Upload
others
View
11
Download
0
Embed Size (px)
Citation preview
GREYFRIARSReading, RG1 1JG
A NEW HEADQUARTERS OFFICE BUILDING OF 39,926 SQ FT IN THE HEART OF READING TOWN CENTRE, THREE MINUTES’
WALK FROM READING RAILWAY STATION.
INCORPORATING A HIGHLY SUSTAINABLE DESIGN, 9 GREYFRIARS WILL BE THE FIRST OFFICE BUILDING IN
READING TO ACHIEVE AN EPC RATING OF A, WITH REDUCED OPERATIONAL COSTS FOR OCCUPIERS.
AVAILABLE Q2 2016.
Reading, RG1 1JGGREYFRIARS
Target EPCRating A
Target Breeam ‘Excellent’
PerformanceSolar Control
Glazing
Heat RecoveryWithin A/C
& VentilationSystems
Low VOC Paint Improving Air
Quality
19 Secure CycleRack Spaces
ExcellentNaturalLight
1,537 sq ft Roof Terrace
Multi Censor LED Lighting Control
ResponsiblySourced Timber
Building Energy Management
System
A FIRST FOR READINGWhen completed, 9 Greyfriars will be the first building in Reading to achieve an EPC Rating A, providing occupiers with excellent energy efficiency and low carbon credentials.
This highly sustainable building will not only have lower operating costs, but has also been carefully designed to incorporate features that positively enhance occupier health, wellbeing and productivity.
HIGHlYEFFIcIENTA high quality, contemporary office spacefor today’s modern business occupier.
Office occupiers will pay significantly less than a typical office for their energy consumption. Energy costs are estimated to be £8.54 per sq m per annum, this is compared to a good practice UK office of £32.31 per sq m and a typical UK office of £50.50 per sq m.(Benchmarks have been taken from CIBSE Guide F)
‘Almost all UK office workers view natural light and access to outdoor space as key factors in their wellbeing.’(British Council for Offices Wellbeing at Work Study)
Good Practice UK Office
£ / sq m per annum
Typical UK Office
£200,000
£150,000
£100,000
£50,000
£0
£50.50per sq m p.a
£32.31per sq m p.a
£8.54per sq m p.a
FlEXIBlE &SPAcIOUSFull Grade A Specification:
VRV air conditioningHighly efficient LED lighting with sensor controlsFully accessible raised floors2 x 10 person passenger liftsMale and female WCs on all floorsDisabled WC, showers and lockersSecure storage for 19 bicycles19 car parking spacesTarget BREEAM of ‘Excellent’Target EPC ‘A’ rating
N
ScHEDUlE OF AREAS
G
Floor SQ M SQ FT
3 803 8,642Roof Terrace 143 1,537
2 969 10,426
1 944 10,161
G 852 9,169
Reception 142 1,528
Total (Excluding Roof Terrace) 3,710 39,926Approximate net lettable floor areas
Car ParkEntrance
Reception
Terrace
3
1&2
SPEcIFIcATION
OccUPANcY
Means of Escape: 1 person / 6 sq m.Cooling / Heating: 1 person / 8 sq m.Lift Provision: 1 person / 10 sq m.Sanitary provision: 1 person / 10 sq m. (60% male / 60% female).
DIvISIBIlITY
Maximum of two independent tenancies per floor.
PlANNING MODUlE
1.5m.
FlOOR lOADINGS
Office Floors: 2.5kn / sq m.Plant Room: 7.5kn / sq m.
FlOOR HEIGHTS
Floor to Floor: 3610mm – typical.Raised Floor Zone: 180mm – typical.Office Floor to Suspended Ceiling: 2700mm.Ceiling Lighting Zone: 80mm – typical.Service Zone: 350mm – typical.
STRUcTURE
The building has a steel frame with 300mm metal deck concrete floor.
EXTERNAl FINISHES
Elevations: A curtain walling system with solar control glazing and modesty fitted glass panels, feature exposed vertical concrete column casings and anodised trim/flashing. A fully glazed elevation with brise soleil anodised fins to the front elevation.
Roof / Terrace: Accessible terrace from 3rd floor office with composite non slip timber decking and glazed balustrade.Roof: A new Bauder roof has been installed, with a 20 year insurance backed warranty.
INTERNAl OFFIcE FINISHES
Walls: Emulsion painted plaster walls.Floors: 600mm x 600mm fully accessible steel encapsulated raised floor tiles.Ceilings: 600mm x 600mm fully accessible metal ceiling tiles laid in an exposed grid with plasterboard margins.Light Fittings: LED lighting throughout designed in accordance with the spirit of CIBSE LG7. Daylight sensing and presence detectors.Doors: Full height solid core Walnut veneered doors with full height glazed vision panels, flush push plates and full height door handles.Skirting: Flush with shadow gap detail.
REcEPTION
Walls: Emulsion painted dry lined with feature Walnut linear timber cladding and back painted glass.Floor: High specification ceramic tiles in 600mm x 1200mm modules.Ceiling: Emulsion painted plasterboard.Lighting: LED specialist linear light fittings with bespoke ceiling edge effect.Doors: Semi-assisted push/pull flush glass doors.Reception Desk: Bespoke white Krion reception desk with Walnut timber cladding and back painted glass accents.
TOIlETS
Male and female on each floor and not designated on ground floor.Walls: Emulsion painted plasterboard.Floors: High quality porcelain tiles and skirtings.Ceilings: Emulsion painted plasterboard.Doors: Full height solid core Walnut veneered doors. WCs: White vitreous china Duravit pans.Wash Hand Basins: A single large solid surface Krion basin/vanity trough in each bathroom with concealed drainage. PIR taps in chrome finish.Mirrors: Full width mirrors above feature glass splashback with linear LED lighting.Cubicles: Full height Walnut veneer doors, back panels with stainless steel flush plate and back painted glass details.
SHOwERS
Four showers are provided, 2 on ground floor (one is within the disabled toilet) and 2 on 4th floor. 20 lockers on 4th floor and provision for drying space.
STAIRcASES
Main Staircase:Carpet tile floor finish and fully glazed balustrade.Secondary Staircase:Carpet tile floor finish and tubular steel balustrade with posts.
lIFT lOBBIES
Walls: Feature glass panel and white emulsion.Floors: Modern grey dynamic pattern carpet tiles.
LIFT LOBBIES
Ceilings: Emulsion painted plasterboard with feature LED linear lighting. Doors: Solid core Walnut veneer to toilets and fully glazed frameless doors to offices.Skirting: Flush with shadow gap detail.
lIFTS
2 x 10 person passenger lifts serving reception up to 3rd floor with group controls.Walls: Stainless steel trims/rails and opaque glass panels/mirror.Floors: High specification ceramic tiles in 1200mm x 300mm modules to match reception.Ceilings: Stainless steel ceilings with halo lighting effect around edges.Handrail: Stainless steel trims and rails.Door Trims: Flush stainless steel doors and jamb trims.
MEcHANIcAl INSTAllATIONS
The office accommodation and reception is cooled and heated by a three pipe VRV AC system with fan coil units located in the ceiling voids. Mechanical ventilation is supplied to the office from air handling plant via the fan coil units.
The toilets are served by mechanical ventilation systems to provide heating and ventilation with the circulation space heated by radiators.
DESIGN PARAMETERS
External Temperatures
Summer: 29˚C db, 20˚C wb.Winter: -4˚C db, 100% saturated.
Internal Temperatures
Heating and Cooling to OfficesSummer: 22˚C db ± 1.0˚C no humidity control.Winter: 21˚C db ± 1.0˚C no humidity control.Heating and Cooling To ReceptionSummer: 22˚C db ±1.0˚C no humidity control.Winter: 18˚C db ± 1.0˚C no humidity control.
HEATING ONlY
Toilets: 18°C db + 1.0°C no humidity control. Stairs:18°C db + 1.0°C no humidity control. Showers:18°C db + 1.0°C no humidity control. Plant Room: Unheated.
HEAT GAIN AllOwANcE
Lighting: 15w / sq m.Occupiers Small Power: 25w / sq m.People: 90 w per person (S). 50 w per person (L).Occupational Density: 1 person / 8 sq m of lettable floor area.Ventilation Rates: 12 l/s per person.
IllUMINATION lEvElS
Office*: 450 lux.Toilets: 150 lux.Reception (plus feature lighting): 300 lux.Lobbies: 150 lux.Plant Room: 150 lux.* Lighting is compatible with the requirements of CIBSE Lighting Guide (LG7) 2005.
AcOUSTIc cRITERIA
The system is designed and equipment selected to achieve the following noise levels within the building.Offices: NR38.Toilets: NR40.Entrance: NR40.Plant Area: As per Local Authority Statutory requirement but not greater than 40dBA at the site boundary or in excess of the prevailing background noise level during normal occupation times of the buildings.
FIRE AlARM
Fully analogue addressable system to L1 classification.
TElEcOMMUNIcATIONS
Incoming BT service with containment in risers. 4 incoming 10mm ducts: 2 BT and 2 spare.
ENvIRONMENTAl PERFORMANcE / SUSTAINABIlITY
Target BREEAM rating of ‘Excellent’ and an Energy Performance Certificate of ‘A’.
The following environmental & energy efficiency measures have been incorporated into the building design:Performance solar control glazing to all elevations.Solar shading to the main entrance.Automatic lighting control to offices & cores via daylight sensing & presence detectors.Building Energy Management Systems (BEMS).Separate occupier electricity metering per floor.Heat recovery from the VRF system to serve the hot water service.LED lighting.Heat recovery in the mechanical ventilation systems.
LIFT LOBBIES
TwyfordTaplow
BurnhamLangley
IverWest Drayton
Ideally situated being just a three minute walk from Reading railway station, which has recently undergone an £800m redevelopment.
The station provides direct accessto London Paddington in 26 minutes with trains every four minutes at peak times. There are also regular direct services to Birmingham, Bristol and Cardiff.
From 2019, Crossrail will provide direct access to over 40 stations and
London’s West End, City and Docklands. In addition, when completed the Western Rail Link will provide direct access to Heathrow Airport in just 28 minutes.
LondonPaddington
HeathrowAirport
ReadingCardiff &Bristol
Wokingham
HighWycombe
Birmingham
Camberley
Guildford
Maidenhead
Watford
A406
A205
M23
M25
M25
M4
M3
M40
M1
GatwickAirport
SERIOUSLY WELLCONNECTED
Rail Times (from Reading) Frequency (p/hr)
Paddington / 26 mins 16Bristol Temple Meads / 74 mins 4Gatwick Airport / 76 mins 4Birmingham / 97 mins 3Oxford / 23 mins 7Heathrow Airport / 62 mins 5
Road Times (from Reading)
Heathrow Airport 34 mins / 28 milesGatwick Airport 65 mins / 56 milesLondon 48 mins / 40 milesM25(J15) 27 mins / 24 milesM4 (J11) 8 mins / 3.5 milesM4 (J10) 10 mins / 5.5 miles
Hayes & HarlingtonSouthallHanwell
West Ealing
Acton Mainline
SloughMaidenhead Heathrow Airport
Ealing Broadway
Paddington
Crossrail (from Reading 2019)
1 Excellent road connections to M4
2 26 minutes to London3 World class connections4 Ready for Crossrail5 Reading rail station6 Extensive local bus services
1
2
5
3 4
TottenhamCourt Road
Bond Street
Farringdon Liverpool Street
Whitechapel Canary Wharf
6
Occupiers
3
Mott McDonald
Covea Insurance
Thames Water
Capita
AXA
Samsung XafinityBabcock
NHS Professionals
Barclays HSBC E&Y Shoosmiths
PwC Hibu
SSE
Deloitte
RBS
Visa
Retail
John Lewis
The Oracle (shopping centre)
House of Fraser
Broad Street Mall (shopping centre)
Leisure
Forbury Hotel
Vue Cinema
Grosvenor Casino
Forbury Gardens
Bars / Restaurant / Café
Cote Brasserie
Strada
Loch Fyne
Carluccio’s
Pitcher & Piano
Malmaison
3 minswalk
3 minswalk
7 minswalk
Reading Station
Forbury Road
Napier Road
Valpy Street
Bla
gra
ve S
tree
t
The
Fo
rbur
y
Fo
rbur
y R
oad
Mer
chan
ts P
lace
West Street
Vachel Rd
Tudor Rd
Queens W
alk
A329
A329
A32
9
B33
45
London S
t
Forbury Road
High St
Bridge Street
Castle Street
Hosier Street Minster Stre
et
South Street
Watlington S
t
Sid
mouth S
t
East S
t
Abbey Street
Gre
yfri
ars
Ro
ad
Sta
tion
Ro
ad
Blagrave Street
Que
en V
icto
ria
St
Uni
on
Str
eet
Cro
ss S
tree
t
Che
apsi
de
Station Hill
Friar Street
Oxford Rd Broad Street
Queens Road A329
A32
9
A329
Bagnell Way
King Street
Abbot’s Walk
Garrard Street
6
1
P
P
P
P
P
P
P
P
P
2
3
4
5
1
2
5
8
67
9
10
11
12
13
14
3
4
1
2
5
8
6
7
9
10
11
12
13
14
3
4
78 9
10
11
12 13
14
6
1
2
3
4
5
7
8
9
10
11
12
13
14
Reading is considered the commercial capital of the Thames Valley and is home to many leading companies from a diverse range of business sectors including a high concentration of FTSE 100 companies and 13 of the world’s top 30 brands.
TOwN cENTRE AMENITIES AND OccUPIERS
M4 (J11)
1
2 3
6
5
4
7
1 Forbury Gardens2 The Oracle (shopping centre)
3 John Lewis4 Malmaison5 Carluccio’s6 River Thames7 Apple Store
McKay Securities PLC is a commercialproperty investment company with RealEstate Investment Trust (REIT) status.
The company has established a longtrack record of developing andrefurbishing high quality, contemporary office and industrial properties in South East England and London.
Completed schemes are retained andmanaged from McKay’s head office in Reading.
A PHIlOSOPHY OF QUAlITY
1
2
3
Computer generated image
1 Prospero, Redhill (under constuction)2 66 Wilson Street, EC23/4 203 Blackfriars Road, SE15/6 329 Bracknell7 30 Lombard Street, EC3 (under constuction)8 Pegasus Place, Crawley
4
7 8
6
5Computer generated image
9GREYFRIARS.COM
Development by
DISCLAIMER: The agents advise that these particulars do not form part of an offer or contract and are intended for general guidance purposes only. They have been prepared from information supplied to us and interested parties should satisfy themselves as to the accuracy of the floor areas, tenancy details etc and whether the premises are fit for purpose before entering into a contract. All prices and
rents are exclusive of VAT and the property is offered subject to contract. December 2015.