22
PUBLIC PARTICIPATION REPORT PPP SUMMARY

PUBLIC PARTICIPATION REPORT E - PPP... · 2012-10-26 · PUBLIC PARTICIPATION SUMMARY This serves as a summary of the Public Participation Process (PPP) followed for the Proposed

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: PUBLIC PARTICIPATION REPORT E - PPP... · 2012-10-26 · PUBLIC PARTICIPATION SUMMARY This serves as a summary of the Public Participation Process (PPP) followed for the Proposed

PUBLIC PARTICIPATION REPORT

PPP SUMMARY

Page 2: PUBLIC PARTICIPATION REPORT E - PPP... · 2012-10-26 · PUBLIC PARTICIPATION SUMMARY This serves as a summary of the Public Participation Process (PPP) followed for the Proposed

PUBLIC PARTICIPATION SUMMARY

This serves as a summary of the Public Participation Process (PPP) followed for the Proposed eGoli

Water Supply Project, Ugu District Municipality, KwaZulu-Natal.

The PPP commenced in September 2012 where site notices were erected along the route in eGoli

Area. During this time comment forms & BID flyers were distributed to the councillor and at tribal

council as well as to other interested and affected parties (I&APs). An advert was placed in the

Isolezwe newspaper on the 17th October 2012 followed by a comment period which was open for the

I&APs to raise their issues and concerns regarding the proposed activity. A draft Basic Assessment

Report and Environmental Management Programme was compiled, and was distributed to the

relevant authorities and to the public for review, for a 40 day comment period in which I&AP’s were

afforded the opportunity to raise any further issues and concerns, until the finalisation of the document

for submission to the KwaZulu-Natal Department of Agriculture and Environmental Affairs (KZN

DAEA).

PUBLIC PARTICIPATION AS PART OF THE SCOPING PP PROCESS

Public Notices/Site Notices

Public notices and site notes were displayed at the entrance of the site and at areas frequently

used by the public: Refer to copy of:

Site notice, providing the displayed detail in Appendix E - Site Notice;

Photographs as proof of site notices displayed.

Written Notices and Background Information Document (BID)

A background information document and notification letter with an invitation register to I&APs, to

submit comments as per attached comment sheet was distributed as follows:

Posted to I&AP database (which included neighbouring properties);

Placed at locations frequently used by the public.

Refer to Background Information Document provided in the PPP section (Appendix E) for the

detail regarding individuals contacted as per above-mentioned list as well as content of BID and

comment form.

Advertisements

Advertisements regarding inter alia the proposed project scope of works, location, details of public

meeting and details of locations and date for draft Basic Assessment Report review as well as

details of EAP were placed in the Isolezwe Newspaper (16.10.2012).

Page 3: PUBLIC PARTICIPATION REPORT E - PPP... · 2012-10-26 · PUBLIC PARTICIPATION SUMMARY This serves as a summary of the Public Participation Process (PPP) followed for the Proposed

Refer to proof of placement of advert in the PPP section (Appendix E) – Adverts.

Public Meeting

No public meeting was held but stakeholders were engaged with.

I&AP Communication

Refer to Issues trail within PPP section (Appendix E) for further detail.

I&APs Comments

As a result of the advertisement, BID’s and public meeting, correspondence was received from

I&APs.

Refer to attached comments: Appendix E – I&AP Correspondence, public meeting minutes and

issues trail for comments and responses.

Draft Basic Assessment Report Review

The draft Basic Assessment Report has been made available for review for a period of 40 days

and hard copies were placed at the following venues, as advertised:

Ugu District Municipality Offices;

Tribal Council; and

RHDHV Website: www.rhdhv.com

Comments will be received and compiled into an Issues Trail.

Issues Trail

An Issues Trial, summarizing the objections and comments from the PPP has been provided in

the PPP section (Appendix E) – Issues Trial.

Ongoing I&AP / Stakeholder communication

The project Team has ongoing communication with I&AP’s to ensure the continued involvement of

all stakeholders and I&AP throughout the EIA process and beyond.

Page 4: PUBLIC PARTICIPATION REPORT E - PPP... · 2012-10-26 · PUBLIC PARTICIPATION SUMMARY This serves as a summary of the Public Participation Process (PPP) followed for the Proposed

PUBLIC PARTICIPATION REPORT

SITE NOTICE

Page 5: PUBLIC PARTICIPATION REPORT E - PPP... · 2012-10-26 · PUBLIC PARTICIPATION SUMMARY This serves as a summary of the Public Participation Process (PPP) followed for the Proposed
Page 6: PUBLIC PARTICIPATION REPORT E - PPP... · 2012-10-26 · PUBLIC PARTICIPATION SUMMARY This serves as a summary of the Public Participation Process (PPP) followed for the Proposed

PUBLIC PARTICIPATION REPORT

PROOF OF SITE NOTICE

Page 7: PUBLIC PARTICIPATION REPORT E - PPP... · 2012-10-26 · PUBLIC PARTICIPATION SUMMARY This serves as a summary of the Public Participation Process (PPP) followed for the Proposed
Page 8: PUBLIC PARTICIPATION REPORT E - PPP... · 2012-10-26 · PUBLIC PARTICIPATION SUMMARY This serves as a summary of the Public Participation Process (PPP) followed for the Proposed

PUBLIC PARTICIPATION REPORT

ADVERTISMENT

Page 9: PUBLIC PARTICIPATION REPORT E - PPP... · 2012-10-26 · PUBLIC PARTICIPATION SUMMARY This serves as a summary of the Public Participation Process (PPP) followed for the Proposed
Page 10: PUBLIC PARTICIPATION REPORT E - PPP... · 2012-10-26 · PUBLIC PARTICIPATION SUMMARY This serves as a summary of the Public Participation Process (PPP) followed for the Proposed

PUBLIC PARTICIPATION REPORT

PROOF OF ADVERTISMENT

Page 11: PUBLIC PARTICIPATION REPORT E - PPP... · 2012-10-26 · PUBLIC PARTICIPATION SUMMARY This serves as a summary of the Public Participation Process (PPP) followed for the Proposed
Page 12: PUBLIC PARTICIPATION REPORT E - PPP... · 2012-10-26 · PUBLIC PARTICIPATION SUMMARY This serves as a summary of the Public Participation Process (PPP) followed for the Proposed

PUBLIC PARTICIPATION REPORT

BID & COMMENT FORM

Page 13: PUBLIC PARTICIPATION REPORT E - PPP... · 2012-10-26 · PUBLIC PARTICIPATION SUMMARY This serves as a summary of the Public Participation Process (PPP) followed for the Proposed
Page 14: PUBLIC PARTICIPATION REPORT E - PPP... · 2012-10-26 · PUBLIC PARTICIPATION SUMMARY This serves as a summary of the Public Participation Process (PPP) followed for the Proposed
Page 15: PUBLIC PARTICIPATION REPORT E - PPP... · 2012-10-26 · PUBLIC PARTICIPATION SUMMARY This serves as a summary of the Public Participation Process (PPP) followed for the Proposed
Page 16: PUBLIC PARTICIPATION REPORT E - PPP... · 2012-10-26 · PUBLIC PARTICIPATION SUMMARY This serves as a summary of the Public Participation Process (PPP) followed for the Proposed
Page 17: PUBLIC PARTICIPATION REPORT E - PPP... · 2012-10-26 · PUBLIC PARTICIPATION SUMMARY This serves as a summary of the Public Participation Process (PPP) followed for the Proposed
Page 18: PUBLIC PARTICIPATION REPORT E - PPP... · 2012-10-26 · PUBLIC PARTICIPATION SUMMARY This serves as a summary of the Public Participation Process (PPP) followed for the Proposed

PUBLIC PARTICIPATION REPORT

I&AP DATABASE

Page 19: PUBLIC PARTICIPATION REPORT E - PPP... · 2012-10-26 · PUBLIC PARTICIPATION SUMMARY This serves as a summary of the Public Participation Process (PPP) followed for the Proposed

First Name

Last Name Company/Organisation Postal Address Telephone Fax Cell No. E-mail

Kushela Naidoo RHDHV [email protected]

Manisha Maharaj DWA [email protected]

Thembile Dlungwana DAFF [email protected]

Dominic Wieners KZN Wildlife [email protected]

Weziwe Tshabalala Amafa [email protected]

Sello Mokhaya Amafa [email protected]

Carolyn Schwegmann WESSA [email protected]

Nonhlanhla Mnyeni Department of Agriculture

Melissa Packree Ugu DM [email protected]

Cllr TE Sibisi Ward Councillor [email protected]

Inkosi Hlengwa Chief

729 373 028

Page 20: PUBLIC PARTICIPATION REPORT E - PPP... · 2012-10-26 · PUBLIC PARTICIPATION SUMMARY This serves as a summary of the Public Participation Process (PPP) followed for the Proposed

PUBLIC PARTICIPATION REPORT

ISSUES TRAIL

Page 21: PUBLIC PARTICIPATION REPORT E - PPP... · 2012-10-26 · PUBLIC PARTICIPATION SUMMARY This serves as a summary of the Public Participation Process (PPP) followed for the Proposed

Royal HaskoningDHV October, 2012

ENVIRONMENTAL IMPACT ASSESSMENT PROCESS

ISSUES TRAIL

eGoli Water Supply Project

Ugu District Municipality

SUMMARY OF ISSUES/CONCERNS AND SUGGESTIONS RAISED BY INTERESTED AND/OR AFFECTED PARTIES

October 2012

This Issues Trail provides a summary of concerns raised by Interested and/or Affected Parties

(I&APs). A full record of the public participation process and stakeholder / I&AP correspondence is

available at Royal HaskoningDHV offices. The issues have been arranged into groups of similar

issues, and are listed within each group in the date order in which they were received. The name,

affiliation and date of the commentator are also indicated.

Page 22: PUBLIC PARTICIPATION REPORT E - PPP... · 2012-10-26 · PUBLIC PARTICIPATION SUMMARY This serves as a summary of the Public Participation Process (PPP) followed for the Proposed

The Proposed eGoli Water Supply Project, Ugu District Municipality

Royal HaskoningDHV October, 2012

NO COMMENTS HAVE BEEN RECEIVED TO DATE

Issue / Comment Raised By Response