10
A meeting ofthe zonal conmliUee Zone"A" for Plains for Common Schedule or rates was held on 23~lO-09 in P.W.D. Rest Halls':, Patiala to fix the Premium on C.S.R.-1987 applicable to Zone"A" MINUTES OF THE MEETING OF ZONAL C01\1!\llTTEE (ZONE"A"PLAJNS) OF SCHEDULE OF RATES 1987 HELD ON 23/10/09 AT I'ATlALA. / ;. . <. > !!:=- =======~~~~~~~~~~~~~~~~~~~~~~~~~~ I - .~~-~ --~ . -'--~-'-~------~ I The following members were present inlhe meeting: J. Er. Ajmer Singh, 8. Er. D.S. Gill, q~ Superintending Engineer, Superintending Engineer, LB., U.B.D.C., Amritsar (Member) Er. Arvinder Singh, 9. Er. G.K. Nayyar, Superintending Engineer, PWD, IB (Drainage) Circle Gidderbflhfl. (Member) Er. Harvinder Singh, 10. Er. M..P. Gflrg, Dy. Chief Engineer,. CCC, GI-ITP, PSEB, Lehra Mobabat (Member) Er. N.S. Brar, . 11. Er. A.K. Singla, Superintending Engineer, Canst. Circle, PWD B&R Branch, ~ Bathinda. (Member) Cf Er. Sohan Lal, 12. Er. G.L.Arora, Superintending Engincer, 1'.S.E.11. Civil Works Circle. F-5, Shakti Vihar, Patiala (Member) Er. G.K. Gupta,. 13. r~r. 1'.S. Bhatti, Superintending Engineer, W/S & Sanitation Circle, Patiala (Member) Er. JagpaJ Singh, . 14. Er. 1'.S. Walia, Superintending Engincer, Const. Circle No 2,I'WD 13&R 131'., Patiala (Convener) The committee reviewed the premium already approved in the meeting helel on 05-09-2008 on various chapters of C.S.R. ] 987. There are some represel1tatiolls Jiolll v[lrious workers unions to increase the wages of daily wages working in their department. I.l was 9iscussed that the premium fixed on Labour Chapter is not sufficient for various items and ftirther steep rise in prices due to increase in rates of bricks, cement, Inbour ami falls in prices of steel was also discussed. After detailed discussion anu deliberations committee decided (0 revise the ceiling premium on various chapters or C.S.R. 1987 Zone-"A" for plains as under :- The rates/premium is without ServiceTax as it is not applicable in sOllle departments. EPF of the labour employed/supplied by the contractor and labour ceSS to be paid has been . induded in the premium. These shall be deemed to have taken effect from the date of isslle.

P.W.D. - Punjab, India · 2018-03-12 · the ceiling premium on various chapters or C.S.R. 1987 Zone-"A" for plains as under :- The rates/premium is without ServiceTax as it is not

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: P.W.D. - Punjab, India · 2018-03-12 · the ceiling premium on various chapters or C.S.R. 1987 Zone-"A" for plains as under :- The rates/premium is without ServiceTax as it is not

A meeting ofthe zonal conmliUee Zone"A" for Plains for Common Schedule or rates was

held on 23~lO-09 in P.W.D. Rest Halls':, Patiala to fix the Premium on C.S.R.-1987 applicable toZone"A"

MINUTES OF THE MEETING OF ZONAL C01\1!\llTTEE (ZONE"A"PLAJNS) OF SCHEDULEOF RATES 1987 HELD ON 23/10/09 AT I'ATlALA.

/

;.. <.

• >

!!:=- =======~~~~~~~~~~~~~~~~~~~~~~~~~~I - .~~-~ --~ . -'--~-'-~------~

I

The following members were present inlhe meeting:

I

J.Er. Ajmer Singh, 8.Er. D.S. Gill,

1q~

Superintending Engineer,

Superintending Engineer,Constn. Circle No. l, PWD B&R Br., LB., U.B.D.C.,Jalandhar (Member) Amritsar (Member)2.

Er. Arvinder Singh, 9.Er. G.K. Nayyar,Superintending Engineer; Superintending Engineer,Canst. Circle, Punjab, PWD B&R Br., PWD, IB (Drainage) CircleChandigarh (Member) Gidderbflhfl. (Member)

J.Er. Harvinder Singh, 10.Er. M..P. Gflrg,

Superintending Engineer, Dy. Chief Engineer,.PWD, IB (Drainage) Circle, CCC, GI-ITP, PSEB,Patiala (Member) Lehra Mobabat (Member)4.

Er. N.S. Brar, . 11.Er. A.K. Singla,Superintending Engineer, Superintending Engineer,PWD 1.8. Circle, Canst. Circle, PWD B&R Branch,~

Patiala (Member) Bathinda. (Member)

Cf

5.Er. Sohan Lal, 12.Er. G.L.Arora,

Superintending Engineer, Superintending Engincer,W/S & Sanitation Circle, 1'.S.E.11. Civil Works Circle.Bathinda. (Member) F-5, Shakti Vihar, Patiala (Member)6.

Er. G.K. Gupta,. 13.r~r. 1'.S. Bhatti,Superintending Engineer, Superintending Engineer,W/'$& Sanitation Circle, W/S & Sanitation Circle,Amritsar (Member)

Patiala (Member)

7

Er. JagpaJ Singh, . 14.Er. 1'.S. Walia,Superintending Engineer, Superintending Engincer,Canal Linning, Circle,

Const. Circle No 2,I'WD 13&R 131'.,Bath inda. (Mem bel')

Patiala (Convener)

The committee reviewed the premium already approved in the meeting helel on

05-09-2008 on various chapters of C.S.R. ] 987. There are some represel1tatiolls Jiolll v[lrious

workers unions to increase the wages of daily wages working in their department. I.l was

9iscussed that the premium fixed on Labour Chapter is not sufficient for various items and

ftirther steep rise in prices due to increase in rates of bricks, cement, Inbour ami falls in prices of

steel was also discussed. After detailed discussion anu deliberations committee decided (0 revise

the ceiling premium on various chapters or C.S.R. 1987 Zone-"A" for plains as under :-

The rates/premium is without ServiceTax as it is not applicable in sOllle departments.

EPF of the labour employed/supplied by the contractor and labour ceSS to be paid has been

. induded in the premium.

These shall be deemed to have taken effect from the date of isslle.

Page 2: P.W.D. - Punjab, India · 2018-03-12 · the ceiling premium on various chapters or C.S.R. 1987 Zone-"A" for plains as under :- The rates/premium is without ServiceTax as it is not

Sr.Chapter Nc.Premium onPremium onNo. labour ratethrough rate

above C.S.Rabove C.S.R1. CHAPTER NO. 1 DAILY WAI;ES

Item No. 1.1, lA, 1.6, 1.100550%

Item No. 1.2, 1.3, 1.13, 1.16, 1.34, 1.39, 1A8, 1.51 to

745%1.57, 1.62,1.70,1.73 1.90,1.99,1.101,1.78,1.96

--<;'~

Item No. 1.5, 1.106 680%

Itef..No. 1.7, 1.10, 1.11, 1.15, 1.21, 1.23, 1.24, 1.28,

650%

lAO, ,1-4.-7,1.81, U5, 1.95, 1.104, 1.107, 1.98 Item No. 1.8

1330%Item No. 1.9

615%Item No. 1.12,

500%Item No. 1.14, 1.22, 1.84, 1.94

525%>Item No, 1.17, 1.86

440%Item No. 1.18

.465%\Item No. 1.19

720%

Item No. 1.20,1.26, 1.49, 1.72, 1.74

815%_'\Item No. 1.25, 1.83

1000%'--' <:r-- ."

Item No. 1.27, 1.36,1.75,1.76,1.89,1.101, 1.105.~555%\::;jO

Item No. 1.29

580%

Item No. 1.30, 1.66 to 1.68, 1.97

900%

Item No. 1.31, 1.33

660%

Item No. 1.32, 1.102

700%

Item No. 1,35

, 570%

ItemNo. 1.37,1.45,1.63

735%,Item No. 1.38 610%

Item No. lA1I

930%

Item No. 1.42, 1.59, 1.60,

I1100%

Item No. 1.43,1.91,1.92

835°Ir,

Item No. 1.44, 1.65, 1.93

950%

Item No. 1.46, 1.108

800%

Item No. 1.50, 1.69, 1:82

710%

Item No. 1.581~

Item No. 1.61, 1.88I

1200% I

Item No. 1.64685% I~

. I

Item No. 1.71480% IItem No.1. 771080% i '1

870% .'

,

I

Item No. 1.79,

Item No. 1.80 540%I

IItem No. 1.87 400%iI

ItemNo.1.109

I750%IItem No. 1.110

840%II

2 sFriday 23 October 2009

Page 3: P.W.D. - Punjab, India · 2018-03-12 · the ceiling premium on various chapters or C.S.R. 1987 Zone-"A" for plains as under :- The rates/premium is without ServiceTax as it is not

Friday 23 October 2009Premium on Premium on

labour rate through rateabove C.S.R. above C.S.R

650%'

650%650%650%650%

3Chapter No.Sr. No.

Item No. ":3. 14(g) Brick bats from well Burnt or Burnt bricks

(a) f:c:-..ritsar,Jalandhar, Kapurthala,GurdaspurTarn Taran; Hoshiarpur, Nawanshahar Distt 650%For Bathinda, Faridkot;Moga, Muktsar and Mansa Distt .For Ferozepur, .Patiala, Fatehgarh Sahib Distt .For Barnala & Ludhiana Distt .For Sangrur Distt ' .Chandigarh(U.T.)Ropar & MohaliDistt.

(b)

(c)

(d)(e)

(f)

C.S.RChpater No. 2(MONTHL Y WAGES)Pay grades are being regulated by the Ptnjab GO'll.

Chapter No.3 (MATERIALS)

No premium has been fixed on items on this chapter except item No. 3.1(h) to3.1(k),3.12,3.14(g) as this chapter is only for basic analysis purpose.Item No. 3.1 (a) to 3.1(g), 3.11 --~

. Rates approved by the Chief Engineer, Pb. PWD B&R Br.,Patiala shall be applicable.Item No. 3.1 (h) to 3.1 (k), 3.12 650%

-

Item No. 3.50 a,bChapter No. 4(LOADING & UNLOADING)

Chapter No.5 (CARRIAGE)All items Upto 40 Km : .

41 Kin. to 60 Km ~61 Km. to 150 Km .151 Km. and above , .

500%460%

650%-~ 575%

325%175%

Note:- Premium on carriage bas been revised keeping in view the Hon'ble Supreme Courtdirections to stop over-loading. These rates are worked out taking into consideration thestipulated load to be carried by the vehicle. If during the execution of work, it is found thatover-loading of material is carried by the agencies then the carriage rates al'e to be reducedl;ly 50% and the recovery will be made from the bill of the agency. Suitable condition to thiseffect is to be provided in the NIT . .The field stafT will certify that the actual carriage ofmaterial is within the norms and no over-loading has been done.

Chapter No. 6(EARTH WORK)All items except Item No. 6.2g(iii), 6.4 .Item No. 6.2g(iii) .Item No. 6.4 .

900%700%1000%

Chapter No. 7(ROCK CUTTING) .•

Chapter No. 8(DEMOLITION) .All items except Item No. 8.6 :.:, .Item No. 8.6 .

800%

850%1100%

Chapter No.9(CENTERING SHUTTERING) 600%

Chapter No.12,13,14,15All items except item No.13.ll,13.13,13 .17,13.18,To 13.22,13.41 to 13.44, 13.52 to 13.54, 14.16 to 14.21,14.23, 14.23(ii), 14.23(iii), 14.25, 14.25(ii) 14.25(iii),14.26, 14.26(ii), 14.26(iii), 14.29, 14.29(ii), 14.29(iii),14.31, 14.31(ii), 14.31(iii),14.32, 14.32(ii), 14.32(iii),14.34, 14.34(ii), 14.34(iii), 14.34(iv)(v), 14.37, 14.37(ii),14.37(iii),14.37(iv), 14.38 to 14.47, 14.48 A,B.C,D,14.49 A,B,C,D,14.50, 14.50(ii), 14.50(iii), 14.50(iv),14.50(v), 14.50(vi), 14.51 to 14.57, 14.57(ii). 14.57(iii),14.58,14.59,14.60 to 14.64, 14.72 to 14.78,15.12, I 5.1315.18,15.61 to 15.75. 700%

500%

500%

Page 4: P.W.D. - Punjab, India · 2018-03-12 · the ceiling premium on various chapters or C.S.R. 1987 Zone-"A" for plains as under :- The rates/premium is without ServiceTax as it is not

Item No.10.53 t9 10.55 10%(These items incorporated vide A&C slip No. 25 dated 10.12.08(Basic rate based 011 Sept. 2008)

Item N o. 10.23 .

Chapter No.lO(CONCRETE)All items except item No. 10.23, 10.53 tl) 10.55 700% 495%

440%

Friday 23 October 2009Premium on Premium on

labour rate through rateabove C.S.R. above C.S.R

4Chapter No.Sr. No.

Chapter ,lifo. l1(BRICK WORK)All items -

(a) Amrit$<lf, Jalandhar, Kapurthala, GurdaspurTam Taran, Hoshiarpur, Nawanshahar Distt... 650%

(b) For Bathinda, Faridkot,Moga, Muktsar and Mansa Distt : 650%

(c) For Ferozepur,. Patia1a, Fatehgarh Sahib IJistt... 650%

(d) For Bamala & Ludhiana Distt 650%(e) For Sangrur Distt , 650%(f) Chandigarh(U.T.)Ropar & MohaliDistt. 650%

600%f

560%

590%545%575%640%

@Rs.2600/ per %0 Nos

@Rs.2800/ per %0 [email protected]/ per %0 [email protected]/ per %0 [email protected]/ per %0 Nos

(d)(e)

(f)

Note:- The rate of bricks has been taken at kiln site including local taxes.(a) Amritsar, Jalandhar, Kapurthala, Gurdasptlr

. Tam Taran, Hoshiarpur, Nawanshahar Distt @Rs.2900/per %0 NosFor Bathinda, Faridkot,

Moga, Muktsar and Mansa Distt;: .For Ferozepur,Patiala, Fatehgarh Sahib Distt .For Bamala & Ludhiana Distt .

For Sangrur Distt .Chandigarh(UT)Ropar & MohaliDistt.

(c)

(b)

Item No. 13.11, 13.13 & 13.17(a) Amritsar, Jalandhar, KapUlihala, Gurdaspur

Tam Taran, Hoshiarpur, Nawanshahar Distt 640%(b) For Bathinda, Faridkot,.

Moga, Muktsar and Mansa Distt 640%(c) For Ferozepur,

Patiala, Fatehgarh Sahib Distt 640%(d) For Bamala & Ludhiana Distt 640%(e) For Sangrur Distt 640%(f) Chandigarh(UT)Ropar & MohaliDistt. _ - ~ 640%

570%

540%

560%530%550%590%

@Rs.28501 per %0 [email protected] per %0 [email protected] per %0 [email protected] per %0 Nos

@Rs.2650/ per %0 Nos

(d)

(e)(f)

(c)

(b)

Note:- The rate of tiles has been taken at kiln site including local taxes.(a) Amritsar, Jalandhar, Kapurthala, Gurdaspur

Tam Taran, Hoshiarpur, Nawanshahar Distt @Rs.2950/ per %0 NosFor Bathinda, Faridkot,Moga, Muktsar and Mansa Distt .For Ferozepur,Patiala, Fatehgarh Sahib Distt .For Bamala & Ludhiana Distt .

For Sangrur Distt .Chandigarh(UT)Ropar & MohaliDistt.

Item No.13.19 to 13.20 .

Item No.13.18,13.21,13.22, .

Item No. ] 3.41 to 13.44 .

Item No. 13.52 .

Item No. 13.53,13.54 .

525% 375%

650%

750%

650%

ROO%

735%

500%

650%

900%

~~ly/

Page 5: P.W.D. - Punjab, India · 2018-03-12 · the ceiling premium on various chapters or C.S.R. 1987 Zone-"A" for plains as under :- The rates/premium is without ServiceTax as it is not

Friday 23 October 2009

600%

Premium on

th rough rateabove C.S.R

560%

~90%545%575%640%

Premium 011

labour rateabove C.S.R.

650%

650%650%650%650%

5

Chapter No.

Item No. 14.16 to 14.21

(a) Amritsar, Ja1andhar, Kapurtha1a, Gurdaspur .Tarn Taran, Hoshiarpur, Nawanshahar DisH 650%For Bathinda, Faridkot,Moga, Muktsar and Mansa DisH .For Ferozepur,Patia1a, Fatehgarh Sahib DisH .For Barna1a & Ludhiana DisH .

For Sangrur DisH .Chandigarh(U.T.)Ropar & MohaliDistt.

Sr. No:

(b)

(c)

(sf)

(e)(f)

Item No.14.23, 14.23(ii), 14.23(iii), 14.25,14.25(ii) 14.25(iii), 14.26, 14.26(ii),

14.26(iii), 14.29, 14.29(ii), 14.29(iii),14.31, 14.31(ii), 14.31(iii),14.32, 14.32(ii),14.32(iii) .. ; . 575% 450%

Item No.14.34, 14.34(ii),(iii),(iv),(v) . 575%

Item No.14.48,14.49,14.51& 14:52 deleted & replaced with new item vide A.c.slip No. 13 dated 20/9/93.

Item No. 14.38 to 14.46., .

Item No.14.3 7,14.3 7(ii),(iii),(iv) .

700%

575%

550%

450%

Item NOc14.48 A,B.C,D 14.49 A,B,C,D .

Item No.14.47

Item No.14.50,14.50 ii, iii,iv,v & vi,

Item No.14.53,14.54, .

Item No.14.55 to 14.57 .

Item No. 14.57 ii & iii .

Item No. 14.58,14.59,14.63,14.64

Item No.14.60 to 14.62 .

Item No.14.72

Item No.,14.73 to 14.75 .

,475% 275%

500%

325%

475%

300%

500%

275%

475%

325%

400%

275%

575%

550%

525%

600%

625%

600%

500%

500%

Item No. 14.76 .

Note: There is variation in the price of floor spring in the market from Rs. 500/- to 5000/-. According to itsmake and as such no premium has been fixed, it may be treated as N.S. item and its rate to be gotapproved from the Competent Authority.

Item No.14.77, 14.78 40% 25%(These items incorporated vide A&C slip No. 25 dated 10.12.08(Basic rate based 011 Sept. 2008)

Item No. 15.12,15.13 15.18Item No.15.61 to 15.75 .

··~650%650%

450%400%

Page 6: P.W.D. - Punjab, India · 2018-03-12 · the ceiling premium on various chapters or C.S.R. 1987 Zone-"A" for plains as under :- The rates/premium is without ServiceTax as it is not

Friday 23 October 2009Premium on

through rateabove C.S.R

Rs.340001- perM.T.Rs.340001- per M.T.Rs.340001- per M.T.Rs. 255/- per bagRs.35000/- per M.T.

Premium onlabour rate

above C.S.R.

6Chapter No.Sr. No.

The above mentioned ceiling premia on through rates are based on the following rates ofmaterials at Govt. stores.

1. Mild Steel (Bars of all sizes)2.' Tor Steel (all sizes)/T.M.T.(all sizes FeA15)3. Structural Steel

4. Cement including cost of bags (PPC)5. Bitumen 25/85 grading for building works

"

Note: '1") ;"0 Storage charges and contractor's profit on these items has beeri accounted for. If the above saidmaterial is arranged by the contractual agency at his own level; the contractor's profit @ 10% maybe ;Ccounted for separately.2) If the structural steel section weighing more than 40 Kg. per mtL or above is used then differencein issue rate or market rate(which ever is less) of light weight section may be accounted separately asthe CSR rates are based on light weight section...3) If OPC cement in stead of PPC cement is allowed to be used due to local condition/importance of

work then difference in cost of PPC & OPC shall be payable extra @ Rs.17 per bag.

Chapter No.16(PAlNTING):All items except itemNo.16.24 toI6.28 .

. Item No. 16.24 to 16.28 , .

Chaper No. 17(WOOD WORK). (a)Deoder wood (all item) .(b)Teak wood (all item) .(c)Hollack wood(all item) : .(d)item No. 17.34 & 17.35 .(e)Kail wood & remaining .items of Chaper No. 17Excephtem No. 17.50 to17.56(f)Item No. 17.50 to 17.52 .

675% 550%625%

450%

550%

900%

~.

550%850%

550%850%

550%

500%550%

600%

500%

Note:- There is variation in the price of door spring, door closer in the market according to its make and assuch no premium has been fixed, it may be treated as N.S. item and its rate to be got approved from.the Competent Authority.

Item No. 17.53 . 500% 500%

Item No.17.54 to 17.56 25% 5%(These items incorporated vide A&C slip No. 25 dated 10.12.08(Basic rate based on Sept. 2008)

Chapter No. 18(STEEL AND IRON WORKS)All items except item No. 18.4, 18.6, 18.7, 18.17, 18.1818.19,18.20, 18.23(i), 18.23(ii), 18.24, 18.26.18.29,18.30 to 18.32 650%

Item No.18.4 , 650%

Item No.18.6,18.7 , 650%

Item No.18.17 650%

595%1

600%

600%

600%

Item No.18.18 650% 495%

Item No.18.19 & 18.20 ; 650%

Item No.18.23(i),(ii) : - - ~650%

570%

600%

Item No.18.24 650% 350%

Item No.18.26 .

Item No.18.29 &18.30 . 650%

600%

500%

Item No.18.31 Same note as per item No. 14.76

Item No.18.32 . 650% 500%

Page 7: P.W.D. - Punjab, India · 2018-03-12 · the ceiling premium on various chapters or C.S.R. 1987 Zone-"A" for plains as under :- The rates/premium is without ServiceTax as it is not

650% 600%

650%

600%700% ~85%

700%

500%

850% 850%

Sr. No. C11apter No.

Chapter No.19(LINING)All items except 19.7, 19.8,19.9,19.26, 9.27 ....

Item No. 19.7,19.8,19.26,19.27 .

Item No. 19.9 · '" .

Chapter No.20(OUTLETS) .

C'i.'?pter NO.21(PILE DRIVING) .

Chapter No.22(WELL SINKING) .

7

Premium onlabour rateabove C.S.R.

Friday 23 October 2009Premium on

through rateabove C.S.R

Chapter No.23 ..(RIVER AND CANAL PROTECTION WORK)All items except item No. 23.1, 23.5, 23.11,

23.22,23.32,23.33,& 23.45 770%

Chapter No.24 (ROAD WORKS)

Item No.

Item No.

Item No.

Item No.

Item No.

Item No.

Item No.

23.1,23.5,23.11,23.22,23.32, 23.33 & 23.45 .

24.1 ,to 24.7, 24.11 to 24.15& 24.41 to 24.42 .

24.9 & 24.10 .

24.16 & 24.17 .

24.18 to 24.22,24.46

24.23 & 24.24 .

24.25 a & 24.26 a .

770%

500%

650%

275%

385%

430%

600%

Item No. 24.25b, 24.26b,Note: Same note as per Chapter No.5

650%

Note: Item No. 24.8 has been deleted as per A.C. slip No.8

Item No.

Item No.

Item No.

Item No.

24.29 to 24.33, .

24.27,24.28,24.34 .

24.35 to 24.40, 24.43

& 24.44 .

24.45 .

600%

360%

700%

500%

495%

600%

Chapter No.25

(MAINTENANCE OF FURNITURE)

Chapter No.26(MISCELLANEOUS)AIl item except item No. 26.36 to 26.38, .

Item No.26.36 to 26.38 .

650%

1100%

550%

Page 8: P.W.D. - Punjab, India · 2018-03-12 · the ceiling premium on various chapters or C.S.R. 1987 Zone-"A" for plains as under :- The rates/premium is without ServiceTax as it is not

L-

Chapter No.28(W ATER SUPPLY)

8 Friday 23 October 2009PI emium on labour as well as through

rates above C.S.R.

28.1 to 28.8 · 900%

28 .9(i) 425%

28.1 0 to 28.75 except item No 28.1 O(ii), 28.9(ii),28.14(ii), 28.34b, 28.36, 28.37a, 28.57(a to e) 480%

28,34b : 580%_. --~

28.36 , 480%

.Chapter No.

Item No.

Item No.

Item }fl?

Item No.

Sr. No.

Item No.

----------------------------------------------_.~-------------------- ------------- ------------------~

.•..

Item No.

Item No.

Item No.

28.37a 470%

.2857a : 680%

28.57b 6800/0

Item No.

Item No.

Item No.

28.57c 530%

28.57d 630%

28.57e 680%

Item No.28.9(ii), 28.10(ii), 28.14(ii) 25%(These items incorporated vide A&C slip No. 25 dated 10.12.08(Basic rate based on Sept. 2008)

Chapter No.29(SEWERAGE AND DRAINAGE)

Item No. 29.1 to 29.6, 29.8 to 29.11... 900%

Item No,Item No.

29.7 : ,-,." ;-:-;0/;.650%29.12 to 29.35,29.78 to 29.93

(a) Amritsar, Jalandhar, KapUlthala, GurdaspurTarn Taran, Hoshiarpur, Nawanshahar DisH 600%

(b) For Bathinda, Faridkot,Moga, Muktsar and Mansa DisH 560%

(c) For Ferozepur,Patiala, Fatehgarh Sahib Distt 590%

(d) For Bamala & Ludhiana Distt 545%(e) for Sangrur Distt 575%(1) Chandigarh(U.T.)Ropar & MohaliDistt. 640%

Item No. 29.36 to 29.62 355%

Item No. 29.63 380%

Item No. 29.64 to 29.77 380%

Chapter No.30 (SANITARY AND INSTALLATION)All item except item No.30.47,30.65, 30.74 to 30.8],30.99 (b & d)& 30.102 ~ :..":':".385%Item No. 30:47 ]70%

Item No. 30.65 · 375%

Item No.30.74 to 30.81 except 30.74 (I)a,b 800%

Item No.30.74 (i) a,b 165%(This item incorporated vide A&C slip No. 20 dated 26.11.98(Basic rate based on 1997)

Item No.30. 99(b&d) 550%

Item No.30.! 02 380% Y

Page 9: P.W.D. - Punjab, India · 2018-03-12 · the ceiling premium on various chapters or C.S.R. 1987 Zone-"A" for plains as under :- The rates/premium is without ServiceTax as it is not

Note:- The above mentioned ceiling premia on through rates are based on the followingrates of store material to be issued from the Govt. store.Lead for caulked joint Rs. 80- per Kg.

In additonto the above mentioned issued rafesof material, storage charges @ 3%shall be charged extra.

Chapter No.3! (ELECTRICAL INSTALLATION)Item No .. 31.01A to 31.04 A, 31.06 A to

." 31.09 A , 31.19, PCC Poles 31.28 {xxxvii toxxxviii (atoe)} .-

"r. No. Chapter No.9 Friday 23 October 2009

Premium on labour as well as throughrates above C.S.R.

175%

Item No.

Item No.

Item No .

Item No.

Itym No.

Item No.

Item No.

Item No.

Item No.

Item No.

Item No.

Item No.

Item No.

Item No.

Item No.

Item No.

31.0 IE to 31.04B, 31.06B, 31.07B, 31.09B31.05, 31.11 (xiii)to (xxv)[Except 31.11(i)to(xii)], .

31.10, 31.21, 31.24 .

31.11 (i)to (xii)[Except 31.11 (xiii)to(xxv)),. 31.15, GJ. Earthing 31.23[except xii(a to c),

xiv(b)& xvi(a to c)] .

31.12,31.13&G.I.Pipe poles 31.28 )c"'{xv(a to c)r-.31.01~.

31.14,31.l7(iv) &(xiii to xv) .

31.16 [Except (iii to xiv)] .

31.16 (iii to xiv)]

31.17[Except (iv) & (xiii to xv)). .

31.18, 31.26 [v (a to e)], 31.08B '

31.20,31.31... ........................................•........

31.25

31.22

Copper Earthing 31.23 [xii (a to c), xiv(b)& xvi (a to c)] _ -.<0'"'.

31.26, [Except v (a to e)], 31.27 .

Over Head Distribution 31.28

[Except X)C"{V(a to c), xxxvi (a to g);x)C"'{viito xxxviii (a to e)], 31.29(i to ii),x (a to f), )C'«(ato d) & xxiii(a to i)

Steel Tubular poles 31.28 xxxvi(a to g) .

225%

580%

Note:- The Ceiling premium on item No. 31.28 xxxvi ( a to g) Steel Tubular poles is fixed bytaking the additional weight of base plate which is in addition to the weight shown inthe nomenclature. Because as per IS1 the weight shown in the nomenclature is only

for pole. ~/"'"

Page 10: P.W.D. - Punjab, India · 2018-03-12 · the ceiling premium on various chapters or C.S.R. 1987 Zone-"A" for plains as under :- The rates/premium is without ServiceTax as it is not

--------------:------------------------------------ --------------------------------------------------

Item No.31.32, to 31.38 .

(These items incorporated vide A&C slip No. 25 dated 10.12.08(Basic rate based on Sept. 2008)

10 Friday 23 October 2009

Premium on labour as well as throughrates above C.S.R.

155%

160%

Chapter No.

31.30 .

31.29[Except (i to ii), x(a to£), -

xx (a to d), xxiii (a to i) ]. .

Item No.

Item No.

Sr. No.

",Chapter No.32(MA CIDNER Y) .

Chapter No.33(HORTICULTURE)

400%

All items except 33.12,33.21 to 33.31 500%

Item No.33.21 to 33.31 25%

(These items incorporated vide A&C slip No. 25 dated 1O.12.08(Basic rate based on Sept. 2008)

Item No. 33 .12 : , . 600%· .

Chapter No.34(MAINTENACE OF BUILDING ROADS)~ ;:-; -=-.;::. 550%

Superin~nding ~gineer,

Constn. Circle No.2~~ B&R Br.,pati;JConv~). -T'

Endst.No. !0:12 r 4 ,

Copies are forwarded to

1)2)3)4)5)6)7)8)9-12)

13)14)

(5)16)17)18)

19)20)

21)22)23)24)25)

The Chief Engineer(S) Punjab, PWD B&R Br., Patiala.The Chief Engineer(N.H.) Punjab, PWD B&R Br., Patiala.The Chief Engineer(LP) Punjab, PWD B&R Br., Patiala.The ChiefEngineer(N) Punjab, PWD B&R Br., Patiala.The Chief Engineer(S) Punjab, PWD B&R Br., Patiala.The Chief Engineer(Elect.&B ldg.) Punjab, PWD B&R Br., CHD.

The ChiefEngineer,Public Health(G.W.) PWD B&R Br., Patiala.The Chief Engineer(C) Punjab, PSEB,Sect<JrS-A,Ch1ftidigarh.The Chief Engineer, Punjab, (IE) ProjectIThein DamlDrainers/Hydal Bhawan See,. ] 8,Chandigarh.The Chief Engineer, Union Territory, Chandigarh.The Chief Engineer, Punjab Small Scale Industries Corporation, CHD.The Housing Commissioner, Pb. Housing Development Board, near K.C.Chandigarh.The ChiefEngineer,Goindwal Industrial and investment corpor~tion, CHD.The Chief Engineer,S. Y.L.(Design)Sec.26, Chandigarh.The ChiefEngineer,S.Y.L.(Const.) Sec. 26, Chandigarh.The ChiefEngineer,(Lining) Irrigation Works Pb. Sec. 17, Chandigarh.The ChiefEngineer/General Manager (Tubewell) Pb. State Tubewell C-urporation,Chandigarh.The Chief Engineer, Mukerian(Hydal Project) Sec.17, Chandigarh.The Chief Engineer, Punjab, PWD (R WS Public Health) Patiala.The Chief Engineer, Pb. Police Housing Corporation Sec. 8-C, CHD.The ChiefEngineer,Pb. Mandi Board, Sec.17, Chandigarh.The Managing Director, Pb. Water Supply and Sewerage Board, CHD.

The above copies may be distributed among the Superintending Engineers and ExecutiveEngineers.

supe~~ineer,

Constn. Circle No.2,~~&R Sr.,patial~nvel)yr)~