    FOR IMMEDIATE RELEASEContact: Adi Bryant, Executive Director of Communications972-617-4013 or [email protected] January 28, 2016

    Update on Construction at Shields Elementary on Ovilla Road

    On December 26, 2015, Donald T. Shields Elementary located at 223 W. OvHeights, Texas, was damaged due to an EF-3 tornado, with winds speeds been between 145 and 150 mph (Report from National Weather Service attatook immediate action to set up a temporary school for the students and ssemester, located at 200 Live Oak Street in Red Oak. On December 27, working with L.A. Fuess Engineering, the engineer for the 2008 representatives from Corgan & Associates, the architects for the school projdamage and evaluate the safety of the building for entry by the volunteers wthe cleanup.

    On December 30, the district was first contacted with questions about construction of the exterior walls at Shields Elementary. Until this inquiryreceived no reports of poor workmanship, nor had any issues arisen with the have prompted an evaluation.

     As part of the district’s efforts to restore the building and assure the students’Oak ISD requested a formal inspection of the entire campus by Corgan andthe inspection, Fuess prepared a preliminary report of the overall damage trepairs, which would be necessary to assure a safe facility. The report confirroof framing on the building (beams, joists, columns and vertical bracinginstances of damage and appeared to be in good condition, and that the load concrete walls on the north side of the building had sustained no damage.

    roof decking, the gymnasium, and the west wall of the kitchen were reported substantial damage. The majority of the HVAC rooftop units had been desblew off the building roof, with some causing damage to the building. Fuewhile the damage was substantial, it appeared that the building could be repaa safe facility for the students. Fuess observed in their report that varioperimeter non-load bearing metal framed walls had fallen away from the stee

  • 8/19/2019 Red Oak ISD Ratcliff Review DTS Ovilla Construction Update 1-28-16

    2/78

    specifications, the engineered shop drawings (prepared by Lalonde Enginapplicable code requirements, the construction of the walls and their connectframe. Mr. Lavi reported that the engineered shop drawings were in generathe performance specifications provided by the architect, and were consistebuilding code requirements, including those for wind load. The engineer cothat some aspects of the exterior wall installations performed by Ratcliff C

    their subcontractors, deviated from the shop drawings and specifications prothe sizes of the fasteners and manner of their installation. The engineer conelements contributed to the failure of the walls.

    On Tuesday, January 12, 2016, Red Oak ISD received a response to the report from Lalonde Engineering Inc., the engineering firm which originengineered shop drawings for the walls in question. The letter provided addregarding the selection and approval of the fasteners used by Ratcliff, regarding the deviations cited in the Lavi Report. Mr. Lalonde’s letter suggeof the storm may have played a larger role in the wall failure than the deviatioReport, reasoning that the tornado, as rated by the National Weather Secreated actual wind pressure load on the walls, two and a half times grearequired design force.

    On January 14, 2016, the district’s investigation continued as a team

     Associates, Lavi & Associates, L.A. Fuess, Ratcliff Constructors and Wis Associates (engineers for Ratcliff Constructors) began the process of cuttinexterior walls to visually inspect the wall fasteners at issue. Additional enginerepresentatives for the various contractors involved joined these parties oElementary the following day. Red Oak ISD formally met with Corgrepresentatives on January 19, 2016 to discuss next steps and continues dialogue; however, Ratcliff declined the invitation to attend the January January 20, 2016, the district received an additional report from Lavi &

    concluded that of 12 sites or walls inspected on January 14 none had fastinstalled in compliance with manufacturer installation guidelines. Specifically, found that the fasteners did not fully penetrate steel framing as required by installation guidelines.

    “The information the district now has suggests that the failure of some of th

  • 8/19/2019 Red Oak ISD Ratcliff Review DTS Ovilla Construction Update 1-28-16

    3/78

    Facts, timelines, reports and documents are on the following pages.Facts on Donald T. Shields Elementary School: 

    "  Donald T. Shields Elementary was built in 2008 and was completed"  The General Contractor for the Shields Elementary construc

    Constructors, L.P."  Ratcliff Constructors constructed no other campus in Red Oak ISD.

    "  No issues with the construction quality at Shields Elementary have

    the district since it opened."  The Shields Elementary building passed all final inspections by B

    inspection provider required by the City of Glenn Heights. A certificwas issued in August 2009. Bureau Veritas has not returned calls fthrough the date of this press release.

    "  Ratcliff Constructors subcontracted the construction of the non-loawalls to Walker Drywall, Inc.

    "  Phillipe Lalonde, P.E., of Lalonde Engineering Inc. prepared anddrawings for the non-load bearing exterior walls at Shields Elementa

    "  The architect for the 2008 Shields Elementary Project was Corgwhich was hired to provide overall design and prepare performancevarious aspects of the building (including the non-load bearing exte

    "  The engineer hired by Corgan for the 2008 Shields ElementaryFuess.

    "  Cadence McShane is the construction company selected by the dis

    complete any/all repairs to Shields Elementary on Ovilla Road."  Cadence McShane was also the General Contractor for Red Oak H

    Timeline of Important Dates:

    "  December 26, 2015: EF-3 tornado damaged Shields Elementary"  December 27, 2015: Engineers from L.A. Fuess were on site to

    campus was safe for entry by the volunteer cleanup crews. The bufor the volunteer cleanup crews to begin work.

    "  December 30, 2015: Red Oak ISD was contacted with questions quality of Shields Elementary.

    "  December 30, 2015: Red Oak ISD requested a report and inspectquality from L.A. Feuss and Corgan & Associates. Subseque

  • 8/19/2019 Red Oak ISD Ratcliff Review DTS Ovilla Construction Update 1-28-16

    4/78

    "  January 14, 2016:  At the request of Red Oak ISD, a team Associates, Lavi & Associates, L.A. Fuess, Ratcliff Constructors Elstner Associates (WJE are the engineers for Ratcliff Construprocess of cutting holes in existing exterior walls to visually inspect

    "  January 15, 2016:  Additional engineers and insurance recontractors were on site at Shields Elementary on Live Oak.

    "  January 19, 2016: Red Oak ISD and Corgan & Associates repre

    discuss next steps. Ratcliff Contractors declined the invitation to att"  January 20, 2016: Red Oak ISD received an updated report from

    recapping the visual inspection of exterior walls that was conductewhich is attached at the end of this press release.

    "  AT PRESENT:  Red Oak ISD is seeking formal recommendatiocorrection of the exterior wall deficiencies.

    Documents Attached:

    "  National Weather Service Report from December 26, 2015"  Statement from Ratcliff Constructors on January 4, 2016"  Statement from Corgan & Associates on January 5, 2016"  L.A. Fuess Report from January 8, 2016"  Lavi & Associates Report from January 11, 2016

    "  Lalonde’s Response to Lavi & Associates Report on January 12, 20"  Lavi & Associates Report from January 20, 2016"  Contract Between Red Oak ISD and Ratcliff Constructors from Janu"  Contract Between Red Oak ISD and Bureau Veritas from Septembe"  Certificate of Occupancy from the City of Glenn Heights from Augus"  Final Inspection Report from Bureau Veritas showing Passed for C/

  • 8/19/2019 Red Oak ISD Ratcliff Review DTS Ovilla Construction Update 1-28-16

    5/78

  • 8/19/2019 Red Oak ISD Ratcliff Review DTS Ovilla Construction Update 1-28-16

    6/78

  • 8/19/2019 Red Oak ISD Ratcliff Review DTS Ovilla Construction Update 1-28-16

    7/78

  • 8/19/2019 Red Oak ISD Ratcliff Review DTS Ovilla Construction Update 1-28-16

    8/78

  • 8/19/2019 Red Oak ISD Ratcliff Review DTS Ovilla Construction Update 1-28-16

    9/78

  • 8/19/2019 Red Oak ISD Ratcliff Review DTS Ovilla Construction Update 1-28-16

    10/78

  • 8/19/2019 Red Oak ISD Ratcliff Review DTS Ovilla Construction Update 1-28-16

    11/78

  • 8/19/2019 Red Oak ISD Ratcliff Review DTS Ovilla Construction Update 1-28-16

    12/78

  • 8/19/2019 Red Oak ISD Ratcliff Review DTS Ovilla Construction Update 1-28-16

    13/78

  • 8/19/2019 Red Oak ISD Ratcliff Review DTS Ovilla Construction Update 1-28-16

    14/78

  • 8/19/2019 Red Oak ISD Ratcliff Review DTS Ovilla Construction Update 1-28-16

    15/78

  • 8/19/2019 Red Oak ISD Ratcliff Review DTS Ovilla Construction Update 1-28-16

    16/78

  • 8/19/2019 Red Oak ISD Ratcliff Review DTS Ovilla Construction Update 1-28-16

    17/78

  • 8/19/2019 Red Oak ISD Ratcliff Review DTS Ovilla Construction Update 1-28-16

    18/78

  • 8/19/2019 Red Oak ISD Ratcliff Review DTS Ovilla Construction Update 1-28-16

    19/78

  • 8/19/2019 Red Oak ISD Ratcliff Review DTS Ovilla Construction Update 1-28-16

    20/78

  • 8/19/2019 Red Oak ISD Ratcliff Review DTS Ovilla Construction Update 1-28-16

    21/78

  • 8/19/2019 Red Oak ISD Ratcliff Review DTS Ovilla Construction Update 1-28-16

    22/78

  • 8/19/2019 Red Oak ISD Ratcliff Review DTS Ovilla Construction Update 1-28-16

    23/78

  • 8/19/2019 Red Oak ISD Ratcliff Review DTS Ovilla Construction Update 1-28-16

    24/78

  • 8/19/2019 Red Oak ISD Ratcliff Review DTS Ovilla Construction Update 1-28-16

    25/78

  • 8/19/2019 Red Oak ISD Ratcliff Review DTS Ovilla Construction Update 1-28-16

    26/78

  • 8/19/2019 Red Oak ISD Ratcliff Review DTS Ovilla Construction Update 1-28-16

    27/78

  • 8/19/2019 Red Oak ISD Ratcliff Review DTS Ovilla Construction Update 1-28-16

    28/78

  • 8/19/2019 Red Oak ISD Ratcliff Review DTS Ovilla Construction Update 1-28-16

    29/78

  • 8/19/2019 Red Oak ISD Ratcliff Review DTS Ovilla Construction Update 1-28-16

    30/78

  • 8/19/2019 Red Oak ISD Ratcliff Review DTS Ovilla Construction Update 1-28-16

    31/78

  • 8/19/2019 Red Oak ISD Ratcliff Review DTS Ovilla Construction Update 1-28-16

    32/78

  • 8/19/2019 Red Oak ISD Ratcliff Review DTS Ovilla Construction Update 1-28-16

    33/78

  • 8/19/2019 Red Oak ISD Ratcliff Review DTS Ovilla Construction Update 1-28-16

    34/78

  • 8/19/2019 Red Oak ISD Ratcliff Review DTS Ovilla Construction Update 1-28-16

    35/78

  • 8/19/2019 Red Oak ISD Ratcliff Review DTS Ovilla Construction Update 1-28-16

    36/78

  • 8/19/2019 Red Oak ISD Ratcliff Review DTS Ovilla Construction Update 1-28-16

    37/78

  • 8/19/2019 Red Oak ISD Ratcliff Review DTS Ovilla Construction Update 1-28-16

    38/78

  • 8/19/2019 Red Oak ISD Ratcliff Review DTS Ovilla Construction Update 1-28-16

    39/78

  • 8/19/2019 Red Oak ISD Ratcliff Review DTS Ovilla Construction Update 1-28-16

    40/78

    LLAAVVII && AASSSSOOCCIIAATTEESS,, LL..PP.. CONSULTING ENGINEERS

  • 8/19/2019 Red Oak ISD Ratcliff Review DTS Ovilla Construction Update 1-28-16

    41/78

    CONSULTING ENGINEERS 10300 N

    D A

    PHONE (214) 340-0049F AX (214) 340-0067EMAIL [email protected] 

    January 20, 2016

    Mr. Steve Hulsey

    Corgan Associates401 N. Houston StreetDallas, Texas 75202

    Re: Shields Elementary School, Red Oak ISD – Tornado Damage

    Dear Mr. Hulsey:

    We are writing to report our visual evaluation of the connection of slotted structural roof edge angle. On January 14, 2016 we observed a total of 12 locatphoto #1. These areas where consisted of approximately 30” x 30” remosheathing and roofing material on the backside of the parapet. In these 12 looking for fastener penetration through the backside of the edge angle whichproper installation of power actuated fasteners. Following are the suobservations.

      In all of the 12 areas selected for observation, none of the faspenetrations as can be seen in photos #2, and 3, and are not in cfastener manufacturer installation guides.

      In some areas studs were not connected to the main structure, therefoconnections may be overloaded. Photo #4

      In several areas where multiple studs were used for jamb studs, connected together as required by design. Photo # 5

    Observation was limited to these 12 areas, however we believe these contypical through the other areas also.

    Shields Ele

    mailto:ylavi@mailto:ylavi@mailto:ylavi@mailto:ylavi@

  • 8/19/2019 Red Oak ISD Ratcliff Review DTS Ovilla Construction Update 1-28-16

    42/78

    Ja

    Photo # 1: Areas circled in red show approximate location of observed areas

    Shields Ele

  • 8/19/2019 Red Oak ISD Ratcliff Review DTS Ovilla Construction Update 1-28-16

    43/78

    Ja

    Photo #2 Fasteners not fully penetrating the edge angle

    Shields Ele

  • 8/19/2019 Red Oak ISD Ratcliff Review DTS Ovilla Construction Update 1-28-16

    44/78

    Ja

    Photo #3 Fasteners have not penetrated the edge angle as required for pro

    Shields EleJ

  • 8/19/2019 Red Oak ISD Ratcliff Review DTS Ovilla Construction Update 1-28-16

    45/78

    Ja

    Photo #4 Stud not connected to structural edge angle

    Shields EleJ

  • 8/19/2019 Red Oak ISD Ratcliff Review DTS Ovilla Construction Update 1-28-16

    46/78

    Ja

    Photo #5 Stud not connected together at window jambs

  • 8/19/2019 Red Oak ISD Ratcliff Review DTS Ovilla Construction Update 1-28-16

    47/78

  • 8/19/2019 Red Oak ISD Ratcliff Review DTS Ovilla Construction Update 1-28-16

    48/78

  • 8/19/2019 Red Oak ISD Ratcliff Review DTS Ovilla Construction Update 1-28-16

    49/78

  • 8/19/2019 Red Oak ISD Ratcliff Review DTS Ovilla Construction Update 1-28-16

    50/78

  • 8/19/2019 Red Oak ISD Ratcliff Review DTS Ovilla Construction Update 1-28-16

    51/78

  • 8/19/2019 Red Oak ISD Ratcliff Review DTS Ovilla Construction Update 1-28-16

    52/78

  • 8/19/2019 Red Oak ISD Ratcliff Review DTS Ovilla Construction Update 1-28-16

    53/78

  • 8/19/2019 Red Oak ISD Ratcliff Review DTS Ovilla Construction Update 1-28-16

    54/78

  • 8/19/2019 Red Oak ISD Ratcliff Review DTS Ovilla Construction Update 1-28-16

    55/78

  • 8/19/2019 Red Oak ISD Ratcliff Review DTS Ovilla Construction Update 1-28-16

    56/78

  • 8/19/2019 Red Oak ISD Ratcliff Review DTS Ovilla Construction Update 1-28-16

    57/78

  • 8/19/2019 Red Oak ISD Ratcliff Review DTS Ovilla Construction Update 1-28-16

    58/78

  • 8/19/2019 Red Oak ISD Ratcliff Review DTS Ovilla Construction Update 1-28-16

    59/78

  • 8/19/2019 Red Oak ISD Ratcliff Review DTS Ovilla Construction Update 1-28-16

    60/78

  • 8/19/2019 Red Oak ISD Ratcliff Review DTS Ovilla Construction Update 1-28-16

    61/78

  • 8/19/2019 Red Oak ISD Ratcliff Review DTS Ovilla Construction Update 1-28-16

    62/78

  • 8/19/2019 Red Oak ISD Ratcliff Review DTS Ovilla Construction Update 1-28-16

    63/78

  • 8/19/2019 Red Oak ISD Ratcliff Review DTS Ovilla Construction Update 1-28-16

    64/78

  • 8/19/2019 Red Oak ISD Ratcliff Review DTS Ovilla Construction Update 1-28-16

    65/78

  • 8/19/2019 Red Oak ISD Ratcliff Review DTS Ovilla Construction Update 1-28-16

    66/78

  • 8/19/2019 Red Oak ISD Ratcliff Review DTS Ovilla Construction Update 1-28-16

    67/78

  • 8/19/2019 Red Oak ISD Ratcliff Review DTS Ovilla Construction Update 1-28-16

    68/78

  • 8/19/2019 Red Oak ISD Ratcliff Review DTS Ovilla Construction Update 1-28-16

    69/78

  • 8/19/2019 Red Oak ISD Ratcliff Review DTS Ovilla Construction Update 1-28-16

    70/78

  • 8/19/2019 Red Oak ISD Ratcliff Review DTS Ovilla Construction Update 1-28-16

    71/78

  • 8/19/2019 Red Oak ISD Ratcliff Review DTS Ovilla Construction Update 1-28-16

    72/78

  • 8/19/2019 Red Oak ISD Ratcliff Review DTS Ovilla Construction Update 1-28-16

    73/78

  • 8/19/2019 Red Oak ISD Ratcliff Review DTS Ovilla Construction Update 1-28-16

    74/78

  • 8/19/2019 Red Oak ISD Ratcliff Review DTS Ovilla Construction Update 1-28-16

    75/78

  • 8/19/2019 Red Oak ISD Ratcliff Review DTS Ovilla Construction Update 1-28-16

    76/78

  • 8/19/2019 Red Oak ISD Ratcliff Review DTS Ovilla Construction Update 1-28-16

    77/78

  • 8/19/2019 Red Oak ISD Ratcliff Review DTS Ovilla Construction Update 1-28-16

    78/78