    Building Permits

    Frequently Asked Questions:What is a Building Permit? Why is it important? 3

    When is a Building Permit required? 4

    Building Permit Process Flowchart 5

    Preparing a Building Permit Application:An explanation o the by-laws, applicable law and otherrequirements that residents and contractors must complywith when applying or a residential Building Permit:

    Plan and Build eServices Centre 6

    Zoning By-law 6

    Committee o Adjustment 6

    Applicable Law 7

    Additional Considerations 7

    Designers/Design Firms:Provincial Qualications and Registration 8

    Designers: Summary o Requirementsunder the Ontario Building Code 9

    Drawing Requirements

    Drawing Requirements 10 Site Plan 10

    Floor Plan 11

    Foundation/Basement Plan 11

    Roo Framing Plan 11

    Exterior Elevations 12

    Cross Sections 19

    Drawing Requirements: Sample Drawings

    Plan Drawings 13

    Sample Site Plan 13

    Sample Basement Plan 14

    Sample First Floor Plan 15

    Sample Roo Framing Plan 16

    Sample Exterior Elevations 17-18

    Cross Section Drawings 19

    Sample Cross Sections, Decks 20

    Sample Cross Sections, Walls 21

    Sample Cross Sections, Other 22

    Construction Notations

    Sample Construction Notations 23

    Mechanical Drawings 24

    Sample HVAC, Basement 25

    Sample HVAC, First Floor 26

    Grading Requirements 27

    Grading Requirements, chart 27

    ApplicationsSubmitting a Building Permit Application 28

    A Complete Building Permit Application 29

    An Incomplete Building Permit Application 29

    Inspections

    Calling or Inspections 30

    Building By-Law 255-05 Schedule E Prescribed Notices/Inspections, chart 31

    Inspection Stages or Housing, fowchart 32

    Other Inspections 33

    Contacts

    Contact Inormation: Municipal 34

    Contact Inormation: Other Agencies 35

    Building Permit Checklist /Notes

    Checklist/Notes 36

    This guide explains the process o applying or

    a building permit rom the City o Mississaugaor construction projects o residential use.These projects include the construction o,additions to and alterations o, single amilydwellings, decks, sheds, gazebos, cabanas andother small buildings o residential use whichare not more than 3 storeys in building heightand not more than 600m2 in building area.

  • 7/29/2019 Residential Building Permit Guide PDF(1)

    4/38

    ResidentialUse

    Frequently asked questions

    What is a Building Permit?

    Under the Ontario Building Code Act, it is unlawul oranyone to start any construction or demolition work beoreobtaining a permit A Building Permit is legal permission tobegin construction or demolition

    Building Permits are issued by the Building Division,Planning and Building Department

    Why is it Important?

    Building Permits ensure that local zoning by-laws, lie,health, structural saety standards and other applicablelaw are met Construction regulations dictate what typeso construction are allowed in the community and ensurethat the construction meets minimum building standardsto saeguard the lie, health and saety o the buildingsoccupants

    The Building Permit Process protects each homeownersinterests, as well as the interests o everyone in thecommunity

    By obtaining a Building Permit, homeowners, designers andcontractors have access to the proessional expertise o theCitys Building Division sta or assistance with design andconstruction issues

    Typically, the designer or contractor will obtain theBuilding Permit However, it is ultimately the homeownersresponsibility to ensure that a Building Permit is obtainedwhen required and that the construction complies with allregulations and by-laws

    When is a Building Permit required?

    Under the Ontario Building Code Act, a Building Permit isrequired or the construction or alteration o any structuregreater than 10m2 (10764 t2) in area

    For every property in the City o Mississauga,The Zoning By-law species what permitted uses andregulations apply such as setbacks, coverage, height, andsize o buildings or structures

    The Zoning By-law requirements apply to ALLconstruction, regardless o whether or not a Building

    Permit is required under the Ontario Building Code Act

    Please see page 4 or more details.

  • 7/29/2019 Residential Building Permit Guide PDF(1)

    5/38

    ResidentialUse

    When is a Building Permit required?

    A Building Permit ISrequired to:

    Construct/demolish a house or addition to an existinghouse

    Construct/demolish an attached or a detached garage

    Construct a deck greater than 10m2 (10764 t2) in areaand all decks attached to the house which are greater than600mm (2 t) above adjacent grade

    Construct a porch or a balcony

    Construct a basement walkout

    Construct/demolish a detached accessory structure greaterthan 10m2 (10764 t2)

    Construct a heated or unheated sunroom

    Erect tents greater than 60m2 or all tents erected within30 m o a building

    Construct roong with structural work (ie- adding newdormers, skylights)

    Create new openings or, or increase the size o, doors andwindows

    Excavate a basement to increase existing headroom/underpinning oundation walls

    Install, change, remove or repair load-bearing walls andother structural components

    Install or modiy HVAC systems

    Install, replace or repair plumbing, drain, sewer systems

    Construct a chimney serving a solid uel re appliance

    Change a buildings use

    Install, replace or repair a private sewage system

    Replace a urnace that is changing uel type, eciency orcapacity

    Install a gas replace as a heating appliance

    Fire damage repair (structural & mechanical)

    A Building Permit IS NOTrequired to:

    Construct/demolish a detached accessory structure under10m2 (10764t2) with no plumbing and with a maximumheight o 30m (ie garden/utility shed/gazebo)

    Construct/demolish an uncovered deck less than 10m2(10764t2) and less than 600mm (2 t) above adjacent grade

    Construct/demolish a non load-bearing basement wall (ienishing basement with no plumbing or HVAC)

    Replace doors and/or windows that are the same size as the

    existing

    Install siding on a house, garage or accessory building

    Re-shingle a roo

    Install eavestroughs, provided the drainage is containedwithin the property

    Damp-proo basements

    Paint or decorate

    Install kitchen or bathroom cupboards without plumbing

    Carry out minor repairs to masonry

    Erect a ence

    Carry out landscaping work

    Add on air conditioning to an existing HVAC system

    Install a decorative gas replace

    Fire damage repair (non-structural & non-mechanical)

    Note: Building permits are not required or residential poolsserving 6 or ewer residential housing units, however a PoolEnclosure Permit is required and can be obtained rom the

    Compliance and Licensing Section, By-law EnorcementDivision o the Transportation and Works Department locatedon the Ground Floor o the Civic Centre.

  • 7/29/2019 Residential Building Permit Guide PDF(1)

    6/38

    ResidentialUse

    Building Permit Process Flowchart

    Submitting a COMPLETE*Building Permit Application

    Application Reviewed by

    BuildingArchitectural/Structural

    MechanicalPlumbing/HVAC

    DevelopmentConstruction

    Zoning

    Preparing a Building Permit Application

    Submitting a INCOMPLETE*Building Permit Application

    Application DOES satisfyall conditions for approval

    Application DOES NOT satisfyall conditions for approval

    Application Status ReportProvided to Applicant

    Building PermitIssuance

    Call forInspections

    Application Revisionand Resubmission

    Recirculation, Consultation

    and further Revisions

    Application ReviewFinalized

    Building Permit Process Flowchart*

    *Note: An application is consideredComplete

    i all required orms and documents have beensubmitted and all permit ees have been paid.I Complete the application will be processedwithin 10 business days as specied in theOntario Building Code. Applications that donot have all the required documents and ormsare considered Incomplete and are not subjectto timelines specied in the Ontario Building Code.

    Shaded cellsare urtherdetailed in thispublication

  • 7/29/2019 Residential Building Permit Guide PDF(1)

    7/38

    ResidentialUse

    Preparing a Building Permit Application

    Plan and Build eServices Centre

    The City o Mississauga is known as the city most

    connected to its residents and clients through its

    innovative and award winning website -- the eCity

    Web Portal

    The eCity Web Portal allows everyone to go to the

    Citys Plan and Build eServices Centre to accessPlanning and Building Department services online,

    providing Building Permit Applicants with the ability

    to manage their building applications at any time

    rom the convenience o their oces or home

    computers through eatures like:

    View Building Permit Application Status

    View Development Application Status

    Schedule Inspections

    My Applications

    Applicants are encouraged to register and set up a

    portal account to best use all the eatures available

    through the Planning and Building eService Centre

    In addition to these eatures applicants can access

    a wealth o inormation and services pertaining to

    property, building and the building permit process

    For example, applicants can download required orms;

    access an FAQ section, view online maps and Ocial

    Plans, research the Zoning and Building By-laws, review

    ee schedules and a host o other services, publications,articles and links

    Applicants will have real time access to application

    status inormation thus acilitating a quicker application

    review process

    Visitwww.mississauga.ca/portal/services/planbuild

    to learn more about online services

    Zoning By-Law

    The Zoning By-law species the permitted uses

    and regulations or each property within the City o

    Mississauga Zoning regulations include items such

    as the use o land and buildings, building setbacks to

    property lines, maximum height or size o buildings/

    structures A Building Permit may only be issued

    when an Applicant has complied with all Zoning By-law

    regulations

    The specic zoning designation o a property and the

    relevant section(s) o the Zoning By-law can be obtained

    in a number o ways:

    1) the Zoning By-law is accessible on the City oMississaugas website atwww.mississauga.ca/portal/residents/ofcialdocuments

    2) inormation on Zoning is available rom Permit

    Administration at the Building Division Counter onthe 9th Floor o City Hall

    3) by calling the Zoning Section at905-896-5581

    Committee o Adjustment

    Approval o Exceptions to the Zoning By-law

    I it is not possible to meet one or more o the

    Zoning By-law regulations, a separate application

    to the Committee o Adjustment is necessary The

    Committee o Adjustment, appointed by City Council

    and authorized by the Ontario Planning Act to grantminor variances, will make a decision on the merits

    o the application and may approve a minor variance

    to the Zoning By-law, thereby amending the Zoning

    regulation that applies to the property

  • 7/29/2019 Residential Building Permit Guide PDF(1)

    8/38

    ResidentialUse

    Applicable Law

    In addition to the Zoning By-law, compliance to other

    Applicable Law may be required Approvals rom

    outside agencies may also be required prior to the

    issuance o a Building Permit

    The most common additional approvals or residential

    construction are as ollows:

    Site Plan Approval rom the Development and Design

    Division o the Planning and Building Department maybe required in certain areas o the City building permitdrawings must correspond exactly with the approved siteplan drawings;

    Conservation Authority Approval required i theproperty is located within, or adjacent to, a food plain or awatercourse as per conservation mapping;

    Heritage Approval required i the property is designatedas a heritage building or i the property has intent todesignate notication applied to it

    A complete index o Applicable Law is listed on the

    Applicable Law Form (newly integrated with thePrescribed Building Permit Application Forms) and

    accessible either on line through the eServices Plan

    and Build Forms Centre, or available rom Permit

    Administration at the Building Division Counter on

    the 9th Floor o City Hall

    For urther inormation about Applicable Law

    and to view the Applicable Law Contact list visit

    www.ontario.ca/buildingcode

    Additional Considerations

    Other items to be aware o when preparing an

    application or Building Permit are:

    Tree By-law controls the number and size o trees thatmay be removed rom site;

    Road Occupancy/Lot Grading/Municipal Services By-law requires rectiying any damage caused by construction toa highway, sidewalk, curb, boulevard, or other municipalservice or lands, and any deposit, throw, spill or track o

    any material, waste or soil onto a highway

    Note: Addresses and telephone numbers are located at

    the back o this booklet. City By-laws can be viewed at

    www.mississauga.ca/portal/cityhall/bylaws

    Preparing a Building Permit Application

  • 7/29/2019 Residential Building Permit Guide PDF(1)

    9/38

    ResidentialUse

    Preparing a Building Permit Application

    Designers/Design Firms

    Provincial Qualifcations and Registration

    IMPORTANT NOTE!

    An Owner o a property is permitted to design

    a residential project intended or their own use

    and is exempt rom compliance to the Provincial

    Qualications and Registration requirements as set out

    by the Ontario Building Code

    Architects are qualied and registered by the Ontario

    Association o Architects and are not required to be

    registered or qualied with the Ministry o Municipal

    Aairs and Housing

    I a designer /design rm is hired to provide design

    services, a Building Permit cannot be issued i the

    designer/design rm are not qualied and/or

    registered For more inormation about Provincial

    Qualication and Registration, please visit

    www.ontario.ca/buildingcode

    When employing the services o a designer/design

    frm the ollowing needs to be considered:

    Designers:

    are individuals who prepare designs or give inormation/opinions about whether a building or part o a buildingcomplies with the Building Code, where such inormationis submitted as part o a permit application

    must be Qualied (unless exempted under the BuildingCode)

    to become Qualied, successul completion o theMinistry o Municipal Aairs and Housing examinationprogram in area(s) o practice is required

    to become Qualied, examination inormation must beled with the Director o the Building and DevelopmentBranch o the Ministry o Municipal Aairs and Housing

    can only carry out design activities in areas o practiceor which the required Qualications have been obtained

    hold a BCIN (Building Code Identication Number)

    Design Firms:

    are architectural, engineering or interior design consultantsthat are engaged in the business o providing designactivities to the public

    must be Registered (unless exempted under the BuildingCode)

    to become Registered, a Design Firm must ensurethat all persons working in the rm who will review andtake responsibility or design activities have successullycompleted the examination program or area(s) o practice

    to become Registered, a Design Firm must le itsqualication inormation with the Director o the Buildingand Development Branch o the Ministry o MunicipalAairs and Housing

    to become Registered, a Design Firm must carry insurance,as required by subsection 362 o Division C o theOntario Building Code

    hold a BCIN (Building Code Identication Number)

  • 7/29/2019 Residential Building Permit Guide PDF(1)

    10/38

    ResidentialUse

    Summary o Requirements or Designers

    under the Ontario Building Code

    Designer Requirements*

    Class of Building Designed By Q R Design Scope Category of Qualification

    House Owner Architectural House

    Tarion Builder*1 Y Structural House

    Designers Y Y*2 Plumbing Plumbing - House

    Including extension, *1 applicable only to new buildings HVAC HVAC - House

    alteration or repair *2 applicable only to architectural/structural designers of newbuildings

    Q = Qualification R = RegistrationY = Indicates Requirement

    Class of Building Designed By Q R Design Scope Category of QualificationSmall Building Owner Y Architectural Small Buildings

    Tarion Builder* Y Structural Building Structural

    Designers Y Y Plumbing Plumbing All Buildings

    HVAC Building Services

    Fire Sprinklers Fire Protection orProtection Standpipes Building Services

    Fire Alarm Fire Protection orEmergency Building Services orLighting, Power Detection, Lighting, Power

    Including extension, *applicable only to new buildingsalteration or repair

    Miscellaneous Projects Designed By Q R Category of Qualification

    Accessory Building

    Serving House class of Any person N/Abuilding > 10m & < =50m

    Accessory Building

    Serving House class ofOwner

    building > 50m & < =600m Designer Y House

    TentsDescribed in 3.14.1.2.(2) of Any person N/ADivision B

    TentsNot exempted by 1.3.1.1.(5)

    Any person Y Y Building Structuralof Division C & not describedin 3.14.1.2.(2) of Division B

    Site Services Any person N/A

    On-Site Sewage Systems Owner N/A

    Registered Installer N/A

    Designer Y Y On Site Sewage SystemsIncidental Appliances

    Any person N/A& Equipment

    Pre-Engineered Elements Competent person N/A

    Demolition Professional EngineerN/A

    Buildings described in General review1.3.1.1.(5) of Division C

    DemolitionBuildings not described in Any person N/A1.3.1.1.(5) of Division C

    Notes:

    1. Registeredmeans registered with the Director o the Building

    and Development Branch o the Ministry o Municipal Aairsand Housing in accordance with Article 3.2.4.2. o Division C.

    2. Qualifedmeans that the designer has successully completed the

    examination program administered by the Ministry o Municipal

    Aairs and Housing in the category o qualifcation set out in

    Section 3.5. o Division C o the Ontario Building Code.

    3. Categories o Qualifcationreers to those categories listed in

    Table 3.5.2.1 o Division C o the Ontario Building Code

    4. Designermeans a person who is engaged in activities as

    described in Subsection 15.11- (5) o the Building Code Act.

    5. Housemeans a detached house, semi-detached house,

    townhouse or row house containing not more than

    2 dwelling units per house.

    6. Small Buildingo residential use means a building which is

    not more than 600m2 in building area and not more than

    3 storeys in building height.

    7. Tarion Buildermeans a builder who is registered under the

    Ontario New Home Warranties Plan Act. TARIONadministers

    the Ontario New Home Warranties Plan Act. TARIONregisters

    new home builders and vendors, enrols new homes or warranty

    coverage, investigates illegal building practices, resolves warranty

    disputes, and promotes high standards o construction among

    Ontarios new home builders.

    This summary

    has been

    developed for

    convenience

    purposes

    only.

    Reference

    should always

    be made to theRegulations.

  • 7/29/2019 Residential Building Permit Guide PDF(1)

    11/38

    ResidentialUse

    10

    Drawing Requirements

    Drawing Requirements

    Along with the ully completed Building Permit

    Application Forms, two (2) copies o the ollowing

    drawings are required to be submitted:

    Site Plan

    Floor Plans

    Exterior Elevations

    Cross Sections

    Mechanical Drawings

    Site Plans must be dimensioned in metric units

    All other plans must be drawn to scale and ully

    dimensioned in either metric or imperial units

    IMPORTANT NOTE!

    Eective January 1, 2006, the Ontario Building Code

    requires Designers to provide inormation about their

    Registration, Qualication, and design responsibility on

    every document submitted or a Building Permit

    The inormation presented in the template below is

    required on every sheet o a set o drawings as well as on

    at least one page o every submitted document such as

    specications, eld review reports etc

    The ollowing SAMPLE plans provide an example o

    the set o drawings typically required or an addition

    to a house

    Site Plan

    A Site Plan shows the location o the proposed

    construction and any other accessory structures in

    relation to the property lot lines

    The ollowing inormation shall be included on theSite Plan:

    Scale (metric only)

    Direction (North arrow)

    Municipal address

    Legal description (lot and plan numbers)

    Existing buildings and accessory structures(pools, sheds, etc)

    Dimensioned property lines with setbacks to all new andexisting structures

    Proposed construction (outline new construction romexisting)

    Overall building dimensions

    Rights-o-way and easements

    Landscaped areas and hard suraces such as driveways

    Site Statistics (lot area, coverage, gross foor area,height, etc)

    The undersigned has reviewed and takes responsibility for

    this design, and has the qualifications and meets the require-

    ments set out in the Ontario Building Code to be a designer.

    QUALIFICATION INFORMATION- Required unless design is exemptunder 3.2.5 .1 of Division C of the Ontario Building Code

    NAME BCIN SIGNATURE

    QUALIFICATION INFORMATION- Required unless design is exemptunder 3.2. 4.1 of Division C of the Ontario Building Code

    FIRM NAME BCIN

  • 7/29/2019 Residential Building Permit Guide PDF(1)

    12/38

    ResidentialUse

    11

    Drawing Requirements

    Floor Plans

    Floor plans show the layout o the house and include

    a oundation/basement plan, a raming plan or each

    foor and a roo raming plan

    Inormation required to be included on

    ALL Floor Plans

    Direction (North arrow)

    Title and scale

    Use and size o rooms and spaces

    Interior and exterior dimensions, including door andwindow sizes

    Structural raming indicating the size, type, grade, spacing,direction o span and location o all structural members(joists, beams, posts and lintels, as well as engineered foormembers when applicable)

    Location o required smoke alarms and carbon monoxidedetectors

    Location o plumbing xtures

    Floor drains and ventilation provisions

    Section marks

    Foundation/Basement Plan

    All inormation mentioned under ALL Floor Plans, plus:

    Soil bearing capacity

    Size, thickness and material specications o oundationwalls and ootings

    SDF = step down ooting locations

    Size, spacing and ooting specications o interior load-bearing walls and columns

    Concrete slab and granular ll thickness and materialspecications

    Size and grade o steel beams and columns

    Roo Framing Plan

    The applicable inormation mentioned under ALL FloorPlans, plus:

    Roo slopes

    Roo space ventilation

    Location o skylights and surrounding raming

    Size, grade and spacing o roo raters, roo joists (icathedral or fat), ceiling joists, collar ties and ridge

    supports or conventional roo raming

    When applicable, spacing and direction o span oengineered roo trusses

    Location o girder trusses and beams

    Building Designers statement o roo truss systemcoordination with architectural/structural drawings

    IMPORTANT NOTE!

    I using an engineered roo truss system, two copies o theroo trusses specications rom the manuacturer/supplier,bearing the seal and signature o an Ontario registered

    Proessional Engineer, together with the roo raminglayout are required with the building permit application

    I using an engineered foor system, two copies o thefoor raming layouts and design specications rom themanuacturer/supplier are required with the buildingpermit application only when the architectural/structuralfoor plans are not signed and sealed by an Ontarioregistered Structural Proessional Engineer

    The foor system package provided by the manuacturer/supplier would require a Proessional Engineer seal andsignature on all specication sheets pertaining to structuraldesign o members subject to point loads

  • 7/29/2019 Residential Building Permit Guide PDF(1)

    13/38

    ResidentialUse

    1

    Drawing Requirements

    Exterior Elevations

    Exterior elevations are side views o the house They are

    required or all new construction and any other project

    that aects the exterior o an existing building

    Elevations are required or each side o the project and

    shall include the ollowing inormation:

    Title and scale

    Grade level

    Existing and proposed work

    Finished foor levels

    Vertical dimensions

    Exterior wall cladding, nishes and fashing

    Sizes and location o windows and doors

    Roo overhang and dimensions

    Roo shape, slope and nish

    Height o chimneys

    Rain water leaders and eavestroughs

    The percentage o glazed areas relative to exposedbuilding ace calculations

    Cross Sections

    Please see pages 19 to 22

    Construction Notations

    Please see page 23

    Mechanical Drawings

    Please see page 24 to 27

  • 7/29/2019 Residential Building Permit Guide PDF(1)

    14/38

    ResidentialUse

    1

    Sample Only

    Drawing Requirements:

    Sample Drawing, Site Plan

    The undersigned has reviewed and takes responsibility for

    this design, and has the qualifications and meets the require-

    ments set out in the Ontario Building Code to be a designer.

    QUALIFICATION INFORMATION- Required unless design is exemptunder 3.2.5.1 of Division C of the Ontario Building Code

    NAME BCIN SIGNATURE

    QUALIFICATION INFORMATION- Required unless design is exemptunder 3.2.4.1 of Division C of the Ontario Building Code

    FIRM NAME BCIN

  • 7/29/2019 Residential Building Permit Guide PDF(1)

    15/38

    ResidentialUse

    1

    Sample Only

    Drawing Requirements:

    Sample Drawing, Basement Plan

    The undersigned has reviewed and takes responsibility for

    this design, and has the qualifications and meets the require-

    ments set out in the Ontario Building Code to be a designer.

    QUALIFICATION INFORMATION- Required unless design is exemptunder 3.2.5.1 of Division C of the Ontario Building Code

    NAME BCIN SIGNATURE

    QUALIFICATION INFORMATION- Required unless design is exemptunder 3.2.4.1 of Division C of the Ontario Building Code

    FIRM NAME BCIN

  • 7/29/2019 Residential Building Permit Guide PDF(1)

    16/38

    ResidentialUse

    1

    Sample Only

    Drawing Requirements:

    Sample Drawing, First Floor Plan

    The undersigned has reviewed and takes responsibility for

    this design, and has the qualifications and meets the require-

    ments set out in the Ontario Building Code to be a designer.

    QUALIFICATION INFORMATION- Required unless design is exemptunder 3.2.5.1 of Division C of the Ontario Building Code

    NAME BCIN SIGNATURE

    QUALIFICATION INFORMATION- Required unless design is exemptunder 3.2.4.1 of Division C of the Ontario Building Code

    FIRM NAME BCIN

  • 7/29/2019 Residential Building Permit Guide PDF(1)

    17/38

    ResidentialUse

    1

    Sample Only

    Drawing Requirements:

    Sample Drawing, Roo Framing Plan

    The undersigned has reviewed and takes responsibility for

    this design, and has the qualifications and meets the require-

    ments set out in the Ontario Building Code to be a designer.

    QUALIFICATION INFORMATION- Required unless design is exemptunder 3.2.5.1 of Division C of the Ontario Building Code

    NAME BCIN SIGNATURE

    QUALIFICATION INFORMATION- Required unless design is exemptunder 3.2.4.1 of Division C of the Ontario Building Code

    FIRM NAME BCIN

  • 7/29/2019 Residential Building Permit Guide PDF(1)

    18/38

    ResidentialUse

    1

    Sample Only

    Drawing Requirements:

    Sample Drawing, Exterior Elevations, A

    Theundersignedhasreviewedandtakesresponsibility

    for

    thisdesign,andhasthequalificationsandmeetstherequire-

    mentssetoutintheOntarioBuildingCodetobeade

    signer.

    QUALIFICATIONINFORMATION-Requiredunlessdesignisexem

    pt

    under3.2.5.1ofDivisionCoftheOntarioBuildingCode

    NAME

    BCIN

    SIGNATURE

    QUALIFICATIONINFORMATION-Requiredunlessdesignisexem

    pt

    under3.2.4.1ofDivisionCoftheOntarioBuildingCode

    FIRMNAME

    BCIN

  • 7/29/2019 Residential Building Permit Guide PDF(1)

    19/38

    ResidentialUse

    1

    Sample Only

    Drawing Requirements:

    Sample Drawing, Exterior Elevations, B

    Theundersignedhasreviewedandtakesresponsib

    ilityfor

    thisdesign,andhasthequalificationsandmeetstherequire-

    mentssetoutintheOntarioBuildingCodetobeadesigner.

    QUALIFICATIONINFORMATION-Requiredunlessdesign

    isexempt

    under3.2.5.1ofDivisionCoftheOntarioBuildingCode

    NAME

    BCIN

    SIGNATURE

    QUALIFICATIONINFORMATION-Requiredunlessdesign

    isexempt

    under3.2.4.1ofDivisionCoftheOntarioBuildi

    ngCode

    FIRMNAME

    BCIN

  • 7/29/2019 Residential Building Permit Guide PDF(1)

    20/38

    ResidentialUse

    1

    Drawing Requirements

    Cross Sections

    Cross Sections

    Cross Sections are views through the proposed

    construction along an imaginary vertical cut line Cross

    sections illustrate various building components hidden

    in walls, foors or ceilings Several cross sections may be

    required at various locations to accurately describe the

    proposal The location o a cross section is identied on

    the foor plans by a section mark

    The ollowing inormation shall be represented on a

    cross section:

    Title and scale

    Size and type o ootings and oundation walls

    Distance rom grade to basement slab and underside oootings

    Finished foor levels and distance rom foor to foor

    Air/vapour barrier, damp proong, water proong and

    drainage layers

    Floor, roo, exterior and interior walls construction

    Insulation, R-values or walls, foors, basement and rooassemblies

    Attic and crawl space height, ventilation and access

    Fire resistance rating details o required re separationassemblies, i any

  • 7/29/2019 Residential Building Permit Guide PDF(1)

    21/38

    ResidentialUse

    0

    Sample Only

    Drawing Requirements:

    Cross Sections, Decks

    The undersigned has reviewed and takes responsibility for

    this design, and has the qualifications and meets the require-

    ments set out in the Ontario Building Code to be a designer.

    QUALIFICATION INFORMATION- Required unless design is exemptunder 3.2.5.1 of Division C of the Ontario Building Code

    NAME BCIN SIGNATURE

    QUALIFICATION INFORMATION- Required unless design is exemptunder 3.2.4.1 of Division C of the Ontario Building Code

    FIRM NAME BCIN

  • 7/29/2019 Residential Building Permit Guide PDF(1)

    22/38

    ResidentialUse

    1

    Drawing Requirements:

    Cross Sections, Walls

    Sample Only

    The undersigned has reviewed and takes responsibility for

    this design, and has the qualifications and meets the require-

    ments set out in the Ontario Building Code to be a designer.

    QUALIFICATION INFORMATION- Required unless design is exemptunder 3.2.5.1 of Division C of the Ontario Building Code

    NAME BCIN SIGNATURE

    QUALIFICATION INFORMATION- Required unless design is exemptunder 3.2.4.1 of Division C of the Ontario Building Code

    FIRM NAME BCIN

  • 7/29/2019 Residential Building Permit Guide PDF(1)

    23/38

    ResidentialUse

    Sample Only

    Drawing Requirements:

    Cross Sections, Other

    Theundersignedhasreviewedandtakesresponsibil

    ityfor

    thisdesign,andhasthequalificationsandmeetsthe

    require-

    mentssetoutintheOntarioBuildingCodetobeade

    signer.

    QUALIFICATIONINFORMATION-Requiredunlessdesignis

    exem

    pt

    under3.2.5.1ofDivisionCoftheOntarioBuilding

    Code

    NAME

    BCIN

    SIGNATURE

    QUALIFICATIONINFORMATION-Requiredunlessdesignis

    exem

    pt

    under3.2.4.1ofDivisionCoftheOntarioBuildingCode

    FIRMNAME

    BCIN

  • 7/29/2019 Residential Building Permit Guide PDF(1)

    24/38

    ResidentialUse

    Drawing Requirements:

    Construction Notations

    Sample Only

    The undersigned has reviewed and takes responsibility for

    this design, and has the qualifications and meets the require-ments set out in the Ontario Building Code to be a designer.

    QUALIFICATION INFORMATION- Required unless design is exemptunder 3.2.5.1 of Division C of the Ontario Building Code

    NAME BCIN SIGNATURE

    QUALIFICATION INFORMATION- Required unless design is exemptunder 3.2.4.1 of Division C of the Ontario Building Code

    FIRM NAME BCIN

  • 7/29/2019 Residential Building Permit Guide PDF(1)

    25/38

    ResidentialUse

    Mechanical Drawings

    Heating, Ventilation and Air Conditioning (HVAC)

    HVAC drawings, heat loss/heat gain calculations

    and duct calculations are required with the permit

    submission These are needed to ensure that the

    proposed HVAC system is adequate to heat and ventilate

    the building The urnace capacity is based on the heat

    loss calculations Duct calculations ensure proper sizing

    or the duct system that distributes air

    The ollowing inormation shall be included on the

    HVAC Drawings:

    Title and scale

    Direction (North arrow)

    Location o heating appliance(s) and ventilation equipment(exhaust ans, heat recovery ventilators) and theirspecications

    Duct layout showing all associated duct sizes, grille sizes,air volumes, etc

    Baseboard heaters (size and location), i any

    Radiant foor heating, i any

    Plumbing

    Separate plumbing design drawings are not required

    to be submitted or plumbing serving House class

    o building Designer qualication and registration

    inormation is also not required

    The xture locations that are shown on the

    architectural/structural drawings are sucient to carry

    out a plumbing review Sanitary and storm sewer invert

    elevations at the property line are required to be shown

    on the Site Plan

    The submission o a Water Receipt is required

    this is obtained rom the Region o Peel or proo o

    connection approval or all new water/sewer hook-ups

    Private Sewage Systems

    I the proposed construction is on a property that is

    or will be served by a septic system or is not serviced by

    municipal sewers, in addition to a Building Permit, a

    permit or the Private Sewage System may be required

    Three copies o sewage system drawings are required

    In addition to these drawings the ollowing supporting

    documentation is required:

    Sizing calculations

    Soil analysis report

    Site evaluation report

  • 7/29/2019 Residential Building Permit Guide PDF(1)

    26/38

    ResidentialUse

    Sample Only

    Mechanical Drawings:

    Sample HVAC, Basement

    The undersigned has reviewed and takes responsibility for

    this design, and has the qualifications and meets the require-

    ments set out in the Ontario Building Code to be a designer.

    QUALIFICATION INFORMATION- Required unless design is exemptunder 3.2.5.1 of Division C of the Ontario Building Code

    NAME BCIN SIGNATURE

    QUALIFICATION INFORMATION- Required unless design is exemptunder 3.2.4.1 of Division C of the Ontario Building Code

    FIRM NAME BCIN

  • 7/29/2019 Residential Building Permit Guide PDF(1)

    27/38

    ResidentialUse

    Sample Only

    Mechanical Drawings:

    Sample HVAC, First Floor

    The undersigned has reviewed and takes responsibility for

    this design, and has the qualifications and meets the require-

    ments set out in the Ontario Building Code to be a designer.

    QUALIFICATION INFORMATION- Required unless design is exemptunder 3.2.5.1 of Division C of the Ontario Building Code

    NAME BCIN SIGNATURE

    QUALIFICATION INFORMATION- Required unless design is exemptunder 3.2.4.1 of Division C of the Ontario Building Code

    FIRM NAME BCIN

  • 7/29/2019 Residential Building Permit Guide PDF(1)

    28/38

    ResidentialUse

    Grading Requirements

    Grading Requirements

    The Development Construction Section o the

    Transportation and Works Department may require

    grading approval prior to the issuance o a Building

    Permit The table below summarizes when lot grading

    certication, approval and/or lot grading deposits may

    be required

    Grading Requirements

    Is approval required? Construction Type Requirement

    3. Certification, approval and deposit

    WILL BE required:

    Grading plans and

    certificates are

    submitted to:

    Development Construction

    Transportation and Works Department3185 Mavis Road (2nd floor)

    Mississauga, Ontario L5C 1T7

    Tel: 905 615 3200 x5155Fax: 905 615-3060

    Transportation and Works Department3484 Semenyk Court

    Mississauga, Ontario L5C 4R1

    Tel: 905 615-3200 x4950

    Fax: 905 615-3172

    Address is subject to change.Please visit mississauga.ca/planbuild

    Deposit payments

    are to be made at:

    - New home

    - Major addition

    Provide five (5) certified grading plans

    (1 original and 4 copies) stamped, signedand dated by a Professional Engineer

    or Ontario Land Surveyor, including

    downspout and sump pump locationswhere applicable and a minimum $5,000

    lot grading deposit. All grading, elevation

    and drainage requirements will beadhered to as per specs.

    Is approval required? Construction Type Requirement

    1. Certification, approval & deposit

    is NOT required:

    Any structure on sono tubes containedto front and rear yard

    Decks

    Minor second storey additions with

    no new foundation(s)

    No grading requirements certificate,approval and deposit waived.

    Is approval required? Construction Type Requirement

    2. Certification, approval & deposit

    MAY BE required:

    First storey addition on new foundations

    Major second storey addition(s)

    Attached/Detached single or double car

    garage

    Basement Walkout

    Any structure on sono tubes located inthe side yard

    Provide site plan with grading details,

    foundation details/cross section,downspout and sump pump locations

    where applicable, need for lot gradingcertification and deposit to be determinedby Development Construction Section.

  • 7/29/2019 Residential Building Permit Guide PDF(1)

    29/38

    ResidentialUse

    Submitting a Building Permit Application

    Where can I submit my application?

    A Building Permit can be applied or in person during

    regular business hours, Monday to Friday, 8:30am to

    4:30pm, at at the Planning and Building Department,

    Building Division Counter located inside the Civic

    Centre at 300 City Centre Drive, 9th Floor

    During the summer months, the Building Division also

    oers the RAPID Service to homeowners The RAPID

    (Renovation andAddition PermitIssuance Days)

    program applies to small residential projects (such as:

    decks, porches, replaces, basement entrances, etc)

    and provides homeowners or their agents with

    extended hours o operation, rom 4:30pm to 7:00pm

    Visitwww.mississauga.ca/portal/services/planbuild

    or specic days and more inormation

    Using the Plan and Build eServices Centre, all

    Prescribed Building Application Forms can bedownloaded in either a Word document or a pd

    ormat These orms are required to be completed

    and signed or submission

    At the time o application, the Applicant will receive an

    Application Status Access Report This report contains

    the Application Inormation (such as: address, building

    permit number, scope o work, date o submission, etc),

    the Property Inormation (such as: legal description,

    etc) as well as theWEB ID access number

    With theWEB ID access number, the application status

    can be monitored on the Internet, or an inspection can

    be scheduled ater the Building Permit has been issued

    To learn more about how toView Building Permit

    Application Status or Schedule Inspections, reer to

    Managing Applications User Manual available online

    under APPLICATIONS/PERMITS MANUALS FOR

    CLIENTS

    Please be advised that it is the Applicants responsibility

    to maintain the privacy o the Application Status

    inormation.

    I the permit application satises all conditions or

    approval, the Building Permit will be issued ater all

    reviewing departments authorize its clearance

    I the permit application does not satisy all conditions

    or approval ater all initial plan review has been

    completed, an Application Status Report will be issued

    to the applicant

    Responding to the Application Status Report in a timely

    manner enables Building Division sta to expedite the

    issuance o the Building Permit.

  • 7/29/2019 Residential Building Permit Guide PDF(1)

    30/38

    ResidentialUse

    Complete and Incomplete Applications

    A Complete Building Permit Application

    Complete Applications are subject to review within

    the time periods specied in Table 1313, that orms

    part o Article 1313 o Division C o the Ontario

    Building Code

    Applications are considered Complete when the

    ollowing ve(5) conditions are met:

    1 The Owner o the property or a person authorized in

    writing by the Owner to apply or a permit on the Ownersbehal makes application or Building Permit;

    2 TheApplicable Law Formis completed and is accompaniedby supporting documentation that provides proo ocompliance to relevant Applicable Law;

    3 The Prescribed Building Permit Application Formsand allother orms required by the Building By-law are completedand signed

    4 Two (2) copies o all drawings, specifcations, and otherdocumentsthat establish compliance with the OntarioBuilding Code regulations and Zoning By-Law (as

    previously described) accompany the application;

    5 Building Permit Feesas prescribed in the City o MississaugaBuilding By-Law have been paid

    NOTE: An administration surcharge, equal to 25% o theBuilding Permit ee is applicable to Complete applicationsthat, through the review process, are deemed to be Incompleteapplications.

    An Incomplete Building Permit Application

    I some o the required documents as outlined in theSubmission o Complete Building Permit Applicationare not ready to be submitted, an applicant may chooseto proceed with an Incompleteapplication The City willprocess the application but it will not be subject to theturnaround timeline stated in the Ontario Building CodeInormation concerning turnaround times is updatedweekly on the website under the Estimated PermitApplication Processing Times

    When submitting an IncompleteBuilding Permit

    Application, in addition to all Prescribed Building PermitApplication Forms, the Applicant must complete and signanAcknowledgement by Applicant o Incomplete ApplicationForm.

    The Building By-law and ee schedules are available at

    www.mississauga.ca/portal/residents/eesandcharges

    All required orms are available or download at

    www.mississauga.ca/portal/residents/pbormscentre

  • 7/29/2019 Residential Building Permit Guide PDF(1)

    31/38

    ResidentialUse

    0

    Calling or Inspections

    Inspection Requirements

    Construction must start within 6 months rom the date theBuilding Permit was issued

    The homeowner or the contractor must notiy the BuildingInspection Groups at certain stages o construction asreerenced in the table on page 31

    The Building Permit must be posted on site and associateddrawings must be kept and maintained on the site oconstruction at all times

    Inspections can be arranged by accessing the eCity portal atwww.mississauga.ca/portal/services/scheduleinspectionsor by calling 905-896-5660 between the hours o 8:00am and4:00pm, at least 48 hours in advance

    The cost or these inspections is included in the BuildingPermit Fee

    Reer to Schedule E o the City o Mississauga Building

    Bylaw 255-05 or complete listings o mandatory and

    additional scheduled inspection requirements Reer topage 31

  • 7/29/2019 Residential Building Permit Guide PDF(1)

    32/38

    ResidentialUse

    1

    The Corporation o the City o Mississauga

    Building By-Law -0, Schedule E

    * Building means, BCA 1.(1)

    (a) a structure occupying an area greater than ten square metres consisting o a wall,roo and foor or any o them or a structural system serving the unction thereoincluding all plumbing, works, xtures and service systems appurtenant thereto,

    Prescribed Notices/InspectionsNotice / Inspection

    Footing Division C 1.3.5.1.(2)(a) Readiness to construct footings

    Backfill Division C 1.3.5.1.(2)(b) Substantial completion of footings and foundationsprior to commencement of backfilling.

    Framing Division C 1.3.5.1.(2)(c) Substantial completion of structural framing, if the building is withinthe scope of Division B Part 9.

    HVAC Rough-In Division C 1.3.5.1.(2)(c) Substantial completion of ductwork and piping for heating and airconditioning, if the building is within the scope of Division B Part 9.

    Insulation Division C 1.3.5.1.(2)(e) Substantial completion of insulation, vapour barriers and air barriers.

    Fire Separations Division C 1.3.5.1.(2)(f) Substantial completion of all required fire separations and closures.

    Fire Protection Systems Division C 1.3.5.1.(2)(f) Substantial completion of all fire protection systems includingstandpipe, sprinkler, fire alarm and emergency lighting systems.

    Fire Access Routes Division C 1.3.5.1.(2)(g) Substantial completion of fire access routes.

    Building Sewers Division C 1.3.5.1.(2)(h)(i) Readiness for inspection and testing of building sewers.

    Building Drains Division C 1.3.5.1.(2)(h)(i) Readiness for inspection and testing of building drains.

    Water Service Pipe Division C 1.3.5.1.(2)(h)(ii) Readiness for inspection and testing of water service pipe.

    Fire Service Main Division C 1.3.5.1.(2)(h)(iii) Readiness for inspection and testing of fire service main.

    Plumbing Rough-in - DWV Division C 1.3.5.1.(2)(h)(iv) Readiness for inspection and testing of drainage systems andventing systems.

    Plumbing Rough-in Water System Division C 1.3.5.1.(2)(h)(v) Readiness for inspection and testing of the water distribution system.

    Plumbing Final Division C 1.3.5.1.(2)(h)(vi) Readiness for inspection and testing of plumbing fixtures andplumbing appliances.

    Pool/Spa Circulation/Recirculation System Division C 1.3.5.1.(2)(j) Substantial completion of the circulation/recirculation system of anoutdoor pool described in Clause 1.3.1.1.(1)(j) of Division A, a public

    pool or a public spa.

    Sewage System Excavation Division C 1.3.5.1.(2)(k) Readiness to construct the sewage system.

    Sewage System Completion Division C 1.3.5.1.(2)(l) Substantial completion of the installation of the sewage systembefore the commencement of backfilling.

    Site Services Division C 1.3.5.1.(2)(m) Substantial completion of installation of plumbing not located in astructure before the commencement of backfilling.

    Occupancy Prior to Completion Division C 1.3.5.1.(2)(n) Completion of construction and installation of components required topermit the issue of an occupancy permit under Sentence 1.3.3.1.(2) ofDivision C or to permit occupancy under Sentence 1.3.3.1.(1) of Division C,if the building or part of the building to be occupied is not fully completed.

    OBC 1.3.5.1.(2) /1.3.5.3.(1)

    of Division C

    OBC Reference Description

    Final Completion of Occupied Division C 1.3.3.3.(1) Completion of the building where a personUnfinished Building has occupied or permitted the occupancy under Section 1.3.3.

    of Division C- Occupancy of Unfinished Building.

    Final Completion of Building* BCA Section 11 Completion of the building or part prior to occupancy or use.

    (b) a structure occupying an area o ten square metres or less that containsplumbing, including the plumbing appurtenant thereto,

    (c) plumbing not located in a structure,

    (c.1) a sewage system; or

    (d) structures designated in the building code.

  • 7/29/2019 Residential Building Permit Guide PDF(1)

    33/38

    ResidentialUse

    Inspection Stages or Housing

    Building

    1. Footing

    3. Backfill of Foundation

    Inspection Stages for Housing

    7. Framing

    9. Building Occupancy

    10. Building Final

    Plumbing

    Building Sewers,Water Service Pipe

    5. Inside Building Drains

    9. Plumbing Occupancy

    10. Plumbing Final

    9. HVAC Occupancy

    10. HVAC Final

    HVAC

    2. Below GradeInsulation

    4. Outside Services

    Drain, waste, ventand water

    6. Plumbing Rough In 6. HVAC Rough In

    House, Floor overGarage, Overhangs

    8. Insulation

  • 7/29/2019 Residential Building Permit Guide PDF(1)

    34/38

    ResidentialUse

    Other Inspections

    Other Inspections to be considered

    I the property is subject to Site Plan Approval or isunder Site Plan Control, inspections o the site works arerequired Upon completion o all site works includinggrading, sodding and driveways, the applicant is to contactthe Landscape Architectural Technologist to arrange a siteinspection Contact the Development and Design Divisiono the Planning and Building Department at 905-896-5511or urther inormation

    I the property is subject to Lot Grading Approval,a Pre-Grade inspection is required prior to the issuance

    o the Building Permit A nal grading inspection isrequired beore the Building Permit can be signed oContact Development Construction o the Transportationand Works Department at 905-615-3200 ext 5155 orurther inormation

    I applicable, contact the Urban Forestry Unit to inspectthe completed site works or the release o securities heldor City owned tree preservation To arrange an inspectioncall 905-615-4100

    There are outside agencies that require inspections in additionto the inspections required by the City o Mississauga andthe Ontario Building Code:

    Electrical installations require inspections To arrangean inspection or any electrical installation, contact theElectrical Saety Authority at 1-877-372-7233

    Installations o gas equipment and appliances requireinspections To arrange an inspection or any gasappliance or equipment installation, contact Enbridgeat 1-800-263-3688

    Beore Excavating

    Remember to locate underground utilities

    (gas, electrical, cable, telephone):

    Underground LocatesCall 1-800-400-2255 or visit wwwon1callcom

    Region o Peel Public Works(Sanitary Sewers, water mains, re mains)Mississauga 905-791-9400 ext3153

    City o Mississauga

    Surveys and InspectionsTransportation and Works Department (Storm Sewers)905-615-3200 x4497

  • 7/29/2019 Residential Building Permit Guide PDF(1)

    35/38

    ResidentialUse

    Contacts - Municipal

    Planning and Building

    Planning and BuildingDepartmentCivic Centre300 City Centre DriveMississauga, Ontario L5B 3C1

    Building Reception:9th foorTel: 905-896-5622

    Planning Reception11th foorTel: 905-896-5511

    Oce Hours: Monday to Friday8:30 am to 4:30 pm

    General Inormationabout Building PermitsPermit Administration9th foorTel: 905-896-5619

    General Planning InormationDevelopment and Design Division11th foorTel: 905-896-5511

    Zoning InormationZoning Plan Examination9th foorTel: 905-896-5581

    Architectural/StructuralInormationBuilding Plan Examination9th foorTel: 905-896-5404

    Heating, Ventilation,Air Conditioning and

    Plumbing InormationMechanical Plan Examination8th foorTel: 905-896-5612

    Private Sewage SystemsInormationPlumbing Inspection8th foorTel: 905-896-5612

    InspectionsBuilding, HVAC, Plumbing,Enorcement8th foorTel: 905-896-5660

    Other City Departments

    Minor Variance Approval

    Committee o AdjustmentOce o the City ClerkCivic Centre300 City Centre DriveMississauga, Ontario L5B 3C13rd foor ReceptionTel: 905-896-5442

    Heritage Approval

    Planning & HeritagePlanning, Development andBusiness Services Division,Community Services DepartmentCivic Centre300 City Centre DriveTel: 905-615-3200 ext 5070

    Lot Grading

    Development ConstructionEngineering and Works Division,Transportation and WorksDepartment3185 Mavis RoadMississauga, Ontario L5C 1T72nd foorTel: 905-615-3200 x5155

    Lot Grading Deposit

    Development ConstructionEngineering and Works Division,

    Transportation and WorksDepartment3484 Semenyk CourtMississauga, Ontario L5C 4R1Tel: 905-615-5136

    Tree Permit By Law

    Recreation and ParksUrban Forestry Division,Community ServicesDepartment3235 Mavis RoadMississauga, Ontario L5C 1T7Tel: 905-615-4100

    Swimming PoolEnclosure Permits

    Compliance and

    Licensing Enorcement,Enorcement Division,Transportation and WorksDepartmentCivic Centre300 City Centre DriveMississauga, Ontario L5B 3C1Ground foorTel: 905-896-5655

    Contractor Licence

    Compliance andLicensing Enorcement,

    Enorcement Division,Transportation and WorksDepartment300 City Centre DriveMississauga, Ontario L5B 3C1Ground foorTel: 905-896-5558

    Fire Saety, Smoke Detectors.CO Detection

    Fire and Emergency ServicesFire Prevention,Community ServicesDepartment

    Civic Centre300 City Centre DriveMississauga, Ontario L5B 3C18th foorTel: 905-896-5908

    Helpul Hint: All addresses listed here are subject to change.We recommend that you always call beore visiting.

  • 7/29/2019 Residential Building Permit Guide PDF(1)

    36/38

    ResidentialUse

    Building Code Inquiries

    Building and Development BranchMinistry o Municipal Aairs andHousing777 Bay Street 2nd foorToronto, Ontario M5G 2E5Tel: 416-585-6666wwwontarioca/buildingcode

    Qualifed Architects

    Ontario Association o Architects111 Moateld AvenueToronto, Ontario M3B 3L6Tel: 416-449-6898Toll ree: 1-800-565-2724wwwoaaonca

    Qualifed Proessional Engineers

    Proessional Engineers o Ontario25 Sheppard Avenue WestSuite 1000Toronto, Ontario M2N 6S9Tel: 416-224-1100Toll ree: 1-800-339-3716wwwpeoonca

    Qualifed ArchitecturalTechnology Designers

    Association o ArchitecturalTechnologists o Ontario1515 Matheson Boulevard EastSuite 207Mississauga, Ontario L4W 2P5Tel: 905-238-7594Toll ree: 1-866-805-2286wwwaatoonca

    Qualifed EngineeringTechnology Designers

    The Ontario Association oCertied Engineering Techniciansand Technologists10 Four Seasons Place, Suite 404Etobicoke, Ontario M9B 6H7Tel: 416-621-9621wwwoacettorg

    Sanitary andWater Connections

    Region o PeelPublic Works Department11 Indell LaneBrampton, Ontario L6T 3Y3Tel: 905-791-7800 ext 7973

    Sewer Repairs andConnection Locates

    Region o PeelPublic Works Department3515 Woledale RoadMississauga, OntarioTel: 905-270-5366wwwregionpeelonca

    Conservation Approval

    Credit Valley Conservation1255 Derry Road WestMississauga, Ontario L5N 6R4Tel: 905-670-1615Toll ree: 1-800-668-5557wwwcreditvalleyconscom

    Conservation ApprovalHalton RegionConservation Authority2596 Britannia Road West RR#2Milton, Ontario L9T 2X6Tel: 905-336-1158

    Conservation Approval

    Toronto and RegionConservation Authority5 Shoreram DriveDownsview, Ontario M3N 1S4Tel: 416-455-0169

    wwwtrcaonca

    Home Builder Registration

    TARION(Ontario New Home Warranty)

    TARION Corporate Oce5160 Yonge Street, 12th foorToronto, Ontario, M2N 6L9

    TARION Customer Centre5150 Yonge Street,Concourse LevelToronto, Ontario M2N 6L8Toll Free: 1-877-9TARIONwwwtarioncom

    Hydro Locates

    Enersource Hydro Mississauga3240 Mavis RoadMississauga, Ontario L5C 3K1Tel: 905- 273-9050wwwenersourcecom

    Inspections andCertifed Contractors

    Electrical Saety AuthorityMississauga Inspection Oce

    155D Matheson Boulevard WestMississauga, Ontario L5R 3L5Toll Free: 1-877-372-7233wwwesainspectionnet

    Inspections and Locates

    Enbridge Gas Distribution6 Colony CourtBrampton, Ontario L6T 4E4Peel Region: 1-888-447-4911wwwenbridgecom

    Fuel Saety andCertifed Contractors

    Technical Standards andSaety Authority14th foor, Centre Tower3300 Bloor Street WestToronto, Ontario M8X 2X4Tel: 416-734-3300Toll Free: 1-877-682-TSSAwwwtssaorg

    Contacts - Other Agencies

    Helpul Hint:All addresses listed hereare subject to change.We recommend thatyou always call beorevisiting.

  • 7/29/2019 Residential Building Permit Guide PDF(1)

    37/38

    ResidentialUse

    Building Permit Checklist

    and Notes

    Building Permit Checklist

    A Building Permit is required.

    Proposed project complies with the Zoning By-law.

    Applicable Law has been checked and supporting documents obtained.

    Additional Items (such as the applicability of the Tree By-law) have been considered.

    Designer/Design Firm Qualifications have been confirmed.

    Two copies of the required drawings have been prepared:

    Site Plan

    Floor Plans

    Exterior Elevations

    Cross Sections

    Mechanical Drawings

    Lot Grading requirements have been met.

    Prescribed Building Permit Application Forms have been completed and fees paid.

    All items listed below are to be addressed PRIOR to submitting aBuilding Permit Application:

    Notes

  • 7/29/2019 Residential Building Permit Guide PDF(1)

    38/38

    This publication is produced bythe City of Mississaugas Planning andBuilding Division (Building Department).Contents are copyright the City ofMississauga.