Our Ref : HTCC/UEMC/MRT V8/300mm and 250mm Dia. Relocation Pipe Jalan RekoDate : 10 Jan 2015
UEM Construction Sdn BhdNo. 5A, Jalan 51 / 217Off Jalan Templer46050 Petaling JayaSelangor, Malaysia
Attn : Mr. Chai Ted Fong / En. Ridzwan / En. Mohd Farid Ahmad Sudari
Dear Sirs,
PROJECT MRT LEMBAH KLANG JAJARAN SUNGAI BULOH - KAJANG
(RELOCATION OF 300MM DIA. AND 250MM DIA. WATER PIPE AT JALAN REKO)
QUOTATION (300mm Dia. And 250mm Dia. Water Pipe Relocation At Jalan Reko)
Kindly pleased note that the GST is excluded and shall add on accordingly if applicable.
Thank you.
Yours faithfully,
PHANG SIEW YEAN
PACKAGE V8: CONSTRUCTION AND COMPLETION OF VIADUCT GUIDEWAY AND OTHER ASSOCIATED WORKS FROM TAMAN MESRA TO KAJANG STATION
With reference to the above and site visit dated 6 Jan 2015, we are pleased to submit herewith the Quotation for your kind consideration and acceptance.
for How Thong Construction & Civil Engineering Sdn. Bhd.
QUOTATION (300mm Dia. And 250mm Dia. Water Pipe Relocation At Jalan Reko)
Kindly pleased note that the GST is excluded and shall add on accordingly if applicable.
Page : 3/10
Project : MRT V8
Subject : Water Pipe Relocation at Jln Reko
Quotation
ITEM DESCRIPTION UNIT QTY RATE
GENERAL NOTES:
1 PRELIMINARIES
a Performance Guarantee/Bond LS By Main Con
bLS By Main Con
c
LS 28,750.00 28,750.00
d
LS By Main Con
eLS By Main Con
e iLS 28,750.00 28,750.00
f
LS By Main Con
Total Carry Forward 57,500.00
Contract Amount
i) All quantities are provisional and subject to SYABAS final approved piping layout drawings, installation method and as-built drawings
ii) The contractor shall be responsible to verify and satisfy itself as to the accuracy and sufficiency of any information provided by the Consultant/Main Contractor. The contractor is deemed to have consulted all relevant Authorities ascertained actual routing of pipe line.
iii) It is the contractor responsibility to obtain all approval from the revalent authorities for the relocation works
iv) The Contractor shall review and verify the proposed scope of relocation works with full responsibility to perform the works
v) The Contractor shall be deemed to have fully understood and considered the Authority Requirements prior to preparation of its offer.
vi) The Contractor shall not in any way be relieved from any obligation under the contract requirements should any technical information, engineering data or other information obtained from the main contractor be incorrect and/or insufficient.
vii) The contractor is advised to visit and examine the sites and its surroundings and obtain for itself on its own responsibility all information that may be necessary for preparing the pricing and entering into a contract for constuction of the works.
Insurance of construction plant, materials in transit to site, EAR and workman compensation.
Mobilization & demobilization of all necessary labour,
plants, equipments and tools for completion of the
relocation works including handling, assembling and
removal off the site after completion.
Contribution, deposits, Bank Guarantee and other fees required by the Authorities for the excution of the works including application/processing fees for work permits
To carry out utilities mapping services to determine and verify the proposed piping route is in order and free from other existing utilities
To carry out piloting on connection and proposed pipe routing
Survey and setting out works and prepare proposed site detailed drawings in accordance with SYABAS requirements and coordinate with SYABAS to obtain approval.
Page : 4/10
Project : MRT V8
Subject : Water Pipe Relocation at Jln Reko
Quotation
ITEM DESCRIPTION UNIT QTY RATE Contract Amount
Total Bring Forward 57,500.00g
LS By Main Con
h
LS 17,250.00 17,250.00
i
LS 17,250.00 17,250.00
jLS 23,000.00 23,000.00
kLS Nil
l Defects rectification works during defects liability period LS -
m
m2 By Main Con
Total Carry Forward 115,000.00
To provide Road Safety and Traffic management as per Authorities requirements
Site access to site including working platform, making good and reinstatement works during execution of the works and clearing the site to the satisfaction of the Consultant/Authorities
SYABAS submission(samples and shop drawings), appoval and coordination including paying for all connection fees and all other related fees and liaising with SYABAS for water main shut off schedule, normalisation of water main and etc.
Allow for over times expenses of the consultant / main contractor / sub contractor supervision
Allow for factory inspection and witness testing at the place of manufacturer's works for SYABAS representatives
Temporary sheet piling including design submission
for approval, installation, maintenance, extraction and
removal from site. (remeasure quantities)
Page : 5/10
Project : MRT V8
Subject : Water Pipe Relocation at Jln Reko
Quotation
ITEM DESCRIPTION UNIT QTY RATE Contract Amount
Total Bring Forward 115,000.000.00
1 300mm and 250mm Dia. PIPE RELOCATION WORKS AT Jalan Reko 0.000.00
a TRENCH EXCAVATION 0.00
0.00
i) 300mm Ø MS Pipe M 1,162 38.00 44,156.15ii) 250mm Ø MS Pipe M 1,125 32.00 36,000.15iii) 50mm Ø Stainless Steel Pipe M 50 18.00 900.15iv) 40mm Ø Stainless Steel Pipe M 50 16.00 800.15v) 32mm Ø Stainless Steel Pipe M 50 14.00 700.15vi) 25mm Ø Stainless Steel Pipe M 50 12.00 600.15
b Extra Over for Sand Bedding for
i) 300mm Ø MS Pipe M 342 22.00 7,524.15ii) 250mm Ø MS Pipe M 325 20.00 6,500.15
c Extra Over for Road Cutting Using Diamond Cutter
i) 300mm Ø MS Pipe M 820 25.00 820.00ii) 250mm Ø MS Pipe M 800 25.00
d Extra Over for Full Trench Sand Fill Under Existing Road
i) 300mm Ø MS Pipe M 820 90.00 ii) 250mm Ø MS Pipe M 800 85.00
e
i) 300mm Ø MS Pipe M 820 110.00 ii) 250mm Ø MS Pipe M 800 105.00
e i Extra Over for Night Work LS
f INSTALLATION OF WATER PIPE 0.00
0.00
i) 300mm Ø MS Pipe M 1,162 310.00 ii) 250mm Ø MS Pipe M 1,125 250.00 iii) 50mm Ø Stainless Steel Pipe M 50 150.00 iv) 40mm Ø Stainless Steel Pipe M 50 120.00 v) 32mm Ø Stainless Steel Pipe M 50 100.00 vi) 25mm Ø Stainless Steel Pipe M 50 80.00
0.00g BENDS 0.00
0.00
i) 300mm Øx45° Horizontal Bend Nr 10 1,000.00 ii) 300mm Øx90° Horizontal Bend Nr 6 1,200.00 iii) 250mm Øx45° Horizontal Bend Nr 10 900.00 iv) 250mm Øx90° Horizontal Bend Nr 6 1,000.00
h T
i) 300mm x 200mm Ø T Nr 1 1,600.00 ii) 250mm x 200mm Ø T Nr 4 1,400.00 iii) 250mm x 150mm Ø T Nr 8 1,200.00 iv) 300mm x 150mm Ø T Nr 10 1,400.00 v) 150mm x 150mm Ø T Nr R.O. 800.00
j Supply and install 100mm Dia. Fire Hydrant Nr. 3 2,800.00
Excavation trench for water pipe including backfilling, dewatering, disposal of surplus earth material to an approved dump site and compaction.
*Note: Resurface Premix By Mill & Pave By Others
Extra Over for Reinstate Premix Road c/w crusherun and premix at trench width only
Supply, deliver and Lay and joint MS and all pipe fittings inclusive of transportation and handling of pipes, fittings, jointing (all types of pipe joints and specials), thrust blocks etc to complete
Install and joint MS Bends inclusive of fittings, pipe cutting, jointing (all types of pipe joints and specials), and all the necessary bolts, nuts, washers etc to complete
Install and joint DI T inclusive of fittings, pipe cutting, jointing (all types of pipe joints and specials), and all the necessary bolts, nuts, washers etc to complete
Page : 6/10
Project : MRT V8
Subject : Water Pipe Relocation at Jln Reko
Quotation
ITEM DESCRIPTION UNIT QTY RATE Contract Amount
Total Carry Forward
Page : 7/10
Project : MRT V8
Subject : Water Pipe Relocation at Jln Reko
Quotation
ITEM DESCRIPTION UNIT QTY RATE Contract Amount
Total Bring Forward 0.00
a MS S Bend SUPPLY BENDS (DOUBLE FLANGED) 0.00
0.00
i) 300mm Ø S Bend Nr 2 13,000.00 ii) 250mm Ø S Bend Nr 2 9,000.00
b Sluice Valve
i) 300mm Ø Sluice Valve Nr 3 11,000.00 ii) 250mm Ø Sluice Valve Nr 2 9,000.00 iii) 200mm Ø Sluice Valve Nr 3 7,000.00 iv) 150mm Ø Scour Valve Nr 8 4,000.00
c Heacy Duty Precast Valve Chamber (600mm x 600mm)Supply, deliver, install Precast Valve Chamber Nr 32 800.00
e MARKER POST
Nr. 80 100.00
f TESTING AND STERILISING
LS 18,000.00
0.00g REMOVAL OF ABANDONE PIPE
LS 130,000.00
h CONNECTION WORKS
i) 300mm Ø pipes Nr 2 18,000.00 ii) 250mm Ø pipes Nr 2 15,000.00 iii) 200mm Ø pipes Nr 6 12,000.00 iv) 150mm Ø pipes Nr 11 9,000.00 v) 100mm Ø pipes Nr 4 6,000.00 vi) 32mm Ø pipes Nr 10 2,000.00 vi) 25mm Ø pipes Nr 10 1,800.00 vi) 20mm Ø pipes Nr 10 1,600.00
j
ii)………………………………………………………
iii)……………………………………………………… 0.00
Total
Supply and install MSCL S Bend c/w double flange bends, Double Flange Short pieces inclusive of fittings, pipe cutting, jointing (all types of pipe joints and specials), and all the necessary bolts, nuts, washers etc to complete
Supply and install DI Sluice Valve c/w flanges, pipe adaptor fittings, pipe cutting, jointing (all types of pipe joints and specials), and all the necessary bolts, nuts, washers etc to complete
Supply, deliver, fixing at required location as per SYABAS requirements
Hydrostatic testing, sterilising and flushing for all the pipelines in accordance with SYABAS requirements and approval including taking water samples and testing at the approved laboratory
Excavate, Exposed, Cut Off, Remove, upload and transport away from site the abandoned pipe
Supply all necessary jointing materials, fittings and equipment to carry out connection works between newly laid pipe and existing pipe at locations as indicated in the drawings including excavation, shoring, dewatering, backfilling, compaction, coordinat
Allow for any other items not included in the foregoing but
required by drawings,specofications, requiremments of all
revant Authorities. Contractor to specifiedi)…Preliminaries / Mob and Demob / Site Supervisor…………………………………………………..
UNIT QUANTITY ALL-INi) 300mm Ø MS Pipe M 1,162 320.93 ii) 250mm Ø MS Pipe M 1,125 iii) 50mm Ø Stainless Steel Pipe M 50 iv) 40mm Ø Stainless Steel Pipe M 50 v) 32mm Ø Stainless Steel Pipe M 50 vi) 25mm Ø Stainless Steel Pipe M 50
DES EXCN PRELIM EO EXCN300mm pipe 38 1162 342 1504 5.00266
SUPPLY/INSTALL BEND T310 1162 10 8.605852 1162 13.42513 337.0336