Upload
others
View
5
Download
0
Embed Size (px)
Citation preview
The instructions are split into two sections: Recess InstallatIon, Page 2,
and suRface InstallatIon, Page 5. Determine which you need before starting.
Please contact Genius for additional custom sizes and colors.
InstallatIon tools
PATIO ENCLOSURES • GAZEBOS • GARAGE DOORS InstallatIon InstRuctIonsOlympic
R E A D T H E C O M P L E T E I N S TA L L AT I O N I N S T R U C T I O N S B E F O R E P R O C E E D I N G W I T H I N S TA L L AT I O N .
Genius olympic insTrucTions • PART NUMBER : 50-00111-0-0 • V.02.06.15
PHILLIPS SCREWDRIVER MEASURING TAPE POWER DRILL & BITS
ContaCt genIus @ 1.866.523.9511 Toll free • geniusscreens.com
NEEDLE PLIERS Pencil or Pen
PAGE 2OLYMPIC RECESS INSTALLATION
A
BB
D
D
D
D
D
D
C
D
C
D
A screen cassette Assembly
B side guide rails
C recess mount clips
D #8 x 1”(25mm) Pan Phillips Head screw
PaRt DesIgnatIons
NOTE: olYmPics ordered with the motorized
system will not include Pullchain.
record your opening measurements on the chart below and provide these
dimensions to Genius when ordering. The screen will be built to match
these dimensions.
oPening WiDTH = ____________________
X
oPening HeigHT = ____________________
MEASURING
Determine the maximum opening height & width for mounting your
screen, as shown below. check for interference with head of opening.
1
GARAGE DOOR JAMB GARAGE DOOR JAMB
OPENING WIDTH
TOP VIEW
SIDE VIEW
GARAGE DOOR HEAD
INSIDE
OUTSIDE
OUTSIDE INSIDE
C-RECESS MOUNT CLIP
OPENING HEIGHT
SILL or FLOOR
PAGE 3OLYMPIC RECESS INSTALLATION
MOUNTING THE SCREEN CASSETTE
on a recess installation, the A-screen cassette Assembly will be fastened to the
inside top with c-recess mount clips. Measure how deep into the door jamb
you wish the cassette Assembly to be installed. Using the D-#8 x 1”(25mm) Pan
Phillips Head screws, screw the mount clips to the top approximately 6” in from
each side. For wider openings, space any remaining clips evenly along the top.
Make certain that the mount clips diagonal flange is at the back and the set
screws are facing the front (2A). With clips screwed to the jamb securely, position
the screen casette Assembly so that the back flanges of the mount clips fit into
the groove at the top and back of the cassette Assembly (2B). Then bring the
front of the casette up, so that the top of the cassette Assembly is flat against
the clips. With the cassette Assembly positioned correctly within the opening,
tighten the mount clip set screws so that the cassette Assembly is secure,
and straight within the opening (2c).
INSTALLING THE SIDE GUIDE RAILS
Using pliers crimp the ends of the channels so that the brush pile does not move.
Slide both B-side guide rails onto the nylon tabs that protrude from the end caps
of the A-screen cassette Assembly with the shorter pile to the inside and with
the plastic end cap toward the sill (3A). (note: make sure the left and right edges
of the screen and screen Pull Bar are inside the side guide rails). Attach the
B-side guide rails to the opening using D-#8 x 1”(25mm) Pan Phillips Head
screws (3B).
moTorizeD screens: if you purchased a motorized screen you will need to
set the limits (the start and stop points of the screen) once the screen is
installed. Please see the separate operating instructions that accompanied your
remote control.
2
3
SIDE VIEW
OU
TS
IDE
DOOR HEAD
INS
IDE
RECESS MOUNT CLIP DC
SET SCREW
A
C
C
A
BB
D
D
D
D
D
D
C
C
A
B
BD
A
D
2B
2C
3a
3B
PAGE 4OLYMPIC RECESS INSTALLATION
2a
shorter Pile
PAGE 5OLYMPIC SURFACE INSTALLATION
A
BB
D
E
D
E
D
DD
D
D
D
F
F
F
F
F
F
A screen cassette Assembly
B side guide rails
D #8 x 1”(25mm) Pan Phillips Head screw
E surface mount ‘l’ clips
F screw cap covers
PaRt DesIgnatIons
NOTE: olYmPics ordered with the motorized
system will not include Pullchain.
record your opening measurements on the chart below and provide these
dimensions to Genius when ordering. The screen will be built to match
these dimensions.
oPening WiDTH = ____________________
X
oPening HeigHT = ____________________
MEASURING
Determine the maximum opening height & width for mounting your
screen, as shown below. check for interference with head of opening.
1
GARAGE DOOR JAMB GARAGE DOOR JAMB
OPENING WIDTH
TOP VIEW
SIDE VIEW
GARAGE DOOR HEAD
OPENING HEIGHT
INSIDE
OUTSIDE
OUTSIDE
E-SURFACE MOUNT ‘L’ CLIP
SILL or FLOOR
PAGE 6OLYMPIC SURFACE INSTALLATION
MOUNTING THE SCREEN CASSETTE
Slide the e-surface mount ‘l’ clips into the back channel on the top of the
A-screen cassette (2A). Using the D-#8 x 1”(25mm) Pan Phillips Head screws,
screw the mount clips approximately 6” in from each side. For wider openings,
space any remaining clips evenly along the top.
INSTALLING THE SIDE GUIDE RAILS
Using pliers crimp the ends of the channels so that the brush pile does not move.
Slide B-inside rails onto the tabs protruding from the f and g-cassette caps
with the shorter pile to the inside and with the plastic end cap toward the sill (3A).
Use an 1/8” drill bit and first drill through both sides of the B-inside rails where
they are to be fastened. Next, using a 3/8” bit, drill through the outside face only.
This will allow you to snap the n-screw cap covers in place. Square and attach
B-inside rails with P - #8 x 1”(25mm) Phillips Panhead screws.n-screw cap
covers. (3B).
moTorizeD screens: if you purchased a motorized screen you will need to
set the limits (the start and stop points of the screen) once the screen is
installed. Please see the separate operating instructions that accompanied your
remote control.
2
3
AEE
A D
E
E
D
A
B
A
B
DF
DF
2a
2B
3a
3B
PAGE 7OLYMPIC SURFACE INSTALLATION
shorter Pile