214
REKAPITULASI RENCANA ANGGARAN BIAYA NO URAIAN PEKERJAAN JUMLAH I PEKERJAAN PERSIAPAN #N/A II PEKERJAAN KAYU 172,191,562.08 III PEKERJAAN PENUTUP LANTAI & DINDING 373,759,064.20 IV PEKERJAAN BETON BERTULANG 37,302,676.59 V PEKERJAAN PENUTUP LANGIT-LANGIT #N/A VI PEKERJAAN LAIN-LAIN 248,871,542.40 VII PEKERJAAN FINSIHING 57,770,906.40 JUMLAH #N/A PPN 10% #N/A TOTAL #N/A DIBULATKAN #N/A Terbilang : SATU MILYAR DUA RATUS ENAM PULUH SEMBILAN JUTA SEMBILAN RATUS EMPAT PULUH TUJUH RIBU RUPIAH

Rencana Anggaran Biaya Pembangunan Gereja

Embed Size (px)

DESCRIPTION

ini adalah contoh harga dalam membangun gereja

Citation preview

Page 1: Rencana Anggaran Biaya Pembangunan Gereja

REKAPITULASIRENCANA ANGGARAN BIAYA

NO URAIAN PEKERJAAN JUMLAH

I PEKERJAAN PERSIAPAN #N/A

II PEKERJAAN KAYU 172,191,562.08

III PEKERJAAN PENUTUP LANTAI & DINDING 373,759,064.20

IV PEKERJAAN BETON BERTULANG 37,302,676.59

V PEKERJAAN PENUTUP LANGIT-LANGIT #N/A

VI PEKERJAAN LAIN-LAIN 248,871,542.40

VII PEKERJAAN FINSIHING 57,770,906.40

JUMLAH #N/APPN 10% #N/ATOTAL #N/ADIBULATKAN #N/A

Terbilang :

SATU MILYAR DUA RATUS ENAM PULUH SEMBILAN JUTA SEMBILAN RATUS EMPAT PULUH TUJUH RIBU RUPIAH

Page 2: Rencana Anggaran Biaya Pembangunan Gereja

RENCANA ANGGARAN BIAYA (R.A.B)

NOURAIAN KODE

VOL SAT HARGA JUMLAH

PEKERJAAN ANALISA SATUAN HARGA

I PEKERJAAN PERSIAPAN1 Pengukuran & Pemasangan Boowplank A.004 111.00 #N/A #N/A #N/A

#N/AII PEKERJAAN KAYU

1 Pasang daun pintu Panel, ky. Lembasung F.005 30.25 m² 554,800.00 16,782,700.00 2 Pasang daun jendela kaca patri motif F.007 65.25 m2 426,080.00 27,801,720.00 3 Pasang kaca Patri L.021 104.70 m2 1,141,355.00 119,494,161.73 4 Pasang Konsul bawah kanopi Ky. Bangkirai F.002 0.80 m3 5,095,062.50 4,085,180.35 5 Pasang plind dinding ky. Ulin M.013 120.00 M' 33,565.00 4,027,800.00

172,191,562.08 III PEKERJAAN PENUTUP LANTAI & DINDING

1 Pasang Lantai Keramik Granite 60x60 M.001 576.00 M2 619,843.75 357,030,000.00 2 Pasang Lantai Kamar mandi 20x20 M.004 16.00 M2 229,928.30 3,678,852.80 3 Pasang Keramik dinding KM/WC 20x25 M.006 32.00 M2 270,514.70 8,656,470.40 4 Pasang plint keramik dinding KM/WC 10x25 M.008 16.00 M' 179,028.75 2,864,460.00 5 Pasang batu palimanan hijau (kolom main entrance) M.012 4.00 M2 382,320.25 1,529,281.00

373,759,064.20 IV PEKERJAAN BETON BERTULANG

1 Beton 1:2:3 - Plesteran tangga 1:4 69.00 M2 61,478.40 4,242,009.60 - Tangga beton G.008 7.05 M3 1,048,591.00 7,392,566.55

2 Pembesian - Tangga beton G.026 896.52 Kg 18,047.00 16,179,496.44

3 Bekisting + bongkar - Tangga beton 34.5 M2 275,032.00 9,488,604.00

37,302,676.59 V PEKERJAAN PENUTUP LANGIT-LANGIT

1 Pasang Rangka Plafond Hollow 855.00 M2 #N/A #N/A2 Pasang Plafond Kayu Bengkirai 2/20 I.007 855.00 M2 145,131.50 124,087,432.50

#N/AVI PEKERJAAN LAIN-LAIN

1 Pasang Salib (material aluminium stainless finished Crome 1.00 Ls 10,000,000.00 10,000,000.00 2 Mimbar Utama & Mimbar kecil 2.00 Ls 25,000,000.00 50,000,000.00 3 Handrail tangga stainlisteel K.009 552.00 M' 253,859.60 140,130,499.20 4 Handrail mezanin stainlisteel K.009 192.00 M' 253,859.60 48,741,043.20

248,871,542.40 VII PEKERJAAN FINSIHING

1 Pengecatan dinding 2x 1,364.00 M2 19,161.00 26,135,604.00 2 Pengecatan kayu dengan cat kilap 3x 665.60 M2 47,529.00 31,635,302.40

57,770,906.40 JUMLAH #N/A

Page 3: Rencana Anggaran Biaya Pembangunan Gereja

Rekapitulasi Harga Satuan Pekerjaan Page 3

DINAS PEKERJAAN UMUMKABUPATEN BULUNGAN

REKAPITULASI ANALISA SNI 2008TAHUN ANGGARAN 2014

ZONA 1 KECAMATAN TANJUNG SELOR & KECAMATAN TANJUNG PALAS

NO.KODE

JENIS PEKERJAAN HARGA SATUAN

ANALISA ( Rp )

1 2 3 4 5

A. PEKERJAAN PERSIAPAN SNI 03-2835-2002

1 A.001 1A.000 Membuat 1 m' pagar sementara dari kayu tinggi 2 meter m' 231,282.75

2 A.002 2A.000 Membuat 1 m' pagar sementara dari seng gelombang tinggi 2 meter m' 315,432.75

3 A.003 3A.000 Membuat 1 m' pagar sementara dari kawat duri tinggi 1.8 meter m' 330,552.75

4 A.004 4A.000 Mengerjakan 1 m' pengukuran dan pemasangan bouwplank m' 57,963.00

5 A.005 5A.000 Membuat 1 m² kantor sementara, dengan lantai plesteran m² 1,405,988.00

6 A.006 6A.000 Membuat 1 m² gudang semen dan alat-alat m² 901,244.50

7 A.007 7A.000 Membuat 1 m² rumah jaga konstruksi kayu m² 958,200.00

8 A.008 8A.000 Membersihkan 1 m² lapangan dan perataan m² 16,000.00

9 A.009 9A.000 Membuat 1 m² bedeng buruh m² 944,489.50

10 A.010 10A.000 Membuat 1 m² jalan sementara m² 216,376.50

11 A.011 11A.000 Membongkar 1 m³ beton bertulang 646,650.00

12 A.012 12A.000 Membongkar 1 m³ dinding tembok bata merah 604,650.00

13 A.013 13A.000 Mengerjakan1 m² pengukuran kembali (site) m² 30,950.00

14 A.014 14A.000 Membongkar 1 m³ dinding bata/ pas. batu kali (bongkaran dipakai kembali) m³ 282,600.00

15 A.015 15A.000 Mengupas 1 m² plesteran m² 13,000.00

16 A.016 16A.000 Membongkar 1 m² plesteran dinding/ siaran m² 13,000.00

17 A.017 17A.000 Membongkar 1 m² genteng/ sirap ( bongkaran dipakai kembali) m² 52,000.00

18 A.018 18A.000 Membongkar 1 m² genteng/ sirap (bongkaran tidak dipakai kembali) m² 10,400.00

19 A.019 19A.000 Membongkar 1 m² rangka atap/ reng/ kaso (bongkaran dipakai kembali) m² 33,100.00

20 A.020 20A.000 Membongkar 1 m² rangka atap/ reng/ kaso (bongkaran tidak dipakai kembali) m² 24,825.00

21 A.021 21A.000 Membongkar 1 m³ kuda-kuda/ gording/ balok (bongkaran dipakai kembali) m³ 1,154,000.00

22 A.022 22A.000 Membongkar 1 m³ kuda-kuda/ gording/ balok (bongkaran tidak dipakai kembali) m³ 718,000.00

23 A.023 23A.000 Membongkar 1 m² plafond (bongkaran dipakai kembali) m² 47,300.00

24 A.024 24A.000 Membongkar 1 m² plafond (bongkaran tidak dipakai kembali) m² 15,600.00

B. PEKERJAAN TANAH SNI

1 B.001 B.001 Menggali 1 m³ tanah biasa sedalam 1 meter 71,000.00

2 B.002 B.002 Menggali 1 m³ tanah biasa sedalam 2 meter 87,300.00

3 B.003 B.003 Menggali 1 m³ tanah biasa sedalam 3 meter 103,880.00

4 B.004 B.004 Menggali 1 m³ tanah keras sedalam 1 meter 94,480.00

5 B.005 B.005 Menggali 1 m³ tanah cadas sedalam 1 meter 143,400.00

6 B.006 B.006 Menggali 1 m³ tanah lumpur sedalam 1 meter 114,300.00

7 B.007 B.007 Mengerjakan 1 m² stripping tebing setinggi 1 meter 5,200.00

8 B.008 B.008 Membuang 1 m³ tanah sejauh 30 meter 31,100.00

9 B.009 B.009 Membuang 1 m³ tanah sejauh 150 meter 53,440.00

10 B.010 B.010 Mengurug kembali 1 m³ galian 23,666.67

11 B.011 B.011 Memadatkan 1 m³ tanah (per 20 cm) 52,000.00

12 B.012 B.012 Mengurug 1 m³ pasir urug 149,360.00

13 B.013 B.013 Mengurug 1 m³ sirtu padat untuk peninggian lantai bangunan 171,200.00

14 B.014 B.014 Mengurug 1 m³ Tanah Timbunan 105,200.00

C. PEKERJAAN PONDASI SNI 03-2836-2002

1 C.001 C.001 Memasang 1 m³ pondasi batu belah; campuran 1 PC : 1 PP 1,483,825.10

2 C.002 C.002 Memasang 1 m³ pondasi batu belah; campuran 1 PC : 2 PP, Batu Belah 15/20 1,268,433.05

3 C.003 C.003 Memasang 1 m³ pondasi batu belah; campuran 1 PC : 2 PP, Batu Gunung 1,221,393.05

4 C.004 C.004 Memasang 1 m³ pondasi batu belah; campuran 1 PC : 2,5 PP 1,483,825.10

5 C.005 C.005 Memasang 1 m³ pondasi batu belah; campuran 1 PC : 3 PP 1,156,347.75

6 C.006 C.006 Memasang 1 m³ pondasi batu belah; campuran 1 PC : 4 PP 1,107,568.00

7 C.007 C.007 Memasang 1 m³ pondasi Batu Gunung; campuran 1 PC : 4 PP 1,060,528.00

8 C.008 C.008 Memasang 1 m³ pondasi batu belah; campuran 1 PC : 5 PP 1,060,999.60

9 C.009 C.009 Memasang 1 m³ pondasi batu belah; campuran 1 PC : 6 PP 1,028,241.15

10 C.010 C.010 Memasang 1 m³ pondasi batu belah; campuran 1 PC : 8 PP 983,385.60

11 C.011 C.011 Memasang 1 m³ batu kosong (anstamping), Batu Belah 15/20 684,615.60

12 C.012 C.012 Memasang 1 m³ batu kosong (anstamping), Batu Gunung 637,575.60

13 C.013 C.013 3,286,686.80

14 C.014 C.014 Memasang 1 m³ pondasi sumuran; diameter 100 cm 1,121,700.80

15 C.015 C.015 Memasang 1 m' tiang pancang (40x40) cm, beton bertulang m' 1,169,080.70

16 C.016 C.016 Memasang 1 m' tiang pancang (35x35) cm, beton bertulang m' 915,357.97

C.0

17 C.017 C.017 Pemancangan Tiang Pancang Beton 25/25 per m' m' 133,600.00

D. PEKERJAAN DINDING SNI 03-2837-2002

1 D.001 D.001 Memasang 1 m² dinding bata merah (8x8x16) cm; tebal 1 bata; campuran 1 PC : 1 PP 328,956.45

2 D.002 D.002 Memasang 1 m² dinding bata merah (8x8x16) cm; tebal 1 bata; campuran 1 PC : 2 PP 289,342.00

3 D.003 D.003 Memasang 1 m² dinding bata merah (8x8x16) cm; tebal 1 bata; campuran 1 PC : 3 PP 271,319.65

4 D.004 D.004 Memasang 1 m² dinding bata merah (8x8x16) cm; tebal 1 bata; campuran 1 PC : 4 PP 259,885.95

5 D.005 D.005 Memasang 1 m² dinding bata merah (8x8x16) cm; tebal 1 bata; campuran 1 PC : 5 PP 252,933.30

6 D.006 D.006 Memasang 1 m² dinding bata merah (8x8x16) cm; tebal 1 bata; campuran 1 PC : 6 PP 248,342.30

7 D.007 D.007 Memasang 1 m² dinding bata merah (8x8x16) cm; tebal ½ bata; campuran 1 PC : 1 PP 156,196.20

8 D.008 D.008 Memasang 1 m² dinding bata merah (8x8x16) cm; tebal ½ bata; campuran 1 PC : 2 PP 139,360.70

9 D.009 D.009 Memasang 1 m² dinding bata merah (8x8x16) cm; tebal ½ bata; campuran 1 PC : 3 PP 131,239.40

10 D.010 D.010 Memasang 1 m² dinding bata merah (8x8x16) cm; tebal ½ bata; campuran 1 PC : 4 PP 126,337.45

11 D.011 D.011 Memasang 1 m² dinding bata merah (8x8x16) cm; tebal ½ bata; campuran 1 PC : 5 PP 123,239.35

12 D.012 D.012 Memasang 1 m² dinding bata merah (8x8x16) cm; tebal ½ bata; campuran 1 PC : 6 PP 121,192.75

NOMOR ANALISA

SATUAN

m³m³

m³m³m³m³m³m³m³m³m³m³m³m³m³m³

m³m³m³m³m³m³m³m³m³m³m³m³

Memasang 1 m³ pondasi siklop; 60% beton campuran 1 PC : 2 PB : 3 KR dan 40 % batu belah

m³m³

m²m²m²m²m²m²m²m²m²m²m²m²

Page 4: Rencana Anggaran Biaya Pembangunan Gereja

Rekapitulasi Harga Satuan Pekerjaan Page 4

NO.KODE

JENIS PEKERJAAN HARGA SATUAN

ANALISA ( Rp ) NOMOR ANALISA

SATUAN

13 D.013 D.013 Memasang 1 m² dinding bata merah (8x8x16) cm; tebal ½ bata; campuran 1 PC : 8 PP 117,987.50

14 D.014 D.014 Memasang 1 m² dinding bata merah (8x8x16) cm; tebal ½ bata; campuran 1 PC : 8 PP 370,308.80

15 D.015 D.015 Memasang 1 m² dinding bata merah (8x8x16) cm; tebal ½ bata; campuran 1 PC : 8 PP 365,170.25

16 D.016 D.016 Memasang 1 m² dinding bata merah (8x8x16) cm; tebal ½ bata; campuran 1 PC : 8 PP 776,458.80

E. PEKERJAAN PLESTERAN SNI 03-2837-2002

1 E.001 E.001 Memasang 1 m² plesteran 1 PC : 1 PP; tebal 15 mm 77,481.68

2 E.002 E.002 Memasang 1 m² plesteran 1 PC : 2 PP; tebal 15 mm 68,300.68

3 E.003 E.003 Memasang 1 m² plesteran 1 PC : 3 PP; tebal 15 mm 64,166.77

4 E.004 E.004 Memasang 1 m² plesteran 1 PC : 4 PP; tebal 15 mm 61,478.40

5 E.005 E.005 Memasang 1 m² plesteran 1 PC : 5 PP; tebal 15 mm 59,070.78

6 E.006 E.006 Memasang 1 m² plesteran 1 PC : 6 PP; tebal 15 mm 58,480.17

7 E.007 E.007 Memasang 1 m² plesteran 1 PC : 7 PP; tebal 15 mm 57,713.72

8 E.008 E.008 Memasang 1 m² plesteran 1 PC : 8 PP; tebal 15 mm 56,947.27

9 E.009 E.009 Memasang 1 m² plesteran 1 PC : 2 PP; tebal 20 mm 91,383.29

10 E.010 E.010 Memasang 1 m² plesteran 1 PC : 3 PP; tebal 20 mm 73,271.41

11 E.011 E.011 Memasang 1 m² plesteran 1 PC : 4 PP; tebal 20 mm 109,971.20

12 E.012 E.012 Memasang 1 m² plesteran 1 PC : 5 PP; tebal 20 mm 80,010.09

13 E.013 E.013 Memasang 1 m² plesteran 1 PC : 6 PP; tebal 20 mm 78,513.56

14 E.014 E.014 Memasang 1 m² plesteran 1 PC : 2 PP; tebal 25 mm 83,022.95

15 E.015 E.015 Memasang 1 m² plesteran 1 PC : 3 PP; tebal 25 mm 72,405.25

16 E.016 E.016 Memasang 1 m² plesteran 1 PC : 4 PP; tebal 25 mm 74,745.30

17 E.017 E.017 Memasang 1 m² plesteran 1 PC : 5 PP; tebal 25 mm 72,049.65

18 E.018 E.018 Memasang 1 m² plesteran 1 PC : 2 PP; tebal 30 mm 99,343.25

19 E.019 E.019 Memasang 1 m² plesteran 1 PC : 3 PP; tebal 30 mm 91,581.85

20 E.020 E.020 Memasang 1 m² plesteran 1 PC : 4 PP; tebal 30 mm 86,861.90

21 E.021 E.021 Memasang 1 m² plesteran 1 PC : 5 PP; tebal 30 mm 81,377.55

22 E.022 E.022 Memasang 1 m² berapen 1 PC : 3 PP; tebal 30 mm 38,347.55

23 E.023 E.023 Memasang 1 m² berapen 1 PC : 5 PP; tebal 30 mm 35,450.78

24 E.024 E.024 Memasang 1 m² plesteran beton 1 PC : 2 PP; tebal 15 mm 68,674.70

25 E.025 E.025 Memasang 1 m² plesteran beton 1 PC : 3 PP; tebal 15 mm 64,937.55

26 E.026 E.026 Memasang 1 m' plesteran skoning 1 PC : 2 PP; lebar 10 mm m' 59,262.95

27 E.027 E.027 Memasang 1 m² plesteran ciprat 1 PC : 2 PP; lebar 10 mm 49,905.30

28 E.028 E.028 Memasang 1 m² finishing siar pasangan dinding bata merah (=20 m') 29,566.56

29 E.029 E.029 Memasang 1 m² finishing siar pasangan dinding conblock ekspose (=8 m') 14,142.00

30 E.030 E.030 Memasang 1 m² finishing siar pasangan batu kali adukan 1 PC : 2 PP 60,374.60

31 E.031 E.031 Memasang 1 m² acian 33,115.00

32 E.032 E.032 Memasang 1 m' Benangan sudut m' 14,114.15

F. PEKERJAAN KAYU SNI 03-3434-2002

1 F.001 F.001 Membuat dan memasang 1 m³ kusen pintu dan kusen jendela; Kayu Lembasung/ Kapur 5,374,062.50

2 F.002 F.002 #N/A 5,095,062.50

3 F.003 F.003 Membuat dan memasang 1 m² pintu klamp sederhana; Kayu Lembasung/ Kapur 239,052.50 4 F.004 F.004 Membuat dan memasang 1 m² pintu klamp sederhana; Kayu Meranti 239,052.50 5 F.005 F.005 Membuat dan memasang 1 m² daun pintu panel; Kayu Lembasung/ Kapur 554,800.00

6 F.006 F.006 Membuat dan memasang 1 m² daun pintu panel; Kayu Meranti 554,800.00

7 F.007 F.007 Membuat dan memasang 1 m² pintu dan jendela kaca; Kayu Lembasung/ Kapur 426,080.00

8 F.008 F.008 Membuat dan memasang 1 m² pintu dan jendela kaca; Kayu Meranti 426,080.00

9 F.009 F.009 Membuat dan memasang 1 m² pintu dan jendela jalusi; Lembasung/ Kapur 599,680.00

10 F.010 F.010 Membuat dan memasang 1 m² pintu dan jendela jalusi; Kayu Meranti 599,680.00

11 F.011 F.011 541,599.50

12 F.012 F.012 Membuat dan memasang 1 m² pintu plywood rangkap; rangka ekspose Kayu Kapur 589,321.50

13 F.013 F.013 Membuat dan memasang 1 m² jalusi kusen; Kayu Kapur/ Lembasung 468,647.50

14 F.014 F.014 Membuat dan memasang 1 m² jalusi kusen; Kayu Meranti 468,647.50

15 F.015 F.015 Membuat dan memasang 1 m² pintu teakwood rangkap; rangka ekspose Kayu Kapur 470,799.50

16 F.016 F.016 561,919.50

17 F.017 F.017 4,411,240.00

18 F.018 F.018 4,411,240.00

19 F.019 F.019 Membuat dan memasang 1 m³ konstruksi kuda kuda ekspose; Kayu Kapur/ Lembasung 5,856,440.00

20 F.020 F.020 Membuat dan memasang 1 m³ konstruksi kuda kuda ekspose; Kayu Meranti 5,856,440.00

21 F.021 F.021 Membuat dan memasang 1 m³ konstruksi gording; Kayu Kapur/ Lembasung 3,609,350.00

22 F.022 F.022 Membuat dan memasang 1 m³ konstruksi gording; Kayu Meranti 3,609,350.00

23 F.023 F.023 Membuat dan memasang 1 m² rangka atap genteng kodok; Kayu Kapur/ Lembasung 56,584.50

24 F.024 F.024 Membuat dan memasang 1 m² rangka atap genteng kodok; Kayu Meranti 56,584.50

25 F.025 F.025 Membuat dan memasang 1 m² rangka atap genteng keramik; Kayu Kapur/ Lembasung 60,324.50

26 F.026 F.026 Membuat dan memasang 1 m² rangka atap genteng keramik; Kayu Meranti 60,324.50

27 F.027 F.027 Membuat dan memasang 1 m² rangka atap genteng beton; Kayu Kapur/ Lembasung 160,182.50

28 F.028 F.028 Membuat dan memasang 1 m² rangka atap genteng beton; Kayu Meranti 160,182.50

29 F.029 F.029 Membuat dan memasang 1 m² rangka atap genteng metal; Kayu Lembasung/Kapur 47,687.50

30 F.030 F.030 Membuat dan memasang 1 m² rangka atap genteng metal; Kayu Meranti 47,687.50

31 F.031 F.031 Memasang 1 m² rangka atap sirap; Kayu Meranti 339,280.00

32 F.032 F.032 Memasang 1 m² rangka langit-langit (100 x 100) cm; Kayu Meranti 79,355.00

33 F.033 F.033 Memasang 1 m² rangka langit-langit (50 x 100) cm; Kayu Meranti 94,028.00

34 F.034 F.034 Memasang 1 m² rangka langit-langit (60 x 60) cm; Kayu Meranti 92,193.50

35 F.035 F.035 Memasang 1 m' lisplank uk. (3 x 20) cm; Kapur/ Lembasung m' 56,661.00

36 F.036 F.036 Memasang 1 m' lisplank uk. (3 x 30) cm; Kayu Kapur/Lembasung m' 56,602.50

37 F.037 F.037 Memasang 1 m' lisplank uk. 2x (3 x 20) cm; Kayu Kapur/ Lembasung m' 83,164.00

38 F.038 F.038 Memasang 1 m' lisplank uk. 2x (2 x 20) cm; Kayu Kapur/ Lembasung m' 45,681.00

39 F.039 F.039 Memasang 1 m² rangka dinding pemisah (60 x 120) cm; Kayu Meranti 125,577.50

40 F.040 F.040 Memasang 1 m² dinding pemisah teakwood rangkap; Kayu Kapur/ Lembasung 199,909.50

41 F.041 F.041 Memasang 1 m² dinding pemisah plywood rangkap; Kayu Meranti 296,927.50

42 F.042 F.042 Pasangan dinding kayu meranti berlidah per m2 - 330,680.00

43 F.043 F.043 Memasang 1 m² dinding lambriziring dari papan; Kayu Meranti 299,520.00

m²m²m²m²

m²m²m²m²m²m²m²m²m²m²m²m²m²m²m²m²m²m²m²m²m²m²m²m²m²

m²m²m²m²m²

m³m³m²m²m²m²m²m²m²m²

Membuat dan memasang 1 m² daun pintu kayu lapis (plywood); rangka tertutup Kayu Kapur

m²m²m²m²m²

Membuat dan memasang 1 m² pintu teakwood rangkap lapis formika; rgk. ekspose Ky. Meranti

m²Membuat dan memasang 1 m³ konstruksi kuda kuda konvensional; Kayu Kapur/ Lembasung

m³Membuat dan memasang 1 m³ konstruksi kuda kuda konvensional; Kayu Meranti

m³m³m³m³m³m²m²m²m²m²m²m²m²m²m²m²m²

m²m²m²m²m²

Page 5: Rencana Anggaran Biaya Pembangunan Gereja

Rekapitulasi Harga Satuan Pekerjaan Page 5

NO.KODE

JENIS PEKERJAAN HARGA SATUAN

ANALISA ( Rp ) NOMOR ANALISA

SATUAN

44 F.044 F.044 Memasang 1 m² dinding lambriziring dari plywood ukuran (120 x 240) cm 74,339.50

45 F.045 F.045 Memasang 1 m' papan ruiter ukuran 3 x 30 cm; Kayu Meranti 50,376.50

46 F.046 F.046 Memasang 1 m' papan ruiter ukuran 2 x 20 cm; Kayu Meranti 39,904.50

47 F.047 F.047 Sebuah tiang pancang dicincin dan dilancipkan Ttk 40,450.00

48 F.048 F.048 Ttk 73,800.00

49 F.049 F.049 Memancang tiang pada tanah lunak per m' m' 172,940.00

F.0 Untuk tanah biasa 1 1/4 x E.13 m' 216,175.00

F.0 Untuk tanah keras 1 1/2 x E.13 m' 259,410.00

50 F.050 F.050 Pasangan tongkat, sloop, gelegar dari kayu ulin per m3 - 6,207,500.00

51 F.051 F.051 Pasangan gelegar kayu kapur/lembasung per m3 - 4,221,650.00

52 F.052 F.052 Pasangan Lantai dari papan kayu kapur/lembasung per m2 - 176,640.00

53 F.053 F.053 Pasangan lantai dari papan kayu meranti per m2 - 176,640.00

F.0 Apabila hanya diketam salah satu sisinya saja 113,860.00

54 F.054 F.054 Pasangan lantai dari papan kayu ulin per m2 - 227,310.00

F.0 Apabila hanya diketam salah satu sisinya saja 164,530.00

55 F.055 F.055 1Ttk Memancang tiang pancang kayu ulin 10/10 - 2 m 1 Ttk 253,306.00

56 F.056 F.056 1Ttk Memancang tiang pancang kayu ulin 10/10 - 4 m 1 Ttk 333,672.00

57 F.057 F.057 Rangka badan/tiang jenang dari kayu kapur/lembasung per m3 - m3 6,908,330.00

58 F.058 F.058 Pasangan sunduk,kalang dari kayu ulin per m3 - m3 6,207,500.00

G. PEKERJAAN BETON RSNI-T-13-2002

1 G.001 G.001 Membuat 1 m³ beton tumbuk 1 PC : 3 PB : 5 KR, Batu Pecah 1,201,178.00

2 G.002 G.002 Membuat 1 m³ beton tumbuk 1 PC : 3 PB : 5 KR, Kerikil Sungai 853,468.00

3 G.003 G.003 Membuat 1 m³ beton tumbuk 1 PC : 3 PB : 6 KR 1,202,517.17

4 G.004 G.004 Membuat 1 m³ beton tumbuk 1 PC : 4 PB : 6 KR 1,124,635.50

5 G.005 G.005 Membuat 1 m² lantai kerja beton tumbuk 1 PC : 3 PB : 5 KR; tebal 5 cm,Koral Beton 156,019.23

6 G.006 G.006 138,433.90

7 G.007 G.007 Membuat 1 m³ beton bertulang 1 PC : 2 PB : 3 KR, Batu Pecah 1,360,331.00

8 G.008 G.008 Membuat 1 m³ beton bertulang 1 PC : 2 PB : 3 KR, Kerikil Sungai 1,048,591.00

9 G.009 G.009 Membuat 1 m³ beton bertulang 1 PC : 2 PB : 4 KR 1,325,767.50

10 G.010 G.010 Membuat 1 m³ beton bertulang 1 PC : 2 PB : 2,5 KR 1,340,260.67

11 G.011 G.011 Membuat 1 m³ beton bertulang 1 PC : 1.5 PB : 3 KR 1,231,693.00

12 G.012 G.012 Membuat 1 m³ beton bertulang 1 PC : 1.5 PB : 2,5 KR 1,443,830.50

13 G.013 G.013 Membuat 1 m³ beton bertulang 1 PC : 1 PB : 2 KR 1,576,708.83

14 G.014 G.014 Membuat 1 m³ beton mutu f'c=7,4 Mpa (K 100); slump (12 ± 2) cm; w/c = 0,87 1,193,492.87

15 G.015 G.015 Membuat 1 m³ beton mutu f'c=9,8 Mpa (K 125); slump (12 ± 2) cm; w/c = 0,78 1,249,313.92

16 G.016 G.016 Membuat 1 m³ beton mutu f'c=12,2 Mpa (K 150); slump (12 ± 2) cm; w/c = 0,72 1,291,330.92

17 G.017 G.017 Membuat 1 m³ beton mutu f'c=7,4 Mpa (K 100); slump (3-6) cm; w/c = 0,87 1,124,088.37

18 G.018 G.018 Membuat 1 m³ beton mutu f'c=14,5 Mpa (K 175); slump (12 ± 2) cm; w/c = 0,66 1,343,189.74

19 G.019 G.019 Membuat 1 m³ beton mutu f'c=16,9 Mpa (K 200); slump (12 ± 2) cm; w/c = 0,61 1,389,240.82

20 G.020 G.020 Membuat 1 m³ beton mutu f'c=19,3 Mpa (K 225); slump (12 ± 2) cm; w/c = 0,58 1,428,900.08

21 G.021 G.021 Membuat 1 m³ beton mutu f'c=21,7 Mpa (K 250); slump (12 ± 2) cm; w/c = 0,56 1,448,298.39

22 G.022 G.022 Membuat 1 m³ beton mutu f'c=24 Mpa (K 275); slump (12 ± 2) cm; w/c = 0,53 1,481,547.10

23 G.023 G.023 Membuat 1 m³ beton mutu f'c=26,4 Mpa (K 300); slump (12 ± 2) cm; w/c = 0,52 1,491,680.94

24 G.024 G.024 Membuat 1 m³ beton mutu f'c=28,8 Mpa (K 325); slump (12 ± 2) cm; w/c = 0,49 1,583,769.42

25 G.025 G.025 Membuat 1 m³ beton mutu f'c=31,2 Mpa (K 350); slump (12 ± 2) cm; w/c = 0,48 1,597,067.96

26 G.026 G.026 Pembesian 1 kg dengan besi polos atau besi ulir kg 18,047.00

27 G.027 G.027 Memasang 10 kg jaring kawat baja /wiremesh kg 166,570.00

28 G.028 G.028 Memasang 1 m² bekisting untuk pondasi 155,975.00

29 G.029 G.029 1 M2 Bongkar bekesting = 1/5 x upah pasang bekesting pondasi 16,484.00

30 G.030 G.030 Memasang 1 m² bekisting untuk sloof 164,225.00

31 G.031 G.031 1 M2 Bongkar bekesting = 1/5 x upah pasang bekesting sloof 16,484.00

32 G.032 G.032 Memasang 1 m² bekisting untuk kolom 271,140.00

33 G.033 G.033 1 M2 Bongkar bekesting = 1/5 x upah pasang bekesting kolom 20,922.00

34 G.034 G.034 Memasang 1 m² bekisting untuk balok 276,090.00

35 G.035 G.035 1 M2 Bongkar bekesting = 1/5 x upah pasang bekesting balok 20,922.00

36 G.036 G.036 Memasang 1 m² bekisting untuk lantai 335,140.00

37 G.037 G.037 1 M2 Bongkar bekesting = 1/5 x upah pasang bekesting lantai 20,922.00

38 G.038 G.038 Memasang 1 m² bekisting untuk dinding 342,890.00

39 G.039 G.039 1 M2 Bongkar bekesting = 1/5 x upah pasang bekesting dinding 20,922.00

40 G.040 G.040 Memasang 1 m² bekisting untuk tangga 254,110.00

41 G.041 G.041 1 M2 Bongkar bekesting = 1/5 x upah pasang bekesting tangga 20,922.00

42 G.042 G.042 Memasang 1 m² jembatan untuk pengecoran beton 85,320.00

43 G.043 G.043 Memasang 1 m³ pondasi beton bertulang (150 kg besi + bekisting) 4,867,756.00

44 G.044 G.044 Memasang 1 m³ sloof beton bertulang (200 kg besi + bekisting) 5,930,251.00

45 G.045 G.045 Memasang 1 m³ kolom beton bertulang (300 kg besi + bekisting) 9,192,491.00

46 G.046 G.046 Memasang 1 m³ balok beton bertulang (200 kg besi + bekisting) 7,046,631.00

47 G.047 G.047 Memasang 1 m³ kolom beton bertulang (150 kg besi + bekisting) 6,256,871.00

48 G.048 G.048 Memasang 1 m³ dinding beton bertulang (150 kg besi + bekisting) 6,062,481.00

49 G.049 G.049 Memasang 1 m³ dinding beton bertulang (200 kg besi + bekisting) 6,707,511.00

50 G.050 G.050 Memasang 1 m' kolom praktis beton bertulang (11 x 11 cm) 98,154.40

51 G.051 G.051 Memasang 1 m' ring balok beton bertulang (10 x 15 cm) 123,542.35

H. PEKERJAAN PENUTUP ATAP SNI 03-3436-2002

1 H.001 H.001 Memasang 1 m² rooflight fibreglass (180 x 90) cm 94,822.50

2 H.002 H.002 Memasang 1 m² atap genteng glazzur 141,410.00

3 H.003 H.003 Memasang 1 m' bubung genteng glazzur m' 109,368.80

4 H.004 H.004 Memasang 1 m² atap genteng beton 112,449.50

5 H.005 H.005 Memasang 1 m' nok genteng beton m' 119,417.30

6 H.006 H.006 Memasang 1 m² atap sirap 189,140.00

7 H.007 H.007 Memasang 1 m' nok atap sirap m' 58,701.50

8 H.008 H.008 Memasang 1 m² atap seng gelombang Bjls 30 64,918.00

m²m²m²

Membuat pen pada tiang dan lubang pada balok pemikul tiap-tiap pasangan pen dan lubang

m³m³m²m²m²m²m²

m³m³m³m³m²

Membuat 1 m² lantai kerja beton tumbuk 1 PC : 3 PB : 5 KR; tebal 5 cm,Kerikil sungai

m²m³m³m³m³m³m³m³m³m³m³m³m³m³m³m³m³m³m³m³

m²m²m²m²m²m²m²m²m²m²m²m²m²m²m²m³m³m³m³m³m³m³m³m³

m²m²

Page 6: Rencana Anggaran Biaya Pembangunan Gereja

Rekapitulasi Harga Satuan Pekerjaan Page 6

NO.KODE

JENIS PEKERJAAN HARGA SATUAN

ANALISA ( Rp ) NOMOR ANALISA

SATUAN

9 H.009 H.009 Memasang 1 m² atap seng gelombang Bjls 20 47,943.00

10 H.010 H.010 Memasang 1 m' atap bubungan seng Bjls 30 m' 151,679.00

11 H.011 H.011 Menutup atap dengan genteng metal surya roof per m2 167,817.38

12 H.012 H.012 Menutup bubungan pada genteng metal Surya roof per m' m' 128,480.00

13 H.013 H.013 Menutup Atap dengan genteng Metal sakura roof per m2 112,337.68

14 H.014 H.014 Menutup bubungan pada genteng metal Sakura roof per m' m' 128,480.00

15 H.015 H.015 Pasang aluminium foil / sisalation per 1 M2 73,690.00

I. PEKERJAAN LANGIT-LANGIT SNI 03-2838-2002

1 I.001 I.001 Memasang 1 m² langit-langit lambriziring kayu, tebal 9 mm 184,866.50

2 I.002 I.002 Memasang 1 m² langit-langit plywood ukuran (120 x 240) cm; tbl. 9 mm 80,399.50

3 I.003 I.003 Memasang 1 m² langit-langit plywood ukuran (120 x 240) cm; tbl. 3 mm 45,337.00

4 I.004 I.004 Memasang 1 m² langit-langit plywood ukuran (60 x 120) cm; tbl. 9 mm 77,489.50

5 I.005 I.005 Memasang 1 m² langit-langit plywood ukuran (60 x 120) cm; tbl. 3 mm 42,427.00

6 I.006 I.006 Memasang 1 m² langit-langit teakwood ukuran (60 x 120) cm; tbl. 4 mm dan 6 mm 77,639.50

7 I.007 I.007 Memasang 1 m² langit-langit lat kayu bengkirai 145,131.50

8 I.008 I.008 Memasang 1 m² langit-langit lat kayu meranti 139,851.50

9 I.009 I.009 Memasang 1 m² Plywood 9 mm, rangka kayu meranti 179,759.00

10 I.010 I.010 Memasang 1 m² Plywood 3mm, rangka kayu meranti 143,294.00

11 I.011 I.011 Memasang 1 m² langit-langit gypsum board uk. (120 x 240) cm, tebal 9 mm 52,467.80

12 I.012 I.012 Memasang 1 m' list gipsum m' 45,450.00

13 I.013 I.013 Memasang 1 m' list kayu profil m' 32,286.50

J. PEKERJAAN SANITASI SNI

1 J.001 Memasang 1 buah kloset duduk bh 2,090,530.00

2 J.002 Memasang 1 buah kloset jongkok porselen bh 724,166.50

3 J.003 Memasang 1 buah kloset jongkok teraso bh 433,811.50

4 J.004 Memasang 1 buah urinoir bh 3,440,046.50

5 J.005 Memasang 1 buah wastafel bh 1,852,991.50

6 J.006 Memasang 1 buah bak mandi fibreglass volume 0,30 m³ bh 1,134,600.00

7 J.007 Memasang 1 buah bak mandi batu bata volume 0,30 m³ bh 1,689,454.13

8 J.008 Memasang 1 buah badkip fiberglass bh 693,150.00

9 J.009 Membuat 1 buah bak beton volume 1m³ bh 5,960,070.50

10 J.010 Memasang 1 buah bak kontrol pas. batu bata ukuran (30 x 30) cm tinggi 35 cm 631,131.49

11 J.011 Memasang 1 buah bak kontrol pas. batu bata ukuran (45 x 45) cm tinggi 60 cm 565,605.70

12 J.012 Memasang 1 buah bak kontrol pas. batu bata ukuran (60 x 60) cm tinggi 65 cm 873,930.69

13 J.013 Memasang 1 m' pipa PVC tipe AW Ø ½" m' 18,622.00

14 J.014 Memasang 1 m' pipa PVC tipe AW Ø ¾" m' 20,172.00

15 J.015 Memasang 1 m' pipa PVC tipe AW Ø 1" m' 23,775.75

16 J.016 Memasang 1 m' pipa PVC tipe AW Ø 1½" m' 34,587.00

17 J.017 Memasang 1 m' pipa PVC tipe AW Ø 2" m' 47,269.25

18 J.018 Memasang 1 m' pipa PVC tipe AW Ø 2½" m' 55,240.75

19 J.019 Memasang 1 m' pipa PVC tipe AW Ø 3" m' 78,641.50

20 J.020 Memasang 1 m' pipa PVC tipe AW Ø 4" m' 108,556.50

21 J.021 Memasang 1 buah bak cuci piring satinless steel bh 758,550.00

22 J.022 Memasang 1 buah kran Ø ¾" atau ½" Biasa bh 24,975.00

23 J.023 Memasang 1 buah kran Ø ¾" atau ½" stanlis bh 101,775.00

24 J.024 Memasang 1 buah floordrain bh 53,630.00

K. PEKERJAAN BESI DAN ALUMUNIUM Revisi SNI T-16-2002

1 K.001 K.001 Memasang 1 kg rangka atap baja kg 27,848.00

2 K.002 K.002 Memasang 1 kg Besi Profil kg 33,095.00

3 K.003 K.003 Mengerjakan 100 kg pekerjaan perakitan kg 35,168.80

4 K.004 K.004 Mengerjakan 1 cm pengelasan dengan las listrik cm 3,232.30

5 K.005 K.005 Memasang 1 m² pintu gulung (rolling door) besi 515,940.00

6 K.006 K.006 Memasang 1 m² pintu lipat (folding door) 2,559,200.00

7 K.007 K.007 Memasang 1 m² rolling door alumunium 1,491,105.00

8 K.008 K.008 Memasang 1 m² pintu alumunium 956,478.00

9 K.009 K.009 Memasang 1 m' Kusen Alumunium 4 " m' 253,859.60 10 K.010 K.010 1 M2 Pintu Kaca Rangka Alumunium SNI 7393 : 2008 1,076,392.20

11 K.011 K.011 1 M2 Daun Jendela Kaca Rangka Alumunium SNI DT 90-0014-2007 841,175.33

12 K.012 K.012 Memasang 1 m² terali besi 474,027.35

13 K.013 K.013 Memasang 1 m² kawat harmonika 45,739.00

14 K.014 K.014 Memasang 1 m² kawat nyamuk 120,064.45

15 K.015 K.015 Memasang 1 m² jendela nako & tralis 234,277.00

16 K.016 K.016 Memasang 1 m' talang datar seng BJLS 30 m' 160,396.50

17 K.017 K.017 Memasang 1 m' talang miring seng BJLS 30 m' 161,931.50

18 K.018 K.018 Memasang 1 m' talang ½ lingkaran Ø 10 cm, seng BJLS 30 m' 117,585.00

19 K.019 K.019 Memasang 1 m' talang ½ lingkaran Ø 10 cm, seng BJLS 20 m' 73,536.00

20 K.020 K.020 Memasang 1 m' talang U dari PVC m' 138,050.00

L. PEKERJAAN KUNCI DAN KACA

1 L.001 L.001 Memasang 1 buah kunci tanam kwalitas baik bh 291,370.00

2 L.002 L.002 Memasang 1 buah kunci tanam biasa bh 107,900.00

3 L.004 L.004 Memasang 1 buah kunci tanam kamar mandi bh 129,050.00

4 L.005 L.005 Memasang 1 buah engsel pintu bh 56,905.00

5 L.006 L.006 Memasang 1 buah engsel jendela kupu-kupu bh 35,270.00

6 L.007 L.007 Memasang 1 buah kait angin bh 39,705.00

7 L.008 L.008 Memasang 1 buah kunci selot bh 43,040.00

8 L.009 L.009 Memasang 1 buah pegangan pintu / door holder bh 396,350.00

9 L.010 L.010 Pasang door closer 1 buah bh 203,850.00

10 L.011 L.011 Pasang door stop 1 buah bh 38,970.00

11 L.012 L.012 Memasang 1 buah rel pintu dorong bh 2,378,220.00

m²m²m²m²m²m²m²m²m²m²m²

m²m²m²

m²m²m²m²

m²m²m²m²m²m²

Page 7: Rencana Anggaran Biaya Pembangunan Gereja

Rekapitulasi Harga Satuan Pekerjaan Page 7

NO.KODE

JENIS PEKERJAAN HARGA SATUAN

ANALISA ( Rp ) NOMOR ANALISA

SATUAN

12 L.013 L.013 Memasang 1 m² kaca polos; tebal 3 mm 144,315.00

13 L.014 L.014 Memasang 1 m² kaca polos; tebal 5 mm 210,205.00

14 L.015 L.015 Memasang 1 m² kaca ryben; tebal 3 mm 208,775.00

15 L.016 L.016 Memasang 1 m² kaca ryben; tebal 5 mm 281,485.00

16 L.017 L.017 Memasang 1 m² kaca ryben; tebal 8 mm 207,380.25

17 L.018 L.018 Memasang 1 m² buram; tebal 3 mm 169,285.00

18 L.019 L.019 Memasang 1 m² buram; tebal 5 mm 265,865.00

19 L.020 L.020 Memasang 1 m² kaca cermin; tebal 3 mm 268,835.00

20 L.021 L.021 Memasang 1 m² kaca patri lokal 1,141,355.00

M. PEKERJAAN PENUTUP LANTAI DAN DINDING

1 M.001 M.001 Memasang 1 m² lantai keramik ukuran 60 x 60 cm 619,843.75

2 M.002 M.002 Memasang 1 m² lantai keramik ukuran 40 x 40 cm 231,357.75

3 M.003 M.003 Memasang 1 m² lantai keramik ukuran 30 x 30 cm 224,021.75

4 M.004 M.004 Pasang lantai keramik 20 x 20 cm per 1 M2 229,928.30

M.005 M.005 Memasang 1 m² dinding keramik ukuran 20 x 20 cm 265,014.70

5 M.006 M.006 Memasang 1 m² dinding keramik ukuran 20 x 25 cm 270,514.70

M.007 M.007 Memasang 1 m² dinding porselin 11 x 11 cm 301,929.70

6 M.008 M.008 Memasang 1 m' plint keramik ukuran 10 x 20 cm 179,028.75

7 M.009 M.009 Memasang 1 m² lantai ubin granito ukuran 40 x 40 cm 363,467.75

8 M.010 M.010 Memasang 1 m² lantai ubin granito ukuran 40x 40 cm (motif khusus) m' 1,547,967.75

9 M.011 M.011 Memasang 1 m² lantai marmer ukuran 40 x 40 cm 368,057.75

10 M.012 M.012 Memasang 1 m² dinding batu alam 382,320.25

11 M.013 M.013 Memasang 1 m' plint kayu ukuran 2 x 10 cm 33,565.00

12 M.014 M.014 Memasang Koral Sikat Motif M2 492,335.65

N. PEKERJAAN PENGECATAN

1 N.001 Mengikis / mengerok permukaan cat tembok lama 1 M2 14,515.00

2 N.002 Mencuci bidang permukaan tembok yang pernah di cat per 1 M2 14,850.00

3 N.003 Mengerok karat cat lama permukaan baja dengan cara manual per 1 m2 14,850.00

4 N.004 Mendempul dan Menggosok 1 m² kayu 11,602.00

5 N.005 Mengecat 1 m² bidang kayu lama 31,330.00

6 N.006 Mengecat 1 m² bidang kayu baru (1 lps plamir, 1 lps cat dsr, 2 lps cat penutup) 32,972.00

7 N.007 Mengecat 1 m² bidang kayu baru (1 lps plamir, 1 lps cat dsr, 3 lps cat penutup) 47,529.00

8 N.008 Pelaburan bidang kayu dengan teak oil per 1 M2 24,654.00

9 N.009 Melabur 1 m² bidang kayu dengan politur 35,915.00

10 N.010 Melabur 1 m² bidang kayu dengan cat residu 13,200.00

11 N.011 Melabur 1 m² bidang kayu dengan vernis 43,631.00

12 N.012 Mengecat 1 m² bidang tembok baru (1 lps plamir, 1 lps cat dsr, 2 lps cat penutup) 19,161.00

13 N.013 Mengecat 1 m² bidang tembok lama (1 lps cat dsr, 2 lps cat penutup) 15,098.00

14 N.014 Mengecat 1 m² bidang tembok tidak terlindung dari panas dan hujan 45,187.00

15 N.015 Pengecatan atap memakai cat khusus atap per m2 49,213.30

16 N.016 Pemasangan wall paper per 1 m2 143,950.00

17 N.017 Mengecat 1 m² permukaan baja dengan meni besi 30,396.00

18 N.018 Mengecat 1 m² permukaan baja dengan meni besi dan perancah 57,121.00

m²m²m²m²m²m²m²m²m²

m²m²m²m²m²m²m²m²m²

m²m²m²m²

m²m²m²m²m²m²m²m²m²m²m²m²m²m²m²m²m²m²

Page 8: Rencana Anggaran Biaya Pembangunan Gereja

Analisa Harga Satuan Pekerjaan Page 8

DINAS PEKERJAAN UMUMKABUPATEN BULUNGAN

ANALISA HARGA SATUAN PEKERJAANTAHUN ANGGARAN 2014

NO KOEF SAT HARGA SAT

Rp.

1 2 3 4 5A. PEKERJAAN PERSIAPAN

A.001 Membuat 1 m' pagar sementara dari kayu tinggi 2 meterBahanKayu Dolken / Kayu perancah 1.2500 Btg 16,000.00 Portland Cement (PC) 2.5000 kg 1,820.00 Pasir Beton (PB) 0.0050 m³ 107,150.00 Kerikil Sungai 0.0090 m³ 242,000.00 Kayu Meranti 5/7 0.0720 m³ 1,870,000.00 Paku Biasa 2" - 5" 0.0600 kg 21,650.00 Residu 0.4000 lt 11,700.00

Jumlah (1) TenagaPekerja 0.4000 OH 90,000.00 Tukang Kayu 0.2000 OH 110,000.00 Kepala Tukang 0.0200 OH 130,000.00 Mandor 0.0200 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

A.002 Membuat 1 m' pagar sementara dari seng gelombang tinggi 2 meterBahanKayu Dolken / Kayu perancah 1.2500 Btg 16,000.00 Portland Cement (PC) 2.5000 kg 1,820.00 Seng Gelombang 3" - 5" 1.2000 lbr 64,950.00 Pasir Beton (PB) 0.0050 m³ 107,150.00 Koral Beton (maksimum 30 mm) 0.0090 m³ 242,000.00 Kayu Meranti 5/7 0.0720 m³ 1,870,000.00 Paku Biasa 2" - 5" 0.0600 kg 21,650.00 Meni Kayu 0.4500 Kg 24,200.00

Jumlah (1)

TenagaPekerja 0.4000 OH 90,000.00 Tukang Kayu 0.2000 OH 110,000.00 Kepala Tukang 0.0200 OH 130,000.00 Mandor 0.0200 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

A.003 Membuat 1 m' pagar sementara dari kawat duri tinggi 1.8 meterBahanKayu Dolken / Kayu perancah 1.0000 Btg 16,000.00 Portland Cement (PC) 2.0000 kg 1,820.00 Kawat Duri 25.0000 kg 10,100.00 Pasir Beton (PB) 0.0050 m³ 107,150.00 Koral Beton (maksimum 30 mm) 0.0090 m³ 242,000.00 Paku Biasa 2" - 5" 0.0600 kg 21,650.00

Jumlah (1) TenagaPekerja 0.3000 OH 90,000.00 Tukang Kayu 0.2000 OH 110,000.00 Kepala Tukang 0.0200 OH 130,000.00 Mandor 0.0200 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

A.004 Mengerjakan 1 m' pengukuran dan pemasangan bouwplankBahanKayu Meranti 5/7 0.0120 m³ 1,870,000.00 Paku Biasa 2" - 5" 0.0200 kg 21,650.00 Kayu Papan Meranti (2 x 20 x 400) 0.0070 m³ 1,870,000.00

Jumlah (1)

Page 9: Rencana Anggaran Biaya Pembangunan Gereja

Analisa Harga Satuan Pekerjaan Page 9

NO KOEF SAT HARGA SAT

Rp.

1 2 3 4 5TenagaPekerja 0.1000 OH 90,000.00 Tukang Kayu 0.1000 OH 110,000.00 Kepala Tukang 0.0100 OH 130,000.00 Mandor 0.0050 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

A.005 Membuat 1 m² kantor sementara, dengan lantai plesteranBahanKayu Dolken / Kayu perancah 1.2500 m' 16,000.00 Kayu Meranti 5/7 (ikat) 0.1800 m³ 1,870,000.00 Paku 0.8500 kg 21,650.00 Besi Strip 1.1000 kg 24,600.00 Semen Portland 35.0000 kg 1,820.00 Pasir Urug 0.1500 m³ 100,800.00 Pasir Beton 0.1000 m³ 107,150.00 Kerikil Sungai 0.1500 m³ 242,000.00 Bata Merah 30.0000 bh 990.00 Seng Plat Bjls 20 0.2500 lbr 15,000.00 Jendela Nako 2.0000 bh 122,100.00 Kaca Polos 3mm 0.0800 m² 113,100.00 Kunci Tanam 0.1500 bh 211,750.00 Plywood 3 mm 0.0600 lbr 60,500.00

Jumlah (1)

Pekerja 2.0000 OH 90,000.00 Tukang Batu 1.0000 OH 110,000.00 Tukang Kayu 2.0000 OH 110,000.00 Kepala Tukang 0.3000 OH 130,000.00 Mandor 0.0500 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

A.006 Membuat 1 m² gudang semen dan alat-alatBahanKayu Dolken / Kayu perancah 1.7000 Btg 16,000.00 Kayu Meranti 5/7 (ikat) 0.2100 m³ 1,870,000.00 Paku 0.3000 kg 21,650.00 Semen Portland 10.5000 kg 1,820.00 Pasir Beton 0.0300 m³ 107,150.00 Kerikil Sungai 0.0500 m³ 242,000.00 Seng Gelombang BJLS 30 1.5000 lbr 64,950.00

Jumlah (1) TenagaPekerja 1.0000 OH 90,000.00 Tukang Kayu 2.0000 OH 110,000.00 Kepala Tukang 0.2000 OH 130,000.00 Mandor 0.0500 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

A.007 Membuat 1 m² rumah jaga konstruksi kayuBahanKayu Dolken / Kayu perancah 3.0000 Btg 16,000.00 Kayu Meranti 5/7 (ikat) 0.2760 m³ 1,870,000.00 Paku 0.7000 kg 21,650.00 Seng Gelombang BJLS 30 1.5000 lbr 64,950.00

Jumlah (1) TenagaPekerja 1.0000 OH 90,000.00 Tukang Kayu 1.5000 OH 110,000.00 Kepala Tukang 0.1500 OH 130,000.00 Mandor 0.0500 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

A.008 Membersihkan 1 m² lapangan dan perataanPekerja 0.1000 OH 90,000.00 Mandor 0.0500 OH 140,000.00

Jumlah (2)

Page 10: Rencana Anggaran Biaya Pembangunan Gereja

Analisa Harga Satuan Pekerjaan Page 10

NO KOEF SAT HARGA SAT

Rp.

1 2 3 4 5A.009 Membuat 1 m² bedeng buruh

BahanKayu Dolken / Kayu perancah 1.2500 Btg 16,000.00 Kayu Meranti 5/7 (ikat) 0.1860 m³ 1,870,000.00 Paku 0.3000 kg 21,650.00 Semen Portland 18.0000 kg 1,820.00 Pasir Beton 0.0300 m³ 107,150.00 Kerikil Sungai 0.0500 m³ 242,000.00 Seng Gelombang BJLS 32 1.5000 lbr 64,950.00 Plywood 6 mm 1.3500 lbr 60,500.00

Jumlah (1) TenagaPekerja 1.0000 OH 90,000.00 Tukang Kayu 2.0000 OH 110,000.00 Kepala Tukang 0.2000 OH 130,000.00 Mandor 0.0500 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

A.010 Membuat 1 m² jalan sementaraBahanBatu Belah 15/20 0.1500 m³ 431,200.00 Batu Pecah 5/7 0.0900 m³ 595,833.33 Pasir Pasang 0.0100 m³ 107,150.00

Jumlah (1) TenagaPekerja 1.0000 OH 90,000.00 Mandor 0.0500 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

A.011 Membongkar 1 m³ beton bertulangPekerja 6.6670 OH 90,000.00 Mandor 0.3330 OH 140,000.00

Jumlah A.012 Membongkar 1 m³ dinding tembok bata merah

Pekerja 6.6670 OH 90,000.00 Mandor 0.0330 OH 140,000.00

Jumlah A.013 Mengerjakan1 m² pengukuran kembali (site)

Pekerja 0.0200 OH 90,000.00 Tukang Kayu 0.0100 OH 110,000.00 Peralatan 0.5000 OH 56,100.00 Jumlah

A.014 Membongkar 1 m³ dinding bata/ pas. batu kali (bongkaran dipakai kembali)Pekerja 3.0000 OH 90,000.00 Mandor 0.0900 OH 140,000.00 Jumlah

A.015 Mengupas 1 m² plesteranPekerja 0.1250 OH 90,000.00 Mandor 0.0125 OH 140,000.00 Jumlah

A.016 Membongkar 1 m² plesteran dinding/ siaranPekerja 0.1250 OH 90,000.00 Mandor 0.0125 OH 140,000.00 Jumlah

A.017 Membongkar 1 m² genteng/ sirap ( bongkaran dipakai kembali)Pekerja 0.5000 OH 90,000.00 Mandor 0.0500 OH 140,000.00 Jumlah

A.018 Membongkar 1 m² genteng/ sirap (bongkaran tidak dipakai kembali)Pekerja 0.1000 OH 90,000.00 Mandor 0.0100 OH 140,000.00 Jumlah

A.019 Membongkar 1 m² rangka atap/ reng/ kaso (bongkaran dipakai kembali)Pekerja 0.2000 OH 90,000.00 Tukang Kayu 0.1000 OH 110,000.00 Kepala Tukang 0.0100 OH 130,000.00 Mandor 0.0200 OH 140,000.00

Page 11: Rencana Anggaran Biaya Pembangunan Gereja

Analisa Harga Satuan Pekerjaan Page 11

NO KOEF SAT HARGA SAT

Rp.

1 2 3 4 5Jumlah

A.020 Membongkar 1 m² rangka atap/ reng/ kaso (bongkaran tidak dipakai kembali)Pekerja 0.1500 OH 90,000.00 Tukang Kayu 0.0750 OH 110,000.00 Kepala Tukang 0.0075 OH 130,000.00 Mandor 0.0150 OH 140,000.00 Jumlah

A.021 Membongkar 1 m³ kuda-kuda/ gording/ balok (bongkaran dipakai kembali)Pekerja 4.0000 OH 90,000.00 Tukang Kayu 6.0000 OH 110,000.00 Kepala Tukang 0.6000 OH 130,000.00 Mandor 0.4000 OH 140,000.00 Jumlah

A.022 Membongkar 1 m³ kuda-kuda/ gording/ balok (bongkaran tidak dipakai kembali)Pekerja 4.0000 OH 90,000.00 Tukang Kayu 3.0000 OH 110,000.00 Mandor 0.2000 OH 140,000.00 Jumlah

A.023 Membongkar 1 m² plafond (bongkaran dipakai kembali)Pekerja 0.1000 OH 90,000.00 Tukang Kayu 0.3000 OH 110,000.00 Kepala Tukang 0.0300 OH 130,000.00 Mandor 0.0100 OH 140,000.00 Jumlah

A.024 Membongkar 1 m² plafond (bongkaran tidak dipakai kembali)Pekerja 0.1500 OH 90,000.00 Mandor 0.0150 OH 140,000.00 Jumlah

B. PEKERJAAN TANAH SNI B.001 Menggali 1 m³ tanah biasa sedalam 1 meter

TenagaPekerja 0.7500 OH 90,000.00 Mandor 0.0250 OH 140,000.00 Jumlah

B.002 Menggali 1 m³ tanah biasa sedalam 2 meterTenagaPekerja 0.9000 OH 90,000.00 Mandor 0.0450 OH 140,000.00 Jumlah

B.003 Menggali 1 m³ tanah biasa sedalam 3 meterTenagaPekerja 1.0500 OH 90,000.00 Mandor 0.0670 OH 140,000.00 Jumlah

B.004 Menggali 1 m³ tanah keras sedalam 1 meterTenagaPekerja 1.0000 OH 90,000.00 Mandor 0.0320 OH 140,000.00 Jumlah

B.005 Menggali 1 m³ tanah cadas sedalam 1 meterTenagaPekerja 1.5000 OH 90,000.00 Mandor 0.0600 OH 140,000.00 Jumlah

B.006 Menggali 1 m³ tanah lumpur sedalam 1 meterTenagaPekerja 1.2000 OH 90,000.00 Mandor 0.0450 OH 140,000.00 Jumlah

B.007 Mengerjakan 1 m² stripping tebing setinggi 1 meterTenagaPekerja 0.0500 OH 90,000.00 Mandor 0.0050 OH 140,000.00 Jumlah

B.008 Membuang 1 m³ tanah sejauh 30 meterTenagaPekerja 0.3300 OH 90,000.00

Page 12: Rencana Anggaran Biaya Pembangunan Gereja

Analisa Harga Satuan Pekerjaan Page 12

NO KOEF SAT HARGA SAT

Rp.

1 2 3 4 5Mandor 0.0100 OH 140,000.00 Jumlah

B.009 Membuang 1 m³ tanah sejauh 150 meterTenagaPekerja 0.5160 OH 90,000.00 Mandor 0.0500 OH 140,000.00 Jumlah

B.010 Mengurug kembali 1 m³ galianTenagaPekerja 0.2500 OH 90,000.00 Mandor 0.0083 OH 140,000.00 Jumlah

B.011 Memadatkan 1 m³ tanah (per 20 cm)TenagaPekerja 0.5000 OH 90,000.00 Mandor 0.0500 OH 140,000.00 Jumlah

B.012 Mengurug 1 m³ pasir urugBahanPasir Urug 1.2000 m³ 100,800.00

Jumlah (1) TenagaPekerja 0.3000 OH 90,000.00 Mandor 0.0100 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

B.013 Mengurug 1 m³ sirtu padat untuk peninggian lantai bangunanBahanSirtu 1.2000 m³ 121,000.00

Jumlah (1) TenagaPekerja 0.2500 OH 90,000.00 Mandor 0.0250 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

B.014 Mengurug 1 m³ Tanah Timbunan BahanTanah Timbunan 1.2000 m³ 66,000.00

Jumlah (1) TenagaPekerja 0.2500 OH 90,000.00 Mandor 0.0250 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

C. PEKERJAAN PONDASI SNI 03-2836-2002 C.001 Memasang 1 m³ pondasi batu belah; campuran 1 PC : 1 PP

BahanBatu Belah 15/20 1.2000 m³ 431,200.00 Portland Cement (PC) 392.0000 kg 1,820.00 Pasir Pasang (PP) 0.3140 m³ 107,150.00

Jumlah (1) TenagaPekerja 1.5000 OH 90,000.00 Tukang Batu 0.6000 OH 110,000.00 Kepala Tukang 0.0600 OH 130,000.00 Mandor 0.0750 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

C.002 Memasang 1 m³ pondasi batu belah; campuran 1 PC : 2 PP, Batu Belah 15/20BahanBatu Belah 15/20 1.2000 m³ 431,200.00 Portland Cement (PC) 267.0000 kg 1,820.00 Pasir Pasang (PP) 0.4270 m³ 107,150.00

Jumlah (1) Tenaga

Page 13: Rencana Anggaran Biaya Pembangunan Gereja

Analisa Harga Satuan Pekerjaan Page 13

NO KOEF SAT HARGA SAT

Rp.

1 2 3 4 5Pekerja 1.5000 OH 90,000.00 Tukang Batu 0.6000 OH 110,000.00 Kepala Tukang 0.0600 OH 130,000.00 Mandor 0.0750 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

C.003 Memasang 1 m³ pondasi batu belah; campuran 1 PC : 2 PP, Batu GunungBahanBatu Gunung 1.2000 m³ 392,000.00 Portland Cement (PC) 267.0000 kg 1,820.00 Pasir Pasang (PP) 0.4270 m³ 107,150.00

Jumlah (1) TenagaPekerja 1.5000 OH 90,000.00 Tukang Batu 0.6000 OH 110,000.00 Kepala Tukang 0.0600 OH 130,000.00 Mandor 0.0750 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

C.004 Memasang 1 m³ pondasi batu belah; campuran 1 PC : 2,5 PPBahanBatu Belah 15/20 1.2000 m³ 431,200.00 Portland Cement (PC) 392.0000 kg 1,820.00 Pasir Pasang (PP) 0.3140 m³ 107,150.00

Jumlah (1) TenagaPekerja 1.5000 OH 90,000.00 Tukang Batu 0.6000 OH 110,000.00 Kepala Tukang 0.0600 OH 130,000.00 Mandor 0.0750 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

C.005 Memasang 1 m³ pondasi batu belah; campuran 1 PC : 3 PPBahanBatu Belah 15/20 1.2000 m³ 431,200.00 Portland Cement (PC) 202.0000 kg 1,820.00 Pasir Pasang (PP) 0.4850 m³ 107,150.00

Jumlah (1) TenagaPekerja 1.5000 OH 90,000.00 Tukang Batu 0.6000 OH 110,000.00 Kepala Tukang 0.0600 OH 130,000.00 Mandor 0.0750 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

C.006 Memasang 1 m³ pondasi batu belah; campuran 1 PC : 4 PPBahanBatu Belah 15/20 1.2000 m³ 431,200.00 Portland Cement (PC) 163.0000 kg 1,820.00 Pasir Pasang (PP) 0.5200 m³ 107,150.00

Jumlah (1) TenagaPekerja 1.5000 OH 90,000.00 Tukang Batu 0.7500 OH 110,000.00 Kepala Tukang 0.0750 OH 130,000.00 Mandor 0.0750 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

C.007 Memasang 1 m³ pondasi Batu Gunung; campuran 1 PC : 4 PPBahanBatu Gunung 1.2000 m³ 392,000.00 Portland Cement (PC) 163.0000 kg 1,820.00 Pasir Pasang (PP) 0.5200 m³ 107,150.00

Jumlah (1) TenagaPekerja 1.5000 OH 90,000.00 Tukang Batu 0.7500 OH 110,000.00 Kepala Tukang 0.0750 OH 130,000.00

Page 14: Rencana Anggaran Biaya Pembangunan Gereja

Analisa Harga Satuan Pekerjaan Page 14

NO KOEF SAT HARGA SAT

Rp.

1 2 3 4 5Mandor 0.0750 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

C.008 Memasang 1 m³ pondasi batu belah; campuran 1 PC : 5 PPBahanBatu Belah 15/20 1.2000 m³ 431,200.00 Portland Cement (PC) 136.0000 kg 1,820.00 Pasir Pasang (PP) 0.5440 m³ 107,150.00

Jumlah (1) TenagaPekerja 1.5000 OH 90,000.00 Tukang Batu 0.7500 OH 110,000.00 Kepala Tukang 0.0750 OH 130,000.00 Mandor 0.0750 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

C.009 Memasang 1 m³ pondasi batu belah; campuran 1 PC : 6 PPBahanBatu Belah 15/20 1.2000 m³ 431,200.00 Portland Cement (PC) 117.0000 kg 1,820.00 Pasir Pasang (PP) 0.5610 m³ 107,150.00

Jumlah (1) TenagaPekerja 1.5000 OH 90,000.00 Tukang Batu 0.7500 OH 110,000.00 Kepala Tukang 0.0750 OH 130,000.00 Mandor 0.0750 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

C.010 Memasang 1 m³ pondasi batu belah; campuran 1 PC : 8 PPBahanBatu Belah 15/20 1.2000 m³ 431,200.00 Portland Cement (PC) 91.0000 kg 1,820.00 Pasir Pasang (PP) 0.5840 m³ 107,150.00

Jumlah (1) TenagaPekerja 1.5000 OH 90,000.00 Tukang Batu 0.7500 OH 110,000.00 Kepala Tukang 0.0750 OH 130,000.00 Mandor 0.0750 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

C.011 Memasang 1 m³ batu kosong (anstamping), Batu Belah 15/20BahanBatu Belah 15/20 1.2000 m³ 431,200.00 Pasir Urug 0.4320 m³ 100,800.00

Jumlah (1) TenagaPekerja 0.7800 OH 90,000.00 Tukang Batu 0.3900 OH 110,000.00 Kepala Tukang 0.0390 OH 130,000.00 Mandor 0.0390 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

C.012 Memasang 1 m³ batu kosong (anstamping), Batu GunungBahanBatu Gunung 1.2000 m³ 392,000.00 Pasir Urug 0.4320 m³ 100,800.00

Jumlah (1) TenagaPekerja 0.7800 OH 90,000.00 Tukang Batu 0.3900 OH 110,000.00 Kepala Tukang 0.0390 OH 130,000.00 Mandor 0.0390 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

C.013 Memasang 1 m³ pondasi siklop; 60% beton campuran 1 PC : 2 PB : 3 KR dan 40 % batu belah

Page 15: Rencana Anggaran Biaya Pembangunan Gereja

Analisa Harga Satuan Pekerjaan Page 15

NO KOEF SAT HARGA SAT

Rp.

1 2 3 4 5BahanBatu Belah 15/20 0.4800 m³ 431,200.00 Portland Cement (PC) 194.0000 kg 1,820.00 Pasir Beton (PB) 0.3120 m³ 107,150.00 Koral (Batu pecah ) 0.4680 m³ 595,833.33 Besi Beton 126.0000 m³ 15,400.00 Kawat Beton 1.8000 m³ 22,000.00

Jumlah (1) TenagaPekerja 3.4000 OH 90,000.00 Tukang Batu 0.8500 OH 110,000.00 Kepala Tukang 0.0850 OH 130,000.00 Mandor 0.1700 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

C.014 Memasang 1 m³ pondasi sumuran; diameter 100 cmBahanBatu Belah 15/20 0.4500 m³ 431,200.00 Portland Cement (PC) 194.0000 kg 1,820.00 Pasir Beton (PB) 0.3120 m³ 107,150.00 Koral (Batu pecah ukuran 5 mm - 40 mm) 0.4680 m³ 595,833.33

Jumlah (1) TenagaPekerja 2.3800 OH 90,000.00 Tukang Batu 0.3000 OH 110,000.00 Kepala Tukang 0.0300 OH 130,000.00 Mandor 0.0800 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

C.015 Memasang 1 m' tiang pancang (40x40) cm, beton bertulangBahanPasir Urug 0.0190 m³ 100,800.00 Pasir Beton (PB) 0.0940 m³ 107,150.00 Koral (Batu pecah ukuran 5 mm - 40 mm) 0.1500 m³ 595,833.33 Portland Cement (PC) 60.5000 kg 1,820.00 Besi Beton 45.0000 kg 15,400.00 Kawat Beton 0.9000 kg 22,000.00 Kayu Kaso 5/7 0.0320 m³ 1,870,000.00 Paku 0.1200 kg 21,650.00 Minyak Bekisting 0.0900 lt 10,600.00 Plamuur Tembok 0.2400 kg 8,360.00

Jumlah (1) TenagaPekerja 1.0000 OH 90,000.00 Tukang Batu 0.6700 OH 110,000.00 Kepala Tukang 0.0670 OH 130,000.00 Mandor 0.0500 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

C.016 Memasang 1 m' tiang pancang (35x35) cm, beton bertulangBahanPasir Urug 0.0160 m³ 100,800.00 Pasir Beton (PB) 0.0800 m³ 107,150.00 Koral (Batu pecah ukuran 5 mm - 40 mm) 0.1250 m³ 595,833.33 Portland Cement (PC) 49.0000 kg 1,820.00 Besi Beton 34.5000 kg 15,400.00 Kawat Beton 0.7000 kg 22,000.00 Kayu Kaso 5/7 0.0270 m³ 1,870,000.00 Paku 0.1200 kg 21,650.00 Minyak Bekisting 0.0900 lt 10,600.00 Plamuur Tembok 0.2000 kg 8,360.00

Jumlah (1) TenagaPekerja 0.8000 OH 90,000.00 Tukang Batu 0.5000 OH 110,000.00 Kepala Tukang 0.0500 OH 130,000.00

Page 16: Rencana Anggaran Biaya Pembangunan Gereja

Analisa Harga Satuan Pekerjaan Page 16

NO KOEF SAT HARGA SAT

Rp.

1 2 3 4 5Mandor 0.0400 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

C.017 Pemancangan Tiang Pancang Beton 25/25 per m'AlatDrop Hammer 0.1300 Jam 250,000.00 Alat Bantu 1.0000 Ls 56,100.00

Jumlah (1) TenagaUpah Kerja 1.0000 m' 45,000.00

Jumlah (2) Jumlah (1) + (2)

D. PEKERJAAN DINDING SNI 03-2837-2002 D.001 Memasang 1 m² dinding bata merah (8x8x16) cm; tebal 1 bata; campuran 1 PC : 1 PP

BahanBata Merah 120.0000 buah 990.00 Portland Cement (PC) 64.0300 kg 1,820.00 Pasir Pasang (PP) 0.0590 m³ 107,150.00

Jumlah (1) TenagaPekerja 0.6500 OH 90,000.00 Tukang Batu 0.2000 OH 110,000.00 Kepala Tukang 0.0200 OH 130,000.00 Mandor 0.0300 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

D.002 Memasang 1 m² dinding bata merah (8x8x16) cm; tebal 1 bata; campuran 1 PC : 2 PPBahanBata Merah 120.0000 buah 990.00 Portland Cement (PC) 43.5000 kg 1,820.00 Pasir Pasang (PP) 0.0800 m³ 107,150.00

Jumlah (1) TenagaPekerja 0.6000 OH 90,000.00 Tukang Batu 0.2000 OH 110,000.00 Kepala Tukang 0.0200 OH 130,000.00 Mandor 0.0300 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

D.003 Memasang 1 m² dinding bata merah (8x8x16) cm; tebal 1 bata; campuran 1 PC : 3 PPBahanBata Merah 120.0000 buah 990.00 Portland Cement (PC) 32.9500 kg 1,820.00 Pasir Pasang (PP) 0.0910 m³ 107,150.00

Jumlah (1) TenagaPekerja 0.6000 OH 90,000.00 Tukang Batu 0.2000 OH 110,000.00 Kepala Tukang 0.0200 OH 130,000.00 Mandor 0.0300 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

D.004 Memasang 1 m² dinding bata merah (8x8x16) cm; tebal 1 bata; campuran 1 PC : 4 PPBahanBata Merah 120.0000 buah 990.00 Portland Cement (PC) 26.5500 kg 1,820.00 Pasir Pasang (PP) 0.0930 m³ 107,150.00

Jumlah (1) TenagaPekerja 0.6000 OH 90,000.00 Tukang Batu 0.2000 OH 110,000.00 Kepala Tukang 0.0200 OH 130,000.00 Mandor 0.0300 OH 140,000.00

Page 17: Rencana Anggaran Biaya Pembangunan Gereja

Analisa Harga Satuan Pekerjaan Page 17

NO KOEF SAT HARGA SAT

Rp.

1 2 3 4 5 Jumlah (2)

Jumlah (1) + (2)D.005 Memasang 1 m² dinding bata merah (8x8x16) cm; tebal 1 bata; campuran 1 PC : 5 PP

BahanBata Merah 120.0000 buah 990.00 Portland Cement (PC) 22.2000 kg 1,820.00 Pasir Pasang (PP) 0.1020 m³ 107,150.00

Jumlah (1) TenagaPekerja 0.6000 OH 90,000.00 Tukang Batu 0.2000 OH 110,000.00 Kepala Tukang 0.0200 OH 130,000.00 Mandor 0.0300 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

D.006 Memasang 1 m² dinding bata merah (8x8x16) cm; tebal 1 bata; campuran 1 PC : 6 PPBahanBata Merah 120.0000 buah 990.00 Portland Cement (PC) 18.5000 kg 1,820.00 Pasir Pasang (PP) 0.1220 m³ 107,150.00

Jumlah (1) TenagaPekerja 0.6000 OH 90,000.00 Tukang Batu 0.2000 OH 110,000.00 Kepala Tukang 0.0200 OH 130,000.00 Mandor 0.0300 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

D.007 Memasang 1 m² dinding bata merah (8x8x16) cm; tebal ½ bata; campuran 1 PC : 1 PPBahanBata Merah 60.0000 buah 990.00 Portland Cement (PC) 27.8000 kg 1,820.00 Pasir Pasang (PP) 0.0280 m³ 107,150.00

Jumlah (1) TenagaPekerja 0.3200 OH 90,000.00 Tukang Batu 0.1000 OH 110,000.00 Kepala Tukang 0.0100 OH 130,000.00 Mandor 0.0150 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

D.008 Memasang 1 m² dinding bata merah (8x8x16) cm; tebal ½ bata; campuran 1 PC : 2 PPBahanBata Merah 60.0000 buah 990.00 Portland Cement (PC) 18.9500 kg 1,820.00 Pasir Pasang (PP) 0.0380 m³ 107,150.00

Jumlah (1) TenagaPekerja 0.3000 OH 90,000.00 Tukang Batu 0.1000 OH 110,000.00 Kepala Tukang 0.0100 OH 130,000.00 Mandor 0.0150 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

D.009 Memasang 1 m² dinding bata merah (8x8x16) cm; tebal ½ bata; campuran 1 PC : 3 PPBahanBata Merah 60.0000 buah 990.00 Portland Cement (PC) 14.3700 kg 1,820.00 Pasir Pasang (PP) 0.0400 m³ 107,150.00

Jumlah (1) TenagaPekerja 0.3000 OH 90,000.00 Tukang Batu 0.1000 OH 110,000.00 Kepala Tukang 0.0100 OH 130,000.00 Mandor 0.0150 OH 140,000.00

Jumlah (2)

Page 18: Rencana Anggaran Biaya Pembangunan Gereja

Analisa Harga Satuan Pekerjaan Page 18

NO KOEF SAT HARGA SAT

Rp.

1 2 3 4 5Jumlah (1) + (2)

D.010 Memasang 1 m² dinding bata merah (8x8x16) cm; tebal ½ bata; campuran 1 PC : 4 PPBahanBata Merah 60.0000 buah 990.00 Portland Cement (PC) 11.5000 kg 1,820.00 Pasir Pasang (PP) 0.0430 m³ 107,150.00

Jumlah (1) TenagaPekerja 0.3000 OH 90,000.00 Tukang Batu 0.1000 OH 110,000.00 Kepala Tukang 0.0100 OH 130,000.00 Mandor 0.0150 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

D.011 Memasang 1 m² dinding bata merah (8x8x16) cm; tebal ½ bata; campuran 1 PC : 5 PPBahanBata Merah 60.0000 buah 990.00 Portland Cement (PC) 9.6800 kg 1,820.00 Pasir Pasang (PP) 0.0450 m³ 107,150.00

Jumlah (1) TenagaPekerja 0.3000 OH 90,000.00 Tukang Batu 0.1000 OH 110,000.00 Kepala Tukang 0.0100 OH 130,000.00 Mandor 0.0150 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

D.012 Memasang 1 m² dinding bata merah (8x8x16) cm; tebal ½ bata; campuran 1 PC : 6 PPBahanBata Merah 60.0000 buah 990.00 Portland Cement (PC) 8.3200 kg 1,820.00 Pasir Pasang (PP) 0.0490 m³ 107,150.00

Jumlah (1) TenagaPekerja 0.3000 OH 90,000.00 Tukang Batu 0.1000 OH 110,000.00 Kepala Tukang 0.0100 OH 130,000.00 Mandor 0.0150 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

D.013 Memasang 1 m² dinding bata merah (8x8x16) cm; tebal ½ bata; campuran 1 PC : 8 PPBahanBata Merah 60.0000 buah 990.00 Portland Cement (PC) 6.5000 kg 1,820.00 Pasir Pasang (PP) 0.0500 m³ 107,150.00

Jumlah (1) TenagaPekerja 0.3000 OH 90,000.00 Tukang Batu 0.1000 OH 110,000.00 Kepala Tukang 0.0100 OH 130,000.00 Mandor 0.0150 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

D.014 Memasang 1 m² dinding terawang (roster) uk. (12x11x24) cm; campuran spesi 1 PC : 3 PPBahanBata Terawang / Roster 30.0000 buah 10,000.00 Portland Cement (PC) 14.0000 kg 1,820.00 Pasir Pasang (PP) 0.0320 m³ 107,150.00

Jumlah (1) TenagaPekerja 0.3000 OH 90,000.00 Tukang Batu 0.1000 OH 110,000.00 Kepala Tukang 0.0100 OH 130,000.00 Mandor 0.0150 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

Page 19: Rencana Anggaran Biaya Pembangunan Gereja

Analisa Harga Satuan Pekerjaan Page 19

NO KOEF SAT HARGA SAT

Rp.

1 2 3 4 5

D.015 Memasang 1 m² dinding terawang (roster) uk. (12x11x24) cm; campuran spesi 1 PC : 4 PPBahanBata Terawang / Roster 30.0000 buah 10,000.00 Portland Cement (PC) 11.0000 kg 1,820.00 Pasir Pasang (PP) 0.0350 m³ 107,150.00

Jumlah (1) TenagaPekerja 0.3000 OH 90,000.00 Tukang Batu 0.1000 OH 110,000.00 Kepala Tukang 0.0100 OH 130,000.00 Mandor 0.0150 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

D.016 Memasang 1 m² dinding bata berongga ekspose uk. (5x11x24) cm; campuran spesi 1 PC : 3 PPBahanBata Terawang / Roster 70.0000 buah 10,000.00 Portland Cement (PC) 14.0000 kg 1,820.00 Pasir Pasang (PP) 0.0320 m³ 107,150.00

Jumlah (1) TenagaPekerja 0.3000 OH 90,000.00 Tukang Batu 0.1500 OH 110,000.00 Kepala Tukang 0.0150 OH 130,000.00 Mandor 0.0150 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

E. PEKERJAAN PLESTERAN SNI 03-2837-2002 E.001 Memasang 1 m² plesteran 1 PC : 1 PP; tebal 15 mm

BahanPortland Cement (PC) 15.5040 kg 1,820.00 Pasir Pasang (PP) 0.0160 m³ 107,150.00

Jumlah (1) TenagaPekerja 0.3000 OH 90,000.00 Tukang Batu 0.1500 OH 110,000.00 Kepala Tukang 0.0150 OH 130,000.00 Mandor 0.0150 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

E.002 Memasang 1 m² plesteran 1 PC : 2 PP; tebal 15 mmBahanPortland Cement (PC) 10.2240 kg 1,820.00 Pasir Pasang (PP) 0.0200 m³ 107,150.00

Jumlah (1) TenagaPekerja 0.3000 OH 90,000.00 Tukang Batu 0.1500 OH 110,000.00 Kepala Tukang 0.0150 OH 130,000.00 Mandor 0.0150 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

E.003 Memasang 1 m² plesteran 1 PC : 3 PP; tebal 15 mmBahanPortland Cement (PC) 7.7760 kg 1,820.00 Pasir Pasang (PP) 0.0230 m³ 107,150.00

Jumlah (1) TenagaPekerja 0.3000 OH 90,000.00 Tukang Batu 0.1500 OH 110,000.00 Kepala Tukang 0.0150 OH 130,000.00 Mandor 0.0150 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

E.004 Memasang 1 m² plesteran 1 PC : 4 PP; tebal 15 mm

Page 20: Rencana Anggaran Biaya Pembangunan Gereja

Analisa Harga Satuan Pekerjaan Page 20

NO KOEF SAT HARGA SAT

Rp.

1 2 3 4 5BahanPortland Cement (PC) 6.2400 kg 1,820.00 Pasir Pasang (PP) 0.0240 m³ 107,150.00

Jumlah (1) TenagaPekerja 0.3000 OH 90,000.00 Tukang Batu 0.1500 OH 110,000.00 Kepala Tukang 0.0150 OH 130,000.00 Mandor 0.0150 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

E.005 Memasang 1 m² plesteran 1 PC : 5 PP; tebal 15 mmBahanPortland Cement (PC) 5.1840 kg 1,820.00 Pasir Pasang (PP) 0.0260 m³ 107,150.00

Jumlah (1)

TenagaPekerja 0.3000 OH 90,000.00 Tukang Batu 0.1500 OH 110,000.00 Kepala Tukang 0.0150 OH 130,000.00 Mandor 0.0100 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

E.006 Memasang 1 m² plesteran 1 PC : 6 PP; tebal 15 mmBahanPortland Cement (PC) 4.4160 kg 1,820.00 Pasir Pasang (PP) 0.0270 m³ 107,150.00

Jumlah (1) TenagaPekerja 0.3000 OH 90,000.00 Tukang Batu 0.1500 OH 110,000.00 Kepala Tukang 0.0150 OH 130,000.00 Mandor 0.0150 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

E.007 Memasang 1 m² plesteran 1 PC : 7 PP; tebal 15 mmBahanPortland Cement (PC) 3.9360 kg 1,820.00 Pasir Pasang (PP) 0.0280 m³ 107,150.00

Jumlah (1) TenagaPekerja 0.3000 OH 90,000.00 Tukang Batu 0.1500 OH 110,000.00 Kepala Tukang 0.0150 OH 130,000.00 Mandor 0.0150 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

E.008 Memasang 1 m² plesteran 1 PC : 8 PP; tebal 15 mmBahanPortland Cement (PC) 3.4560 kg 1,820.00 Pasir Pasang (PP) 0.0290 m³ 107,150.00

Jumlah (1) TenagaPekerja 0.3000 OH 90,000.00 Tukang Batu 0.1500 OH 110,000.00 Kepala Tukang 0.0150 OH 130,000.00 Mandor 0.0150 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

E.009 Memasang 1 m² plesteran 1 PC : 2 PP; tebal 20 mmBahanPortland Cement (PC) 13.6320 kg 1,820.00 Pasir Pasang (PP) 0.0270 m³ 107,150.00

Jumlah (1) TenagaPekerja 0.4000 OH 90,000.00

Page 21: Rencana Anggaran Biaya Pembangunan Gereja

Analisa Harga Satuan Pekerjaan Page 21

NO KOEF SAT HARGA SAT

Rp.

1 2 3 4 5Tukang Batu 0.2000 OH 110,000.00 Kepala Tukang 0.0200 OH 130,000.00 Mandor 0.0220 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

E.010 Memasang 1 m² plesteran 1 PC : 3 PP; tebal 20 mmBahanPortland Cement (PC) 10.3680 kg 1,820.00 Pasir Pasang (PP) 0.0310 m³ 107,150.00

Jumlah (1) TenagaPekerja 0.2600 OH 90,000.00 Tukang Batu 0.2000 OH 110,000.00 Kepala Tukang 0.0200 OH 130,000.00 Mandor 0.0220 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

E.011 Memasang 1 m² plesteran 1 PC : 4 PP; tebal 20 mmBahanPortland Cement (PC) 8.3200 kg 1,820.00 Pasir Pasang (PP) 0.0320 m³ 107,150.00

Jumlah (1) TenagaPekerja 0.4000 OH 90,000.00 Tukang Batu 0.2000 OH 110,000.00 Kepala Tukang 0.0200 OH 130,000.00 Mandor 0.2200 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

E.012 Memasang 1 m² plesteran 1 PC : 5 PP; tebal 20 mmBahanPortland Cement (PC) 6.9120 kg 1,820.00 Pasir Pasang (PP) 0.0350 m³ 107,150.00

Jumlah (1) TenagaPekerja 0.4000 OH 90,000.00 Tukang Batu 0.2000 OH 110,000.00 Kepala Tukang 0.0200 OH 130,000.00 Mandor 0.0220 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

E.013 Memasang 1 m² plesteran 1 PC : 6 PP; tebal 20 mmBahanPortland Cement (PC) 5.8880 kg 1,820.00 Pasir Pasang (PP) 0.0360 m³ 107,150.00

Jumlah (1) TenagaPekerja 0.4000 OH 90,000.00 Tukang Batu 0.2000 OH 110,000.00 Kepala Tukang 0.0220 OH 130,000.00 Mandor 0.0220 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

E.014 Memasang 1 m² plesteran 1 PC : 2 PP; tebal 25 mmBahanPortland Cement (PC) 15.5000 kg 1,820.00 Pasir Pasang (PP) 0.0130 m³ 107,150.00

Jumlah (1) TenagaPekerja 0.3000 OH 90,000.00 Tukang Batu 0.2000 OH 110,000.00 Kepala Tukang 0.0200 OH 130,000.00 Mandor 0.0130 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

E.015 Memasang 1 m² plesteran 1 PC : 3 PP; tebal 25 mm

Page 22: Rencana Anggaran Biaya Pembangunan Gereja

Analisa Harga Satuan Pekerjaan Page 22

NO KOEF SAT HARGA SAT

Rp.

1 2 3 4 5BahanPortland Cement (PC) 11.7500 kg 1,820.00 Pasir Pasang (PP) 0.0350 m³ 107,150.00

Jumlah (1) TenagaPekerja 0.3000 OH 90,000.00 Tukang Batu 0.1500 OH 110,000.00 Kepala Tukang 0.0150 OH 130,000.00 Mandor 0.0130 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

E.016 Memasang 1 m² plesteran 1 PC : 4 PP; tebal 25 mmBahanPortland Cement (PC) 9.4800 kg 1,820.00 Pasir Pasang (PP) 0.0380 m³ 107,150.00

Jumlah (1) TenagaPekerja 0.3000 OH 90,000.00 Tukang Batu 0.2000 OH 110,000.00 Kepala Tukang 0.0200 OH 130,000.00 Mandor 0.0130 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

E.017 Memasang 1 m² plesteran 1 PC : 5 PP; tebal 25 mmBahanPortland Cement (PC) 7.9400 kg 1,820.00 Pasir Pasang (PP) 0.0390 m³ 107,150.00

Jumlah (1) TenagaPekerja 0.3000 OH 90,000.00 Tukang Batu 0.2000 OH 110,000.00 Kepala Tukang 0.0200 OH 130,000.00 Mandor 0.0130 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

E.018 Memasang 1 m² plesteran 1 PC : 2 PP; tebal 30 mmBahanPortland Cement (PC) 18.6500 kg 1,820.00 Pasir Pasang (PP) 0.0350 m³ 107,150.00

Jumlah (1) TenagaPekerja 0.3200 OH 90,000.00 Tukang Batu 0.2500 OH 110,000.00 Kepala Tukang 0.0250 OH 130,000.00 Mandor 0.0150 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

E.019 Memasang 1 m² plesteran 1 PC : 3 PP; tebal 30 mmBahanPortland Cement (PC) 14.1500 kg 1,820.00 Pasir Pasang (PP) 0.0390 m³ 107,150.00

Jumlah (1) TenagaPekerja 0.3200 OH 90,000.00 Tukang Batu 0.2500 OH 110,000.00 Kepala Tukang 0.0250 OH 130,000.00 Mandor 0.0150 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

E.020 Memasang 1 m² plesteran 1 PC : 4 PP; tebal 30 mmBahanPortland Cement (PC) 11.3800 kg 1,820.00 Pasir Pasang (PP) 0.0420 m³ 107,150.00

Jumlah (1) Tenaga

Page 23: Rencana Anggaran Biaya Pembangunan Gereja

Analisa Harga Satuan Pekerjaan Page 23

NO KOEF SAT HARGA SAT

Rp.

1 2 3 4 5Pekerja 0.3200 OH 90,000.00 Tukang Batu 0.2500 OH 110,000.00 Kepala Tukang 0.0250 OH 130,000.00 Mandor 0.0150 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

E.021 Memasang 1 m² plesteran 1 PC : 5 PP; tebal 30 mmBahanPortland Cement (PC) 8.1900 kg 1,820.00 Pasir Pasang (PP) 0.0450 m³ 107,150.00

Jumlah (1) TenagaPekerja 0.3200 OH 90,000.00 Tukang Batu 0.2500 OH 110,000.00 Kepala Tukang 0.0250 OH 130,000.00 Mandor 0.0150 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

E.022 Memasang 1 m² berapen 1 PC : 3 PP; tebal 30 mmBahanPortland Cement (PC) 7.0700 kg 1,820.00 Pasir Pasang (PP) 0.0210 m³ 107,150.00

Jumlah (1) TenagaPekerja 0.1500 OH 90,000.00 Tukang Batu 0.0700 OH 110,000.00 Kepala Tukang 0.0070 OH 130,000.00 Mandor 0.0080 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

E.023 Memasang 1 m² berapen 1 PC : 5 PP; tebal 30 mmBahanPortland Cement (PC) 5.1840 kg 1,820.00 Pasir Pasang (PP) 0.0260 m³ 107,150.00

Jumlah (1) TenagaPekerja 0.1500 OH 90,000.00 Tukang Batu 0.0700 OH 110,000.00 Kepala Tukang 0.0070 OH 130,000.00 Mandor 0.0080 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

E.024 Memasang 1 m² plesteran beton 1 PC : 2 PP; tebal 15 mmBahanPortland Cement (PC) 9.3000 kg 1,820.00 Pasir Pasang (PP) 0.0180 m³ 107,150.00

Jumlah (1) TenagaPekerja 0.2600 OH 90,000.00 Tukang Batu 0.2000 OH 110,000.00 Kepala Tukang 0.0200 OH 130,000.00 Mandor 0.0130 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

E.025 Memasang 1 m² plesteran beton 1 PC : 3 PP; tebal 15 mmBahanPortland Cement (PC) 7.0700 kg 1,820.00 Pasir Pasang (PP) 0.0210 m³ 107,150.00

Jumlah (1) TenagaPekerja 0.2600 OH 90,000.00 Tukang Batu 0.2000 OH 110,000.00 Kepala Tukang 0.0200 OH 130,000.00 Mandor 0.0130 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

Page 24: Rencana Anggaran Biaya Pembangunan Gereja

Analisa Harga Satuan Pekerjaan Page 24

NO KOEF SAT HARGA SAT

Rp.

1 2 3 4 5

E.026 Memasang 1 m' plesteran skoning 1 PC : 2 PP; lebar 10 mmBahanPortland Cement (PC) 0.5000 kg 1,820.00 Pasir Pasang (PP) 0.0130 m³ 107,150.00

Jumlah (1) TenagaPekerja 0.0800 OH 90,000.00 Tukang Batu 0.4000 OH 110,000.00 Kepala Tukang 0.0400 OH 130,000.00 Mandor 0.0040 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

E.027 Memasang 1 m² plesteran ciprat 1 PC : 2 PP; lebar 10 mmBahanPortland Cement (PC) 4.3200 kg 1,820.00 Pasir Pasang (PP) 0.0060 m³ 107,150.00

Jumlah (1) TenagaPekerja 0.3000 OH 90,000.00 Tukang Batu 0.1000 OH 110,000.00 Kepala Tukang 0.0100 OH 130,000.00 Mandor 0.0150 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

E.028 Memasang 1 m² finishing siar pasangan dinding bata merah (=20 m')BahanPortland Cement (PC) 3.1080 kg 1,820.00

Jumlah (1) TenagaPekerja 0.1500 OH 90,000.00 Tukang Batu 0.0750 OH 110,000.00 Kepala Tukang 0.0080 OH 130,000.00 Mandor 0.0080 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

E.029 Memasang 1 m² finishing siar pasangan dinding conblock ekspose (=8 m')BahanPortland Cement (PC) 1.6000 kg 1,820.00

Jumlah (1) TenagaPekerja 0.0700 OH 90,000.00 Tukang Batu 0.0350 OH 110,000.00 Kepala Tukang 0.0040 OH 130,000.00 Mandor 0.0040 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

E.030 Memasang 1 m² finishing siar pasangan batu kali adukan 1 PC : 2 PPBahanPortland Cement (PC) 6.3400 kg 1,820.00 Pasir Pasang (PP) 0.0120 m³ 107,150.00

Jumlah (1) TenagaPekerja 0.3000 OH 90,000.00 Tukang Batu 0.1500 OH 110,000.00 Kepala Tukang 0.0150 OH 130,000.00 Mandor 0.0150 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

E.031 Memasang 1 m² acianBahanPortland Cement (PC) 3.2500 kg 1,820.00

Jumlah (1) TenagaPekerja 0.1500 OH 90,000.00 Tukang Batu 0.1000 OH 110,000.00 Kepala Tukang 0.0100 OH 130,000.00

Page 25: Rencana Anggaran Biaya Pembangunan Gereja

Analisa Harga Satuan Pekerjaan Page 25

NO KOEF SAT HARGA SAT

Rp.

1 2 3 4 5Mandor 0.0100 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

E.032 Memasang 1 m' Benangan sudutBahanPortland Cement (PC) 0.0040 Zak 72,800.00 Pasir Pasang (PP) 0.0130 m3 107,150.00

Jumlah (1) TenagaPekerja 0.0300 OH 90,000.00 Tukang Batu 0.0700 OH 110,000.00 Kepala Tukang 0.0070 OH 130,000.00 Mandor 0.0080 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

F. PEKERJAAN KAYU SNI 03-3434-2002 F.001 Membuat dan memasang 1 m³ kusen pintu dan kusen jendela; Kayu Lembasung/ Kapur

BahanBalok Lembasung/ Kapur 1.1000 m³ 1,870,000.00 Paku 10 cm 1.2500 kg 21,650.00 Lem Kayu 1.0000 kg 28,000.00

Jumlah (1) TenagaPekerja 7.0000 OH 90,000.00 Tukang Kayu 21.0000 OH 110,000.00 Kepala Tukang 2.1000 OH 130,000.00 Mandor 0.3500 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

F.002 Membuat dan memasang 1 m³ kusen pintu dan kusen jendela; Kayu Kayu Meranti BahanBalok Kayu Meranti / Kayu Kelas II 1.2000 m³ 1,870,000.00 Paku 10 cm 1.2500 kg 21,650.00 Lem Kayu 1.0000 kg 28,000.00

Jumlah (1) TenagaPekerja 6.0000 OH 90,000.00 Tukang Kayu 18.0000 OH 110,000.00 Kepala Tukang 1.8000 OH 130,000.00 Mandor 0.3000 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

F.003 Membuat dan memasang 1 m² pintu klamp sederhana; Kayu Lembasung/ KapurBahanPapan Kayu Lembasung/ kapur 0.0400 m³ 1,870,000.00 Paku 5 cm - 7 cm 0.0500 kg 21,650.00

Jumlah (1) TenagaPekerja 0.3500 OH 90,000.00 Tukang Kayu 1.0500 OH 110,000.00 Kepala Tukang 0.1050 OH 130,000.00 Mandor 0.0180 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

F.004 Membuat dan memasang 1 m² pintu klamp sederhana; Kayu MerantiBahanPapan Kayu Meranti 0.0400 m³ 1,870,000.00 Paku 5 cm - 7 cm 0.0500 kg 21,650.00

Jumlah (1) TenagaPekerja 0.3500 OH 90,000.00 Tukang Kayu 1.0500 OH 110,000.00 Kepala Tukang 0.1050 OH 130,000.00 Mandor 0.0180 OH 140,000.00

Jumlah (2)

Page 26: Rencana Anggaran Biaya Pembangunan Gereja

Analisa Harga Satuan Pekerjaan Page 26

NO KOEF SAT HARGA SAT

Rp.

1 2 3 4 5Jumlah (1) + (2)

F.005 Membuat dan memasang 1 m² daun pintu panel; Kayu Lembasung/ KapurBahanPapan Kayu Lembasung/ kapur 0.0400 m³ 1,870,000.00 Lem Kayu 0.5000 kg 28,000.00

Jumlah (1) TenagaPekerja 1.0000 OH 90,000.00 Tukang Kayu 3.0000 OH 110,000.00 Kepala Tukang 0.3000 OH 130,000.00 Mandor 0.0500 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

F.006 Membuat dan memasang 1 m² daun pintu panel; Kayu MerantiBahanPapan Kayu Meranti 0.0400 m³ 1,870,000.00 Lem Kayu 0.5000 kg 28,000.00

Jumlah (1) TenagaPekerja 1.0000 OH 90,000.00 Tukang Kayu 3.0000 OH 110,000.00 Kepala Tukang 0.3000 OH 130,000.00 Mandor 0.0500 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

F.007 Membuat dan memasang 1 m² pintu dan jendela kaca; Kayu Lembasung/ KapurBahanPapan Kayu Lembasung/ Kapur 0.0240 m³ 1,870,000.00 Lem Kayu 0.3000 kg 28,000.00

Jumlah (1) TenagaPekerja 0.8000 OH 90,000.00 Tukang Kayu 2.4000 OH 110,000.00 Kepala Tukang 0.2400 OH 130,000.00 Mandor 0.0400 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

F.008 Membuat dan memasang 1 m² pintu dan jendela kaca; Kayu MerantiBahanPapan Kayu Meranti 0.0240 m³ 1,870,000.00 Lem Kayu 0.3000 kg 28,000.00

Jumlah (1) TenagaPekerja 0.8000 OH 90,000.00 Tukang Kayu 2.4000 OH 110,000.00 Kepala Tukang 0.2400 OH 130,000.00 Mandor 0.0400 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

F.009 Membuat dan memasang 1 m² pintu dan jendela jalusi; Lembasung/ KapurBahanPapan Kayu Lembasung/ Kapur 0.0640 m³ 1,870,000.00 Lem Kayu 0.5000 kg 28,000.00

Jumlah (1) TenagaPekerja 1.0000 OH 90,000.00 Tukang Kayu 3.0000 OH 110,000.00 Kepala Tukang 0.3000 OH 130,000.00 Mandor 0.0500 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

F.010 Membuat dan memasang 1 m² pintu dan jendela jalusi; Kayu MerantiBahanPapan Kayu Meranti 0.0640 m³ 1,870,000.00 Lem Kayu 0.5000 kg 28,000.00

Jumlah (1) Tenaga

Page 27: Rencana Anggaran Biaya Pembangunan Gereja

Analisa Harga Satuan Pekerjaan Page 27

NO KOEF SAT HARGA SAT

Rp.

1 2 3 4 5Pekerja 1.0000 OH 90,000.00 Tukang Kayu 3.0000 OH 110,000.00 Kepala Tukang 0.3000 OH 130,000.00 Mandor 0.0500 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

F.011 Membuat dan memasang 1 m² daun pintu kayu lapis (plywood); rangka tertutup Kayu KapurBahanPapan Kayu Kapur 0.0250 m³ 1,870,000.00 Paku 1 cm - 2,5 cm 0.0300 kg 21,650.00 Lem Kayu 0.5000 kg 28,000.00 Plywood tbl. 9 mm; uk. (90 x 220) cm 1.0000 lembar 154,000.00

Jumlah (1) TenagaPekerja 0.7000 OH 90,000.00 Tukang Kayu 2.1000 OH 110,000.00 Kepala Tukang 0.2100 OH 130,000.00 Mandor 0.0350 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

F.012 Membuat dan memasang 1 m² pintu plywood rangkap; rangka ekspose Kayu KapurBahanPapan Kayu Kapur 0.0256 m³ 1,870,000.00 Paku 1 cm - 2,5 cm 0.0300 kg 21,650.00 Lem Kayu 0.5000 kg 28,000.00 Plywood tbl. 9 mm; uk. (90 x 220) cm 1.0000 lembar 154,000.00

Jumlah (1) TenagaPekerja 0.8000 OH 90,000.00 Tukang Kayu 2.4000 OH 110,000.00 Kepala Tukang 0.2400 OH 130,000.00 Mandor 0.0400 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

F.013 Membuat dan memasang 1 m² jalusi kusen; Kayu Kapur/ LembasungBahanPapan Kayu Kapur/ Lembasung 0.0600 m³ 1,870,000.00 Paku 1 cm - 2,5 cm 0.1500 kg 21,650.00

Jumlah (1) TenagaPekerja 0.6700 OH 90,000.00 Tukang Kayu 2.0000 OH 110,000.00 Kepala Tukang 0.2000 OH 130,000.00 Mandor 0.3350 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

F.014 Membuat dan memasang 1 m² jalusi kusen; Kayu MerantiBahanPapan Kayu Meranti 0.0600 m³ 1,870,000.00 Paku 1 cm - 2,5 cm 0.1500 kg 21,650.00

Jumlah (1)

TenagaPekerja 0.6700 OH 90,000.00 Tukang Kayu 2.0000 OH 110,000.00 Kepala Tukang 0.2000 OH 130,000.00 Mandor 0.3350 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

F.015 Membuat dan memasang 1 m² pintu teakwood rangkap; rangka ekspose Kayu KapurBahanPapan Kayu Kapur 0.0250 m³ 1,870,000.00 Paku 1 cm - 2,5 cm 0.0300 kg 21,650.00 Lem Kayu 0.3000 kg 28,000.00 Teakwood tbl. 4 mm; uk. (90 x 220) cm 1.0000 lembar 68,200.00

Jumlah (1) Tenaga

Page 28: Rencana Anggaran Biaya Pembangunan Gereja

Analisa Harga Satuan Pekerjaan Page 28

NO KOEF SAT HARGA SAT

Rp.

1 2 3 4 5Pekerja 0.8000 OH 90,000.00 Tukang Kayu 2.4000 OH 110,000.00 Kepala Tukang 0.0400 OH 130,000.00 Mandor 0.0400 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

F.016 Membuat dan memasang 1 m² pintu teakwood rangkap lapis formika; rgk. ekspose Ky. MerantiBahanPapan Kayu Meranti 0.0250 m³ 1,870,000.00 Paku 1 cm - 2,5 cm 0.0300 kg 21,650.00 Lem Kayu 0.8000 kg 28,000.00 Teakwood tbl. 4 mm; uk. (90 x 220) cm 1.0000 lembar 68,200.00 Formika 0.5000 lembar 55,500.00

Jumlah (1) TenagaPekerja 0.8500 OH 90,000.00 Tukang Kayu 2.5500 OH 110,000.00 Kepala Tukang 0.2550 OH 130,000.00 Mandor 0.0430 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

F.017 Membuat dan memasang 1 m³ konstruksi kuda kuda konvensional; Kayu Kapur/ LembasungBahanBalok Kayu Kapur/ Lembasung 1.1000 m³ 1,870,000.00 Besi Strip 5 mm 15.0000 kg 24,600.00 Paku 12 cm 5.6000 kg 21,650.00

Jumlah (1) TenagaPekerja 4.0000 OH 90,000.00 Tukang Kayu 12.0000 OH 110,000.00 Kepala Tukang 1.2000 OH 130,000.00 Mandor 0.2000 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

F.018 Membuat dan memasang 1 m³ konstruksi kuda kuda konvensional; Kayu MerantiBahanBalok Kayu Meranti 1.1000 m³ 1,870,000.00 Besi Strip 5 mm 15.0000 kg 24,600.00 Paku 12 cm 5.6000 kg 21,650.00

Jumlah (1) TenagaPekerja 4.0000 OH 90,000.00 Tukang Kayu 12.0000 OH 110,000.00 Kepala Tukang 1.2000 OH 130,000.00 Mandor 0.2000 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

F.019 Membuat dan memasang 1 m³ konstruksi kuda kuda ekspose; Kayu Kapur/ LembasungBahanBalok Kayu Kapur/ Lembasung 1.2000 m³ 1,870,000.00 Besi Strip 5 mm 15.0000 kg 24,600.00 Paku 12 cm 5.6000 kg 21,650.00

Jumlah (1) TenagaPekerja 6.7000 OH 90,000.00 Tukang Kayu 20.1000 OH 110,000.00 Kepala Tukang 2.0100 OH 130,000.00 Mandor 0.3350 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

F.020 Membuat dan memasang 1 m³ konstruksi kuda kuda ekspose; Kayu MerantiBahanBalok Kayu Meranti 1.2000 m³ 1,870,000.00 Besi Strip 5 mm 15.0000 kg 24,600.00 Paku 12 cm 5.6000 kg 21,650.00

Jumlah (1)

Page 29: Rencana Anggaran Biaya Pembangunan Gereja

Analisa Harga Satuan Pekerjaan Page 29

NO KOEF SAT HARGA SAT

Rp.

1 2 3 4 5TenagaPekerja 6.7000 OH 90,000.00 Tukang Kayu 20.1000 OH 110,000.00 Kepala Tukang 2.0100 OH 130,000.00 Mandor 0.3350 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

F.021 Membuat dan memasang 1 m³ konstruksi gording; Kayu Kapur/ LembasungBahanBalok Kayu Kapur/ Lembasung 1.1000 m³ 1,870,000.00 Besi Strip 5 mm 15.0000 kg 24,600.00 Paku 12 cm 3.0000 kg 21,650.00

Jumlah (1) TenagaPekerja 2.4000 OH 90,000.00 Tukang Kayu 7.2000 OH 110,000.00 Kepala Tukang 0.7200 OH 130,000.00 Mandor 0.1200 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

F.022 Membuat dan memasang 1 m³ konstruksi gording; Kayu MerantiBahanBalok Kayu Meranti 1.1000 m³ 1,870,000.00 Besi Strip 5 mm 15.0000 kg 24,600.00 Paku 12 cm 3.0000 kg 21,650.00

Jumlah (1) TenagaPekerja 2.4000 OH 90,000.00 Tukang Kayu 7.2000 OH 110,000.00 Kepala Tukang 0.7200 OH 130,000.00 Mandor 0.1200 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

F.023 Membuat dan memasang 1 m² rangka atap genteng kodok; Kayu Kapur/ LembasungBahanKaso-kaso (5 x 7) cm 0.0120 m³ 1,870,000.00 Reng (2 x 3) cm 0.0036 m³ 1,870,000.00 Paku 5 cm & 10 cm 0.2500 kg 21,650.00

Jumlah (1) TenagaPekerja 0.1000 OH 90,000.00 Tukang Kayu 0.1000 OH 110,000.00 Kepala Tukang 0.0100 OH 130,000.00 Mandor 0.0050 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

F.024 Membuat dan memasang 1 m² rangka atap genteng kodok; Kayu MerantiBahanKaso-kaso (5 x 7) cm 0.0120 m³ 1,870,000.00 Reng (2 x 3) cm 0.0036 m³ 1,870,000.00 Paku 5 cm & 10 cm 0.2500 kg 21,650.00

Jumlah (1) TenagaPekerja 0.1000 OH 90,000.00 Tukang Kayu 0.1000 OH 110,000.00 Kepala Tukang 0.0100 OH 130,000.00 Mandor 0.0050 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

F.025 Membuat dan memasang 1 m² rangka atap genteng keramik; Kayu Kapur/ LembasungBahanKaso-kaso (5 x 7) cm 0.0140 m³ 1,870,000.00 Reng (2 x 3) cm 0.0036 m³ 1,870,000.00 Paku 5 cm & 10 cm 0.2500 kg 21,650.00

Jumlah (1) TenagaPekerja 0.1000 OH 90,000.00

Page 30: Rencana Anggaran Biaya Pembangunan Gereja

Analisa Harga Satuan Pekerjaan Page 30

NO KOEF SAT HARGA SAT

Rp.

1 2 3 4 5Tukang Kayu 0.1000 OH 110,000.00 Kepala Tukang 0.0100 OH 130,000.00 Mandor 0.0050 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

F.026 Membuat dan memasang 1 m² rangka atap genteng keramik; Kayu MerantiBahanKaso-kaso (5 x 7) cm 0.0140 m³ 1,870,000.00 Reng (2 x 3) cm 0.0036 m³ 1,870,000.00 Paku 5 cm & 10 cm 0.2500 kg 21,650.00

Jumlah (1) TenagaPekerja 0.1000 OH 90,000.00 Tukang Kayu 0.1000 OH 110,000.00 Kepala Tukang 0.0100 OH 130,000.00 Mandor 0.0050 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

F.027 Membuat dan memasang 1 m² rangka atap genteng beton; Kayu Kapur/ LembasungBahanKaso-kaso (5 x 7) cm 0.0140 m³ 1,870,000.00 Reng (3 x 4) cm 0.0570 m³ 1,870,000.00 Paku 5 cm & 10 cm 0.2500 kg 21,650.00

Jumlah (1) TenagaPekerja 0.1000 OH 90,000.00 Tukang Kayu 0.1000 OH 110,000.00 Kepala Tukang 0.0100 OH 130,000.00 Mandor 0.0050 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

F.028 Membuat dan memasang 1 m² rangka atap genteng beton; Kayu MerantiBahanKaso-kaso (5 x 7) cm 0.0140 m³ 1,870,000.00 Reng (3 x 4) cm 0.0570 m³ 1,870,000.00 Paku 5 cm & 10 cm 0.2500 kg 21,650.00

Jumlah (1) TenagaPekerja 0.1000 OH 90,000.00 Tukang Kayu 0.1000 OH 110,000.00 Kepala Tukang 0.0100 OH 130,000.00 Mandor 0.0050 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

F.029 Membuat dan memasang 1 m² rangka atap genteng metal; Kayu Lembasung/KapurBahanKayu Kapur 0.0120 m³ 1,870,000.00 Paku 5 cm & 10 cm 0.1500 kg 21,650.00

Jumlah (1) TenagaPekerja 0.1000 OH 90,000.00 Tukang Kayu 0.1000 OH 110,000.00 Kepala Tukang 0.0100 OH 130,000.00 Mandor 0.0050 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

F.030 Membuat dan memasang 1 m² rangka atap genteng metal; Kayu MerantiBahanKayu Meranti 0.0120 m³ 1,870,000.00 Paku 5 cm & 10 cm 0.1500 kg 21,650.00

Jumlah (1) TenagaPekerja 0.1000 OH 90,000.00 Tukang Kayu 0.1000 OH 110,000.00 Kepala Tukang 0.0100 OH 130,000.00 Mandor 0.0050 OH 140,000.00

Jumlah (2)

Page 31: Rencana Anggaran Biaya Pembangunan Gereja

Analisa Harga Satuan Pekerjaan Page 31

NO KOEF SAT HARGA SAT

Rp.

1 2 3 4 5Jumlah (1) + (2)

F.031 Memasang 1 m² rangka atap sirap; Kayu MerantiBahanKayu Meranti 0.1650 m³ 1,870,000.00 Paku 5 cm & 10 cm 0.2000 kg 21,650.00

Jumlah (1) TenagaPekerja 0.1200 OH 90,000.00 Tukang Kayu 0.1200 OH 110,000.00 Kepala Tukang 0.0120 OH 130,000.00 Mandor 0.0060 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

F.032 Memasang 1 m² rangka langit-langit (100 x 100) cm; Kayu Meranti BahanKaso-kaso (5 x 7) cm 0.0120 m³ 1,870,000.00 Paku 7 cm - 10 cm 0.1000 kg 21,650.00

Jumlah (1) TenagaPekerja 0.1500 OH 90,000.00 Tukang Kayu 0.2500 OH 110,000.00 Kepala Tukang 0.0250 OH 130,000.00 Mandor 0.0750 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

F.033 Memasang 1 m² rangka langit-langit (50 x 100) cm; Kayu Meranti BahanKaso-kaso (5 x 7) cm 0.0154 m³ 1,870,000.00 Paku 7 cm - 10 cm 0.2000 kg 21,650.00

Jumlah (1) TenagaPekerja 0.1500 OH 90,000.00 Tukang Kayu 0.3000 OH 110,000.00 Kepala Tukang 0.0300 OH 130,000.00 Mandor 0.0750 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

F.034 Memasang 1 m² rangka langit-langit (60 x 60) cm; Kayu MerantiBahanKaso-kaso (5 x 7) cm 0.0163 m³ 1,870,000.00 Paku 7 cm - 10 cm 0.2500 kg 21,650.00

Jumlah (1) TenagaPekerja 0.2000 OH 90,000.00 Tukang Kayu 0.3000 OH 110,000.00 Kepala Tukang 0.0300 OH 130,000.00 Mandor 0.0100 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

F.035 Memasang 1 m' lisplank uk. (3 x 20) cm; Kapur/ LembasungBahanPapan Kayu Kapur/ Lembasung 0.0108 m³ 1,870,000.00 Paku 5 cm - 7 cm 0.1000 kg 21,650.00

Jumlah (1) TenagaPekerja 0.1000 OH 90,000.00 Tukang Kayu 0.2000 OH 110,000.00 Kepala Tukang 0.0200 OH 130,000.00 Mandor 0.0050 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

F.036 Memasang 1 m' lisplank uk. (3 x 30) cm; Kayu Kapur/LembasungBahan

Page 32: Rencana Anggaran Biaya Pembangunan Gereja

Analisa Harga Satuan Pekerjaan Page 32

NO KOEF SAT HARGA SAT

Rp.

1 2 3 4 5Papan Kayu Lembasung 0.0110 m³ 1,870,000.00 Paku 5 cm - 7 cm 0.0500 kg 21,650.00

Jumlah (1) TenagaPekerja 0.1000 OH 90,000.00 Tukang Kayu 0.2000 OH 110,000.00 Kepala Tukang 0.0250 OH 130,000.00 Mandor 0.0050 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

F.037 Memasang 1 m' lisplank uk. 2x (3 x 20) cm; Kayu Kapur/ LembasungBahanPapan Kayu Kapur/ Lembasung 0.0145 m³ 1,870,000.00 Paku 5 cm - 7 cm 0.0600 kg 21,650.00

Jumlah (1) TenagaPekerja 0.1500 Oh 90,000.00 Tukang Kayu 0.2500 Oh 110,000.00 Kepala Tukang 0.0250 Oh 130,000.00 Mandor 0.0750 Oh 140,000.00

Jumlah (2) Jumlah (1) + (2)

F.038 Memasang 1 m' lisplank uk. 2x (2 x 20) cm; Kayu Kapur/ LembasungBahanPapan Kayu Kapur/ Lembasung 0.0086 m³ 1,870,000.00 Paku 5 cm - 7 cm 0.0600 kg 21,650.00

Jumlah (1) TenagaPekerja 0.1000 Oh 90,000.00 Tukang Kayu 0.1000 Oh 110,000.00 Kepala Tukang 0.0100 Oh 130,000.00 Mandor 0.0500 Oh 140,000.00

Jumlah (2) Jumlah (1) + (2)

F.039 Memasang 1 m² rangka dinding pemisah (60 x 120) cm; Kayu MerantiBahanBalok Kayu Meranti 0.0280 m³ 1,870,000.00 Paku 5 cm - 7 cm 0.1500 kg 21,650.00

Jumlah (1) TenagaPekerja 0.1500 OH 90,000.00 Tukang Kayu 0.4500 OH 110,000.00 Kepala Tukang 0.0450 OH 130,000.00 Mandor 0.0080 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

F.040 Memasang 1 m² dinding pemisah teakwood rangkap; Kayu Kapur/ LembasungBahanBalok Kayu Kapur/ Lembasung 0.0280 m³ 1,870,000.00 Paku 5 cm - 10 cm 0.1500 kg 21,650.00 Teakwood tbl. 4 mm; uk. (120 x 240) cm 0.8600 lembar 68,200.00 Lem Kayu 0.5600 kg 28,000.00

Jumlah (1) TenagaPekerja 0.1500 OH 90,000.00 Tukang Kayu 0.4500 OH 110,000.00 Kepala Tukang 0.0450 OH 130,000.00 Mandor 0.0080 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

F.041 Memasang 1 m² dinding pemisah plywood rangkap; Kayu MerantiBahanBalok Kayu Meranti 0.0280 m³ 1,870,000.00 Paku 5 cm - 10 cm 0.1500 kg 21,650.00 Plywood tbl. 9 mm; uk. (120 x 240) cm 0.8600 lembar 154,000.00 Lem Kayu 0.5600 kg 28,000.00

Jumlah (1)

Page 33: Rencana Anggaran Biaya Pembangunan Gereja

Analisa Harga Satuan Pekerjaan Page 33

NO KOEF SAT HARGA SAT

Rp.

1 2 3 4 5TenagaPekerja 0.2000 OH 90,000.00 Tukang Kayu 0.6000 OH 110,000.00 Kepala Tukang 0.0600 OH 130,000.00 Mandor 0.0100 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

F.042 Pasangan dinding kayu meranti berlidah per m2 -BahanPapan kayu meranti 0.0250 M3 1,870,000.00 Paku 0.2000 Kg 21,650.00

Jumlah (1) TenagaPekerja 0.6000 OH 90,000.00 Tukang Kayu 1.8000 OH 110,000.00 Kepala Tukang 0.1800 OH 130,000.00 Mandor 0.0300 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

F.043 Memasang 1 m² dinding lambriziring dari papan; Kayu MerantiBahanPapan Kayu Meranti 0.0070 m³ 1,870,000.00 Paku 5 cm - 10 cm 0.1000 kg 21,650.00 Paku Skrup 10 cm/ Besi 0.1500 kg 31,100.00

Jumlah (1) TenagaPekerja 0.6000 OH 90,000.00 Tukang Kayu 1.8000 OH 110,000.00 Kepala Tukang 0.1800 OH 130,000.00 Mandor 0.0300 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

F.044 Memasang 1 m² dinding lambriziring dari plywood ukuran (120 x 240) cmBahanPlywood tbl. 9 mm; uk. (120 x 240) cm 0.4000 lembar 154,000.00 Paku 5 cm - 10 cm 0.0500 kg 21,650.00

Jumlah (1) TenagaPekerja 0.0250 OH 90,000.00 Tukang Kayu 0.0750 OH 110,000.00 Kepala Tukang 0.0075 OH 130,000.00 Mandor 0.0013 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

F.045 Memasang 1 m' papan ruiter ukuran 3 x 30 cm; Kayu MerantiBahanPapan Kayu Meranti (2 x 25 x 400) 0.0100 m³ 1,870,000.00 Paku 5 cm - 10 cm 0.0100 kg 21,650.00

Jumlah (1) TenagaPekerja 0.0700 OH 90,000.00 Tukang Kayu 0.2000 OH 110,000.00 Kepala Tukang 0.0200 OH 130,000.00 Mandor 0.0040 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

F.046 Memasang 1 m' papan ruiter ukuran 2 x 20 cm; Kayu MerantiBahanPapan Kayu Meranti (2 x 20 x 400) 0.0044 m³ 1,870,000.00 Paku 5 cm - 10 cm 0.0100 kg 21,650.00

Jumlah (1) TenagaPekerja 0.0700 OH 90,000.00 Tukang Kayu 0.2000 OH 110,000.00 Kepala Tukang 0.0200 OH 130,000.00 Mandor 0.0040 OH 140,000.00

Jumlah (2)

Page 34: Rencana Anggaran Biaya Pembangunan Gereja

Analisa Harga Satuan Pekerjaan Page 34

NO KOEF SAT HARGA SAT

Rp.

1 2 3 4 5Jumlah (1) + (2)

F.047 Sebuah tiang pancang dicincin dan dilancipkan TenagaPekerja 0.1000 OH 90,000.00 Tukang Kayu 0.2500 OH 110,000.00 Kepala Tukang 0.0250 OH 130,000.00 Mandor 0.0050 OH 140,000.00

Jumlah Jumlah (1) + (2)

F.048 Membuat pen pada tiang dan lubang pada balok pemikul tiap-tiap pasangan pen dan lubang TenagaTukang Kayu 0.6000 OH 110,000.00 Kepala Tukang 0.0600 OH 130,000.00

Jumlah Jumlah (1) + (2)

F.049 Memancang tiang pada tanah lunak per m' TenagaPekerja 1.8000 OH 90,000.00 Tukang Kayu 0.0400 OH 110,000.00 Kepala Tukang 0.0040 OH 130,000.00 Mandor 0.0430 OH 140,000.00

Jumlah Jumlah (1) + (2)Untuk tanah biasa 1 1/4 x E.13Untuk tanah keras 1 1/2 x E.13

F.050 Pasangan tongkat, sloop, gelegar dari kayu ulin per m3 - BahanBalok kayu ulin 1.0000 m³ 3,850,000.00 Paku ulin 1.0000 kg 27,500.00

Jumlah (1) TenagaPekerja 5.0000 OH 90,000.00 Tukang Kayu 15.0000 OH 110,000.00 Kepala Tukang 1.5000 OH 130,000.00 Mandor 0.2500 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

F.051 Pasangan gelegar kayu kapur/lembasung per m3 - BahanBalok Kayu Kapur/ Lembasung 1.0000 m³ 1,870,000.00 Paku 1.0000 kg 21,650.00

Jumlah (1) TenagaPekerja 5.0000 OH 90,000.00 Tukang Kayu 15.0000 OH 110,000.00 Kepala Tukang 1.5000 OH 130,000.00 Mandor 0.2500 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

F.052 Pasangan Lantai dari papan kayu kapur/lembasung per m2 - BahanPapan kayu kapur/lembasung 0.0250 m³ 1,870,000.00 Paku 0.2000 kg 21,650.00

Jumlah (1) TenagaPekerja 0.2800 OH 90,000.00 Tukang Kayu 0.8000 OH 110,000.00 Kepala Tukang 0.0800 OH 130,000.00 Mandor 0.0140 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

F.053 Pasangan lantai dari papan kayu meranti per m2 - BahanPapan kayu meranti 0.0250 m³ 1,870,000.00

Page 35: Rencana Anggaran Biaya Pembangunan Gereja

Analisa Harga Satuan Pekerjaan Page 35

NO KOEF SAT HARGA SAT

Rp.

1 2 3 4 5Paku 0.2000 kg 21,650.00

Jumlah (1) TenagaPekerja 0.2800 OH 90,000.00 Tukang Kayu 0.8000 OH 110,000.00 Kepala Tukang 0.0800 OH 130,000.00 Mandor 0.0140 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)Apabila hanya diketam salah satu sisinya saja 62,780.00

F.054 Pasangan lantai dari papan kayu ulin per m2 - BahanPapan kayu ulin 0.0250 m³ 3,850,000.00 Paku ulin 0.2000 kg 27,500.00

Jumlah (1) TenagaPekerja 0.2800 OH 90,000.00 Tukang Kayu 0.8000 OH 110,000.00 Kepala Tukang 0.0800 OH 130,000.00 Mandor 0.0140 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)Apabila hanya diketam salah satu sisinya saja 62,780.00

F.055 1Ttk Memancang tiang pancang kayu ulin 10/10 - 2 mBahanKayu ulin 10/10 - 2 m 0.0200 m³ 3,850,000.00

Jumlah (1) TenagaPekerja 1.8000 OH 90,000.00 Tukang Kayu 0.0400 OH 110,000.00 Kepala Tukang 0.0040 OH 130,000.00 Mandor 0.0430 OH 140,000.00 Alat Bantu 0.0600 56,100.00

Jumlah (2) Jumlah (1) + (2)

F.056 1Ttk Memancang tiang pancang kayu ulin 10/10 - 4 mBahanKayu ulin 10/10 - 4 m 0.0400 m³ 3,850,000.00

Jumlah (1) TenagaPekerja 1.8000 OH 90,000.00 Tukang Kayu 0.0400 OH 110,000.00 Kepala Tukang 0.0040 OH 130,000.00 Mandor 0.0430 OH 140,000.00 Alat Bantu 0.1200 56,100.00

Jumlah (2) Jumlah (1) + (2)

F.057 Rangka badan/tiang jenang dari kayu kapur/lembasung per m3 - Bahankayu kapur/lembasung 1.2000 m³ 1,870,000.00 Paku 0.2000 kg 21,650.00

Jumlah (1) TenagaPekerja 10.0000 OH 90,000.00 Tukang Kayu 30.0000 OH 110,000.00 Kepala Tukang 3.0000 OH 130,000.00 Mandor 0.5000 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

F.058 Pasangan sunduk,kalang dari kayu ulin per m3 - BahanBalok kayu ulin 1.0000 m³ 3,850,000.00 Paku ulin 1.0000 kg 27,500.00

Jumlah (1) TenagaPekerja 5.0000 OH 90,000.00 Tukang Kayu 15.0000 OH 110,000.00 Kepala Tukang 1.5000 OH 130,000.00

Page 36: Rencana Anggaran Biaya Pembangunan Gereja

Analisa Harga Satuan Pekerjaan Page 36

NO KOEF SAT HARGA SAT

Rp.

1 2 3 4 5Mandor 0.2500 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

G. PEKERJAAN BETON RSNI-T-13-2002 G.001 Membuat 1 m³ beton tumbuk 1 PC : 3 PB : 5 KR, Batu Pecah

BahanPortland Cement (PC) 218.0000 kg 1,820.00 Pasir Beton (PB) 0.5200 m³ 107,150.00 Koral Beton (maksimum 30 mm) 0.8700 m³ 641,666.67

Jumlah (1) TenagaPekerja 1.6500 OH 90,000.00 Tukang Batu 0.2500 OH 110,000.00 Kepala Tukang 0.0250 OH 130,000.00 Mandor 0.0800 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

G.002 Membuat 1 m³ beton tumbuk 1 PC : 3 PB : 5 KR, Kerikil SungaiBahanPortland Cement (PC) 218.0000 kg 1,820.00 Pasir Beton (PB) 0.5200 m³ 107,150.00 Kerikil Sungai 0.8700 m³ 242,000.00

Jumlah (1) TenagaPekerja 1.6500 OH 90,000.00 Tukang Batu 0.2500 OH 110,000.00 Kepala Tukang 0.0250 OH 130,000.00 Mandor 0.0800 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

G.003 Membuat 1 m³ beton tumbuk 1 PC : 3 PB : 6 KRBahanPortland Cement (PC) 197.0000 kg 1,820.00 Pasir Beton (PB) 0.4700 m³ 107,150.00 Koral Beton (maksimum 30 mm) 0.9400 m³ 641,666.67

Jumlah (1) TenagaPekerja 1.6500 OH 90,000.00 Tukang Batu 0.2500 OH 110,000.00 Kepala Tukang 0.0250 OH 130,000.00 Mandor 0.0800 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

G.004 Membuat 1 m³ beton tumbuk 1 PC : 4 PB : 6 KRBahanPortland Cement (PC) 173.0000 kg 1,820.00 Pasir Beton (PB) 0.5700 m³ 107,150.00 Koral Beton (maksimum 30 mm) 0.8700 m³ 641,666.67

Jumlah (1) TenagaPekerja 1.6500 OH 90,000.00 Tukang Batu 0.2500 OH 110,000.00 Kepala Tukang 0.0250 OH 130,000.00 Mandor 0.0800 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

G.005 Membuat 1 m² lantai kerja beton tumbuk 1 PC : 3 PB : 5 KR; tebal 5 cm,Koral BetonBahanPortland Cement (PC) 10.0000 kg 1,820.00 Pasir Beton (PB) 0.0260 m³ 107,150.00 Koral Beton (maksimum 30 mm) 0.0440 m³ 641,666.67

Jumlah (1) TenagaPekerja 1.1500 OH 90,000.00 Tukang Batu 0.0200 OH 110,000.00

Page 37: Rencana Anggaran Biaya Pembangunan Gereja

Analisa Harga Satuan Pekerjaan Page 37

NO KOEF SAT HARGA SAT

Rp.

1 2 3 4 5Kepala Tukang 0.0020 OH 130,000.00 Mandor 0.0060 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

G.006 Membuat 1 m² lantai kerja beton tumbuk 1 PC : 3 PB : 5 KR; tebal 5 cm,Kerikil sungaiBahanPortland Cement (PC) 10.0000 kg 1,820.00 Pasir Beton (PB) 0.0260 m³ 107,150.00 Kerikil sungai 0.0440 m³ 242,000.00

Jumlah (1) TenagaPekerja 1.1500 OH 90,000.00 Tukang Batu 0.0200 OH 110,000.00 Kepala Tukang 0.0020 OH 130,000.00 Mandor 0.0060 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

G.007 Membuat 1 m³ beton bertulang 1 PC : 2 PB : 3 KR, Batu PecahBahanPortland Cement (PC) 336.0000 kg 1,820.00 Pasir Beton (PB) 0.5400 m³ 107,150.00 Koral Beton (maksimum 30 mm) 0.7800 m³ 641,666.67

Jumlah (1) TenagaPekerja 1.6500 OH 90,000.00 Tukang Batu 0.2500 OH 110,000.00 Kepala Tukang 0.0250 OH 130,000.00 Mandor 0.0800 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

G.008 Membuat 1 m³ beton bertulang 1 PC : 2 PB : 3 KR, Kerikil SungaiBahanPortland Cement (PC) 336.0000 kg 1,820.00 Pasir Beton (PB) 0.5400 m³ 107,150.00 Kerikil Sungai 0.7800 m³ 242,000.00

Jumlah (1) TenagaPekerja 1.6500 OH 90,000.00 Tukang Batu 0.2500 OH 110,000.00 Kepala Tukang 0.0250 OH 130,000.00 Mandor 0.0800 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

G.009 Membuat 1 m³ beton bertulang 1 PC : 2 PB : 4 KRBahanPortland Cement (PC) 280.0000 kg 1,820.00 Pasir Beton (PB) 0.4500 m³ 107,150.00 Koral Beton (maksimum 30 mm) 0.9000 m³ 641,666.67

Jumlah (1) TenagaPekerja 1.6500 OH 90,000.00 Tukang Batu 0.2500 OH 110,000.00 Kepala Tukang 0.0250 OH 130,000.00 Mandor 0.0800 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

G.010 Membuat 1 m³ beton bertulang 1 PC : 2 PB : 2,5 KRBahanPortland Cement (PC) 352.0000 kg 1,820.00 Pasir Beton (PB) 0.5600 m³ 107,150.00 Koral Beton (maksimum 30 mm) 0.7000 m³ 641,666.67

Jumlah (1) TenagaPekerja 1.6500 OH 90,000.00 Tukang Batu 0.2500 OH 110,000.00 Kepala Tukang 0.0250 OH 130,000.00 Mandor 0.0800 OH 140,000.00

Page 38: Rencana Anggaran Biaya Pembangunan Gereja

Analisa Harga Satuan Pekerjaan Page 38

NO KOEF SAT HARGA SAT

Rp.

1 2 3 4 5 Jumlah (2)

Jumlah (1) + (2)

G.011 Membuat 1 m³ beton bertulang 1 PC : 1.5 PB : 3 KRBahanPortland Cement (PC) 357.0000 kg 1,820.00 Pasir Beton (PB) 0.4200 m³ 107,150.00 Koral Beton (maksimum 30 mm) 0.5400 m³ 641,666.67

Jumlah (1) TenagaPekerja 1.6500 OH 90,000.00 Tukang Batu 0.2500 OH 110,000.00 Kepala Tukang 0.0250 OH 130,000.00 Mandor 0.0800 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

G.012 Membuat 1 m³ beton bertulang 1 PC : 1.5 PB : 2,5 KRBahanPortland Cement (PC) 386.0000 kg 1,820.00 Pasir Beton (PB) 0.4700 m³ 107,150.00 Koral Beton (maksimum 30 mm) 0.7800 m³ 641,666.67

Jumlah (1) TenagaPekerja 1.6500 OH 90,000.00 Tukang Batu 0.2500 OH 110,000.00 Kepala Tukang 0.0250 OH 130,000.00 Mandor 0.0800 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

G.013 Membuat 1 m³ beton bertulang 1 PC : 1 PB : 2 KRBahanPortland Cement (PC) 479.0000 kg 1,820.00 Pasir Beton (PB) 0.3700 m³ 107,150.00 Koral Beton (maksimum 30 mm) 0.7400 m³ 641,666.67

Jumlah (1) TenagaPekerja 1.6500 OH 90,000.00 Tukang Batu 0.2500 OH 110,000.00 Kepala Tukang 0.0250 OH 130,000.00 Mandor 0.0800 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

G.014 Membuat 1 m³ beton mutu f'c=7,4 Mpa (K 100); slump (12 ± 2) cm; w/c = 0,87BahanPortland Cement (PC) 247.0000 kg 1,820.00 Pasir Beton (PB) 0.6207 m³ 107,150.00 Koral Beton (maksimum 30 mm) 0.7400 m³ 641,666.67 Air 215.0000 liter 40.00

Jumlah (1) TenagaPekerja 1.6500 OH 90,000.00 Tukang Batu 0.2750 OH 110,000.00 Kepala Tukang 0.0280 OH 130,000.00 Mandor 0.0830 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

G.015 Membuat 1 m³ beton mutu f'c=9,8 Mpa (K 125); slump (12 ± 2) cm; w/c = 0,78BahanPortland Cement (PC) 276.0000 kg 1,820.00 Pasir Beton (PB) 0.5914 m³ 107,150.00 Koral Beton (maksimum 30 mm) 0.7496 m³ 641,666.67 Air 215.0000 liter 40.00

Jumlah (1) TenagaPekerja 1.6500 OH 90,000.00

Page 39: Rencana Anggaran Biaya Pembangunan Gereja

Analisa Harga Satuan Pekerjaan Page 39

NO KOEF SAT HARGA SAT

Rp.

1 2 3 4 5Tukang Batu 0.2750 OH 110,000.00 Kepala Tukang 0.0280 OH 130,000.00 Mandor 0.0830 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

G.016 Membuat 1 m³ beton mutu f'c=12,2 Mpa (K 150); slump (12 ± 2) cm; w/c = 0,72BahanPortland Cement (PC) 299.0000 kg 1,820.00 Pasir Beton (PB) 0.5707 m³ 107,150.00 Koral Beton (maksimum 30 mm) 0.7533 m³ 641,666.67 Air 215.0000 liter 40.00

Jumlah (1) TenagaPekerja 1.6500 OH 90,000.00 Tukang Batu 0.2750 OH 110,000.00 Kepala Tukang 0.0280 OH 130,000.00 Mandor 0.0830 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

G.017 Membuat 1 m³ beton mutu f'c=7,4 Mpa (K 100); slump (3-6) cm; w/c = 0,87BahanPortland Cement (PC) 230.0000 kg 1,820.00 Pasir Beton (PB) 0.6379 m³ 107,150.00 Koral Beton (maksimum 30 mm) 0.7607 m³ 641,666.67 Air 200.0000 liter 40.00

Jumlah (1) TenagaPekerja 1.2000 OH 90,000.00 Tukang Batu 0.2000 OH 110,000.00 Kepala Tukang 0.0200 OH 130,000.00 Mandor 0.0600 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

G.018 Membuat 1 m³ beton mutu f'c=14,5 Mpa (K 175); slump (12 ± 2) cm; w/c = 0,66BahanPortland Cement (PC) 326.0000 kg 1,820.00 Pasir Beton (PB) 0.5429 m³ 107,150.00 Koral Beton (maksimum 30 mm) 0.7622 m³ 641,666.67 Air 215.0000 liter 40.00

Jumlah (1) TenagaPekerja 1.6500 OH 90,000.00 Tukang Batu 0.2750 OH 110,000.00 Kepala Tukang 0.0280 OH 130,000.00 Mandor 0.0830 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

G.019 Membuat 1 m³ beton mutu f'c=16,9 Mpa (K 200); slump (12 ± 2) cm; w/c = 0,61BahanPortland Cement (PC) 352.0000 kg 1,820.00 Pasir Beton (PB) 0.5221 m³ 107,150.00 Koral Beton (maksimum 30 mm) 0.7637 m³ 641,666.67 Air 215.0000 liter 40.00

Jumlah (1) TenagaPekerja 1.6500 OH 90,000.00 Tukang Batu 0.2750 OH 110,000.00 Kepala Tukang 0.0280 OH 130,000.00 Mandor 0.0830 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

G.020 Membuat 1 m³ beton mutu f'c=19,3 Mpa (K 225); slump (12 ± 2) cm; w/c = 0,58BahanPortland Cement (PC) 371.0000 kg 1,820.00 Pasir Beton (PB) 0.4986 m³ 107,150.00

Page 40: Rencana Anggaran Biaya Pembangunan Gereja

Analisa Harga Satuan Pekerjaan Page 40

NO KOEF SAT HARGA SAT

Rp.

1 2 3 4 5Koral Beton (maksimum 30 mm) 0.7756 m³ 641,666.67 Air 215.0000 liter 40.00

Jumlah (1) TenagaPekerja 1.6500 OH 90,000.00 Tukang Batu 0.2750 OH 110,000.00 Kepala Tukang 0.0280 OH 130,000.00 Mandor 0.0830 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

G.021 Membuat 1 m³ beton mutu f'c=21,7 Mpa (K 250); slump (12 ± 2) cm; w/c = 0,56BahanPortland Cement (PC) 384.0000 kg 1,820.00 Pasir Beton (PB) 0.4943 m³ 107,150.00 Koral Beton (maksimum 30 mm) 0.7696 m³ 641,666.67 Air 215.0000 liter 40.00

Jumlah (1) TenagaPekerja 1.6500 OH 90,000.00 Tukang Batu 0.2750 OH 110,000.00 Kepala Tukang 0.0280 OH 130,000.00 Mandor 0.0830 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

G.022 Membuat 1 m³ beton mutu f'c=24 Mpa (K 275); slump (12 ± 2) cm; w/c = 0,53BahanPortland Cement (PC) 406.0000 kg 1,820.00 Pasir Beton (PB) 0.4886 m³ 107,150.00 Koral Beton (maksimum 30 mm) 0.7600 m³ 641,666.67 Air 215.0000 liter 40.00

Jumlah (1) TenagaPekerja 1.6500 OH 90,000.00 Tukang Batu 0.2750 OH 110,000.00 Kepala Tukang 0.0280 OH 130,000.00 Mandor 0.0830 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

G.023 Membuat 1 m³ beton mutu f'c=26,4 Mpa (K 300); slump (12 ± 2) cm; w/c = 0,52BahanPortland Cement (PC) 413.0000 kg 1,820.00 Pasir Beton (PB) 0.4864 m³ 107,150.00 Koral Beton (maksimum 30 mm) 0.7563 m³ 641,666.67 Air 215.0000 liter 40.00

Jumlah (1) TenagaPekerja 1.6500 OH 90,000.00 Tukang Batu 0.2750 OH 110,000.00 Kepala Tukang 0.0280 OH 130,000.00 Mandor 0.0830 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

G.024 Membuat 1 m³ beton mutu f'c=28,8 Mpa (K 325); slump (12 ± 2) cm; w/c = 0,49BahanPortland Cement (PC) 439.0000 kg 1,820.00 Pasir Beton (PB) 0.4786 m³ 107,150.00 Koral Beton (maksimum 30 mm) 0.7452 m³ 641,666.67 Air 215.0000 liter 40.00

Jumlah (1) TenagaPekerja 2.1000 OH 90,000.00 Tukang Batu 0.3500 OH 110,000.00 Kepala Tukang 0.0350 OH 130,000.00 Mandor 0.1050 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

Page 41: Rencana Anggaran Biaya Pembangunan Gereja

Analisa Harga Satuan Pekerjaan Page 41

NO KOEF SAT HARGA SAT

Rp.

1 2 3 4 5G.025 Membuat 1 m³ beton mutu f'c=31,2 Mpa (K 350); slump (12 ± 2) cm; w/c = 0,48

BahanPortland Cement (PC) 448.0000 kg 1,820.00 Pasir Beton (PB) 0.4764 m³ 107,150.00 Koral Beton (maksimum 30 mm) 0.7407 m³ 641,666.67 Air 215.0000 liter 40.00

Jumlah (1) TenagaPekerja 2.1000 OH 90,000.00 Tukang Batu 0.3500 OH 110,000.00 Kepala Tukang 0.0350 OH 130,000.00 Mandor 0.1050 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

G.026 Pembesian 1 kg dengan besi polos atau besi ulirBahanBesi Beton (polos/ulir) 1.0500 kg 15,400.00 Kawat Beton 0.0150 kg 22,000.00

Jumlah (1) TenagaPekerja 0.0070 OH 90,000.00 Tukang Besi 0.0070 OH 110,000.00 Kepala Tukang 0.0007 OH 130,000.00 Mandor 0.0004 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

G.027Bahan

10.2000 kg 15,400.00 Kawat Beton 0.0500 kg 22,000.00

Jumlah (1) TenagaPekerja 0.0250 OH 90,000.00 Tukang Besi 0.0250 OH 110,000.00 Kepala Tukang 0.0250 OH 130,000.00 Mandor 0.0010 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

G.028 Memasang 1 m² bekisting untuk pondasiBahanKayu Bekisting 0.0400 m³ 1,650,000.00 Paku 5 cm - 10 cm 0.3000 kg 21,650.00 Minyak Bekisting 0.1000 liter 10,600.00

Jumlah (1) TenagaPekerja 0.5200 OH 90,000.00 Tukang Kayu 0.2600 OH 110,000.00 Kepala Tukang 0.0260 OH 130,000.00 Mandor 0.0260 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

G.029 1 M2 Bongkar bekesting = 1/5 x upah pasang bekesting pondasi

G.030 Memasang 1 m² bekisting untuk sloofBahanKayu bekisting 0.0450 m³ 1,650,000.00 Paku 5 cm - 10 cm 0.3000 kg 21,650.00 Minyak Bekisting 0.1000 liter 10,600.00

Jumlah (1) TenagaPekerja 0.5200 OH 90,000.00 Tukang Kayu 0.2600 OH 110,000.00 Kepala Tukang 0.0260 OH 130,000.00 Mandor 0.0260 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

Memasang 10 kg jaring kawat baja /wiremesh

Jaring Kawat Baja dilas/wiremesh

Page 42: Rencana Anggaran Biaya Pembangunan Gereja

Analisa Harga Satuan Pekerjaan Page 42

NO KOEF SAT HARGA SAT

Rp.

1 2 3 4 5G.031 1 M2 Bongkar bekesting = 1/5 x upah pasang bekesting sloof

G.032 Memasang 1 m² bekisting untuk kolomBahanKayu Bekisting 0.0400 m³ 1,650,000.00 Paku 5 cm - 12 cm 0.4000 kg 21,650.00 Minyak Bekisting 0.2000 liter 10,600.00 Balok Kayu 0.0150 m³ 1,650,000.00 Papan Bekisting 0.0200 m3 1,650,000.00 Kayu Perancah 8.0000 m' 4,000.00

Jumlah (1) TenagaPekerja 0.6600 OH 90,000.00 Tukang Kayu 0.3300 OH 110,000.00 Kepala Tukang 0.0330 OH 130,000.00 Mandor 0.0330 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

G.033 1 M2 Bongkar bekesting = 1/5 x upah pasang bekesting kolom

G.034 Memasang 1 m² bekisting untuk balokBahanKayu Bekisting 0.0400 m³ 1,650,000.00 Paku 5 cm - 12 cm 0.4000 kg 21,650.00 Minyak Bekisting 0.2000 liter 10,600.00 Balok Kayu 0.0180 m³ 1,650,000.00 Papan Bekisting 0.0200 m3 1,650,000.00 Kayu Perancah 8.0000 m' 4,000.00

Jumlah (1) TenagaPekerja 0.6600 OH 90,000.00 Tukang Kayu 0.3300 OH 110,000.00 Kepala Tukang 0.0330 OH 130,000.00 Mandor 0.0330 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

G.035 1 M2 Bongkar bekesting = 1/5 x upah pasang bekesting balok

G.036 Memasang 1 m² bekisting untuk lantaiBahanKayu Bekisting 0.0400 m³ 1,650,000.00 Paku 5 cm - 12 cm 0.4000 kg 21,650.00 Minyak Bekisting 0.2000 liter 10,600.00 Balok Kayu 0.0150 m³ 1,650,000.00 Papan Bekisting 0.0200 m3 1,650,000.00 Kayu Perancah 24.0000 m' 4,000.00

Jumlah (1) TenagaPekerja 0.6600 OH 90,000.00 Tukang Kayu 0.3300 OH 110,000.00 Kepala Tukang 0.0330 OH 130,000.00 Mandor 0.0330 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

G.037 1 M2 Bongkar bekesting = 1/5 x upah pasang bekesting lantai

G.038 Memasang 1 m² bekisting untuk dindingBahanKayu Bekisting 0.0300 m³ 1,650,000.00 Paku 5 cm - 12 cm 0.4000 kg 21,650.00 Minyak Bekisting 0.2000 liter 10,600.00 Balok Kayu 0.0200 m³ 1,650,000.00 Papan Bekisting 0.0200 m3 1,650,000.00 Kayu Perancah 12.0000 m' 4,000.00 Formite/Penjaga jarak Bekisting/spacer 4.0000 buah 16,000.00

Jumlah (1) Tenaga

Page 43: Rencana Anggaran Biaya Pembangunan Gereja

Analisa Harga Satuan Pekerjaan Page 43

NO KOEF SAT HARGA SAT

Rp.

1 2 3 4 5Pekerja 0.6600 OH 90,000.00 Tukang Kayu 0.3300 OH 110,000.00 Kepala Tukang 0.0330 OH 130,000.00 Mandor 0.0330 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

G.039 1 M2 Bongkar bekesting = 1/5 x upah pasang bekesting dinding

G.040 Memasang 1 m² bekisting untuk tanggaBahanKayu Bekisting 0.0300 m³ 1,650,000.00 Paku 5 cm - 12 cm 0.4000 kg 21,650.00 Minyak Bekisting 0.1500 liter 10,600.00 Balok Kayu 0.0150 m³ 1,650,000.00 Papan Bekisting 0.0200 m3 1,650,000.00 Kayu Perancah 8.0000 m' 4,000.00

Jumlah (1) TenagaPekerja 0.6600 OH 90,000.00 Tukang Kayu 0.3300 OH 110,000.00 Kepala Tukang 0.0330 OH 130,000.00 Mandor 0.0330 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

G.041 1 M2 Bongkar bekesting = 1/5 x upah pasang bekesting tangga

G.042 Memasang 1 m² jembatan untuk pengecoran betonBahanKayu Bekisting 0.0264 m³ 1,650,000.00 Paku 5 cm - 12 cm 0.6000 kg 21,650.00 Kayu Perancah 2.0000 m' 4,000.00

Jumlah (1) TenagaPekerja 0.1500 OH 90,000.00 Tukang Kayu 0.0500 OH 110,000.00 Kepala Tukang 0.0050 OH 130,000.00 Mandor 0.0080 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

G.043 Memasang 1 m³ pondasi beton bertulang (150 kg besi + bekisting)BahanKayu Bekisting 0.2000 m³ 1,650,000.00 Paku 5 cm - 12 cm 1.5000 kg 21,650.00 Minyak Bekisting 0.4000 liter 10,600.00 Besi Beton (polos/ulir) 157.5000 kg 15,400.00 Kawat Beton 2.2500 kg 22,000.00 Portland Cement (PC) 336.0000 kg 1,820.00 Pasir Beton (PB) 0.5400 m³ 107,150.00 Koral Beton (maksimum 30 mm) 0.8100 m³ 641,666.67

Jumlah (1) TenagaPekerja 5.3000 OH 90,000.000 Tukang Batu 0.2750 OH 110,000.000 Tukang Kayu 1.3000 OH 110,000.000 Tukang Besi 1.0500 OH 110,000.000 Kepala Tukang 0.2620 OH 130,000.000 Mandor 0.2650 OH 140,000.000

Jumlah (2) Jumlah (1) + (2)

G.044 Memasang 1 m³ sloof beton bertulang (200 kg besi + bekisting)BahanKayu Bekisting 0.2700 m³ 1,650,000.00 Paku 5 cm - 12 cm 2.0000 kg 21,650.00 Minyak Bekisting 0.6000 liter 10,600.00 Besi Beton (polos/ulir) 210.0000 kg 15,400.00 Kawat Beton 3.0000 kg 22,000.00 Portland Cement (PC) 336.0000 kg 1,820.00

Page 44: Rencana Anggaran Biaya Pembangunan Gereja

Analisa Harga Satuan Pekerjaan Page 44

NO KOEF SAT HARGA SAT

Rp.

1 2 3 4 5Pasir Beton (PB) 0.5400 m³ 107,150.00 Koral Beton (maksimum 30 mm) 0.8100 m³ 641,666.67

Jumlah (1) TenagaPekerja 5.6500 OH 90,000.00 Tukang Batu 0.2750 OH 110,000.00 Tukang Kayu 1.5600 OH 110,000.00 Tukang Besi 1.4000 OH 110,000.00 Kepala Tukang 0.3230 OH 130,000.00 Mandor 0.2830 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

G.045 Memasang 1 m³ kolom beton bertulang (300 kg besi + bekisting)BahanKayu Bekisting 0.4000 m³ 1,650,000.00 Paku 5 cm - 12 cm 4.0000 kg 21,650.00 Minyak Bekisting 2.0000 liter 10,600.00 Besi Beton (polos/ulir) 315.0000 kg 15,400.00 Kawat Beton 4.5000 kg 22,000.00 Portland Cement (PC) 336.0000 kg 1,820.00 Pasir Beton (PB) 0.5400 m³ 107,150.00 Koral Beton (maksimum 30 mm) 0.8100 m³ 641,666.67 Balok Kayu 0.1500 m³ 1,650,000.00 Plywood tebal 9 mm 3.5000 lembar 154,000.00 Kayu Perancah 80.0000 4,000.00

Jumlah (1) TenagaPekerja 7.0500 OH 90,000.00 Tukang Batu 0.2750 OH 110,000.00 Tukang Kayu 1.6500 OH 110,000.00 Tukang Besi 2.1000 OH 110,000.00 Kepala Tukang 0.4030 OH 130,000.00 Mandor 0.3530 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

G.046 Memasang 1 m³ balok beton bertulang (200 kg besi + bekisting)BahanKayu Bekisting 0.3200 m³ 1,650,000.00 Paku 5 cm - 12 cm 3.2000 kg 21,650.00 Minyak Bekisting 1.6000 liter 10,600.00 Besi Beton (polos/ulir) 210.0000 kg 15,400.00 Kawat Beton 3.0000 kg 22,000.00 Portland Cement (PC) 336.0000 kg 1,820.00 Pasir Beton (PB) 0.5400 m³ 107,150.00 Koral Beton (maksimum 30 mm) 0.8100 m³ 641,666.67 Balok Kayu 0.1400 m³ 1,650,000.00 Plywood tebal 9 mm 2.8000 lembar 154,000.00 Kayu Perancah 64.0000 4,000.00

Jumlah (1) TenagaPekerja 6.3500 OH 90,000.00 Tukang Batu 0.2750 OH 110,000.00 Tukang Kayu 1.6500 OH 110,000.00 Tukang Besi 1.4000 OH 110,000.00 Kepala Tukang 0.3330 OH 130,000.00 Mandor 0.3180 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

G.047 Memasang 1 m³ kolom beton bertulang (150 kg besi + bekisting)BahanKayu Bekisting 0.3200 m³ 1,650,000.00 Paku 5 cm - 12 cm 3.2000 kg 21,650.00 Minyak Bekisting 1.6000 liter 10,600.00 Besi Beton (polos/ulir) 157.5000 kg 15,400.00 Kawat Beton 2.2500 kg 22,000.00

m'

m'

Page 45: Rencana Anggaran Biaya Pembangunan Gereja

Analisa Harga Satuan Pekerjaan Page 45

NO KOEF SAT HARGA SAT

Rp.

1 2 3 4 5Portland Cement (PC) 336.0000 kg 1,820.00 Pasir Beton (PB) 0.5400 m³ 107,150.00 Koral Beton (maksimum 30 mm) 0.8100 m³ 641,666.67 Balok Kayu 0.1200 m³ 1,650,000.00 Plywood tebal 9 mm 2.8000 lembar 154,000.00 Kayu Perancah 128.0000 4,000.00

Jumlah (1) TenagaPekerja 5.3000 OH 90,000.00 Tukang Batu 0.2750 OH 110,000.00 Tukang Kayu 1.3000 OH 110,000.00 Tukang Besi 1.0500 OH 110,000.00 Kepala Tukang 0.2650 OH 130,000.00 Mandor 0.2650 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

G.048 Memasang 1 m³ dinding beton bertulang (150 kg besi + bekisting)BahanKayu Bekisting 0.2400 m³ 1,650,000.00 Paku 5 cm - 12 cm 3.2000 kg 21,650.00 Minyak Bekisting 1.6000 liter 10,600.00 Besi Beton (polos/ulir) 157.5000 kg 15,400.00 Kawat Beton 2.2500 kg 22,000.00 Portland Cement (PC) 336.0000 kg 1,820.00 Pasir Beton (PB) 0.5400 m³ 107,150.00 Koral Beton (maksimum 30 mm) 0.8100 m³ 641,666.67 Balok Kayu 0.1600 m³ 1,650,000.00 Plywood tebal 9 mm 2.8000 lembar 154,000.00 Kayu Perancah 96.0000 4,000.00

Jumlah (1) TenagaPekerja 5.3000 OH 90,000.00 Tukang Batu 0.2750 OH 110,000.00 Tukang Kayu 1.3000 OH 110,000.00 Tukang Besi 1.0500 OH 110,000.00 Kepala Tukang 0.2620 OH 130,000.00 Mandor 0.2650 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

G.049 Memasang 1 m³ dinding beton bertulang (200 kg besi + bekisting)BahanKayu Bekisting 0.2500 m³ 1,650,000.00 Paku 5 cm - 12 cm 3.0000 kg 21,650.00 Minyak Bekisting 1.2000 liter 10,600.00 Besi Beton (polos/ulir) 210.0000 kg 15,400.00 Kawat Beton 3.0000 kg 22,000.00 Portland Cement (PC) 336.0000 kg 1,820.00 Pasir Beton (PB) 0.5400 m³ 107,150.00 Koral Beton (maksimum 30 mm) 0.8100 m³ 641,666.67 Balok Kayu Meranti 5/7 0.1050 m³ 1,650,000.00 Plywood tebal 9 mm 2.5000 lembar 154,000.00 Kayu Perancah 56.0000 4,000.00

Jumlah (1) TenagaPekerja 5.6500 OH 90,000.00 Tukang Batu 0.2750 OH 110,000.00 Tukang Kayu 1.5600 OH 110,000.00 Tukang Besi 1.4000 OH 110,000.00 Kepala Tukang 0.3230 OH 130,000.00 Mandor 0.2830 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

G.050 Memasang 1 m' kolom praktis beton bertulang (11 x 11 cm)BahanKayu Bekisting 0.0020 m³ 1,650,000.00 Paku 5 cm - 12 cm 0.0100 kg 21,650.00 Minyak Bekisting 0.0000 liter 10,600.00

m'

m'

m'

Page 46: Rencana Anggaran Biaya Pembangunan Gereja

Analisa Harga Satuan Pekerjaan Page 46

NO KOEF SAT HARGA SAT

Rp.

1 2 3 4 5Besi Beton (polos/ulir) 3.0000 kg 15,400.00 Kawat Beton 0.4500 kg 22,000.00 Portland Cement (PC) 4.0000 kg 1,820.00 Pasir Beton (PB) 0.0060 m³ 107,150.00 Koral Beton (maksimum 30 mm) 0.0090 m³ 641,666.67

Jumlah (1) TenagaPekerja 0.1800 OH 90,000.00 Tukang Batu 0.0200 OH 110,000.00 Tukang Kayu 0.0200 OH 110,000.00 Tukang Besi 0.0200 OH 110,000.00 Kepala Tukang 0.0060 OH 130,000.00 Mandor 0.0090 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

G.051 Memasang 1 m' ring balok beton bertulang (10 x 15 cm)BahanKayu Bekisting 0.0030 m³ 1,650,000.00 Paku 5 cm - 12 cm 0.0200 kg 21,650.00 Minyak Bekisting 0.0000 liter 10,600.00 Besi Beton (polos/ulir) 3.6000 kg 15,400.00 Kawat Beton 0.0500 kg 22,000.00 Portland Cement (PC) 5.5000 kg 1,820.00 Pasir Beton (PB) 0.0090 m³ 107,150.00 Koral Beton (maksimum 30 mm) 0.0150 m³ 641,666.67

Jumlah (1) TenagaPekerja 0.2970 OH 90,000.00 Tukang Batu 0.0330 OH 110,000.00 Tukang Kayu 0.0330 OH 110,000.00 Tukang Besi 0.0330 OH 110,000.00 Kepala Tukang 0.0100 OH 130,000.00 Mandor 0.0150 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

H. PEKERJAAN PENUTUP ATAP SNI 03-3436-2002 H.001 Memasang 1 m² rooflight fibreglass (180 x 90) cm

BahanRooflight Fibreglass 0.6000 lbr 119,800.00 Paku Biasa 2" - 5" 0.0500 kg 21,650.00

Jumlah (1) TenagaPekerja 0.1400 OH 90,000.00 Tukang Kayu 0.0670 OH 110,000.00 Kepala Tukang 0.0070 OH 130,000.00 Mandor 0.0070 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

H.002 Memasang 1 m² atap genteng glazzurBahanGenteng glazzur 25.0000 bh 4,700.00

Jumlah (1) TenagaPekerja 0.1500 Oh 90,000.00 Tukang Kayu 0.0750 Oh 110,000.00 Kepala Tukang 0.0080 Oh 130,000.00 Mandor 0.0080 Oh 140,000.00

Jumlah (2) Jumlah (1) + (2)

H.003 Memasang 1 m' bubung genteng glazzurBahanGenteng bubung glazuur 5.0000 bh 6,100.00

Page 47: Rencana Anggaran Biaya Pembangunan Gereja

Analisa Harga Satuan Pekerjaan Page 47

NO KOEF SAT HARGA SAT

Rp.

1 2 3 4 5Semen portland 8.0000 Kg 1,820.00 Pasir Pasang 0.0320 M3 107,150.00

Jumlah (1) TenagaPekerja 0.4000 Oh 90,000.00 Tukang Kayu 0.2000 Oh 110,000.00 Kepala Tukang 0.0200 Oh 130,000.00 Mandor 0.0020 Oh 140,000.00

Jumlah (2) Jumlah (1) + (2)

H.004 Memasang 1 m² atap genteng betonBahanGenteng Beton 11.0000 bh 7,300.00 Paku 2" - 5" 0.0300 kg 21,650.00

Jumlah (1) TenagaPekerja 0.2000 OH 90,000.00 Tukang Kayu 0.1000 OH 110,000.00 Kepala Tukang 0.0100 OH 110,000.00 Mandor 0.0100 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

H.005 Memasang 1 m' nok genteng betonBahanNok Genteng Beton 3.5000 bh 9,100.00 Paku 2" - 5" 0.0500 kg 21,650.00 Portland Cement (PC) 10.8000 kg 1,820.00 Pasir Pasang 0.0320 m³ 107,150.00 Cement Warna 1.0000 kg 16,500.00

Jumlah (1) TenagaPekerja 0.4000 OH 90,000.00 Tukang Kayu 0.2000 OH 110,000.00 Kepala Tukang 0.0200 OH 130,000.00 Mandor 0.0200 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

H.006 Memasang 1 m² atap sirapBahanGenteng Sirap 60.0000 bh 2,300.00 Paku ½" - 1" 0.2000 kg 21,650.00

Jumlah (1) TenagaPekerja 0.1660 OH 90,000.00 Tukang Kayu 0.2500 OH 110,000.00 Kepala Tukang 0.0250 OH 130,000.00 Mandor 0.0080 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

H.007 Memasang 1 m' nok atap sirapBahanSeng Plat 3' -6' BJLS 20 0.4000 lbr 15,000.00 Paku ½" - 1" 0.0600 kg 21,650.00 Paku 2" - 5" 0.0500 kg 21,650.00 Papan Kayu Meranti 0.0040 m³ 1,870,000.00

Jumlah (1) TenagaPekerja 0.1250 OH 90,000.00 Tukang Kayu 0.2500 OH 110,000.00 Kepala Tukang 0.0250 OH 130,000.00 Mandor 0.0060 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

H.008 Memasang 1 m² atap seng gelombang Bjls 30BahanSeng Gelombang 3' - 6' BJLS 30 0.7000 lbr 64,950.00 Paku ½" - 1" 0.0200 kg 21,650.00

Page 48: Rencana Anggaran Biaya Pembangunan Gereja

Analisa Harga Satuan Pekerjaan Page 48

NO KOEF SAT HARGA SAT

Rp.

1 2 3 4 5 Jumlah (1)

TenagaPekerja 0.1200 OH 90,000.00 Tukang Kayu 0.0600 OH 110,000.00 Kepala Tukang 0.0060 OH 130,000.00 Mandor 0.0060 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

H.009 Memasang 1 m² atap seng gelombang Bjls 20BahanSeng Gelombang 3' - 6' BJLS 20 0.7000 lbr 40,700.00 Paku ½" - 1" 0.0200 kg 21,650.00

Jumlah (1) TenagaPekerja 0.1200 OH 90,000.00 Tukang Kayu 0.0600 OH 110,000.00 Kepala Tukang 0.0060 OH 130,000.00 Mandor 0.0060 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

H.010 Memasang 1 m' atap bubungan seng Bjls 30BahanSeng Plat 3' - 6' BJLS 30 1.0000 m 52,500.00 Paku ½" - 1" 0.0600 kg 21,650.00 Papan Lembasung/ Sejenis 0.0400 m3 1,870,000.00

Jumlah (1) TenagaPekerja 0.1500 OH 90,000.00 Tukang Kayu 0.0700 OH 110,000.00 Kepala Tukang 0.0080 OH 130,000.00 Mandor 0.0060 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

H.011 Menutup atap dengan genteng metal surya roof per m2 BahanGenteng metal surya roof 1.6234 lbr 79,375.00 Paku genteng metal 12.0000 Bh 605.00

Jumlah (1) TenagaPekerja 0.2000 OH 90,000.00 Tukang Kayu 0.1000 OH 110,000.00 Kepala Tukang 0.0100 OH 130,000.00 Mandor 0.0100 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

H.012 Menutup bubungan pada genteng metal Surya roof per m'BahanBubungan surya roof 2.5000 Bh 33,300.00 Paku genteng metal 10.0000 Bh 605.00 Kayu Lembasung/ sejenis 0.0040 m³ 1,870,000.00

Jumlah (1) TenagaPekerja 0.2000 OH 90,000.00 Tukang Kayu 0.1000 OH 110,000.00 Kepala Tukang 0.0100 OH 130,000.00 Mandor 0.0100 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

H.013 Menutup Atap dengan genteng Metal sakura roof per m2 BahanGenteng metal sakura roof 1.6234 lbr 45,200.00 Paku genteng metal 12.0000 Bh 605.00

Jumlah (1) TenagaPekerja 0.2000 OH 90,000.00 Tukang Kayu 0.1000 OH 110,000.00

Page 49: Rencana Anggaran Biaya Pembangunan Gereja

Analisa Harga Satuan Pekerjaan Page 49

NO KOEF SAT HARGA SAT

Rp.

1 2 3 4 5Kepala Tukang 0.0100 OH 130,000.00 Mandor 0.0100 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

H.014 Menutup bubungan pada genteng metal Sakura roof per m'BahanBubungan sakura roof 2.5000 Bh 33,300.00 Paku genteng metal 10.0000 Bh 605.00 Kayu Lembasung/ sejenis 0.0040 m³ 1,870,000.00

Jumlah (1) TenagaPekerja 0.2000 OH 90,000.00 Tukang Kayu 0.1000 OH 110,000.00 Kepala Tukang 0.0100 OH 130,000.00 Mandor 0.0100 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

H.015 Pasang aluminium foil / sisalation per 1 M2BahanSisalation / aluminium foil 1.0500 m² 50,400.00

Jumlah (1) TenagaPekerja 0.1500 OH 90,000.00 Tukang 0.0500 OH 110,000.00 Kepala Tukang 0.0050 OH 130,000.00 Mandor 0.0080 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

I. PEKERJAAN LANGIT-LANGIT SNI 03-2838-2002 I.001 Memasang 1 m² langit-langit lambriziring kayu, tebal 9 mm

BahanPapan Kayu 0.0150 m³ 1,870,000.00 Paku Triplek 0.0100 kg 21,650.00

Jumlah (1) TenagaPekerja 0.6000 OH 90,000.00 Tukang Kayu 0.8000 OH 110,000.00 Kepala Tukang 0.0800 OH 130,000.00 Mandor 0.0300 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

I.002 Memasang 1 m² langit-langit plywood ukuran (120 x 240) cm; tbl. 9 mmBahanPlywood tbl. 9 mm 0.3750 lembar 154,000.00 Paku Triplek 0.0300 kg 21,650.00

Jumlah (1) TenagaPekerja 0.1000 OH 90,000.00 Tukang Kayu 0.1000 OH 110,000.00 Kepala Tukang 0.0100 OH 130,000.00 Mandor 0.0050 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

I.003 Memasang 1 m² langit-langit plywood ukuran (120 x 240) cm; tbl. 3 mmBahanPlywood tbl. 3 mm 0.3750 lembar 60,500.00 Paku Triplek 0.0300 kg 21,650.00

Jumlah (1) TenagaPekerja 0.1000 OH 90,000.00 Tukang Kayu 0.1000 OH 110,000.00 Kepala Tukang 0.0100 OH 130,000.00 Mandor 0.0050 OH 140,000.00

Page 50: Rencana Anggaran Biaya Pembangunan Gereja

Analisa Harga Satuan Pekerjaan Page 50

NO KOEF SAT HARGA SAT

Rp.

1 2 3 4 5 Jumlah (2)

Jumlah (1) + (2)I.004 Memasang 1 m² langit-langit plywood ukuran (60 x 120) cm; tbl. 9 mm

BahanPlywood tbl. 9 mm 0.3750 lembar 154,000.00 Paku Triplek 0.0300 kg 21,650.00

Jumlah (1) TenagaPekerja 0.0700 OH 90,000.00 Tukang Kayu 0.1000 OH 110,000.00 Kepala Tukang 0.0100 OH 130,000.00 Mandor 0.0035 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

I.005 Memasang 1 m² langit-langit plywood ukuran (60 x 120) cm; tbl. 3 mm BahanPlywood tbl. 3 mm 0.3750 lembar 60,500.00 Paku Triplek 0.0300 kg 21,650.00

Jumlah (1) TenagaPekerja 0.0700 OH 90,000.00 Tukang Kayu 0.1000 OH 110,000.00 Kepala Tukang 0.0100 OH 130,000.00 Mandor 0.0035 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

I.006 Memasang 1 m² langit-langit teakwood ukuran (60 x 120) cm; tbl. 4 mm dan 6 mmBahanTeakwood 0.3750 lembar 154,400.00 Paku Triplek 0.0300 kg 21,650.00

Jumlah (1) TenagaPekerja 0.0700 OH 90,000.00 Tukang Kayu 0.1000 OH 110,000.00 Kepala Tukang 0.0100 OH 130,000.00 Mandor 0.0035 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

I.007 Memasang 1 m² langit-langit lat kayu bengkiraiBahanPapan Kayu Bengkirai 0.0240 m³ 2,090,000.00 Paku 0.0100 kg 21,650.00 Paku Sekrup 0.0500 kg 31,100.00

Jumlah (1) TenagaPekerja 0.2000 OH 90,000.00 Tukang Kayu 0.6000 OH 110,000.00 Kepala Tukang 0.0600 OH 130,000.00 Mandor 0.0100 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

I.008 Memasang 1 m² langit-langit lat kayu merantiBahanPapan Kayu Meranti 0.0240 m³ 1,870,000.00 Paku 0.0100 kg 21,650.00 Paku Sekrup 0.0500 kg 31,100.00

Jumlah (1) TenagaPekerja 0.2000 OH 90,000.00 Tukang Kayu 0.6000 OH 110,000.00 Kepala Tukang 0.0600 OH 130,000.00 Mandor 0.0100 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

I.009 Memasang 1 m² Plywood 9 mm, rangka kayu meranti

Page 51: Rencana Anggaran Biaya Pembangunan Gereja

Analisa Harga Satuan Pekerjaan Page 51

NO KOEF SAT HARGA SAT

Rp.

1 2 3 4 5BahanKaso Kayu Meranti 0.0230 m³ 1,870,000.00 Paku 0.0600 kg 21,650.00 Plywood 4' x 8' x 9 mm 0.3900 lbr 154,000.00

Jumlah (1) TenagaPekerja 0.2700 OH 90,000.00 Tukang Kayu 0.4000 OH 110,000.00 Kepala Tukang 0.0400 OH 130,000.00 Mandor 0.0135 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

I.010 Memasang 1 m² Plywood 3mm, rangka kayu merantiBahanKaso Kayu Meranti 0.0230 m³ 1,870,000.00 Paku 0.0600 kg 21,650.00 Plywood 4' x 8' x 3mm 0.3900 lbr 60,500.00

Jumlah (1) TenagaPekerja 0.2700 OH 90,000.00 Tukang Kayu 0.4000 OH 110,000.00 Kepala Tukang 0.0400 OH 130,000.00 Mandor 0.0135 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

I.011 Memasang 1 m² langit-langit gypsum board uk. (120 x 240) cm, tebal 9 mmBahanGypsum Board 0.3640 lembar 91,200.00 Paku Sekrup 0.1100 kg 31,100.00

Jumlah (1) TenagaPekerja 0.1000 OH 90,000.00 Tukang Kayu 0.0500 OH 110,000.00 Kepala Tukang 0.0050 OH 130,000.00 Mandor 0.0050 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

I.012 Memasang 1 m' list gipsumBahanList gipsum 1.0500 m' 30,000.00 Tepung Gipsum 0.1500 kg 5,000.00

Jumlah (1) TenagaPekerja 0.0600 OH 90,000.00 Tukang Kayu 0.0600 OH 110,000.00 Kepala Tukang 0.0060 OH 130,000.00 Mandor 0.0030 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

I.013 Memasang 1 m' list kayu profilBahanList Kayu Profil 1.0500 m' 20,000.00 Paku Triplek 0.0100 kg 21,650.00

Jumlah (1) TenagaPekerja 0.0500 OH 90,000.00 Tukang Kayu 0.0500 OH 110,000.00 Kepala Tukang 0.0050 OH 130,000.00 Mandor 0.0030 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

J. PEKERJAAN SANITASI SNI J.001 Memasang 1 buah kloset duduk

Bahan

Page 52: Rencana Anggaran Biaya Pembangunan Gereja

Analisa Harga Satuan Pekerjaan Page 52

NO KOEF SAT HARGA SAT

Rp.

1 2 3 4 5Kolset Duduk 1.0000 bh 1,650,000.00 Perlengkapan 6% harga kloset 99,000.00

Jumlah (1) TenagaPekerja 3.3000 OH 90,000.00 Tukang Batu 1.1000 OH 110,000.00 Kepala Tukang 0.0010 OH 130,000.00 Mandor 0.1600 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

J.002 Memasang 1 buah kloset jongkok porselenBahanKloset Jongkok Porselen 1.0000 bh 239,775.00 Portland Cement (PC) 6.0000 kg 1,820.00 Pasir Pasang 0.0100 m³ 107,150.00

Jumlah (1) TenagaPekerja 1.0000 OH 90,000.00 Tukang Batu 1.5000 OH 110,000.00 Kepala Tukang 1.5000 OH 130,000.00 Mandor 0.1600 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

J.003 Memasang 1 buah kloset jongkok terasoBahanKloset Jongkok Teraso 1.0000 bh 106,480.00 Bata Merah 8 x 8 x 16 cm 6.0000 bh 990.00 Portland Cement (PC) 6.0000 kg 1,820.00 Pasir Pasang 0.0100 m³ 107,150.00

Jumlah (1) TenagaPekerja 1.0000 OH 90,000.00 Tukang Batu 1.5000 OH 110,000.00 Kepala Tukang 0.3000 OH 130,000.00 Mandor 0.1100 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

J.004 Memasang 1 buah urinoirBahanUrinoir 1.0000 bh 2,462,350.00 Perlengkapan 30% harga urinoir 738,705.00 Portland Cement (PC) 6.0000 kg 1,820.00 Pasir Pasang 0.0100 m³ 107,150.00

Jumlah (1) TenagaPekerja 1.0000 OH 90,000.00 Tukang Batu 1.0000 OH 110,000.00 Kepala Tukang 0.1000 OH 130,000.00 Mandor 0.1000 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

J.005 Memasang 1 buah wastafelBahanWastafel 1.0000 bh 1,375,000.00 Perlengkapan 12% harga wastafel 165,000.00 Portland Cement (PC) 6.0000 kg 1,820.00 Pasir Pasang 0.0100 m³ 107,150.00

Jumlah (1) TenagaPekerja 1.2000 OH 90,000.00 Tukang Batu 1.4500 OH 110,000.00 Kepala Tukang 0.1500 OH 130,000.00 Mandor 0.1000 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

J.006 Memasang 1 buah bak mandi fibreglass volume 0,30 m³

Page 53: Rencana Anggaran Biaya Pembangunan Gereja

Analisa Harga Satuan Pekerjaan Page 53

NO KOEF SAT HARGA SAT

Rp.

1 2 3 4 5BahanBak Fibreglass 1.0000 bh 500,000.00 Perlengkapan 18% harga bak 90,000.00

Jumlah (1) TenagaPekerja 1.8000 OH 90,000.00 Tukang Batu 2.7000 OH 110,000.00 Kepala Tukang 0.5400 OH 130,000.00 Mandor 0.1100 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

J.007 Memasang 1 buah bak mandi batu bata volume 0,30 m³BahanBata Merah 8 x x8 x 16 cm 223.4375 bh 990.00 Portland Cement (PC) 120.0000 kg 1,820.00 Pasir Pasang 0.3000 m³ 107,150.00 Keramik Dinding 20x25 cm 2.1780 m² 77,000.00 Semen Nat 6.0000 kg 16,500.00

Jumlah (1) TenagaPekerja 6.0000 OH 90,000.00 Tukang Batu 3.0000 OH 110,000.00 Kepala Tukang 0.3000 OH 130,000.00 Mandor 0.3000 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

J.008 Memasang 1 buah badkip fiberglassBahanBadkip Fibreglass 1.0000 bh 552,400.00 Perlengkapan 20% harga badkip 110,480.00

Jumlah (1) TenagaPekerja 0.0000 OH 90,000.00 Tukang Batu 0.0750 OH 110,000.00 Kepala Tukang 0.7500 OH 130,000.00 Mandor 0.2500 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

J.009 Membuat 1 buah bak beton volume 1m³BahanBeton 1 : 1½ : 2½ (G.009) 0.9000 m³ 1,443,830.50 Besi Beton 180.0000 kg 15,400.00 Kayu Cetakan 0.0800 m³ 1,650,000.00 Keramik Dinding 20x25 cm 5.0000 m² 77,000.00 Perlengkapan 10% harga total bahan 318,623.05

Jumlah (1) TenagaPekerja 3.5000 OH 90,000.00 Tukang Batu 4.5000 OH 110,000.00 Kepala Tukang 0.9000 OH 71,500.00 Mandor 0.9000 OH 77,000.00

Jumlah (2) Jumlah (1) + (2)

J.010 Memasang 1 buah bak kontrol pas. batu bata ukuran (30 x 30) cm tinggi 35 cmBahanBata Merah 8 x 8 x 16 cm 94.4010 bh 990.00 Portland Cement (PC) 44.0000 kg 1,820.00 Pasir Pasang 0.0700 m³ 107,150.00 Batu Kerikil 0.0700 m³ 242,000.00 Besi Beton 1.6000 kg 15,400.00 Pasir Beton 0.0600 m³ 107,150.00

Jumlah (1) TenagaPekerja 3.2000 OH 90,000.00 Tukang Batu 1.0150 OH 110,000.00 Kepala Tukang 0.0015 OH 130,000.00 Mandor 0.0160 OH 140,000.00

Page 54: Rencana Anggaran Biaya Pembangunan Gereja

Analisa Harga Satuan Pekerjaan Page 54

NO KOEF SAT HARGA SAT

Rp.

1 2 3 4 5 Jumlah (2)

Jumlah (1) + (2)J.011 Memasang 1 buah bak kontrol pas. batu bata ukuran (45 x 45) cm tinggi 60 cm

BahanBata Merah 8 x 8 x 16 cm 162.7603 bh 990.00 Portland Cement (PC) 77.0000 kg 1,820.00 Pasir Pasang 0.1300 m³ 107,150.00 Batu Kerikil 0.0200 m³ 242,000.00 Besi Beton 2.6000 kg 15,400.00 Pasir Beton 0.0900 m³ 107,150.00

Jumlah (1) TenagaPekerja 1.4200 OH 90,000.00 Tukang Batu 0.4730 OH 110,000.00 Kepala Tukang 0.0470 OH 130,000.00 Mandor 0.0710 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

J.012 Memasang 1 buah bak kontrol pas. batu bata ukuran (60 x 60) cm tinggi 65 cmBahanBata Merah 8 x 8 x 16 cm 241.5365 bh 990.00 Portland Cement (PC) 114.0000 kg 1,820.00 Pasir Pasang 0.1840 m³ 107,150.00 Batu Kerikil 0.0330 m³ 242,000.00 Besi Beton 4.8500 kg 15,400.00 Pasir Beton 0.1200 m³ 107,150.00

Jumlah (1) TenagaPekerja 2.1600 OH 90,000.00 Tukang Batu 0.7200 OH 110,000.00 Kepala Tukang 0.0720 OH 130,000.00 Mandor 0.1080 OH 140,000.00 Tukang Gali/Buruh Tak terlatih 0.1000 OH 140,000

Jumlah (2) Jumlah (1) + (2)

J.013 Memasang 1 m' pipa PVC tipe AW Ø ½"BahanPipa PVC 1.2000 m' 5,000.00 Perlengkapan 35% harga pipa 1,750.00

Jumlah (1) TenagaPekerja 0.0360 OH 90,000.00 Tukang Batu 0.0600 OH 110,000.00 Kepala Tukang 0.0060 OH 130,000.00 Mandor 0.0018 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

J.014 Memasang 1 m' pipa PVC tipe AW Ø ¾"BahanPipa PVC 1.2000 m' 6,000.00 Perlengkapan 35% harga pipa 2,100.00

Jumlah (1) TenagaPekerja 0.0360 OH 90,000.00 Tukang Batu 0.0600 OH 110,000.00 Kepala Tukang 0.0060 OH 130,000.00 Mandor 0.0018 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

J.015 Memasang 1 m' pipa PVC tipe AW Ø 1"BahanPipa PVC 1.2000 m' 8,325.00 Perlengkapan 35% harga pipa 2,913.75

Jumlah (1) TenagaPekerja 0.0360 OH 90,000.00

Page 55: Rencana Anggaran Biaya Pembangunan Gereja

Analisa Harga Satuan Pekerjaan Page 55

NO KOEF SAT HARGA SAT

Rp.

1 2 3 4 5Tukang Batu 0.0600 OH 110,000.00 Kepala Tukang 0.0060 OH 130,000.00 Mandor 0.0018 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

J.016 Memasang 1 m' pipa PVC tipe AW Ø 1½"BahanPipa PVC 1.2000 m' 15,300.00 Perlengkapan 35% harga pipa 5,355.00

Jumlah (1) TenagaPekerja 0.0360 OH 90,000.00 Tukang Batu 0.0600 OH 110,000.00 Kepala Tukang 0.0060 OH 130,000.00 Mandor 0.0018 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

J.017 Memasang 1 m' pipa PVC tipe AW Ø 2"BahanPipa PVC 1.2000 m' 19,975.00 Perlengkapan 35% harga pipa 6,991.25

Jumlah (1) TenagaPekerja 0.0540 OH 90,000.00 Tukang Batu 0.0900 OH 110,000.00 Kepala Tukang 0.0090 OH 130,000.00 Mandor 0.0027 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

J.018 Memasang 1 m' pipa PVC tipe AW Ø 2½"BahanPipa PVC 1.2000 m' 28,625.00 Perlengkapan 35% harga pipa 10,018.75

Jumlah (1) TenagaPekerja 0.0360 OH 90,000.00 Tukang Batu 0.0600 OH 110,000.00 Kepala Tukang 0.0060 OH 130,000.00 Mandor 0.0018 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

J.019 Memasang 1 m' pipa PVC tipe AW Ø 3"BahanPipa PVC 1.2000 m' 34,950.00 Perlengkapan 35% harga pipa 12,232.50

Jumlah (1) TenagaPekerja 0.0810 OH 90,000.00 Tukang Batu 0.1350 OH 110,000.00 Kepala Tukang 0.0135 OH 130,000.00 Mandor 0.0041 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

J.020 Memasang 1 m' pipa PVC tipe AW Ø 4"BahanPipa PVC 1.2000 m' 54,250.00 Perlengkapan 35% harga pipa 18,987.50

Jumlah (1) TenagaPekerja 0.0810 OH 90,000.00 Tukang Batu 0.1350 OH 110,000.00 Kepala Tukang 0.0135 OH 130,000.00 Mandor 0.0041 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

J.021 Memasang 1 buah bak cuci piring satinless steelBahan

Page 56: Rencana Anggaran Biaya Pembangunan Gereja

Analisa Harga Satuan Pekerjaan Page 56

NO KOEF SAT HARGA SAT

Rp.

1 2 3 4 5Bak Cuci Satinless Steel 1.0000 bh 532,400.00 Water Drain + Aksesoris 1.0000 set 186,340.00

Jumlah (1) TenagaPekerja 0.0300 OH 90,000.00 Tukang Batu 0.3000 OH 110,000.00 Kepala Tukang 0.0300 OH 130,000.00 Mandor 0.0015 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

J.022 Memasang 1 buah kran Ø ¾" atau ½" BiasaBahanKran Air 1.0000 bh 11,000.00 Seal Tape 0.0250 bh 3,000.00

Jumlah (1)

TenagaPekerja 0.0100 OH 90,000.00 Tukang Batu 0.1000 OH 110,000.00 Kepala Tukang 0.0100 OH 130,000.00 Mandor 0.0050 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

J.023 Memasang 1 buah kran Ø ¾" atau ½" stanlisBahanKran Air 1.0000 bh 88,000.00 Seal Tape 0.0250 bh 3,000.00

Jumlah (1) TenagaPekerja 0.0100 OH 90,000.00 Tukang Batu 0.1000 OH 110,000.00 Kepala Tukang 0.0100 OH 110,000.00 Mandor 0.0050 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

J.024 Memasang 1 buah floordrain BahanFloordrain 1.0000 bh 39,930.00

Jumlah (1) TenagaPekerja 0.0100 OH 90,000.00 Tukang Batu 0.1000 OH 110,000.00 Pipa PVC 4" berlobang jenis AW 9.0000 m' 108,556.50 Urugan kembali perataan tanah 0.5625 m³ 23,666.67 Tambahan upah 0.0650 ls 500,000.00 Jumlah

K. PEKERJAAN BESI DAN ALUMUNIUM Revisi SNI T-16-2002 K.001 Memasang 1 kg rangka atap baja

BahanBesi Profil IWF 1.1000 kg 17,300.00 Meni Besi 0.0800 kg 24,200.00

Jumlah (1) TenagaPekerja 0.0600 OH 90,000.00 Tukang Besi 0.0060 OH 110,000.00 Kepala Tukang 0.0060 OH 130,000.00 Mandor 0.0003 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

K.002 Memasang 1 kg Besi ProfilBahanBesi Profil 1.1500 kg 17,300.00

Jumlah (1) TenagaPekerja 0.0600 OH 90,000.00

Page 57: Rencana Anggaran Biaya Pembangunan Gereja

Analisa Harga Satuan Pekerjaan Page 57

NO KOEF SAT HARGA SAT

Rp.

1 2 3 4 5Tukang Besi 0.0600 OH 110,000.00 Kepala Tukang 0.0060 OH 130,000.00 Mandor 0.0030 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

K.003 Mengerjakan 100 kg pekerjaan perakitanBahanSolar 1.0000 ltr 9,900.00 Minyak Pelumas 0.1000 ltr 39,900.00

Jumlah (1) TenagaPekerja 0.1000 OH 90,000.00 Tukang Besi 0.1000 OH 110,000.00 Kepala Tukang 0.0010 OH 130,000.00 Mandor 0.0050 OH 140,000.00 Sewa Alat 0.0080 Jam 56,100.00

Jumlah (2) Jumlah (1) + (2)

K.004 Mengerjakan 1 cm pengelasan dengan las listrikBahanKawat Las Listrik 0.04 kg 29,700.00 Solar 0.0300 ltr 9,900.00 Minyak Pelumas 0.0040 ltr 39,900.00

Jumlah (1) TenagaPekerja 0.0040 OH 90,000.00 Tukang Besi 0.0020 OH 110,000.00 Kepala Tukang 0.0002 OH 130,000.00 Mandor 0.0002 OH 140,000.00 Sewa Alat 0.0170 Jam 56,100.00

Jumlah (2) Jumlah (1) + (2)

K.005 Memasang 1 m² pintu gulung (rolling door) besiBahanPintu Gulung (Rolling Door) Besi 1.0000 m² 259,500.00

Jumlah (1) TenagaPekerja 1.2000 OH 90,000.00 Tukang Besi 1.2000 OH 110,000.00 Kepala Tukang 0.1200 OH 130,000.00 Mandor 0.0060 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

K.006 Memasang 1 m² pintu lipat (folding door)BahanPintu Lipat (Folding Door) 1.0000 m² 2,462,400.00

Jumlah (1) TenagaPekerja 0.4400 OH 90,000.00 Tukang Besi 0.4400 OH 110,000.00 Kepala Tukang 0.0440 OH 130,000.00 Mandor 0.0220 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

K.007 Memasang 1 m² rolling door alumuniumBahanRolling Door Alumunium 1.0000 m² 1,271,105.00

Jumlah (1) TenagaPekerja 1.0000 OH 90,000.00 Tukang Alumunium 1.0000 OH 110,000.00 Kepala Tukang 0.1000 OH 130,000.00 Mandor 0.0500 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

K.008 Memasang 1 m² pintu alumuniumBahan

Page 58: Rencana Anggaran Biaya Pembangunan Gereja

Analisa Harga Satuan Pekerjaan Page 58

NO KOEF SAT HARGA SAT

Rp.

1 2 3 4 5Pintu Alumunium 1.000 m2 732,100.00

Jumlah (1) TenagaPekerja 1.0500 OH 90,000.00 Tukang Besi 1.0500 OH 110,000.00 Kepala Tukang 0.1050 OH 130,000.00 Mandor 0.0052 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

K.009 Memasang 1 m' Kusen Alumunium 4 " BahanKusen Alumunium 1.1000 m' 199,650.00 Skrub Fixer 2.0000 Bh 10,000.00 Sealent 0.0600 Tube 79,860.00

Jumlah (1) TenagaPekerja 0.0430 OH 90,000.00 Tukang Besi 0.0430 OH 110,000.00 Kepala Tukang 0.0043 OH 130,000.00 Mandor 0.0021 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

K.010 1 M2 Pintu Kaca Rangka Alumunium SNI 7393 : 2008BahanRangka Pintu Alumunium 4.4000 m' 199,650.00 Profil kaca 4.5000 m' 35,000.00 Sealent 0.2700 Tube 79,860.00

Jumlah (1) TenagaPekerja 0.0850 OH 90,000.00 Tukang 0.0850 OH 110,000.00 Kep Tukang 0.0090 OH 130,000.00 Mandor 0.0050 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

K.011 1 M2 Daun Jendela Kaca Rangka Alumunium SNI DT 90-0014-2007BahanRangka Daun Jendela Alumunium 3.4125 m' 199,650.00 Profil kaca 3.4125 m' 35,000.00 Sealent 0.2700 Tube 79,860.00

Jumlah (1) TenagaPekerja 0.0850 OH 90,000.00 Tukang 0.0850 OH 110,000.00 Kep Tukang 0.0090 OH 130,000.00 Mandor 0.0050 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

K.012 Memasang 1 m² terali besiBahanBesi Strip 2 x 3 11.5000 m' 1,666.67 Pengelasan 27.0800 cm 3,232.30

Jumlah (1) TenagaPekerja 1.6700 OH 90,000.00 Tukang Las 1.6700 OH 110,000.00 Kepala Tukang 0.1670 OH 130,000.00 Mandor 0.0830 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

K.013 Memasang 1 m² kawat harmonikaBahanKawat Harmonika 1.1000 m² 18,700.00 Paku Biasa ½" - 1" 0.0200 kg 21,650.00 Kayu Papan meranti 0.0018 m³ 1,870,000.00

Page 59: Rencana Anggaran Biaya Pembangunan Gereja

Analisa Harga Satuan Pekerjaan Page 59

NO KOEF SAT HARGA SAT

Rp.

1 2 3 4 5 Jumlah (1)

TenagaPekerja 0.1000 OH 90,000.00 Tukang Kayu 0.1000 OH 110,000.00 Kepala Tukang 0.0100 OH 130,000.00 Mandor 0.0005 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

K.014 Memasang 1 m² kawat nyamukBahanKawat Nyamuk 1.1000 m² 18,700.00 Besi Strip (0,2 x 2 cm) 1.7160 kg 24,600.00 Pengelasan 11.1100 cm 3,232.30

Jumlah (1) TenagaPekerja 0.1000 OH 49,500.00 Tukang Kayu 0.1000 OH 60,500.00 Kepala Tukang 0.0100 OH 71,500.00 Mandor 0.0005 OH 77,000.00

Jumlah (2) Jumlah (1) + (2)

K.015 Memasang 1 m² jendela nako & tralisBahanJendela Nako / kaca 5 mm 1.1000 lbr 173,000.00 Paku sekrup 1 - 2,5 cm 0.0200 kg 31,100.00 Besi Strip 0.0250 kg 24,600.00

Jumlah (1) TenagaPekerja 0.2000 OH 90,000.00 Tukang Kayu 0.2000 OH 110,000.00 Kepala Tukang 0.0200 OH 130,000.00 Mandor 0.0010 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

K.016 Memasang 1 m' talang datar seng BJLS 30BahanSeng Plat 3' x 6 ' BJLS 30 1.1000 m 52,500.00 Paku Biasa ½" - 1" atau sekrup 0.0150 kg 31,100.00 Kayu lembasung/kapur 0.0190 m³ 1,870,000.00

Jumlah (1) TenagaPekerja 0.2000 OH 90,000.00 Tukang Kayu 0.4000 OH 110,000.00 Kepala Tukang 0.0250 OH 130,000.00 Mandor 0.0100 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

K.017 Memasang 1 m' talang miring seng BJLS 30BahanSeng Plat 3' x 6 ' BJLS 30 1.1000 m 52,500.00 Paku Biasa ½" - 1" atau sekrup 0.0150 kg 31,100.00 Kayu lembasung/kapur 0.0190 m³ 1,870,000.00 Flincote/Meni Besi 0.3000 kg 24,200.00

Jumlah (1) TenagaPekerja 0.1500 OH 90,000.00 Tukang Kayu 0.4000 OH 110,000.00 Kepala Tukang 0.0250 OH 130,000.00 Mandor 0.0013 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

K.018 Memasang 1 m' talang ½ lingkaran Ø 10 cm, seng BJLS 30BahanSeng Plat 3' x 6 ' BJLS 30 1.1000 m 52,500.00 Paku Biasa ½" - 1" atau sekrup 0.1000 kg 31,100.00 Besi Strip 0.5000 kg 24,600.00

Jumlah (1)

Page 60: Rencana Anggaran Biaya Pembangunan Gereja

Analisa Harga Satuan Pekerjaan Page 60

NO KOEF SAT HARGA SAT

Rp.

1 2 3 4 5TenagaPekerja 0.1500 OH 90,000.00 Tukang Kayu 0.2500 OH 110,000.00 Kepala Tukang 0.0250 OH 130,000.00 Mandor 0.0013 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

K.019 Memasang 1 m' talang ½ lingkaran Ø 10 cm, seng BJLS 20BahanSeng Plat 3' x 6 ' BJLS 20 1.1000 lbr 15,000.00 Paku Biasa ½" - 1" atau sekrup 0.0100 kg 31,100.00 Besi Strip 0.5000 kg 24,600.00

Jumlah (1) TenagaPekerja 0.1500 OH 90,000.00 Tukang Kayu 0.2500 OH 110,000.00 Kepala Tukang 0.0250 OH 130,000.00 Mandor 0.0013 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

K.020 Memasang 1 m' talang U dari PVCBahanTalang U dari PVC 1.0000 m 28,750.00 Klam U 1.0000 bh 18,700.00

Jumlah (1) TenagaPekerja 0.3000 OH 90,000.00 Tukang Kayu 0.5000 OH 110,000.00 Kepala Tukang 0.0500 OH 130,000.00 Mandor 0.0150 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

L. PEKERJAAN KUNCI DAN KACAL.001 Memasang 1 buah kunci tanam kwalitas baik

BahanKunci Tanam 1.0000 bh 211,750.00

Jumlah (1) TenagaPekerja 0.0600 OH 90,000.00 Tukang Kayu 0.6000 OH 110,000.00 Kepala Tukang 0.0600 OH 130,000.00 Mandor 0.0030 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

L.002 Memasang 1 buah kunci tanam biasaBahanKunci Tanam Biasa 1.0000 bh 50,000.00

Jumlah (1) TenagaPekerja 0.0050 OH 90,000.00 Tukang Kayu 0.5000 OH 110,000.00 Kepala Tukang 0.0050 OH 130,000.00 Mandor 0.0003 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

L.004 Memasang 1 buah kunci tanam kamar mandiBahanKunci Tanam Kamar Mandi 1.0000 bh 72,600.00

Jumlah (1) TenagaPekerja 0.0050 OH 90,000.00 Tukang Kayu 0.5000 OH 110,000.00 Kepala Tukang 0.0050 OH 130,000.00

Page 61: Rencana Anggaran Biaya Pembangunan Gereja

Analisa Harga Satuan Pekerjaan Page 61

NO KOEF SAT HARGA SAT

Rp.

1 2 3 4 5Mandor 0.0025 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

L.005 Memasang 1 buah engsel pintuBahanEngsel Pintu 1.0000 bh 37,000.00

Jumlah (1) TenagaPekerja 0.0150 OH 90,000.00 Tukang Kayu 0.1500 OH 110,000.00 Kepala Tukang 0.0150 OH 130,000.00 Mandor 0.0008 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

L.006 Memasang 1 buah engsel jendela kupu-kupuBahanEngsel Jendela Kupu-Kupu 1.0000 bh 22,000.00

Jumlah (1) TenagaPekerja 0.0100 OH 90,000.00 Tukang Kayu 0.1000 OH 110,000.00 Kepala Tukang 0.0100 OH 130,000.00 Mandor 0.0005 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

L.007 Memasang 1 buah kait anginBahanKait Angin 1.0000 bh 19,800.00

Jumlah (1) TenagaPekerja 0.0150 OH 90,000.00 Tukang Kayu 0.1500 OH 110,000.00 Kepala Tukang 0.0150 OH 130,000.00 Mandor 0.0008 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

L.008 Memasang 1 buah kunci selotBahanKunci Selot / Gerendel 1.0000 bh 16,500.00

Jumlah (1) TenagaPekerja 0.0200 OH 90,000.00 Tukang Kayu 0.2000 OH 110,000.00 Kepala Tukang 0.0200 OH 130,000.00 Mandor 0.0010 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

L.009 Memasang 1 buah pegangan pintu / door holderBahanPegangan Pintu 1.0000 bh 330,000.00

Jumlah (1) TenagaPekerja 0.0500 OH 90,000.00 Tukang Kayu 0.5000 OH 110,000.00 Kepala Tukang 0.0500 OH 130,000.00 Mandor 0.0025 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

L.010 Pasang door closer 1 buahBahanDoor closer 1.0000 bh 137,500.00

Jumlah (1) TenagaPekerja 0.0500 OH 90,000.00

Page 62: Rencana Anggaran Biaya Pembangunan Gereja

Analisa Harga Satuan Pekerjaan Page 62

NO KOEF SAT HARGA SAT

Rp.

1 2 3 4 5Tukang Kayu 0.5000 OH 110,000.00 Kepala Tukang 0.0500 OH 130,000.00 Mandor 0.0025 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

L.011 Pasang door stop 1 buahBahanDoor stop 1.0000 bh 27,500.00

Jumlah (1) TenagaPekerja 0.1000 OH 90,000.00 Tukang Kayu 0.0100 OH 110,000.00 Kepala Tukang 0.0100 OH 130,000.00 Mandor 0.0005 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

L.012 Memasang 1 buah rel pintu dorongBahanRel Pintu Dorong 1.0000 bh 2,298,600.00

Jumlah (1) TenagaPekerja 0.0600 OH 90,000.00 Tukang Kayu 0.6000 OH 110,000.00 Kepala Tukang 0.0600 OH 130,000.00 Mandor 0.0030 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

L.013 Memasang 1 m² kaca polos; tebal 3 mmBahanKaca 1.1000 m² 113,100.00

Jumlah (1) TenagaPekerja 0.0150 OH 90,000.00 Tukang Kayu 0.1500 OH 110,000.00 Kepala Tukang 0.0150 OH 130,000.00 Mandor 0.0008 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

L.014 Memasang 1 m² kaca polos; tebal 5 mmBahanKaca 1.1000 m² 173,000.00

Jumlah (1) TenagaPekerja 0.0150 OH 90,000.00 Tukang Kayu 0.1500 OH 110,000.00 Kepala Tukang 0.0150 OH 130,000.00 Mandor 0.0008 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

L.015 Memasang 1 m² kaca ryben; tebal 3 mmBahanKaca 1.1000 m² 171,700.00

Jumlah (1) TenagaPekerja 0.0150 OH 90,000.00 Tukang Kayu 0.1500 OH 110,000.00 Kepala Tukang 0.0150 OH 130,000.00 Mandor 0.0008 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

L.016 Memasang 1 m² kaca ryben; tebal 5 mmBahanKaca 1.1000 m² 237,800.00

Jumlah (1) Tenaga

Page 63: Rencana Anggaran Biaya Pembangunan Gereja

Analisa Harga Satuan Pekerjaan Page 63

NO KOEF SAT HARGA SAT

Rp.

1 2 3 4 5Pekerja 0.0150 OH 49,500.00 Tukang Kayu 0.1500 OH 60,500.00 Kepala Tukang 0.0150 OH 71,500.00 Mandor 0.0008 OH 77,000.00

Jumlah (2) Jumlah (1) + (2)

L.018 Memasang 1 m² buram; tebal 3 mmBahanKaca 1.1000 m² 135,800.00

Jumlah (1) TenagaPekerja 0.0150 OH 90,000.00 Tukang Kayu 0.1500 OH 110,000.00 Kepala Tukang 0.0150 OH 130,000.00 Mandor 0.0008 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

L.019 Memasang 1 m² buram; tebal 5 mmBahanKaca 1.1000 m² 223,600.00

Jumlah (1) TenagaPekerja 0.0150 OH 90,000.00 Tukang Kayu 0.1500 OH 110,000.00 Kepala Tukang 0.0150 OH 130,000.00 Mandor 0.0008 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

L.020 Memasang 1 m² kaca cermin; tebal 3 mmBahanKaca 1.1000 m² 226,300.00

Jumlah (1) TenagaPekerja 0.0150 OH 90,000.00 Tukang Kayu 0.1500 OH 110,000.00 Kepala Tukang 0.0150 OH 130,000.00 Mandor 0.0008 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

L.021 Memasang 1 m² kaca patri lokalBahanKaca 1.1000 m² 1,019,500.00

Jumlah (1) Tenaga

Jumlah (1) TenagaPekerja 0.2600 OH 49,500.00 Tukang Batu 0.1300 OH 60,500.00 Kepala Tukang 0.0130 OH 71,500.00 Mandor 0.0130 OH 77,000.00

Jumlah (2) Jumlah (1) + (2)

M.001 Memasang 1 m² lantai keramik ukuran 60 x 60 cmBahanKeramik 60 x 60 cm 1.0000 m² 465,850.00 Portland Cement (PC) 9.6000 kg 1,820.00 Pasir Pasang 0.0450 m³ 107,150.00 Semen Warna 1.3000 kg 16,500.00

Jumlah (1) TenagaPekerja 0.7000 OH 90,000.00 Tukang Batu 0.3500 OH 110,000.00 Kepala Tukang 0.0350 OH 130,000.00 Mandor 0.0300 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

Page 64: Rencana Anggaran Biaya Pembangunan Gereja

Analisa Harga Satuan Pekerjaan Page 64

NO KOEF SAT HARGA SAT

Rp.

1 2 3 4 5

M.002 Memasang 1 m² lantai keramik ukuran 40 x 40 cmBahanKeramik 40 x 40 cm 1.0000 m² 77,000.00 Portland Cement (PC) 9.8000 kg 1,820.00 Pasir Pasang 0.0450 m³ 107,150.00 Semen Warna 1.3000 kg 16,500.00

Jumlah (1) TenagaPekerja 0.7000 OH 90,000.00 Tukang Batu 0.3500 OH 110,000.00 Kepala Tukang 0.0350 OH 130,000.00 Mandor 0.0300 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

M.003 Memasang 1 m² lantai keramik ukuran 30 x 30 cmBahanKeramik 30 x 30 cm 1.0000 66,000.00 Portland Cement (PC) 10.0000 kg 1,820.00 Pasir Pasang 0.0450 m³ 107,150.00 Semen Warna 1.5000 kg 16,500.00

Jumlah (1) TenagaPekerja 0.7000 OH 90,000.00 Tukang Batu 0.3500 OH 110,000.00 Kepala Tukang 0.0350 OH 130,000.00 Mandor 0.0300 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

M.004 Pasang lantai keramik 20 x 20 cm per 1 M2Bahankeramik 20 x 20 cm 1.0000 m² 71,500.00 Portland Cement (PC) 10.4000 kg 1,820.00 Pasir Pasang 0.0420 m³ 107,150.00 Semen Warna 1.5000 kg 16,500.00

Jumlah (1) TenagaPekerja 0.7000 OH 90,000.00 Tukang Batu 0.3500 OH 110,000.00 Kepala Tukang 0.0350 OH 130,000.00 Mandor 0.0300 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

M.005 Memasang 1 m² dinding keramik ukuran 20 x 20 cmBahanKeramik 1.0000 m² 71,500.00 Portland Cement (PC) 9.3000 kg 1,820.00 Pasir Pasang 0.0180 m³ 107,150.00 Semen Warna 1.9400 kg 16,500.00

Jumlah (1) TenagaPekerja 0.9000 OH 90,000.00 Tukang Batu 0.4500 OH 110,000.00 Kepala Tukang 0.0450 OH 130,000.00 Mandor 0.0450 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

M.006 Memasang 1 m² dinding keramik ukuran 20 x 25 cmBahanKeramik 1.0000 m² 77,000.00 Portland Cement (PC) 9.3000 kg 1,820.00 Pasir Pasang 0.0180 m³ 107,150.00 Semen Warna 1.9400 kg 16,500.00

Jumlah (1) TenagaPekerja 0.9000 OH 90,000.00 Tukang Batu 0.4500 OH 110,000.00

Page 65: Rencana Anggaran Biaya Pembangunan Gereja

Analisa Harga Satuan Pekerjaan Page 65

NO KOEF SAT HARGA SAT

Rp.

1 2 3 4 5Kepala Tukang 0.0450 OH 130,000.00 Mandor 0.0450 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

M.007 Memasang 1 m² dinding porselin 11 x 11 cmBahanporselin 1.0000 m² 99,825.00 Portland Cement (PC) 9.3000 kg 1,820.00 Pasir Pasang 0.0180 m³ 107,150.00 Semen Warna 1.5000 kg 16,500.00

Jumlah (1) TenagaPekerja 1.0000 OH 90,000.00 Tukang Batu 0.5000 OH 110,000.00 Kepala Tukang 0.0500 OH 130,000.00 Mandor 0.0500 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

M.008 Memasang 1 m' plint keramik ukuran 10 x 20 cmBahanPlint Keramik 10/20 5.3000 bh 29,500.00 Portland Cement (PC) 1.1400 kg 1,820.00 Pasir Pasang 0.0030 m³ 107,150.00 Semen Warna 0.0250 kg 16,500.00

Jumlah (1) TenagaPekerja 0.0900 OH 90,000.00 Tukang Batu 0.0900 OH 110,000.00 Kepala Tukang 0.0090 OH 130,000.00 Mandor 0.0050 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

M.009 Memasang 1 m² lantai ubin granito ukuran 40 x 40 cmBahanUbin Granito 40 x 40 cm 1.0000 m2 279,600.00 Portland Cement (PC) 9.8000 kg 1,820.00 Pasir Pasang 0.0450 m³ 107,150.00 Semen Warna 1.3000 kg 16,500.00

Jumlah (1) TenagaPekerja 0.2500 OH 90,000.00 Tukang Batu 0.1250 OH 110,000.00 Kepala Tukang 0.0130 OH 130,000.00 Mandor 0.0130 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

M.010 Memasang 1 m² lantai ubin granito ukuran 40x 40 cm (motif khusus)BahanUbin Granito 40 x 40 cm 1.0000 m2 1,464,100.00 Portland Cement (PC) 9.8000 kg 1,820.00 Pasir Pasang 0.0450 m³ 107,150.00 Semen Warna 1.3000 kg 16,500.00

Jumlah (1) TenagaPekerja 0.2500 OH 90,000.00 Tukang Batu 0.1250 OH 110,000.00 Kepala Tukang 0.0130 OH 130,000.00 Mandor 0.0130 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

M.011 Memasang 1 m² lantai marmer ukuran 40 x 40 cm BahanMarmer 1.0000 m² 213,000.00 Portland Cement (PC) 9.8000 kg 1,820.00 Pasir Pasang 0.0450 m³ 107,150.00

Page 66: Rencana Anggaran Biaya Pembangunan Gereja

Analisa Harga Satuan Pekerjaan Page 66

NO KOEF SAT HARGA SAT

Rp.

1 2 3 4 5Semen Warna 1.3000 kg 16,500.00

Jumlah (1) TenagaPekerja 0.7000 OH 90,000.00 Tukang Batu 0.3500 OH 110,000.00 Kepala Tukang 0.0350 OH 130,000.00 Mandor 0.0350 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

M.012 Memasang 1 m² dinding batu alamBahanBatu Paras 1.1000 m² 223,850.00 Portland Cement (PC) 11.7500 kg 1,820.00 Pasir Pasang 0.0350 m³ 107,150.00

Jumlah (1) TenagaPekerja 0.7000 OH 90,000.00 Tukang Batu 0.3500 OH 110,000.00 Kepala Tukang 0.0350 OH 130,000.00 Mandor 0.0350 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

M.013 Memasang 1 m' plint kayu ukuran 2 x 10 cmBahanPapan Kayu Lembasung 0.0030 m³ 1,870,000.00 Paku Sekrup 5 cm 0.0500 kg 31,100.00

Jumlah (1) TenagaPekerja 0.1200 OH 90,000.00 Tukang Kayu 0.1200 OH 110,000.00 Kepala Tukang 0.0120 OH 130,000.00 Mandor 0.0060 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

M.014 Memasang Koral Sikat Motif M2BahanKoral Sikat 3.0000 Zak 75,000.00 Portland Cement (PC) 14.1600 kg 1,820.00 Pasir Pasang 0.0230 M3 107,150.00

Jumlah (1) TenagaPekerja 0.6000 OH 90,000.00 Tukang Batu 1.5000 OH 110,000.00 Kepala Tukang 0.0900 OH 130,000.00 Mandor 0.0600 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

N. PEKERJAAN PENGECATAN SNI N.001 Mengikis / mengerok permukaan cat tembok lama 1 M2

BahanSoda Api 0.0500 kg 13,300.00

Jumlah (1) TenagaPekerja 0.1500 OH 90,000.00 Mandor 0.0025 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

N.002 Mencuci bidang permukaan tembok yang pernah di cat per 1 M2 BahanSabun 0.0500 kg 20,000.00

Jumlah (1) Tenaga

Page 67: Rencana Anggaran Biaya Pembangunan Gereja

Analisa Harga Satuan Pekerjaan Page 67

NO KOEF SAT HARGA SAT

Rp.

1 2 3 4 5Pekerja 0.1500 OH 90,000.00 Mandor 0.0025 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

N.003 Mengerok karat cat lama permukaan baja dengan cara manual per 1 m2 BahanSabun 0.0500 kg 20,000.00

Jumlah (1) TenagaPekerja 0.1500 OH 90,000.00 Mandor 0.0025 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

N.004 Mendempul dan Menggosok 1 m² kayuBahanDempul Jadi 0.0800 kg 22,000.00 Minyak Cat/ tinner 0.0200 kg 25,300.00 Batu Apung 0.0100 kg 46,600.00

Jumlah (1) TenagaPekerja 0.0400 OH 90,000.00 Tukang Cat 0.0400 OH 110,000.00 Kepala Tukang 0.0040 OH 130,000.00 Mandor 0.0025 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

N.005 Mengecat 1 m² bidang kayu lamaBahanPlamir 0.1500 kg 22,000.00 Cat Dasar 0.1700 kg 24,200.00 Cat Penutup 0.1700 kg 47,300.00

Jumlah (1) TenagaPekerja 0.0700 OH 90,000.00 Tukang Cat 0.0750 OH 110,000.00 Kepala Tukang 0.0075 OH 130,000.00 Mandor 0.0025 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

N.006 Mengecat 1 m² bidang kayu baru (1 lps plamir, 1 lps cat dsr, 2 lps cat penutup)BahanCat Meni 0.2000 kg 24,200.00 Plamir 0.1500 kg 22,000.00 Cat Dasar 0.1700 kg 24,200.00 Cat Penutup 0.2600 kg 47,300.00

Jumlah (1) TenagaPekerja 0.0700 OH 90,000.00 Tukang Cat 0.0090 OH 110,000.00 Kepala Tukang 0.0060 OH 130,000.00 Mandor 0.0025 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

N.007 Mengecat 1 m² bidang kayu baru (1 lps plamir, 1 lps cat dsr, 3 lps cat penutup)BahanCat Meni 0.2000 kg 24,200.00 Plamir 0.1500 kg 22,000.00 Cat Dasar 0.1700 kg 24,200.00 Cat Penutup 0.3500 kg 47,300.00

Jumlah (1) TenagaPekerja 0.0700 OH 90,000.00 Tukang Cat 0.1050 OH 110,000.00 Kepala Tukang 0.0040 OH 130,000.00 Mandor 0.0025 OH 140,000.00

Page 68: Rencana Anggaran Biaya Pembangunan Gereja

Analisa Harga Satuan Pekerjaan Page 68

NO KOEF SAT HARGA SAT

Rp.

1 2 3 4 5 Jumlah (2)

Jumlah (1) + (2)N.008 Pelaburan bidang kayu dengan teak oil per 1 M2

BahanTeak oil 0.3600 Ltr 33,400.00

Jumlah (1) TenagaPekerja 0.0400 Oh 90,000.00 Tukang Cat 0.0600 OH 110,000.00 Kepala Tukang 0.0160 OH 130,000.00 Mandor 0.0025 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

N.009 Melabur 1 m² bidang kayu dengan politurBahanPolitur 0.2000 kg 47,300.00 Politur Jadi 0.1500 kg 49,500.00 Ampelas 2.0000 lbr 5,000.00

Jumlah (1) TenagaTukang Cat 0.0600 OH 110,000.00 Kepala Tukang 0.0160 OH 130,000.00 Mandor 0.0025 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

N.010 Melabur 1 m² bidang kayu dengan cat residuBahanResidu 0.3500 ltr 9,600.00

Jumlah (1) TenagaPekerja 0.1000 OH 90,000.00 Mandor 0.0060 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

N.011 Melabur 1 m² bidang kayu dengan vernisBahanVernis 0.1500 ltr 49,500.00 Dempul 0.0500 kg 22,000.00 Ampelas 0.1000 lbr 5,000.00 Kuas 0.0100 bh 17,600.00

Jumlah (1) TenagaPekerja 0.1600 OH 90,000.00 Tukang Cat 0.1600 OH 110,000.00 Kepala Tukang 0.0160 OH 130,000.00 Mandor 0.0025 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

N.012 Mengecat 1 m² bidang tembok baru (1 lps plamir, 1 lps cat dsr, 2 lps cat penutup)BahanPlamir 0.1000 kg 8,360.00 Cat Dasar 0.1000 kg 24,200.00 Cat Penutup 0.2600 kg 23,100.00

Jumlah (1) TenagaPekerja 0.0200 OH 90,000.00 Tukang Cat 0.0630 OH 110,000.00 Kepala Tukang 0.0063 OH 130,000.00 Mandor 0.0025 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

N.013 Mengecat 1 m² bidang tembok lama (1 lps cat dsr, 2 lps cat penutup)BahanCat Alkali 0.1000 kg 44,000.00 Cat ICI Weathershield 0.3600 kg 85,800.00

Jumlah (1) Tenaga

Page 69: Rencana Anggaran Biaya Pembangunan Gereja

Analisa Harga Satuan Pekerjaan Page 69

NO KOEF SAT HARGA SAT

Rp.

1 2 3 4 5Pekerja 0.0200 OH 90,000.00 Tukang Cat 0.0630 OH 110,000.00 Kepala Tukang 0.0063 OH 130,000.00 Mandor 0.0025 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

N.015 Pengecatan atap memakai cat khusus atap per m2 BahanCat khusus 0.3500 Kg 115,500.00

Jumlah (1) TenagaPekerja 0.0167 Oh 90,000.00 Tukang Cat 0.0050 Oh 110,000.00 Kepala Tukang 0.0500 Oh 130,000.00 Mandor 0.0017 Oh 140,000.00

Jumlah (2) Jumlah (1) + (2)

N.016 Pemasangan wall paper per 1 m2BahanWall paper 1.2000 M2 93,200.00 Perekat / lem 0.2000 Kg 38,500.00

Jumlah (1) TenagaPekerja 0.0200 Oh 90,000.00 Tukang Cat 0.2000 Oh 110,000.00 Kepala Tukang 0.0020 Oh 130,000.00 Mandor 0.0025 Oh 140,000.00

Jumlah (2) Jumlah (1) + (2)

N.017 Mengecat 1 m² permukaan baja dengan meni besiBahanMeni Besi 0.1000 kg 24,200.00 Kuas 0.0100 bh 17,600.00

Jumlah (1) TenagaPekerja 0.0200 OH 90,000.00 Tukang Cat 0.2000 OH 110,000.00 Kepala Tukang 0.0200 OH 130,000.00 Mandor 0.0100 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

N.018 Mengecat 1 m² permukaan baja dengan meni besi dan perancahBahanMeni Besi 0.1000 kg 24,200.00 Kuas 0.0100 bh 17,600.00 Perancah Kayu 0.0020 m³ 1,650,000.00

Jumlah (1) TenagaPekerja 0.2500 OH 90,000.00 Tukang Cat 0.2250 OH 110,000.00 Kepala Tukang 0.0225 OH 130,000.00 Mandor 0.0075 OH 140,000.00

Jumlah (2) Jumlah (1) + (2)

Page 70: Rencana Anggaran Biaya Pembangunan Gereja

Analisa Harga Satuan Pekerjaan Page 70

ANALISA HARGA SATUAN PEKERJAANTAHUN ANGGARAN 2014

JUMLAH

Rp.

6=(3x5) SNI 03-2835-2002

20,000.00 4,550.00 535.75 2,178.00 134,640.00 1,299.00 4,680.00 167,882.75

36,000.00 22,000.00 2,600.00 2,800.00 63,400.00 231,282.75

20,000.00 4,550.00 77,940.00 535.75 2,178.00 134,640.00 1,299.00 10,890.00 252,032.75

36,000.00 22,000.00 2,600.00 2,800.00 63,400.00 315,432.75

16,000.00 3,640.00 252,500.00 535.75 2,178.00 1,299.00 276,152.75

27,000.00 22,000.00 2,600.00 2,800.00 54,400.00 330,552.75

22,440.00 433.00 13,090.00 35,963.00

Page 71: Rencana Anggaran Biaya Pembangunan Gereja

Analisa Harga Satuan Pekerjaan Page 71

JUMLAH

Rp.

6=(3x5)

9,000.00 11,000.00 1,300.00 700.00 22,000.00 57,963.00

20,000.00 336,600.00 18,402.50 27,060.00 63,700.00 15,120.00 10,715.00 36,300.00 29,700.00 3,750.00 244,200.00 9,048.00 31,762.50 3,630.00 849,988.00

180,000.00 110,000.00 220,000.00 39,000.00 7,000.00 556,000.00 1,405,988.00

27,200.00 392,700.00 6,495.00 19,110.00 3,214.50 12,100.00 97,425.00 558,244.50

90,000.00 220,000.00 26,000.00 7,000.00 343,000.00 901,244.50

48,000.00 516,120.00 15,155.00 97,425.00 676,700.00

90,000.00 165,000.00 19,500.00 7,000.00 281,500.00 958,200.00

9,000.00 7,000.00 16,000.00

Page 72: Rencana Anggaran Biaya Pembangunan Gereja

Analisa Harga Satuan Pekerjaan Page 72

JUMLAH

Rp.

6=(3x5)

20,000.00 347,820.00 6,495.00 32,760.00 3,214.50 12,100.00 97,425.00 81,675.00 601,489.50

90,000.00 220,000.00 26,000.00 7,000.00 343,000.00 944,489.50

64,680.00 53,625.00 1,071.50 119,376.50

90,000.00 7,000.00 97,000.00 216,376.50

600,030.00 46,620.00 646,650.00

600,030.00 4,620.00 604,650.00

1,800.00 1,100.00 28,050.00 30,950.00

270,000.00 12,600.00 282,600.00

11,250.00 1,750.00 13,000.00

11,250.00 1,750.00 13,000.00

45,000.00 7,000.00 52,000.00

9,000.00 1,400.00 10,400.00

18,000.00 11,000.00 1,300.00 2,800.00

Page 73: Rencana Anggaran Biaya Pembangunan Gereja

Analisa Harga Satuan Pekerjaan Page 73

JUMLAH

Rp.

6=(3x5) 33,100.00

13,500.00 8,250.00 975.00 2,100.00 24,825.00

360,000.00 660,000.00 78,000.00 56,000.00 1,154,000.00

360,000.00 330,000.00 28,000.00 718,000.00

9,000.00 33,000.00 3,900.00 1,400.00 47,300.00

13,500.00 2,100.00 15,600.00

SNI

67,500.00 3,500.00 71,000.00

81,000.00 6,300.00 87,300.00

94,500.00 9,380.00 103,880.00

90,000.00 4,480.00 94,480.00

135,000.00 8,400.00 143,400.00

108,000.00 6,300.00 114,300.00

4,500.00 700.00 5,200.00

29,700.00

Page 74: Rencana Anggaran Biaya Pembangunan Gereja

Analisa Harga Satuan Pekerjaan Page 74

JUMLAH

Rp.

6=(3x5) 1,400.00 31,100.00

46,440.00 7,000.00 53,440.00

22,500.00 1,166.67 23,666.67

45,000.00 7,000.00 52,000.00

120,960.00 120,960.00

27,000.00 1,400.00 28,400.00 149,360.00

145,200.00 145,200.00

22,500.00 3,500.00 26,000.00 171,200.00

79,200.00 79,200.00

22,500.00 3,500.00 26,000.00 105,200.00

SNI 03-2836-2002

517,440.00 713,440.00 33,645.10 1,264,525.10

135,000.00 66,000.00 7,800.00 10,500.00 219,300.00 1,483,825.10

517,440.00 485,940.00 45,753.05 1,049,133.05

Page 75: Rencana Anggaran Biaya Pembangunan Gereja

Analisa Harga Satuan Pekerjaan Page 75

JUMLAH

Rp.

6=(3x5) 135,000.00 66,000.00 7,800.00 10,500.00 219,300.00 1,268,433.05

470,400.00 485,940.00 45,753.05 1,002,093.05

135,000.00 66,000.00 7,800.00 10,500.00 219,300.00 1,221,393.05

517,440.00 713,440.00 33,645.10 1,264,525.10

135,000.00 66,000.00 7,800.00 10,500.00 219,300.00 1,483,825.10

517,440.00 367,640.00 51,967.75 937,047.75

135,000.00 66,000.00 7,800.00 10,500.00 219,300.00 1,156,347.75

517,440.00 296,660.00 55,718.00 869,818.00

135,000.00 82,500.00 9,750.00 10,500.00 237,750.00 1,107,568.00

470,400.00 296,660.00 55,718.00 822,778.00

135,000.00 82,500.00 9,750.00

Page 76: Rencana Anggaran Biaya Pembangunan Gereja

Analisa Harga Satuan Pekerjaan Page 76

JUMLAH

Rp.

6=(3x5) 10,500.00 237,750.00 1,060,528.00

517,440.00 247,520.00 58,289.60 823,249.60

135,000.00 82,500.00 9,750.00 10,500.00 237,750.00 1,060,999.60

517,440.00 212,940.00 60,111.15 790,491.15

135,000.00 82,500.00 9,750.00 10,500.00 237,750.00 1,028,241.15

517,440.00 165,620.00 62,575.60 745,635.60

135,000.00 82,500.00 9,750.00 10,500.00 237,750.00 983,385.60

517,440.00 43,545.60 560,985.60

70,200.00 42,900.00 5,070.00 5,460.00 123,630.00 684,615.60

470,400.00 43,545.60 513,945.60

70,200.00 42,900.00 5,070.00 5,460.00 123,630.00 637,575.60

Memasang 1 m³ pondasi siklop; 60% beton campuran 1 PC : 2 PB : 3 KR dan 40 % batu belah

Page 77: Rencana Anggaran Biaya Pembangunan Gereja

Analisa Harga Satuan Pekerjaan Page 77

JUMLAH

Rp.

6=(3x5)

206,976.00 353,080.00 33,430.80 278,850.00 1,940,400.00 39,600.00 2,852,336.80

306,000.00 93,500.00 11,050.00 23,800.00 434,350.00 3,286,686.80

Memasang 1 m³ pondasi sumuran; diameter 100 cm

194,040.00 353,080.00 33,430.80 278,850.00 859,400.80

214,200.00 33,000.00 3,900.00 11,200.00 262,300.00 1,121,700.80

Memasang 1 m' tiang pancang (40x40) cm, beton bertulang

1,915.20 10,072.10 89,375.00 110,110.00 693,000.00 19,800.00 59,840.00 2,598.00 954.00 2,006.40 989,670.70

90,000.00 73,700.00 8,710.00 7,000.00 179,410.00 1,169,080.70

Memasang 1 m' tiang pancang (35x35) cm, beton bertulang

1,612.80 8,572.00 74,479.17 89,180.00 531,300.00 15,400.00 50,490.00 2,598.00 954.00 1,672.00 776,257.97

72,000.00 55,000.00 6,500.00

Page 78: Rencana Anggaran Biaya Pembangunan Gereja

Analisa Harga Satuan Pekerjaan Page 78

JUMLAH

Rp.

6=(3x5) 5,600.00 139,100.00 915,357.97

Pemancangan Tiang Pancang Beton 25/25 per m'

32,500.00 56,100.00 88,600.00

45,000.00 45,000.00 133,600.00

SNI 03-2837-2002 Memasang 1 m² dinding bata merah (8x8x16) cm; tebal 1 bata; campuran 1 PC : 1 PP

118,800.00 116,534.60 6,321.85 241,656.45

58,500.00 22,000.00 2,600.00 4,200.00 87,300.00 328,956.45

Memasang 1 m² dinding bata merah (8x8x16) cm; tebal 1 bata; campuran 1 PC : 2 PP

118,800.00 79,170.00 8,572.00 206,542.00

54,000.00 22,000.00 2,600.00 4,200.00 82,800.00 289,342.00

Memasang 1 m² dinding bata merah (8x8x16) cm; tebal 1 bata; campuran 1 PC : 3 PP

118,800.00 59,969.00 9,750.65 188,519.65

54,000.00 22,000.00 2,600.00 4,200.00 82,800.00 271,319.65

Memasang 1 m² dinding bata merah (8x8x16) cm; tebal 1 bata; campuran 1 PC : 4 PP

118,800.00 48,321.00 9,964.95 177,085.95

54,000.00 22,000.00 2,600.00 4,200.00

Page 79: Rencana Anggaran Biaya Pembangunan Gereja

Analisa Harga Satuan Pekerjaan Page 79

JUMLAH

Rp.

6=(3x5) 82,800.00 259,885.95

Memasang 1 m² dinding bata merah (8x8x16) cm; tebal 1 bata; campuran 1 PC : 5 PP

118,800.00 40,404.00 10,929.30 170,133.30

54,000.00 22,000.00 2,600.00 4,200.00 82,800.00 252,933.30

Memasang 1 m² dinding bata merah (8x8x16) cm; tebal 1 bata; campuran 1 PC : 6 PP

118,800.00 33,670.00 13,072.30 165,542.30

54,000.00 22,000.00 2,600.00 4,200.00 82,800.00 248,342.30

Memasang 1 m² dinding bata merah (8x8x16) cm; tebal ½ bata; campuran 1 PC : 1 PP

59,400.00 50,596.00 3,000.20 112,996.20

28,800.00 11,000.00 1,300.00 2,100.00 43,200.00 156,196.20

Memasang 1 m² dinding bata merah (8x8x16) cm; tebal ½ bata; campuran 1 PC : 2 PP

59,400.00 34,489.00 4,071.70 97,960.70

27,000.00 11,000.00 1,300.00 2,100.00 41,400.00 139,360.70

Memasang 1 m² dinding bata merah (8x8x16) cm; tebal ½ bata; campuran 1 PC : 3 PP

59,400.00 26,153.40 4,286.00 89,839.40

27,000.00 11,000.00 1,300.00 2,100.00 41,400.00

Page 80: Rencana Anggaran Biaya Pembangunan Gereja

Analisa Harga Satuan Pekerjaan Page 80

JUMLAH

Rp.

6=(3x5) 131,239.40

Memasang 1 m² dinding bata merah (8x8x16) cm; tebal ½ bata; campuran 1 PC : 4 PP

59,400.00 20,930.00 4,607.45 84,937.45

27,000.00 11,000.00 1,300.00 2,100.00 41,400.00 126,337.45

Memasang 1 m² dinding bata merah (8x8x16) cm; tebal ½ bata; campuran 1 PC : 5 PP

59,400.00 17,617.60 4,821.75 81,839.35

27,000.00 11,000.00 1,300.00 2,100.00 41,400.00 123,239.35

Memasang 1 m² dinding bata merah (8x8x16) cm; tebal ½ bata; campuran 1 PC : 6 PP

59,400.00 15,142.40 5,250.35 79,792.75

27,000.00 11,000.00 1,300.00 2,100.00 41,400.00 121,192.75

Memasang 1 m² dinding bata merah (8x8x16) cm; tebal ½ bata; campuran 1 PC : 8 PP

59,400.00 11,830.00 5,357.50 76,587.50

27,000.00 11,000.00 1,300.00 2,100.00 41,400.00 117,987.50

Memasang 1 m² dinding terawang (roster) uk. (12x11x24) cm; campuran spesi 1 PC : 3 PP

300,000.00 25,480.00 3,428.80 328,908.80

27,000.00 11,000.00 1,300.00 2,100.00 41,400.00 370,308.80

Page 81: Rencana Anggaran Biaya Pembangunan Gereja

Analisa Harga Satuan Pekerjaan Page 81

JUMLAH

Rp.

6=(3x5)

Memasang 1 m² dinding terawang (roster) uk. (12x11x24) cm; campuran spesi 1 PC : 4 PP

300,000.00 20,020.00 3,750.25 323,770.25

27,000.00 11,000.00 1,300.00 2,100.00 41,400.00 365,170.25

Memasang 1 m² dinding bata berongga ekspose uk. (5x11x24) cm; campuran spesi 1 PC : 3 PP

700,000.00 25,480.00 3,428.80 728,908.80

27,000.00 16,500.00 1,950.00 2,100.00 47,550.00 776,458.80

SNI 03-2837-2002 Memasang 1 m² plesteran 1 PC : 1 PP; tebal 15 mm

28,217.28 1,714.40 29,931.68

27,000.00 16,500.00 1,950.00 2,100.00 47,550.00 77,481.68

Memasang 1 m² plesteran 1 PC : 2 PP; tebal 15 mm

18,607.68 2,143.00 20,750.68

27,000.00 16,500.00 1,950.00 2,100.00 47,550.00 68,300.68

Memasang 1 m² plesteran 1 PC : 3 PP; tebal 15 mm

14,152.32 2,464.45 16,616.77

27,000.00 16,500.00 1,950.00 2,100.00 47,550.00 64,166.77

Memasang 1 m² plesteran 1 PC : 4 PP; tebal 15 mm

Page 82: Rencana Anggaran Biaya Pembangunan Gereja

Analisa Harga Satuan Pekerjaan Page 82

JUMLAH

Rp.

6=(3x5)

11,356.80 2,571.60 13,928.40

27,000.00 16,500.00 1,950.00 2,100.00 47,550.00 61,478.40

Memasang 1 m² plesteran 1 PC : 5 PP; tebal 15 mm

9,434.88 2,785.90 12,220.78

27,000.00 16,500.00 1,950.00 1,400.00 46,850.00 59,070.78

Memasang 1 m² plesteran 1 PC : 6 PP; tebal 15 mm

8,037.12 2,893.05 10,930.17

27,000.00 16,500.00 1,950.00 2,100.00 47,550.00 58,480.17

Memasang 1 m² plesteran 1 PC : 7 PP; tebal 15 mm

7,163.52 3,000.20 10,163.72

27,000.00 16,500.00 1,950.00 2,100.00 47,550.00 57,713.72

Memasang 1 m² plesteran 1 PC : 8 PP; tebal 15 mm

6,289.92 3,107.35 9,397.27

27,000.00 16,500.00 1,950.00 2,100.00 47,550.00 56,947.27

Memasang 1 m² plesteran 1 PC : 2 PP; tebal 20 mm

24,810.24 2,893.05 27,703.29

36,000.00

Page 83: Rencana Anggaran Biaya Pembangunan Gereja

Analisa Harga Satuan Pekerjaan Page 83

JUMLAH

Rp.

6=(3x5) 22,000.00 2,600.00 3,080.00 63,680.00 91,383.29

Memasang 1 m² plesteran 1 PC : 3 PP; tebal 20 mm

18,869.76 3,321.65 22,191.41

23,400.00 22,000.00 2,600.00 3,080.00 51,080.00 73,271.41

Memasang 1 m² plesteran 1 PC : 4 PP; tebal 20 mm

15,142.40 3,428.80 18,571.20

36,000.00 22,000.00 2,600.00 30,800.00 91,400.00 109,971.20

Memasang 1 m² plesteran 1 PC : 5 PP; tebal 20 mm

12,579.84 3,750.25 16,330.09

36,000.00 22,000.00 2,600.00 3,080.00 63,680.00 80,010.09

Memasang 1 m² plesteran 1 PC : 6 PP; tebal 20 mm

10,716.16 3,857.40 14,573.56

36,000.00 22,000.00 2,860.00 3,080.00 63,940.00 78,513.56

Memasang 1 m² plesteran 1 PC : 2 PP; tebal 25 mm

28,210.00 1,392.95 29,602.95

27,000.00 22,000.00 2,600.00 1,820.00 53,420.00 83,022.95

Memasang 1 m² plesteran 1 PC : 3 PP; tebal 25 mm

Page 84: Rencana Anggaran Biaya Pembangunan Gereja

Analisa Harga Satuan Pekerjaan Page 84

JUMLAH

Rp.

6=(3x5)

21,385.00 3,750.25 25,135.25

27,000.00 16,500.00 1,950.00 1,820.00 47,270.00 72,405.25

Memasang 1 m² plesteran 1 PC : 4 PP; tebal 25 mm

17,253.60 4,071.70 21,325.30

27,000.00 22,000.00 2,600.00 1,820.00 53,420.00 74,745.30

Memasang 1 m² plesteran 1 PC : 5 PP; tebal 25 mm

14,450.80 4,178.85 18,629.65

27,000.00 22,000.00 2,600.00 1,820.00 53,420.00 72,049.65

Memasang 1 m² plesteran 1 PC : 2 PP; tebal 30 mm

33,943.00 3,750.25 37,693.25

28,800.00 27,500.00 3,250.00 2,100.00 61,650.00 99,343.25

Memasang 1 m² plesteran 1 PC : 3 PP; tebal 30 mm

25,753.00 4,178.85 29,931.85

28,800.00 27,500.00 3,250.00 2,100.00 61,650.00 91,581.85

Memasang 1 m² plesteran 1 PC : 4 PP; tebal 30 mm

20,711.60 4,500.30 25,211.90

Page 85: Rencana Anggaran Biaya Pembangunan Gereja

Analisa Harga Satuan Pekerjaan Page 85

JUMLAH

Rp.

6=(3x5) 28,800.00 27,500.00 3,250.00 2,100.00 61,650.00 86,861.90

Memasang 1 m² plesteran 1 PC : 5 PP; tebal 30 mm

14,905.80 4,821.75 19,727.55

28,800.00 27,500.00 3,250.00 2,100.00 61,650.00 81,377.55

Memasang 1 m² berapen 1 PC : 3 PP; tebal 30 mm

12,867.40 2,250.15 15,117.55

13,500.00 7,700.00 910.00 1,120.00 23,230.00 38,347.55

Memasang 1 m² berapen 1 PC : 5 PP; tebal 30 mm

9,434.88 2,785.90 12,220.78

13,500.00 7,700.00 910.00 1,120.00 23,230.00 35,450.78

Memasang 1 m² plesteran beton 1 PC : 2 PP; tebal 15 mm

16,926.00 1,928.70 18,854.70

23,400.00 22,000.00 2,600.00 1,820.00 49,820.00 68,674.70

Memasang 1 m² plesteran beton 1 PC : 3 PP; tebal 15 mm

12,867.40 2,250.15 15,117.55

23,400.00 22,000.00 2,600.00 1,820.00 49,820.00 64,937.55

Page 86: Rencana Anggaran Biaya Pembangunan Gereja

Analisa Harga Satuan Pekerjaan Page 86

JUMLAH

Rp.

6=(3x5)

Memasang 1 m' plesteran skoning 1 PC : 2 PP; lebar 10 mm

910.00 1,392.95 2,302.95

7,200.00 44,000.00 5,200.00 560.00 56,960.00 59,262.95

Memasang 1 m² plesteran ciprat 1 PC : 2 PP; lebar 10 mm

7,862.40 642.90 8,505.30

27,000.00 11,000.00 1,300.00 2,100.00 41,400.00 49,905.30

Memasang 1 m² finishing siar pasangan dinding bata merah (=20 m')

5,656.56 5,656.56

13,500.00 8,250.00 1,040.00 1,120.00 23,910.00 29,566.56

Memasang 1 m² finishing siar pasangan dinding conblock ekspose (=8 m')

2,912.00 2,912.00

6,300.00 3,850.00 520.00 560.00 11,230.00 14,142.00

Memasang 1 m² finishing siar pasangan batu kali adukan 1 PC : 2 PP

11,538.80 1,285.80 12,824.60

27,000.00 16,500.00 1,950.00 2,100.00 47,550.00 60,374.60

Memasang 1 m² acian

5,915.00 5,915.00

13,500.00 11,000.00 1,300.00

Page 87: Rencana Anggaran Biaya Pembangunan Gereja

Analisa Harga Satuan Pekerjaan Page 87

JUMLAH

Rp.

6=(3x5) 1,400.00 27,200.00 33,115.00

Memasang 1 m' Benangan sudut

291.20 1,392.95 1,684.15

2,700.00 7,700.00 910.00 1,120.00 12,430.00 14,114.15

SNI 03-3434-2002 Membuat dan memasang 1 m³ kusen pintu dan kusen jendela; Kayu Lembasung/ Kapur

2,057,000.00 27,062.50 28,000.00 2,112,062.50

630,000.00 2,310,000.00 273,000.00 49,000.00 3,262,000.00 5,374,062.50

Membuat dan memasang 1 m³ kusen pintu dan kusen jendela; Kayu Kayu Meranti

2,244,000.00 27,062.50 28,000.00 2,299,062.50

540,000.00 1,980,000.00 234,000.00 42,000.00 2,796,000.00 5,095,062.50

Membuat dan memasang 1 m² pintu klamp sederhana; Kayu Lembasung/ Kapur

74,800.00 1,082.50 75,882.50

31,500.00 115,500.00 13,650.00 2,520.00 163,170.00 239,052.50

Membuat dan memasang 1 m² pintu klamp sederhana; Kayu Meranti

74,800.00 1,082.50 75,882.50

31,500.00 115,500.00 13,650.00 2,520.00 163,170.00

Page 88: Rencana Anggaran Biaya Pembangunan Gereja

Analisa Harga Satuan Pekerjaan Page 88

JUMLAH

Rp.

6=(3x5) 239,052.50

Membuat dan memasang 1 m² daun pintu panel; Kayu Lembasung/ Kapur

74,800.00 14,000.00 88,800.00

90,000.00 330,000.00 39,000.00 7,000.00 466,000.00 554,800.00

Membuat dan memasang 1 m² daun pintu panel; Kayu Meranti

74,800.00 14,000.00 88,800.00

90,000.00 330,000.00 39,000.00 7,000.00 466,000.00 554,800.00

Membuat dan memasang 1 m² pintu dan jendela kaca; Kayu Lembasung/ Kapur

44,880.00 8,400.00 53,280.00

72,000.00 264,000.00 31,200.00 5,600.00 372,800.00 426,080.00

Membuat dan memasang 1 m² pintu dan jendela kaca; Kayu Meranti

44,880.00 8,400.00 53,280.00

72,000.00 264,000.00 31,200.00 5,600.00 372,800.00 426,080.00

Membuat dan memasang 1 m² pintu dan jendela jalusi; Lembasung/ Kapur

119,680.00 14,000.00 133,680.00

90,000.00 330,000.00 39,000.00 7,000.00 466,000.00 599,680.00

Membuat dan memasang 1 m² pintu dan jendela jalusi; Kayu Meranti

119,680.00 14,000.00 133,680.00

Page 89: Rencana Anggaran Biaya Pembangunan Gereja

Analisa Harga Satuan Pekerjaan Page 89

JUMLAH

Rp.

6=(3x5) 90,000.00 330,000.00 39,000.00 7,000.00 466,000.00 599,680.00

Membuat dan memasang 1 m² daun pintu kayu lapis (plywood); rangka tertutup Kayu Kapur

46,750.00 649.50 14,000.00 154,000.00 215,399.50

63,000.00 231,000.00 27,300.00 4,900.00 326,200.00 541,599.50

Membuat dan memasang 1 m² pintu plywood rangkap; rangka ekspose Kayu Kapur

47,872.00 649.50 14,000.00 154,000.00 216,521.50

72,000.00 264,000.00 31,200.00 5,600.00 372,800.00 589,321.50

Membuat dan memasang 1 m² jalusi kusen; Kayu Kapur/ Lembasung

112,200.00 3,247.50 115,447.50

60,300.00 220,000.00 26,000.00 46,900.00 353,200.00 468,647.50

Membuat dan memasang 1 m² jalusi kusen; Kayu Meranti

112,200.00 3,247.50 115,447.50

60,300.00 220,000.00 26,000.00 46,900.00 353,200.00 468,647.50

Membuat dan memasang 1 m² pintu teakwood rangkap; rangka ekspose Kayu Kapur

46,750.00 649.50 8,400.00 68,200.00 123,999.50

Page 90: Rencana Anggaran Biaya Pembangunan Gereja

Analisa Harga Satuan Pekerjaan Page 90

JUMLAH

Rp.

6=(3x5) 72,000.00 264,000.00 5,200.00 5,600.00 346,800.00 470,799.50

Membuat dan memasang 1 m² pintu teakwood rangkap lapis formika; rgk. ekspose Ky. Meranti

46,750.00 649.50 22,400.00 68,200.00 27,750.00 165,749.50

76,500.00 280,500.00 33,150.00 6,020.00 396,170.00 561,919.50

Membuat dan memasang 1 m³ konstruksi kuda kuda konvensional; Kayu Kapur/ Lembasung

2,057,000.00 369,000.00 121,240.00 2,547,240.00

360,000.00 1,320,000.00 156,000.00 28,000.00 1,864,000.00 4,411,240.00

Membuat dan memasang 1 m³ konstruksi kuda kuda konvensional; Kayu Meranti

2,057,000.00 369,000.00 121,240.00 2,547,240.00

360,000.00 1,320,000.00 156,000.00 28,000.00 1,864,000.00 4,411,240.00

Membuat dan memasang 1 m³ konstruksi kuda kuda ekspose; Kayu Kapur/ Lembasung

2,244,000.00 369,000.00 121,240.00 2,734,240.00

603,000.00 2,211,000.00 261,300.00 46,900.00 3,122,200.00 5,856,440.00

Membuat dan memasang 1 m³ konstruksi kuda kuda ekspose; Kayu Meranti

2,244,000.00 369,000.00 121,240.00 2,734,240.00

Page 91: Rencana Anggaran Biaya Pembangunan Gereja

Analisa Harga Satuan Pekerjaan Page 91

JUMLAH

Rp.

6=(3x5)

603,000.00 2,211,000.00 261,300.00 46,900.00 3,122,200.00 5,856,440.00

Membuat dan memasang 1 m³ konstruksi gording; Kayu Kapur/ Lembasung

2,057,000.00 369,000.00 64,950.00 2,490,950.00

216,000.00 792,000.00 93,600.00 16,800.00 1,118,400.00 3,609,350.00

Membuat dan memasang 1 m³ konstruksi gording; Kayu Meranti

2,057,000.00 369,000.00 64,950.00 2,490,950.00

216,000.00 792,000.00 93,600.00 16,800.00 1,118,400.00 3,609,350.00

Membuat dan memasang 1 m² rangka atap genteng kodok; Kayu Kapur/ Lembasung

22,440.00 6,732.00 5,412.50 34,584.50

9,000.00 11,000.00 1,300.00 700.00 22,000.00 56,584.50

Membuat dan memasang 1 m² rangka atap genteng kodok; Kayu Meranti

22,440.00 6,732.00 5,412.50 34,584.50

9,000.00 11,000.00 1,300.00 700.00 22,000.00 56,584.50

Membuat dan memasang 1 m² rangka atap genteng keramik; Kayu Kapur/ Lembasung

26,180.00 6,732.00 5,412.50 38,324.50

9,000.00

Page 92: Rencana Anggaran Biaya Pembangunan Gereja

Analisa Harga Satuan Pekerjaan Page 92

JUMLAH

Rp.

6=(3x5) 11,000.00 1,300.00 700.00 22,000.00 60,324.50

Membuat dan memasang 1 m² rangka atap genteng keramik; Kayu Meranti

26,180.00 6,732.00 5,412.50 38,324.50

9,000.00 11,000.00 1,300.00 700.00 22,000.00 60,324.50

Membuat dan memasang 1 m² rangka atap genteng beton; Kayu Kapur/ Lembasung

26,180.00 106,590.00 5,412.50 138,182.50

9,000.00 11,000.00 1,300.00 700.00 22,000.00 160,182.50

Membuat dan memasang 1 m² rangka atap genteng beton; Kayu Meranti

26,180.00 106,590.00 5,412.50 138,182.50

9,000.00 11,000.00 1,300.00 700.00 22,000.00 160,182.50

Membuat dan memasang 1 m² rangka atap genteng metal; Kayu Lembasung/Kapur

22,440.00 3,247.50 25,687.50

9,000.00 11,000.00 1,300.00 700.00 22,000.00 47,687.50

Membuat dan memasang 1 m² rangka atap genteng metal; Kayu Meranti

22,440.00 3,247.50 25,687.50

9,000.00 11,000.00 1,300.00 700.00 22,000.00

Page 93: Rencana Anggaran Biaya Pembangunan Gereja

Analisa Harga Satuan Pekerjaan Page 93

JUMLAH

Rp.

6=(3x5) 47,687.50

Memasang 1 m² rangka atap sirap; Kayu Meranti

308,550.00 4,330.00 312,880.00

10,800.00 13,200.00 1,560.00 840.00 26,400.00 339,280.00

Memasang 1 m² rangka langit-langit (100 x 100) cm; Kayu Meranti

22,440.00 2,165.00 24,605.00

13,500.00 27,500.00 3,250.00 10,500.00 54,750.00 79,355.00

Memasang 1 m² rangka langit-langit (50 x 100) cm; Kayu Meranti

28,798.00 4,330.00 33,128.00

13,500.00 33,000.00 3,900.00 10,500.00 60,900.00 94,028.00

Memasang 1 m² rangka langit-langit (60 x 60) cm; Kayu Meranti

30,481.00 5,412.50 35,893.50

18,000.00 33,000.00 3,900.00 1,400.00 56,300.00 92,193.50

Memasang 1 m' lisplank uk. (3 x 20) cm; Kapur/ Lembasung

20,196.00 2,165.00 22,361.00

9,000.00 22,000.00 2,600.00 700.00 34,300.00 56,661.00

Memasang 1 m' lisplank uk. (3 x 30) cm; Kayu Kapur/Lembasung

Page 94: Rencana Anggaran Biaya Pembangunan Gereja

Analisa Harga Satuan Pekerjaan Page 94

JUMLAH

Rp.

6=(3x5) 20,570.00 1,082.50 21,652.50

9,000.00 22,000.00 3,250.00 700.00 34,950.00 56,602.50

Memasang 1 m' lisplank uk. 2x (3 x 20) cm; Kayu Kapur/ Lembasung

27,115.00 1,299.00 28,414.00

13,500.00 27,500.00 3,250.00 10,500.00 54,750.00 83,164.00

Memasang 1 m' lisplank uk. 2x (2 x 20) cm; Kayu Kapur/ Lembasung

16,082.00 1,299.00 17,381.00

9,000.00 11,000.00 1,300.00 7,000.00 28,300.00 45,681.00

Memasang 1 m² rangka dinding pemisah (60 x 120) cm; Kayu Meranti

52,360.00 3,247.50 55,607.50

13,500.00 49,500.00 5,850.00 1,120.00 69,970.00 125,577.50

Memasang 1 m² dinding pemisah teakwood rangkap; Kayu Kapur/ Lembasung

52,360.00 3,247.50 58,652.00 15,680.00 129,939.50

13,500.00 49,500.00 5,850.00 1,120.00 69,970.00 199,909.50

Memasang 1 m² dinding pemisah plywood rangkap; Kayu Meranti

52,360.00 3,247.50 132,440.00 15,680.00 203,727.50

Page 95: Rencana Anggaran Biaya Pembangunan Gereja

Analisa Harga Satuan Pekerjaan Page 95

JUMLAH

Rp.

6=(3x5)

18,000.00 66,000.00 7,800.00 1,400.00 93,200.00 296,927.50

Pasangan dinding kayu meranti berlidah per m2 -

46,750.00 4,330.00 51,080.00

54,000.00 198,000.00 23,400.00 4,200.00 279,600.00 330,680.00

Memasang 1 m² dinding lambriziring dari papan; Kayu Meranti

13,090.00 2,165.00 4,665.00 19,920.00

54,000.00 198,000.00 23,400.00 4,200.00 279,600.00 299,520.00

Memasang 1 m² dinding lambriziring dari plywood ukuran (120 x 240) cm

61,600.00 1,082.50 62,682.50

2,250.00 8,250.00 975.00 182.00 11,657.00 74,339.50

Memasang 1 m' papan ruiter ukuran 3 x 30 cm; Kayu Meranti

18,700.00 216.50 18,916.50

6,300.00 22,000.00 2,600.00 560.00 31,460.00 50,376.50

Memasang 1 m' papan ruiter ukuran 2 x 20 cm; Kayu Meranti

8,228.00 216.50 8,444.50

6,300.00 22,000.00 2,600.00 560.00 31,460.00

Page 96: Rencana Anggaran Biaya Pembangunan Gereja

Analisa Harga Satuan Pekerjaan Page 96

JUMLAH

Rp.

6=(3x5) 39,904.50

Sebuah tiang pancang dicincin dan dilancipkan

9,000.00 27,500.00 3,250.00 700.00 40,450.00 40,450.00

Membuat pen pada tiang dan lubang pada balok pemikul tiap-tiap pasangan pen dan lubang

66,000.00 7,800.00 73,800.00 73,800.00

Memancang tiang pada tanah lunak per m'

162,000.00 4,400.00 520.00 6,020.00 172,940.00 172,940.00 216,175.00 259,410.00

Pasangan tongkat, sloop, gelegar dari kayu ulin per m3 -

3,850,000.00 27,500.00 3,877,500.00

450,000.00 1,650,000.00 195,000.00 35,000.00 2,330,000.00 6,207,500.00

Pasangan gelegar kayu kapur/lembasung per m3 -

1,870,000.00 21,650.00 1,891,650.00

450,000.00 1,650,000.00 195,000.00 35,000.00 2,330,000.00 4,221,650.00

Pasangan Lantai dari papan kayu kapur/lembasung per m2 -

46,750.00 4,330.00 51,080.00

25,200.00 88,000.00 10,400.00 1,960.00 125,560.00 176,640.00

Pasangan lantai dari papan kayu meranti per m2 -

46,750.00

Page 97: Rencana Anggaran Biaya Pembangunan Gereja

Analisa Harga Satuan Pekerjaan Page 97

JUMLAH

Rp.

6=(3x5) 4,330.00 51,080.00

25,200.00 88,000.00 10,400.00 1,960.00 125,560.00 176,640.00 113,860.00

Pasangan lantai dari papan kayu ulin per m2 -

96,250.00 5,500.00 101,750.00

25,200.00 88,000.00 10,400.00 1,960.00 125,560.00 227,310.00 164,530.00

1Ttk Memancang tiang pancang kayu ulin 10/10 - 2 m

77,000.00 77,000.00

162,000.00 4,400.00 520.00 6,020.00 3,366.00 176,306.00 253,306.00

1Ttk Memancang tiang pancang kayu ulin 10/10 - 4 m

154,000.00 154,000.00

162,000.00 4,400.00 520.00 6,020.00 6,732.00 179,672.00 333,672.00

Rangka badan/tiang jenang dari kayu kapur/lembasung per m3 -

2,244,000.00 4,330.00 2,248,330.00

900,000.00 3,300,000.00 390,000.00 70,000.00 4,660,000.00 6,908,330.00

Pasangan sunduk,kalang dari kayu ulin per m3 -

3,850,000.00 27,500.00 3,877,500.00

450,000.00 1,650,000.00 195,000.00

Page 98: Rencana Anggaran Biaya Pembangunan Gereja

Analisa Harga Satuan Pekerjaan Page 98

JUMLAH

Rp.

6=(3x5) 35,000.00 2,330,000.00 6,207,500.00

RSNI-T-13-2002 Membuat 1 m³ beton tumbuk 1 PC : 3 PB : 5 KR, Batu Pecah

396,760.00 55,718.00 558,250.00 1,010,728.00

148,500.00 27,500.00 3,250.00 11,200.00 190,450.00 1,201,178.00

Membuat 1 m³ beton tumbuk 1 PC : 3 PB : 5 KR, Kerikil Sungai

396,760.00 55,718.00 210,540.00 663,018.00

148,500.00 27,500.00 3,250.00 11,200.00 190,450.00 853,468.00

Membuat 1 m³ beton tumbuk 1 PC : 3 PB : 6 KR

358,540.00 50,360.50 603,166.67 1,012,067.17

148,500.00 27,500.00 3,250.00 11,200.00 190,450.00 1,202,517.17

Membuat 1 m³ beton tumbuk 1 PC : 4 PB : 6 KR

314,860.00 61,075.50 558,250.00 934,185.50

148,500.00 27,500.00 3,250.00 11,200.00 190,450.00 1,124,635.50

Membuat 1 m² lantai kerja beton tumbuk 1 PC : 3 PB : 5 KR; tebal 5 cm,Koral Beton

18,200.00 2,785.90 28,233.33 49,219.23

103,500.00 2,200.00

Page 99: Rencana Anggaran Biaya Pembangunan Gereja

Analisa Harga Satuan Pekerjaan Page 99

JUMLAH

Rp.

6=(3x5) 260.00 840.00 106,800.00 156,019.23

Membuat 1 m² lantai kerja beton tumbuk 1 PC : 3 PB : 5 KR; tebal 5 cm,Kerikil sungai

18,200.00 2,785.90 10,648.00 31,633.90

103,500.00 2,200.00 260.00 840.00 106,800.00 138,433.90

Membuat 1 m³ beton bertulang 1 PC : 2 PB : 3 KR, Batu Pecah

611,520.00 57,861.00 500,500.00 1,169,881.00

148,500.00 27,500.00 3,250.00 11,200.00 190,450.00 1,360,331.00

Membuat 1 m³ beton bertulang 1 PC : 2 PB : 3 KR, Kerikil Sungai

611,520.00 57,861.00 188,760.00 858,141.00

148,500.00 27,500.00 3,250.00 11,200.00 190,450.00 1,048,591.00

Membuat 1 m³ beton bertulang 1 PC : 2 PB : 4 KR

509,600.00 48,217.50 577,500.00 1,135,317.50

148,500.00 27,500.00 3,250.00 11,200.00 190,450.00 1,325,767.50

Membuat 1 m³ beton bertulang 1 PC : 2 PB : 2,5 KR

640,640.00 60,004.00 449,166.67 1,149,810.67

148,500.00 27,500.00 3,250.00 11,200.00

Page 100: Rencana Anggaran Biaya Pembangunan Gereja

Analisa Harga Satuan Pekerjaan Page 100

JUMLAH

Rp.

6=(3x5) 190,450.00 1,340,260.67

Membuat 1 m³ beton bertulang 1 PC : 1.5 PB : 3 KR

649,740.00 45,003.00 346,500.00 1,041,243.00

148,500.00 27,500.00 3,250.00 11,200.00 190,450.00 1,231,693.00

Membuat 1 m³ beton bertulang 1 PC : 1.5 PB : 2,5 KR

702,520.00 50,360.50 500,500.00 1,253,380.50

148,500.00 27,500.00 3,250.00 11,200.00 190,450.00 1,443,830.50

Membuat 1 m³ beton bertulang 1 PC : 1 PB : 2 KR

871,780.00 39,645.50 474,833.33 1,386,258.83

148,500.00 27,500.00 3,250.00 11,200.00 190,450.00 1,576,708.83

Membuat 1 m³ beton mutu f'c=7,4 Mpa (K 100); slump (12 ± 2) cm; w/c = 0,87

449,540.00 66,509.54 474,833.33 8,600.00 999,482.87

148,500.00 30,250.00 3,640.00 11,620.00 194,010.00 1,193,492.87

Membuat 1 m³ beton mutu f'c=9,8 Mpa (K 125); slump (12 ± 2) cm; w/c = 0,78

502,320.00 63,371.57 481,012.35 8,600.00 1,055,303.92

148,500.00

Page 101: Rencana Anggaran Biaya Pembangunan Gereja

Analisa Harga Satuan Pekerjaan Page 101

JUMLAH

Rp.

6=(3x5) 30,250.00 3,640.00 11,620.00 194,010.00 1,249,313.92

Membuat 1 m³ beton mutu f'c=12,2 Mpa (K 150); slump (12 ± 2) cm; w/c = 0,72

544,180.00 61,152.04 483,388.89 8,600.00 1,097,320.92

148,500.00 30,250.00 3,640.00 11,620.00 194,010.00 1,291,330.92

Membuat 1 m³ beton mutu f'c=7,4 Mpa (K 100); slump (3-6) cm; w/c = 0,87

418,600.00 68,346.39 488,141.98 8,000.00 983,088.37

108,000.00 22,000.00 2,600.00 8,400.00 141,000.00 1,124,088.37

Membuat 1 m³ beton mutu f'c=14,5 Mpa (K 175); slump (12 ± 2) cm; w/c = 0,66

593,320.00 58,167.14 489,092.59 8,600.00 1,149,179.74

148,500.00 30,250.00 3,640.00 11,620.00 194,010.00 1,343,189.74

Membuat 1 m³ beton mutu f'c=16,9 Mpa (K 200); slump (12 ± 2) cm; w/c = 0,61

640,640.00 55,947.61 490,043.21 8,600.00 1,195,230.82

148,500.00 30,250.00 3,640.00 11,620.00 194,010.00 1,389,240.82

Membuat 1 m³ beton mutu f'c=19,3 Mpa (K 225); slump (12 ± 2) cm; w/c = 0,58

675,220.00 53,421.93

Page 102: Rencana Anggaran Biaya Pembangunan Gereja

Analisa Harga Satuan Pekerjaan Page 102

JUMLAH

Rp.

6=(3x5) 497,648.15 8,600.00 1,234,890.08

148,500.00 30,250.00 3,640.00 11,620.00 194,010.00 1,428,900.08

Membuat 1 m³ beton mutu f'c=21,7 Mpa (K 250); slump (12 ± 2) cm; w/c = 0,56

698,880.00 52,962.71 493,845.68 8,600.00 1,254,288.39

148,500.00 30,250.00 3,640.00 11,620.00 194,010.00 1,448,298.39

Membuat 1 m³ beton mutu f'c=24 Mpa (K 275); slump (12 ± 2) cm; w/c = 0,53

738,920.00 52,350.43 487,666.67 8,600.00 1,287,537.10

148,500.00 30,250.00 3,640.00 11,620.00 194,010.00 1,481,547.10

Membuat 1 m³ beton mutu f'c=26,4 Mpa (K 300); slump (12 ± 2) cm; w/c = 0,52

751,660.00 52,120.82 485,290.12 8,600.00 1,297,670.94

148,500.00 30,250.00 3,640.00 11,620.00 194,010.00 1,491,680.94

Membuat 1 m³ beton mutu f'c=28,8 Mpa (K 325); slump (12 ± 2) cm; w/c = 0,49

798,980.00 51,278.93 478,160.49 8,600.00 1,337,019.42

189,000.00 38,500.00 4,550.00 14,700.00 246,750.00 1,583,769.42

Page 103: Rencana Anggaran Biaya Pembangunan Gereja

Analisa Harga Satuan Pekerjaan Page 103

JUMLAH

Rp.

6=(3x5) Membuat 1 m³ beton mutu f'c=31,2 Mpa (K 350); slump (12 ± 2) cm; w/c = 0,48

815,360.00 51,049.32 475,308.64 8,600.00 1,350,317.96

189,000.00 38,500.00 4,550.00 14,700.00 246,750.00 1,597,067.96

Pembesian 1 kg dengan besi polos atau besi ulir

16,170.00 330.00 16,500.00

630.00 770.00 91.00 56.00 1,547.00 18,047.00

157,080.00 1,100.00 158,180.00

2,250.00 2,750.00 3,250.00 140.00 8,390.00 166,570.00

Memasang 1 m² bekisting untuk pondasi

66,000.00 6,495.00 1,060.00 73,555.00

46,800.00 28,600.00 3,380.00 3,640.00 82,420.00 155,975.00 16,484.00

Memasang 1 m² bekisting untuk sloof

74,250.00 6,495.00 1,060.00 81,805.00

46,800.00 28,600.00 3,380.00 3,640.00 82,420.00 164,225.00

Memasang 10 kg jaring kawat baja /wiremesh

Page 104: Rencana Anggaran Biaya Pembangunan Gereja

Analisa Harga Satuan Pekerjaan Page 104

JUMLAH

Rp.

6=(3x5) 16,484.00

Memasang 1 m² bekisting untuk kolom

66,000.00 8,660.00 2,120.00 24,750.00 33,000.00 32,000.00 166,530.00

59,400.00 36,300.00 4,290.00 4,620.00 104,610.00 271,140.00 20,922.00

Memasang 1 m² bekisting untuk balok

66,000.00 8,660.00 2,120.00 29,700.00 33,000.00 32,000.00 171,480.00

59,400.00 36,300.00 4,290.00 4,620.00 104,610.00 276,090.00 20,922.00

Memasang 1 m² bekisting untuk lantai

66,000.00 8,660.00 2,120.00 24,750.00 33,000.00 96,000.00 230,530.00

59,400.00 36,300.00 4,290.00 4,620.00 104,610.00 335,140.00 20,922.00

Memasang 1 m² bekisting untuk dinding

49,500.00 8,660.00 2,120.00 33,000.00 33,000.00 48,000.00 64,000.00 238,280.00

Page 105: Rencana Anggaran Biaya Pembangunan Gereja

Analisa Harga Satuan Pekerjaan Page 105

JUMLAH

Rp.

6=(3x5) 59,400.00 36,300.00 4,290.00 4,620.00 104,610.00 342,890.00 20,922.00

Memasang 1 m² bekisting untuk tangga

49,500.00 8,660.00 1,590.00 24,750.00 33,000.00 32,000.00 149,500.00

59,400.00 36,300.00 4,290.00 4,620.00 104,610.00 254,110.00 20,922.00

Memasang 1 m² jembatan untuk pengecoran beton

43,560.00 12,990.00 8,000.00 64,550.00

13,500.00 5,500.00 650.00 1,120.00 20,770.00 85,320.00

Memasang 1 m³ pondasi beton bertulang (150 kg besi + bekisting)

330,000.00 32,475.00 4,240.00 2,425,500.00 49,500.00 611,520.00 57,861.00 519,750.00 4,030,846.00

477,000.00 30,250.00 143,000.00 115,500.00 34,060.00 37,100.00 836,910.00 4,867,756.00

Memasang 1 m³ sloof beton bertulang (200 kg besi + bekisting)

445,500.00 43,300.00 6,360.00 3,234,000.00 66,000.00 611,520.00

Page 106: Rencana Anggaran Biaya Pembangunan Gereja

Analisa Harga Satuan Pekerjaan Page 106

JUMLAH

Rp.

6=(3x5) 57,861.00 519,750.00 4,984,291.00

508,500.00 30,250.00 171,600.00 154,000.00 41,990.00 39,620.00 945,960.00 5,930,251.00

Memasang 1 m³ kolom beton bertulang (300 kg besi + bekisting)

660,000.00 86,600.00 21,200.00 4,851,000.00 99,000.00 611,520.00 57,861.00 519,750.00 247,500.00 539,000.00 320,000.00 8,013,431.00

634,500.00 30,250.00 181,500.00 231,000.00 52,390.00 49,420.00 1,179,060.00 9,192,491.00

Memasang 1 m³ balok beton bertulang (200 kg besi + bekisting)

528,000.00 69,280.00 16,960.00 3,234,000.00 66,000.00 611,520.00 57,861.00 519,750.00 231,000.00 431,200.00 256,000.00 6,021,571.00

571,500.00 30,250.00 181,500.00 154,000.00 43,290.00 44,520.00 1,025,060.00 7,046,631.00

Memasang 1 m³ kolom beton bertulang (150 kg besi + bekisting)

528,000.00 69,280.00 16,960.00 2,425,500.00 49,500.00

Page 107: Rencana Anggaran Biaya Pembangunan Gereja

Analisa Harga Satuan Pekerjaan Page 107

JUMLAH

Rp.

6=(3x5) 611,520.00 57,861.00 519,750.00 198,000.00 431,200.00 512,000.00 5,419,571.00

477,000.00 30,250.00 143,000.00 115,500.00 34,450.00 37,100.00 837,300.00 6,256,871.00

Memasang 1 m³ dinding beton bertulang (150 kg besi + bekisting)

396,000.00 69,280.00 16,960.00 2,425,500.00 49,500.00 611,520.00 57,861.00 519,750.00 264,000.00 431,200.00 384,000.00 5,225,571.00

477,000.00 30,250.00 143,000.00 115,500.00 34,060.00 37,100.00 836,910.00 6,062,481.00

Memasang 1 m³ dinding beton bertulang (200 kg besi + bekisting)

412,500.00 64,950.00 12,720.00 3,234,000.00 66,000.00 611,520.00 57,861.00 519,750.00 173,250.00 385,000.00 224,000.00 5,761,551.00

508,500.00 30,250.00 171,600.00 154,000.00 41,990.00 39,620.00 945,960.00 6,707,511.00

Memasang 1 m' kolom praktis beton bertulang (11 x 11 cm)

3,300.00 216.50 -

Page 108: Rencana Anggaran Biaya Pembangunan Gereja

Analisa Harga Satuan Pekerjaan Page 108

JUMLAH

Rp.

6=(3x5) 46,200.00 9,900.00 7,280.00 642.90 5,775.00 73,314.40

16,200.00 2,200.00 2,200.00 2,200.00 780.00 1,260.00 24,840.00 98,154.40

Memasang 1 m' ring balok beton bertulang (10 x 15 cm)

4,950.00 433.00 - 55,440.00 1,100.00 10,010.00 964.35 9,625.00 82,522.35

26,730.00 3,630.00 3,630.00 3,630.00 1,300.00 2,100.00 41,020.00 123,542.35

SNI 03-3436-2002 Memasang 1 m² rooflight fibreglass (180 x 90) cm

71,880.00 1,082.50 72,962.50

12,600.00 7,370.00 910.00 980.00 21,860.00 94,822.50

Memasang 1 m² atap genteng glazzur

117,500.00 117,500.00

13,500.00 8,250.00 1,040.00 1,120.00 23,910.00 141,410.00

Memasang 1 m' bubung genteng glazzur

30,500.00

Page 109: Rencana Anggaran Biaya Pembangunan Gereja

Analisa Harga Satuan Pekerjaan Page 109

JUMLAH

Rp.

6=(3x5) 14,560.00 3,428.80 48,488.80

36,000.00 22,000.00 2,600.00 280.00 60,880.00 109,368.80

Memasang 1 m² atap genteng beton

80,300.00 649.50 80,949.50

18,000.00 11,000.00 1,100.00 1,400.00 31,500.00 112,449.50

Memasang 1 m' nok genteng beton

31,850.00 1,082.50 19,656.00 3,428.80 16,500.00 56,017.30

36,000.00 22,000.00 2,600.00 2,800.00 63,400.00 119,417.30

Memasang 1 m² atap sirap

138,000.00 4,330.00 142,330.00

14,940.00 27,500.00 3,250.00 1,120.00 46,810.00 189,140.00

Memasang 1 m' nok atap sirap

6,000.00 1,299.00 1,082.50 7,480.00 15,861.50

11,250.00 27,500.00 3,250.00 840.00 42,840.00 58,701.50

Memasang 1 m² atap seng gelombang Bjls 30

45,465.00 433.00

Page 110: Rencana Anggaran Biaya Pembangunan Gereja

Analisa Harga Satuan Pekerjaan Page 110

JUMLAH

Rp.

6=(3x5) 45,898.00

10,800.00 6,600.00 780.00 840.00 19,020.00 64,918.00

Memasang 1 m² atap seng gelombang Bjls 20

28,490.00 433.00 28,923.00

10,800.00 6,600.00 780.00 840.00 19,020.00 47,943.00

Memasang 1 m' atap bubungan seng Bjls 30

52,500.00 1,299.00 74,800.00

128,599.00

13,500.00 7,700.00 1,040.00 840.00 23,080.00 151,679.00

Menutup atap dengan genteng metal surya roof per m2

128,857.38 7,260.00 136,117.38

18,000.00 11,000.00 1,300.00 1,400.00 31,700.00 167,817.38

Menutup bubungan pada genteng metal Surya roof per m'

83,250.00 6,050.00 7,480.00 96,780.00

18,000.00 11,000.00 1,300.00 1,400.00 31,700.00 128,480.00

Menutup Atap dengan genteng Metal sakura roof per m2

73,377.68 7,260.00 80,637.68

18,000.00 11,000.00

Page 111: Rencana Anggaran Biaya Pembangunan Gereja

Analisa Harga Satuan Pekerjaan Page 111

JUMLAH

Rp.

6=(3x5) 1,300.00 1,400.00 31,700.00 112,337.68

Menutup bubungan pada genteng metal Sakura roof per m'

83,250.00 6,050.00 7,480.00 96,780.00

18,000.00 11,000.00 1,300.00 1,400.00 31,700.00 128,480.00

Pasang aluminium foil / sisalation per 1 M2

52,920.00 52,920.00

13,500.00 5,500.00 650.00 1,120.00 20,770.00 73,690.00

SNI 03-2838-2002 Memasang 1 m² langit-langit lambriziring kayu, tebal 9 mm

28,050.00 216.50 28,266.50

54,000.00 88,000.00 10,400.00 4,200.00 156,600.00 184,866.50

Memasang 1 m² langit-langit plywood ukuran (120 x 240) cm; tbl. 9 mm

57,750.00 649.50 58,399.50

9,000.00 11,000.00 1,300.00 700.00 22,000.00 80,399.50

Memasang 1 m² langit-langit plywood ukuran (120 x 240) cm; tbl. 3 mm

22,687.50 649.50 23,337.00

9,000.00 11,000.00 1,300.00 700.00

Page 112: Rencana Anggaran Biaya Pembangunan Gereja

Analisa Harga Satuan Pekerjaan Page 112

JUMLAH

Rp.

6=(3x5) 22,000.00 45,337.00

Memasang 1 m² langit-langit plywood ukuran (60 x 120) cm; tbl. 9 mm

57,750.00 649.50 58,399.50

6,300.00 11,000.00 1,300.00 490.00 19,090.00 77,489.50

Memasang 1 m² langit-langit plywood ukuran (60 x 120) cm; tbl. 3 mm

22,687.50 649.50 23,337.00

6,300.00 11,000.00 1,300.00 490.00 19,090.00 42,427.00

Memasang 1 m² langit-langit teakwood ukuran (60 x 120) cm; tbl. 4 mm dan 6 mm

57,900.00 649.50 58,549.50

6,300.00 11,000.00 1,300.00 490.00 19,090.00 77,639.50

Memasang 1 m² langit-langit lat kayu bengkirai

50,160.00 216.50 1,555.00 51,931.50

18,000.00 66,000.00 7,800.00 1,400.00 93,200.00 145,131.50

Memasang 1 m² langit-langit lat kayu meranti

44,880.00 216.50 1,555.00 46,651.50

18,000.00 66,000.00 7,800.00 1,400.00 93,200.00 139,851.50

Memasang 1 m² Plywood 9 mm, rangka kayu meranti

Page 113: Rencana Anggaran Biaya Pembangunan Gereja

Analisa Harga Satuan Pekerjaan Page 113

JUMLAH

Rp.

6=(3x5)

43,010.00 1,299.00 60,060.00 104,369.00

24,300.00 44,000.00 5,200.00 1,890.00 75,390.00 179,759.00

Memasang 1 m² Plywood 3mm, rangka kayu meranti

43,010.00 1,299.00 23,595.00 67,904.00

24,300.00 44,000.00 5,200.00 1,890.00 75,390.00 143,294.00

Memasang 1 m² langit-langit gypsum board uk. (120 x 240) cm, tebal 9 mm

33,196.80 3,421.00 36,617.80

9,000.00 5,500.00 650.00 700.00 15,850.00 52,467.80

Memasang 1 m' list gipsum

31,500.00 750.00 32,250.00

5,400.00 6,600.00 780.00 420.00 13,200.00 45,450.00

Memasang 1 m' list kayu profil

21,000.00 216.50 21,216.50

4,500.00 5,500.00 650.00 420.00 11,070.00 32,286.50

SNI Memasang 1 buah kloset duduk

Page 114: Rencana Anggaran Biaya Pembangunan Gereja

Analisa Harga Satuan Pekerjaan Page 114

JUMLAH

Rp.

6=(3x5) 1,650,000.00 99,000.00 1,650,000.00

297,000.00 121,000.00 130.00 22,400.00 440,530.00 2,090,530.00

Memasang 1 buah kloset jongkok porselen

239,775.00 10,920.00 1,071.50 251,766.50

90,000.00 165,000.00 195,000.00 22,400.00 472,400.00 724,166.50

Memasang 1 buah kloset jongkok teraso

106,480.00 5,940.00 10,920.00 1,071.50 124,411.50

90,000.00 165,000.00 39,000.00 15,400.00 309,400.00 433,811.50

Memasang 1 buah urinoir

2,462,350.00 738,705.00 10,920.00 1,071.50 3,213,046.50

90,000.00 110,000.00 13,000.00 14,000.00 227,000.00 3,440,046.50

Memasang 1 buah wastafel

1,375,000.00 165,000.00 10,920.00 1,071.50 1,551,991.50

108,000.00 159,500.00 19,500.00 14,000.00 301,000.00 1,852,991.50

Memasang 1 buah bak mandi fibreglass volume 0,30 m³

Page 115: Rencana Anggaran Biaya Pembangunan Gereja

Analisa Harga Satuan Pekerjaan Page 115

JUMLAH

Rp.

6=(3x5)

500,000.00 90,000.00 590,000.00

162,000.00 297,000.00 70,200.00 15,400.00 544,600.00 1,134,600.00

Memasang 1 buah bak mandi batu bata volume 0,30 m³

221,203.13 218,400.00 32,145.00 167,706.00 99,000.00 738,454.13

540,000.00 330,000.00 39,000.00 42,000.00 951,000.00 1,689,454.13

Memasang 1 buah badkip fiberglass

552,400.00 110,480.00 552,400.00

- 8,250.00 97,500.00 35,000.00 140,750.00 693,150.00

Membuat 1 buah bak beton volume 1m³

1,299,447.45 2,772,000.00 132,000.00 385,000.00 318,623.05 4,907,070.50

315,000.00 495,000.00 64,350.00 69,300.00 554,400.00

#REF!Memasang 1 buah bak kontrol pas. batu bata ukuran (30 x 30) cm tinggi 35 cm

93,456.99 80,080.00 7,500.50 16,940.00 24,640.00 6,429.00 229,046.49

288,000.00 111,650.00 195.00 2,240.00

Page 116: Rencana Anggaran Biaya Pembangunan Gereja

Analisa Harga Satuan Pekerjaan Page 116

JUMLAH

Rp.

6=(3x5) 402,085.00 631,131.49

Memasang 1 buah bak kontrol pas. batu bata ukuran (45 x 45) cm tinggi 60 cm

161,132.70 140,140.00 13,929.50 4,840.00 40,040.00 9,643.50 369,725.70

127,800.00 52,030.00 6,110.00 9,940.00 195,880.00 565,605.70

Memasang 1 buah bak kontrol pas. batu bata ukuran (60 x 60) cm tinggi 65 cm

239,121.09 207,480.00 19,715.60 7,986.00 74,690.00 12,858.00 561,850.69

194,400.00 79,200.00 9,360.00 15,120.00 14,000.00 312,080.00 873,930.69

Memasang 1 m' pipa PVC tipe AW Ø ½"

6,000.00 1,750.00 7,750.00

3,240.00 6,600.00 780.00 252.00 10,872.00 18,622.00

Memasang 1 m' pipa PVC tipe AW Ø ¾"

7,200.00 2,100.00 9,300.00

3,240.00 6,600.00 780.00 252.00 10,872.00 20,172.00

Memasang 1 m' pipa PVC tipe AW Ø 1"

9,990.00 2,913.75 12,903.75

3,240.00

Page 117: Rencana Anggaran Biaya Pembangunan Gereja

Analisa Harga Satuan Pekerjaan Page 117

JUMLAH

Rp.

6=(3x5) 6,600.00 780.00 252.00 10,872.00 23,775.75

Memasang 1 m' pipa PVC tipe AW Ø 1½"

18,360.00 5,355.00 23,715.00

3,240.00 6,600.00 780.00 252.00 10,872.00 34,587.00

Memasang 1 m' pipa PVC tipe AW Ø 2"

23,970.00 6,991.25 30,961.25

4,860.00 9,900.00 1,170.00 378.00 16,308.00 47,269.25

Memasang 1 m' pipa PVC tipe AW Ø 2½"

34,350.00 10,018.75 44,368.75

3,240.00 6,600.00 780.00 252.00 10,872.00 55,240.75

Memasang 1 m' pipa PVC tipe AW Ø 3"

41,940.00 12,232.50 54,172.50

7,290.00 14,850.00 1,755.00 574.00 24,469.00 78,641.50

Memasang 1 m' pipa PVC tipe AW Ø 4"

65,100.00 18,987.50 84,087.50

7,290.00 14,850.00 1,755.00 574.00 24,469.00 108,556.50

Memasang 1 buah bak cuci piring satinless steel

Page 118: Rencana Anggaran Biaya Pembangunan Gereja

Analisa Harga Satuan Pekerjaan Page 118

JUMLAH

Rp.

6=(3x5) 532,400.00 186,340.00 718,740.00

2,700.00 33,000.00 3,900.00 210.00 39,810.00 758,550.00

Memasang 1 buah kran Ø ¾" atau ½" Biasa

11,000.00 75.00 11,075.00

900.00 11,000.00 1,300.00 700.00 13,900.00 24,975.00

Memasang 1 buah kran Ø ¾" atau ½" stanlis

88,000.00 75.00 88,075.00

900.00 11,000.00 1,100.00 700.00 13,700.00 101,775.00

Memasang 1 buah floordrain

39,930.00 39,930.00

900.00 11,000.00 977,008.50 13,312.50 32,500.00

#REF!

Revisi SNI T-16-2002 Memasang 1 kg rangka atap baja

19,030.00 1,936.00 20,966.00

5,400.00 660.00 780.00 42.00 6,882.00 27,848.00

Memasang 1 kg Besi Profil

19,895.00 19,895.00

5,400.00

Page 119: Rencana Anggaran Biaya Pembangunan Gereja

Analisa Harga Satuan Pekerjaan Page 119

JUMLAH

Rp.

6=(3x5) 6,600.00 780.00 420.00 13,200.00 33,095.00

Mengerjakan 100 kg pekerjaan perakitan

9,900.00 3,990.00 13,890.00

9,000.00 11,000.00 130.00 700.00 448.80 21,278.80 35,168.80

Mengerjakan 1 cm pengelasan dengan las listrik

1,188.00 297.00 159.60 1,644.60

360.00 220.00 26.00 28.00 953.70 1,587.70 3,232.30

Memasang 1 m² pintu gulung (rolling door) besi

259,500.00 259,500.00

108,000.00 132,000.00 15,600.00 840.00 256,440.00 515,940.00

Memasang 1 m² pintu lipat (folding door)

2,462,400.00 2,462,400.00

39,600.00 48,400.00 5,720.00 3,080.00 96,800.00 2,559,200.00

Memasang 1 m² rolling door alumunium

1,271,105.00 1,271,105.00

90,000.00 110,000.00 13,000.00 7,000.00 220,000.00 1,491,105.00

Memasang 1 m² pintu alumunium

Page 120: Rencana Anggaran Biaya Pembangunan Gereja

Analisa Harga Satuan Pekerjaan Page 120

JUMLAH

Rp.

6=(3x5) 732,100.00 732,100.00

94,500.00 115,500.00 13,650.00 728.00 224,378.00 956,478.00

Memasang 1 m' Kusen Alumunium 4 "

219,615.00 20,000.00 4,791.60 244,406.60

3,870.00 4,730.00 559.00 294.00 9,453.00 253,859.60

1 M2 Pintu Kaca Rangka Alumunium SNI 7393 : 2008

878,460.00 157,500.00 21,562.20 1,057,522.20

7,650.00 9,350.00 1,170.00 700.00 18,870.00 1,076,392.20

1 M2 Daun Jendela Kaca Rangka Alumunium SNI DT 90-0014-2007

681,305.63 119,437.50 21,562.20 822,305.33

7,650.00 9,350.00 1,170.00 700.00 18,870.00 841,175.33

Memasang 1 m² terali besi

19,166.67 87,530.68 106,697.35

150,300.00 183,700.00 21,710.00 11,620.00 367,330.00 474,027.35

Memasang 1 m² kawat harmonika

20,570.00 433.00 3,366.00

Page 121: Rencana Anggaran Biaya Pembangunan Gereja

Analisa Harga Satuan Pekerjaan Page 121

JUMLAH

Rp.

6=(3x5) 24,369.00

9,000.00 11,000.00 1,300.00 70.00 21,370.00 45,739.00

Memasang 1 m² kawat nyamuk

20,570.00 42,213.60 35,910.85 98,694.45

4,950.00 6,050.00 715.00 38.50 11,753.50

#REF!Memasang 1 m² jendela nako & tralis

190,300.00 622.00 615.00 191,537.00

18,000.00 22,000.00 2,600.00 140.00 42,740.00 234,277.00

Memasang 1 m' talang datar seng BJLS 30

57,750.00 466.50 35,530.00 93,746.50

18,000.00 44,000.00 3,250.00 1,400.00 66,650.00 160,396.50

Memasang 1 m' talang miring seng BJLS 30

57,750.00 466.50 35,530.00 7,260.00 101,006.50

13,500.00 44,000.00 3,250.00 175.00 60,925.00 161,931.50

Memasang 1 m' talang ½ lingkaran Ø 10 cm, seng BJLS 30

57,750.00 3,110.00 12,300.00 73,160.00

Page 122: Rencana Anggaran Biaya Pembangunan Gereja

Analisa Harga Satuan Pekerjaan Page 122

JUMLAH

Rp.

6=(3x5)

13,500.00 27,500.00 3,250.00 175.00 44,425.00 117,585.00

Memasang 1 m' talang ½ lingkaran Ø 10 cm, seng BJLS 20

16,500.00 311.00 12,300.00 29,111.00

13,500.00 27,500.00 3,250.00 175.00 44,425.00 73,536.00

Memasang 1 m' talang U dari PVC

28,750.00 18,700.00 47,450.00

27,000.00 55,000.00 6,500.00 2,100.00 90,600.00 138,050.00

Memasang 1 buah kunci tanam kwalitas baik

211,750.00 211,750.00

5,400.00 66,000.00 7,800.00 420.00 79,620.00 291,370.00

Memasang 1 buah kunci tanam biasa

50,000.00 128,775.00

450.00 55,000.00 650.00 35.00 56,135.00 184,910.00

Memasang 1 buah kunci tanam kamar mandi

72,600.00 72,600.00

450.00 55,000.00 650.00

Page 123: Rencana Anggaran Biaya Pembangunan Gereja

Analisa Harga Satuan Pekerjaan Page 123

JUMLAH

Rp.

6=(3x5) 350.00 56,450.00 129,050.00

Memasang 1 buah engsel pintu

37,000.00 37,000.00

1,350.00 16,500.00 1,950.00 105.00 19,905.00 56,905.00

Memasang 1 buah engsel jendela kupu-kupu

22,000.00 22,000.00

900.00 11,000.00 1,300.00 70.00 13,270.00 35,270.00

Memasang 1 buah kait angin

19,800.00 19,800.00

1,350.00 16,500.00 1,950.00 105.00 19,905.00 39,705.00

Memasang 1 buah kunci selot

16,500.00 16,500.00

1,800.00 22,000.00 2,600.00 140.00 26,540.00 43,040.00

Memasang 1 buah pegangan pintu / door holder

330,000.00 330,000.00

4,500.00 55,000.00 6,500.00 350.00 66,350.00 396,350.00

Pasang door closer 1 buah

137,500.00 137,500.00

4,500.00

Page 124: Rencana Anggaran Biaya Pembangunan Gereja

Analisa Harga Satuan Pekerjaan Page 124

JUMLAH

Rp.

6=(3x5) 55,000.00 6,500.00 350.00 66,350.00 203,850.00

Pasang door stop 1 buah

27,500.00 27,500.00

9,000.00 1,100.00 1,300.00 70.00 11,470.00 38,970.00

Memasang 1 buah rel pintu dorong

2,298,600.00 2,298,600.00

5,400.00 66,000.00 7,800.00 420.00 79,620.00 2,378,220.00

Memasang 1 m² kaca polos; tebal 3 mm

124,410.00 124,410.00

1,350.00 16,500.00 1,950.00 105.00 19,905.00 144,315.00

Memasang 1 m² kaca polos; tebal 5 mm

190,300.00 190,300.00

1,350.00 16,500.00 1,950.00 105.00 19,905.00 210,205.00

Memasang 1 m² kaca ryben; tebal 3 mm

188,870.00 188,870.00

1,350.00 16,500.00 1,950.00 105.00 19,905.00 208,775.00

Memasang 1 m² kaca ryben; tebal 5 mm

261,580.00 196,432.50

Page 125: Rencana Anggaran Biaya Pembangunan Gereja

Analisa Harga Satuan Pekerjaan Page 125

JUMLAH

Rp.

6=(3x5) 742.50 9,075.00 1,072.50 57.75 10,947.75 207,380.25

Memasang 1 m² buram; tebal 3 mm

149,380.00 149,380.00

1,350.00 16,500.00 1,950.00 105.00 19,905.00 169,285.00

Memasang 1 m² buram; tebal 5 mm

245,960.00 245,960.00

1,350.00 16,500.00 1,950.00 105.00 19,905.00 265,865.00

Memasang 1 m² kaca cermin; tebal 3 mm

248,930.00 248,930.00

1,350.00 16,500.00 1,950.00 105.00 19,905.00 268,835.00

Memasang 1 m² kaca patri lokal

1,121,450.00 1,121,450.00

1,121,450.00

12,870.00 7,865.00 929.50 1,001.00 22,665.50 1,144,115.50

Memasang 1 m² lantai keramik ukuran 60 x 60 cm

465,850.00 17,472.00 4,821.75 21,450.00 509,593.75

63,000.00 38,500.00 4,550.00 4,200.00 110,250.00 619,843.75

Page 126: Rencana Anggaran Biaya Pembangunan Gereja

Analisa Harga Satuan Pekerjaan Page 126

JUMLAH

Rp.

6=(3x5)

Memasang 1 m² lantai keramik ukuran 40 x 40 cm

77,000.00 17,836.00 4,821.75 21,450.00 121,107.75

63,000.00 38,500.00 4,550.00 4,200.00 110,250.00 231,357.75

Memasang 1 m² lantai keramik ukuran 30 x 30 cm

66,000.00 18,200.00 4,821.75 24,750.00 113,771.75

63,000.00 38,500.00 4,550.00 4,200.00 110,250.00 224,021.75

Pasang lantai keramik 20 x 20 cm per 1 M2

71,500.00 18,928.00 4,500.30 24,750.00 119,678.30

63,000.00 38,500.00 4,550.00 4,200.00 110,250.00 229,928.30

Memasang 1 m² dinding keramik ukuran 20 x 20 cm

71,500.00 16,926.00 1,928.70 32,010.00 122,364.70

81,000.00 49,500.00 5,850.00 6,300.00 142,650.00 265,014.70

Memasang 1 m² dinding keramik ukuran 20 x 25 cm

77,000.00 16,926.00 1,928.70 32,010.00 127,864.70

81,000.00 49,500.00

Page 127: Rencana Anggaran Biaya Pembangunan Gereja

Analisa Harga Satuan Pekerjaan Page 127

JUMLAH

Rp.

6=(3x5) 5,850.00 6,300.00 142,650.00 270,514.70

Memasang 1 m² dinding porselin 11 x 11 cm

99,825.00 16,926.00 1,928.70 24,750.00 143,429.70

90,000.00 55,000.00 6,500.00 7,000.00 158,500.00 301,929.70

Memasang 1 m' plint keramik ukuran 10 x 20 cm

156,350.00 2,074.80 321.45 412.50 159,158.75

8,100.00 9,900.00 1,170.00 700.00 19,870.00 179,028.75

Memasang 1 m² lantai ubin granito ukuran 40 x 40 cm

279,600.00 17,836.00 4,821.75 21,450.00 323,707.75

22,500.00 13,750.00 1,690.00 1,820.00 39,760.00 363,467.75

Memasang 1 m² lantai ubin granito ukuran 40x 40 cm (motif khusus)

1,464,100.00 17,836.00 4,821.75 21,450.00 1,508,207.75

22,500.00 13,750.00 1,690.00 1,820.00 39,760.00 1,547,967.75

Memasang 1 m² lantai marmer ukuran 40 x 40 cm

213,000.00 17,836.00 4,821.75

Page 128: Rencana Anggaran Biaya Pembangunan Gereja

Analisa Harga Satuan Pekerjaan Page 128

JUMLAH

Rp.

6=(3x5) 21,450.00 257,107.75

63,000.00 38,500.00 4,550.00 4,900.00 110,950.00 368,057.75

Memasang 1 m² dinding batu alam

246,235.00 21,385.00 3,750.25 271,370.25

63,000.00 38,500.00 4,550.00 4,900.00 110,950.00 382,320.25

Memasang 1 m' plint kayu ukuran 2 x 10 cm

5,610.00 1,555.00 7,165.00

10,800.00 13,200.00 1,560.00 840.00 26,400.00 33,565.00

Memasang Koral Sikat Motif M2

225,000.00 25,771.20 2,464.45 253,235.65

54,000.00 165,000.00 11,700.00 8,400.00 239,100.00 492,335.65

SNI Mengikis / mengerok permukaan cat tembok lama 1 M2

665.00 665.00

13,500.00 350.00 13,850.00 14,515.00

1,000.00 1,000.00

Page 129: Rencana Anggaran Biaya Pembangunan Gereja

Analisa Harga Satuan Pekerjaan Page 129

JUMLAH

Rp.

6=(3x5) 13,500.00 350.00 13,850.00 14,850.00

1,000.00 1,000.00

13,500.00 350.00 13,850.00 14,850.00

Mendempul dan Menggosok 1 m² kayu

1,760.00 506.00 466.00 2,732.00

3,600.00 4,400.00 520.00 350.00 8,870.00 11,602.00

Mengecat 1 m² bidang kayu lama

3,300.00 4,114.00 8,041.00 15,455.00

6,300.00 8,250.00 975.00 350.00 15,875.00 31,330.00

Mengecat 1 m² bidang kayu baru (1 lps plamir, 1 lps cat dsr, 2 lps cat penutup)

4,840.00 3,300.00 4,114.00 12,298.00 24,552.00

6,300.00 990.00 780.00 350.00 8,420.00 32,972.00

Mengecat 1 m² bidang kayu baru (1 lps plamir, 1 lps cat dsr, 3 lps cat penutup)

4,840.00 3,300.00 4,114.00 16,555.00 28,809.00

6,300.00 11,550.00 520.00 350.00

Page 130: Rencana Anggaran Biaya Pembangunan Gereja

Analisa Harga Satuan Pekerjaan Page 130

JUMLAH

Rp.

6=(3x5) 18,720.00 47,529.00

Pelaburan bidang kayu dengan teak oil per 1 M2

12,024.00 12,024.00

3,600.00 6,600.00 2,080.00 350.00 12,630.00 24,654.00

Melabur 1 m² bidang kayu dengan politur

9,460.00 7,425.00 10,000.00 26,885.00

6,600.00 2,080.00 350.00 9,030.00 35,915.00

Melabur 1 m² bidang kayu dengan cat residu

3,360.00 3,360.00

9,000.00 840.00 9,840.00 13,200.00

Melabur 1 m² bidang kayu dengan vernis

7,425.00 1,100.00 500.00 176.00 9,201.00

14,400.00 17,600.00 2,080.00 350.00 34,430.00 43,631.00

Mengecat 1 m² bidang tembok baru (1 lps plamir, 1 lps cat dsr, 2 lps cat penutup)

836.00 2,420.00 6,006.00 9,262.00

1,800.00 6,930.00 819.00 350.00 9,899.00 19,161.00

Mengecat 1 m² bidang tembok lama (1 lps cat dsr, 2 lps cat penutup)

4,400.00 30,888.00 35,288.00

Page 131: Rencana Anggaran Biaya Pembangunan Gereja

Analisa Harga Satuan Pekerjaan Page 131

JUMLAH

Rp.

6=(3x5) 1,800.00 6,930.00 819.00 350.00 9,899.00 45,187.00

Pengecatan atap memakai cat khusus atap per m2

40,425.00 40,425.00

1,500.30 550.00 6,500.00 238.00 8,788.30 49,213.30

Pemasangan wall paper per 1 m2

111,840.00 7,700.00 119,540.00

1,800.00 22,000.00 260.00 350.00 24,410.00 143,950.00

Mengecat 1 m² permukaan baja dengan meni besi

2,420.00 176.00 2,596.00

1,800.00 22,000.00 2,600.00 1,400.00 27,800.00 30,396.00

Mengecat 1 m² permukaan baja dengan meni besi dan perancah

2,420.00 176.00 3,300.00 5,896.00

22,500.00 24,750.00 2,925.00 1,050.00 51,225.00 57,121.00

Page 132: Rencana Anggaran Biaya Pembangunan Gereja

I.1 Rangka Holow m2 #N/A0.8000 kg Profil holow #N/A #N/A0.1100 kg Paku sekrup #N/A #N/A0.1500 kg Kawat penggantung #N/A #N/A0.1000 oh Pekerja #N/A #N/A0.05 oh Tukang #N/A #N/A0.005 oh Kepala tukang #N/A #N/A0.0050 oh Mandor #N/A #N/A

Page 133: Rencana Anggaran Biaya Pembangunan Gereja

Page 133

DINAS PEKERJAAN UMUMKABUPATEN BULUNGAN

DAFTAR HARGA SATUAN BAHAN DAN UPAHTAHUN 2014

NO. U R A I A N SATUAN

HARGA HARGA HARGA HARGA HARGA HARGA HARGA HARGA

KETERANGAN

SATUAN 2012 SATUAN SATUAN SATUAN SATUAN SATUAN SATUAN Rp. BUL;UNGAN Rp. Rp. Rp. Rp. Rp. Rp.

Zona 1 Zona 2 Zona 3 Zona 4 Zona 5 Zona 6 Zona 7 Tjg.Selor Tg. Palas Tengah Sekatak Tg. Palas timur Peso Hilir PESO BUNYU

Tjg.Palas Tg.Palas Utara Tg. Palas Barat

1 2 3 4 5 6 7 8 9 10 11

A. UPAH TENAGA :Tukang

1 Tukang kayu hari 110,000 ### 110,000 110,000 110,000 110,000 110,000 110,000

2 Tukang batu hari 110,000 ### 110,000 110,000 110,000 110,000 110,000 110,000

3 Tukang besi hari 110,000 ### 110,000 110,000 110,000 110,000 110,000 110,000

4 Tukang las hari 110,000 ### 110,000 110,000 110,000 110,000 110,000 110,000

5 Tukang cat hari 110,000 ### 110,000 110,000 110,000 110,000 110,000 110,000

6 Tukang plitur hari 110,000 ### 110,000 110,000 110,000 110,000 110,000 110,000

7 Tukang bor hari 110,000 ### 110,000 110,000 110,000 110,000 110,000 110,000

8 Tukang listrik hari 110,000 ### 110,000 110,000 110,000 110,000 110,000 110,000

9 Tukang pipa ledeng hari 110,000 ### 110,000 110,000 110,000 110,000 110,000 110,000

10 Tukang kapur hari 110,000 ### 110,000 110,000 110,000 110,000 110,000 110,000

11 Tukang gali hari 110,000 ### 110,000 110,000 110,000 110,000 110,000 110,000 Kepala Tukang

12 Kepala tukang kayu hari 130,000 ### 130,000 130,000 130,000 130,000 130,000 130,000

13 Kepala tukang batu hari 130,000 ### 130,000 130,000 130,000 130,000 130,000 130,000

14 Kepala tukang besi hari 130,000 ### 130,000 130,000 130,000 130,000 130,000 130,000

15 Kepala tukang las hari 130,000 ### 130,000 130,000 130,000 130,000 130,000 130,000

16 Kepala tukang cat hari 130,000 ### 130,000 130,000 130,000 130,000 130,000 130,000

17 Kepala tukang plitur hari 130,000 ### 130,000 130,000 130,000 130,000 130,000 130,000

18 Kepala tukang bor hari 130,000 ### 130,000 130,000 130,000 130,000 130,000 130,000 Pekerja

19 Mandor hari 140,000 ### 140,000 140,000 140,000 140,000 140,000 140,000

20 Sopir hari 120,000 ### 120,000 120,000 120,000 120,000 120,000 120,000

21 Kernet / pembantu sopir hari 90,000 ### 90,000 90,000 90,000 90,000 90,000 90,000

22 Mekanik terlatih hari 130,000 ### 130,000 130,000 130,000 130,000 130,000 130,000 Operator

23 Operator tak terlatih hari 85,000 ### 85,000 85,000 85,000 85,000 85,000 85,000

24 Operator terlatih hari 120,000 ### 120,000 120,000 120,000 120,000 120,000 120,000

25 Operator semi terlatih hari 100,000 ### 100,000 100,000 100,000 100,000 100,000 100,000 Buruh

26 Buruh terlatih hari 90,000 ### 90,000 90,000 90,000 90,000 90,000 90,000

27 Buruh semi terlatih hari 85,000 ### 85,000 85,000 85,000 85,000 85,000 85,000

28 Buruh tak terlatih hari 80,000 ### 80,000 80,000 80,000 80,000 80,000 80,000

B. B A H A N :Kelompok Material Alam :Tanah

1 Tanah urug m³ 61,875 ### 61,900 61,900 61,900 61,900 61,900 330,000

2 Tanah urug Pilihan m³ 66,000 ### 66,000 66,000 66,000 66,000 66,000 412,500

Pasir dan Tanah1 Pasir urug m³ 100,800 ### 198,000 220,000 110,000 100,800 187,000 385,000

2 Pasir batu (sirtu) m³ 121,000 198,000 275,000 137,500 121,000 149,100 465,900

3 Pasir pasang / Pasir Beton m³ 107,150 ### 267,630 242,000 310,640 168,000 190,400 453,200

4 Tanah Timbunan m3 82,500 82,500 82,500 82,500 91,667 110,000 110,000

5 Tanah Timbunan Pilihan m3 140,000 90,750 90,750 90,750 100,833 121,000 121,000

Batu6 Batu gunung m³ 392,000 297,000 278,438 625,000 278,438 371,250 696,900

7 Batu belah 15/20 m³ 431,200 ### 459,900 429,000 681,400 431,200 574,900 766,600

8 Batu kali besar m³ 177,760 ### 177,760 177,760 381,260 177,760 192,500 495,000

9 Batu kali kecil m³ 177,760 ### 177,760 177,760 381,260 177,760 192,500 495,000

10 Kerikil sungai m³ 242,000 ### 165,000 242,000 357,280 242,000 242,000 495,000

11 Batu teraso kg 13,600 ### 13,900 14,000 14,000 14,100 14,300 14,200

12 Batu granito kg 13,600 ### 13,900 14,000 14,000 14,100 14,300 14,200

13 Abu Batu m³ 641,667 684,400 440,000 891,667 703,450 1,650,000 1,265,000

Koral Sikat Zak 75,000 80,000 75,000 118,500 75,000 100,000 133,300

Batu Pecah Tangan14 Batu pecah tangan 2-3 cm (split) m³ 595,833 ### 385,000 396,000 845,833 412,500 1,595,000 1,210,000

15 Batu pecah tangan 3-5 cm m³ 595,833 385,000 396,000 845,833 412,500 1,595,000 1,210,000

16 Batu pecah tangan 5-7 cm m³ 595,833 385,000 396,000 845,833 412,500 1,595,000 1,210,000

Batu Pecah Mesin17 Batu pecah mesin 0,5-1 cm m³ 641,667 440,000 440,000 891,667 703,450 1,650,000 1,265,000

18 Batu pecah mesin 1-2 cm m³ 641,667 440,000 440,000 891,667 703,450 1,650,000 1,265,000

19 Batu pecah mesin 2-3 cm m³ 641,667 440,000 440,000 891,667 703,450 1,650,000 1,265,000

20 Batu pecah mesin 3-5 cm m³ 641,667 440,000 440,000 891,667 703,450 1,650,000 1,265,000

Batu Tempel21 Batu Tempel (muka segi 6) tebal 10 cm buah21 Batu Tempel Palimanan Hijau m² 223,850 227,100 227,400 227,900 227,600 228,100 228,000

22 Batu Tempel Palimanan Kuning m² 266,200 270,000 270,500 271,100 270,700 271,300 271,200

23 Batu Tempel (Tidak Beraturan) Kecil m² 199,650 202,500 202,800 203,300 203,000 203,500 203,400

24 Batu Tempel (Tidak Beraturan) Besar m² 199,650 202,500 202,800 203,300 203,000 203,500 203,400

25 Batu Candi Tempel 20/20, 5/20 m² 146,410 148,500 148,800 149,100 148,900 149,200 149,100

Batu Bata26 Batu bata ukuran 8 x 8 x 16 cm buah 990 1,100 1,300 1,200 1,320 1,200 1,870

27 Batu bata bali buah 1,175 ### 1,200 1,300 1,400 1,400 1,500 2,200

28 Batako buah 2,750 ### 3,300 3,300 4,400 4,400 3,520 ###

29 Kapur pasang m3 232,925 251,600 270,200 279,500 279,500 298,100 298,100

Kelompok Kayu & Langit-langit30 Kayu Jati

a. Kayu Jati Klas 2 : Balok 8/15 m³ 14,241,700 14,448,600 14,456,400 14,491,600 14,475,900 14,511,100 14,511,100

b. Kayu Jati Klas 3 : Balok 8/15 m³ 14,241,700 14,448,600 14,456,400 14,491,600 14,475,900 14,511,100 14,511,100

c. Papan kayu jati m³ 14,241,700 14,448,600 14,456,400 14,491,600 14,475,900 14,511,100 14,511,100

31 Kayu Kampera. Kayu Kamper : Balok 8/15 m³ 2,090,000 1,811,300 1,741,700 1,741,700 1,741,700 1,811,300 2,786,700

b. Kayu Kamper : 5/7 & 4/6 m³ 2,090,000 1,811,300 1,741,700 1,741,700 1,741,700 1,811,300 2,786,700

c. Kayu Kamper : 3/4 & 3/5 m³ 2,090,000 1,811,300 1,741,700 1,741,700 1,741,700 1,811,300 2,786,700

d. Kayu Kamper : 2/3 m³ 2,090,000 1,811,300 1,741,700 1,741,700 1,741,700 1,811,300 2,786,700

e. Papan kamper m³ 2,090,000 1,811,300 1,741,700 1,741,700 1,741,700 1,811,300 2,786,700

32 Kayu Bangkiraia. Kayu Bangkirai : Balok 10/10 m³ 2,035,000 ### 1,763,700 1,695,800 2,200,000 1,540,000 1,763,700 3,080,000

b. Kayu Bangkirai : Balok 8/15 m³ 2,090,000 ### 1,811,300 1,741,700 2,200,000 1,741,700 1,811,300 3,080,000

c. Kayu Bangkirai : 5/7 & 4/6 m³ 2,090,000 ### 1,811,300 1,741,700 2,200,000 1,650,000 1,811,300 3,080,000

d. Kayu Bangkirai : 3/4 & 3/5 m³ 2,310,000 ### 2,002,000 1,925,000 2,200,000 1,925,000 2,002,000 3,080,000

e. Kayu Bangkirai : 2/3 m³ 2,310,000 ### 2,002,000 1,925,000 2,200,000 1,925,000 2,002,000 3,080,000

f. Papan bangkirai ( 2 x 20 x 400 ) m³ 2,090,000 ### 1,811,300 1,741,700 2,200,000 1,650,000 1,811,300 3,080,000

g. Papan bangkirai ( 2 x 25 x 400 ) m³ 2,090,000 ### 1,811,300 1,741,700 2,200,000 1,741,700 1,811,300 3,080,000

h Papan bangkirai ( 2 x 30 x 400 ) m³ 2,090,000 ### 1,811,300 1,741,700 2,200,000 1,741,700 1,811,300 3,080,000

33 Kayu Kruing / Lembasunga. Kayu Kruing : Balok 8/15 m³ 1,870,000 1,620,700 1,558,300 2,200,000 1,558,300 1,620,700 1,980,000

b. Kayu Kruing : 5/7 & 4/6 m³ 1,870,000 1,620,700 1,558,300 2,200,000 1,558,300 1,620,700 1,980,000

c. Kayu Kruing : 3/4 & 3/5 m³ 1,870,000 1,620,700 1,558,300 2,200,000 1,558,300 1,620,700 1,980,000

d. Kayu Kruing : 2/3 m³ 1,870,000 1,620,700 1,558,300 2,200,000 1,558,300 1,620,700 1,980,000

34 Kayu Merantia. Kayu Kalimantan ( Meranti ) : Balok 10/1 m³ 1,870,000 ### 1,726,200 1,654,200 1,650,000 1,320,000 1,726,200 2,589,200

b. Kayu Kalimantan ( Meranti ) : Balok 8/15 m³ 1,870,000 ### 1,726,200 1,654,200 1,650,000 1,654,200 1,726,200 2,589,200

c. Kayu Kalimantan ( Meranti ) 5/7 & 4/6 m³ 1,870,000 ### 1,726,200 1,654,200 1,650,000 1,654,200 1,726,200 2,589,200

d. Kayu Kalimantan ( Meranti ) : 3/4 & 3/5 m³ 1,870,000 ### 1,726,200 1,654,200 1,650,000 1,654,200 1,726,200 2,589,200

e. Kayu Kalimantan ( Meranti ) : 2/3 m³ 1,870,000 ### 1,726,200 1,654,200 1,650,000 1,654,200 1,726,200 2,589,200

f. Papan Meranti ( 2 x 20 x 400 ) m³ 1,870,000 ### 1,726,200 1,654,200 1,650,000 1,320,000 1,726,200 2,589,200

g Papan Meranti ( 2 x 25 x 400 ) m³ 1,870,000 ### 1,726,200 1,654,200 1,650,000 1,654,200 1,726,200 2,589,200

35 Kayu Ulina Kayu Ulin : 5/10 m³ 3,850,000 ### 3,850,000 3,300,000 3,850,000 3,080,000 3,300,000 6,050,000

b. Kayu Ulin : 10/10 m³ 3,850,000 ### 3,850,000 3,575,000 3,850,000 3,575,000 3,850,000 6,050,000

c. Kayu Ulin : 12/12 m³ 3,850,000 ### 3,850,000 3,575,000 3,850,000 3,575,000 3,850,000 6,050,000

d Kayu Ulin : 15/15 m³ 4,400,000 ### 4,400,000 3,575,000 3,850,000 3,575,000 3,850,000 6,050,000

e. Kayu Ulin : 20/20 m³ 6,050,000 ### 5,610,000 4,675,000 ### 4,675,000 5,610,000 6,050,000

f Papan Ulin ( 2,5 x 20 x 400 ) m³ 3,850,000 ### 3,850,000 3,575,000 3,850,000 3,080,000 4,400,000 6,820,000

g Papan Ulin ( 5 x 20 x 400 ) m³ 4,950,000 ### 4,950,000 3,575,000 3,850,000 3,575,000 4,400,000 8,250,000

h Papan Ulin ( 9 x 25 x 400 ) m³ 4,950,000 ### 5,610,000 4,400,000 ### 4,400,000 4,400,000 8,250,000

i Papan Ulin ( 2,5 x 20 x 200 ) m³ 3,850,000 ### 3,850,000 3,575,000 3,850,000 3,080,000 4,400,000 6,820,000

Page 134: Rencana Anggaran Biaya Pembangunan Gereja

Page 134

Kayu Begesting, Perancah, Dolken36 Kayu Rawa (merah) m³ 990,000 1,100,000 1,430,000 1,100,000 1,320,000 1,650,000 1,440,000

37 Papan Cetak ( kayu rawa ) uk 2 x 20 x 400 m³ 990,000 1,100,000 1,430,000 1,100,000 1,320,000 1,650,000 1,440,000

38 Kayu bakar m³ 49,500 ### 49,500 49,500 ### 49,500 49,500 ###

39 Kayu stoot ( bambu ), 5 m btg 5,500 5,000 4,800 4,800 4,800 5,000 8,000

40 Kayu perancah 4m btg 16,000 ### 14,500 13,800 13,800 13,800 14,500 23,300

41 Kayu perancah m³ 1,650,000 ### 1,650,000 1,650,000 1,650,000 1,650,000 1,650,000 2,420,000

42 Dolken Ø 5 kayu rawa (merah) btg 17,600 16,000 15,200 15,200 15,200 16,000 33,000

43 Dolken Ø 12 kayu rawa (merah) btg 33,000 30,000 28,500 28,500 28,500 30,000 48,000

Lain-lain44 Ijuk kg 31,600 32,100 32,100 32,200 32,100 32,200 32,200

45 Pintu Kayu panil ukuran 80 x 220 cm buah 732,050 742,700 743,100 744,900 744,100 745,900 745,900

Teakwood46 Teakwood tebal 3 mm lbr 133,100 135,000 135,100 135,400 135,300 135,600 135,600

47 Teakwood tebal 3 mm uk. 90 x 120 cm lbr 93,200 94,600 94,600 94,800 94,700 95,000 95,000

48 Teakwood tebal 4 mm uk. 90 x 210 cm lbr 113,100 114,700 114,800 115,100 115,000 115,200 115,200

49 Teakwood tebal 4 mm uk. 120 x 240 cm lbr 154,400 156,600 156,700 157,100 156,900 157,300 157,300

Multiplek50 Multipleks 9 mm lbr 154,000 156,200 156,300 156,700 156,500 156,900 156,900

51 Multipleks 12 mm lbr 203,500 206,500 206,600 207,100 206,800 207,300 207,300

Board Pabrikasi52 lbr 81,200 82,400 82,400 82,600 82,500 82,700 82,700

53 Gipsum Board lbr 91,200 92,525 92,600 92,800 92,700 92,925 ###

54 Asbes Datar uk. 100x100 lbr 17,300 17,600 17,600 17,600 17,600 17,600 17,600

55 GRC Board lbr 76,230 77,300 77,400 77,600 77,500 77,700 77,700

56 E t e r n i t m² 20,000 20,300 20,300 20,400 20,300 20,400 20,400

Plywood57 Plywood 3 mm uk. 90 x 220 cm lbr 60,500 61,400 61,400 77,000 61,500 61,600 61,600

58 Plywood 4 mm lbr 68,200 69,200 69,200 69,400 69,300 69,500 69,500

59 Plywood 9 mm uk. 120 x 240 mm lbr 154,000 156,200 156,300 156,700 156,500 156,900 156,900

List Kayu Profil60 List Kayu Profil 1/3 m' 13,300 13,500 13,600 13,500 13,600 13,600 13,700

61 List Kayu Profil 1/5 m' 20,000 20,300 20,400 20,400 20,400 20,400 20,500

62 List Kayu Profil 2/4 m' 20,000 20,300 20,400 20,400 20,400 20,400 20,500

List Gipsum m' 30,000 30,500 30,600 30,500 30,600 30,600 30,800

Tepung Gipsum Kg 5,000 5,100 5,100 5,100 5,100 5,100 5,100

63 Triplek 4 mm uk 120 x 240 lbr 73,200 74,300 74,700 74,500 74,700 74,700 75,200

Kelompok Fiber, Besi& BajaPaku & Baut

64 Paku biasa kg 21,650 22,000 22,000 22,000 22,000 22,800 19,800

65 Paku ulin kg 27,500 28,050 28,600 29,700 ### 30,800 29,700

66 Paku besi kg 31,100 31,500 31,600 31,700 31,700 31,700 31,800

67 Paku atap metal kg 30,250 30,800 30,900 31,200 31,200 33,600 30,800

68 Paku seng gelombang kg 25,300 25,800 25,900 26,100 27,500 28,100 27,500

69 Baut Ø 1/2 - 45 cm buah 33,000 33,400 33,800 34,600 33,900 35,500 33,900

70 Mur Baut Panjang buah 26,400 26,800 27,100 27,700 27,100 28,400 27,100

71 Mur Baut Pendek buah 24,200 24,500 24,800 25,400 24,900 26,100 24,900

Besi72 Besi beton polos kg 15,400 15,700 16,800 21,300 19,000 22,400 21,300

73 Besi beton ulir kg 16,500 16,800 18,000 22,800 20,400 24,000 22,800

74 Besi beton U-24 kg 15,400 15,700 16,800 21,300 19,000 22,400 21,300

75 Besi beton U-39 kg 16,720 17,000 18,200 23,100 20,700 24,300 23,100

76 Besi Strip ( tebal 5 mm, lebar 5 cm ) kg 24,600 25,000 25,000 25,000 25,000 25,100 25,100

77 Besi Strip ( tebal 3 mm - 12 m ) lembar 20,000 20,300 20,300 20,400 20,300 20,400 20,400

78 Besi klam U buah 18,700 19,250 19,800 20,900 ### 22,000 19,800

79 Besi hollow 4 x 4 cm tebal 1.2 mm m' 38,500 39,100 39,100 39,200 39,100 39,200 39,200

80 Kanopi ( Besi Tempa ) m² 1,064,800 1,080,300 1,081,900 1,084,000 1,082,700 1,085,100 1,084,800

Pagar BRC81 Pagar BRC Galvanis 90 x 240 cm lbr 299,475 304,900 326,700 413,800 370,300 435,600 413,800

82 Pagar BRC Galvanis 120 x 240 cm lbr 366,025 372,700 399,300 505,800 452,500 532,400 505,800

83 Tiang BRC Galvanis panjang 120 cm btg 106,500 108,400 116,200 147,200 131,700 154,900 147,200

84 Tiang BRC Galvanis panjang 150 cm btg 126,400 128,700 137,900 174,700 156,300 183,900 174,700

Pintu85 Pintu PVC (lengkap; kusen + daun) unit 385,000 392,000 420,000 532,000 476,000 560,000 532,000

86 Rolling Door Besi m² 259,500 264,200 283,100 358,600 320,800 377,500 358,600

87 Folding Door ( 3x2,5 ) m² 2,462,400 2,507,200 2,686,300 3,402,600 3,044,400 3,581,700 3,402,600

88 Rell Pintu Dorong / 5m' Bh 2,298,600 2,340,400 2,507,600 3,176,200 2,841,900 3,343,400 3,176,200

Kawat89 Kawat duri roll 90,750 104,400 105,300 106,200 107,100 108,900 105,300

90 Kawat duri kg 10,100 11,600 11,700 11,800 11,900 12,100 11,700

91 Kawat harmonika 4 x 4 cm m² 18,700 21,500 21,700 21,900 22,100 22,400 21,700

92 Kawat Ayam m² 17,600 20,200 20,400 20,600 22,000 21,100 20,400

93 Kawat beton (bindrad) kg 22,000 25,300 27,500 34,900 39,000 44,600 25,400

94 Kawat bronjong Q 4 mm kg 34,100 39,200 39,600 39,900 40,200 40,900 39,600

95 Kawat galvanis Q 1 mm kg 70,500 81,100 81,800 82,500 83,200 84,600 81,800

96 Kawat Las kg 33,000 38,000 38,300 38,600 38,900 39,600 38,300

97 Kawat Las Listrik RD 26 kg 29,700 34,200 34,500 34,700 35,000 35,600 34,500

98 Kawat Las Listrik RB 26 kg 154,000 177,100 178,600 180,200 181,700 184,800 178,600

Baja99 Bondex ( plat beton ) m² 163,600 166,000 166,200 166,500 166,300 166,700 166,700

100 Wiremesh M6 m² 105,500 107,000 107,200 107,400 107,300 107,500 107,500

101 Baja plat lembar 425,900 432,100 432,700 433,500 433,000 434,100 433,900

102 Baja siku L 50.50.4 kg 15,000 15,200 15,200 15,300 15,300 15,300 15,300

103 Baja IWF kg 17,300 17,600 17,600 17,600 17,600 17,600 17,600

104 Pengadaan rangka baja ringan m² 308,000 312,500 312,900 313,500 313,100 313,900 313,800

Acesories Daun Pintu & Daun JendelaLain-lain

105 Door closer 137,500 158,100 159,500 160,900 162,300 163,600 165,000

106 Door stoper 27,500 31,600 31,900 32,200 32,500 32,700 33,000 Kunci tanam

Kunci tanam kwalitas baik buah 211,750 243,500 245,600 247,800 249,900 252,000 254,100

Kunci tanam biasa buah 50,000

Kunci putar kamar mandi buah 72,600 83,500 84,200 84,900 85,700 86,400 87,100

Engsel107 Engsel pintu Nylon (kwalitas prima) buah 143,000 164,500 165,900 167,300 168,700 170,200 171,600

108 Engsel pintu kuningan buah 37,000 42,600 42,900 43,300 43,700 44,000 44,400

109 Engsel jendela Nylon buah 9,900 11,400 11,500 11,600 11,700 11,800 11,900

110 Engsel jendela kuningan buah 22,000 25,300 25,500 25,700 26,000 26,200 26,400

Kait Angin111 Kait angin 6" psg 5,500 6,300 6,400 6,400 6,500 6,500 6,600

112 Kait angin 8" psg 19,800 22,800 23,000 23,200 23,400 23,600 23,800

113 Kait angin 10" psg 24,200 27,800 28,100 28,300 28,600 28,800 29,000

Hak Angin114 Hak angin biasa buah 11,000 12,700 12,800 12,900 13,000 13,100 13,200

115 Hak angin kualitas baik buah 22,000 25,300 25,500 25,700 26,000 26,200 26,400

Grendel116 Grendel biasa buah 5,500 6,300 6,400 6,400 6,500 6,500 6,600

117 Grendel kualitas baik buah 16,500 19,000 19,100 19,300 19,500 19,600 19,800

Handle118 Tarikan / Pegangan pintu kwalitas baik buah 330,000 379,500 382,800 386,100 389,400 392,700 396,000

119 Tarikan / Pegangan pintu biasa buah 275,000 316,300 319,000 321,800 324,500 327,300 330,000

120 Tarikan / Pegangan pintu aluminium buah 385,000 442,800 446,600 450,500 454,300 458,200 462,000

Kelompok AluminiumPlat aluminium

121 Aluminium composite panel 3 mm + rangka m² 465,850 475,200 477,200 477,800 480,700 488,100 490,700

122 Aluminium composite panel 4 mm + rangka m² 512,400 522,600 524,900 525,500 528,700 536,900 539,700

123 Aluminium foil m² 50,400 51,400 51,600 51,700 52,000 52,800 53,100

Kusen Aluminium124 Kusen Almunium 4" Coklat m' 199,650 203,600 204,500 204,800 206,000 209,200 210,300

125 Kusen Almunium 4" Putih m' 146,400 149,300 150,000 150,100 151,100 153,400 154,200

Pintu+Kaca Aluminium126 Pintu Kaca Rayban Alumunium 4" Putih unit 2,435,700 2,484,400 2,495,000 2,498,000 2,513,200 2,552,000 2,565,700

127 Pintu Kaca Bening Alumunium 4" Putih unit 2,395,800 2,443,700 2,454,100 2,457,100 2,472,100 2,510,200 2,523,700

128 Pintu Kaca Rayban Alumunium 4" Coklat unit 2,701,900 2,755,900 2,767,700 2,771,000 2,787,900 2,830,900 2,846,100

129 Pintu Kaca Bening Alumunium 4" Coklat unit 2,662,000 2,715,200 2,726,800 2,730,100 2,746,700 2,789,100 2,804,100

Jendela+Kaca Aluminium130 Jendela Kaca Rayban Alumunium 4" Putih Engsel S unit 599,000 611,000 613,400 615,200 618,100 627,800 624,800

131 Jendela Kaca Rayban Alumunium 4" Putih Engsel A unit 599,000 611,000 613,400 615,200 618,100 627,800 624,800

132 Jendela Kaca Bening Alumunium 4" Putih Engsel S unit 532,400 543,000 545,200 546,800 549,400 558,000 555,300

133 Jendela Kaca Bening Alumunium 4" Putih Engsel Ay unit 532,400 543,000 545,200 546,800 549,400 558,000 555,300

134 Jendela Kaca Rayban Alumunium 4" Coklat Engsel unit 665,500 678,800 681,500 683,500 686,800 697,400 694,100

135 Jendela Kaca Rayban Alumunium 4" Coklat Engsel unit 665,500 678,800 681,500 683,500 686,800 697,400 694,100

136 Jendela Kaca Bening Alumunium 4" Coklat Engsel unit 599,000 611,000 613,400 615,200 618,100 627,800 624,800

137 Jendela Kaca Bening Alumunium 4" Coklat Engsel unit 599,000 611,000 613,400 615,200 618,100 627,800 624,800

138 Jendela Kaca Mati Rayban Alumunium 4" m² 825,200 841,700 845,000 847,500 851,600 864,800 860,700

139 Jendela Kaca Mati Bening Alumunium 4" m² 758,700 773,900 776,900 779,200 783,000 795,100 791,400

Hardpleks 0,35 mm 1,22 x 2,44 m, kalsiboard (tahan api)

Page 135: Rencana Anggaran Biaya Pembangunan Gereja

Page 135

Pintu Aluminium140 Pintu Lipat Varia m² 1,904,700 1,942,800 1,950,400 1,956,100 1,965,600 1,996,100 1,986,600

141 Rolling Door Alumunium m² 1,271,105 1,296,500 1,301,600 1,305,400 1,311,800 1,332,100 1,325,800

142 Pintu Alumunium m² 732,100 746,800 749,700 751,900 755,500 767,200 763,600

143 Pintu almunium unit 1,264,450 1,289,800 1,294,800 1,298,600 1,304,900 1,325,100 1,318,800 Jendela BV Aluminium

144 Jendela Casemen standard BV tanpa kaca (A 4,5m' Bh 600,350 612,400 614,700 616,500 619,600 629,100 626,200

145 Jendela Casemen standard BV tanpa kaca (A 4,5m' Bh 675,400 688,900 691,600 693,600 697,000 707,700 704,500

146 Jendela Casemen BV tanpa kaca (A 2,8m' )Gloss Bh 469,050 478,400 480,300 481,700 484,100 491,500 489,200

147 Jendela Casemen BV tanpa kaca (A 2,8m' )Doff Bh 515,875 526,200 528,200 529,800 532,400 540,600 538,100 Jendela Sliding Aluminium

148 Jendela Sliding ekonomi standard kaca ( A 4,5 m') G Bh 598,950 610,900 555,900 615,200 618,100 627,700 624,700

149 Jendela Sliding ekonomi standard kaca ( A 4,5 m') D Bh 469,050 478,400 435,300 481,700 484,000 491,600 489,200 Jalusi Aluminium

150 Louvre( Jalusi ) 7 cm,coklat,merk superex m' 30,050 ### 30,600 30,800 30,800 31,000 31,500 32,700

151 Louvre( Jalusi ) 10 cm,coklat,merk superex m' 60,000 ### 61,100 61,400 61,500 61,900 62,800 65,200 Rangka Plafon & Dinding

152 Plafon spandel,coklat,merk superex m² 431,425 ### 440,100 441,800 443,100 445,200 452,200 450,000

153 Rangka curtain wall,coklat,merk superex m² 337,625 ### 344,400 345,700 346,700 348,500 353,800 352,200

154 Sunscren Alumunium m² 753,975 ### 769,100 772,100 774,400 778,100 790,200 786,400 Lain-lain

155 Sealent Kg 79,860 81,500 81,800 82,000 82,500 83,700 83,400

156 Puzzdith - 100 XR Liter 41,625 42,500 42,600 42,800 43,000 43,600 43,500 Profil Kaca m' 35,000 35,700 35,800 35,900 36,100 36,700 36,600

Kelompok Penutup Lantai & Dinding :Keramik Lantai

157 Keramik polos kw. 1 ukuran 20 x 20 cm m² 71,500 72,600 72,700 72,800 72,700 72,900 72,900

158 Keramik motif kw. 1 ukuran 20 x 20 cm m² 71,500 72,600 72,700 72,800 72,700 72,900 72,900

159 Keramik polos kw.1 ukuran 30 x 30 cm m² 66,000 67,000 67,100 67,200 67,100 67,300 67,300

160 Keramik motif kw.1 ukuran 30 x 30 cm m² 71,500 72,600 72,700 72,800 72,700 72,900 72,900

161 Keramik motif granit kw.1 ukuran 30 x 30 cm m² 199,650 202,600 202,900 203,200 203,100 203,500 203,500

162 Keramik polos kw.1 ukuran 40 x 40 cm m² 77,000 78,100 78,200 78,400 78,300 78,500 78,500

163 Keramik motif kw.1 ukuran 40 x 40 cm m² 93,500 94,900 95,000 95,200 95,100 95,300 95,300

164 Keramik motif granit kw.1 ukuran 40 x 40 cm m² 266,200 270,200 270,500 271,000 270,800 271,400 271,400

165 Keramik polos kw.1 ukuran 60 x 60 cm m² 192,500 195,400 195,600 196,000 195,800 196,200 196,200

166 Keramik motif kw.1 ukuran 60 x 60 cm m² 192,500 195,400 195,600 196,000 195,800 196,200 196,200

167 Keramik motif granit kw.1 ukuran 60 x 60 cm m² 465,850 472,800 473,400 474,200 473,800 474,900 474,900

Keramik Dinding168 Keramik dinding polos kw.1 ukuran 20 x 25 cm m² 77,000 78,100 78,200 78,400 78,300 78,500 78,500

169 Keramik dinding motif kw.1 uikuran 20 x 25 cm m² 77,000 78,100 78,200 78,400 78,300 78,500 78,500

170 Keramik dinding polos kw 1 uk. 10 x 20 cm m² 60,500 61,400 61,500 61,600 61,500 61,700 61,700

171 Keramik dinding polos kw 1 uk. 10 x 25 cm m² 65,000 66,000 66,100 66,200 66,100 66,300 66,300

Lain-lain172 Stepnozing anak tangga m' 38,500 39,100 39,100 39,200 39,200 39,200 39,200

173 List keramik m' 27,500 27,900 27,900 28,000 28,000 28,000 28,000

174 Keramik siku m' 2,200 2,200 2,200 2,200 2,200 2,200 2,200

Granit 175 Granit Import m² 1,464,100 1,485,900 1,487,800 1,490,500 1,489,200 1,492,500 1,492,500

176 Granito uk. 30 x 30 cm buah 43,900 44,600 44,600 44,700 44,700 44,800 44,800

177 Granito uk. 40 x 40 cm buah 46,600 47,300 47,400 47,400 47,400 47,500 47,500

Keramik Artistik178 Keramik Artistik 10/20 ; buah 29,500 29,900 30,000 30,000 30,000 30,100 30,100

179 Keramik Artistik 10/10 buah 14,800 15,000 15,000 15,100 15,100 15,100 15,100

180 Porselin 11 x 11 cm m² 99,825 101,300 101,400 101,600 101,500 101,800 101,800

181 Mozaik 20 x 20 cm m² 525,000 532,800 533,500 534,500 534,000 535,200 535,200

182 Mozaik 30 x 30 cm m² 552,400 560,600 561,400 562,400 561,900 563,100 563,100

Marmer183 marmer 40 x 40 x 2 m² 213,000 216,200 216,500 216,800 216,600 217,100 217,100

184 marmer 60 x 60 x 2 m² 339,400 344,400 344,900 345,500 345,200 346,000 346,000

185 marmer 30 x 30 x 2 m² 159,700 162,100 162,300 162,600 162,400 162,800 162,800

186 marmer 30 x 10 x 2 m² 133,100 135,100 135,300 135,500 135,400 135,700 135,700

Ubin PC187 Ubin PC abu - abu buah 5,300 5,400 5,400 5,400 5,400 5,400 5,400

188 Ubin plint PC abu - abu buah 4,700 4,800 4,800 4,800 4,800 4,800 4,800

189 Ubin PC warna buah 8,000 8,100 8,100 8,100 8,100 8,200 8,200

190 Ubin plint PC warna buah 6,700 6,800 6,800 6,800 6,800 6,800 6,800

Parquet191 Parquet indoor m² 173,000 175,600 175,800 176,100 176,000 176,400 176,400

192 Parquet outdoor m² 266,200 270,200 270,500 271,000 270,800 271,400 271,400

Paving193 Paving blok natural segi 4 tb. 6 cm (K.175) kw. 1 m² 79,900 84,700 89,600 92,000 92,000 96,800 96,800

194 Paving blok natural segi 6 tb. 6 cm (K.175) kw. 1 m² 99,825 105,900 111,900 115,000 115,000 121,000 121,000

195 Paving blok natural segi 4 tb. 8 cm (K.175) kw. 1 m² 93,200 98,800 104,500 107,300 107,300 113,000 113,000

196 Paving blok natural segi 6 tb. 8 cm (K.175) kw. 1 m² 109,100 115,700 122,300 125,600 125,600 132,200 132,200

197 Paving blok natural segi 4 tb. 8 cm (K.350) kw. 1 m² 99,825 105,900 111,900 115,000 115,000 121,000 121,000

198 Paving blok natural segi 6 tb. 8 cm (K.350) kw. 1 m² 131,800 139,800 147,800 151,800 151,800 159,800 159,800

199 Paving blok natural segi 4 tb. 10 cm (K.350) kw. 1 m² 139,800 148,300 156,700 161,000 161,000 169,500 169,500

200 Paving blok natural segi 6 tb. 10 cm (K.350) kw. 1 m² 146,400 155,300 164,100 168,600 168,600 177,500 177,500

Kanstin201 Kanstin uk. 15 x 20 x 30 x 60 cm buah 86,500 91,700 97,000 99,600 99,600 104,800 104,800

202 Kanstin uk. 10 x 15 x 30 x 60 cm buah 66,550 70,600 74,600 76,600 76,600 80,700 80,700

203 Kanstin uk. 10 x 20 x 50 cm buah 33,275 35,300 37,300 38,300 38,300 40,300 40,300

204 Kanstin beton cetak 10 x 20 x 40 cm buah 16,000 17,000 17,900 18,400 18,400 19,400 19,400

205 Kanstin beton cetak 15 x 30 x 60 cm buah 20,000 21,200 22,400 23,000 23,000 24,200 24,200

Grefel206 Grefel beton Ø 20 cm buah 51,900 55,000 58,200 59,800 59,800 62,900 62,900

207 Grefel beton Ø 30 cm buah 58,600 62,200 65,700 67,500 67,500 71,000 71,000

Roster208 Roster bata (10x20) buah 10,000 10,600 11,200 11,500 11,500 12,100 12,100

209 Roster beton (10x20) buah 13,300 14,100 14,900 15,300 15,300 16,100 16,100

210 Roster keramik (25x25) buah 55,000 58,300 61,700 63,300 63,300 66,700 66,700

211 Roster keramik (20x20) buah 44,000 46,700 49,300 50,700 50,700 53,300 53,300

Kelompok Atap :Genteng

212 Genteng pres lokal buah 5,300 6,100 6,100 6,200 6,300 6,300 6,400

213 Genteng pres jatiwangi buah 7,400 8,500 8,600 8,700 8,700 8,800 8,900

214 Genteng pres open jatiwangi buah 9,300 10,700 10,800 10,900 11,000 11,100 11,200

215 Genteng pres morando biasa buah 4,000 4,600 4,600 4,700 4,700 4,800 4,800

216 Genteng pres morando glasur buah 4,700 5,400 5,500 5,500 5,500 5,600 5,600

217 Genteng beton polos buah 4,700 5,400 5,500 5,500 5,500 5,600 5,600

218 Genteng beton warna buah 7,300 8,400 8,500 8,500 8,600 8,700 8,800

219 Genteng mortir buah 9,800 11,200 11,400 11,500 11,600 11,700 11,800

Nok220 Nok genteng pres lokal buah 6,800 7,800 7,900 8,000 8,000 8,100 8,200

221 Nok genteng pres jatiwangi buah 8,300 9,500 9,600 9,700 9,800 9,900 10,000

222 Nok genteng pres open jatiwangi buah 10,600 12,100 12,300 12,400 12,500 12,600 12,700

223 Nok genteng morando biasa buah 5,300 6,100 6,100 6,200 6,300 6,300 6,400

224 Nok genteng pres morando glasur buah 6,100 7,000 7,100 7,100 7,200 7,300 7,300

225 Nok genteng beton polos buah 6,100 7,000 7,100 7,100 7,200 7,300 7,300

226 Nok genteng beton warna buah 9,100 10,400 10,600 10,600 10,700 10,800 10,900

Sirap227 Atap Sirap 4 lapis buah 2,300 2,600 2,700 2,700 2,700 2,700 2,800

Polikarbonat228 Atap Polikarbonat + rangka besi tempa m² 372,680 427,100 432,400 436,000 439,700 443,300 447,000

229 Atap Polikarbonat + rangka Stainless m² 598,950 686,300 694,900 700,700 706,600 712,500 718,300

230 Atap Polikarbonat; lebar = 120 cm tebal m' 272,250 312,000 315,800 318,500 321,200 323,800 326,500

231 Atap Polikarbonat; lebar = 120 cm tipis m' 163,350 187,200 189,500 191,100 192,700 194,300 195,900

Seng gelombang232 Seng gelombang BJLS 30 lbr 64,950 73,500 74,500 75,800 77,700 78,300 79,000

233 Seng gelombang (210 x 80 x 0.2 cm) lbr 40,700 45,500 46,700 47,500 48,700 49,100 49,500

234 Seng gelombang 3'-6' (90 x 180 x 0.2 cm) lbr 40,700 45,500 46,700 47,500 48,700 49,100 49,500

Seng plat235 Seng Plat BJLS 30 lebar 90 cm ; panjang 180 lbr 52,500 58,700 60,200 61,200 62,800 63,300 63,800

236 Seng Plat BJLS 30 lebar 60 cm ; panjang 180 cm lbr 25,000 27,900 28,700 29,200 29,900 30,200 30,400

237 Seng Plat BJLS 30 lebar 30 cm ; panjang 180 cm lbr 18,750 21,000 21,500 21,900 27,500 22,600 22,800

238 Seng Plat BJLS 20 lebar 20 cm ; panjang 180 cm lbr 15,000 16,800 17,200 17,500 17,900 18,100 18,200

Fiber239 Atap fiber gelombang 90cm x 180cm lbr 57,500 66,100 66,700 67,300 67,800 68,400 69,100

240 Atap fiber glass lbr 119,800 137,700 138,900 140,200 141,300 142,500 143,900

241 Talang U pvc lonjor 115,000 128,800 132,300 134,600 138,000 139,200 140,300

242 Fiberglass gelombang uk. 180 x 80 cm lbr 119,800 137,700 138,900 140,200 141,300 142,500 143,900

262 Fiberglass plat lebar 100 cm m'Metal

Atap metal 77 cm x 80 cm (Sakura Roof) lbr 45,200 51,950 52,400 52,850 53,300 54,000 54,250

Atap metal 77 cm x 80 cm (Surya Roof) lbr 79,375 91,275 92,075 92,875 93,700 94,350 95,250

Atap metal 77 cm x 80 cm (Multi Roof) lbr 140,425 161,525 162,900 164,300 165,725 167,075 168,500

243 Bubungan metal buah 33,300 38,300 38,600 38,900 39,300 39,800 40,000

Page 136: Rencana Anggaran Biaya Pembangunan Gereja

Page 136

Kelompok Cat / Minyak :Bahan Cair

244 A i r liter 40 41 41 ### 41 41 42

245 Minyak Terpentin kg 8,800 9,400 10,000 10,600 10,600 11,700 11,700

246 Minyak Bekisting ( olie bekas ) liter 10,600 11,300 12,000 12,700 12,700 14,100 14,100

247 S p i r t u s liter 8,000 8,500 9,100 9,600 9,600 10,700 10,700

248 T e e r kg 8,250 8,800 9,400 9,900 9,900 11,000 11,000

249 S o l a r liter 9,900 9,900 10,010 10,120 10,230 10,900 9,900

250 Solar industri liter 13,200 13,200 13,300 13,500 13,600 14,500 13,200

251 Minyak tanah liter 8,000 8,700 9,300 9,300 9,300 10,700 8,000

252 Minyak pelumas liter 39,900 39,900 40,300 40,800 41,200 43,900 42,350

253 Bensin liter 9,900 9,900 10,010 10,120 10,230 10,900 9,900

254 Teak oil kg 33,400 33,400 33,800 34,100 34,500 36,700 33,400

Cat minyak255 Cat Warna ( Kayu/besi ) 5 kg kaleng 247,500 251,800 253,100 253,100 253,100 253,700 255,500

256 Cat Warna ( Kayu/besi ). kg 47,300 ### 48,100 48,400 48,400 48,400 48,500 48,800

257 Cat dasar ( meni kayu/besi ) 5 kg kaleng 110,000 ### 111,900 112,500 112,500 112,500 112,800 113,600

258 Cat dasar ( meni kayu/besi ) kg 24,200 ### 24,600 24,700 24,700 24,700 24,800 25,000

259 Cat khusus atap kg 115,500 117,500 118,100 118,100 118,100 118,400 119,300

260 Cat khusus atap 5 kg kaleng 115,500 117,500 118,100 118,100 118,100 118,400 119,300

261 Vernis bening ltr 41,800 42,500 42,700 42,700 42,700 42,800 43,200

262 Vernis warna ltr 49,500 50,400 50,600 50,600 50,600 50,700 51,100

263 Politur kg 47,300 48,100 48,400 48,400 48,400 48,500 48,800

Pengencer264 Tinner A spesial kg 29,700 30,200 30,400 30,400 41,800 30,400 30,700

265 Tinner A kg 25,300 25,700 25,900 25,900 25,900 25,900 26,100

266 Tinner B kg 23,100 23,500 23,600 23,600 41,800 23,700 23,900

267 Tinner khusus kg 19,800 20,100 20,200 20,200 20,200 20,300 20,400

Cat air268 Cat tembok eksterior 5 kg (kwalitas sedang) kaleng 115,500 117,500 118,100 118,100 118,100 118,400 119,300

269 Cat tembok eksterior kg 23,100 23,500 23,600 23,600 23,600 23,700 23,900

270 Cat tembok interior 5 kg kaleng 110,000 111,900 112,500 112,500 112,500 112,800 113,600

271 Cat tembok interior (kwalitas sedang) kg 22,000 22,400 22,500 22,500 22,500 22,600 22,700

272 Cat tembok curah eksterior 5 kg kaleng 71,500 72,800 73,100 73,100 73,100 73,300 73,800

273 Cat tembok curah eksterior kg 14,300 14,600 14,600 14,600 14,600 14,700 14,800

274 Cat tembok curah interior 5 kg kaleng 66,000 67,200 67,500 67,500 67,500 67,700 68,100

275 Cat tembok curah interior kg 13,200 13,400 13,500 13,500 13,500 13,500 13,600

Plamur/dempul276 Plamur Kayu 5 kg kaleng 110,000 111,900 112,500 112,500 112,500 112,800 113,600

277 Plamur Kayu kg 22,000 22,400 22,500 22,500 22,500 22,600 22,700

278 Plamur Tembok 5 kg kaleng 41,800 42,500 42,700 42,700 42,700 42,800 43,200

279 Plamur Tembok kg 8,360 8,500 8,500 8,500 8,500 8,600 8,600

280 Flincote kg 33,000 33,600 33,700 33,700 33,700 33,800 34,100

Amplas281 Amplas kayu/besi lbr 5,000 5,100 5,100 5,100 5,100 5,100 5,200

282 Amplas kayu/besi m 13,200 13,400 13,500 13,500 13,500 13,500 13,600

Lain-lain283 Batu kambang (batu apung) kg 46,600 47,400 47,600 47,600 47,600 47,800 48,100

284 S i r l a k kg 199,650 203,100 204,100 204,100 204,100 204,600 206,100

285 Oker putih kg 22,600 23,000 23,100 23,100 23,100 23,200 23,300

286 Oker warna kg 25,600 26,000 26,200 26,200 26,200 26,200 26,400

287 Melamin kg 73,200 74,500 74,800 74,800 74,800 75,000 75,600

288 Kuas cat buah 17,600 17,900 18,000 18,000 18,000 18,000 18,200

289 Roll Cat buah 15,400 15,700 15,700 15,700 15,700 15,800 15,900

290 Residu / Soligium ltr 11,700 11,900 12,000 12,000 12,000 12,000 12,100

291 Lem Kayu kg 28,000 28,500 28,600 28,600 28,600 28,700 28,900

292 Lem Kuning kg 38,500 39,200 39,400 39,400 39,400 39,500 39,800

293 Godler/residu kg 9,600 9,800 9,800 9,800 9,800 9,800 9,900

294 Wallpaper m2 93,200 94,800 95,300 95,300 95,300 95,500 96,200

295 Soda api kg 13,300 13,500 13,600 13,600 13,600 13,600 13,700

296 Sabun deterjen kg 20,000 20,400 20,500 20,500 20,500 20,500 20,700

297 Wood Filler kg 49,500 50,400 50,600 50,600 50,600 50,700 51,100

Kelompok Cement, Beton & Kaca:Portland Cement ( PC )

298 Portland Cement ( PC ) 40 kg zak 72,800 89,600 89,600 96,100 90,000 112,560 104,500

299 Portland Cement ( PC ) 50 kg zak 87,800 115,000 115,000 115,900 113,700 140,700 122,700

300 Portland Cement ( PC ) kg 1,820 2,240 2,240 2,403 2,250 2,814 2,613

301 Cement warna kg 16,500 17,600 19,100 19,100 21,300 22,500 19,100

302 Cement putih kg 4,400 4,700 5,100 5,100 5,700 6,000 5,100

Beton 303 Beton K 125 (ready mix) m³ 1,120,500 1,379,100 1,357,500 1,479,600 1,450,900 1,795,700 1,565,800

304 Beton K 175 (ready mix) m³ 1,171,300 1,441,600 1,419,100 1,546,700 1,516,700 1,877,100 1,636,800

305 Beton K 225 (ready mix) m³ 1,228,150 1,511,600 1,488,000 1,621,800 1,590,300 1,968,200 1,716,300

306 Beton K 250 (ready mix) m³ 1,276,550 1,571,100 1,546,600 1,685,700 1,653,000 2,045,800 1,783,900

307 Beton K 275 (ready mix) m³ 1,333,400 1,641,100 1,615,500 1,760,800 1,726,600 2,136,900 1,863,300

308 Beton K 300 (ready mix) m³ 1,500,400 1,846,600 1,817,800 1,981,300 1,942,800 2,404,500 2,096,700

309 Beton K 350 (ready mix) m³ 1,524,600 1,876,400 1,847,100 2,013,300 1,974,200 2,443,300 2,130,500

Tiang Pancang 344 Tiang Pancang 20/20 K-450 + Joint (ex. Surabaya) m' 252,400 310,600 305,800 333,300 326,800 404,500 352,700

345 Tiang Pancang 25/25 K-500 + Joint (ex. Surabaya) m' 372,000 457,800 450,700 491,200 481,700 596,200 519,800

346 Tiang Pancang 30/30 K-500 + Joint (ex. Surabaya) m' 480,200 591,000 581,800 634,100 621,800 769,600 671,000

347 Tiang Pancang 35/35 K-500 + Joint (ex. Surabaya) m' 625,600 770,000 757,900 826,100 810,100 1,002,600 874,200

348 Tiang Pancang 40/40 K-500 + Joint (ex. Surabaya) m' 771,000 948,900 934,100 1,018,100 998,300 1,235,600 1,077,400

Kaca 303 Kaca bening tebal 3 mm m² 113,100 130,100 131,200 132,300 133,500 134,600 135,700

304 Kaca bening tebal 5 mm m² 173,000 199,000 200,700 202,400 204,100 205,900 207,600

305 Kaca rayban tebal 3 mm m² 171,700 197,500 199,200 200,900 202,600 204,300 206,000

306 Kaca rayban tebal 5 mm m² 237,800 273,500 275,800 278,200 280,600 283,000 285,400

307 Kaca Buram tebal 3 mm m² 135,800 156,200 157,500 158,900 160,200 161,600 163,000

308 Kaca Buram tebal 5 mm m² 223,600 257,100 259,400 261,600 263,800 266,100 268,300

309 Jendela nako buah 26,600 27,100 27,200 27,300 27,500 27,900 27,700

310 Kaca cermin 3 mm m² 226,300 260,200 262,500 264,800 267,000 269,300 271,600

311 Kaca cermin 5 mm m² 332,800 382,700 386,000 389,400 392,700 396,000 399,400

312 Kaca patri m² 1,019,500 1,172,400 1,182,600 1,192,800 1,203,000 1,213,200 1,223,400

313 Kaca grafir warna m² 1,325,700 1,524,600 1,537,800 1,551,100 1,564,300 1,577,600 1,590,800

314 Kaca sunblast m² 705,400 811,200 818,300 825,300 832,400 839,400 846,500

315 Glassblock buah 27,500 31,600 31,900 32,200 32,500 32,700 33,000

Kelompok SanitaryShower

316 Shower stainless buah 266,200 270,300 271,000 271,000 271,000 271,700 273,000

317 Shower stainless kualitas baik buah 275,000 279,200 280,000 280,000 280,000 280,700 282,100

318 Shower standar/biasa buah 93,500 94,900 95,200 95,200 95,200 95,400 95,900

319 Shower kualitas baik buah 133,100 135,200 135,500 135,500 135,500 135,800 136,500

Kran air320 Kran air plastik buah 11,000 11,200 11,200 11,200 11,200 11,200 11,300

321 Kran air stainless buah 88,000 89,400 89,600 89,600 89,600 89,800 90,300

Seal Tape bh 3,000

Tangki air fiberglas322 Tangki air fiberglas Isi : 250 ltr unit 465,850 530,100 535,500 642,600 546,200 803,200 535,500

323 Tangki air fiberglas Isi : 800 ltr unit 1,100,000 1,251,700 1,264,400 1,517,200 1,289,700 1,896,600 1,264,400

324 Tangki air fiberglas Isi : 1100 ltr unit 1,400,000 1,600,000 1,650,000 2,006,900 1,700,000 2,590,000 1,650,000

325 Tangki air fiberglas Isi : 1200 ltr unit 1,600,000 1,800,000 1,850,000 2,206,900 1,900,000 2,790,000 1,850,000

326 Tangki air fiberglas Isi : 2100 ltr unit 2,700,000 ### 3,200,000 3,250,000 3,837,900 3,400,000 3,700,000 3,250,000

327 Tangki air fiberglas Isi : 2200 ltr unit 3,000,000 3,500,000 3,550,000 4,137,900 3,700,000 4,000,000 3,550,000

Tangki air stainless Steel328 Tangki air stainless steel Isi : 250 ltr unit 998,250 1,135,900 1,147,400 1,376,900 1,170,400 1,721,100 1,147,400

329 Tangki air stainless steel Isi : 800 ltr unit 3,327,500 3,786,500 3,824,700 4,589,700 3,901,200 5,737,100 3,824,700

330 Tangki air stainless steel Isi : 1100 ltr unit 3,826,625 4,354,400 4,398,400 5,278,100 4,486,400 6,597,600 4,398,400

331 Tangki air stainless steel Isi : 1200 ltr unit 3,993,000 4,543,800 4,589,700 5,507,600 4,681,400 6,884,500 4,589,700

332 Tangki air stainless steel Isi : 2100 ltr unit 6,987,750 7,951,600 8,031,900 9,638,300 8,192,500 12,047,800 8,031,900

333 Tangki air stainless steel Isi : 2200 ltr unit 7,320,500 8,330,200 8,414,400 10,097,200 8,582,700 12,621,600 8,414,400

Bak mandi334 Bak Mandi Fiberglass, volume 120 ltrr (sudut) buah 385,000 390,900 391,900 391,900 391,900 392,900 394,900

335 Bak Mandi Fiberglass, volume 120 ltrr (kotak) buah 385,000 390,900 391,900 391,900 391,900 392,900 394,900

336 Bak Mandi Fiberglass, volume 150 ltrr buah 500,000 507,700 509,000 509,000 509,000 510,300 512,900

Closet337 Closet duduk buah 137,500 139,600 140,000 140,000 140,000 140,300 141,000

338 Closet duduk monoblock kwalitas prima buah 2,090,000 2,122,300 2,127,700 2,127,700 2,127,700 2,133,000 2,143,700

339 Kloset duduk / Monoblok Warna Putih standard Buah 1,650,000 1,675,500 1,679,700 1,679,700 1,679,700 1,684,000 1,692,400

340 Kloset jongkok Porselin, warna tua Buah 239,775 243,500 244,100 244,100 244,100 244,700 245,900

341 Kloset jongkok Porselin, warna muda Buah 239,775 243,500 244,100 244,100 244,100 244,700 245,900

342 Kloset jongkok Traso dicat Buah 106,480 108,100 108,400 108,400 108,400 108,700 109,200

Lain-lain343 Urinoir buah 2,462,350 2,500,400 2,506,700 2,506,700 2,506,700 2,513,100 2,525,700

344 Floordrain (saringan buangan air KM/WC) buah 39,930 40,500 40,600 40,600 40,600 40,800 41,000

345 Badkeep Fibreglass buah 552,400 560,900 562,400 562,400 562,400 563,800 566,600

346 Wastafel unit 1,375,000 1,396,200 1,399,800 1,399,800 1,399,800 1,403,300 1,410,400

Page 137: Rencana Anggaran Biaya Pembangunan Gereja

Page 137

Bak cuci347 Bak Cuci Stainless Steel ukuran kecil Buah 203,500 206,600 207,200 207,200 207,200 207,700 208,700

348 Bak Cuci Stainless Steel ( 1,00 x 0,90 ) m² Buah 532,400 540,600 542,000 542,000 542,000 543,400 546,100

349 Bak Cuci Stainless Steel 80 Cm Buah 332,750 337,900 338,700 338,700 338,700 339,600 341,300

Pipa

350 Pipa PVC 1/2 AW Buah 20,000 22,100 22,600 23,000 23,500 23,700 23,800

351 Pipa PVC 3/4 AW Buah 24,000 26,500 27,200 27,600 28,200 28,400 28,600

352 Pipa PVC 1 AW Buah 33,300 36,800 37,700 38,300 39,100 39,400 39,600

353 Pipa PVC 1 1/2 AW Buah 61,200 67,600 69,300 70,300 71,900 72,400 72,900

354 Pipa PVC 2 AW Buah 79,900 88,300 90,500 91,800 93,800 94,500 95,100

355 Pipa PVC 2 1/2 AW Buah 114,500 126,500 129,600 131,500 134,400 135,500 136,300

356 Pipa PVC 3 AW Buah 139,800 154,500 158,300 160,600 164,100 165,400 166,500

357 Pipa PVC 4 AW Buah 217,000 239,800 245,700 249,300 254,800 256,800 258,400

Kelompok KelistrikanTusuk Kontak (Steker)

358 Tusuk kontak 2 kutup tanpa pembumian/arde buah 6,100 6,200 6,200 6,200 6,200 6,200 6,300

359 Tusuk kontak 2 kutup dengan pembumian/arde buah 12,100 12,300 12,300 12,300 12,300 12,400 12,400

360 Tusuk kontak 2 kutup tanpa pembumian (timbul) buah 7,600 7,700 7,700 7,700 7,700 7,800 7,800

361 Tusuk kontak 2 kutup dengan pembumian (timbul) buah 13,600 13,800 13,800 13,800 13,900 13,900 13,900

362 Tusuk kontak 2 kutup tanpa pembumian (tanam) buah 6,100 6,200 6,200 6,200 6,200 6,200 6,300

363 Tusuk kontak 2 kutup dengan pembumian (tanam) buah 12,100 12,300 12,300 12,300 12,300 12,400 12,400

364 Pasang instalasi / titik titik 366,000 371,000 371,900 372,500 373,100 373,600 375,100 Lampu pijar

365 Lampu pijar 5 watt buah 6,100 6,200 6,200 6,200 6,200 6,200 6,300

366 Lampu pijar 10 watt buah 7,600 7,700 7,700 7,700 7,700 7,800 7,800

367 Lampu pijar 25 watt/ 40 watt buah 8,700 8,800 8,800 8,900 8,900 8,900 8,900

368 Lampu pijar 60 watt / 75 watt buah 9,100 9,200 9,200 9,300 9,300 9,300 9,300

369 Lampu pijar 100 watt buah 11,300 11,500 11,500 11,500 11,500 11,500 11,600

370 Lampu softone 100 watt buah 22,700 23,000 23,100 23,100 23,100 23,200 23,300

371 Lampu pijar 150 watt buah 51,400 52,100 52,200 52,300 52,400 52,500 52,700

372 Lampu pijar 200 watt buah 59,000 59,800 59,900 60,000 60,100 60,200 60,500 Lampu TL

373 Lampu TL 10 watt buah 8,000 8,100 8,100 8,100 8,200 8,200 8,200

374 Lampu TL 15 watt buah 10,600 10,700 10,800 10,800 10,800 10,800 10,900

375 Lampu TL 18 watt buah 13,300 13,500 13,500 13,500 13,600 13,600 13,600

376 Lampu TL 36 watt buah 16,000 16,200 16,300 16,300 16,300 16,300 16,400 Lampu SLE

377 Lampu SLE 11 watt buah 70,500 71,500 71,600 71,700 71,900 72,000 72,300

378 Lampu SLE 15 watt buah 73,900 74,900 75,100 75,200 75,300 75,400 75,700

379 Lampu SLE 20 watt buah 79,900 81,000 81,200 81,300 81,400 81,600 81,900 Lampu Slang

380 Lampu Slang 2 jalur (sekualitas sinyoku), 1 roll 100 roll 1,730,300 1,753,900 1,758,100 1,760,900 1,763,700 1,766,500 1,773,400

381 Lampu Slang 3 jalur (sekualitas sinyoku), 1 roll 100 roll 2,196,150 2,226,200 2,231,500 2,235,000 2,238,500 2,242,100 2,250,900 Lampu Capsul

382 Lampu Capsul isi 100 pcs 46,600 47,200 47,300 47,400 47,500 47,600 47,800

383 Lampu Capsul isi 140 pcs 66,550 67,500 67,600 67,700 67,800 67,900 68,200 Lampu Anggur

384 Lampu Anggur isi 100 pcs 46,600 47,200 47,300 47,400 47,500 47,600 47,800

385 Lampu Anggur isi 140 pcs 66,550 67,500 67,600 67,700 67,800 67,900 68,200 Lampu Natal

386 Lampu Natal isi 50 pcs 30,000 30,400 30,500 30,500 30,600 30,600 30,700

387 Lampu Natal isi 100 pcs 50,000 50,700 50,800 50,900 51,000 51,000 51,200 Bolam Mercury

388 Bolam Mercury 80 watt buah 195,700 198,400 198,800 199,200 199,500 199,800 200,600

389 Bolam Mercury 125 watt buah 332,750 337,300 338,100 338,600 339,200 339,700 341,000

390 Bolam Mercury 250 watt buah 549,700 557,200 558,500 559,400 560,300 561,200 563,400

391 Bolam Mercury 400 watt buah 858,500 870,200 872,300 873,700 875,100 876,400 879,900 Bolam Halogin

392 Bolam Halogin 500 watt buah 33,000 33,500 33,500 33,600 33,600 33,700 33,800

393 Bolam Halogin 1000 watt buah 44,000 44,600 44,700 44,800 44,800 44,900 45,100 Starter & Travo

394 Starter TL 20/40 watt buah 6,700 6,800 6,800 6,800 6,800 6,800 6,900

395 Travo TL 10 watt buah 29,300 29,700 29,800 29,800 29,900 29,900 30,000

396 Travo TL 20 watt buah 33,000 33,500 33,500 33,600 33,600 33,700 33,800

397 Travo TL 40 watt buah 33,000 33,500 33,500 33,600 33,600 33,700 33,800 Balast Mercury

398 Balast Mercury 80 watt buah 99,825 101,200 101,400 101,600 101,800 101,900 102,300

399 Balast Mercury 125 watt buah 119,800 121,400 121,700 121,900 122,100 122,300 122,800

400 Balast Mercury 250 watt buah 197,000 199,700 200,200 200,500 200,800 201,100 201,900

401 Balast Mercury 400 watt buah 239,600 242,900 243,500 243,800 244,200 244,600 245,600 Fitting

402 Fitting Kecil Lampu 2,5 Watt buah 3,750 3,800 3,800 3,800 3,800 3,800 3,800

403 Fitting Plastik Hitam buah 4,375 4,400 4,400 4,500 4,500 4,500 4,500

404 Fitting Gantung plastik gantung buah 5,000 5,100 5,100 5,100 5,100 5,100 5,100

405 Fitting duduk buah 12,500 12,700 12,700 12,700 12,700 12,800 12,800 Kap Aluminium

406 Kap Alumunium E.27 buah 113,100 114,600 114,900 115,100 115,300 115,500 115,900

407 Kap Alumunium E.40 buah 139,800 141,700 142,000 142,300 142,500 142,700 143,300 Kabel Snoor & NYA

408 Kabel NYA 2,5 sqmm roll 297,000 301,100 301,800 302,300 302,700 303,200 304,400

409 Kabel NYA 1,5 sqmm roll 198,000 200,700 201,200 201,500 201,800 202,100 202,900

410 Kabel NYA 2,5 sqmm m' 4,400 4,500 4,500 4,500 4,500 4,500 4,500

411 Kabel NYA 1,5 sqmm m' 3,300 3,300 3,400 3,400 3,400 3,400 3,400 Kabel NYM

412 Kabel NYM 2 x 1,5 sqmm 10,000 10,100 10,200 10,200 10,200 10,200 10,200

413 Kabel NYM 2 x 2,5 sqmm 12,500 12,700 12,700 12,700 12,700 12,800 12,800

414 Kabel NYM 2 x 4 sqmm 12,500 12,700 12,700 12,700 12,700 12,800 12,800

415 Kabel NYM 3 x 1,5 sqmm 12,500 12,700 12,700 12,700 12,700 12,800 12,800

416 Kabel NYM 3 x 2,5 sqmm 15,000 15,200 15,200 15,300 15,300 15,300 15,400

417 Kabel NYM 3 x 4 sqmm 25,000 25,300 25,400 25,400 25,500 25,500 25,600 Saklar & Stop kontak

418 Skaklar seri OB buah 17,500 17,700 17,800 17,800 17,800 17,900 17,900

419 Skaklar seri IB buah 22,500 22,800 22,900 22,900 22,900 23,000 23,100

420 Skaklar engkel OB buah 22,500 22,800 22,900 22,900 22,900 23,000 23,100

421 Skaklar engkel IB buah 15,000 15,200 15,200 15,300 15,300 15,300 15,400

422 Stop kontak IB buah 22,500 22,800 22,900 22,900 22,900 23,000 23,100

423 Stop kontak OB buah 15,000 15,200 15,200 15,300 15,300 15,300 15,400 Kapasitor

424 Kapasitor 25 F buah 25,000 25,300 25,400 25,400 25,500 25,500 25,600

425 Kapasitor 20 F buah 25,000 25,300 25,400 25,400 25,500 25,500 25,600

426 Kapasitor 12,5 uF buah 25,000 25,300 25,400 25,400 25,500 25,500 25,600 MCB

427 MCB 25 Ampere / 16 Ampere buah 62,500 63,400 63,500 63,600 63,700 63,800 64,100

428 MCB 40 Ampere buah 87,500 88,700 88,900 89,000 89,200 89,300 89,700

429 MCB 6 Ampere buah 56,250 57,000 57,200 57,200 57,300 57,400 57,700 Box

430 Box Kwh Meter 25 x 35 x 20 buah 173,900 176,300 176,700 177,000 177,300 177,500 178,200

431 Box panel 30 x 40 x 20 buah 262,400 266,000 266,600 267,000 267,500 267,900 268,900

432 Box 25 x 25 x 20 buah 143,700 145,700 146,000 146,200 146,500 146,700 147,300

433 Box 20 x 40 x 50 buah 332,800 337,300 338,200 338,700 339,200 339,800 341,100 Timer

434 Timer Delay H3-BA (omron) buah 958,320 971,400 973,700 975,300 976,800 978,300 982,200 Lain-lain

435 Pilot Lamp buah 4,500 4,600 4,600 4,600 4,600 4,600 4,600

436 Kop sekering buah 2,300 2,300 2,300 2,300 2,300 2,300 2,400

437 Isolasi besar buah 7,700 7,800 7,800 7,800 7,800 7,900 7,900

438 Spot + F.MP buah - - - - - -

438 Tang Kombinasi buah 33,000 33,500 33,500 33,600 33,600 33,700 33,800

439 Obeng +/- buah 22,000 22,300 22,400 22,400 22,400 22,500 22,500

440 GZ 30 A buah - - - - - -

440 Multitester buah 378,100 383,300 384,200 384,800 385,400 386,000 387,500

441 Sekering buah 12,900 13,100 13,100 13,100 13,100 13,200 13,200

442 Mata lampu pijar 25 W -75 W buah 7,700 7,800 7,800 7,800 7,800 7,900 7,900

443 Stabilizer 300 A unit 266,200 269,800 270,500 270,900 271,300 271,800 272,800

444 Alat Bantu unit 56,100 ### 56,100 56,100 ### 56,100 56,100 ###

Keterangan : Harga Satuan sudah termasuk PPN dan PPh

m1

m1

m1

m1

m1

m1

Page 138: Rencana Anggaran Biaya Pembangunan Gereja

Page 138

1 1 1 1 1 5.3333333331 1 1 1 1 6.25

1 1 1 1 1 4.0509259262.186858316 1 2.899383984 1 1.232032854 3.8501026692.186858316 1 2.899383984 1 1.232032854 3.850102669

1.066666667 1 1.580246914 1 1.333333333 1.7777777781.066666667 1 1.580246914 1 1.333333333 1.777777778

1 1 2.14480198 1 1.082920792 2.7846534651 1 2.14480198 1 1.082920792 2.7846534651 1 2.323319027 1 1 3.21888412

1.018382353 1.025735294 1.0294117647 1.033088235 1.049632353 1.0459558821.018382353 1.025735294 1.0294117647 1.033088235 1.049632353 1.0459558821.066666667 1 1.580246914 1 1.333333333 1.7777777781.066666667 1 1.580246914 1 1.333333333 1.777777778

1 1 1.471938776 1.631377551 2.933673469 1.5306122451 1 1.471938776 1.631377551 2.933673469 1.5306122451 1 1.471938776 1.631377551 2.933673469 1.530612245

1 1 1.471938776 1.631377551 2.933673469 1.5306122451 1 1.471938776 1.631377551 2.933673469 1.5306122451 1 1.471938776 1.631377551 2.933673469 1.5306122451 1 1.471938776 1.631377551 2.933673469 1.530612245

1.014456317 1.016027656 1.01822753 1.016760947 1.019170333 1.0186465541.014456317 1.016027656 1.01822753 1.016760947 1.019170333 1.0186465541.014456317 1.016027656 1.01822753 1.016760947 1.019170333 1.0186465541.014456317 1.016027656 1.01822753 1.016760947 1.019170333 1.0186465541.014456317 1.016027656 1.01822753 1.016760947 1.019170333 1.018646554

1.0625 1.125 1.1875 1.1875 1.25 1.8751.0625 1.125 1.1875 1.1875 1.25 1.875

1.08 1.16 1.2 1.2 1.28 1.281.08 1.16 1.2 1.2 1.28 1.28

1.014528509 1.015076754 1.01754386 1.016447368 1.018914474 1.0189144741.014528509 1.015076754 1.01754386 1.016447368 1.018914474 1.0189144741.014528509 1.015076754 1.01754386 1.016447368 1.018914474 1.018914474

0.866666667 0.833333333 0.833333333 0.833333333 0.866666667 1.3333333330.866666667 0.833333333 0.833333333 0.833333333 0.866666667 1.3333333330.866666667 0.833333333 0.833333333 0.833333333 0.866666667 1.3333333330.866666667 0.833333333 0.833333333 0.833333333 0.866666667 1.3333333330.866666667 0.833333333 0.833333333 0.833333333 0.866666667 1.333333333

0.866666667 0.833333333 0.833333333 0.833333333 0.866666667 1.3333333330.866666667 0.833333333 0.833333333 0.833333333 0.866666667 1.3333333330.866666667 0.833333333 0.833333333 0.833333333 0.866666667 1.3333333330.866666667 0.833333333 0.833333333 0.833333333 0.866666667 1.3333333330.866666667 0.833333333 0.833333333 0.833333333 0.866666667 1.3333333330.866666667 0.833333333 0.833333333 0.833333333 0.866666667 1.3333333330.866666667 0.833333333 0.833333333 0.833333333 0.866666667 1.3333333330.866666667 0.833333333 0.833333333 0.833333333 0.866666667 1.333333333

0.866666667 0.833333333 0.833333333 0.833333333 0.866666667 1.3333333330.866666667 0.833333333 0.833333333 0.833333333 0.866666667 1.3333333330.866666667 0.833333333 0.833333333 0.833333333 0.866666667 1.3333333330.866666667 0.833333333 0.833333333 0.833333333 0.866666667 1.333333333

0.923076923 0.884615385 0.884615385 0.884615385 0.923076923 1.3846153850.923076923 0.884615385 0.884615385 0.884615385 0.923076923 1.3846153850.923076923 0.884615385 0.884615385 0.884615385 0.923076923 1.3846153850.923076923 0.884615385 0.884615385 0.884615385 0.923076923 1.3846153850.923076923 0.884615385 0.884615385 0.884615385 0.923076923 1.3846153850.923076923 0.884615385 0.884615385 0.884615385 0.923076923 1.3846153850.923076923 0.884615385 0.884615385 0.884615385 0.923076923 1.384615385

1 0.785714286 0.785714286 0.785714286 0.857142857 1.5714285711 0.928571429 0.928571429 0.928571429 0.928571429 1.5714285711 0.928571429 0.928571429 0.928571429 0.928571429 1.5714285711 0.928571429 0.928571429 0.928571429 0.928571429 1.571428571

0.927272727 0.772727273 0.772727273 0.772727273 0.927272727 11 0.928571429 0.928571429 0.928571429 1 1.7714285711 0.928571429 0.928571429 0.928571429 1 2.142857143

1.133333333 0.888888889 0.888888889 0.888888889 1.133333333 1.6666666670.927272727 0.772727273 0.772727273 0.772727273 0.927272727 1

Page 139: Rencana Anggaran Biaya Pembangunan Gereja

Page 139

0.909090909 0.863636364 0.863636364 0.863636364 0.909090909 1.4545454550.909090909 0.863636364 0.863636364 0.863636364 0.909090909 1.4545454550.909090909 0.863636364 0.863636364 0.863636364 0.909090909 1.4545454550.909090909 0.863636364 0.863636364 0.863636364 0.909090909 1.4545454550.909090909 0.863636364 0.863636364 0.863636364 0.909090909 1.4545454550.909090909 0.863636364 0.863636364 0.863636364 0.909090909 1.4545454550.909090909 0.863636364 0.863636364 0.863636364 0.909090909 1.4545454550.909090909 0.863636364 0.863636364 0.863636364 0.909090909 1.454545455

1.014528509 1.015076754 1.01754386 1.016447368 1.018914474 1.0189144741.014528509 1.015076754 1.01754386 1.016447368 1.018914474 1.018914474

1.014528509 1.015076754 1.01754386 1.016447368 1.018914474 1.0189144741.014528509 1.015076754 1.01754386 1.016447368 1.018914474 1.0189144741.014528509 1.015076754 1.01754386 1.016447368 1.018914474 1.0189144741.014528509 1.015076754 1.01754386 1.016447368 1.018914474 1.018914474

1.014528509 1.015076754 1.01754386 1.016447368 1.018914474 1.0189144741.014528509 1.015076754 1.01754386 1.016447368 1.018914474 1.018914474

1.014528509 1.015076754 1.01754386 1.016447368 1.018914474 1.0189144741.014528509 1.015076754 1.01754386 1.016447368 1.018914474 1.0189144741.014528509 1.015076754 1.01754386 1.016447368 1.018914474 1.0189144741.014528509 1.015076754 1.01754386 1.016447368 1.018914474 1.0189144741.014528509 1.015076754 1.01754386 1.016447368 1.018914474 1.018914474

1.014528509 1.015076754 1.01754386 1.016447368 1.018914474 1.0189144741.014528509 1.015076754 1.01754386 1.016447368 1.018914474 1.0189144741.014528509 1.015076754 1.01754386 1.016447368 1.018914474 1.018914474

1.015015015 1.021021021 1.018 1.021021021 1.021021021 1.0270270271.015015015 1.021021021 1.018 1.021021021 1.021021021 1.0270270271.015015015 1.021021021 1.018 1.021021021 1.021021021 1.0270270271.015015015 1.021021021 1.018 1.021021021 1.021021021 1.0270270271.015015015 1.021021021 1.018 1.021021021 1.021021021 1.0270270271.015015015 1.021021021 1.018 1.021021021 1.021021021 1.027027027

1.016166282 1.020785219 1.025404157 1.025404157 1.051963048 1.066974596

1.02 1.04 1.08 1.04 1.12 1.081.013665595 1.01607717 1.017684887 1.017684887 1.019292605 1.02331189711.018348624 1.022518766 1.030025021 1.030025021 1.1109257715 1.0183486241.018348624 1.022518766 1.030025021 1.030025021 1.1109257715 1.0183486241.013513514 1.024774775 1.04954955 1.027027027 1.076576577 1.0270270271.013513514 1.024774775 1.04954955 1.027027027 1.076576577 1.0270270271.013513514 1.024774775 1.04954955 1.027027027 1.076576577 1.027027027

1.018181818 1.090909091 1.381818182 1.236363636 1.454545455 1.3818181821.018181818 1.090909091 1.381818182 1.236363636 1.454545455 1.3818181821.018181818 1.090909091 1.381818182 1.236363636 1.454545455 1.3818181821.018181818 1.090909091 1.381818182 1.236363636 1.454545455 1.3818181821.014514515 1.016016016 1.018018018 1.016816817 1.019019019 1.0188188191.014514515 1.016016016 1.018018018 1.016816817 1.019019019 1.0188188191.014514515 1.016016016 1.018018018 1.016816817 1.019019019 1.0188188191.014514515 1.016016016 1.018018018 1.016816817 1.019019019 1.0188188191.014514515 1.016016016 1.018018018 1.016816817 1.019019019 1.0188188191.014514515 1.016016016 1.018018018 1.016816817 1.019019019 1.0188188191.018181818 1.090909091 1.381818182 1.236363636 1.454545455 1.3818181821.018181818 1.090909091 1.381818182 1.236363636 1.454545455 1.3818181821.018181818 1.090909091 1.381818182 1.236363636 1.454545455 1.3818181821.018181818 1.090909091 1.381818182 1.236363636 1.454545455 1.381818182

1.018181818 1.090909091 1.381818182 1.236363636 1.454545455 1.3818181821.018181818 1.090909091 1.381818182 1.236363636 1.454545455 1.3818181821.018181818 1.090909091 1.381818182 1.236363636 1.454545455 1.3818181821.018181818 1.090909091 1.381818182 1.236363636 1.454545455 1.381818182

1.15 1.16 1.17 1.18 1.2 1.161.15 1.16 1.17 1.18 1.2 1.161.15 1.16 1.17 1.18 1.2 1.161.15 1.16 1.17 1.18 1.2 1.16

1.148648649 1.153153153 1.585585586 1.774774775 2.027027027 1.1531531531.15 1.16 1.17 1.18 1.2 1.161.15 1.16 1.17 1.18 1.2 1.161.15 1.16 1.17 1.18 1.2 1.161.15 1.16 1.17 1.18 1.2 1.161.15 1.16 1.17 1.18 1.2 1.161.15 1.16 1.17 1.18 1.2 1.16

1.01463964 1.016047297 1.017924174 1.016704204 1.019237988 1.0187687691.01463964 1.016047297 1.017924174 1.016704204 1.019237988 1.0187687691.01463964 1.016047297 1.017924174 1.016704204 1.019237988 1.0187687691.01463964 1.016047297 1.017924174 1.016704204 1.019237988 1.0187687691.01463964 1.016047297 1.017924174 1.016704204 1.019237988 1.0187687691.01463964 1.016047297 1.017924174 1.016704204 1.019237988 1.018768769

1.15 1.160022523 1.170045045 1.180067568 1.19009009 1.21.15 1.160022523 1.170045045 1.180067568 1.19009009 1.2

1.15 1.160022523 1.170045045 1.180067568 1.19009009 1.2

1.15 1.160022523 1.170045045 1.180067568 1.19009009 1.2

1.15 1.160022523 1.170045045 1.180067568 1.19009009 1.21.15 1.160022523 1.170045045 1.180067568 1.19009009 1.21.15 1.160022523 1.170045045 1.180067568 1.19009009 1.21.15 1.160022523 1.170045045 1.180067568 1.19009009 1.21.15 1.160022523 1.170045045 1.180067568 1.19009009 1.21.15 1.160022523 1.170045045 1.180067568 1.19009009 1.21.15 1.160022523 1.170045045 1.180067568 1.19009009 1.21.15 1.160022523 1.170045045 1.180067568 1.19009009 1.2

1.15 1.160022523 1.170045045 1.180067568 1.19009009 1.21.15 1.160022523 1.170045045 1.180067568 1.19009009 1.21.15 1.160022523 1.170045045 1.180067568 1.19009009 1.21.15 1.160022523 1.170045045 1.180067568 1.19009009 1.21.15 1.160022523 1.170045045 1.180067568 1.19009009 1.21.15 1.160022523 1.170045045 1.180067568 1.19009009 1.21.15 1.160022523 1.170045045 1.180067568 1.19009009 1.21.15 1.160022523 1.170045045 1.180067568 1.19009009 1.21.15 1.160022523 1.170045045 1.180067568 1.19009009 1.2

1.019975031 1.024344569 1.025593009 1.031835206 1.047752809 1.0533707871.019975031 1.024344569 1.025593009 1.031835206 1.047752809 1.0533707871.019975031 1.024344569 1.025593009 1.031835206 1.047752809 1.053370787

1.019975031 1.024344569 1.025593009 1.031835206 1.047752809 1.0533707871.019975031 1.024344569 1.025593009 1.031835206 1.047752809 1.053370787

1.019975031 1.024344569 1.025593009 1.031835206 1.047752809 1.0533707871.019975031 1.024344569 1.025593009 1.031835206 1.047752809 1.0533707871.019975031 1.024344569 1.025593009 1.031835206 1.047752809 1.0533707871.019975031 1.024344569 1.025593009 1.031835206 1.047752809 1.053370787

1.019977758 1.023981397 1.026994237 1.031968456 1.048003235 1.0430492371.019977758 1.023981397 1.026994237 1.031968456 1.048003235 1.0430492371.019977758 1.023981397 1.026994237 1.031968456 1.048003235 1.0430492371.019977758 1.023981397 1.026994237 1.031968456 1.048003235 1.0430492371.019977758 1.023981397 1.026994237 1.031968456 1.048003235 1.0430492371.019977758 1.023981397 1.026994237 1.031968456 1.048003235 1.0430492371.019977758 1.023981397 1.026994237 1.031968456 1.048003235 1.0430492371.019977758 1.023981397 1.026994237 1.031968456 1.048003235 1.0430492371.019977758 1.023981397 1.026994237 1.031968456 1.048003235 1.0430492371.019977758 1.023981397 1.026994237 1.031968456 1.048003235 1.043049237

Page 140: Rencana Anggaran Biaya Pembangunan Gereja

Page 140

1.020015487 1.02400546 1.0270110643 1.031985405 1.04798467 1.0430103291.020015487 1.02400546 1.0270110643 1.031985405 1.04798467 1.0430103291.020015487 1.02400546 1.0270110643 1.031985405 1.04798467 1.0430103291.020015487 1.02400546 1.0270110643 1.031985405 1.04798467 1.043010329

1.01998834 1.023944366 1.026983426 1.031981344 1.047888732 1.0430165741.01998834 1.023944366 1.026983426 1.031981344 1.047888732 1.0430165741.01998834 1.023944366 1.026983426 1.031981344 1.047888732 1.0430165741.01998834 1.023944366 1.026983426 1.031981344 1.047888732 1.043016574

1.019986676 0.928047968 1.027048634 1.031912059 1.048034644 1.0430379751.019986676 0.928047968 1.027048634 1.031912059 1.048034644 1.043037975

1.018302829 1.023294509 1.025790349 1.031613977 1.047420965 1.0865224631.018302829 1.023294509 1.025790349 1.031613977 1.047420965 1.086522463

1.020049835 1.024048212 1.027003535 1.03198702 1.048096425 1.0430549921.020066642 1.0239911144 1.02695298 1.032062199 1.047982229 1.04302110331.020027189 1.024006101 1.027023442 1.031963925 1.048012202 1.043005405

1.021021021 1.024024024 1.027027027 1.032432432 1.048048048 1.0444444441.021021021 1.024024024 1.027027027 1.032432432 1.048048048 1.0444444441.021021021 1.024024024 1.027027027 1.032432432 1.048048048 1.044444444

1.014864865 1.016216216 1.018018018 1.0171171171 1.019369369 1.0193693691.014864865 1.016216216 1.018018018 1.0171171171 1.019369369 1.0193693691.014864865 1.016216216 1.018018018 1.0171171171 1.019369369 1.0193693691.014864865 1.016216216 1.018018018 1.0171171171 1.019369369 1.0193693691.014864865 1.016216216 1.018018018 1.0171171171 1.019369369 1.0193693691.014864865 1.016216216 1.018018018 1.0171171171 1.019369369 1.0193693691.014864865 1.016216216 1.018018018 1.0171171171 1.019369369 1.0193693691.014864865 1.016216216 1.018018018 1.0171171171 1.019369369 1.0193693691.014864865 1.016216216 1.018018018 1.0171171171 1.019369369 1.0193693691.014864865 1.016216216 1.018018018 1.0171171171 1.019369369 1.0193693691.014864865 1.016216216 1.018018018 1.0171171171 1.019369369 1.0193693691.014864865 1.016216216 1.018018018 1.0171171171 1.019369369 1.0193693691.014864865 1.016216216 1.018018018 1.0171171171 1.019369369 1.0193693691.014864865 1.016216216 1.018018018 1.0171171171 1.019369369 1.0193693691.014864865 1.016216216 1.018018018 1.0171171171 1.019369369 1.0193693691.014864865 1.016216216 1.018018018 1.0171171171 1.019369369 1.0193693691.014864865 1.016216216 1.018018018 1.0171171171 1.019369369 1.019369369

1.014864865 1.016216216 1.018018018 1.0171171171 1.019369369 1.0193693691.014864865 1.016216216 1.018018018 1.0171171171 1.019369369 1.0193693691.014864865 1.016216216 1.018018018 1.0171171171 1.019369369 1.0193693691.014864865 1.016216216 1.018018018 1.0171171171 1.019369369 1.019369369

1.014864865 1.016216216 1.018018018 1.0171171171 1.019369369 1.0193693691.014864865 1.016216216 1.018018018 1.0171171171 1.019369369 1.0193693691.014864865 1.016216216 1.018018018 1.0171171171 1.019369369 1.0193693691.014864865 1.016216216 1.018018018 1.0171171171 1.019369369 1.0193693691.014864865 1.016216216 1.018018018 1.0171171171 1.019369369 1.0193693691.014864865 1.016216216 1.018018018 1.0171171171 1.019369369 1.0193693691.014864865 1.016216216 1.018018018 1.0171171171 1.019369369 1.0193693691.014864865 1.016216216 1.018018018 1.0171171171 1.019369369 1.0193693691.014864865 1.016216216 1.018018018 1.0171171171 1.019369369 1.0193693691.014864865 1.016216216 1.018018018 1.0171171171 1.019369369 1.0193693691.014864865 1.016216216 1.018018018 1.0171171171 1.019369369 1.0193693691.014864865 1.016216216 1.018018018 1.0171171171 1.019369369 1.0193693691.014864865 1.016216216 1.018018018 1.0171171171 1.019369369 1.0193693691.014864865 1.016216216 1.018018018 1.0171171171 1.019369369 1.0193693691.014864865 1.016216216 1.018018018 1.0171171171 1.019369369 1.0193693691.014864865 1.016216216 1.018018018 1.0171171171 1.019369369 1.0193693691.014864865 1.016216216 1.018018018 1.0171171171 1.019369369 1.0193693691.014864865 1.016216216 1.018018018 1.0171171171 1.019369369 1.0193693691.014864865 1.016216216 1.018018018 1.0171171171 1.019369369 1.0193693691.014864865 1.016216216 1.018018018 1.0171171171 1.019369369 1.0193693691.014864865 1.016216216 1.018018018 1.0171171171 1.019369369 1.0193693691.014864865 1.016216216 1.018018018 1.0171171171 1.019369369 1.019369369

1.060606061 1.121212121 1.151515152 1.151515152 1.212121212 1.2121212121.060606061 1.121212121 1.151515152 1.151515152 1.212121212 1.2121212121.060606061 1.121212121 1.151515152 1.151515152 1.212121212 1.2121212121.060606061 1.121212121 1.151515152 1.151515152 1.212121212 1.2121212121.060606061 1.121212121 1.151515152 1.151515152 1.212121212 1.2121212121.060606061 1.121212121 1.151515152 1.151515152 1.212121212 1.2121212121.060606061 1.121212121 1.151515152 1.151515152 1.212121212 1.2121212121.060606061 1.121212121 1.151515152 1.151515152 1.212121212 1.212121212

1.060606061 1.121212121 1.151515152 1.151515152 1.212121212 1.2121212121.060606061 1.121212121 1.151515152 1.151515152 1.212121212 1.2121212121.060606061 1.121212121 1.151515152 1.151515152 1.212121212 1.2121212121.060606061 1.121212121 1.151515152 1.151515152 1.212121212 1.2121212121.060606061 1.121212121 1.151515152 1.151515152 1.212121212 1.212121212

1.060606061 1.121212121 1.151515152 1.151515152 1.212121212 1.2121212121.060606061 1.121212121 1.151515152 1.151515152 1.212121212 1.212121212

1.060606061 1.121212121 1.151515152 1.151515152 1.212121212 1.2121212121.060606061 1.121212121 1.151515152 1.151515152 1.212121212 1.2121212121.060606061 1.121212121 1.151515152 1.151515152 1.212121212 1.2121212121.060606061 1.121212121 1.151515152 1.151515152 1.212121212 1.212121212

1.145907473 1.160142349 1.169928826 1.179715302 1.189501779 1.1992882561.145907473 1.160142349 1.169928826 1.179715302 1.189501779 1.1992882561.145907473 1.160142349 1.169928826 1.179715302 1.189501779 1.1992882561.145907473 1.160142349 1.169928826 1.179715302 1.189501779 1.1992882561.145907473 1.160142349 1.169928826 1.179715302 1.189501779 1.1992882561.145907473 1.160142349 1.169928826 1.179715302 1.189501779 1.1992882561.145907473 1.160142349 1.169928826 1.179715302 1.189501779 1.1992882561.145907473 1.160142349 1.169928826 1.179715302 1.189501779 1.199288256

1.145907473 1.160142349 1.169928826 1.179715302 1.189501779 1.199288256

1.145907473 1.160142349 1.169928826 1.179715302 1.189501779 1.1992882561.145907473 1.160142349 1.169928826 1.179715302 1.189501779 1.1992882561.145907473 1.160142349 1.169928826 1.179715302 1.189501779 1.1992882561.145907473 1.160142349 1.169928826 1.179715302 1.189501779 1.1992882561.145907473 1.160142349 1.169928826 1.179715302 1.189501779 1.1992882561.145907473 1.160142349 1.169928826 1.179715302 1.189501779 1.199288256

1.145907473 1.160142349 1.169928826 1.179715302 1.189501779 1.199288256

1.145907473 1.160142349 1.169928826 1.179715302 1.189501779 1.1992882561.145907473 1.160142349 1.169928826 1.179715302 1.189501779 1.1992882561.145907473 1.160142349 1.169928826 1.179715302 1.189501779 1.1992882561.145907473 1.160142349 1.169928826 1.179715302 1.189501779 1.199288256

1.1178097345 1.147123894 1.166482301 1.196349558 1.20630531 1.2157079651.1178097345 1.147123894 1.166482301 1.196349558 1.20630531 1.2157079651.1178097345 1.147123894 1.166482301 1.196349558 1.20630531 1.215707965

1.1178097345 1.147123894 1.166482301 1.196349558 1.20630531 1.2157079651.1178097345 1.147123894 1.166482301 1.196349558 1.20630531 1.2157079651.1178097345 1.147123894 1.166482301 1.196349558 1.20630531 1.2157079651.1178097345 1.147123894 1.166482301 1.196349558 1.20630531 1.215707965

1.149825784 1.159407666 1.170296167 1.179878049 1.18945993 1.2012195121.149825784 1.159407666 1.170296167 1.179878049 1.18945993 1.2012195121.120031797 1.150238474 1.1701112878 1.200052994 1.210121887 1.2201907791.149825784 1.159407666 1.170296167 1.179878049 1.18945993 1.201219512

1.149336283 1.159292035 1.169247788 1.17920354 1.194690265 1.200221239

1.149336283 1.159292035 1.169247788 1.17920354 1.194690265 1.200221239

Page 141: Rencana Anggaran Biaya Pembangunan Gereja

Page 141

1.0175 1.0225 1.0225 1.0225 1.025 1.03251.066666667 1.133333333 1.2 1.2 1.333333333 1.3333333331.066666667 1.133333333 1.2 1.2 1.333333333 1.3333333331.066666667 1.133333333 1.2 1.2 1.333333333 1.3333333331.066666667 1.133333333 1.2 1.2 1.333333333 1.333333333

1 1.0111111111 1.022222222 1.033333333 1.1 11 1.0111111111 1.022222222 1.033333333 1.1 1

1.083333333 1.166666667 1.166666667 1.166666667 1.333333333 1 11 1.0111111111 1.022222222 1.033333333 1.1 11 1.0111111111 1.022222222 1.033333333 1.1 11 1.0111111111 1.022222222 1.033333333 1.1 1

1.0175 1.0225 1.0225 1.0225 1.025 1.03251.0175 1.0225 1.0225 1.0225 1.025 1.03251.0175 1.0225 1.0225 1.0225 1.025 1.03251.0175 1.0225 1.0225 1.0225 1.025 1.03251.0175 1.0225 1.0225 1.0225 1.025 1.03251.0175 1.0225 1.0225 1.0225 1.025 1.03251.0175 1.0225 1.0225 1.0225 1.025 1.03251.0175 1.0225 1.0225 1.0225 1.025 1.03251.0175 1.0225 1.0225 1.0225 1.025 1.0325

1.0175 1.0225 1.0225 1.0225 1.025 1.03251.0175 1.0225 1.0225 1.0225 1.025 1.03251.0175 1.0225 1.0225 1.0225 1.025 1.03251.0175 1.0225 1.0225 1.0225 1.025 1.0325

1.0175 1.0225 1.0225 1.0225 1.025 1.03251.0175 1.0225 1.0225 1.0225 1.025 1.03251.0175 1.0225 1.0225 1.0225 1.025 1.03251.0175 1.0225 1.0225 1.0225 1.025 1.03251.0175 1.0225 1.0225 1.0225 1.025 1.03251.0175 1.0225 1.0225 1.0225 1.025 1.03251.0175 1.0225 1.0225 1.0225 1.025 1.03251.0175 1.0225 1.0225 1.0225 1.025 1.0325

1.0175 1.0225 1.0225 1.0225 1.025 1.03251.0175 1.0225 1.0225 1.0225 1.025 1.03251.0175 1.0225 1.0225 1.0225 1.025 1.03251.0175 1.0225 1.0225 1.0225 1.025 1.03251.0175 1.0225 1.0225 1.0225 1.025 1.0325

1.0175 1.0225 1.0225 1.0225 1.025 1.03251.0175 1.0225 1.0225 1.0225 1.025 1.0325

1.0175 1.0225 1.0225 1.0225 1.025 1.03251.0175 1.0225 1.0225 1.0225 1.025 1.03251.0175 1.0225 1.0225 1.0225 1.025 1.03251.0175 1.0225 1.0225 1.0225 1.025 1.03251.0175 1.0225 1.0225 1.0225 1.025 1.03251.0175 1.0225 1.0225 1.0225 1.025 1.03251.0175 1.0225 1.0225 1.0225 1.025 1.03251.0175 1.0225 1.0225 1.0225 1.025 1.03251.0175 1.0225 1.0225 1.0225 1.025 1.03251.0175 1.0225 1.0225 1.0225 1.025 1.03251.0175 1.0225 1.0225 1.0225 1.025 1.03251.0175 1.0225 1.0225 1.0225 1.025 1.03251.0175 1.0225 1.0225 1.0225 1.025 1.03251.0175 1.0225 1.0225 1.0225 1.025 1.03251.0175 1.0225 1.0225 1.0225 1.025 1.0325

1.230769231 1.2115384615 1.320512821 1.294871795 1.602564103 1.3974358971.230769231 1.2115384615 1.320512821 1.294871795 1.602564103 1.3974358971.231884058 1.217391304 1.289855072 1.289855072 1.594202899 1.3913043481.068965517 1.155172414 1.155172414 1.293103448 1.362068966 1.1551724141.068965517 1.155172414 1.155172414 1.293103448 1.362068966 1.155172414

1.230769231 1.2115384615 1.320512821 1.294871795 1.602564103 1.3974358971.230769231 1.2115384615 1.320512821 1.294871795 1.602564103 1.3974358971.230769231 1.2115384615 1.320512821 1.294871795 1.602564103 1.3974358971.230769231 1.2115384615 1.320512821 1.294871795 1.602564103 1.3974358971.230769231 1.2115384615 1.320512821 1.294871795 1.602564103 1.3974358971.230769231 1.2115384615 1.320512821 1.294871795 1.602564103 1.3974358971.230769231 1.2115384615 1.320512821 1.294871795 1.602564103 1.3974358971.230769231 1.2115384615 1.320512821 1.294871795 1.602564103 1.3974358971.230769231 1.2115384615 1.320512821 1.294871795 1.602564103 1.3974358971.230769231 1.2115384615 1.320512821 1.294871795 1.602564103 1.3974358971.230769231 1.2115384615 1.320512821 1.294871795 1.602564103 1.3974358971.230769231 1.2115384615 1.320512821 1.294871795 1.602564103 1.3974358971.230769231 1.2115384615 1.320512821 1.294871795 1.602564103 1.397435897

1.15 1.160003754 1.170007508 1.180001877 1.190005631 1.21.15 1.160003754 1.170007508 1.180001877 1.190005631 1.21.15 1.160003754 1.170007508 1.180001877 1.190005631 1.21.15 1.160003754 1.170007508 1.180001877 1.190005631 1.21.15 1.160003754 1.170007508 1.180001877 1.190005631 1.21.15 1.160003754 1.170007508 1.180001877 1.190005631 1.2

1.02006552 1.024160524 1.026818182 1.032350532 1.048321048 1.0432022931.15 1.160003754 1.170007508 1.180001877 1.190005631 1.21.15 1.160003754 1.170007508 1.180001877 1.190005631 1.21.15 1.160003754 1.170007508 1.180001877 1.190005631 1.21.15 1.160003754 1.170007508 1.180001877 1.190005631 1.21.15 1.160003754 1.170007508 1.180001877 1.190005631 1.21.15 1.160003754 1.170007508 1.180001877 1.190005631 1.2

1.015444015 1.018018018 1.018018018 1.018018018 1.020592021 1.0257142861.015444015 1.018018018 1.018018018 1.018018018 1.020592021 1.0257142861.015444015 1.018018018 1.018018018 1.018018018 1.020592021 1.0257142861.015444015 1.018018018 1.018018018 1.018018018 1.020592021 1.0257142861.015444015 1.018018018 1.018018018 1.018018018 1.020592021 1.0257142861.015444015 1.018018018 1.018018018 1.018018018 1.020592021 1.0257142861.015444015 1.018018018 1.018018018 1.018018018 1.020592021 1.025714286

1.137931034 1.149425287 1.379310345 1.172413793 1.724137931 1.1494252871.137931034 1.149425287 1.379310345 1.172413793 1.724137931 1.1494252871.137931034 1.149425287 1.379310345 1.172413793 1.724137931 1.1494252871.137931034 1.149425287 1.379310345 1.172413793 1.724137931 1.1494252871.137931034 1.149425287 1.379310345 1.172413793 1.724137931 1.1494252871.137931034 1.149425287 1.379310345 1.172413793 1.724137931 1.149425287

1.137931034 1.149425287 1.379310345 1.172413793 1.724137931 1.1494252871.137931034 1.149425287 1.379310345 1.172413793 1.724137931 1.1494252871.137931034 1.149425287 1.379310345 1.172413793 1.724137931 1.1494252871.137931034 1.149425287 1.379310345 1.172413793 1.724137931 1.1494252871.137931034 1.149425287 1.379310345 1.172413793 1.724137931 1.1494252871.137931034 1.149425287 1.379310345 1.172413793 1.724137931 1.149425287

1.015444015 1.018018018 1.018018018 1.018018018 1.020592021 1.0257142861.015444015 1.018018018 1.018018018 1.018018018 1.020592021 1.0257142861.015444015 1.018018018 1.018018018 1.018018018 1.020592021 1.025714286

1.015444015 1.018018018 1.018018018 1.018018018 1.020592021 1.0257142861.015444015 1.018018018 1.018018018 1.018018018 1.020592021 1.0257142861.015444015 1.018018018 1.018018018 1.018018018 1.020592021 1.0257142861.015444015 1.018018018 1.018018018 1.018018018 1.020592021 1.0257142861.015444015 1.018018018 1.018018018 1.018018018 1.020592021 1.0257142861.015444015 1.018018018 1.018018018 1.018018018 1.020592021 1.0257142861.015444015 1.018018018 1.018018018 1.018018018 1.020592021 1.0257142861.015444015 1.018018018 1.018018018 1.018018018 1.020592021 1.0257142861.015444015 1.018018018 1.018018018 1.018018018 1.020592021 1.0257142861.015444015 1.018018018 1.018018018 1.018018018 1.020592021 1.0257142861.015444015 1.018018018 1.018018018 1.018018018 1.020592021 1.025714286

Page 142: Rencana Anggaran Biaya Pembangunan Gereja

Page 142

1.015444015 1.018018018 1.018018018 1.018018018 1.020592021 1.0257142861.015444015 1.018018018 1.018018018 1.018018018 1.020592021 1.0257142861.015444015 1.018018018 1.018018018 1.018018018 1.020592021 1.0257142861.015444015 1.018018018 1.018018018 1.018018018 1.020592021 1.025714286

1.105105105 1.132132132 1.148648649 1.174174174 1.183183183 1.1906666671.105105105 1.132132132 1.148648649 1.174174174 1.183183183 1.1906666671.105105105 1.132132132 1.148648649 1.174174174 1.183183183 1.1906666671.105105105 1.132132132 1.148648649 1.174174174 1.183183183 1.1906666671.105105105 1.132132132 1.148648649 1.174174174 1.183183183 1.1906666671.105105105 1.132132132 1.148648649 1.174174174 1.183183183 1.1906666671.105105105 1.132132132 1.148648649 1.174174174 1.183183183 1.1906666671.105105105 1.132132132 1.148648649 1.174174174 1.183183183 1.190666667

1.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.0249196141.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.0249196141.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.0249196141.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.0249196141.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.0249196141.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.0249196141.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.024919614

1.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.0249196141.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.0249196141.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.0249196141.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.0249196141.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.0249196141.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.0249196141.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.0249196141.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.0249196141.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.0249196141.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.0249196141.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.0249196141.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.0249196141.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.0249196141.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.0249196141.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.0249196141.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.0249196141.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.0249196141.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.0249196141.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.0249196141.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.0249196141.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.0249196141.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.0249196141.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.0249196141.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.0249196141.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.0249196141.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.0249196141.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.0249196141.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.0249196141.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.0249196141.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.0249196141.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.0249196141.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.0249196141.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.0249196141.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.0249196141.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.0249196141.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.0249196141.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.0249196141.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.0249196141.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.0249196141.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.0249196141.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.0249196141.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.0249196141.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.0249196141.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.0249196141.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.0249196141.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.0249196141.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.0249196141.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.0249196141.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.0249196141.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.0249196141.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.0249196141.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.0249196141.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.0249196141.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.0249196141.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.0249196141.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.0249196141.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.0249196141.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.0249196141.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.0249196141.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.0249196141.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.0249196141.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.024919614

1.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.024919614

1.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.024919614

1.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.024919614

1.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.024919614

1.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.024919614

1.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.0249196141.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.0249196141.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.0249196141.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.0249196141.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.0249196141.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.0249196141.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.0249196141.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.0249196141.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.0249196141.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.0249196141.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.0249196141.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.0249196141.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.0249196141.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.0249196141.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.0249196141.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.0249196141.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.0249196141.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.0249196141.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.0249196141.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.0249196141.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.0249196141.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.0249196141.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.0249196141.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.0249196141.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.0249196141.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.0249196141.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.0249196141.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.0249196141.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.0249196141.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.0249196141.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.0249196141.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.0249196141.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.0249196141.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.024919614

Page 143: Rencana Anggaran Biaya Pembangunan Gereja

Page 143 ANALISA TG.SELOR DAN TG.PALAS 2011.xls

DAFTAR ANALISA PERHITUNGAN UNIT PRICE

DAERAH KABUPATEN BULUNGANTAHUN ANGGARAN 2012

Page 144: Rencana Anggaran Biaya Pembangunan Gereja

Page 144 ANALISA TG.SELOR DAN TG.PALAS 2011.xls

DAFTAR ANALISA PERHITUNGAN UNIT PRICE

DAERAH KABUPATEN BULUNGANTAHUN ANGGARAN 2012

Page 145: Rencana Anggaran Biaya Pembangunan Gereja

Page 145 Harga Material 2011

DAFTAR HARGA MATERIALDINAS PEKERJAAN UMUM KABUPATEN BULUNGANPROPINSI : KALIMANTAN TIMURKABUPATEN : BULUNGANTAHUN ANGGARAN : 2012

NO URAIAN SATUAN

HARGA MATERIAL TAHUN 2012 ( Rp )

KETERANGANZONA 1

TG.SELOR TG. PALAS

I BAHAN

1 Batu Gunung M3 278,437.50 Harga Sudah termasuk PPN 10 %

2 Kerikil Sungai M3 153,780.00

3 Batu Kali Bulat M3 177,760.00

4 Batu Pecah 15 - 20 cm ( Ex Sekatak ) M3 431,200.00

5 Batu Pecah 5 - 7 cm ( Ex Sekatak ) M3 431,200.00

6 Batu Pecah 3 - 5 cm ( Ex Sekatak ) M3 431,200.00

7 Batu Pecah 2 - 3 cm ( Ex Sekatak ) M3 431,200.00

8 Batu Pecah 1 - 2 cm ( Ex Sekatak ) M3 431,200.00

9 Batu Pecah 0,5 - 1 cm ( Ex Sekatak ) M3 431,200.00

10 Abu Batu (ex. Sekatak) M3 431,200.00

11 Pasir Urug / Timbunan M3 95,040.00

12 Pasir Beton M3 107,140.00

13 Kerikil Sungai Tak Disaring M3 28,490.00

14 Timbunan Pilihan M3 66,000.00

15 Timbunan Tanah M3 61,875.00

16 Aspal Kg 17,880.50

17 Batu Bata bh 880.00

18 Bataco bh 2,750.00

19 Minyak Tanah Ltr 6,600.00

20 Minyak Disel / Solar Lt 9,900.00

21 Minyak Premium Lt 9,900.00

22 Minyak Pelumas Lt 38,850.00

23 Tear /Residu lt 8,250.00

24 Semen 40 Kg Kg 1,725.00

25 Semen 40 Kg Zak 68,640.00

26 Semen warna Kg 15,950.00

27 Cat Jembatan Galvanis Kg 38,850.00

28 Kawat Bronjong Kg 21,450.00

Page 146: Rencana Anggaran Biaya Pembangunan Gereja

Page 146 Harga Material 2011

NO URAIAN SATUAN

HARGA MATERIAL TAHUN 2012 ( Rp )

KETERANGANZONA 1

TG.SELOR TG. PALAS

29 Baut Baja Kg 22,200.00

30 Baja Propil Tulangan Beton Kg 15,125.00

31 Alat- alat bantu Unit 56,100.00

32 Profil Tank 650 Lt 1 Unit 870,000.00

33 Profil Tank 1200 Lt 1 Unit 1,600,000.00

34 Profil Tank 2200 Lt 1 Unit 3,000,000.00

35 Kawat Baja ( Bindrat ) Kg 22,200.00

36 Beton Cetak ( Paving Blok ) Buah 3,630.00

37 Air Bersih Ltrr 16.00

38 Koral Sikat Zak 50,000.00

-

II BAHAN ATAP -

1 Genteng Mortir Buah 9,800.00

2 Besi Strip 2 x 1cm Lembar 30,525.00

3 Besi Plat Lembar 18,300.00

4 Besi Plat Strif 1 x 1 cm Lembar 30,525.00

5 Besi Strip 2 x 2 cm Lembar 42,750.00

6 Besi Strip Meter 3,900.00

7 Seng Plastik 0,90 x 1,80 cm Lembar 45,200.00

8 Seng Gelombang Bjls. 30 Lembar 64,950.00

9 Seng Gelombang Bjls. 20 Lembar 51,625.00

10 Seng Plat Bjls. 30 L = 45 cm 1 M' 26,875.00

11 Seng Plat Bjls. 20 L = 45 cm 1 M' 21,650.00

12 Alumunim Foil M2 12,225.00

13 Sakura Roof ( Ukuran standard 77 X 80 cm ). Lembar 45,200.00

14 Surya Roof ( Ukuran standard 77 X 80 cm ). Lembar 79,375.00

15 Multi Roof ( Ukuran standard 77 X 80 cm ) . Lembar 140,425.00

16 Bubungan Sakura Roof ( Model C ) 1 Buah 27,750.00

17 Bubungan Surya Roop( Model C ) 1 Buah 33,300.00

18 Bubungan Multi Roop( Model C ) 1 Buah 61,050.00

19 Genteng glazuur 1 Buah 28,100.00

20 Bubungan genteng glazuur 1 Buah 17,100.00

23 Atap fiber glass 1 Lembar 57,400.00

24 Talang U PVC 4 M' 94,350.00

25 Genteng Sirap bh 530.00

-

Page 147: Rencana Anggaran Biaya Pembangunan Gereja

Page 147 Harga Material 2011

NO URAIAN SATUAN

HARGA MATERIAL TAHUN 2012 ( Rp )

KETERANGANZONA 1

TG.SELOR TG. PALAS

III BAHAN KACA -

1 Kaca Polos T. 3 mm 1 M2 99,900.00

2 Kaca Polos T. 5 mm 1 M2 134,325.00

3 Kaca Buram T. 3 mm 1 M2 146,525.00

4 Kaca Buram T. 5 mm 1 M2 164,300.00

5 Kaca Riben T. 3 mm 1 M2 121,125.00

6 Kaca Riben T. 5 mm 1 M2 149,850.00

7 Kaca Riben T.8 mm 2 M2 178,575.00

8 Kaca Nako Polos T. 3 mm 1 M2 109,900.00

9 Kaca Nako Polos T. 5 mm 1 M2 121,000.00

10 Kaca patri warna ( lokal 100% ) 1 M2 888,000.00

11 Kaca patri warna ( import 100% ) 1 M2 2,664,000.00

12 Kaca cermin T.5 mm 1 M2 213,675.00

13 Glass Block 1 Buah 28,100.00

14 Jendela Nako Bh 122,100.00

-

IV ALAT PENGGANTUNG DAN PENGUNCI -

1 Kunci Yale Itali 1 Buah 222,000.00

2 Kunci Yale Type I 1 Buah 138,750.00

3 Kunci Yale Type II 1 Buah 83,250.00

4 Kunci kuda terbang 1 Buah 83,250.00

5 Kunci Tanam Union 1 Buah 49,950.00

6 Kunci Yale Biasa 1 Buah 72,725.00

7 Kunci Cylindeer WINMA 1 Buah 128,775.00

8 Ensel Kupu - kupu 1 Buah 14,450.00

9 Handel Jendela 1 Buah 25,000.00

10 Hak Angin Biasa 1 Buah 4,450.00

11 Hak Angin Kualitas baik 1 Buah 22,000.00

12 Grendel Biasa 1 Buah 8,900.00

13 Grendel Kuningan 1 Buah 22,200.00

14 Engsel Kuningan 1 Ps 36,650.00

15 Engsel Kuningan Infra 5 Inchi I Buah 36,650.00

16 Pegangan Pintu/door holder 1 Buah 187,050.00

17 Door closer 1 Buah 166,500.00

18 Door Stop 1Buah 125,000.00

-

Page 148: Rencana Anggaran Biaya Pembangunan Gereja

Page 148 Harga Material 2011

NO URAIAN SATUAN

HARGA MATERIAL TAHUN 2012 ( Rp )

KETERANGANZONA 1

TG.SELOR TG. PALAS

-

V BAHAN LANGIT - LANGIT -

1 Gipsum Board 1 Lembar 91,200.00

2 Playwood 3 mm 1 Lembar 54,125.00

3 Playwood 6 mm 1 Lembar 109,900.00

4 Multi Playwood 10 mm 1 Lembar 194,250.00

5 Multi Playwood 18 mm 1 Lembar 270,575.00

6 Texwood 1 Lembar 122,100.00

7 Jabarwood 1 Lembar 55,500.00

8 Plywood Formica 1 Lembar 55,500.00

9 Milamin 1 Lembar 103,800.00

10 List Plafond Gipsim m 30,000.00

11 Tepung Gipsum kg 5,000.00

-

VI BAHAN LANTAI -

1 Keramik 60 x 60 cm 1 Ktk/M2 187,325.00

2 Keramik 40 x 40 1 Ktk/M2 74,925.00

3 Keramik 30 x 30 1 Ktk/M2 55,500.00

4 Keramik 20 x 25 1 Ktk/M2 55,500.00

5 Keramik 20 x 20 cm 1 Ktk/M2 53,300.00

6 Porselin 11 x 11 cm 1 Ktk/M2 49,950.00

7 Mozaik 20 x 20 cm 1 Ktk/M2 88,800.00

8 Mozaik 30 x 30 cm 1 Ktk/M2 91,575.00

9 Granite tile Esenza ( Standart ) 1 Ktk/M2 271,950.00

10 Granite tile Esenza ( Motif Khusus ) 1 Ktk/M2 371,850.00

11 Granite tile Inesa 1 Ktk/M2 323,575.00

12 Ubin marmer Bandung 40 x 40 x 2 M2 304,150.00

13 Ubin marmer Bandung 60 x 40 x 2 M2 329,675.00

14 Ubin marmer Bandung 30 x 30 x 2 M2 243,100.00

15 Ubin marmer Bandung 30 x 10 x 2 M2 186,500.00

16 Ubin PC abu-abu 20x20 bh 3,900.00

17 Ubin plint PC abu-abu 10/20 bh 3,500.00

18 Ubin PC warna 20x20 bh 5,500.00

19 Ubin plint PC warna 10/20 bh 3,500.00

20 Batu Palimanan M2 238,650.00

21 Parquet jati 30 x 5 x 1,5 cm M2 305,250.00

Page 149: Rencana Anggaran Biaya Pembangunan Gereja

Page 149 Harga Material 2011

NO URAIAN SATUAN

HARGA MATERIAL TAHUN 2012 ( Rp )

KETERANGANZONA 1

TG.SELOR TG. PALAS

-

VII BAHAN BESI -

1 Besi Plat Tebal 3 mm - 12 m 1 Lembar 266,400.00

2 Besi beton kg 15,275.00

3 Besi Plat tebal 2mm x 180cm x 240 cm 1 Lembar 499,500.00

4 Besi Strip 2 cm x 2 mm 1 lonjor 38,850.00

5 Besi Strip 1 cm x 1 mm 1 lonjor 27,750.00

6 Besi Baut Diameter 1/2 inch - 45 cm Buah 22,200.00

7 Besi Klam " U " Buah 20,550.00

8 Kawat Duri Roll 184,000.00

9 Kawat Duri Kg 17,775.00

10 Kawat Harmonika 4 x 4 cm 1 M2 34,200.00

11 Kawat Ayam 1 M2 24,975.00

12 Kawat Nyamuk Hitam 1 M2 18,325.00

13 Kawat Nyamuk Putih 1 M2 22,200.00

14 Besi plat strip 1 kg 22,200.00

15 Wiremaah 1kg 22,200.00

-

VIII BAHAN FINISHING -

1 Amplas Kayu / Besi 1 Lembar 5,000.00

2 Amplas Kayu / Besi 1 Meter 10,000.00

3 Kuas Cat 1 Buah 17,350.00

4 Meni Kayu / Besi 5 Kg Kaleng 107,675.00

5 Meni Kayu / Besi 1 Kg 41,625.00

6 Dempul Plamir 5 Kg Kaleng 108,225.00

7 Dempul Plamir 1 Kg 21,925.00

8 Teak Oil 1 Liter 24,425.00

9 Godler / Residu 1 Kg 8,325.00

10 Cat Air 5 Kg Aries 1 Kaleng 36,075.00

11 Cat Air Aries 1 Kg 7,225.00

12 Cat Air 5 kg Catylax 1 Kaleng 104,350.00

13 Cat Air Catylac 1 Kg 20,875.00

14 Cat Lencote interior 1 Kg 55,000.00

15 Cat Mowilex interior 1 kg 59,400.00

16 Cat Mowilex exterior 1 kg 85,800.00

17 Cat duluxe exterior 1 kg 104,500.00

Page 150: Rencana Anggaran Biaya Pembangunan Gereja

Page 150 Harga Material 2011

NO URAIAN SATUAN

HARGA MATERIAL TAHUN 2012 ( Rp )

KETERANGANZONA 1

TG.SELOR TG. PALAS

18 Cat Alkali 1 kg 44,000.00

19 Cat Kilap Glotek 1 Kg 43,850.00

20 Tiner A Spesial 1 Kg 27,750.00

21 Tiner A Biasa 1 Kg 24,425.00

22 Cat Air 5 Kg Gamalek 1 Kaleng 30,525.00

23 Cat Air 5 Kg Gamalek 1 Kg 48,850.00

24 Vernis Clear Lt 45,075.00

25 Vernis warna Lt 46,900.00

26 Pelitur Lt 41,625.00

27 Pelitur Pernis Lt 47,750.00

28 Cat dasar Kg 29,425.00

29 Cat khusus atap 1 Kg 102,125.00

30 Wallpaper kingston M2 57,900.00

31 Soda Api 1 Kg 15,000.00

32 Sabun 1 Kg 16,500.00

33 Batu Apung 1 Kg 13,675.00

-

IX BAHAN SANITAIR -

1 Closed Jongkok Porselin 1 Buah 239,775.00

2 Closed Duduk Porselin 1 Buah 1,665,000.00

3 Wastapel Porselin 1 Buah 1,348,650.00

4 Bak Cuci Alumunium 1 Buah 636,050.00

5 Urinoir Porselin 1 Buah 271,950.00

6 Closed monoblok 1 Buah 1,615,050.00

7 Bath Knip Plastik / Fiber 1 Buah 757,025.00

8 Kran Air biasa 1 Buah 19,425.00

9 Kran Air Stanlis 1 Buah 66,600.00

10 Kran Air Kuningan 1 Buah 27,750.00

11 Bak mandi fiberglas Uk.70x70x66 cm 1 Buah 388,500.00

12 Floor Drain PVC Bh 13,325.00

13 Floor Drain stanlis Bh 75,000.00

14 Pipa PVC Type AW 1/2" batang 16,650.00

15 Pipa PVC Type AW 3/4" batang 19,100.00

16 Pipa PVC Type AW 1" batang 30,875.00

17 Pipa PVC Type AW 1 1/2" batang 51,512.50

18 Pipa PVC Type AW 2" batang 72,150.00

Page 151: Rencana Anggaran Biaya Pembangunan Gereja

Page 151 Harga Material 2011

NO URAIAN SATUAN

HARGA MATERIAL TAHUN 2012 ( Rp )

KETERANGANZONA 1

TG.SELOR TG. PALAS

19 Pipa PVC Type AW 2 1/2" batang 102,675.00

20 Pipa PVC Type AW 3" batang 133,200.00

21 Pipa PVC Type AW 4" batang 199,800.00

22 seal tape bh 3,000.00

-

X BAHAN PAKU -

1 Paku Biasa 1/2" - 1" 1 Kg 21,650.00

2 Paku Biasa 1,5" - 2" 1 Kg 21,650.00

3 Paku Biasa 4" - 5" 1 Kg 21,650.00

4 Paku Ulin 1", 2" , 4" 1 Kg 27,500.00

5 Paku Jembatan Kg 20,900.00

6 Paku Besi Ukuran 1/2 " Kg 31,100.00

7 Paku Besi Ukuran 3/4 " Kg 31,100.00

8 Paku Besi Ukuran 1 " Kg 31,100.00

9 Paku Besi Ukuran 1,50 " Buah 3,615.00

10 Paku Gipsum Kg 22,500.00

11 Paku Genteng Metal bh 450.00

12 Skrub Fixer bh 500.00

-

XI BAHAN KAYU -

1 Kayu Kapur 10x10 cm x 4M 1 M3 1,665,000.00

2 Kayu Meranti 10 x 10 cm x 4M 1 M3 1,443,000.00

3 Papan Kapur 2 x 20 cm x 4M 1 M3 1,887,000.00

4 Papan Meranti 2 x 20 cm x 4M 1 M3 1,443,000.00

5 Balok Meranti 5 x 7 cm x 4M 1 M3 1,443,000.00

6 Balok Meranti 5 x 5 cm x 4M 1 M3 1,443,000.00

7 Kayu Reng 2 x 3 cm x 4M 1 M3 1,443,000.00

8 Kayu Untuk Perancah 1M3 1,221,000.00

9 Kayu Untuk Perancah 4m' 1 Bh 15,960.78

10 Kayu Untuk Konstruksi Jembatan 1M3 1,443,000.00

11 Balok Ulin 10/10 cm x 4 m 1M3 3,850,000.00

12 Balok Ulin 12/12 cm x 4 m 1M3 3,850,000.00

13 Balok Ulin 15/15 cm x 4 m 1M3 3,850,000.00

14 Balok Ulin 20/20 cm x 4 m 1M3 6,050,000.00

15 Balok Ulin 5/10 cm x 4 m 1M3 3,850,000.00

16 Papan Ulin Tebal = 2,5 cm 1M3 3,850,000.00

Page 152: Rencana Anggaran Biaya Pembangunan Gereja

Page 152 Harga Material 2011

NO URAIAN SATUAN

HARGA MATERIAL TAHUN 2012 ( Rp )

KETERANGANZONA 1

TG.SELOR TG. PALAS

17 Papan Ulin Tebal = 5 cm 1M3 3,850,000.00

18 Papan Ulin 9 / 25 cm x 4 m 1M3 4,950,000.00

19 Kayu Bakar M3 49,500.00

20 Lem Kayu Kg 33,300.00

21 List kayu profil m' 8,325.00

-

XII ALUMINIUM -

1 Kusen aluminium 3" YKK ( Doff ) 1M' 80,100.00

2 Kusen aluminium 3" YKK ( Gloss ) 1M' 143,315.00

3 Kusen aluminium 4" YKK ( Doff ) 1M' 109,125.00

4 Kusen aluminium 4" YKK ( Gloss ) 1M' 150,075.00

5 Frame Daun Pintu Alumunium 1M' 100,000.00

6 Frame Daun Jendela Alumunium 1M' 90,000.00

7 Pintu swing standard tanpa kaca ( uk.90x210)Doff,merk YKK Bh 1,236,375.00

8 Pintu swing standard tanpa kaca ( uk.90x210)Gloss,merk YKK Bh 1,492,175.00

9 Pintu swing dg spandel Gloss Grendel(uk.85x210),Doff,merk YKK Bh 1,219,350.00

10 Pintu swing standard tanpa kaca ( uk.85x210)Gloss,merk YKK Bh 1,407,000.00

11 Pintu sliding standard tanpa kaca ( uk.90x210)Gloss,merk YKK Bh 1,028,425.00

12 Pintu Lipat Varia M2 1,904,775.00

13 Pintu swing standard tanpa kaca ( uk.90x210)Doff,merk YKK Bh 1,265,525.00

14 Jendela Casemen standard BV tanpa kaca (A 4,5m' ) Bh 600,350.00

15 Jendela Casemen standard BV tanpa kaca (A 4,5m' ) Bh 675,400.00

16 Jendela Casemen BV tanpa kaca (A 2,8m' )Gloss Bh 469,050.00

17 Jendela Casemen BV tanpa kaca (A 2,8m' )Doff Bh 515,875.00

18 Jendela Sliding ekonomi standard kaca ( A 4,5 m') Gloss Bh 375,250.00

19 Jendela Sliding ekonomi standard kaca ( A 4,5 m') Doff Bh 469,050.00

20 Louvre( Jalusi ) 7 cm,coklat,merk superex 1M' 30,050.00

21 Louvre( Jalusi ) 10 cm,coklat,merk superex 1M' 60,000.00

22 Plafon spandel,coklat,merk superex 1M2 431,425.00

23 Rangka curtain wall,coklat,merk superex 1M2 337,625.00

24 Spring Knip Bh 95,250.00

25 Rell Pintu Dorong / 5m' Bh 1,269,850.00

26 Sealent Kg 22,200.00

27 Sealent Tube 100,000.00

28 Profil Kaca m 7,500.00

29 Sunscren Alumunium M2 753,975.00

Page 153: Rencana Anggaran Biaya Pembangunan Gereja

Page 153 Harga Material 2011

NO URAIAN SATUAN

HARGA MATERIAL TAHUN 2012 ( Rp )

KETERANGANZONA 1

TG.SELOR TG. PALAS

30 Rolling Door Alumunium M2 1,269,850.00

31 Pintu Alumunium M2 720,675.00

32 Rooling Door Besi M2 990,000.00

33 Puzzdith - 100 XR Ltr 41,625.00

34 Batu Granito Plasteran Kg 13,600.00

35 Batu Traso Plasteran Kg 13,600.00

36 Sabun Kg 16,950.00

37 Batu Bata Bali Bh 1,175.00

38 Pengadaan Rangka Baja Kg 42,350.00

39 Assumsi Pengelasan Cm 850.00

40 lempengan rumput biasa m2 38,850.00

41 kawat las listrik kg 27,750.00

42

43

-

Page 154: Rencana Anggaran Biaya Pembangunan Gereja

Page 154 Harga Material 2011

NO URAIAN SATUAN

HARGA MATERIAL TAHUN 2012 ( Rp )

KETERANGANZONA 1

TG.SELOR TG. PALAS

XIII INSTALASI LISTRIK -

1 Lampu Pijar 14 Watt Bh 31,100

2 Saklar Tunggal Bh 13,325

3 Saklar Ganda Bh 16,650

4 Lampu TL Bh 77,700

5 Lampu SL 14 watt 55,500

6 Lampu SL 24 Watt Bh 65,000

7 Stop Kontak Bh 16,650

8 MCB Bh 44,400

9 Kabel NYA 2,5 mm m' 271,950

10 Fiting Lampu bh 22,200

XIV TANAMAN

1 Pupuk Kandang Zak 20,000.00

2 Tanaman Glodok Btg 250,000.00

3 Palem Kipas Btg 562,000.00

4 Rumput Gajah M2 50,000.00

5 Bunga Dadap Merah Btg 300,000.00

Tanjung Selor, Januari 2011KEPALA DINAS PEKERJAAN UMUM

KABUPATEN BULUNGAN

H. ZAINAL ABIDIN, MD, ST, M.SiNIP.19560106 197502 1 001

Page 155: Rencana Anggaran Biaya Pembangunan Gereja

Page 155 Harga Material 2011

306281.25 278,437.50

169158 153,780.00

195536 177,760.00

474320 431,200.00

474320 431,200.00

474320 431,200.00

474320 431,200.00

474320 431,200.00

474320 431,200.00

474320 431,200.00

104544 95,040.00

117854 107,140.00

31339 28,490.00

72600 66,000.00

68062.5 61,875.00

19668.55 17,880.50

968 880.00

3025 2,750.00

7260 6,600.00

10890 9,900.00

10890 9,900.00

42735 38,850.00

9075 8,250.00

1897.5 1,725.00

75504 65000 68,640.00

17545 15,950.00

42735 38,850.00

23595 21,450.00

Page 156: Rencana Anggaran Biaya Pembangunan Gereja

Page 156 Harga Material 2011

24420 22,200.00

16637.5 15,125.00

61710 56,100.00

957000 870,000.00

1760000 1,600,000.00

3300000 3,000,000.00

24420 22,200.00

3993 3,630.00

0

0

10780 9,800.00

33577.5 30,525.00

20130 18,300.00

33577.5 30,525.00

47025 42,750.00

4290 3,900.00

49720 45,200.00

71445 64,950.00

56787.5 51,625.00

29562.5 26,875.00

23815 21,650.00

13447.5 12,225.00

49720 45,200.00

87312.5 79,375.00

154467.5 140,425.00

30525 27,750.00

36630 33,300.00

67155 61,050.00

30910 28,100.00

18810 17,100.00

63140 57,400.00

103785 94,350.00

0

Page 157: Rencana Anggaran Biaya Pembangunan Gereja

Page 157 Harga Material 2011

0

109890 99,900.00

147757.5 134,325.00

161177.5 146,525.00

180730 164,300.00

133237.5 121,125.00

164835 149,850.00

120890 109,900.00

133100 121,000.00

976800 888,000.00

2930400 2,664,000.00

235042.5 213,675.00

30910 28,100.00

134310 122,100.00

0

0

244200 222,000.00

152625 138,750.00

91575 83,250.00

91575 83,250.00

54945 49,950.00

79997.5 72,725.00

141652.5 128,775.00

15895 14,450.00

4895 4,450.00

9790 8,900.00

24420 22,200.00

40315 36,650.00

40315 36,650.00

205755 187,050.00

183150 166,500.00

137500 125,000.00

0

Page 158: Rencana Anggaran Biaya Pembangunan Gereja

Page 158 Harga Material 2011

0

0

100320 91,200.00

59537.5 54,125.00

120890 109,900.00

213675 194,250.00

297632.5 270,575.00

134310 122,100.00

61050 55,500.00

61050 55,500.00

114180 103,800.00

33000 30,000.00

0

0

206057.5 187,325.00

82417.5 74,925.00

61050 55,500.00

61050 55,500.00

58630 53,300.00

54945 49,950.00

97680 88,800.00

100732.5 91,575.00

299145 271,950.00

409035 371,850.00

355932.5 323,575.00

334565 304,150.00

362642.5 329,675.00

267410 243,100.00

205150 186,500.00

4290 3,900.00

3850 3,500.00

6050 5,500.00

3850 3,500.00

262515 238,650.00

335775 305,250.00

Page 159: Rencana Anggaran Biaya Pembangunan Gereja

Page 159 Harga Material 2011

0

0

293040 266,400.00

16802.5 15,275.00

549450 499,500.00

42735 38,850.00

30525 27,750.00

24420 22,200.00

22605 20,550.00

202400 184,000.00

19552.5 17,775.00

37620 34,200.00

27472.5 24,975.00

20157.5 18,325.00

24420 22,200.00

24420 22,200.00

24420

0

0

5500 5,000.00

11000 10,000.00

19085 17,350.00

118442.5 107,675.00

45787.5 41,625.00

119047.5 108,225.00

24117.5 21,925.00

26867.5 24,425.00

9157.5 8,325.00

39682.5 36,075.00

7947.5 7,225.00

114785 104,350.00

22962.5 20,875.00

Page 160: Rencana Anggaran Biaya Pembangunan Gereja

Page 160 Harga Material 2011

48235 43,850.00

30525 27,750.00

26867.5 24,425.00

33577.5 30,525.00

53735 48,850.00

49582.5 45,075.00

51590 46,900.00

45787.5 41,625.00

52525 47,750.00

32367.5 29,425.00

112337.5 102,125.00

63690 57,900.00

16500 15,000.00

18150 16,500.00

15042.5 13,675.00

0

0

263752.5 239,775.00

1831500 1,665,000.00

1483515 1,348,650.00

699655 636,050.00

299145 271,950.00

1776555 1,615,050.00

832727.5 757,025.00

21367.5 19,425.00

73260 66,600.00

30525 27,750.00

427350 388,500.00

14657.5 13,325.00

18315 16,650.00

21010 19,100.00

33962.5 30,875.00

56663.75

79365 72,150.00

Page 161: Rencana Anggaran Biaya Pembangunan Gereja

Page 161 Harga Material 2011

146520 133,200.00

219780 199,800.00

0

0

23815 21,650.00

23815 21,650.00

23815 21,650.00

30250 27,500.00

22990 20,900.00

34210 31,100.00

34210 31,100.00

34210 31,100.00

3976.5 3,615.00

24750 22,500.00

0

0

1831500 1,665,000.00

1587300 1,443,000.00 61.48

2075700 1,887,000.00 38.52

1587300 1,443,000.00

1587300 1,443,000.00 913500

1587300 1,443,000.00

1587300 1,443,000.00

1343100 1,221,000.00 (669,600.00)

17556.8627451 15,960.78 (0.22)

1587300 1,443,000.00 1888887

4235000 3,850,000.00

4235000 3,850,000.00

4235000 3,850,000.00

6655000 6,050,000.00 0.014

4235000 3,850,000.00 71.42857143

4235000 3,850,000.00

Page 162: Rencana Anggaran Biaya Pembangunan Gereja

Page 162 Harga Material 2011

4235000 3,850,000.00

5445000 4,950,000.00

54450 49,500.00

36630 tp.tgh 33,300.00 tg plas timur peso hilir peso bunyu

9157.5 0.9140 8,325.00 0.9171 0.9160 0.9180 0.9178

0

0

88110 80,100.00

157646.5 143,315.00

120037.5 109,125.00

165082.5 150,075.00

1360012.5 1,236,375.00

1641392.5 1,492,175.00

1341285 1,219,350.00

1547700 1,407,000.00

1131267.5 1,028,425.00

2095252.5 1,904,775.00

1392077.5 1,265,525.00

660385 600,350.00

742940 675,400.00

515955 469,050.00

567462.5 515,875.00

412775 375,250.00

515955 469,050.00

33055 30,050.00

66000 60,000.00

474567.5 431,425.00

371387.5 337,625.00

104775 95,250.00

1396835 1,269,850.00

24420 22,200.00

829372.5 753,975.00

Page 163: Rencana Anggaran Biaya Pembangunan Gereja

Page 163 Harga Material 2011

1396835 1,269,850.00

792742.5 720,675.00

45787.5 41,625.00

14960 13,600.00

14960 13,600.00

18645 16,950.00

1292.5 1,175.00

46585 42,350.00

935 850.00

42735 38,850.00

30525 27,750.00

Page 164: Rencana Anggaran Biaya Pembangunan Gereja

Page 164 Harga Material 2011

34210 31,100.00

14657.5 77,700.00

18315 55,500.00

85470 16,650.00

61050

71500 13,325.00

18315 55,500.00

48840 16,650.00

299145 271,950.00

24420 22,200

Tanjung Selor, Januari 2011KEPALA DINAS PEKERJAAN UMUM

KABUPATEN BULUNGAN

H. ZAINAL ABIDIN, MD, ST, M.SiNIP.19560106 197502 1 001

Page 165: Rencana Anggaran Biaya Pembangunan Gereja

Page 165 Daftar Harga Pipa dan Assesories 2012

HARGA SATUAN PIPA DAN ASSESORIES KECAMATAN TANJUNG SELOR DAN TANJUNG PALAS 2012

NO URAIAN SATUAN KETERANGANBAHAN 2012

ZONA 1Kec.TG.Selor

/TG.Palas1 GIP

300 12 " Per Meter 789,579.50 Harga200 8 " Per Meter 732,325.00 Sudah 150 6 " Per Meter 628,468.00 Termasuk 100 4 " Per Meter 419,422.50 PPn 10 %75 3 " Per Meter 362,634.03 50 2 " Per Meter 151,125.25 40 1.1/2 " Per Meter 84,017.65 25 1 " Per Meter 39,279.25 20 3/4 " Per Meter 34,752.15

12.5 1/2 " Per Meter 22,262.68

PVC RRJ S. 12,5300 Per Meter 399,994.25 200 Per Meter 247,648.61 150 Per Meter 171,823.62 100 Per Meter 146,780.50 75 Per Meter 86,190.07 50 Per Meter 44,729.80 40 Per Meter 26,190.93 25 Per Meter 15,651.96

- PVC SC S. 12,5 -

300 Per Meter 399,994.25 200 Per Meter 247,648.61 150 Per Meter 171,823.62 100 Per Meter 146,780.50 75 Per Meter 86,190.07 50 Per Meter 44,729.80 40 Per Meter 26,190.93 25 Per Meter 15,651.96 20 Per Meter 9,182.48

12.5 Per Meter 6,295.57

NO URAIAN SATUAN KETERANGANBAHAN 2012

ZONA 1Kec.TG.Selor

/TG.PalasPVC RRJ S. 10

300 Per Meter 429,029.27 Harga200 Per Meter 283,357.85 Sudah 150 Per Meter 184,565.87 Termasuk 100 Per Meter 173,061.71 PPn 10 %75 Per Meter 96,134.83 50 Per Meter 59,458.13 40 Per Meter 37,276.67 25 Per Meter 22,249.37

PVC SC S. 10 - 300 Per Meter 429,029.27 200 Per Meter 283,357.85

HARGA SATUAN BAHAN 2010

PIPA Ø

PIPA Ø

PIPA Ø

HARGA SATUAN BAHAN 2010

PIPA Ø

PIPA Ø

Page 166: Rencana Anggaran Biaya Pembangunan Gereja

Page 166 Daftar Harga Pipa dan Assesories 2012

150 Per Meter 184,565.87 100 Per Meter 173,061.71 75 Per Meter 96,134.83 50 Per Meter 59,458.13 40 Per Meter 37,276.67 25 Per Meter 22,249.37 20 Per Meter 14,412.16

12.5 Per Meter 9,666.69 -

Page 167: Rencana Anggaran Biaya Pembangunan Gereja

Page 167 Daftar Harga Pipa dan Assesories 2012

2 GATE VALVE - 200 Per Buah 9,508,907.25 150 Per Buah 7,276,381.20 100 Per Buah 4,054,065.98 75 Per Buah 2,728,642.95 50 Per Buah 1,975,408.07

- 3 FLANGE SOCKED -

200 Per Buah 724,294.72 150 Per Buah 486,697.87 100 Per Buah 288,862.27 75 Per Buah 216,314.16 50 Per Buah 141,573.07

- 4 FLANGE SPIGOTE -

200 Per Buah 648,187.52 150 Per Buah 485,763.16

NO URAIAN SATUAN KETERANGANBAHAN 2012

ZONA 1Kec.TG.Selor

/TG.Palas100 Per Buah 463,761.45 75 Per Buah 158,397.90 Harga50 Per Buah 146,678.04 Sudah

- Termasuk 5 FLANGE LAS - PPn 10 %

300 Per Buah 705,348.81 250 Per Buah 546,303.80 200 Per Buah 344,621.49 150 Per Buah 239,250.58 100 Per Buah 166,437.50 75 Per Buah 128,343.29 50 Per Buah 75,352.25

- 6 BLIND FLANGE -

300 Per Buah 904,514.58 250 Per Buah 668,679.30 200 Per Buah 465,918.48 150 Per Buah 336,065.27 100 Per Buah 220,696.13 75 Per Buah 126,977.17 50 Per Buah 97,785.36

- 7 ALL SOCKET TEE -

RRJ - 200 X200 Per Buah 823,985.46

X150 Per Buah 712,538.91 X100 Per Buah 634,382.52 X75 Per Buah 353,285.56 X50 Per Buah -

- 150 X150 Per Buah 813,847.42

X100 Per Buah 729,076.14 X75 Per Buah 665,883.15 X50 Per Buah 554,248.86

Per Buah - 100 X100 Per Buah 501,725.18

X75 Per Buah 469,801.13 X50 Per Buah 466,997.00

HARGA SATUAN BAHAN 2010

Page 168: Rencana Anggaran Biaya Pembangunan Gereja

Page 168 Daftar Harga Pipa dan Assesories 2012

NO URAIAN SATUAN KETERANGANBAHAN 2012

ZONA 1Kec.TG.Selor

/TG.Palas75 X75 Per Buah 437,769.24

X50 Per Buah 405,953.05 Harga - Sudah

50 X50 Per Buah 169,398.76 Termasuk - PPn 10 %

200 X200 Per Buah 756,074.97 X150 Per Buah 644,412.71 X100 Per Buah 583,440.66 X75 Per Buah 169,398.76 X50 Per Buah -

- 150 X150 Per Buah 756,074.97

X100 Per Buah 644,412.71 X75 Per Buah 583,440.66 X50 Per Buah 169,398.76

- 100 X100 Per Buah 409,835.70

X75 Per Buah 284,620.11 X50 Per Buah 284,620.11

- 75 X75 Per Buah 215,703.00

X50 Per Buah 156,456.58 -

50 X50 Per Buah 105,135.24 -

7 ALL FLANGE TEE - CI -

200 X200 Per Buah 1,233,533.56 X150 Per Buah 1,011,934.67 X100 Per Buah 888,480.66 X75 Per Buah 866,407.05 X50 Per Buah 862,495.64

- 150 X150 Per Buah 841,241.70

X100 Per Buah 776,530.80 X75 Per Buah 830,456.55 X50 Per Buah 737,344.76

NO URAIAN SATUAN KETERANGANBAHAN 2012

ZONA 1Kec.TG.Selor

/TG.Palas100 X100 Per Buah 663,286.73

X75 Per Buah 554,033.16 HargaX50 Per Buah 525,668.21 Sudah

- Termasuk 75 X75 Per Buah 458,368.88 PPn 10 %

X50 Per Buah 419,542.34 -

50 X50 Per Buah 350,517.38 -

ALL FLANGE TEE - GIV -

HARGA SATUAN BAHAN 2010

HARGA SATUAN BAHAN 2010

Page 169: Rencana Anggaran Biaya Pembangunan Gereja

Page 169 Daftar Harga Pipa dan Assesories 2012

200 X200 Per Buah 1,295,210.23 X150 Per Buah 1,062,531.41 X100 Per Buah 932,904.69 X75 Per Buah 909,727.40 X50 Per Buah 905,620.42

- 150 X150 Per Buah 883,303.79

X100 Per Buah 815,357.34 X75 Per Buah 871,979.38 X50 Per Buah 774,211.99

- 100 X100 Per Buah 696,451.06

X75 Per Buah 581,734.81 X50 Per Buah 551,951.62

Page 170: Rencana Anggaran Biaya Pembangunan Gereja

Page 170 Daftar Harga Pipa dan Assesories 2012

- 75 X75 Per Buah 481,287.32

X50 Per Buah 440,519.45 Per Buah -

50 X50 Per Buah 368,043.24 -

8 BEND RRJ - 90 x300 Per Buah 1,028,831.41

X200 Per Buah 963,761.00 X150 Per Buah 455,708.54 X100 Per Buah 204,673.39 X75 Per Buah 100,763.07 X50 Per Buah 50,086.24

NO URAIAN SATUAN KETERANGANBAHAN 2012

ZONA 1Kec.TG.Selor

/TG.Palas45 ; 22,5 X200 Per Buah 665,659.46

X150 Per Buah 393,154.67 HargaX100 Per Buah 140,206.95 Sudah X75 Per Buah 84,124.17 Termasuk X50 Per Buah 40,965.59 PPn 10 %

- BEND SC -

90 x300 Per Buah 756,398.52 X200 Per Buah 884,669.90 X150 Per Buah 399,553.86 X100 Per Buah 163,466.92 X75 Per Buah 90,091.95 X50 Per Buah 80,025.81

- 45 ; 22,5 X200 Per Buah 639,918.90

X150 Per Buah 340,415.28 X100 Per Buah 114,682.10 X75 Per Buah 64,171.64 X50 Per Buah 31,458.49

- BEND CI -

90 x300 Per Buah 1,159,124.01 X200 Per Buah 1,064,638.11 X150 Per Buah 573,050.97 X100 Per Buah 237,273.30 X75 Per Buah 183,347.55 X50 Per Buah 161,777.25

45 ; 22,5 X200 Per Buah 683,059.50 X150 Per Buah 523,279.50 X100 Per Buah 226,488.15 X75 Per Buah 204,917.85 X50 Per Buah 152,989.35

BEND GIP - 90 x300 Per Buah 1,316,147.81

X200 Per Buah 1,266,392.31 X150 Per Buah 690,537.20 X100 Per Buah 392,148.05 X75 Per Buah 347,713.24 X50 Per Buah 331,032.20

HARGA SATUAN BAHAN 2010

Page 171: Rencana Anggaran Biaya Pembangunan Gereja

Page 171 Daftar Harga Pipa dan Assesories 2012

NO URAIAN SATUAN KETERANGANBAHAN 2012

ZONA 1Kec.TG.Selor

/TG.Palas45 ; 22,5 X200 Per Buah 1,047,669.47

X150 Per Buah 828,011.92 HargaX100 Per Buah 511,216.11 Sudah X75 Per Buah 496,116.90 Termasuk X50 Per Buah 288,323.01 PPn 10 %

HARGA SATUAN BAHAN 2010

Page 172: Rencana Anggaran Biaya Pembangunan Gereja

Page 172 Daftar Harga Pipa dan Assesories 2012

- 9 DOP -

200 Per Buah 122,231.70 150 Per Buah 107,851.50 100 Per Buah 79,091.10 75 Per Buah 58,958.82 50 Per Buah 48,533.18 25 Per Buah 18,334.76

- 10 CLAMB SADLE -

75 X 1/2 Per Buah 54,644.76 50 X 1/2 Per Buah 45,297.63

- 11 WATER METER INDUK -

500 20" Per Buah 156,093,115.81 400 16" Per Buah 103,294,550.64 300 12" Per Buah 74,457,639.83 250 10" Per Buah 27,762,803.24 200 8" Per Buah 19,454,208.79 150 6" Per Buah 15,493,918.81 100 4" Per Buah 9,979,083.72 75 3" Per Buah 8,383,892.66 50 2" Per Buah 7,230,944.60 40 1. 1/2" Per Buah 4,213,166.80

30/32 1. 3/4" Per Buah 3,060,276.76 25 1" Per Buah 2,544,692.96 20 3/4" Per Buah 952,457.99 15 1/2" Per Buah 270,703.80

- 13 REDUCER RRJ -

200 X 150 Per Buah 333,368.99 X 100 Per Buah 324,633.02

150 X 100 Per Buah 281,600.27 X 75 Per Buah 281,600.27

NO URAIAN SATUAN KETERANGANBAHAN 2012

ZONA 1Kec.TG.Selor

/TG.Palas100 X 75 Per Buah 193,773.20

X 50 Per Buah 193,773.20 Harga75 X 50 Per Buah 104,220.50 Sudah 50 X 32 Per Buah 85,022.93 Termasuk 50 X 25 Per Buah 75,402.58 PPn 10 %25 X 3/4 Per Buah 53,997.65

3/4 X 1/2 Per Buah 34,152.98 -

REDUCER - 200 X 150 Per Buah 323,734.25

X 100 Per Buah 310,432.57 150 X 100 Per Buah 237,956.36

X 75 Per Buah 209,483.56 100 X 75 Per Buah 176,013.65

X 50 Per Buah 129,421.80 75 X 50 Per Buah 94,909.32 50 X 32 Per Buah 82,470.45 50 X 25 Per Buah 71,541.50 25 X 3/4 Per Buah 50,977.81

3/4 X 1/2 Per Buah 32,247.60 -

REDUCER GIP - 200 X 150 Per Buah 1,022,432.22

X 100 Per Buah 931,836.96

HARGA SATUAN BAHAN 2010

Page 173: Rencana Anggaran Biaya Pembangunan Gereja

Page 173 Daftar Harga Pipa dan Assesories 2012

150 X 100 Per Buah 683,059.50 X 75 Per Buah 554,284.81

100 X 75 Per Buah 366,695.10 X 50 Per Buah 323,554.50

75 X 50 Per Buah 266,033.70 50 X 32 Per Buah 194,815.76 50 X 25 Per Buah 110,727.54 25 X 3/4 Per Buah 108,211.01

3/4 X 1/2 Per Buah 104,615.96 -

REDUCER FLANGE / CI - 200 X 150 Per Buah 553,206.29

X 100 Per Buah 485,475.55 150 X 100 Per Buah 410,842.31

X 75 Per Buah 338,509.91

Page 174: Rencana Anggaran Biaya Pembangunan Gereja

Page 174 Daftar Harga Pipa dan Assesories 2012

NO URAIAN SATUAN KETERANGANBAHAN 2012

ZONA 1Kec.TG.Selor

/TG.Palas100 X 75 Per Buah 269,628.75

X 50 Per Buah 238,279.91 Harga75 X 50 Per Buah 136,611.90 Sudah 50 X 32 Per Buah 125,826.75 Termasuk 50 X 25 Per Buah 102,710.58 PPn 10 %25 X 3/4 Per Buah 79,450.61

3/4 X 1/2 Per Buah 71,541.50 -

14 KARET PACKING - 300 Per Buah 119,930.87 250 Per Buah 113,459.78 200 Per Buah 79,091.10 150 Per Buah 67,586.94 100 Per Buah 49,611.69

75 Per Buah 41,271.17 50 Per Buah 27,897.59

- 15 GIBOULT JOINT -

200 Per Buah 698,158.71 150 Per Buah 540,192.21 100 Per Buah 353,321.51

75 Per Buah 266,752.71 50 Per Buah 252,516.31

- 16 PUDDLE PIPE GIV -

300 Per Buah 1,078,515.00 250 Per Buah 682,196.69 200 Per Buah 438,236.60 150 Per Buah 426,660.53 100 Per Buah 395,455.50

- 17 BAUT -

3/4 ' - 7.5 CM Per Buah 9,490.93 5/8 ' - 7.5 CM Per Buah 7,909.11

- 18 STREET BOX Per Buah 186,942.60

-

NO URAIAN SATUAN KETERANGANBAHAN 2012

ZONA 1Kec.TG.Selor

/TG.Palas19 STOP KRAN

50 Per Buah 179,752.50 Harga40 Per Buah 115,041.60 25 Per Buah 50,330.70 Sudah

- Termasuk 20 Dresser Joint Ø 75 mm CI Per Buah 347,012.20 PPn 10 %

Dresser Joint Ø 100 mm CI Per Buah 444,887.44 -

21 Flexible Joint Ø 50 mm CI Per Buah 252,696.06 Flexible Joint Ø 75 mm CI Per Buah 293,625.71

- 22 Pasir Silika Per Kilogramm 6,471.09

HARGA SATUAN BAHAN 2010

HARGA SATUAN BAHAN 2010

Page 175: Rencana Anggaran Biaya Pembangunan Gereja

Page 175 Daftar Harga Pipa dan Assesories 2012

23 Nosel Per Buah 35,950.50 -

Bahan Kimia Gramm 30,787.50

Tanjung Selor, 2012KEPALA DINAS PEKERJAAN UMUM

KABUPATEN BULUNGAN

H. ZAINAL ABIDIN, MD, ST, M.SiNIP. 195601061975021001

Page 176: Rencana Anggaran Biaya Pembangunan Gereja

Page 176 Daftar Harga Pipa dan Assesories 2012

ZONA I KOEFISIEN 1

TANJUNG SELORKM 9KM 12TANJUNG BUKA-TRANSTANJUNG PALASTERASSALIM BATU

ZONA I KOEFISIEN 1.15

KLUBIRPIMPINGKARANG AGUNGSEPATUNG ( PANCA AGUNG )ARDIMULYOMENTADAURUHUI RAHAYUTANJUNG AGUNGWONOMULYOSAJAU PUNGITSAJAU TENGAHSAJAU HILIRBINAI

Page 177: Rencana Anggaran Biaya Pembangunan Gereja

Page 177 Daftar Harga Pipa dan Assesories 2012

ZONA 11 KECAMATAN TANJUNG SELOR2 KECAMATAN TANJUNG PALAS

ZONA 21 KECAMATAN TANJUNG PALAS TENGAH

2 KECAMATAN TANJUNG PALAS UTARA

ZONA 31 KECAMATAN SEKATAK

ZONA 41 KECAMATAN TANJUNG PALAS BARAT

KECAMATAN PESO HILIR

ZONA 5KECAMATAN PESO

Page 178: Rencana Anggaran Biaya Pembangunan Gereja

Page 178 Daftar Harga Pipa dan Assesories 2012

ZONA 6KECAMATAN TANJUNG PALAS TIMUR

ZONA 7KECAMATAN BUNYU

Page 179: Rencana Anggaran Biaya Pembangunan Gereja

Page 179 Daftar Harga Pipa dan Assesories 2012

90,000.00 7,500.00 90,000.00

75,000.00 6,250.00 75,000.00

Page 180: Rencana Anggaran Biaya Pembangunan Gereja

Page 180 Daftar Harga Pipa dan Assesories 2012

Page 181: Rencana Anggaran Biaya Pembangunan Gereja

Page 181 Daftar Harga Pipa dan Assesories 2012

Page 182: Rencana Anggaran Biaya Pembangunan Gereja

Page 182 Daftar Harga Pipa dan Assesories 2012

Page 183: Rencana Anggaran Biaya Pembangunan Gereja

Page 183 Daftar Harga Pipa dan Assesories 2012

Page 184: Rencana Anggaran Biaya Pembangunan Gereja

Page 184 Daftar Harga Pipa dan Assesories 2012

Page 185: Rencana Anggaran Biaya Pembangunan Gereja

Page 185 Daftar Harga Pipa dan Assesories 2012

Page 186: Rencana Anggaran Biaya Pembangunan Gereja

Page 186 Daftar Harga Pipa dan Assesories 2012

Page 187: Rencana Anggaran Biaya Pembangunan Gereja

Page 187 Daftar Harga Pipa dan Assesories 2012

Page 188: Rencana Anggaran Biaya Pembangunan Gereja

Page 188 Daftar Harga Pipa dan Assesories 2012

Page 189: Rencana Anggaran Biaya Pembangunan Gereja

Page 189 Daftar Harga Pipa dan Assesories 2012

Page 190: Rencana Anggaran Biaya Pembangunan Gereja

Page 190 Daftar Harga Pipa dan Assesories 2012

Page 191: Rencana Anggaran Biaya Pembangunan Gereja

Page 191 Daftar Harga Pipa dan Assesories 2012

Page 192: Rencana Anggaran Biaya Pembangunan Gereja

Page 192 Daftar Harga Pipa dan Assesories 2012

Page 193: Rencana Anggaran Biaya Pembangunan Gereja

Page 193 Daftar Harga Pipa dan Assesories 2012

Page 194: Rencana Anggaran Biaya Pembangunan Gereja

Page 194 Daftar Harga Pipa dan Assesories 2012

Page 195: Rencana Anggaran Biaya Pembangunan Gereja

DAFTAR HARGA UPAH TAHUN 2014DINAS PEKERJAAN UMUM KABUPATEN BULUNGANPROPINSI : KALIMANTAN TIMURKABUPATEN : BULUNGANTAHUN ANGGARAN : 2014

NO URAIAN SATUAN

DAFTAR UPAH TAHUN 2012 ( Rp )

KETERANGANZONA 1

TG.SELOR

TG. PALAS

1 2 3 4 10

1 Mandor Lapangan Hari 77,000.00 2 Mekanik Hari 71,500.00 3 Pembantu Mekanik Hari 49,500.00 4 Tukang Hari 60,500.00 5 Kepala Tukang Hari 71,500.00 6 Operator Terlatih Hari 66,000.00 7 Operator Kurang Terlatih Hari 55,000.00 8 Pembantu Operator Hari 49,500.00 9 Sopir Truk Hari 66,000.00

10 Sopir Personil Hari 66,000.00 11 Pembantu Sopir / Kernek Hari 49,500.00 12 Buruh Lapangan Terlatih Hari 49,500.00 13 Buruh Lapangan Agak Terlatih Hari 46,750.00 14 Buruh Lapangan Tidak Terlatih Hari 44,000.00

Tanjung Selor, Januari 2011KEPALA DINAS PEKERJAAN UMUM

KABUPATEN BULUNGAN

H. ZAINAL ABIDIN, MD, ST, M.SiNIP.19560106 197502 1 001

Page 196: Rencana Anggaran Biaya Pembangunan Gereja

PERHITUNGAN VOLUME

KEGIATAN : PEMBANGUNAN GEDUNG KANTORPEKERJAAN : PEMBANGUNAN MARKAS PEMADAMAN KEBAKARAN LOKASI : TANJUNG SELORTAHUN ANGGARAN : 2012

NO URAIAN PEKERJAAN VOLUME SATUAN

1 2 3 4

I PEKERJAAN PERSIAPAN1 Pembuatan papan nama proyek 1.00 Bh2 Pembongkaran dan pembersihan bangunan lama 1.00 Ls3 Pasang pagar seng gelombang (pengaman proyek) 200.00 M14 Pengukuran dan pasang bowplank 135.60 M15 Pembuatan direksikeet dan perlengkapannya 24.00 M26 Pelaporan Kegiatan dan Asbuilt drawing 1.00 Ls

II PEKERJAAN TANAH DAN URUGAN1 Urugan tanah peninggian peil lantai 868.14 M3

Luas Bangunan 667.80 m2Tinggi timbunan 1.30 m

2 Galian tanah pondasi menerus 246.38 M3Panjang Gali memanjang 177.20 m

melintang 165.00 mTotal panjang 342.20 m

Lebar galian 0.90 mTinggi galian 0.80 m

3 Galian tanah pondasi setempat 226.80 M3Jumlah poorplate 50 bh

Luas Poorplate 3.24 M2tinggi galian 1.4 M

4 Urugan tanah kembali 94.64 M35 Urugan pasir bawah pondasi dan lantai, tebal 10 cm 97.58 M3

Tebal Urugan 0.1 m

III PEKERJAAN PONDASI1 Pengadaan tiang pancang beton pre cast 25/25 K 500 4,664.00 M1

Jumlah Pancang isi 5 60 bhjumlah Pancang isi 4 152 bhkedalaman pancang 22 m

2 Pemancangan tiang pancang beton 25/25 4,664.00 M13 Penyambungan tiang pancang 636.00 cm4 Beton lantai kerja bawah pile cap, t = 3 cm (1:3:5) 4.51 M35 Beton pile cap (K.225 ) 75.13 M3

- Pasang begisting 173.20 M2 - bongkar begisting 173.20 M2 - Besi beton ulir Ø 19 9,062.63 Kg

5 Aanstampeng batu gunung tinggi 20 cm 61.60 M3Luas 0.18 m2

6 Pasangan Batu gunung cam 1:4 164.26 M3Luas 0.48 m2

IV PEKERJAAN BETONA LANTAI 1

1 Sloof S 30/40 ( K.225 ) 48.14 M3 - Pasang begisting 320.96 M2 - Bongkar begisting 320.96 M2 - Besi beton ulir Ø19 8,946.76 Kg - Besi beton polos Ø12 3,341.37 Kg

2 Sloof S1 20/30 (K.225 ) 4.58 M3 - Pasang begisting 45.84 M2 - Bongkar begisting 45.84 M2 - Besi beton ulir Ø13 397.28 Kg - Besi beton polos Ø10 314.88 Kg

PEMERINTAH KABUPATEN BULUNGANDINAS PEKERJAAN UMUM

Jalan Teratai Telepon (0552) 21020 Tanjung Selor

Page 197: Rencana Anggaran Biaya Pembangunan Gereja

3 Balok Gantung 15/30 0.36 M3 - Pasang begisting 6.00 M2 - Bongkar begisting 6.00 M2 - Besi beton polos Ø12 42.82 Kg - Besi beton polos Ø10 30.17 Kg

4 Beton Bo lantai kerja bawah sloof, t = 3 cm ( 1:3:5 ) 12.04 M35 Beton bertulang plat lantai dasar, t = 15 cm ( K.225 ) 101.07 M3

- Pasang begisting 88.40 M2 - Bongkar begisting 88.40 M2 - Besi beton polos Ø 12 ### Kg

6 Beton Kolom K1 40/60 ( K.225 ) 19.68 M3 - Pasang begisting 164.00 M2 - Bongkar begisting 164.00 M2 - Besi beton ulir Ø19 2,560.04 Kg - Besi beton polos Ø12 975.25 Kg

7 Beton Kolom K2 40/40 ( K.225 ) 19.01 M3 - Pasang begisting 190.08 M2 - Bongkar begisting 190.08 M2 - Besi beton ulir Ø19 3,179.09 Kg - Besi beton polos Ø12 1,130.34 Kg

8 Beton Kolom K3 40/40 ( K.225 ) 21.15 M3 - Pasang begisting 211.52 M2 - Bongkar begisting 211.52 M2 - Besi beton ulir Ø19 3,537.67 Kg - Besi beton polos Ø12 1,257.84 Kg

9 Beton Kolom K6 30/80 ( K.225 ) 3.98 M3 - Pasang begisting 36.52 M2 - Bongkar begisting 36.52 M2 - Besi beton ulir Ø19 666.32 Kg - Besi beton polos Ø12 217.17 Kg

###Kolom K4 10/20 ( 1:2:3 ) 1.29 m3 - Pasang begisting 25.76 M2 - Bongkar begisting 25.76 M2 - Besi beton polos Ø12 344.67 Kg - Besi beton polos Ø 8 67.83 Kg

###Kolom K5 15/50 ( 1:2:3 ) 1.38 m3 - Pasang begisting 23.92 M2 - Bongkar begisting 23.92 M2 - Besi beton polos Ø12 164.13 Kg - Besi beton polos Ø 10 62.99 Kg

###Plat kanopi t = 10 cm ( 1:2:3 ) 1.44 M3 - Pasang begisting 18.00 M2 - Bongkar begisting 18.00 M2 - Besi beton polos Ø12 214.08 Kg

###Beton Tangga Utama ( K.225 ) 3.25 M3 - Pasang begisting 21.65 M2 - Bongkar begisting 21.65 M2 - Besi beton ulir Ø13 600.29 Kg

###Beton Tangga Darurat ( K.225 ) 1.20 M3 - Pasang begisting 7.99 M2 - Bongkar begisting 7.99 M2 - Besi beton ulir Ø13 221.64 Kg

###Balok Latei 15/25 ( 1:2:3 ) 0.68 M3 - Pasang begisting 11.70 M2 - Bongkar begisting 11.70 M2 - Besi beton polos Ø12 96.34 Kg - Besi beton polos Ø 8 38.24 Kg

###Beton parit keliling bangunan ( 1:2:3) 15.18 M3 - Pasang begisting 193.20 M2 - Bongkar begisting 193.20 M2 - Besi beton polos Ø12 1,016.88 Kg

###Beton lantai kerja (Bo) parit keliling bangunan 1.66 M3

Page 198: Rencana Anggaran Biaya Pembangunan Gereja
Page 199: Rencana Anggaran Biaya Pembangunan Gereja

B LANTAI 21 Plat lantai 2, t = 12 cm ( K.225 ) 10.80 M3

- Pasang begisting 90.00 M2 - Bongkar begisting 90.00 M2 - Besi beton polos Ø 12 2,140.80 Kg

2 Balok Lantai B1 30/60 ( K.225 ) 24.30 M3 - Pasang begisting 202.50 M2 - Bongkar begisting 202.50 M2 - Besi beton ulir Ø19 4,816.80 Kg - Besi beton polos Ø 12 1,446.65 Kg

3 Balok Lantai B2 30/50 ( K.225 ) 3.75 M3 - Pasang begisting 32.50 M2 - Bongkar begisting 32.50 M2 - Besi beton ulir Ø19 836.25 Kg - Besi beton polos Ø 12 239.29 Kg

4 Balok Lantai B3 25/40 ( K.225 ) 1.50 M3 - Pasang begisting 15.75 M2 - Bongkar begisting 15.75 M2 - Besi beton ulir Ø19 401.40 Kg - Besi beton polos Ø 12 117.12 Kg

5 Balok Lantai BA 25/35 ( K.225 ) 1.58 M3 - Pasang begisting 17.10 M2 - Bongkar begisting 17.10 M2 - Besi beton ulir Ø19 240.84 Kg - Besi beton polos Ø 12 129.52 Kg

6 Balok Gantung 15/30 ( 1 : 2 3 ) 0.36 M3 - Pasang begisting 6.00 M2 - Bongkar begisting 6.00 M2 - Besi beton polos Ø12 57.09 Kg - Besi beton polos Ø10 30.17 Kg

7 Beton Kolom K1 40/60 ( K.225 ) 3.22 M3 - Pasang begisting 26.80 M2 - Bongkar begisting 26.80 M2 - Besi beton ulir Ø19 418.35 Kg - Besi beton polos Ø12 159.37 Kg

8 Beton Kolom K2 40/40 ( K.225 ) 5.36 M3 - Pasang begisting 53.60 M2 - Bongkar begisting 53.60 M2 - Besi beton ulir Ø19 896.46 Kg - Besi beton polos Ø12 333.01 Kg

9 Beton Kolom K3 40/40 ( K.225 ) 10.72 M3 - Pasang begisting 107.20 M2 - Bongkar begisting 107.20 M2 - Besi beton ulir Ø19 1,792.92 Kg - Besi beton polos Ø12 666.03 Kg

###Beton Kolom K4 10/20 ( 1:2:3 ) 0.94 M3 - Pasang begisting 28.14 M2 - Bongkar begisting 28.14 M2 - Besi beton polos Ø12 167.34 Kg - Besi beton polos Ø8 206.45 Kg

###Kolom K5 15/50 ( 1:2:3 ) 1.01 m3 - Pasang begisting 17.42 M2 - Bongkar begisting 17.42 M2 - Besi beton polos Ø12 119.53 Kg - Besi beton polos Ø 10 71.65 Kg

###Ringbalk pagar void 10/10 ( 1:2:3 ) 0.06 M3

Page 200: Rencana Anggaran Biaya Pembangunan Gereja

- Pasang begisting 1.20 M2 - Bongkar begisting 1.20 M2 - Besi beton polos Ø12 21.41 Kg - Besi beton polos Ø8 6.48 Kg

###Plat kanopi t = 10 cm ( 1:2:3 ) 8.05 M3 - Pasang begisting 100.60 M2 - Bongkar begisting 100.60 M2 - Besi beton polos Ø12 1,196.47 Kg

###Beton Tangga Utama ( K.225 ) 3.25 M3 - Pasang begisting 21.65 M2 - Bongkar begisting 21.65 M2 - Besi beton ulir Ø13 600.29 Kg

###Beton Tangga Darurat ( K.225 ) 1.20 M3 - Pasang begisting 7.99 M2 - Bongkar begisting 7.99 M2 - Besi beton ulir Ø13 221.64 Kg

###Balok Latei 15/25 ( 1:2:3 ) 0.23 M3 - Pasang begisting 3.90 M2 - Bongkar begisting 3.90 M2 - Besi beton polos Ø12 32.11 Kg - Besi beton polos Ø 8 12.96 Kg

C LANTAI 31 Plat lantai 3, t = 12 cm ( K.225 ) 81.94 M3

- Pasang begisting 682.80 M2 - Bongkar begisting 682.80 M2 - Besi beton polos Ø12 ### Kg

2 Balok Lantai B1 30/60 ( K.225 ) 35.82 M3 - Pasang begisting 298.50 M2 - Bongkar begisting 298.50 M2 - Besi beton ulir Ø19 7,100.32 Kg - Besi beton polos Ø12 2,131.70 Kg

3 Balok Lantai B2 30/50 ( K.225 ) 25.98 M3 - Pasang begisting 225.16 M2 - Bongkar begisting 225.16 M2 - Besi beton ulir Ø19 5,793.54 Kg - Besi beton polos Ø12 1,649.37 Kg

4 Balok Lantai B3 25/40 ( K.225 ) 18.06 M3 - Pasang begisting 189.63 M2 - Bongkar begisting 189.63 M2 - Besi beton ulir Ø19 4,832.86 Kg - Besi beton polos Ø12 1,397.32 Kg

5 Balok Lantai BA 25/35 ( K.225 ) 0.70 M3 - Pasang begisting 7.60 M2 - Bongkar begisting 7.60 M2 - Besi beton ulir Ø19 107.04 Kg - Besi beton polos Ø 12 58.16 Kg

5 Balok Gantung 15/30 ( 1 : 2 3 ) 0.72 M3 - Pasang begisting 12.00 M2 - Bongkar begisting 12.00 M2 - Besi beton polos Ø12 114.18 Kg - Besi beton polos Ø10 59.79 Kg

Page 201: Rencana Anggaran Biaya Pembangunan Gereja

6 Beton Kolom K1 40/60 ( K.225 ) 13.44 M3 - Pasang begisting 112.00 M2 - Bongkar begisting 112.00 M2 - Besi beton ulir Ø19 1,748.32 Kg - Besi beton polos Ø12 666.03 Kg

7 Beton Kolom K2 & K3 40/40 ( K.225 ) 24.32 M3 - Pasang begisting 243.20 M2 - Bongkar begisting 243.20 M2 - Besi beton ulir Ø19 4,067.52 Kg - Besi beton polos Ø12 1,594.24 Kg

8 Beton Kolom K4 10/20 5.20 M3 - Pasang begisting 156.00 M2 - Bongkar begisting 156.00 M2 - Besi beton polos Ø12 927.68 Kg - Besi beton polos Ø 8 426.21 Kg

9 Kolom K5 15/50 ( 1:2:3 ) 1.20 m3 - Pasang begisting 20.80 M2 - Bongkar begisting 20.80 M2 - Besi beton polos Ø12 142.72 Kg - Besi beton polos Ø 10 54.77 Kg

###Kolom Sirip 10/50 ( 1:2:3 ) 11.38 M3 - Pasang begisting 273.00 M2 - Bongkar begisting 273.00 M2 - Besi beton polos Ø12 1,623.44 Kg - Besi beton polos Ø 8 749.71 Kg

###Ringbalk pagar void 10/10 ( 1:2:3 ) 0.04 M3 - Pasang begisting 0.80 M2 - Bongkar begisting 0.80 M2 - Besi beton polos Ø12 14.27 Kg - Besi beton polos Ø 8 4.37 Kg

###Balok Latei 15/25 ( 1:2:3 ) 3.77 M3 - Pasang begisting 65.39 M2 - Bongkar begisting 65.39 M2 - Besi beton polos Ø12 538.41 Kg - Besi beton polos Ø 8 212.25 Kg

###Plat kanopi t = 10 cm ( 1:2:3 ) 10.06 M3 - Pasang begisting 100.60 M2 - Bongkar begisting 100.60 M2 - Besi beton polos Ø12 1,196.47 Kg

###Beton Tangga Utama ( K.225 ) 3.81 M3 - Pasang begisting 25.40 M2 - Bongkar begisting 25.40 M2 - Besi beton ulir Ø13 704.40 Kg

###Beton meja pantri, t = 7 cm ( 1:2:3 ) 0.24 M3 - Pasang begisting 3.96 M2 - Bongkar begisting 3.96 M2 - Besi beton polos Ø12 21.17 Kg

D DAK (LANTAI 4)1 Plat lantai 4, t = 12 cm ( K.225 ) 80.14 M3

- Pasang begisting 667.80 M2 - Bongkar begisting 667.80 M2 - Besi beton polos Ø12 ### Kg

2 Balok Lantai B1 30/60 ( K.225 ) 33.66 M3 - Pasang begisting 280.50 M2 - Bongkar begisting 280.50 M2 - Besi beton ulir Ø19 6,672.16 Kg - Besi beton polos Ø12 2,003.25 Kg

3 Balok Lantai B2 30/50 ( K.225 ) 25.23 M3 - Pasang begisting 218.66 M2 - Bongkar begisting 218.66 M2 - Besi beton ulir Ø19 5,626.29 Kg - Besi beton polos Ø12 1,601.79 Kg

Page 202: Rencana Anggaran Biaya Pembangunan Gereja

4 Balok Lantai B3 25/40 ( K.225 ) 18.06 M3 - Pasang begisting 189.63 M2 - Bongkar begisting 189.63 M2 - Besi beton ulir Ø19 4,832.86 Kg - Besi beton polos Ø12 1,397.32 Kg

5 Balok Lantai BA 25/35 ( K.225 ) 0.70 M3 - Pasang begisting 7.60 M2 - Bongkar begisting 7.60 M2 - Besi beton ulir Ø19 107.04 Kg - Besi beton polos Ø12 58.16 Kg

6 Beton Kolom K1 40/60 ( K.225 ) 2.16 M3 - Pasang begisting 18.00 M2 - Bongkar begisting 18.00 M2 - Besi beton ulir Ø19 280.98 Kg - Besi beton polos Ø12 107.04 Kg

7 Beton Kolom K2 40/40 ( K.225 ) 3.68 M3 - Pasang begisting 36.80 M2 - Bongkar begisting 36.80 M2 - Besi beton ulir Ø19 615.48 Kg - Besi beton polos Ø12 218.84 Kg

8 Beton Kolom K4"20/20 ( K.225 ) 2.44 M3 - Pasang begisting 48.80 M2 - Bongkar begisting 48.80 M2 - Besi beton ulir Ø12 652.94 Kg - Besi beton polos Ø8 128.51 Kg

9 Beton Kolom K4 10/20 0.32 M3 - Pasang begisting 9.60 M2 - Bongkar begisting 9.60 M2 - Besi beton polos Ø12 57.09 Kg - Besi beton polos Ø 8 26.23 Kg

###Beton Kolom Praktis 10/10 0.30 M3 - Pasang begisting 12.00 M2 - Bongkar begisting 12.00 M2 - Besi beton polos Ø12 107.04 Kg - Besi beton polos Ø 8 34.76 Kg

###Balok 20/35 ( 1:2:3 ) 3.57 M3 - Pasang begisting 35.70 M2 - Bongkar begisting 35.70 M2 - Besi beton polos Ø12 272.95 Kg - Besi beton polos Ø 8 148.16 Kg

###Ringbalk 15/20 ( 1:2:3 ) 4.34 M3 - Pasang begisting 57.84 M2 - Bongkar begisting 57.84 M2 - Besi beton polos Ø12 773.90 Kg - Besi beton polos Ø 8 266.82 Kg

###Beton plat dak teras atap t = 10 cm ( K.225 ) 13.20 M3 - Pasang begisting 132.00 M2 - Bongkar begisting 132.00 M2 - Besi beton polos Ø12 1,569.92 kg

Jumlah IV (A+B+C+D)V PEKERJAAN DINDING & PLESTERAN

A LANTAI 11 Pasangan bata merah 1 : 2 49.60 M22 Pasangan bata merah 1 : 4 472.15 M23 Plesteran 1 : 2 tebal 15 cm 99.20 M24 Plesteran 1 : 4 tebal 15 cm 944.31 M25 Plesteran beton 1 : 2 1,324.28 M26 Benangan sudut 351.20 M'

Page 203: Rencana Anggaran Biaya Pembangunan Gereja

B LANTAI 21 Pasangan bata merah 1 : 4 154.41 M22 Plesteran 1 : 4 308.82 M23 Plesteran Beton 1 : 2 9.60 M24 Benangan sudut M'

C LANTAI 31 Pasangan bata merah 1 : 4 958.61 M22 Plesteran 1 : 4 1,917.22 M23 Plesteran Beton 1 : 2 114.00 M23 Benangan sudut 196.00 M'

Page 204: Rencana Anggaran Biaya Pembangunan Gereja

D DAK ATAP (LANTAI 4)1 Pasangan bata merah 1 : 4 240.09 M22 Plesteran 1 : 4 480.17 M23 Plesteranbeton 1:2 776.75 M24 Benangan sudut 550.00 M'

VI PEKERJAAN KERAMIKA LANTAI 1

1 Keramik lantai 40/40 229.17 M22 Keramik lantai KM/WC 20/20 13.50 M23 Keramik dinding KM/WC 20/25 16.67 M24 Plint dinding Keramik 10/20 24.00 M'5 Pasang Batu alam motif garis 129.60 m2

B LANTAI 21 Keramik lantai 40/40 75.49 M2

Page 205: Rencana Anggaran Biaya Pembangunan Gereja

C LANTAI 31 Keramik lantai 40/40 540.22 M22 Keramik lantai 20/20 27.86 M23 Keramik dinding KM/WC 20/25 88.50 M24 Plint dinding Keramik 10/20 59.00 M'5 Pasang Batu alam motif garis 84.60 m2

D LANTAI 41 Keramik lantai 40/40 88.07 M22 Pasang Batu alam motif garis 25.60 m2

VII PEKERJAAN KUSEN PINTU DAN JENDELA & RAILLINGA LANTAI 1

1 Kusen Pintu, Jendela Dan Bouvenlist Alumunium + sealent 0.00 M12 Pekerjaan Pintu

a Pintu Type PJ1 Jumlah 1 BuahDaun Pintu Double Kaca Ryben t. 5 mm, Rangka Aluminium Uk.0.85x2.30 2.00 BhDaun Jendela Kaca Ryben 5 mm, Rangka Aluminium Uk.0.85x1.46 2.00 BhDaun Ventilasi Kaca Ryben 5 mm, Rangka Aluminium Uk.0.85x0.54 2.00 BhKaca Mati Ryben t. 5 mm 0.00 M2

b Pintu Type P1 Jumlah 2 BuahDaun Pintu Double Teakwood + finil , Rangka Aluminium Uk.0.77x2.10 4.00 BhDaun Ventilasi Kaca Ryben 5 mm, Rangka Aluminium Uk.0.75x0.54 4.00 Bh

c Pintu Type P2 Jumlah 2 BuahDaun Pintu Double Teakwood+ finil , Rangka Aluminium Uk.0.80x2.10 2.00 BhDaun Ventilasi Kaca Ryben 5 mm, Rangka Aluminium Uk.0.80x0.54 2.00 Bh

d Pintu Type P3 Jumlah 2 BuahDaun Pintu Double Teakwood + Finil , Rangka Aluminium )Uk.0.70x2.10 2.00 BhDaun Ventilasi Kaca Ryben 5 mm, Rangka Aluminium Uk.0.70x0.54 2.00 Bh

3 Pekerjaan Jendelaa Jendela Type J1 Jumlah 2 Buah

Daun jendela Kaca Ryben 5 mm, Rangka Aluminium Uk.0.65x1.40 4.00 BhDaun Ventilasi Kaca Ryben 5 mm, Rangka Aluminium Uk.0.65x0.54 4.00 BhKaca Mati Ryben t. 5 mm 0.00 M2

b Kaca Mati Ryben t 5 mm Jendela Sudut 0.00 M24 Pekerjaan Bovenlist

a Bouvenlist 1 ( BV1 ), jumlah 2 buahDaun Bouvenlist kaca Ryben 5 mm, rangka Aluminium Uk.0.50x0.50 4.00 Bh

b Bouvenlist 2 ( BV2), jumlah 4 buahDaun Bouvenlist kaca Ryben 5 mm, rangka Aluminium Uk.0.69x0.69 12.00 Bh

5 Kunci Pintu Ganda Utama + Kelengkapannya Terpasang 1.00 Bh6 Kunci Pintu Ganda+ Kelengkapannya Terpasang 2.00 Bh7 Kunci Pintu Tunggal + Kelengkapan Terpasang 4.00 Bh8 Engsel Pintu 4 " 30.00 Bh9 Engsel Jendela 3" 12.00 Bh

###Grandel Jendela /Spring Knipe 6.00 Bh###Hak Angin Jendela 12.00 Bh###Engsel Ventilasi 3 " 60.00 Bh###Hak Angin Ventilasi 60.00 Bh###Door Holder 2.00 Bh###Door Closer 8.00 Bh###Door Stop 4.00 Bh###Railling tangga utama dari pipa Kotak 12.02 m2###Railling tangga darurat dari pipa Kotak 5.47 m2

B LANTAI 21 Kusen Pintu, Jendela Dan Bouvenlist Alumunium + sealent 0.00 M12 Pekerjaan Pintu

a Pintu Type P2 Jumlah 2 BuahDaun Pintu Double Teakwood+ finil , Rangka Aluminium Uk.0.80x2.10 2.00 BhDaun Ventilasi Kaca Ryben 5 mm, Rangka Aluminium Uk.0.80x0.54 2.00 Bh

3 Pekerjaan Jendelaa Jendela Type J8 Jumlah 2 Buah

Daun jendela Kaca Ryben 5 mm, Rangka Aluminium Uk.0.65x1.40 4.00 Bhb Kaca Mati Ryben t 5 mm jendela sudut 0.00 m2

Page 206: Rencana Anggaran Biaya Pembangunan Gereja

4 Kunci Pintu Tunggal + Kelengkapan Terpasang 2.00 Bh5 Engsel Pintu 4 " 6.00 Bh6 Engsel Jendela 3" 8.00 Bh7 Grandel Jendela /Spring Knipe 4.00 Bh8 Hak Angin Jendela 8.00 Bh9 Engsel Ventilasi 3 " 8.00 Bh

###Hak Angin Ventilasi 8.00 Bh###Door Closer 2.00 Bh###Railling tangga utama dari pipa Kotak 12.70 m2###Railling tangga darurat dari pipa Kotak 7.87 m2###Railling pagar Void dari pipa kotak 28.73 m2

C LANTAI 31 Kusen Pintu, Jendela Dan Bouvenlist Alumunium + sealent 0.00 M12 Pekerjaan Pintu

a Pintu Type P1 Jumlah 6 BuahDaun Pintu Double Teakwood + finil , Rangka Aluminium Uk.0.77x2.10 12.00 BhDaun Ventilasi Kaca Ryben 5 mm, Rangka Aluminium Uk.0.75x0.54 12.00 Bh

b Pintu Type P2 Jumlah 1 BuahDaun Pintu Double Teakwood+ finil , Rangka Aluminium Uk.0.80x2.10 1.00 BhDaun Ventilasi Kaca Ryben 5 mm, Rangka Aluminium Uk.0.80x0.54 1.00 Bh

c Pintu Type P3 Jumlah 6 BuahDaun Pintu Double Teakwood + Finil , Rangka Aluminium )Uk.0.70x2.10 6.00 BhDaun Ventilasi Kaca Ryben 5 mm, Rangka Aluminium Uk.0.70x0.54 6.00 Bh

3 Pekerjaan Jendelaa Jendela Type J2 Jumlah 8 Buah

Daun jendela Kaca Ryben 5 mm, Rangka Aluminium Uk.0.65x0.65 16.00 BhDaun Ventilasi Kaca Ryben 5 mm, Rangka Aluminium ( lengkap )Uk.0.65x0.54 16.00 BhKaca Mati Ryben t. 5 mm 0.00 m2

b Jendela Type J3 Jumlah 12 BuahDaun jendela Kaca Ryben 5 mm, Rangka Aluminium Uk.0.65x0.65 12.00 BhDaun Ventilasi Kaca Ryben 5 mm, Rangka Aluminium Uk.0.65x0.54 12.00 Bh

c Jendela Type J4 Jumlah 1 BuahDaun jendela Kaca Ryben 5 mm, Rangka Aluminium Uk.0.65x1.40 2.00 BhDaun Ventilasi Kaca Ryben 5 mm, Rangka Aluminium Uk.0.65x0.54 2.00 Bh

d Jendela Type J5 Jumlah 48 BuahDaun jendela Kaca Ryben 5 mm, Rangka Aluminium Uk.0.6x1.70 48.00 BhDaun Ventilasi Kaca Ryben 5 mm, Rangka Aluminium Uk.0.65x0.69 48.00 Bh

e Jendela Type J7 Jumlah 6 BuahKaca Mati Ryben 5mm 0.00 m2

f Kaca Mati Ryben t 5 mm Jendela sudut 0.00 m24 Pekerjaan Bovenlist

a Bouvenlist 1 ( BV1 ), jumlah 7 buahDaun Bouvenlist kaca Ryben 5 mm, rangka Aluminium Uk.0.50x0.50 14.00 Bh

5 Kunci Pintu Ganda+ Kelengkapannya Terpasang 6.00 Bh6 Kunci Pintu Tunggal + Kelengkapan Terpasang 7.00 Bh7 Engsel Pintu 4 " 57.00 Bh8 Engsel Jendela 3" 156.00 Bh9 Grandel Jendela /Spring Knipe 78.00 Bh

###Hak Angin Jendela 156.00 Bh###Engsel Ventilasi 3 " 222.00 Bh###Hak Angin Ventilasi 111.00 Bh###Door Closer 13.00 Bh###Door Stop 7.00 Bh###Railling tangga utama dari pipa Kotak 16.32 m2###Railling pagar Void dari pipa kotak 9.12 m2###Pasang pipa seluncur stainlist steel 11.10 M'

D LANTAI 41 Kusen Pintu, Jendela Dan Bouvenlist Alumunium + sealent 107.34 M12 Pekerjaan Pintu

a Pintu Type P1 Jumlah 1 BuahDaun Pintu Double Teakwood + finil , Rangka Aluminium Uk.0.77x2.10 2.00 BhDaun Ventilasi Kaca Ryben 5 mm, Rangka Aluminium Uk.0.75x0.54 2.00 Bh

3 Pekerjaan Jendelaa Jendela Type J1 Jumlah 2 Buah

Daun jendela Kaca Ryben 5 mm, Rangka Aluminium Uk.0.65x1.40 4.00 BhDaun Ventilasi Kaca Ryben 5 mm, Rangka Aluminium Uk.0.65x0.54 4.00 BhKaca Mati Ryben t. 5 mm 2.13 M2

b Jendela Type J6 Jumlah 2 BuahDaun jendela Kaca Ryben 5 mm, Rangka Aluminium Uk.0.65x1.40 2.00 BhDaun Ventilasi Kaca Ryben 5 mm, Rangka Aluminium Uk.0.65x0.54 2.00 Bh

4 Pekerjaan Bovenlista Bouvenlist 3 ( BV3), jumlah 4 buah

Kaca Mati Ryben 5 mm 11.43 M2

Jumlah VII (A+B+C+D)

VIII PEKERJAAN PLAFONDA PLAFOND LANTAI 1

1 Pasang rangka dan plafond gypsum 9 mm 127.50 M2

Page 207: Rencana Anggaran Biaya Pembangunan Gereja

2 Pasang plafond gypsum 9 mm 127.503 Pasang list plafond gypsum 100.00 m'

B PLAFOND LANTAI 21 Pasang rangka dan plafond gypsum 9 mm 60.00 M22 Pasang plafond gypsum 9 mm 60.003 Pasang list plafond gypsum 56.00 M'

C PLAFOND LANTAI 31 Pasang rangka dan plafond gypsum 9 mm 609.21 M22 Pasang plafond gypsum 9 mm 609.213 Pasang list plafond gypsum 430.88 M'

D PLAFOND DAK ATAP (LANTAI 4)1 Pasang rangka dan plafond gypsum 9 mm 75.00 M22 Pasang plafond gypsum 9 mm 75.003 Pasang list plafond gypsum 58.00 M'

Jumlah VIII (A+B+C+D)IX PEKERJAAN ATAP & SUNSCREEN

1 Rangka atap kantilever baja INP (5x 8) m2 (lengkap) 1.00 Unit2 Atap kantilever polycarbonate 40.00 M23 Grill besi siku + plat strip 5 cm 41.40 M24 Kuda kuda kayu lembasung 6/12 0.48 M35 Gording kayu lembasung 5/10 0.52 M36 Rangka atap kasau/reng kayu lembasung 65.00 M27 Penutup atap genteng metal 65.00 M28 Bubungan atap genteng metal 16.00 M1

Jumlah IX X PEKERJAAN SANITAIR & PLUMBING

1 Biaya penyambungan air PDAM 1.00 Paket2 Pasang jaringan air bersih dalam gedung

- Pasang Pipa 1/2 " 31.00 m- Pasang Pipa 3/4 " 84.00 m

3 Pasang jaringan air kotor- Pasang Pipa 4 " 67.00 m- Pasang Pipa 2 " 66.80 m

4 Pasang pipa pvc Ǿ 4" untuk air hujan 234.00 M'5 Pasang closed duduk porselin (lengkap) 8.00 Unit6 Hand shower (lengkap dengan kran air) 8.00 Bh7 Pasang floor drain Ø 2" 8.00 Bh8 Kran air 1/2" 10.00 Bh9 Wastafel Porselin (lengkap) 1.00 Unit

###Bak cuci alumunium 2 lubang 1.00 Bh###Pembuatan septictank + sumur resapan 2.00 Unit###Pompa air listrik sanyo 1.00 Unit###Waterproofing

- Lantai KM/WC 53.75 M2 - Atap dak beton 618.48 M2

Jumlah XXI PEKERJAAN INSTALASI LISTRIK & LAMPU

1 Penyambungan baru listrik 1.00 Bh2 Pasang jaringan titik lampu LT. 1 27.00 Titik

- Pasang lampu down light SL 18 watt 24.00 Titik - Pasang lampu SL 14 watt 3.00 Titik - Pasang Stop Kontak & Instalasi 5.00 Titik - Saklar tunggal 5.00 Titik - Saklar ganda 6.00 Titik - Penghisap ruangan 3.00 Titik

3 Pasang jaringan titik lampu LT. 2 47.00 Titik - Pasang lampu down light SL 18 watt 11.00 Titik - Pasang lampu SL 14 watt 3.00 Titik - Pasang lampu spotlight halogen 100 watt 33.00 Titik - Pasang Stop Kontak & Instalasi 4.00 Titik - Saklar tunggal 3.00 Titik - Saklar ganda 12.00 Titik - Penghisap ruangan 2.00 Titik

4 Pasang jaringan titik lampu LT. 3 67.00 Titik - Pasang lampu down light SL 18 watt 46.00 Titik

Page 208: Rencana Anggaran Biaya Pembangunan Gereja

- Pasang lampu SL 14 watt 7.00 Titik - Pasang lampu spotlight halogen 100 watt 2.00 Titik - Pasang Lampu TL 2 x 40 watt 8.00 Titik - Pasang Lampu TL 1 x 40 watt 4.00 Titik - Pasang Stop Kontak & Instalasi 34.00 Titik - Saklar tunggal 5.00 Titik - Saklar ganda 28.00 Titik - Penghisap ruangan 16.00 Titik

NO URAIAN PEKERJAAN VOLUME SATUAN

1 2 3 45 Pasang jaringan titik lampu dak atap 7.00 Titik

- Pasang lampu spotlight halogen 100 watt 7.00 Titik - Saklar ganda 3.00 Titik

6 Pasang panel box 10 Amphere 3.00 Titik7 Pasang Instalasi penangkal petir 1.00 Titik

Jumlah XIXII PEKERJAAN CAT

A LANTAI 11 Cat dinding dalam (cat air) 1,020.53 M22 Cat dinding luar (cat wheatersield)3 Cat plafond & beton expose (cat air) 212.28 M24 Cat kilap 11.27 M2

B LANTAI 21 Cat dinding (cat air) 1,427.79 M22 Cat dinding luar (cat wheatersield)3 Cat plafond & beton expose (cat air) 801.08 M24 Cat kilap 3.70 M2

C LANTAI 31 Cat dinding (cat air) 1,497.84 M223 Cat plafond & beton expose (cat air) 714.38 M24 Cat kilap 59.02 M2

D DAK ATAP1 Cat dinding (cat air) 551.33 M223 Cat plafond & beton expose (cat air) 714.38 M24 Cat kilap 0.88 M2

Jumlah XII (A+B+C+D)XIII PEKERJAAN PLUMBING TANDON AIR ATAS

A Pengadaan Dan Pemasangan Pipa & Aksesoris1 Pipa PVC Ǿ 1,5" 92.00 M'2 Stop Kran Ø 1,5" 4.00 Bh3 Elbow Ø 1,5" 4.00 Bh4 TEE Ø 1,5" 4.00 Bh5 Aksesoris pipa PVC Ǿ 1.5" 1.00 Pkt6 Stop Kran / Hidran 24.00 Bh7 Profil Tank 2200 lt 4.00 Bh

NO URAIAN PEKERJAAN VOLUME SATUAN

1 2 3 4B Pekerjaan lain - lain

1 Plat persegi 5cm gantungan pipa 1.00 Ls2 Clam pipa 1.00 Ls3 Pengecatan pipa dan Aksesoris 1.00 Ls

Jumlah XIII (A+B)XIV PEKERJAAN BAK AIR BAWAH 3MX10M X2

A Pekerjaan Tanah dan Pancang1 Galian tanah 162.00 M32 Urugan bekas galian 7.50 M33 Urug pasir bawah plat coor 3.00 M34 Pancang ulin 10/10 - 2m 44.00 Titik5 Galian tanah/bongkar beton untuk pipa tandon air 200.00 M3

Page 209: Rencana Anggaran Biaya Pembangunan Gereja

B Pekerjaan Beton1 Lantai Kerja 5cm 1.50 M32 Beton lantai tebal 15cm

- Coor beton 1:2:3 4.50 M3 - Besi beton polos Ǿ12 358.45 kg

3 Beton dinding tebal 15 cm - Coor beton 1:2:3 21.06 M3 - Pasang begisting 140.40 M2 - Pasang begisting 140.40 M2 - Besi beton polos Ǿ12 1,855.38 Kg

4 Beton balok 15/30 - Coor beton 1:2:3 0.41 M3 - Pasang begisting 26.00 M2 - Pasang begisting 26.00 M2 - Besi beton polos Ǿ12 (Tulangan) 80.25 Kg - Besi beton polos Ǿ10(begel) 39.22 Kg

5 Beton daak tebal 15 cm - Coor beton 1:2:3 4.50 M3 - Pasang begisting 30.00 M2 - Pasang begisting 30.00 M2 - Besi beton polos (Tulangan) 358.45 Kg

C Pekerjaan Plesteran1 Plester & Acian lantai 1:2 30.00 M22 Plester & Acian dinding 1:2 46.8 M23 Plester & Acian lantai atas 1:2 60.00 M2

DPengadaan Pipa & Aksesoris1 Pipa GIP Ǿ 2" 200.00 M'2 Gate Valve Ǿ 2" 2.00 Bh3 Flange Socket Ǿ 2" 2.00 Bh4 Flange Spigot Ǿ 2" 2.00 Bh6 Flange las Ǿ 2" 7.00 Bh7 Stop Kran / Hidran 1.00 Bh

EPemasangan Pipa & Aksesoris1 Pipa GIP Ǿ 2" 200.00 M'2 Gate Valve Ǿ 2" 2.00 Bh3 Flange Socket Ǿ 2" 2.00 Bh4 Flange Spigot Ǿ 2" 2.00 Bh5 Flange las Ǿ 2" 7.00 Bh6 Stop Kran / Hidran 1.00 Bh7 Pengetesan pipa 200.00 M'

FPekerjaan lain - lain1 Plat penutup 6mm 1.00 Bh2 Tangga reservoar 1.00 Bh

Jumlah XIV (A+B+C+D+E+F)Jumlah XIV x 2 Buah Reservoar

XV PEKERJAAN PAGAR A Pekerjaan tanah dan pancang

1 Galian tanah pondasi 136.00 m32 Urugan bekas galian 27.20 m33 Urug pasir bawah pondasi 14.88 m34 Pancang ulin 10/10 - 2m 142.00 ttk5 Sunduk kayu ulin 5/10 - 50cm 1.06 m36 Kalang kayu ulin 5/20 - 4m 1.06 m3

B Pekerjaan pasangan & beton1 Pas. Anstampang 20cm 35.2 m32 Pasangan batu gunung 1:2 154.00 m33 Beton sloof 15/30

- Coor beton 1:2:3 9.56 m3 - Pasang begesting 127.50 m2 - Bongkar begesting 127.50 m2 - Besi beton polos Ǿ 10 786.68 kg - Besi begel Ǿ 8 503.63 kg

4 Beton kolom 20/20 - Coor beton 1:2:3 5.80 m3 - Pasang begesting 116.00 m2 - Bongkar begesting 116.00 m2 - Besi beton polos Ǿ 10 536.79 kg - Besi begel Ǿ 8 229.10 kg

5 Beton ring 10/20 - Coor beton 1:2:3 4.25 m3 - Pasang begesting 85.00 m2 - Bongkar begesting 85.00 m2 - Besi beton polos Ǿ 10 524.45 kg - Besi begel Ǿ 8 251.81 kg

6 Pasangan batu bata 1:4 42.50 m3

Page 210: Rencana Anggaran Biaya Pembangunan Gereja

7 Plesteran & acian 1:4 1,062.50 m28 Pek. pengecatan , 1xplamir 1xcat dasar, 2xcat penutup 1,062.50 m2

Jumlah XV (A+B)

NO URAIAN PEKERJAAN VOLUME SATUAN

1 2 3 4XVI PEKERJAAN LANSDCAPE

A Perkerasan jalan dan halaman coor beton bertulang1 Urugan tanah peningian peil t=60cm 750.00 M32 Urug pasir 10 cm 227.22 M3

3 Beton coor tebal 15 cm - Coor beton 1:2:3 225.00 M3 - Pasang begesting 150.00 M2

- Bongkar begesting 150.00 M2 - Besi beton polos Ǿ 12 16,050.00 Kg

4 Plester finishing koral sikat 1,500.00 M2

B Pekerjaan Media taman1 Media taman 1 (depan)

- Galian tanah 3.20 M3 - Pasangan batu bata 1:4 0.30 M3 - Plester dan acian 1:4 24.00 M2 - Benangan sudut 35.00 M' - Pek. pengecatan , 1xplamir 1xcat dasar, 2xcat penutup 75.00 M2

2 Pengadaan bunga dan penanaman - Pupuk kadang 20.00 Zak - Tanaman glodok 2.00 Btg - Palem kipas 4.00 Btg - Rumput gajah 25.00 M2

3 Media taman 2 (Samping) - Galian tanah 6.00 M3 - Pasangan batu bata 1:4 1.50 M3 - Plester dan acian 1:4 150.00 M2 - Benangan sudut 70.00 M' - Pek. pengecatan , 1xplamir 1xcat dasar, 2xcat penutup 140.00 M2

4 Pengadaan bunga dan penanaman - Pupuk kadang 112.00 Zak - Tanaman glodok 28.00 Btg - Palem kipas 2.00 Btg - Rumput gajah 30.00 M2

3 Media taman 3 (Belakang) - Galian tanah 3.08 M3 - Pasangan batu bata 1:4 3.85 M3 - Plester dan acian 1:4 77.00 M2 - Benangan sudut 124.00 M' - Pek. pengecatan , 1xplamir 1xcat dasar, 2xcat penutup 96.25 M2

4 Pengadaan bunga dan penanaman - Pupuk kadang 170.00 Zak - Palem kipas 12.00 Btg - Bunga dadap merah 12.00 Btg - Rumput gajah 360.00 M2

Jumlah XVI (A+B)

Page 211: Rencana Anggaran Biaya Pembangunan Gereja

ANAL kusen 318679864.xls Page_211_Of_214

A N A L I S A HARGA SATUAN PEKERJAAN PEKERJAAN PINTU DAN JENDELA

( S N I )

KEGIATAN : PEMBANGUNAN GEDUNG KANTOR

PEKERJAAN : PEMBANGUNAN MARKAS PEMADAM KEBAKARAN

LOKASI : TANJUNG SELOR KABUPATEN BULUNGAN

D E S C R I P T I O N UNIT TOTAL PRICE

Harga Satuan Upah Bahan/Alat JUMLAH 1 2 3 5 6 7

A PEKERJAAN PINTU JENDELA BANGUNAN PMK

1 Pintu Type PJ1 Per Buah

Daun Pintu

3.9100 m2 Daun pintu panel 1,076,392.20 4,208,693.50 2.8000 m2 Kaca ryben 5 mm 281,485.00 788,158.00 1.0000 set Lockset (Lokcset, Cylinder, Handle) Pintu 291,370.00 291,370.00 6.0000 bh Hinges 56,905.00 341,430.00 2.0000 bh door closer 203,850.00 407,700.00 2.0000 bh door holder 396,350.00 792,700.00

6,830,051.50 6,830,051.50

Daun Jendela

2.4800 m2 Daun jendela 841,175.33 2,086,114.81 1.8800 m2 Kaca ryben 5 mm 281,485.00 529,191.80 2.0000 bh handel jendela 25,000.00 50,000.00 2.0000 bh grandel 43,040.00 86,080.00 2.0000 bh whindak 39,705.00 79,410.00 4.0000 bh engsel 35,270.00 141,080.00

2,971,876.61 2,971,876.61

Kaca Mati Ryben 5mm

3.0200 m2 kaca ryben 5 mm 281,485.00 850,084.70 850,084.70 850,084.70

Total Harga Satuan PJ 1 10,652,012.81

2 Pintu Type P1 / bh

3.3600 m2 Daun pintu panel 1,076,392.20 3,616,677.79 2.2200 m2 Double teakwood + vinil 250,000.00 555,000.00 0.7800 m2 Kaca Mati Ryben 5 mm 281,485.00 219,558.30 1.0000 set Lockset (Lokcset, Cylinder, Handle) Pintu 291,370.00 291,370.00 6.0000 bh Hinges 56,905.00 341,430.00 2.0000 bh door closer 203,850.00 407,700.00

5,431,736.09 5,431,736.09

3 Pintu Type P2 / bh

1.6800 m2 Daun pintu panel 1,076,392.20 1,808,338.90 1.1100 m2 Double teakwood + vinil 250,000.00 277,500.00 0.4000 m2 Kaca Mati Ryben 5 mm 281,485.00 1.0000 set Lockset (Lokcset, Cylinder, Handle) Pintu 291,370.00 291,370.00 3.0000 bh Hinges 56,905.00 170,715.00 1.0000 bh door closer 203,850.00 203,850.00

2,751,773.90 2,751,773.90

NO / KODE

Page 212: Rencana Anggaran Biaya Pembangunan Gereja

ANAL kusen 318679864.xls Page_212_Of_214

A N A L I S A HARGA SATUAN PEKERJAAN PEKERJAAN PINTU DAN JENDELA

( S N I )

KEGIATAN : PEMBANGUNAN GEDUNG KANTOR

PEKERJAAN : PEMBANGUNAN MARKAS PEMADAM KEBAKARAN

LOKASI : TANJUNG SELOR KABUPATEN BULUNGAN

D E S C R I P T I O N UNIT TOTAL PRICE

Harga Satuan Upah Bahan/Alat JUMLAH 1 2 3 5 6 7

NO / KODE

4 Pintu Type P3 / bh

1.4700 m2 Daun pintu panel 1,076,392.20 1,582,296.53 1.1100 m2 Double teakwood + vinil 250,000.00 277,500.00 1.0000 set Lockset (Lokcset, Cylinder, Handle) Pintu 291,370.00 291,370.00 3.0000 bh Hinges 56,905.00 170,715.00 1.0000 bh door closer 203,850.00 203,850.00

2,525,731.53 2,525,731.53

5 Jendela Type J1 / bh

1.8200 m2 Daun jendela 841,175.33 1,530,939.09 3.0100 m2 Kaca ryben 5 mm 281,485.00 847,269.85 2.0000 bh handel jendela 25,000.00 50,000.00 2.0000 bh grandel 43,040.00 86,080.00 2.0000 bh whindak 39,705.00 79,410.00 4.0000 bh engsel 35,270.00 141,080.00

2,734,778.94 2,734,778.94

6 Jendela Type J2 / bh

0.8400 m2 Daun jendela 841,175.33 706,587.27 1.8100 m2 Kaca ryben 5 mm 281,485.00 509,487.85 2.0000 bh handel jendela 25,000.00 50,000.00 2.0000 bh grandel 43,040.00 86,080.00 2.0000 bh whindak 39,705.00 79,410.00 4.0000 bh engsel 35,270.00 141,080.00

1,572,645.12 1,572,645.12

7 Jendela Type J3/ bh

0.4200 m2 Daun jendela 841,175.33 353,293.64 0.5900 m2 Kaca ryben 5 mm 281,485.00 166,076.15 1.0000 bh handel jendela 25,000.00 25,000.00 1.0000 bh grandel 43,040.00 43,040.00 1.0000 bh whindak 39,705.00 39,705.00 2.0000 bh engsel 35,270.00 70,540.00

697,654.79 697,654.79

8 Jendela Type J4/ bh

1.8200 m2 Daun jendela 841,175.33 1,530,939.09 1.9400 m2 Kaca ryben 5 mm 281,485.00 546,080.90 2.0000 bh handel jendela 25,000.00 50,000.00

Page 213: Rencana Anggaran Biaya Pembangunan Gereja

ANAL kusen 318679864.xls Page_213_Of_214

A N A L I S A HARGA SATUAN PEKERJAAN PEKERJAAN PINTU DAN JENDELA

( S N I )

KEGIATAN : PEMBANGUNAN GEDUNG KANTOR

PEKERJAAN : PEMBANGUNAN MARKAS PEMADAM KEBAKARAN

LOKASI : TANJUNG SELOR KABUPATEN BULUNGAN

D E S C R I P T I O N UNIT TOTAL PRICE

Harga Satuan Upah Bahan/Alat JUMLAH 1 2 3 5 6 7

NO / KODE

2.0000 bh grandel 43,040.00 86,080.00 2.0000 bh whindak 39,705.00 79,410.00 4.0000 bh engsel 35,270.00 141,080.00

2,433,589.99 2,433,589.99

9 Jendela Type J5/ bh

1.4900 m2 Daun jendela 841,175.33 1,253,351.23 1.0300 m2 Kaca ryben 5 mm 281,485.00 289,929.55 2.0000 bh handel jendela 25,000.00 50,000.00 2.0000 bh grandel 43,040.00 86,080.00 2.0000 bh whindak 39,705.00 79,410.00 4.0000 bh engsel 35,270.00 141,080.00

1,899,850.78 1,899,850.78

10 Jendela Type J6/ bh

0.9100 m2 Daun jendela 841,175.33 765,469.55 0.9700 m2 Kaca ryben 5 mm 281,485.00 273,040.45 1.0000 bh handel jendela 25,000.00 25,000.00 1.0000 bh grandel 43,040.00 43,040.00 1.0000 bh whindak 39,705.00 39,705.00 2.0000 bh engsel 35,270.00 70,540.00

1,216,795.00 1,216,795.00

11 Jendela Type J8/ bh

1.8200 m2 Daun jendela 841,175.33 1,530,939.09 1.2800 m2 Kaca ryben 5 mm 281,485.00 360,300.80 2.0000 bh handel jendela 25,000.00 50,000.00 2.0000 bh grandel 43,040.00 86,080.00 2.0000 bh whindak 39,705.00 79,410.00 4.0000 bh engsel 35,270.00 141,080.00

2,247,809.89 2,247,809.89

12 Bouvenlist Type BV1/ bh

0.5000 m2 Daun jendela 841,175.33 420,587.66 0.2200 m2 Kaca ryben 5 mm 281,485.00 61,926.70 2.0000 bh handel jendela 25,000.00 50,000.00 2.0000 bh grandel 43,040.00 86,080.00 2.0000 bh whindak 39,705.00 79,410.00 4.0000 bh engsel 35,270.00 141,080.00

839,084.36 839,084.36

13 Bouvenlist Type BV2/ bh

Page 214: Rencana Anggaran Biaya Pembangunan Gereja

ANAL kusen 318679864.xls Page_214_Of_214

A N A L I S A HARGA SATUAN PEKERJAAN PEKERJAAN PINTU DAN JENDELA

( S N I )

KEGIATAN : PEMBANGUNAN GEDUNG KANTOR

PEKERJAAN : PEMBANGUNAN MARKAS PEMADAM KEBAKARAN

LOKASI : TANJUNG SELOR KABUPATEN BULUNGAN

D E S C R I P T I O N UNIT TOTAL PRICE

Harga Satuan Upah Bahan/Alat JUMLAH 1 2 3 5 6 7

NO / KODE

0.7500 m2 Daun jendela 841,175.33 630,881.49 0.3300 m2 Kaca ryben 5 mm 281,485.00 92,890.05 3.0000 bh handel jendela 25,000.00 75,000.00 3.0000 bh grandel 43,040.00 129,120.00 3.0000 bh whindak 39,705.00 119,115.00 6.0000 bh engsel 35,270.00 211,620.00

1,258,626.54 1,258,626.54