RESIDUALS
Central Elgin, Ontario N0L 2L0
ELGIN AREA WATER TREATMENT PLANT
MECHANICAL SCHEDULES
M608
60246477
Che
cker
Des
igne
rAp
prov
er
I/R DATE DESCRIPTION
60246477-Elgin RMF_M600s_2013-10-04_Rev0 For TENDER.pdf
OUTDOOR AIR
EXHAUST AIR
EVFD-10EFC-10
EF-10
EF-8 EF-9
EXHAUST AIR EXHAUST AIR
EXHAUST AIR
EVFD-11EFC-11
EF-11
EVFD-8EFC-8
EVFD-9EFC-9
UH-2 UH-3
T
UH-5UH-4
SPACE OCCUPANCY SENSOR (TYP.)(4 GROUND FLOOR / 2 MEZZANINE)
TEMPERATURE SENSOR (TYP.)
MOTORIZEDDAMPER
GRAVITY BACKDRAFTDAMPER (TYP.)
T TT
OUTDOOR AIR
OA
T
FDP
FILTER
SUPPLY AIR
SVFD-1SFC-1
H
G
HXV
EXHAUST AIR
EVFD-4EFC-4
EF-4
EXHAUST AIR
EVFD-5EFC-5
EF-5
MUA-1
SPACE MOUNTEDTEMPERATURE SENSOR
SPACE OCCUPANCYSENSOR (TYP.)
T
EXHAUST AIR
EF-3
EVFD-3EFC-3
UH-1
TEMPERATURE SENSOR
OCCUPANCY SENSOR
OUTDOOR AIR
GRAVITY BACKDRAFTDAMPER
T
OUTDOOR AIR
EXHAUST AIR
EVFD-6EFC-6
EF-6
IFR-3 IFR-4
SPACE OCCUPANCY SENSOR (TYP.)
TEMPERATURE SENSOR (TYP.)
GRAVITY BACKDRAFTDAMPER (TYP.)
EXHAUST AIR
EVFD-7EFC-7
EF-7
TT
OUTDOOR AIR
OUTDOOR AIR
IFR-1 IFR-2
EF-12
EVFD-12EFC-12
EXHAUST AIR
MOTORIZED DAMPER(TYP.)
NOx + CO GAS DETECTIONSENSOR(S) TYPICAL
TEMPERATURE SENSOR (TYP.)
T T
ABBREVATION DESCRIPTIONEFCEVFDFDP
EXHAUST FAN MOTOR CURRENTEXHAUST VARIABLE FREQUENCY DRIVEFILTER DIFFERENTIAL PRESSURE
HXV NATURAL GAS FIRED INDIRECT HEAT EXCHANGERIFR INFRARED HEATERMUA MAKE-UP AIR UNITOAT OUTDOOR AIR TEMPERATURE SENSORSFCSVFD
SUPPLY AIR MOTOR CURRENTSUPPLY AIR VARIABLE FREQUENCY DRIVE
UH UNIT HEATERRTU ROOF TOP UNITMUA MAKE-UP AIR UNITEF EXHAUST FANIFR INFRARED HEATERUH UNIT HEATERCP STAND A LONE CONTROLLER CONTROL PANEL
PROJECT
CLIENT
CONSULTANT
KEY PLAN
ISSUE/REVISION
SHEET NUMBER
SHEET TITLE
PROJECT NUMBER
ISSUED FOR TENDER
Last
Plo
tted:
File
nam
e:
Printed on ___% Post-ConsumerRecycled Content Paper
Proj
ect M
anag
emen
t Ini
tials
:Des
igne
r:C
heck
ed:
Appr
oved
:IS
O A
1 59
4mm
x 8
41m
m
2345
12345
D
C
B
A
1
ELGIN AREA WATERSUPPLY SYSTEM
AECOM250 York Street, Suite 410London, Ontario N6A 6K2519.676.0510 tel 519.673.5975 faxwww.aecom.com
235 North Centre Road, Suite 200 LondonOntario N5X 4E7519.930.3505 tel 519.474.0451 faxwww.watersupply.london.ca
2013-10-090
10/4
/201
3 9:
15:4
4 AM
C:\U
sers
\koh
lers
\Doc
umen
ts\R
evit
Loca
l File
s\60
2464
77-M
OD
-30-
0000
-M-C
F_ko
hler
s.rv
t
MANAGEMENT
43665 Dexter Line
FACILITY
RESIDUALS
Central Elgin, Ontario N0L 2L0
ELGIN AREA WATER TREATMENT PLANT
MECHANICAL CONTROLSCHEMATICS
M609
60246477
?S
HS
H
M609 SCALE: N.T.S
1 SCHEMATIC - SLUDGE THICKENER RM. 604 CONTROL
M609 SCALE: N.T.S
2 SCHEMATIC - PUMP GALLERY RM. 601 CONTROL
M609 SCALE: N.T.S
3 SCHEMATIC - DECHLORINATION RM. 615 CONTROL
M609 SCALE: N.T.S
4 SCHEMATIC - CENTRIFUGE RM. 617 CONTROL
M609 SCALE: N.T.S
5 SCHEMATIC - TRUCK BAY RM. 614 CONTROL
BUILDING AUTOMATION POINTS LISTANALOGUE IN ANALOGUE OUT DIGITAL IN DIGITAL OUT SOFTWARE PROGRAMS
TEM
PER
ATU
RE
HU
MID
ITY
DIF
FER
EN
TIAL
PR
ESS
UR
E
FLO
W
CO
NC
ENTR
ATIO
N
0 - 1
0 V
OLT
S
4 - 2
0Ma
STAT
US
FILT
ER
HIG
H L
EVEL
FIR
E
FLO
W
OC
CU
PAN
CY
STAR
T / S
TOP
ENAB
LE /
DIS
ABLE
OPE
N /
CLO
SE
ALA
RM
TIM
E S
CH
EDU
LE
EN
THAL
PY
RE
SE
T
EV
EN
T PR
OG
RA
M
MA
INTE
NA
NC
E
GR
APH
IC
ROOFTOP UNIT [RTU-1] (CP-1) X X
SUPPLY FAN X X X X X X
GAS FIRED HEAT EXCHANGER X X X X X
CONDENSER X X X X
OUTDOOR AIR DAMPER X X
FILTERS X X X
AIR QUALITY SENSOR X X X
TEMPERATURE SENSORS X
ROOFTOP UNITS [RTU-2] & [RTU-3] (CP-2) & (CP-3) X X
SUPPLY FAN X X X X X X
GAS FIRED HEAT EXCHANGER X X X X X
CONDENSERS X X X X
OUTDOOR AIR DAMPER X X
FILTERS X X X
TEMPERATURE SENSORS X
HUMIDITY SENSORS X X X
PUMP GALLERY [601] (CP-4) X
SUPPLY FAN [MUA-1] X X X X X
GAS FIRED HEAT EXCHANGER [MUA-1] X X X X X
FILTERS [MUA-1] X X X
EXHAUST FANS [EF-4] & [EF-5] X X X X X
TEMPERATURE SENSOR X X
OCCUPANCY SENSORS X X
SLUDGE THICKENER [604] (CP-5) X
UNIT HEATERS [UH-2], [UH-3], [UH-4] & [UH-5] X X X X X X
EXHAUST FANS [EF-8], EF-9], [EF-10] & [EF-11] X X X X X
TEMPERATURE SENSOR X X
OCCUPANCY SENSORS X X
OUTDOOR AIR DAMPERS X
TRUCK BAY [614] (CP-6) X
INFRARED HEATERS [IFR-1] & [IFR-2] X X X X X X
EXHAUST FAN [EF-12] X X X X X X
TEMPERATURE SENSORS X X
GAS DETECTION SENSORS X X
OUTDOOR AIR DAMPERS X
DECHLORINATION ROOM [615] (CP-7) X
UNIT HEATER [UH-1] X X X X X X
EXHAUST FAN [EF-3] X X X X X
TEMPERATURE SENSOR X X
OCCUPANCY SENSOR X X
CENTRIFUGE ROOM [617] (CP-8) X
INFRARED HEATERS [IFR-3] & [IFR-4] X X X X X X
EXHAUST FANS [EF-6] & [EF-7] X X X X X
TEMPERATURE SENSOR X X
OCCUPANCY SENSORS X X
OUTDOOR AIR DAMPERS X
GEN
ERAL
ALA
RM
TO
SC
ADA
X
X
X
X
X
X
X
X
I/R DATE DESCRIPTION
60246477-Elgin RMF_M600s_2013-10-04_Rev0 For TENDER.pdf
3"(75mm) 1"(25mm)2"(50mm)
18"(450mm)
1"(25mm)3"(75mm) 2"(50mm)
36"(900mm)
HOT WATER HEATING
HOT WATER HEATING
SECONDARY COLOR BAND
PRIMARY COLOR
DIRECTION ARROW
LEGEND
LEGEND
DIRECTION ARROW
PRIMARY COLOR
SECONDARY COLOR BAND
VALVE
TT
HOT WATER
COLD WATERTEMPERED WATER
ISOLATION VALVE
SURFACE MOUNTEDSTAINLESS STEELCABINET
THERMOMETER
THERMOSTATIC WATERCONTROLLER c/w INTEGRALCHECK STOPS.
32Ø32Ø
EMERGENCY FIXTURE
(75m
m)
(200
mm
)
(450mm)
(150mm)
PORTABLE PIPE SUPPORT
DIAMETER
HOOD
3" 8"
18"2"(50mm)
6"
D + 4" MIN.(100mm)SLEEVE DIAMETER
D = PIPE
1/4" x 6"(6.5 x 150mm)CLAMPING COLLAR
FLASHING BYGENERALCONTRACTOR
CLAMP TO PIPE
COPPER WEATHER
REFER TO STRUCTURAL DRAWINGSFOR ROOF CONSTRUCTION
S.P. (in. wg.)
-5.00-4.75-4.50-4.25-4.00-3.75-3.50-3.25-3.00
-1.00-1.25-1.50-1.75-2.00-2.25-2.50-2.75
-0.25-0.50-0.75
0.00 0.25 0.50 0.75 1.00 1.25 1.50 1.75 2.00 2.25 2.50 2.75 3.00 3.25 3.50 3.75 4.00 4.25 4.50 4.75 5.00 8.50
8.137.757.387.006.636.255.885.505.134.754.384.003.633.252.882.502.131.751.381.00
2.131.751.38
5.134.754.384.003.633.252.882.5
5.505.886.256.637.007.387.758.138.50
H (in.) H1 (in.)
3.002.882.752.632.502.382.252.132.00
1.001.131.251.381.501.631.751.88
0.630.750.88
0.500.630.750.881.001.131.251.381.501.631.751.882.002.132.252.382.502.632.752.883.00
OUTLET (TRAP INLET)WHERE S.P. DENOTES STATIC PRESSURE AT DRAIN
H = 1.5 x S.P. +1"H1 = 0.5 x S.P. +0.5"
SUCTION SIDE (-ve SP)
DISCHARGE SIDE (+ve SP)
H
H1
H
FLOW
FLOW
DRAIN PLUG
H1
INTERIOR WALLS
EXTERIOR WALLS
TERMINATE SLEEVE FLUSH WITH FINISHED WALLSURFACES
SEAL OR CAULK SLEEVE THROUGH FIRE WALLS INA SMOKE TIGHT MANNER
CONCEALED PIPING
COAT EXTERIOR SURFACES WITH TAR COMPOUND
CENTER PIPE IN SLEEVEFILL VOID WITH NONSHRINK HYDRAULIC GROUT
STANDARD WEIGHT STEEL PIPE POURED IN PLACE
SEALING (WATERSTOP), AND ANCHORING COLLAR
STANDARD WEIGHT STEEL PIPE SLEEVE OF SIZE TO PASS PIPE ANDINSULATION
FINISHED ESCUTCHEON PLATE FLUSH AGAINST WALL AND OF SIZETO COMPLETELY COVER OPENING
PIPE AND INSULATION TO BE CENTERED IN SLEEVE. DO NOT SUPPORTPIPE FROM SLEEVE
FINISHED WALLSURFACE
PIPING EXPOSED TO VIEW
EXTERIOR
CONCRETE WALL CONSTRUCTION
NOTE: BRICK & BLOCK WALL CONSTRUCTION TO BE SIMILAR.
SEAL SLEEVE WITH LINK SEAL
INTERIOR
NON-SHRINK GROUT
1/4"(6mm) THICK STEEL PLATEWELDED TO PIPE SLEEVE
EXISTING FLOOR SLAB
MIN. 2" (50mm)
MIN. 3" (76mm)
PIPE WITH / WITHOUT INSULATION
FIRE STOP SEALANT1/4"(6mm) THICK STEEL PIPESLEEVE 2"(50mm) LONGERTHAN DIAMETER OF PIPEINCLUDING INSULATION
NOTE:
ALL APPLICATIONS TO BE VERIFIED WITH STRUCTURAL ENGINEER.
REFER TO REQUIREMENTS FOR SERVICE PENETRATIONS ANDFIRE STOP SYSTEMS.
BRANCH DUCT
SINGLE LEAF BALANCING DAMPER
TAPERED SIDE TAKE-OFF
SUPPLY AIR PLENUMAIR FLOW
`X'
`X'
D
D2
D112"
`L'
SECONDARY BRANCH
SLOPE NOT TO
D1 VOLUME IN MAIN DUCT AFTER TAKE-OFF
D2 VOLUME IN SECONDARY BRANCHRATIO
R= D2 + 3/4 D
FULL HEIGHT LOCKABLE SPLITTER DAMPER
MAIN SUPPLY DUCT
(300mm)MINIMUMAIR FLOW
`L' = 1-1/2 D2 FOR 8" (200mm) TO 24" (600mm)
`L' = 1-1/4 D2 FOR D2 OVER 24" (600mm)
=
R= 3/4 D
BRANCH DUCTSTYPICAL ALLVOLUME DAMPER
EXCEED 1 IN 7
PWH-1
INSTANTANEOUSWATER HEATER
NA
TUR
AL
GA
SG
DIRT POCKETTYP.
50Ø
S
TO FFD3
PWH-2
INSTANTANEOUSWATER HEATER
NA
TUR
AL
GA
SG
50Ø
S
TO FFD3
PWH-3
INSTANTANEOUSWATER HEATER
NA
TUR
AL
GA
SG
50Ø
S
TO FFD332Ø 32Ø
75Ø
32Ø 32Ø 32Ø
BY
DIV
. 15
BY
DIV
. 11
PROJECT
CLIENT
CONSULTANT
KEY PLAN
ISSUE/REVISION
SHEET NUMBER
SHEET TITLE
PROJECT NUMBER
ISSUED FOR TENDER
Last
Plo
tted:
File
nam
e:
Printed on ___% Post-ConsumerRecycled Content Paper
Proj
ect M
anag
emen
t Ini
tials
:Des
igne
r:C
heck
ed:
Appr
oved
:IS
O A
1 59
4mm
x 8
41m
m
2345
12345
D
C
B
A
1
ELGIN AREA WATERSUPPLY SYSTEM
AECOM250 York Street, Suite 410London, Ontario N6A 6K2519.676.0510 tel 519.673.5975 faxwww.aecom.com
235 North Centre Road, Suite 200 LondonOntario N5X 4E7519.930.3505 tel 519.474.0451 faxwww.watersupply.london.ca
2013-10-090
10/4
/201
3 9:
15:4
8 AM
C:\U
sers
\koh
lers
\Doc
umen
ts\R
evit
Loca
l File
s\60
2464
77-M
OD
-30-
0000
-M-C
F_ko
hler
s.rv
t
MANAGEMENT
43665 Dexter Line
FACILITY
RESIDUALS
Central Elgin, Ontario N0L 2L0
ELGIN AREA WATER TREATMENT PLANT
MECHANICAL SCHEMATICS ANDDETAILS
M610
60246477
Che
cker
Des
igne
rAp
prov
er
M610 SCALE: N.T.S
1 DETAIL - PIPING IDENTIFICATIONM610 SCALE: N.T.S
2 SCHEMATIC - MIXING VALVE AND CABINETM610 SCALE: N.T.S
3 DETAIL - GAS PIPING THROUGH ROOF
M610 SCALE: N.T.S
4 DETAIL - TRAPS FOR AIR HANDLING UNITSM610 SCALE: N.T.S
5 DETAIL - PIPE WALL PENETRATIONM610 SCALE: N.T.S
6 DETAIL - PIPE FLOOR PENETRATION
M610 SCALE: N.T.S
8 DETAIL - ROUND DUCT TAKE-OFFM610 SCALE: N.T.S
7DETAIL - FULL RADIUS ELBOW BRANCHTAKE-OFF
M610 SCALE: N.T.S
9 DETAIL - SCHEMATIC OF PROCESS GAS-FIRED WATER HEATER
I/R DATE DESCRIPTION
60246477-Elgin RMF_M600s_2013-10-04_Rev0 For TENDER.pdf
D
R=D+3/4 D
R=3/4 D
STRAIGHT
FLOW
AIR
12"(300mm)
FULL HEIGHT LOCKABLE SPLITTER DAMPER
`L'=1-1/2 D FOR 8" (200mm) TO 24" (600mm)
`L'=1-1/4 D FOR OVER 24" (600mm)
`L' MINIMUM
SLOPE 1 IN 7
CURVED FOR 45°
BRANCH DUCTSTYPICAL ALL
VOLUME DAMPER
D
R=D+3/4 D
R=3/4 D
STRAIGHT
FLOW
AIR
VOLUME DAMPERTYPICAL ALL BRANCH DUCTS
CURVED FOR 45°
SLOPE 1 IN 7
`L' = 1-1/2 D2 FOR 8" (200mm) TO 24" (600mm)`L' = 1-1/4 D2 FOR D2 OVER 24" (600mm)
MINIMUMFLOW
AIR
HINGE
SPLITTER RODCLAMP
BRANCH DUCT
MAIN DUCT
D1
D2
`L' 12" (300mm)
CONNECTION TOBREAKAWAY
COLLAR AND
DUCT WITH
FILLER PIECE ATBLADE HEAD.
OF DAMPER
4. INSTALL DAMPER SQUARE AND PLUMB.
TO ENSURE FREE MOVEMENT.8. CYCLE DAMPER AFTER INSTALLATION
OR DAMPER DIRECTLY TO WALL.
5. DO NOT CAST DAMPER IN PLACE.
6. DO NOT CAULK OR SEAL DAMPERTO WALL. ENSURE THAT EXPANSION
7. DO NOT FASTEN RETAINING ANGLES
CLEARANCES ARE KEPT.
3. INSTALL DAMPER IN PLANE OF FIRE SEPARATION.
FRAMED PARTITIONS OR WALLS.
NOTES:
1. FIRE DAMPERS TO BE INSTALLED IN STRICT ACCORDANCE WITH MANUFACTURER'S
INSTALLATION INSTRUCTIONS.
2. INSPECT WALL OPENINGS PRIOR TO DAMPERINSTALLATION TO VERIFY SIZE OF OPENINGAND PROPER PREPARATION. REFER TOMANUFACTURER'S INSTALLATION INSTRUCTIONS
FOR PREPARATION OF OPENINGS IN STUD
DUCT
RETAINING ANGLE IN ACCORDANCE
INSTALLATION INSTRUCTIONS.WITH MANUFACTURER'S
1" (25mm) OVERLAP
INSTALLATION INSTRUCTIONS.
CENTRE LINE
INSTALLATION INSTRUCTIONS.ACCORDANCE WITH MANUFACTURER'SFASTEN COLLAR TO DAMPER IN
FASTEN ANGLE TO COLLAR IN
COLLAR
MAXIMUM 1/2" (13mm) SPACE FOR EXPANSION
ACCORDANCE WITH MANUFACTURER'S
DUCT WITH BREAKAWAY CONNECTIONTO COLLAR AND FILLER PIECE AT BLADEHEADE
FASTEN ANGLE TO COLLAR INACCORDANCE WITH MANUFACTURERSINSTALLATION INSTRUCTIONS
MAXIMUM 1/2" (13mm) SPACEFOR EXPANSION
CENTRE LINE OF DAMPER
FASTEN COLLAR TO DAMPER INACCORDANCE WITH MANUFACTURERSINSTALLATION INSTRUCTIONS
RETAINING ANGLE IN ACCORDANCEWITH MANUFACTURERSINSTALLATION INSTRUCTIONS
STAINLESS STEEL SPRING CLOSURE
SLEEVE
COLLAR
1" (25mm)OVERLAP
DUCT
4. INSTALL DAMPER SQUARE AND PLUMB.
TO ENSURE FREE MOVEMENT.8. CYCLE DAMPER AFTER INSTALLATION
OR DAMPER DIRECTLY TO WALL.
5. DO NOT CAST DAMPER IN PLACE.
6. DO NOT CAULK OR SEAL DAMPERTO WALL. ENSURE THAT EXPANSION
7. DO NOT FASTEN RETAINING ANGLES
CLEARANCES ARE KEPT.
3. INSTALL DAMPER IN PLANE OF FIRE SEPARATION.
NOTES:
1. FIRE DAMPERS TO BE INSTALLED IN STRICT ACCORDANCE WITH MANUFACTURER'S
INSTALLATION INSTRUCTIONS.
2. INSPECT FLOOR OPENINGS PRIOR TO DAMPERINSTALLATION TO VERIFY SIZE OF OPENINGAND PROPER PREPARATION. REFER TOMANUFACTURER'S INSTALLATION INSTRUCTIONS
DUCT COLLAR
BREAKAWAY JOINT
DUCT
MAXIMUM 1/2" SPACE FOR EXPANSION
FASTEN COLLAR TO DAMPER INACCORDANCE WITH MANUFACTURER'SINSTALLATION INSTRUCTIONS.
INSTALLATION INSTRUCTIONS.WITH MANUFACTURER'SRETAINING ANGLE IN ACCORDANCE
1. FIRE DAMPERS TO BE INSTALLED IN STRICTACCORDANCE WITH MANUFACTURER'SINSTALLATION INSTRUCTIONS.
2. INSPECT FLOOR OPENINGS PRIOR TO DAMPERINSTALLATION TO VERIFY SIZE OF OPENINGAND PROPER PREPARATION. REFER TOMANUFACTURER'S INSTALLATION INSTRUCTIONSFOR PREPARATION OF OPENINGS IN STUDFRAMED PARTITIONS OR WALLS.
3. INSTALL DAMPER IN PLANE OF FIRE SEPARATION.
4. INSTALL DAMPER SQUARE AND PLUMB.
5. DO NOT CAST DAMPER IN PLACE.
6. DO NOT CAULK OR SEAL DAMPER TO WALLENSURE THAT EXPANSION CLEARANCES ARE KEPT.
7. DO NOT FASTEN RETAINING ANGLES OR DAMPERDIRECTLY TO WALL.
8. CYCLE DAMPER AFTER INSTALLATION TO ENSUREFREE MOVEMENT.
NOTES:
32Ø 19Ø
T T T
DW
HS
DC
WS
DH
WR
NA
TUR
AL
GA
SG
GWH-1
INSTANTANEOUSWATER HEATER
DIRT POCKET
50Ø
AQUASTAT
P-1
TEMPERATURE ANDPRESSURE RELIEF VALVE
TIMER
TO SERVICE SINK
S.A. ARMSTRONGAST.5 (OR EQUAL)EXPANSION TANK
FOR LOCATIONS OF VOLUME DAMPERSREFER TO FLOOR PLAN FOR
1-1/2 D
CV 1-1/2
C
NOTEV = 1-1/2 C + 2"C & D ARE AS NOTED ON FLOOR PLAN
P
P
150Ø
150Ø POTABLE WATER SERVICEFROM VALVE CHAMBER
PVC SS
STAIRWELL
100x150
150x32 RED
150-UW-SS
100x150
BY DIV. 11 BY DIV. 15
TO FD
150 SERVICE WATER
32 POTABLE WATER
REDUCED PRESSUREBACKFLOW PREVENTERS
FLOOR ELEV. 204.55
SEE MEC. DWGS
WATER METERBY DIV. 11
TO FD
BY
DIV
. 15
BY
DIV
. 11
PROJECT
CLIENT
CONSULTANT
KEY PLAN
ISSUE/REVISION
SHEET NUMBER
SHEET TITLE
PROJECT NUMBER
ISSUED FOR TENDER
Last
Plo
tted:
File
nam
e:
Printed on ___% Post-ConsumerRecycled Content Paper
Proj
ect M
anag
emen
t Ini
tials
:Des
igne
r:C
heck
ed:
Appr
oved
:IS
O A
1 59
4mm
x 8
41m
m
2345
12345
D
C
B
A
1
ELGIN AREA WATERSUPPLY SYSTEM
AECOM250 York Street, Suite 410London, Ontario N6A 6K2519.676.0510 tel 519.673.5975 faxwww.aecom.com
235 North Centre Road, Suite 200 LondonOntario N5X 4E7519.930.3505 tel 519.474.0451 faxwww.watersupply.london.ca
2013-10-090
10/4
/201
3 9:
15:5
0 AM
C:\U
sers
\koh
lers
\Doc
umen
ts\R
evit
Loca
l File
s\60
2464
77-M
OD
-30-
0000
-M-C
F_ko
hler
s.rv
t
MANAGEMENT
43665 Dexter Line
FACILITY
RESIDUALS
Central Elgin, Ontario N0L 2L0
ELGIN AREA WATER TREATMENT PLANT
MECHANICAL SCHEMATICS ANDDETAILS
M611
60246477
Che
cker
Des
igne
rAp
prov
er
M611 SCALE: 1 : 1
5 DETAIL - SUPPLY TAP-IN CONNECTION
M611 SCALE: 1 : 1
2 DETAIL - RETURN TAP-IN CONNECTIONM611 SCALE: N.T.S
3 DETAIL - SPLITTER DAMPER
M611 SCALE: 1 : 1
4DETAIL - TYPE B FIRE DAMPERINSTALLATION VERTICAL
M611 SCALE: 1 : 1
1DETAIL - TYPE B FIRE DAMPERINSTALLATION HORIZONTAL
M611 SCALE: N.T.S
7DETAIL - SIDE WALL FIRE DAMPERINSTALLATION
M611 SCALE: N.T.S
9DETAIL - SCHEMATIC OF GAS-FIREDWATER HEATER
M611 SCALE: N.T.S
6 DETAIL - CONICAL TEE CONNECTION
M611 SCALE: N.T.S
8 SCHEMATIC - PLANT SERVICE WATER
I/R DATE DESCRIPTION
60246477-Elgin RMF_M600s_2013-10-04_Rev0 For TENDER.pdf