12
Advisian 4321 Still Creek Drive Burnaby BC V5C 6S7 Canada P: +1 604 298 1616 A business of WorleyParsons Canada Services Ltd www.advisian.com 307071-01144-01-EN-LET-0002_R0.docx Page 1 of 3 15 March 2018 Ryan Wickham, Project Manager Anthem Duncan Developments LP Suite 300 Bentall 5, 550 Burrard Street Vancouver, BC V6C 2B5 Dear Mr. Wickham: RE: DFO Self-Screening Assessment – Sediment Remediation and Dike Construction Anthem Duncan Developments LP (Anthem) is planning to construct a townhouse development at 41 and 175 Duncan Street in New Westminster, British Columbia (BC), which was previously an industrial facility (the Site). The Project is located in the Queensborough neighbourhood of New Westminster, BC, on northeast Lulu Island, facing the south side of Poplar Island (49˚11.475’N, 122˚55.829’W, see Figure 1, Attachment 1). Lulu Island and Annacis Island (south of Lulu) are between the north and south arms of the Fraser River. Several activities are required prior to the initiation of the construction of the townhouse development, which includes sediment remediation and the construction of a dike along the foreshore of the site (the Project). Advisian was retained to providing engineering design for the dike and permitting support for the Project. Sections 35 and 36 of the Fisheries Act, of which Fisheries and Oceans Canada (DFO) and Environment and Climate Change Canada (ECCC) are the regulatory authorities (RAs) are pertinent to the Program. Section 35 of the Fisheries Act prohibits serious harm to fish, which is defined as “the death of fish or any permanent alteration to, or destruction of, fish habitat.” Under this legislation, proponents are required to avoid or mitigate serious harm to fish that are part of or support a commercial, recreational, or Aboriginal (CRA) fishery. Consultation with DFO is necessary when it is determined that residual serious harm to fish may occur (Section 35(2) Fisheries Act Authorization [FAA]), or when seeking advice on the potential for serious harm (Request for Review [RFR]). It is the responsibility of the proponent to conduct a “self-assessment” of their activities to determine if there may be serious harm. This letter provides written documentation of the Project self-assessment conducted by a Qualified Environmental Professional (QEP). The primary objectives of this self-assessment are to determine the potential of serious harm to fish, fish habitat, or fish that support such fisheries, provide mitigations to avoid serious harm, and limit adverse environmental effects to the marine environment during the Project. Aquatic construction activities for the Project have been categorized as those that are proposed to occur within the Vancouver Fraser Port Authority (VFPA) jurisdiction, and those that are above the VFPA jurisdiction but below the High Water Line (HWL) (see Table A). A Project and Environmental Review Category C Application (hereafter referred to as the Application) was submitted to the VFPA on March 9, 2018. Advisian prepared a Construction Environmental Management Plan (Sediment Remediation and Dike Construction CEMP [Advisian 2018]) for these activities along with the submission. An additional CEMP will be completed that encompasses all proposed activities below the HWL.

RE: DFO Self-Screening Assessment Sediment Remediation and … · Construction of sheet pile wall All works are planned to be completed within DFO’s recommended least-risk work

Embed Size (px)

Citation preview

Advisian

4321 Still Creek Drive

Burnaby BC V5C 6S7

Canada

P: +1 604 298 1616

A business of WorleyParsons Canada Services Ltd

www.advisian.com

307071-01144-01-EN-LET-0002_R0.docx Page 1 of 3

15 March 2018

Ryan Wickham, Project Manager

Anthem Duncan Developments LP

Suite 300 Bentall 5, 550 Burrard Street

Vancouver, BC V6C 2B5

Dear Mr. Wickham:

RE: DFO Self-Screening Assessment – Sediment Remediation and Dike

Construction

Anthem Duncan Developments LP (Anthem) is planning to construct a townhouse development at 41 and 175

Duncan Street in New Westminster, British Columbia (BC), which was previously an industrial facility (the Site).

The Project is located in the Queensborough neighbourhood of New Westminster, BC, on northeast Lulu

Island, facing the south side of Poplar Island (49˚11.475’N, 122˚55.829’W, see Figure 1, Attachment 1).

Lulu Island and Annacis Island (south of Lulu) are between the north and south arms of the Fraser River.

Several activities are required prior to the initiation of the construction of the townhouse development, which

includes sediment remediation and the construction of a dike along the foreshore of the site (the Project).

Advisian was retained to providing engineering design for the dike and permitting support for the Project.

Sections 35 and 36 of the Fisheries Act, of which Fisheries and Oceans Canada (DFO) and Environment and

Climate Change Canada (ECCC) are the regulatory authorities (RAs) are pertinent to the Program. Section 35

of the Fisheries Act prohibits serious harm to fish, which is defined as “the death of fish or any permanent

alteration to, or destruction of, fish habitat.”

Under this legislation, proponents are required to avoid or mitigate serious harm to fish that are part of or

support a commercial, recreational, or Aboriginal (CRA) fishery. Consultation with DFO is necessary when it is

determined that residual serious harm to fish may occur (Section 35(2) Fisheries Act Authorization [FAA]), or

when seeking advice on the potential for serious harm (Request for Review [RFR]). It is the responsibility of the

proponent to conduct a “self-assessment” of their activities to determine if there may be serious harm.

This letter provides written documentation of the Project self-assessment conducted by a Qualified

Environmental Professional (QEP). The primary objectives of this self-assessment are to determine the

potential of serious harm to fish, fish habitat, or fish that support such fisheries, provide mitigations to avoid

serious harm, and limit adverse environmental effects to the marine environment during the Project.

Aquatic construction activities for the Project have been categorized as those that are proposed to occur

within the Vancouver Fraser Port Authority (VFPA) jurisdiction, and those that are above the VFPA jurisdiction

but below the High Water Line (HWL) (see Table A). A Project and Environmental Review Category C

Application (hereafter referred to as the Application) was submitted to the VFPA on March 9, 2018. Advisian

prepared a Construction Environmental Management Plan (Sediment Remediation and Dike Construction

CEMP [Advisian 2018]) for these activities along with the submission. An additional CEMP will be completed

that encompasses all proposed activities below the HWL.

307071-01144-01-EN-LET-0002_R0.docx Page 2 of 3

Engineering drawings showing dike construction are provided in Attachment 2 as follows:

307071-01144-00-CI-DGA-1010 - General Notes and Design Criteria

307071-01144-00-CI-DGA-1011 - Plan and Profile

307071-01144-00-CI-DGA-1012 - Lockblock Wall Elevation View

307071-01144-00-CI-DGA-1013 - Sections and Details (Sheet 1)

307071-01144-00-CI-DGA-1014 - Sections and Details (Sheet 12)

Table A Project Construction Activities within VFPA Jurisdiction as well as those below the HWL

Proposed Activity VFPA

Jurisdiction

Below HWL and

above VFPA

jurisdiction

Sediment remediation in Project site foreshore (Marine Demolition

Project).

Removal of remaining marine structures and debris removal,

including soil remediation works within retained areas on the

foreshore.

Sediment excavation for dike construction

Construction of retaining wall(s)

Excavation of existing and replacement of rip rap shoreline

protection

Construction of sheet pile wall

All works are planned to be completed within DFO’s recommended least-risk work windows (June 16 to

February 28) (DFO 2014: Area 28 Vancouver: Fraser River Estuary [Oak Street Bridge/George Massey Tunnel

to Mission Bridge]) (DFO, 2014). Further, all construction activities that are above (landward) VFPA’s

jurisdiction and below the HWL will be conducted in ‘out of water’ tidal conditions.

It is my professional opinion that the preceding scope of work for the Project can be conducted in a manner

that is not likely to cause serious harm to CRA fish (or fish that support such fisheries), provided the

mitigation, monitoring and adaptive monitoring measures outlined in the Aquatic Activities CEMP (Advisian

2018b), in addition to any requirements from the VFPA Permit.

Therefore, a RFR or FAA by DFO is not required for the proposed Project.

307071-01144-01-EN-LET-0002_R0.docx Attachments

Attachment 1 Figures

Poplar Island

Fraser River

122°55'0"W122°56'0"W

49°12'0"N

5050005450000

ANTHEM PROPERTIES

307071-01144 1 0

KR

15/03/2018

KR

VB

PLOT DATE & TIM

E: 15/03/2018 10:43:18 AM

SAVE DATE & TIM

E: 15/03/2018 10:43:18 AM

USER NAME: kenneth.w.ritchie

ISSUING OFFICE: BURNABY GIS

FILE LOCATION: \\WorleyParsons.com\CA\Data\YVR\307071\01144_AP_DuncanDike\10_Eng\16_Geomatics\01_Mxd\Anthem_Dike_Self_Assessment\Figure1_20180315_Location_Rev0.mxd

SCALE: SHOWN

"This drawing is prepared for the use of our customer as specified in the accompanying report. WorleyParsons Canada Ltd.assumes no liability to any other party for any representations

contained in this drawing."

CUSTOMER:A SHEET

WORLEYPARSONS PROJECT No: FIG No: REV

DATE:

DRAWN:

EDITED:

APPROVED:

Site Location

Service Layer Credits: Sources: Esri, HERE, DeLorme, Intermap, increment P Corp., GEBCO, USGS, FAO, NPS, NRCAN, GeoBase, IGN, Kadaster NL, Ordnance Survey, Esri Japan, METI, Esri China (Hong Kong), swisstopo, MapmyIndia, © OpenStreetMap contributors, and the GIS User

Community

Legend

VFPA Boundary

Site Location

SITE LOCATION

0 100 200 30050

Metres ±

Approximate location of Retaining Wall(to be removed)

1 2 3

West Foreshore Mid Foreshore East Foreshore

122°55'38"W122°55'39"W122°55'40"W122°55'41"W122°55'42"W122°55'43"W122°55'44"W122°55'45"W122°55'46"W122°55'47"W122°55'48"W122°55'49"W122°55'50"W122°55'51"W122°55'52"W122°55'53"W

49°11'49"N

49°11'48"N

49°11'47"N

49°11'46"N

49°11'45"N

49°11'44"N

505000 505100 505200 505300

5449200

5449300

PLOT DATE & TIME: 15/03/2018 10:45:32 AM

SAVE DATE & TIME: 15/03/2018 10:45:32 AM

USER NAME: kenneth.w.ritchie

ISSUING OFFICE: BURNABY GIS

FILE LOCATION: U:\YVR\307071\01144_AP_DuncanDike\10_Eng\16_Geomatics\01_Mxd\Anthem_Dike_Self_Assessment\Figure2_20180315_RMA_Rev0.mxd

SCALE: SHOWN CUSTOMER:B SHEET

DATE:

DRAWN:

EDITED:

APPROVED:

K.R.

Y.M.

V.B.

307071-01144

15/03/2018

"This drawing is prepared for the use of our customer as specified in the accompanying report. WorleyParsons Canada Ltd.assumes no liability to any other party for any representations

contained in this drawing."

WORLEYPARSONS PROJECT No: FIG No: REV

Service Layer Credits: Source: Esri, DigitalGlobe, GeoEye, Earthstar Geographics, CNES/Airbus DS, USDA, USGS, AeroGRID, IGN, and the GIS User Community

Lot information from City of New Westminster.VFPA Jurisdiction supplied by Port of Vancouver.

Legend

High High Water Level

Low Low Water Level

RAR 30m Buffer

Dike Layout

Limit of VFPA Jurisdiction

Lot Boundary (Approx.)

Risk Management

Ground Truth ClassificationBased On Survey

Low Productivity

Moderate Productivity

0 10 205

Metres ±ANTHEM PROPERTIES

RISK MANAGEMENT AREAS AND DIKE FOOTPRINTFOR THE UPCOMING ANTHEM PROJECT

2 0

307071-01144-01-EN-LET-0002_R0.docx Attachments

Attachment 2 Engineering Drawings