9
f 467 – Transportation Systems Analysis ll 2010/11 PRT@LHR September 2010

PRT@LHR September 2010

  • Upload
    duena

  • View
    32

  • Download
    0

Embed Size (px)

DESCRIPTION

PRT@LHR September 2010. Off-line station with 2 berths. Recharging “Shoe” Vehicles are battery powered; recharged in stations. Station at Terminal 5 with touch screens. Central Control Room 2 cameras in each vehicle as well as everywhere else. Movies: 1 2 3 5. - PowerPoint PPT Presentation

Citation preview

Page 1: PRT@LHR September 2010

Orf 467 – Transportation Systems Analysis Fall 2010/11

PRT@LHRSeptember 2010

Page 2: PRT@LHR September 2010

Orf 467 – Transportation Systems Analysis Fall 2010/11

Off-line station with 2 berths

Page 3: PRT@LHR September 2010

Orf 467 – Transportation Systems Analysis Fall 2010/11

Page 4: PRT@LHR September 2010

Orf 467 – Transportation Systems Analysis Fall 2010/11

Recharging “Shoe”Vehicles are battery powered; recharged in stations

Page 5: PRT@LHR September 2010

Orf 467 – Transportation Systems Analysis Fall 2010/11

Page 6: PRT@LHR September 2010

Orf 467 – Transportation Systems Analysis Fall 2010/11

Station at Terminal 5 with touch screens

Page 7: PRT@LHR September 2010

Orf 467 – Transportation Systems Analysis Fall 2010/11

Central Control Room2 cameras in each vehicle as well as everywhere else

Page 8: PRT@LHR September 2010

Orf 467 – Transportation Systems Analysis Fall 2010/11

Page 9: PRT@LHR September 2010

Orf 467 – Transportation Systems Analysis Fall 2010/11 Movies:

1 2 3 5

Relative perspective & Maintenance Depot