43
SEQUENCE OF OPERATION ( AUTOMATIC PROCEDURE )

Puregold Elimac Presentation Final1

Embed Size (px)

DESCRIPTION

electrical

Citation preview

Page 1: Puregold Elimac Presentation Final1

SEQUENCE OF OPERATION( AUTOMATIC PROCEDURE )

Page 2: Puregold Elimac Presentation Final1

BUILDING LOAD

NORMAL OPERATION

1. ATS are in normal position connected to utility source

2. All generator set paralleling circuit breaker open

Page 3: Puregold Elimac Presentation Final1

BUILDING LOAD

LOSS OF NORMAL POWER

1. Upon reciept of start signal from any ATS all generators automatically and independently start.ATS

2. Any genset at normal operating condition will closed each GCB at deadbus condition

3. Succeeding genset will synchronize to the emergency bus

Page 4: Puregold Elimac Presentation Final1

BUILDING LOAD

ATS TRANSFER TO EMERGENCY POWER

1. After the preset time delay expire ATS will transfer to emergency power.

ATS

Page 5: Puregold Elimac Presentation Final1

LOAD MANAGEMENT ( LOAD DEMAND CONTROL )

Page 6: Puregold Elimac Presentation Final1

BUILDING LOAD

TOTAL LOAD IS 80%

1. All synchronized generators will share the load equally

ATS

Page 7: Puregold Elimac Presentation Final1

BUILDING LOAD

1. If the total load is reduced to 20% of the total capacity while the 2 generators are running

ATS

2. The system will shut off the GCB # 2

3. Priority Genset # 1 will received the reduced load

Page 8: Puregold Elimac Presentation Final1

BUILDING LOAD

1. Single generator is running and reached 70% of its rated capacity

ATS

2. The system will start genset # 2 synchronized to online generator and share load equally

Page 9: Puregold Elimac Presentation Final1

NORMAL POWER RETURNS

www.intellisyspower.com

Page 10: Puregold Elimac Presentation Final1

www.intellisyspower.com

BUILDING LOAD

1. When normal power return, ATS will transfer power from emergency into normal power after a preset time delay

ATS

NORMAL POWER RETURNS

START SIGNAL

2. System start from ATS will be remove and the genset will turn off after cool down timer expires

Page 11: Puregold Elimac Presentation Final1

MANUAL PARALLELING USING DEIF AGC - 4

www.intellisyspower.com

Page 12: Puregold Elimac Presentation Final1

1. Before any attempt to start and parallel the generators, check that all generator paralleling circuit breaker are all in OFF position. Generator controller auto mode must be switch on. 2. Press MODE push button (SELECT SEMI-AUTO MODE) located on the front face of DEIF controller (G1 and G2) and then press START button the generator will start and ramp to rated voltage and frequency.

www.intellisyspower.com

Mode Button

Start Button

Page 13: Puregold Elimac Presentation Final1

3. Check if run and generator voltage LED illuminates , it means the generator is protected and ready.4. Select the generator (G1 and G2) to be online first, then press CB CLOSE/OPEN button on the DEIF controller. The controller will automatically detects if it is a paralleling mode or a single mode

www.intellisyspower.com

CB Close/Open Button

Run LED

Page 14: Puregold Elimac Presentation Final1

5. To synchronize the second generator, press CB CLOSE/OPEN button on DEIF controller , the digital synchroscope will automatically display during synchronization time and then it will disappear after generator breaker closed. Available loads on the bus will automatically load share to the units online. Typically the load share percentage factor is 50 %.

www.intellisyspower.com

CB Close/Open Button

Page 15: Puregold Elimac Presentation Final1

www.intellisyspower.com

6. To stop the G1 and G2 press STOP button on DEIF controller to perform engine cooling down. When the preset cool down timer elapse the engine will automatically shutdown.

Stop Button

Page 16: Puregold Elimac Presentation Final1

BASIC TROUBLESHOOTING GUIDE

www.intellisyspower.com

Page 17: Puregold Elimac Presentation Final1

GCB Fail to CloseProbable Cause

• Circuit Breaker control CB tripped off• GCB Closing relay defective (3XG)• Circuit Breaker Spring Discharged

• Defective closing coil , de –energized• Controller relay output defective• GCB control transformer defective or no output

Corrective Action

• Check GCB control circuit, reset control CB• Replace defective closing relay• Manually charged circuit breaker using manual handle• Replace defective closing coil• Replace or check defective under voltage trip coil• Check controller input / output status

www.intellisyspower.com

Page 18: Puregold Elimac Presentation Final1

GCB Fail to OpenProbable Cause

• GCB opening relay defective (3YG)• Controller relay output defecting• Control supply loose• Defective tripping coil

Corrective Action

• Manually open circuit breaker using manual button on circuit breaker• Check CB opening control circuit (Refer to Wiring Diagram)• Check controller input / output status

www.intellisyspower.com

Page 19: Puregold Elimac Presentation Final1

Fail to Synchronize

Probable Cause

• Analog output from controller has too low output range • Toho Electronic governor controller cannot regulate the voltage and frequency of incoming generator • Speed Bias control not responding• Voltage Bias control not responding

Corrective Action

• Check controller analog output maximum settings• Check and Calibrate speed bias control• Check and calibrate voltage bias control

www.intellisyspower.com

Page 20: Puregold Elimac Presentation Final1

`

Generator fail to startProbable Cause

• Fault and Alarm is active• Defective generator run relay (4x)• MGS controller not in auto• Low Battery voltage

Corrective Action

• Check and reset fault and alarm active• Replace defective run relay• Switch MGS controller to auto mode• Check and replace battery• Check automatic battery charger if operational or defective

www.intellisyspower.com

Page 21: Puregold Elimac Presentation Final1

Probable Cause

• Analog output from controller has too low output range• Generator fuel lines and filter is clogged • Generator governor control unable to accept speed bias signal• Defective controller speed governor output • Faulty control cable connection

Corrective Action

• Check and calibrate speed bias control• Replace clogged fuel filter• Check and calibrate generator governor control system• Check control cable connection

Generator not able to take load at 100 %

www.intellisyspower.com

Page 22: Puregold Elimac Presentation Final1

Probable Cause

• Loose governor control sensing• Loose control cable connection from Toho Electronic governor control • Generator fuel filter clogged

Corrective Action

• Check all control cable connection for possible loose ( Refer to Wiring Diagram )• Replace clogged fuel filter• Check and calibrate governor control systems

Generator speed unstable or hunting

www.intellisyspower.com

Page 23: Puregold Elimac Presentation Final1

www.intellisyspower.com

LED FUNCTIONS

Page 24: Puregold Elimac Presentation Final1

AGC (DG)

AlarmFlashing: Unacknowledged alarms present,Fixed: Acknowledged alarms present,No alarm: no LED light up

Power: indicates auxiliary supply ONSelf check OK: Indicates self check OK

Alarm inh: Indicates alarm inhibit active LED is ON,After engine running LED is OFF.

AUTO: Only LED ON at Auto mode

RUN: LED ON at Generator running.

LED ON: Generator Frequency and Voltage OK

LED ON: Generator Breaker ONLED OFF: Generator Breaker OFF

Page 25: Puregold Elimac Presentation Final1

PUSHBUTTON GUIDE

Page 26: Puregold Elimac Presentation Final1

AGC (DG)

INFO: Shifts the display three lower lines to show the alarm list.

BACK: jumps one step back ward in the menu

JUMP: Enter a specific menu number selection

START: Start of gen-setat Semi-auto/Manual

STOP: Stop of gen-setat Semi-auto/Manual

Only at SEMI-AUTO: Opens the GB, if it is closed.Closes (Sync:) the GB, if it is opened.

LOG: Shifts the display three lowerLines to show the event and alarm list.

VIEW: Shift the first line displaying in the setup Menus. Push 2 sec to switch to master display incase more than 1 display is connected.

MODE: Changes the display menu line (line four) to mode Selection.

Page 27: Puregold Elimac Presentation Final1

AGC (DG)

Increases the value of set point (in the setup menu).In the daily use display, this button function is used for scrolling the second line displayingOf generator values.

Moves the cursor left formanoeuvring in the menu

SEL: Selects the underscored entry in the fourth line of the display, enter/selectbutton for parameter setup and Acknowledgethe alarm.

Moves the cursor right formanoeuvring in the menu

Decreases the value of set point (in the setup menu).In the daily use display, this button function is used for scrolling the second line displayingOf generator values.

Page 28: Puregold Elimac Presentation Final1

MANUAL OPERATION OF AIR

CIRCUIT BREAKER

www.intellisyspower.com

Page 29: Puregold Elimac Presentation Final1

AIR CIRCUIT BREAKER

LEVER

LOCK BUTTON

CHARGING SPRING STATUS

TRIP UNIT

RACKING HANDLEBREAKER

POSITIONING STATUS

INDICATOR

ON AND OFF BUTTON

CRADLE

BREAKER STATUS

INDICATOR

www.intellisyspower.com

Page 30: Puregold Elimac Presentation Final1

Step : 1

Manual charging of ACB by cranking the lever at least “6 times”.

DISCHARGEOFF

www.intellisyspower.com

Page 31: Puregold Elimac Presentation Final1

OFF CHARGE OK

CLICK

Step : 2

After cranking the chargerLever, The charging springMechanism is in charge position state.

www.intellisyspower.com

Page 32: Puregold Elimac Presentation Final1

. CHARGE OKOFFStep : 3

The Breaker is ready toclose. Close the ACB bypressing the black pushbutton ( on button )

www.intellisyspower.com

Page 33: Puregold Elimac Presentation Final1

ON DISCHARGE

The ACB is in close position.Charging spring Indicatorwill switch from Charge toDischarge state.

www.intellisyspower.com

Page 34: Puregold Elimac Presentation Final1

ON DISCHARGE Step : 4

The Breaker is in closePosition. To off the Breaker,Press the red pushbutton

www.intellisyspower.com

Page 35: Puregold Elimac Presentation Final1

OFF DISCHARGE

The ACB is in Open position.

www.intellisyspower.com

Page 36: Puregold Elimac Presentation Final1

WITHDRAWING IN AND OUT OF AIR CIRCUIT BREAKER

www.intellisyspower.com

Page 37: Puregold Elimac Presentation Final1

DRAW-OUT ACB STATUS INDICATOR

RACKING HANDLE

LOCK PUSH BUTTON FOR WITHDRAWING

THE ACB

BREAKER POSITION INDICATOR

www.intellisyspower.com

Page 38: Puregold Elimac Presentation Final1

LOCK BUTTON

PUSH THE LOCK BUTTONOF THE ACB BEFORE DRAW-IN/DRAW-OUT.

Note:

www.intellisyspower.com

Page 39: Puregold Elimac Presentation Final1

DRAW-IN/DRAW-OUT CYCLE OF

ACB

Pull-out the racking handle

GREEN ARROW RACKING-IN THE

ACB

RED ARROW RACKING-OUT THE ACBwww.intellisyspower.com

Page 40: Puregold Elimac Presentation Final1

DRAW OUT BREAKER POSITION INDICATOR

CONNECTED POSITION

WITHDRAWN POSITION

TEST POSITION

www.intellisyspower.com

Page 41: Puregold Elimac Presentation Final1

Note:

Push the Draw-in/out lock mechanism before drawing in and out the breaker.

www.intellisyspower.com

Page 42: Puregold Elimac Presentation Final1

Pull-out the ACB

PULLING IN AND OUT OF

ACBPull-IN the ACB

GREEN ARROW DRAW-OUT

THE ACB

RED ARROW DRAW-IN THE ACB

www.intellisyspower.com

Page 43: Puregold Elimac Presentation Final1

MICROLOGIC TRIP UNIT 2.0A

INDICATING LED’s

LCD SCREEN

KEYSLONG TIME

DELAY

LONG TIME

SHORT TIME

RESET BUTTON

www.intellisyspower.com