Upload
others
View
3
Download
0
Embed Size (px)
Citation preview
PROPOSED CAPITAL IMPROVEMENT PROGRAM
FISCAL YEARS 2020/21-2024/25
Public Copy
PREPARED BY: DAVID R. ELLSPERMANN, CLERK OF THE CIRCUIT COURT AND COMPTROLLER – BUDGET DEPARTMENT
a......... Marion <;~4nry
i
Marion County Board of County Commissioners Table of Contents
Fiscal Years 2021 thru 2025 Proposed Budget
Page #
County Officials 1
Letter of Transmittal 3
Proposed Capital Improvement Program - Summary: Fund / Funding Source 5
Proposed Capital Improvement Program - Summary: Expenditure Category / Fund / Cost Center 9
Proposed Capital Improvement Program - Summary: Fund / Funding Source / Project 13
Proposed Capital Improvement Program - Summary: Expenditure Category / Project / Cost Center 29
Proposed General Capital Improvements Funding Analysis Capital Projects Funds 51
CSC000001 Comm Svc Silver Spring Shores Infrastructure
Proposed Capital Improvement Program - Project Detail
54
CTC000001 Courtroom Audio and Video Upgrade 55
ESC000001 Enterprise Resource Planning Capital 56
FHC000003 Facilities Health Dept Re Roof Building 58
FHC000004 Health Dept Replace Heating Boilers 59
FLC000001 New Consolidated Fleet Facility 60
FMC000002 Fac Mgmt Energy Mgmt Control 61
FMC000003 Fac Mgmt Fire Panel Upgrades 62
FMC000009 AC Upgrades for TC and PA 63
FMC000014 Fac Mgmt Jail E and F Pod Shower Replacement 64
FMC000016 Fac Mgmt Jail Sliding Cell Doors 65
FMC000017 MCSO Jail Infrastructure Improvement 66
FMC000018 JC1 Replacement Of Air Handler Unit 67
FMC000019 MCSO Jail Repl Dayroom Window 68
FMC000020 JC2 Replacement Of Air Handlers 69
FMC000021 MC Jail Indoor Air Quality Improvement 70
FMC000022 JC Upgrade Elevators 71
FMC000023 Security Upgrades Judicial Center 1 72
FRC000007 Fire EMC Ocala Central 73
FRC000009 Fire Station 18 Foundation Piers 74
FRC000010 Fire Employee Wellness Center 75
FRC000011 Installation Of Direct Capture System 76
- a......... Marion <;~4nry
Marion County Board of County Commissioners Table of Contents
Fiscal Years 2021 thru 2025 Proposed Budget
Page #
FRC000012 Fire Station 28 Rolling Greens 77
FRC000013 HVAC System Fire Station 1 78
ITC000001 Granicus Solution 79
LBC375013 Freedom Public Library Expansion 80
LPC000002 SELP Electric Water Sewer 81
LPC000003 SELP Fans In Back Arena 82
LPC000004 SELP Wash Rack For Back Arena 83
LPC000005 SELP Repair Drainage On Wash Rack 84
LPC000006 SELP Phase 3 85
LPC000010 SELP Galvanized Stalls 86
LPC032720 SELP Auditorium Av Upgrade 87
LPC202001 SELP Back Arena Announcers Booth 88
LPC202002 SELP Extension Auditorium Remodel 89
LPC202003 SELP Sales Arena Remodel 90
MAC000001 Airport Master Plan Update 91
MAC000005 Design And Construct 20 T Hangars 92
MAC202001 Fuel Farm Replacement 93
MAC202002 T-Hanger Construction 94
PCC000002 Public Safety Comm Bunkhouse 95
PCC000003 Backup EOC 96
PCC000004 Work Station Replacement 97
PCC000006 800MHz Tower Site Marion Oaks 98
PCC000008 911 System Replacement 99
PCC000009 EOC Radio DBA 100
PCC000010 CADD Computer Replacement 101
PCC000011 Radio Master Control Site Relocation 102
PCC000012 Radio GPS Tracker 103
PCC000013 Radio Signal Aligner 104
PCC000015 Emergency Management Antenna 105
PCC000016 PSC Server Replacement 106
PCC000017 Radio Systems Tower Repair 107
PCC000018 800MHz System Infra Upgrade 108
ii
- a......... Marion <;~4nry
Marion County Board of County Commissioners Table of Contents
Fiscal Years 2021 thru 2025 Proposed Budget
Page #
PDC000001 Public Defender Building Expansion 109
PRC000003 Blue Run Restroom 110
PRC000005 Little Lake Weir Bulkhead Improvements 111
PRC000007 Wrigley Batting Cages 112
PRC000009 Shocker Park Improvements 113
PRC000010 Shocker Park Restrooms Upper Field 114
PRC000017 Ray Wayside Park Improvements 115
PRC000031 Heagy Burry Boat Ramp 116
PRC000032 Ray Wayside Park 117
PRC202001 Salt Springs Civic Park Restroom 118
PRC202002 Gores Landing Improvements 119
PRC202003 North Shop Extension 120
PRC202004 Central Shop Extension and Restroom 121
PRC202005 Belleview Sportsplex Phase I 122
PRC202006 Ray Wayside Site Improvements 123
PRC202007 Baseline Road Trailhead Improvements 124
PRC202008 Westbrook Park Improvements 125
PRC202009 Ocala Park Estates Improvements 126
PRC202010 Kiwanis Beach Improvements 127
PRC202011 Brick City ADA Improvements 128
PRC202012 Eureka West Ramp Site Improvements 129
PRC202013 Forest Community Center Site Improvements 130
PRC202014 Horsehoe Lake ADA Site Improvements 131
PRC202015 John Van Fleet Parking Lot Site Improvements 132
PRC202017 KP Hole Dive Improvements 133
PRC202018 Moorhead Ramp Parking Lot Improvements 134
PRC202019 Rotary Sportsplex Improvements 135
RBC000001 Employee Wellness Center 136
SAC000001 State Attorney Expansion and Courtrooms 137
SMC0001MA Timucuan Rd and Lake Weir Culvert Imprv 138
SMC0002DR Country Gardens SWRF CP 59 139
SMC0002FL Stanton-Weirsdale Drainage Project 140
iii
- a......... Marion <;~4nry
Marion County Board of County Commissioners Table of Contents
Fiscal Years 2021 thru 2025 Proposed Budget
Page #
SMC0002WQ SSS 23 Innov SWRF CP 75 141
SMC0003FL SW 27th Ave Flood Relief HMGP 142
SMC0003WQ RS 5th Replat Innov SWRF CP 74 143
SMC0004FL SW 52nd St Flood Relief HMGP 144
SMC0005FL NW 115th Ct Flood Relief HMGP 145
SMC0006FL Country Gardens Flood Relief HMGP 146
SMC0006WQ SSS Unit 68 Innov SWRF CP 79 147
SOC000002 Sheriff Evidence Forensics Building 148
SOC000003 MCSO Jail AC Upgrade 149
SOC000005 MCSO Jail Reroof Ops Building 150
SOC000006 MCSO Jail Boiler Replacements 151
SOC000008 Sheriff Remodel Evidence Section 152
SOC000009 Sheriff Demo Pave Old Evidence Bld 153
SOC000010 MCSO Jail Construct Security Fence 154
SOC000011 MCSO Admin Remodel 155
SOC000012 MCSO Training Bldg Enhancements 156
SOC000013 MCSO Jail Renovation Assessment 157
SSC810001 SSS Roof Replacement 158
STC0732IT Fire Info Tech Infrastruct Surtax 159
STC0732SG Fire Safety Gear Infrastruct Surtax 160
STC0732VE Fire Vehicles Infrastruct Surtax 161
STC0733IT EMS Info Tech Infrastructure Surtax 162
STC0733SG EMS Safety Gear Infrastruct Surtax 163
STC0733VE EMS Vehicles Infrastructure Surtax 164
STC0734CC Emerg Comm Infrastructure Surtax 165
STC0735IT Sheriff Jail Info Tech Infrast Surtax 166
STC0736IT Sheriff Regular Info Tech Infrast Surtax 167
STC0736SG Sheriff Reg Safety Gear Infrast Surtax 168
STC0736VE Sheriff Regular Vehicles Infrast Surtax 169
STC0737AV Sheriff Patrol Aviation Infrast Surtax 170
STC0737IT Sheriff Patrol Info Tech Infrast Surtax 171
STC0737SG Sheriff Patrol Safety Gear Infrast Surtx
iv
172
- a......... Marion <;~4nry
Marion County Board of County Commissioners Table of Contents
Fiscal Years 2021 thru 2025 Proposed Budget
Page #
STC0737VE Sheriff Patrol Vehicles Infrast Surtax 173
STC073801 NW 49th 35th St Ph 2B Infrast Srtx 174
STC073802 NW 49th 35th St Ph 2C Infrast Srtx 175
STC073804 SW 49th 40th Ave Ph1 Infrast Srtx 176
STC073806 SW 49th Ave South Seg E Infrst Srtx 177
STC073807 SW 49th 40th Ave Ph2 Infrast Srtx 178
STC073808 SW 49th 40th Ave Ph3 Infrast Srtx 179
STC073809 SW 49th 40th Ave Ph1A Infrast Srtx 180
STC073810 SW 49th Ave South Seg A Infrst Srtx 181
STC073858 NE Hwy 315 Infrast Srtx 182
STC073860 S Hwy 314A Infrast Srtx 183
STC073861 S 182nd Avenue Rd Infrast Srtx 184
STC073863 SW 38th Avenue Infrast Srtx 185
STC073864 CR 484 Infrast Srtx 186
STC073865 Emerald Road Extension Infrast Srtx 187
STC073866 NW 80th 70th Avenue Infrast Srtx 188
STC073867 NW 70th Ave At Us 27 Infrast Srtx 189
STC073868 NW 80th Ave At Sr 40 Infrast Srtx 190
SWC000001 Recycling Centers Improvements 191
SWC000006 Martel Landfill 192
SWC000011 Davis Landfill 193
SWC000012 Davis Potable Water System 194
SWC000013 Baseline Landfill 195
SWC000018 Baseline Landfill Improvements I 196
SWC000020 Baseline Landfill Improvements III 197
SWC000026 Single Stream Recycling 198
SWC000027 Citizen Drop Off Facility Baseline 199
SWC000028 Baseline Transfer Station Improvements 200
SWC000029 Baseline Landfill A B C Wet Wells 201
SWC000030 Newton Contamination Remediation 202
SWC000033 Baseline Class I Landfill Closure 203
SWC000034 Baseline Scale Complex Improvements 204
v
- a......... Marion <;~4nry
Marion County Board of County Commissioners Table of Contents
Fiscal Years 2021 thru 2025 Proposed Budget
Page #
SWC000035 Solid Waste Animal Svc Master Plan 205
SWC000036 Hazard Mitigation Generators 206
SWC000040 Baseline LF New Recycling Center 207
SWC000041 Inbound Scale With Automation Design 208
UTC000059 Lift Station And Sewer Mains 209
UTC000115 Relocations Due To Construction 210
UTC000116 Water Mains And Fire Hydrants 211
UTC000117 Automated Meter Reading 212
UTC000135 Reclaimed Water Stations And Mains 213
UTC000136 Water Treatment Plant Improvements 214
UTC000138 Wastewater Treatment Plant Improvements 215
UTC000140 Computerized Maint Management System 216
UTC000144 Toilet Rebate Minor Capital Replacement 217
UTC000154 Ocala Crossing South Pud Utility Improvement 218
UTC000155 Smart Water Software Integration 219
UTC000161 Utility Acquisitions 220
UTC000163 Florida Horse Park Sewer Connection 221
UTC000164 SE 108th Water Main Interconnect 222
UTC000165 Utilities Customer Service Building Renovation 223
UTC000166 Master Wastewater Feasibility Study 224
UTC000167 Golden Ocala Wastewater Treatment 225
UTC000170 Silver Springs Shores Wastewater 226
UTC000171 Florida Commerce Commercial Park 227
UTC000184 CR484 At I75 Utility Reconstruction 228
VCC000001 VCC Gateway Signage 42nd St Flyover 229
VCC000002 VCC Gateway Signage NW 49th Street 230
VCC000003 VCC North County Line Gateway Sign 231
VCC000004 VCC South County Line Gateway Sign 232
VCC000005 VCC Visitor Center Signage 233
VHC000001 Veterans Nursing Home 234
vi
MARION COUNTY, FLORIDA COUNTY OFFICIALS
BOARD OF COUNTY COMMISSIONERS
Kathy Bryant ................................................................. Chairman - District 2
Jeff Gold ................................................................ Vice-Chairman - District 3
David Moore .......................................................... Commissioner - District 1
Carl Zalak III ........................................................... Commissioner - District 4
Michelle Stone ...................................................... Commissioner - District 5
ELECTED COUNTY OFFICERS
David R. Ellspermann ..............Clerk of the Circuit Court and Comptroller
Villie M. Smith .................................................................. Property Appraiser
Billy Woods ............................................................................................ Sheriff
Wesley Wilcox........................................................... Supervisor of Elections
George Albright ......................................................................... Tax Collector
1
_,,,,,,, ---~'f,.Cl.£RK1 ,, - ,..-.s ••••••• c.a '•
.,... v" •• •• ~ ,#:::,~· •• ,.,,, " i:J: ·.?l , 19:: •~O 'I
~\\ •.. ,.• 1!: ,, '1"..,. •• •• :it" ,,,
'
·17,_ •• •• {iii _,
'
v~. ••• ••• ,..~--, .,, C, ••• ~"--,,O(JNT'(, -,,,,,-
CLERK OF THE CIRCUIT COURT AND COMPTROLLER David R. Ellspermann
June 16, 2020
Marion County Board of County Commissioners 601 SE 25th Avenue Ocala, Florida 34471
Dear Commissioners,
Provided herein, is the Proposed Capital Improvement Program for fiscal years 2020/21 – 2024/25. This document serves to provide the Board of County Commissioners with an overview of funding for the Capital Improvement needs of the County over the next five fiscal years. This document does not address the County’s Transportation Improvement Program or the County’s Stormwater Implementation Program which are adopted separately. The Capital Improvement Program serves only as a capital outlay funding plan and does not represent an official appropriation of County funds. Official appropriations for capital projects are dependent upon their inclusion in the current and future annual budgets of the county as adopted through the statutorily required annual budget process.
For the five fiscal years 2020/21 – 2024/25 the Capital Improvement Program is proposed in the total amount of $95,355,979. This total includes projects covering a broad range of purposes and funding sources. In addition to $21,709,799 appropriated for General Capital Improvement projects, the Capital Improvement Program includes total project amounts of $19,800,000 for Solid Waste, $15,026,907 for Transportation Projects, $11,285,000 for Parks and Recreation, $8,235,000 for Utilities, $6,966,407 for Stormwater Projects, $6,498,341 for Sheriff, $3,434,525 for Fire Rescue and EMS Services, $2,150,000 for Airport and $250,000 for Emergency Communications.
The Capital Improvement Program includes $21,217,773 for capital projects utilizing a portion of anticipated proceeds of the 1% Local Option Infrastructure Sales Surtax to be collected in calendar years 2017 through 2020 as approved by public referendum.
Marion County Clerk of the Circuit Court and Comptroller Post Office Box 1030 • Ocala Florida 34478-1030 • Telephone (352) 671-5604 • Facsimile (352) 671-5600 • www.marioncountyclerk.org
3
u
June 16, 2020 Page 2
A general revenue appropriation of $3,735,245 for fiscal year 2020-21 is funded in the County's proposed fiscal year 2020-21 budget. Other countywide projects in the amount of $20,011,704 for future fisc~I years 2021-22 and beyond are included in the Capital Improvement Program. and are currently designated as "Operating Revenue". These projects will remain under consideration for funding as future annual budgets are proposed and subsequently adopted.
We would be pleased to answer any questions concerning the. Capital Improvement Program or provide further information as needed.
Respectfully submitted,
DAVID R. ELLSPERMANN Clerk of the Circuit Court and Comptroller Mari<;>n County, Florida ·
4
Marion <;~11ntJ
Marion County Board of County CommissionersProposed Capital Improvement Program
Summary: Fund / Funding SourceFiscal Years 2021 thru 2025
Fund / Funding Source Appropriated
To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Five Year
Total
911 Management Fund Operating Revenue 1,381,580 0 0 0 0 0 0
Total 911 Management Fund 1,381,580 0 0 0 0 0 0
Building Safety Fund Operating Revenue 214,929 16,844 0 0 0 0 16,844
Total Building Safety Fund 214,929 16,844 0 0 0 0 16,844
County Transportation Maintenance Fund Operating Revenue 665,365 64,160 0 0 0 0 64,160
Total County Transportation Maintenance Fund
665,365 64,160 0 0 0 0 64,160
Dunnellon Airport Fund Grant Federal 270,000 Grant State 743,368 Operating Revenue 321,843
0 0 0
0 1,120,000
280,000
0 600,000 150,000
0 0 0
0 0 0
0 1,720,000
430,000
Total Dunnellon Airport Fund 1,335,211 0 1,400,000 750,000 0 0 2,150,000
Fire Rescue and EMS Fund Grant Federal 573,182 Operating Revenue 839,568
0 23,754
0 0
0 0
0 0
0 0
0 23,754
Total Fire Rescue and EMS Fund
1,412,750 23,754 0 0 0 0 23,754
Fire Rescue Impact Fees Fund Operating Revenue 204,794 0 0 0 0 0 0
Total Fire Rescue Impact Fees Fund
204,794 0 0 0 0 0 0
5
Marion <;~11ntJ
Marion County Board of County CommissionersProposed Capital Improvement Program
Summary: Fund / Funding SourceFiscal Years 2021 thru 2025
Appropriated Five Year Fund / Funding Source To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
General Fund Grant Federal 230,504 0 0 0 0 0 0 Grant State 4,892,489 0 0 0 0 0 0 Operating Revenue 9,529,301 3,735,245 4,439,336 6,201,836 4,625,836 4,744,696 23,746,949 Restricted Program Income 246 0 0 0 0 0 0
Total General Fund 14,652,540 3,735,245 4,439,336 6,201,836 4,625,836 4,744,696 23,746,949
Infrastructure Surtax Capital Projects Surtax Revenue 133,407,519 21,217,773 0 0 0 0 21,217,773
Total Infrastructure Surtax 133,407,519 21,217,773 0 0 0 0 21,217,773 Capital Projects
Insurance Fund Operating Revenue 384,747 40,099 35,000 0 0 0 75,099
Total Insurance Fund 384,747 40,099 35,000 0 0 0 75,099
Local Housing Assistance Trust Fund Grant Federal 13,179 1,121 0 0 0 0 1,121
Total Local Housing 13,179 1,121 0 0 0 0 1,121 Assistance Trust Fund
Marion County Utility Fund Debt General Bond 2,790,517 0 0 0 0 0 0 Debt SRF Loan 16,000,000 0 0 0 0 0 0 Grant Federal 86,580 0 0 0 0 0 0 Grant Local 4,383,144 0 0 0 0 0 0 Grant State 3,210,872 0 0 0 0 0 0 Operating Revenue 82,106,824 8,308,755 0 0 0 0 8,308,755
Total Marion County Utility 108,577,937 8,308,755 0 0 0 0 8,308,755 Fund
Parks and Recreation Fees Fund Operating Revenue 1,717,555 369,276 2,920,000 778,000 6,670,000 582,000 11,319,276
Total Parks and Recreation 1,717,555 369,276 2,920,000 778,000 6,670,000 582,000 11,319,276 Fees Fund
6
Marion <;~11ntJ
Marion County Board of County CommissionersProposed Capital Improvement Program
Summary: Fund / Funding SourceFiscal Years 2021 thru 2025
Appropriated Five Year Fund / Funding Source To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Parks Capital Project Fund Operating Revenue 272,925 0 0 0 0 0 0
Total Parks Capital Project 272,925 0 0 0 0 0 0 Fund
Silver Springs Shores Special Tax District Operating Revenue 126,520 0 0 0 0 0 0
Total Silver Springs Shores 126,520 0 0 0 0 0 0 Special Tax District
Solid Waste Disposal Fund Grant Federal 180,000 0 0 0 0 0 0 Operating Revenue 25,536,487 19,811,675 0 0 0 0 19,811,675
Total Solid Waste Disposal 25,716,487 19,811,675 0 0 0 0 19,811,675 Fund
Stormwater Program Grant Federal 0 3,045,944 0 0 0 0 3,045,944 Operating Revenue 35,840 2,514,652 1,408,050 0 0 0 3,922,702
Total Stormwater Program 35,840 5,560,596 1,408,050 0 0 0 6,968,646
Surtax Capital Projects Operating Revenue 296,449 0 0 0 0 0 0
Total Surtax Capital Projects 296,449 0 0 0 0 0 0
Tourist Development Tax Operating Revenue 1,407,006 151,927 0 0 1,500,000 0 1,651,927
Total Tourist Development 1,407,006 151,927 0 0 1,500,000 0 1,651,927 Tax
Total - All Funding 291,823,333 59,301,225 10,202,386 7,729,836 12,795,836 5,326,696 95,355,979
7
Marion <;~11ntJ
Marion County Board of County CommissionersProposed Capital Improvement Program
Summary: Expenditure Category / Fund / Cost CenterFiscal Years 2021 thru 2025
Category / Fund / Cost Center
Appropriated To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025
Five Year Total
Airport Dunnellon Airport Fund
Dunnellon Airport
Surtax Capital Projects Surtax Capital Projects
1,332,011
60,000
0
0
1,400,000
0
750,000
0
0
0
0
0
2,150,000
0
Total Airport 1,392,011 0 1,400,000 750,000 0 0 2,150,000
Emergency Communications 911 Management Fund
9-1-1 Management 1,381,580
General Fund General Government Capital 112,000
Infrastructure Surtax Capital ProjectsInfrastructure Tax Emerg 12,500,112 Comm
0
0
250,000
0
0
0
0
0
0
0
0
0
0
0
0
0
0
250,000
Total EmergencyCommunications
13,993,692 250,000 0 0 0 0 250,000
Fire Rescue and EMS Services Fire Rescue and EMS Fund
Fire Rescue Services 1,122,656
Fire Rescue Impact Fees Fund Fire Rescue Impact Fee 204,794
General Fund Emergency Medical Services 143,720 Capital
Infrastructure Surtax Capital ProjectsInfrastructure Tax Fire 13,146,499 Infrastructure Tax Medical 9,952,027 Service
0
0
0
961,875 2,472,650
0
0
0
0 0
0
0
0
0
0
0
0
0
0 0
0
0
0
0 0
0
0
0
961,875 2,472,650
Total Fire Rescue and EMS Services
24,569,696 3,434,525 0 0 0 0 3,434,525
General Capital Improvements Building Safety Fund
Building Safety 214,929
County Transportation Maintenance FundTransportation 665,365
Dunnellon Airport Fund Dunnellon Airport 3,200
Fire Rescue and EMS Fund Fire Rescue Services 290,094
16,844
64,160
0
23,754
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
16,844
64,160
0
23,754
9
Marion <;~11ntJ
Marion County Board of County CommissionersProposed Capital Improvement Program
Summary: Expenditure Category / Fund / Cost CenterFiscal Years 2021 thru 2025
Category / Fund / Appropriated Five Year Cost Center To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
General Capital Improvements General Fund
Community Develop Block 230,354 0 0 0 0 0 0 Grant Courthouse Capital 3,549,693 450,336 1,579,336 1,765,836 165,836 144,696 4,106,040
Emergency Solutions Program 34 0 0 0 0 0 0 Fleet Capital 0 0 0 350,000 1,000,000 4,000,000 5,350,000 General Government Capital 4,091,926 989,064 1,450,000 0 0 0 2,439,064
Health Services Capital 1,002,000 0 160,000 0 0 0 160,000 Home Investment Partnership 116 0 0 0 0 0 0 Jail Capital 845,000 0 0 0 0 0 0
Library Capital 0 0 250,000 3,600,000 2,620,000 0 6,470,000 Livestock Pavilion Capital 3,956,730 543,845 0 486,000 0 200,000 1,229,845 Neighborhood Stabiliz Pgrm 1 246 0 0 0 0 0 0
Insurance Fund Risk And Benefit Services 59,747 40,099 35,000 0 0 0 75,099 Risk Benefits Capital 325,000 0 0 0 0 0 0
Local Housing Assistance Trust FundState House Initiative Partner 13,179 1,121 0 0 0 0 1,121
Marion County Utility Fund Utilities Capital 922,975 73,755 0 0 0 0 73,755 Constructruction
Parks and Recreation Fees Fund Parks & Recreation Fees 147,153 34,276 0 0 0 0 34,276
Solid Waste Disposal Fund Solid Waste Disposal 144,866 11,675 0 0 0 0 11,675
Stormwater Program Stormwater Program 35,840 2,239 0 0 0 0 2,239
Surtax Capital Projects Surtax Capital Projects 236,449 0 0 0 0 0 0
Tourist Development Tax Visitors And Convention 1,407,006 151,927 0 0 1,500,000 0 1,651,927 Bureau
Total General Capital 18,141,902 2,403,095 3,474,336 6,201,836 5,285,836 4,344,696 21,709,799 Improvements
MSTU Improvements Silver Springs Shores Special Tax District
Silver Springs Shores 126,520 0 0 0 0 0 0 Recreation
Total MSTU 126,520 0 0 0 0 0 0 Improvements
10
Marion <;~11ntJ
Marion County Board of County CommissionersProposed Capital Improvement Program
Summary: Expenditure Category / Fund / Cost CenterFiscal Years 2021 thru 2025
Category / Fund / Appropriated Five Year Cost Center To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Parks and Recreation General Fund
Other Recreation Programs 720,721 0 0 0 0 0 0
Parks and Recreation Fees Fund Parks & Recreation Fees 1,570,402 335,000 2,920,000 778,000 6,670,000 582,000 11,285,000
Parks Capital Project Fund Parks & Land Acq Capital 272,925 0 0 0 0 0 0
Total Parks and 2,564,048 335,000 2,920,000 778,000 6,670,000 582,000 11,285,000 Recreation
Sheriff General Fund
Jail Capital 0 1,600,000 1,000,000 0 280,000 400,000 3,280,000 Sheriff Capital 0 152,000 0 0 560,000 0 712,000
Infrastructure Surtax Capital ProjectsInfrastructure Tax Sheriff Jail 236,797 55,095 0 0 0 0 55,095 Infrastructure Tax Sheriff 24,055,992 2,190,058 0 0 0 0 2,190,058 Patrol Infrastructure Tax Sheriff 1,321,274 261,188 0 0 0 0 261,188 Regular
Total Sheriff 25,614,063 4,258,341 1,000,000 0 840,000 400,000 6,498,341
Solid Waste Disposal Solid Waste Disposal Fund
Solid Waste Disposal 23,621,621 17,700,000 0 0 0 0 17,700,000 Solid Waste Recycling 1,950,000 2,100,000 0 0 0 0 2,100,000
Total Solid Waste 25,571,621 19,800,000 0 0 0 0 19,800,000 Disposal
Stormwater Stormwater Program
Stormwater Program 0 5,558,357 1,408,050 0 0 0 6,966,407
Total Stormwater 0 5,558,357 1,408,050 0 0 0 6,966,407
Transportation Services Infrastructure Surtax Capital Projects
Infrastructure Tax 72,194,818 15,026,907 0 0 0 Transportation
Total Transportation 72,194,818 15,026,907 0 0 0 Services
0 15,026,907
0 15,026,907
11
Marion County Board of County CommissionersProposed Capital Improvement Program
Summary: Expenditure Category / Fund / Cost CenterFiscal Years 2021 thru 2025
Marion <;~11ntJ
Category / Fund / Appropriated Five Year Cost Center To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Utilities Marion County Utility Fund
Utilities Capital Constructruction
Total Utilities
Total - All Categories
107,654,962
107,654,962
291,823,333
8,235,000
8,235,000
59,301,225
0
0
10,202,386
0 0
0 0
7,729,836 12,795,836
0
0
5,326,696
8,235,000
8,235,000
95,355,979
12
Marion <;~11ntJ
Marion County Board of County CommissionersProposed Capital Improvement Program
Summary: Fund / Funding Source / ProjectFiscal Years 2021 thru 2025
Fund / Funding Source / Project
Appropriated To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025
Five Year Total
911 Management Fund
Operating Revenue
911 System Replacement 1,381,580 0 0 0 0 0 0
Total Operating Revenue
1,381,580 0 0 0 0 0 0
Total 911 Management Fund 1,381,580 0 0 0 0 0 0
Building Safety Fund
Operating Revenue
Enterprise Resource Planning Capital 214,929
Total Operating 214,929
Revenue
16,844
16,844
0
0
0
0
0
0
0
0
16,844
16,844
Total Building Safety Fund 214,929 16,844 0 0 0 0 16,844
County Transportation Maintenance Fund
Operating Revenue
Enterprise Resource Planning Capital 662,165
Granicus Solution 3,200
Total Operating 665,365
Revenue
64,160
0
64,160
0
0
0
0
0
0
0
0
0
0
0
0
64,160
0
64,160
Total County Transportation Maintenance Fund
665,365 64,160 0 0 0 0 64,160
Dunnellon Airport Fund
Grant Federal
Airport Master Plan Update
Total Grant Federal
270,000
270,000
0
0
0
0
0
0
0
0
0
0
0
0
Grant State
Airport Master Plan Update 24,000 0 0 0 0 0 0
13
Marion <;~11ntJ
Marion County Board of County CommissionersProposed Capital Improvement Program
Summary: Fund / Funding Source / ProjectFiscal Years 2021 thru 2025
Fund / Funding Source / Appropriated Five Year Project To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Dunnellon Airport Fund
Grant State
Design And Construct 20 T Hangars 719,368 0 0 0 0 0 0
Fuel Farm Replacement 0 0 0 600,000 0 0 600,000
T-Hanger Construction 0 0 1,120,000 0 0 0 1,120,000
Total Grant State 743,368 0 1,120,000 600,000 0 0 1,720,000
Operating Revenue
Airport Master Plan Update 6,000 0 0 0 0 0 0
Design And Construct 20 T Hangars 312,643 0 0 0 0 0 0
Fuel Farm Replacement 0 0 0 150,000 0 0 150,000
Granicus Solution 3,200 0 0 0 0 0 0
T-Hanger Construction 0 0 280,000 0 0 0 280,000
Total Operating Revenue
321,843 0 280,000 150,000 0 0 430,000
Total Dunnellon Airport Fund 1,335,211 0 1,400,000 750,000 0 0 2,150,000
Fire Rescue and EMS Fund
Grant Federal
Installation Of Direct Capture System 573,182 0 0 0 0 0 0
Total Grant Federal 573,182 0 0 0 0 0 0
Operating Revenue
Enterprise Resource Planning Capital 290,094
Fire Employee Wellness Center 13,080
Installation Of Direct Capture System 536,394
23,754
0
0
0
0
0
0
0
0
0
0
0
0
0
0
23,754
0
0
Total Operating Revenue
839,568 23,754 0 0 0 0 23,754
14
Marion <;~11ntJ
Marion County Board of County CommissionersProposed Capital Improvement Program
Summary: Fund / Funding Source / ProjectFiscal Years 2021 thru 2025
Fund / Funding Source / Appropriated Five Year Project To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Total Fire Rescue and EMS 1,412,750 23,754 0 0 0 0 23,754 Fund
Fire Rescue Impact Fees Fund
Operating Revenue
Fire Station 28 Rolling Greens 204,794 0 0 0 0 0 0
Total Operating Revenue
204,794 0 0 0 0 0 0
Total Fire Rescue Impact 204,794 0 0 0 0 0 0 Fees Fund
General Fund
Grant Federal
Comm Svc Silver Spring Shores Infrastructure 229,999 0 0 0 0 0 0
Enterprise Resource Planning Capital 505 0 0 0 0 0 0
Total Grant Federal 230,504 0 0 0 0 0 0
Grant State
Blue Run Restroom 150,000 0 0 0 0 0 0
Heagy Burry Boat Ramp 80,920 0 0 0 0 0 0
Ray Wayside Park 289,801 0 0 0 0 0 0
SELP Phase 3 3,671,768 0 0 0 0 0 0
Shocker Park Improvements 200,000 0 0 0 0 0 0
Veterans Nursing Home 500,000 0 0 0 0 0 0
Total Grant State 4,892,489 0 0 0 0 0 0
Operating Revenue
AC Upgrades for TC and PA 500,000 0 0 0 0 0 0
Backup EOC 112,000 0 0 0 0 0 0
Courtroom Audio and Video Upgrade 0 225,336 179,336 165,836 165,836 144,696 881,040
Enterprise Resource Planning Capital 3,198,466 189,064 0 0 0 0 189,064
15
Marion <;~11ntJ
Marion County Board of County CommissionersProposed Capital Improvement Program
Summary: Fund / Funding Source / ProjectFiscal Years 2021 thru 2025
Fund / Funding Source / Appropriated Five Year Project To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
General Fund
Operating Revenue
Fac Mgmt Energy Mgmt Control 100,000 0 0 0 0 0 0
Fac Mgmt Fire Panel Upgrades 150,000 0 0 0 0 0 0
Fac Mgmt Jail E and F Pod Shower Replacement 245,000 0 0 0 0 0 0
Fac Mgmt Jail Sliding Cell Doors 600,000 0 0 0 0 0 0
Facilities Health Dept Re Roof Building 502,000 0 0 0 0 0 0
Fire Employee Wellness Center 8,720 0 0 0 0 0 0
Freedom Public Library Expansion 0 0 250,000 3,600,000 2,620,000 0 6,470,000
Granicus Solution 143,460 0 0 0 0 0 0
Health Dept Replace Heating Boilers 0 0 160,000 0 0 0 160,000
HVAC System Fire Station 1 135,000 0 0 0 0 0 0
JC Upgrade Elevators 1,200,000 225,000 0 0 0 0 225,000
JC1 Replacement Of Air Handler Unit 0 800,000 0 0 0 0 800,000
JC2 Replacement Of Air Handlers 0 0 1,450,000 0 0 0 1,450,000
MC Jail Indoor Air Quality Improvement 0 0 0 0 0 400,000 400,000
MCSO Admin Remodel 0 0 0 0 560,000 0 560,000
MCSO Jail AC Upgrade 0 650,000 0 0 0 0 650,000
MCSO Jail Boiler Replacements 0 200,000 200,000 0 0 0 400,000
MCSO Jail Construct Security Fence 0 450,000 0 0 0 0 450,000
MCSO Jail Infrastructure Improvement 0 0 0 0 280,000 0 280,000
MCSO Jail Renovation Assessment 0 100,000 0 0 0 0 100,000
MCSO Jail Repl Dayroom Window 0 200,000 0 0 0 0 200,000
MCSO Jail Reroof Ops Building 0 0 800,000 0 0 0 800,000
MCSO Training Bldg Enhancements 0 152,000 0 0 0 0 152,000
New Consolidated Fleet Facility 0 0 0 350,000 1,000,000 4,000,000 5,350,000
16
Marion <;~11ntJ
Marion County Board of County CommissionersProposed Capital Improvement Program
Summary: Fund / Funding Source / ProjectFiscal Years 2021 thru 2025
Fund / Funding Source / Appropriated Five Year Project To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
General Fund
Operating Revenue
Public Defender Building Expansion 1,819,693 0 0 0 0 0 0
Security Upgrades Judicial Center 1 300,000 0 0 0 0 0 0
SELP Auditorium Av Upgrade 0 327,750 0 0 0 0 327,750
SELP Back Arena Announcers Booth 0 0 0 120,000 0 0 120,000
SELP Electric Water Sewer 150,000 0 0 0 0 0 0
SELP Extension Auditorium Remodel 0 216,095 0 0 0 0 216,095
SELP Fans In Back Arena 0 0 0 176,000 0 0 176,000
SELP Galvanized Stalls 34,962 0 0 0 0 0 0
SELP Repair Drainage On Wash Rack 100,000 0 0 0 0 0 0
SELP Sales Arena Remodel 0 0 0 190,000 0 0 190,000
SELP Wash Rack For Back Arena 0 0 0 0 0 200,000 200,000
State Attorney Expansion and Courtrooms 230,000 0 1,400,000 1,600,000 0 0 3,000,000
Total Operating Revenue
9,529,301 3,735,245 4,439,336 6,201,836 4,625,836 4,744,696 23,746,949
Restricted Program Income
Enterprise Resource Planning Capital 246 0 0 0 0 0 0
Total Restricted Program Income
246 0 0 0 0 0 0
Total General Fund 14,652,540 3,735,245 4,439,336 6,201,836 4,625,836 4,744,696 23,746,949
Infrastructure Surtax Capital Projects
Surtax Revenue
800MHz System Infra Upgrade 1,000,000
800MHz Tower Site Marion Oaks 600,000
Backup EOC 1,033,150
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
17
Marion <;~11ntJ
Marion County Board of County CommissionersProposed Capital Improvement Program
Summary: Fund / Funding Source / ProjectFiscal Years 2021 thru 2025
Fund / Funding Source / Appropriated Five Year Project To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Infrastructure Surtax Capital Projects
Surtax Revenue
CADD Computer Replacement 48,000 0 0 0 0 0 0
CR 484 Infrast Srtx 8,900,000 0 0 0 0 0 0
Emerald Road Extension Infrast Srtx 409,622 0 0 0 0 0 0
Emerg Comm Infrastructure Surtax 8,471,762 0 0 0 0 0 0
Emergency Management Antenna 50,000 0 0 0 0 0 0
EMS Info Tech Infrastructure Surtax 452,222 0 0 0 0 0 0
EMS Safety Gear Infrastruct Surtax 990,966 0 0 0 0 0 0
EMS Vehicles Infrastructure Surtax 6,308,839 1,452,650 0 0 0 0 1,452,650
EOC Radio DBA 37,500 0 0 0 0 0 0
Fire EMC Ocala Central 2,200,000 1,020,000 0 0 0 0 1,020,000
Fire Info Tech Infrastruct Surtax 108,000 0 0 0 0 0 0
Fire Safety Gear Infrastruct Surtax 1,787,933 0 0 0 0 0 0
Fire Station 18 Foundation Piers 410,000 0 0 0 0 0 0
Fire Station 28 Rolling Greens 2,556,797 0 0 0 0 0 0
Fire Vehicles Infrastruct Surtax 7,993,769 961,875 0 0 0 0 961,875
Installation Of Direct Capture System 290,000 0 0 0 0 0 0
NE Hwy 315 Infrast Srtx 5,074,391 0 0 0 0 0 0
NW 49th 35th St Ph 2B Infrast Srtx 14,875,000 0 0 0 0 0 0
NW 49th 35th St Ph 2C Infrast Srtx 6,855,462 5,700,000 0 0 0 0 5,700,000
NW 70th Ave At Us 27 Infrast Srtx 6,710,000 0 0 0 0 0 0
NW 80th 70th Avenue Infrast Srtx 2,297,963 0 0 0 0 0 0
NW 80th Ave At Sr 40 Infrast Srtx 5,350,000 0 0 0 0 0 0
PSC Server Replacement 24,000 0 0 0 0 0 0
Public Safety Comm Bunkhouse 666,117 0 0 0 0 0 0
18
Marion <;~11ntJ
Marion County Board of County CommissionersProposed Capital Improvement Program
Summary: Fund / Funding Source / ProjectFiscal Years 2021 thru 2025
Fund / Funding Source / Appropriated Five Year Project To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Infrastructure Surtax Capital Projects
Surtax Revenue
Radio GPS Tracker 0 200,000 0 0 0 0 200,000
Radio Master Control Site Relocation 20,000 0 0 0 0 0 0
Radio Signal Aligner 0 50,000 0 0 0 0 50,000
Radio Systems Tower Repair 80,000 0 0 0 0 0 0
S 182nd Avenue Rd Infrast Srtx 3,111,089 0 0 0 0 0 0
S Hwy 314A Infrast Srtx 3,300,000 0 0 0 0 0 0
Sheriff Demo Pave Old Evidence Bld 238,000 0 0 0 0 0 0
Sheriff Evidence Forensics Building 7,517,837 0 0 0 0 0 0
Sheriff Jail Info Tech Infrast Surtax 236,797 55,095 0 0 0 0 55,095
Sheriff Patrol Aviation Infrast Surtax 3,552,119 0 0 0 0 0 0
Sheriff Patrol Info Tech Infrast Surtax 2,826,805 473,845 0 0 0 0 473,845
Sheriff Patrol Safety Gear Infrast Surtx 718,961 36,300 0 0 0 0 36,300
Sheriff Patrol Vehicles Infrast Surtax 8,761,270 1,679,913 0 0 0 0 1,679,913
Sheriff Reg Safety Gear Infrast Surtax 28,523 0 0 0 0 0 0
Sheriff Regular Info Tech Infrast Surtax 572,843 120,061 0 0 0 0 120,061
Sheriff Regular Vehicles Infrast Surtax 719,908 141,127 0 0 0 0 141,127
Sheriff Remodel Evidence Section 441,000 0 0 0 0 0 0
SW 38th Avenue Infrast Srtx 813,395 0 0 0 0 0 0
SW 49th 40th Ave Ph1 Infrast Srtx 1,750,000 4,626,907 0 0 0 0 4,626,907
SW 49th 40th Ave Ph1A Infrast Srtx 947,448 0 0 0 0 0 0
SW 49th 40th Ave Ph2 Infrast Srtx 2,953,000 0 0 0 0 0 0
SW 49th 40th Ave Ph3 Infrast Srtx 2,487,448 0 0 0 0 0 0
SW 49th Ave South Seg A Infrst Srtx 3,000,000 4,700,000 0 0 0 0 4,700,000
SW 49th Ave South Seg E Infrst Srtx 3,360,000 0 0 0 0 0 0
19
Marion <;~11ntJ
Marion County Board of County CommissionersProposed Capital Improvement Program
Summary: Fund / Funding Source / ProjectFiscal Years 2021 thru 2025
Fund / Funding Source / Appropriated Five Year Project To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Infrastructure Surtax Capital Projects
Surtax Revenue
Work Station Replacement 469,583 0 0 0 0 0 0
Total Surtax Revenue 133,407,519 21,217,773 0 0 0 0 21,217,773
Total Infrastructure Surtax 133,407,519 21,217,773 0 0 0 0 21,217,773 Capital Projects
Insurance Fund
Operating Revenue
Employee Wellness Center 325,000
Enterprise Resource Planning Capital 59,747
0
40,099
0
35,000
0
0
0
0
0
0
0
75,099
Total Operating Revenue
384,747 40,099 35,000 0 0 0 75,099
Total Insurance Fund 384,747 40,099 35,000 0 0 0 75,099
Local Housing Assistance Trust Fund
Grant Federal
Enterprise Resource Planning Capital 13,179 1,121 0 0 0 0 1,121
Total Grant Federal 13,179 1,121 0 0 0 0 1,121
Total Local Housing Assistance Trust Fund
13,179 1,121 0 0 0 0 1,121
Marion County Utility Fund
Debt General Bond
Automated Meter Reading 1,163,790
Lift Station And Sewer Mains 265,674
Relocations Due To Construction 189,415
Water Mains And Fire Hydrants 1,171,638
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
20
Marion <;~11ntJ
Marion County Board of County CommissionersProposed Capital Improvement Program
Summary: Fund / Funding Source / ProjectFiscal Years 2021 thru 2025
Fund / Funding Source / Appropriated Five Year Project To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Marion County Utility Fund
Total Debt General Bond
2,790,517 0 0 0 0 0 0
Debt SRF Loan
Golden Ocala Wastewater Treatment 16,000,000 0 0 0 0 0 0
Total Debt SRF Loan 16,000,000 0 0 0 0 0 0
Grant Federal
Utilities Customer Service Building Renovation 86,580 0 0 0 0 0 0
Total Grant Federal 86,580 0 0 0 0 0 0
Grant Local
CR484 At I75 Utility Reconstruction 300,000 0 0 0 0 0 0
SE 108th Water Main Interconnect 596,106 0 0 0 0 0 0
Silver Springs Shores Wastewater 3,487,038 0 0 0 0 0 0
Total Grant Local 4,383,144 0 0 0 0 0 0
Grant State
Florida Commerce Commercial Park 1,414,319 0 0 0 0 0 0
Florida Horse Park Sewer Connection 1,296,553 0 0 0 0 0 0
Master Wastewater Feasibility Study 500,000 0 0 0 0 0 0
Total Grant State 3,210,872 0 0 0 0 0 0
Operating Revenue
Automated Meter Reading 6,486,520 450,000 0 0 0 0 450,000
Computerized Maint Management System 522,231 0 0 0 0 0 0
Enterprise Resource Planning Capital 919,775 73,755 0 0 0 0 73,755
Florida Commerce Commercial Park 188,848 0 0 0 0 0 0
Granicus Solution 3,200 0 0 0 0 0 0
Lift Station And Sewer Mains 13,261,977 2,585,000 0 0 0 0 2,585,000
21
Marion <;~11ntJ
Marion County Board of County CommissionersProposed Capital Improvement Program
Summary: Fund / Funding Source / ProjectFiscal Years 2021 thru 2025
Fund / Funding Source / Appropriated Five Year Project To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Marion County Utility Fund
Operating Revenue
Ocala Crossing South Pud Utility Improvement 2,101,103 0 0 0 0 0 0
Reclaimed Water Stations And Mains 5,432,054 0 0 0 0 0 0
Relocations Due To Construction 1,688,617 200,000 0 0 0 0 200,000
SE 108th Water Main Interconnect 900,276 0 0 0 0 0 0
Silver Springs Shores Wastewater 6,243,952 0 0 0 0 0 0
Smart Water Software Integration 2,357,407 0 0 0 0 0 0
Toilet Rebate Minor Cap Replacement 319,228 0 0 0 0 0 0
Utilities Customer Service Building Renovation 309,240 0 0 0 0 0 0
Utility Acquisitions 300,000 100,000 0 0 0 0 100,000
Wastewater Treatment Plant Improvements 13,620,044 300,000 0 0 0 0 300,000
Water Mains And Fire Hydrants 19,905,030 3,250,000 0 0 0 0 3,250,000
Water Treatment Plant Improvements 7,547,322 1,350,000 0 0 0 0 1,350,000
Total Operating Revenue
82,106,824 8,308,755 0 0 0 0 8,308,755
Total Marion County Utility108,577,937 Fund
8,308,755 0 0 0 0 8,308,755
Parks and Recreation Fees Fund
Operating Revenue
Baseline Road Trailhead Improvements 0
Belleview Sportsplex Phase I 0
Blue Run Restroom 150,000
Brick City ADA Improvements 0
Central Shop Extension and Restroom 0
Enterprise Resource Planning Capital 147,153
0
0
0
0
0
34,276
925,000
0
0
0
280,000
0
0
0
0
108,000
0
0
2,000,000
4,560,000
0
0
0
0
0
0
0
0
0
0
2,925,000
4,560,000
0
108,000
280,000
34,276 Eureka West Ramp Site Improvements
0 0 0 175,000 0 0 175,000
22
Marion <;~11ntJ
Marion County Board of County CommissionersProposed Capital Improvement Program
Summary: Fund / Funding Source / ProjectFiscal Years 2021 thru 2025
Fund / Funding Source / Appropriated Five Year Project To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Parks and Recreation Fees Fund
Operating Revenue
Forest Community Center Site Improvements 0 0 0 0 0 127,000 127,000
Gores Landing Improvements 0 0 800,000 0 0 0 800,000
Heagy Burry Boat Ramp 636,477 0 0 0 0 0 0
Horsehoe Lake ADA Site Improvements 0 0 0 0 0 125,000 125,000
John Van Fleet Parking Lot Site Improvements 0 0 0 175,000 0 0 175,000
Kiwanis Beach Improvements 0 0 150,000 0 0 0 150,000
KP Hole Dive Improvements 0 0 0 120,000 0 0 120,000
Little Lake Weir Bulkhead Improvements 145,000 0 0 0 0 0 0
Moorhead Ramp Parking Lot Improvements 0 0 0 0 110,000 0 110,000
North Shop Extension 0 0 155,000 0 0 0 155,000
Ocala Park Estates Improvements 0 155,000 0 0 0 0 155,000
Ray Wayside Park 100,000 0 0 0 0 0 0
Ray Wayside Park Improvements 50,000 0 0 0 0 0 0
Ray Wayside Site Improvements 0 0 460,000 0 0 0 460,000
Rotary Sportsplex Improvements 0 180,000 0 0 0 0 180,000
Salt Springs Civic Park Restroom 0 0 150,000 0 0 0 150,000
Shocker Park Improvements 125,000 0 0 0 0 0 0
Shocker Park Restrooms Upper Field 200,000 0 0 0 0 0 0
Westbrook Park Improvements 0 0 0 200,000 0 330,000 530,000
Wrigley Batting Cages 163,925 0 0 0 0 0 0
Total Operating Revenue
1,717,555 369,276 2,920,000 778,000 6,670,000 582,000 11,319,276
Total Parks and Recreation 1,717,555 369,276 2,920,000 778,000 6,670,000 582,000 11,319,276 Fees Fund
23
Marion <;~11ntJ
Marion County Board of County CommissionersProposed Capital Improvement Program
Summary: Fund / Funding Source / ProjectFiscal Years 2021 thru 2025
Fund / Funding Source / Appropriated Five Year Project To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Parks Capital Project Fund
Operating Revenue
Heagy Burry Boat Ramp 272,925 0 0 0 0 0 0
Total Operating Revenue
272,925 0 0 0 0 0 0
Total Parks Capital Project Fund
272,925 0 0 0 0 0 0
Silver Springs Shores Special Tax District
Operating Revenue
SSS Roof Replacement 126,520 0 0 0 0 0 0
Total Operating Revenue
126,520 0 0 0 0 0 0
Total Silver Springs Shores Special Tax District
126,520 0 0 0 0 0 0
Solid Waste Disposal Fund
Grant Federal
Hazard Mitigation Generators 180,000 0 0 0 0 0 0
Total Grant Federal 180,000 0 0 0 0 0 0
Operating Revenue
Baseline Class I Landfill Closure 1,400,000
Baseline Landfill 2,562,970
Baseline Landfill A B C Wet Wells 1,125,000
Baseline Landfill Improvements I 2,610,285
Baseline Landfill Improvements III 3,077,750
Baseline LF New Recycling Center 0
Baseline Scale Complex Improvements 120,000
Baseline Transfer Station Improvements 684,121
17,500,000
0
0
0
0
1,800,000
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
17,500,000
0
0
0
0
1,800,000
0
0
24
Marion <;~11ntJ
Marion County Board of County CommissionersProposed Capital Improvement Program
Summary: Fund / Funding Source / ProjectFiscal Years 2021 thru 2025
Fund / Funding Source / Appropriated Five Year Project To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Solid Waste Disposal Fund
Operating Revenue
Citizen Drop Off Facility Baseline 3,163,726 0 0 0 0 0 0
Davis Landfill 2,527,251 0 0 0 0 0 0
Davis Potable Water System 3,554,098 0 0 0 0 0 0
Enterprise Resource Planning Capital 144,866 11,675 0 0 0 0 11,675
Hazard Mitigation Generators 60,000 0 0 0 0 0 0
Inbound Scale With Automation Design 0 200,000 0 0 0 0 200,000
Martel Landfill 1,673,011 0 0 0 0 0 0
Newton Contamination Remediation 585,000 0 0 0 0 0 0
Recycling Centers Improvements 1,710,000 300,000 0 0 0 0 300,000
Single Stream Recycling 380,500 0 0 0 0 0 0
Solid Waste Animal Svc Master Plan 157,909 0 0 0 0 0 0
Total Operating Revenue
25,536,487 19,811,675 0 0 0 0 19,811,675
Total Solid Waste Disposal 25,716,487 Fund
19,811,675 0 0 0 0 19,811,675
Stormwater Program
Grant Federal
Country Gardens Flood Relief HMGP
NW 115th Ct Flood Relief HMGP
SW 27th Ave Flood Relief HMGP
SW 52nd St Flood Relief HMGP
0
0
0
0
424,546
818,344
1,406,427
396,627
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
424,546
818,344
1,406,427
396,627
Total Grant Federal 0 3,045,944 0 0 0 0 3,045,944
Operating Revenue
Country Gardens Flood Relief HMGP
Country Gardens SWRF CP 59 0
0
141,514
227,250
0
0
0
0
0
0
0
0
141,514
227,250
25
Marion <;~11ntJ
Marion County Board of County CommissionersProposed Capital Improvement Program
Summary: Fund / Funding Source / ProjectFiscal Years 2021 thru 2025
Fund / Funding Source / Project
Appropriated To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025
Five Year Total
Stormwater Program
Operating Revenue
Enterprise Resource Planning Capital 35,840
NW 115th Ct Flood Relief HMGP 0
RS 5th Replat Innov SWRF CP 74 0
SSS 23 Innov SWRF CP 75 0
SSS Unit 68 Innov SWRF CP 79 0
Stanton-Weirsdale Drainage Project 0
SW 27th Ave Flood Relief HMGP 0
SW 52nd St Flood Relief HMGP 0
Timucuan Rd and Lake Weir Culvert Imprv 0
2,239
272,781
0
0
899,850
120,000
468,809
132,209
250,000
0
0
435,750
972,300
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
2,239
272,781
435,750
972,300
899,850
120,000
468,809
132,209
250,000
Total Operating Revenue
35,840 2,514,652 1,408,050 0 0 0 3,922,702
Total Stormwater Program 35,840 5,560,596 1,408,050 0 0 0 6,968,646
Surtax Capital Projects
Operating Revenue
Design And Construct 20 T Hangars 60,000
Public Defender Building Expansion 228,307
SELP Galvanized Stalls 8,142
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Total Operating Revenue
296,449 0 0 0 0 0 0
Total Surtax Capital Projects 296,449 0 0 0 0 0 0
Tourist Development Tax
Operating Revenue
Enterprise Resource Planning Capital 22,751 1,927 0 0 0 0 1,927
26
Marion <;~11ntJ
Marion County Board of County CommissionersProposed Capital Improvement Program
Summary: Fund / Funding Source / ProjectFiscal Years 2021 thru 2025
Fund / Funding Source / Appropriated Five Year Project To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Tourist Development Tax
Operating Revenue
VCC Gateway Signage 42nd St Flyover 984,255
VCC Gateway Signage NW 49th Street 0
VCC North County Line Gateway Sign 200,000
VCC South County Line Gateway Sign 200,000
VCC Visitor Center Signage 0
Total Operating 1,407,006
Revenue
Total Tourist Development 1,407,006 Tax
Total - All Funds 291,823,333
0
0
0
0
150,000
151,927
151,927
59,301,225
0
0
0
0
0
0
0
10,202,386
0 0
0 1,500,000
0 0
0 0
0 0
0 1,500,000
0 1,500,000
7,729,836 12,795,836
0
0
0
0
0
0
0
5,326,696
0
1,500,000
0
0
150,000
1,651,927
1,651,927
95,355,979
27
Marion <;~11ntJ
Marion County Board of County CommissionersProposed Capital Improvement Program
Summary: Expenditure Category / Project / Cost CenterFiscal Years 2021 thru 2025
Category / Project / Appropriated Five Year Cost Center To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Airport Airport Master Plan Update
Dunnellon Airport 300,000 0 0 0 0 0 0
Project Total 300,000 0 0 0 0 0 0
Design And Construct 20 T Hangars
Dunnellon Airport 1,032,011 0 0 0 0 0 0
Surtax Capital Projects 60,000 0 0 0 0 0 0
Project Total 1,092,011 0 0 0 0 0 0
Fuel Farm Replacement
Dunnellon Airport 0 0 0 750,000 0 0 750,000
Project Total 0 0 0 750,000 0 0 750,000
T-Hanger Construction
Dunnellon Airport 0 0 1,400,000 0 0 0 1,400,000
Project Total 0 0 1,400,000 0 0 0 1,400,000
Total Airport 1,392,011 0 1,400,000 750,000 0 0 2,150,000
Emergency Communications 800MHz System Infra Upgrade
Infrastructure Tax Emerg Comm
1,000,000 0 0 0 0 0 0
Project Total 1,000,000 0 0 0 0 0 0
800MHz Tower Site Marion Oaks
Infrastructure Tax Emerg Comm
600,000 0 0 0 0 0 0
Project Total 600,000 0 0 0 0 0 0
911 System Replacement
9-1-1 Management 1,381,580 0 0 0 0 0 0
Project Total 1,381,580 0 0 0 0 0 0
Backup EOC
General Government Capital 112,000 0 0 0 0 0 0 Infrastructure Tax Emerg 1,033,150 0 0 0 0 0 0 Comm
Project Total 1,145,150 0 0 0 0 0 0
29
Marion <;~11ntJ
Marion County Board of County CommissionersProposed Capital Improvement Program
Summary: Expenditure Category / Project / Cost CenterFiscal Years 2021 thru 2025
Category / Project / Appropriated Five Year Cost Center To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Emergency Communications CADD Computer Replacement
Infrastructure Tax Emerg 48,000 Comm
0 0 0 0 0 0
Project Total 48,000 0 0 0 0 0 0
Emerg Comm Infrastructure Surtax
Infrastructure Tax Emerg 8,471,762 Comm
0 0 0 0 0 0
Project Total 8,471,762 0 0 0 0 0 0
Emergency Management Antenna
Infrastructure Tax Emerg 50,000 Comm
0 0 0 0 0 0
Project Total 50,000 0 0 0 0 0 0
EOC Radio DBA
Infrastructure Tax Emerg Comm
37,500 0 0 0 0 0 0
Project Total 37,500 0 0 0 0 0 0
PSC Server Replacement
Infrastructure Tax Emerg Comm
24,000 0 0 0 0 0 0
Project Total 24,000 0 0 0 0 0 0
Public Safety Comm Bunkhouse
Infrastructure Tax Emerg 666,117 Comm
0 0 0 0 0 0
Project Total 666,117 0 0 0 0 0 0
Radio GPS Tracker
Infrastructure Tax Emerg Comm
0 200,000 0 0 0 0 200,000
Project Total 0 200,000 0 0 0 0 200,000
Radio Master Control Site Relocation
Infrastructure Tax Emerg Comm
20,000 0 0 0 0 0 0
Project Total 20,000 0 0 0 0 0 0
Radio Signal Aligner
Infrastructure Tax Emerg Comm
0 50,000 0 0 0 0 50,000
Project Total 0 50,000 0 0 0 0 50,000
30
Marion <;~11ntJ
Marion County Board of County CommissionersProposed Capital Improvement Program
Summary: Expenditure Category / Project / Cost CenterFiscal Years 2021 thru 2025
Category / Project / Appropriated Five Year Cost Center To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Emergency Communications Radio Systems Tower Repair
Infrastructure Tax Emerg 80,000 Comm
0 0 0 0 0 0
Project Total 80,000 0 0 0 0 0 0
Work Station Replacement
Infrastructure Tax Emerg Comm
469,583 0 0 0 0 0 0
Project Total 469,583 0 0 0 0 0 0
Total EmergencyCommunications
13,993,692 250,000 0 0 0 0 250,000
Fire Rescue and EMS Services EMS Info Tech Infrastructure Surtax
Infrastructure Tax Medical Service
452,222 0 0 0 0 0 0
Project Total 452,222 0 0 0 0 0 0
EMS Safety Gear Infrastruct Surtax
Infrastructure Tax Medical 990,966 Service
0 0 0 0 0 0
Project Total 990,966 0 0 0 0 0 0
EMS Vehicles Infrastructure Surtax
Infrastructure Tax Medical Service
6,308,839 1,452,650 0 0 0 0 1,452,650
Project Total 6,308,839 1,452,650 0 0 0 0 1,452,650
Fire EMC Ocala Central
Infrastructure Tax Medical Service
2,200,000 1,020,000 0 0 0 0 1,020,000
Project Total 2,200,000 1,020,000 0 0 0 0 1,020,000
Fire Employee Wellness Center
Emergency Medical Services Capital Fire Rescue Services
8,720
13,080
0
0
0
0
0
0
0
0
0
0
0
0
Project Total 21,800 0 0 0 0 0 0
Fire Info Tech Infrastruct Surtax
Infrastructure Tax Fire 108,000 0 0 0 0 0 0
Project Total 108,000 0 0 0 0 0 0
31
Marion <;~11ntJ
Marion County Board of County CommissionersProposed Capital Improvement Program
Summary: Expenditure Category / Project / Cost CenterFiscal Years 2021 thru 2025
Category / Project / Appropriated Five Year Cost Center To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Fire Rescue and EMS Services Fire Safety Gear Infrastruct Surtax
Infrastructure Tax Fire 1,787,933 0 0 0 0 0 0
Project Total 1,787,933 0 0 0 0 0 0
Fire Station 18 Foundation Piers
Infrastructure Tax Fire 410,000 0 0 0 0 0 0
Project Total 410,000 0 0 0 0 0 0
Fire Station 28 Rolling Greens
Fire Rescue Impact Fee 204,794
Infrastructure Tax Fire 2,556,797
0
0
0
0 0 0
0
0
0
0
0
0
Project Total 2,761,591 0 0 0 0 0 0
Fire Vehicles Infrastruct Surtax
Infrastructure Tax Fire 7,993,769 961,875 0 0 0 0 961,875
Project Total 7,993,769 961,875 0 0 0 0 961,875
HVAC System Fire Station 1
Emergency Medical Services Capital
Project Total
135,000
135,000
0
0
0
0
0
0
0
0
0
0
0
0
Installation Of Direct Capture System
Fire Rescue Services 1,109,576 Infrastructure Tax Fire 290,000
0 0
0 0
0
0
0 0
0 0
0 0
Project Total 1,399,576 0 0 0 0 0 0
Total Fire Rescue and EMS Services
24,569,696 3,434,525 0 0 0 0 3,434,525
General Capital Improvements AC Upgrades for TC and PA
General Government Capital 500,000 0 0 0 0 0 0
Project Total 500,000 0 0 0 0 0 0
Comm Svc Silver Spring Shores Infrastructure
Community Develop Block 229,999 Grant
0 0 0 0 0 0
Project Total 229,999 0 0 0 0 0 0
32
Marion <;~11ntJ
Marion County Board of County CommissionersProposed Capital Improvement Program
Summary: Expenditure Category / Project / Cost CenterFiscal Years 2021 thru 2025
Category / Project / Appropriated Five Year Cost Center To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
General Capital Improvements Courtroom Audio and Video Upgrade
Courthouse Capital 0 225,336 179,336 165,836 165,836 144,696 881,040
Project Total 0 225,336 179,336 165,836 165,836 144,696 881,040
Employee Wellness Center
Risk Benefits Capital 325,000 0 0 0 0 0 0
Project Total 325,000 0 0 0 0 0 0
Enterprise Resource Planning Capital
Building Safety 214,929 16,844 0 0 0 0 16,844
Community Develop Block Grant
355 0 0 0 0 0 0
Emergency Solutions Program Fire Rescue Services
34
290,094
0
23,754
0
0
0
0
0
0
0
0
0
23,754
General Government Capital 3,198,466 189,064 0 0 0 0 189,064 Home Investment 116 0 0 0 0 0 0 Partnership Neighborhood Stabiliz Pgrm 1
246 0 0 0 0 0 0
Parks & Recreation Fees 147,153 34,276 0 0 0 0 34,276 Risk And Benefit Services 59,747 40,099 35,000 0 0 0 75,099 Solid Waste Disposal 144,866 11,675 0 0 0 0 11,675
State House Initiative Partner 13,179 1,121 0 0 0 0 1,121 Stormwater Program 35,840 2,239 0 0 0 0 2,239 Transportation 662,165 64,160 0 0 0 0 64,160
Utilities Capital Constructruction
919,775 73,755 0 0 0 0 73,755
Visitors And Convention 22,751 1,927 0 0 0 0 1,927 Bureau
Project Total 5,709,716 458,914 35,000 0 0 0 493,914
Fac Mgmt Energy Mgmt Control
General Government Capital 100,000 0 0 0 0 0 0
Project Total 100,000 0 0 0 0 0 0
Fac Mgmt Fire Panel Upgrades
General Government Capital 150,000 0 0 0 0 0 0
Project Total 150,000 0 0 0 0 0 0
Fac Mgmt Jail E and F Pod Shower Replacement
Jail Capital 245,000 0 0 0 0 0 0
Project Total 245,000 0 0 0 0 0 0
33
Marion <;~11ntJ
Marion County Board of County CommissionersProposed Capital Improvement Program
Summary: Expenditure Category / Project / Cost CenterFiscal Years 2021 thru 2025
Category / Project / Appropriated Five Year Cost Center To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
General Capital Improvements Fac Mgmt Jail Sliding Cell Doors
Jail Capital 600,000 0 0 0 0 0 0
Project Total 600,000 0 0 0 0 0 0
Facilities Health Dept Re Roof Building
Health Services Capital 502,000 0 0 0 0 0 0
Project Total 502,000 0 0 0 0 0 0
Freedom Public Library Expansion
Library Capital 0 0 250,000 3,600,000 2,620,000 0 6,470,000
Project Total 0 0 250,000 3,600,000 2,620,000 0 6,470,000
Granicus Solution
Dunnellon Airport 3,200 0 0 0 0 0 0 General Government Capital 143,460 0 0 0 0 0 0
Transportation 3,200 0 0 0 0 0 0 Utilities Capital 3,200 Constructruction
0 0 0 0 0 0
Project Total 153,060 0 0 0 0 0 0
Health Dept Replace Heating Boilers
Health Services Capital 0 0 160,000 0 0 0 160,000
Project Total 0 0 160,000 0 0 0 160,000
JC Upgrade Elevators
Courthouse Capital 1,200,000 225,000 0 0 0 0 225,000
Project Total 1,200,000 225,000 0 0 0 0 225,000
JC1 Replacement Of Air Handler Unit
General Government Capital 0 800,000 0 0 0 0 800,000
Project Total 0 800,000 0 0 0 0 800,000
JC2 Replacement Of Air Handlers
General Government Capital 0 0 1,450,000 0 0 0 1,450,000
Project Total 0 0 1,450,000 0 0 0 1,450,000
New Consolidated Fleet Facility
Fleet Capital 0 0 0 350,000 1,000,000 4,000,000 5,350,000
Project Total 0 0 0 350,000 1,000,000 4,000,000 5,350,000
34
Marion <;~11ntJ
Marion County Board of County CommissionersProposed Capital Improvement Program
Summary: Expenditure Category / Project / Cost CenterFiscal Years 2021 thru 2025
Category / Project / Appropriated Five Year Cost Center To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
General Capital Improvements Public Defender Building Expansion
Courthouse Capital 1,819,693 0 0 0 0 0 0 Surtax Capital Projects 228,307 0 0 0 0 0 0
Project Total 2,048,000 0 0 0 0 0 0
Security Upgrades Judicial Center 1
Courthouse Capital 300,000 0 0 0 0 0 0
Project Total 300,000 0 0 0 0 0 0
SELP Auditorium Av Upgrade
Livestock Pavilion Capital 0 327,750 0 0 0 0 327,750
Project Total 0 327,750 0 0 0 0 327,750
SELP Back Arena Announcers Booth
Livestock Pavilion Capital 0 0 0 120,000 0 0 120,000
Project Total 0 0 0 120,000 0 0 120,000
SELP Electric Water Sewer
Livestock Pavilion Capital 150,000 0 0 0 0 0 0
Project Total 150,000 0 0 0 0 0 0
SELP Extension Auditorium Remodel
Livestock Pavilion Capital 0 216,095 0 0 0 0 216,095
Project Total 0 216,095 0 0 0 0 216,095
SELP Fans In Back Arena
Livestock Pavilion Capital 0 0 0 176,000 0 0 176,000
Project Total 0 0 0 176,000 0 0 176,000
SELP Galvanized Stalls
Livestock Pavilion Capital 34,962 0 0 0 0 0 0 Surtax Capital Projects 8,142 0 0 0 0 0 0
Project Total 43,104 0 0 0 0 0 0
SELP Phase 3
Livestock Pavilion Capital 3,671,768 0 0 0 0 0 0
Project Total 3,671,768 0 0 0 0 0 0
SELP Repair Drainage On Wash Rack
Livestock Pavilion Capital 100,000 0 0 0 0 0 0
Project Total 100,000 0 0 0 0 0 0
35
Marion <;~11ntJ
Marion County Board of County CommissionersProposed Capital Improvement Program
Summary: Expenditure Category / Project / Cost CenterFiscal Years 2021 thru 2025
Category / Project / Cost Center
Appropriated To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025
Five Year Total
General Capital Improvements SELP Sales Arena Remodel
Livestock Pavilion Capital 0 0 0 190,000 0 0 190,000
Project Total 0 0 0 190,000 0 0 190,000
SELP Wash Rack For Back Arena
Livestock Pavilion Capital 0 0 0 0 0 200,000 200,000
Project Total 0 0 0 0 0 200,000 200,000
State Attorney Expansion and Courtrooms
Courthouse Capital 230,000 0 1,400,000 1,600,000 0 0 3,000,000
Project Total 230,000 0 1,400,000 1,600,000 0 0 3,000,000
VCC Gateway Signage 42nd St Flyover
Visitors And Convention 984,255 Bureau
0 0 0 0 0 0
Project Total 984,255 0 0 0 0 0 0
VCC Gateway Signage NW 49th Street
Visitors And Convention 0 Bureau
0 0 0 1,500,000 0 1,500,000
Project Total 0 0 0 0 1,500,000 0 1,500,000
VCC North County Line Gateway Sign
Visitors And Convention 200,000 Bureau
0 0 0 0 0 0
Project Total 200,000 0 0 0 0 0 0
VCC South County Line Gateway Sign
Visitors And Convention 200,000 Bureau
0 0 0 0 0 0
Project Total 200,000 0 0 0 0 0 0
VCC Visitor Center Signage
Visitors And Convention Bureau
0 150,000 0 0 0 0 150,000
Project Total 0 150,000 0 0 0 0 150,000
Veterans Nursing Home
Health Services Capital 500,000 0 0 0 0 0 0
Project Total 500,000 0 0 0 0 0 0
Total General Capital Improvements
18,141,902 2,403,095 3,474,336 6,201,836 5,285,836 4,344,696 21,709,799
36
Marion <;~11ntJ
Marion County Board of County CommissionersProposed Capital Improvement Program
Summary: Expenditure Category / Project / Cost CenterFiscal Years 2021 thru 2025
Category / Project / Appropriated Five Year Cost Center To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
MSTU Improvements SSS Roof Replacement
Silver Springs Shores 126,520 0 0 0 0 0 0 Recreation
Project Total 126,520 0 0 0 0 0 0
Total MSTU 126,520 0 0 0 0 0 0 Improvements
Parks and Recreation Baseline Road Trailhead Improvements
Parks & Recreation Fees 0 0 925,000 0 2,000,000
Project Total 0 0 925,000 0 2,000,000
Belleview Sportsplex Phase I
Parks & Recreation Fees 0 0 0 0 4,560,000
Project Total 0 0 0 0 4,560,000
Blue Run Restroom
Other Recreation Programs 150,000 0 0 0 0
Parks & Recreation Fees 150,000 0 0 0 0
Project Total 300,000 0 0 0 0
Brick City ADA Improvements
Parks & Recreation Fees 0 0 0 108,000 0
Project Total 0 0 0 108,000 0
Central Shop Extension and Restroom
Parks & Recreation Fees 0 0 280,000 0 0
Project Total 0 0 280,000 0 0
Eureka West Ramp Site Improvements
Parks & Recreation Fees 0 0 0 175,000 0
Project Total 0 0 0 175,000 0
Forest Community Center Site Improvements
Parks & Recreation Fees 0 0 0 0 0
Project Total 0 0 0 0 0
Gores Landing Improvements
Parks & Recreation Fees 0 0 800,000 0 0
Project Total 0 0 800,000 0 0
0
0
0
0
0
0
0
0
0
0
0
0
0
127,000
127,000
0
0
2,925,000
2,925,000
4,560,000
4,560,000
0
0
0
108,000
108,000
280,000
280,000
175,000
175,000
127,000
127,000
800,000
800,000
37
Marion <;~11ntJ
Marion County Board of County CommissionersProposed Capital Improvement Program
Summary: Expenditure Category / Project / Cost CenterFiscal Years 2021 thru 2025
Category / Project / Appropriated Five Year Cost Center To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Parks and Recreation Heagy Burry Boat Ramp
Other Recreation Programs 80,920 0 0 0 0 0 0 Parks & Land Acq Capital 272,925 0 0 0 0 0 0 Parks & Recreation Fees 636,477 0 0 0 0 0 0
Project Total 990,322 0 0 0 0 0 0
Horsehoe Lake ADA Site Improvements
Parks & Recreation Fees 0 0 0 0 0 125,000 125,000
Project Total 0 0 0 0 0 125,000 125,000
John Van Fleet Parking Lot Site Improvements
Parks & Recreation Fees 0 0 0 175,000 0 0 175,000
Project Total 0 0 0 175,000 0 0 175,000
Kiwanis Beach Improvements
Parks & Recreation Fees 0 0 150,000 0 0 0 150,000
Project Total 0 0 150,000 0 0 0 150,000
KP Hole Dive Improvements
Parks & Recreation Fees 0 0 0 120,000 0 0 120,000
Project Total 0 0 0 120,000 0 0 120,000
Little Lake Weir Bulkhead Improvements
Parks & Recreation Fees 145,000 0 0 0 0 0 0
Project Total 145,000 0 0 0 0 0 0
Moorhead Ramp Parking Lot Improvements
Parks & Recreation Fees 0 0 0 0 110,000 0 110,000
Project Total 0 0 0 0 110,000 0 110,000
North Shop Extension
Parks & Recreation Fees 0 0 155,000 0 0 0 155,000
Project Total 0 0 155,000 0 0 0 155,000
Ocala Park Estates Improvements
Parks & Recreation Fees 0 155,000 0 0 0 0 155,000
Project Total 0 155,000 0 0 0 0 155,000
Ray Wayside Park
Other Recreation Programs 289,801 0 0 0 0 0 0 Parks & Recreation Fees 100,000 0 0 0 0 0 0
Project Total 389,801 0 0 0 0 0 0
38
Marion <;~11ntJ
Marion County Board of County CommissionersProposed Capital Improvement Program
Summary: Expenditure Category / Project / Cost CenterFiscal Years 2021 thru 2025
Category / Project / Appropriated Five Year Cost Center To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Parks and Recreation Ray Wayside Park Improvements
Parks & Recreation Fees 50,000 0 0 0 0 0 0
Project Total 50,000 0 0 0 0 0 0
Ray Wayside Site Improvements
Parks & Recreation Fees 0 0 460,000 0 0 0 460,000
Project Total 0 0 460,000 0 0 0 460,000
Rotary Sportsplex Improvements
Parks & Recreation Fees 0 180,000 0 0 0 0 180,000
Project Total 0 180,000 0 0 0 0 180,000
Salt Springs Civic Park Restroom
Parks & Recreation Fees 0 0 150,000 0 0 0 150,000
Project Total 0 0 150,000 0 0 0 150,000
Shocker Park Improvements
Other Recreation Programs 200,000 0 0 0 0 0 0 Parks & Recreation Fees 125,000 0 0 0 0 0 0
Project Total 325,000 0 0 0 0 0 0
Shocker Park Restrooms Upper Field
Parks & Recreation Fees 200,000 0 0 0 0 0 0
Project Total 200,000 0 0 0 0 0 0
Westbrook Park Improvements
Parks & Recreation Fees 0 0 0 200,000 0 330,000 530,000
Project Total 0 0 0 200,000 0 330,000 530,000
Wrigley Batting Cages
Parks & Recreation Fees 163,925 0 0 0 0 0 0
Project Total 163,925 0 0 0 0 0 0
Total Parks and 2,564,048 335,000 2,920,000 778,000 6,670,000 582,000 11,285,000 Recreation
Sheriff MC Jail Indoor Air Quality Improvement
Jail Capital 0 0 0 0 0 400,000 400,000
Project Total 0 0 0 0 0 400,000 400,000
39
Marion <;~11ntJ
Marion County Board of County CommissionersProposed Capital Improvement Program
Summary: Expenditure Category / Project / Cost CenterFiscal Years 2021 thru 2025
Category / Project / Appropriated Five Year Cost Center To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Sheriff MCSO Admin Remodel
Sheriff Capital 0 0 0 0 560,000 0 560,000
Project Total 0 0 0 0 560,000 0 560,000
MCSO Jail AC Upgrade
Jail Capital 0 650,000 0 0 0 0 650,000
Project Total 0 650,000 0 0 0 0 650,000
MCSO Jail Boiler Replacements
Jail Capital 0 200,000 200,000 0 0 0 400,000
Project Total 0 200,000 200,000 0 0 0 400,000
MCSO Jail Construct Security Fence
Jail Capital 0 450,000 0 0 0 0 450,000
Project Total 0 450,000 0 0 0 0 450,000
MCSO Jail Infrastructure Improvement
Jail Capital 0 0 0 0 280,000 0 280,000
Project Total 0 0 0 0 280,000 0 280,000
MCSO Jail Renovation Assessment
Jail Capital 0 100,000 0 0 0 0 100,000
Project Total 0 100,000 0 0 0 0 100,000
MCSO Jail Repl Dayroom Window
Jail Capital 0 200,000 0 0 0 0 200,000
Project Total 0 200,000 0 0 0 0 200,000
MCSO Jail Reroof Ops Building
Jail Capital 0 0 800,000 0 0 0 800,000
Project Total 0 0 800,000 0 0 0 800,000
MCSO Training Bldg Enhancements
Sheriff Capital 0 152,000 0 0 0 0 152,000
Project Total 0 152,000 0 0 0 0 152,000
Sheriff Demo Pave Old Evidence Bld
Infrastructure Tax Sheriff 238,000 0 0 0 0 0 0 Patrol
Project Total 238,000 0 0 0 0 0 0
40
Marion <;~11ntJ
Marion County Board of County CommissionersProposed Capital Improvement Program
Summary: Expenditure Category / Project / Cost CenterFiscal Years 2021 thru 2025
Category / Project / Appropriated Five Year Cost Center To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Sheriff Sheriff Evidence Forensics Building
Infrastructure Tax Sheriff 7,517,837 Patrol
0 0 0 0 0 0
Project Total 7,517,837 0 0 0 0 0 0
Sheriff Jail Info Tech Infrast Surtax
Infrastructure Tax Sheriff Jail 236,797 55,095 0 0 0 0 55,095
Project Total 236,797 55,095 0 0 0 0 55,095
Sheriff Patrol Aviation Infrast Surtax
Infrastructure Tax Sheriff Patrol
3,552,119 0 0 0 0 0 0
Project Total 3,552,119 0 0 0 0 0 0
Sheriff Patrol Info Tech Infrast Surtax
Infrastructure Tax Sheriff Patrol
2,826,805 473,845 0 0 0 0 473,845
Project Total 2,826,805 473,845 0 0 0 0 473,845
Sheriff Patrol Safety Gear Infrast Surtx
Infrastructure Tax Sheriff 718,961 Patrol
36,300 0 0 0 0 36,300
Project Total 718,961 36,300 0 0 0 0 36,300
Sheriff Patrol Vehicles Infrast Surtax
Infrastructure Tax Sheriff Patrol
8,761,270 1,679,913 0 0 0 0 1,679,913
Project Total 8,761,270 1,679,913 0 0 0 0 1,679,913
Sheriff Reg Safety Gear Infrast Surtax
Infrastructure Tax Sheriff 28,523 Regular
0 0 0 0 0 0
Project Total 28,523 0 0 0 0 0 0
Sheriff Regular Info Tech Infrast Surtax
Infrastructure Tax Sheriff 572,843 Regular
120,061 0 0 0 0 120,061
Project Total 572,843 120,061 0 0 0 0 120,061
Sheriff Regular Vehicles Infrast Surtax
Infrastructure Tax Sheriff 719,908 Regular
141,127 0 0 0 0 141,127
Project Total 719,908 141,127 0 0 0 0 141,127
41
Marion <;~11ntJ
Marion County Board of County CommissionersProposed Capital Improvement Program
Summary: Expenditure Category / Project / Cost CenterFiscal Years 2021 thru 2025
Category / Project / Appropriated Five Year Cost Center To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Sheriff Sheriff Remodel Evidence Section
Infrastructure Tax Sheriff 441,000 0 0 0 0 0 0 Patrol
Project Total 441,000 0 0 0 0 0 0
Total Sheriff 25,614,063 4,258,341 1,000,000 0 840,000 400,000 6,498,341
Solid Waste Disposal Baseline Class I Landfill Closure
Solid Waste Disposal 1,400,000 17,500,000 0
Project Total 1,400,000 17,500,000 0
Baseline Landfill
Solid Waste Disposal 2,562,970 0 0
Project Total 2,562,970 0 0
Baseline Landfill A B C Wet Wells
Solid Waste Disposal 1,125,000 0 0
Project Total 1,125,000 0 0
Baseline Landfill Improvements I
Solid Waste Disposal 2,610,285 0 0
Project Total 2,610,285 0 0
Baseline Landfill Improvements III
Solid Waste Disposal 3,077,750 0 0
Project Total 3,077,750 0 0
Baseline LF New Recycling Center
Solid Waste Recycling 0 1,800,000 0
Project Total 0 1,800,000 0
Baseline Scale Complex Improvements
Solid Waste Disposal 120,000 0 0
Project Total 120,000 0 0
Baseline Transfer Station Improvements
Solid Waste Disposal 684,121 0 0
Project Total 684,121 0 0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
17,500,000
17,500,000
0
0
0
0
0
0
0
0
1,800,000
1,800,000
0
0
0
0
42
Marion <;~11ntJ
Marion County Board of County CommissionersProposed Capital Improvement Program
Summary: Expenditure Category / Project / Cost CenterFiscal Years 2021 thru 2025
Category / Project / Appropriated Five Year Cost Center To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Solid Waste Disposal Citizen Drop Off Facility Baseline
Solid Waste Disposal 3,163,726 0 0 0 0 0 0
Project Total 3,163,726 0 0 0 0 0 0
Davis Landfill
Solid Waste Disposal 2,527,251 0 0 0 0 0 0
Project Total 2,527,251 0 0 0 0 0 0
Davis Potable Water System
Solid Waste Disposal 3,554,098 0 0 0 0 0 0
Project Total 3,554,098 0 0 0 0 0 0
Hazard Mitigation Generators
Solid Waste Recycling 240,000 0 0 0 0 0 0
Project Total 240,000 0 0 0 0 0 0
Inbound Scale With Automation Design
Solid Waste Disposal 0 200,000 0 0 0 0 200,000
Project Total 0 200,000 0 0 0 0 200,000
Martel Landfill
Solid Waste Disposal 1,673,011 0 0 0 0 0 0
Project Total 1,673,011 0 0 0 0 0 0
Newton Contamination Remediation
Solid Waste Disposal 585,000 0 0 0 0 0 0
Project Total 585,000 0 0 0 0 0 0
Recycling Centers Improvements
Solid Waste Recycling 1,710,000 300,000 0 0 0 0 300,000
Project Total 1,710,000 300,000 0 0 0 0 300,000
Single Stream Recycling
Solid Waste Disposal 380,500 0 0 0 0 0 0
Project Total 380,500 0 0 0 0 0 0
Solid Waste Animal Svc Master Plan
Solid Waste Disposal 157,909 0 0 0 0 0 0
Project Total 157,909 0 0 0 0 0 0
Total Solid Waste 25,571,621 19,800,000 0 0 0 0 19,800,000 Disposal
43
Marion <;~11ntJ
Marion County Board of County CommissionersProposed Capital Improvement Program
Summary: Expenditure Category / Project / Cost CenterFiscal Years 2021 thru 2025
Category / Project / Appropriated Five Year Cost Center To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Stormwater Country Gardens Flood Relief HMGP
Stormwater Program 0 566,060 0 0 0 0 566,060
Project Total 0 566,060 0 0 0 0 566,060
Country Gardens SWRF CP 59
Stormwater Program 0 227,250 0 0 0 0 227,250
Project Total 0 227,250 0 0 0 0 227,250
NW 115th Ct Flood Relief HMGP
Stormwater Program 0 1,091,125 0 0 0 0 1,091,125
Project Total 0 1,091,125 0 0 0 0 1,091,125
RS 5th Replat Innov SWRF CP 74
Stormwater Program 0 0 435,750 0 0 0 435,750
Project Total 0 0 435,750 0 0 0 435,750
SSS 23 Innov SWRF CP 75
Stormwater Program 0 0 972,300 0 0 0 972,300
Project Total 0 0 972,300 0 0 0 972,300
SSS Unit 68 Innov SWRF CP 79
Stormwater Program 0 899,850 0 0 0 0 899,850
Project Total 0 899,850 0 0 0 0 899,850
Stanton-Weirsdale Drainage Project
Stormwater Program 0 120,000 0 0 0 0 120,000
Project Total 0 120,000 0 0 0 0 120,000
SW 27th Ave Flood Relief HMGP
Stormwater Program 0 1,875,236 0 0 0 0 1,875,236
Project Total 0 1,875,236 0 0 0 0 1,875,236
SW 52nd St Flood Relief HMGP
Stormwater Program 0 528,836 0 0 0 0 528,836
Project Total 0 528,836 0 0 0 0 528,836
Timucuan Rd and Lake Weir Culvert Imprv
Stormwater Program 0 250,000 0 0 0 0 250,000
Project Total 0 250,000 0 0 0 0 250,000
Total Stormwater 0 5,558,357 1,408,050 0 0 0 6,966,407
44
Marion <;~11ntJ
Marion County Board of County CommissionersProposed Capital Improvement Program
Summary: Expenditure Category / Project / Cost CenterFiscal Years 2021 thru 2025
Category / Project / Appropriated Five Year Cost Center To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Transportation Services CR 484 Infrast Srtx
Infrastructure Tax Transportation
8,900,000 0 0 0 0 0 0
Project Total 8,900,000 0 0 0 0 0 0
Emerald Road Extension Infrast Srtx
Infrastructure Tax Transportation
409,622 0 0 0 0 0 0
Project Total 409,622 0 0 0 0 0 0
NE Hwy 315 Infrast Srtx
Infrastructure Tax Transportation
5,074,391 0 0 0 0 0 0
Project Total 5,074,391 0 0 0 0 0 0
NW 49th 35th St Ph 2B Infrast Srtx
Infrastructure Tax Transportation
14,875,000 0 0 0 0 0 0
Project Total 14,875,000 0 0 0 0 0 0
NW 49th 35th St Ph 2C Infrast Srtx
Infrastructure Tax Transportation
6,855,462 5,700,000 0 0 0 0 5,700,000
Project Total 6,855,462 5,700,000 0 0 0 0 5,700,000
NW 70th Ave At Us 27 Infrast Srtx
Infrastructure Tax Transportation
6,710,000 0 0 0 0 0 0
Project Total 6,710,000 0 0 0 0 0 0
NW 80th 70th Avenue Infrast Srtx
Infrastructure Tax Transportation
2,297,963 0 0 0 0 0 0
Project Total 2,297,963 0 0 0 0 0 0
NW 80th Ave At Sr 40 Infrast Srtx
Infrastructure Tax Transportation
5,350,000 0 0 0 0 0 0
Project Total 5,350,000 0 0 0 0 0 0
S 182nd Avenue Rd Infrast Srtx
Infrastructure Tax Transportation
3,111,089 0 0 0 0 0 0
Project Total 3,111,089 0 0 0 0 0 0
45
Marion <;~11ntJ
Marion County Board of County CommissionersProposed Capital Improvement Program
Summary: Expenditure Category / Project / Cost CenterFiscal Years 2021 thru 2025
Category / Project / Appropriated Five Year Cost Center To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Transportation Services S Hwy 314A Infrast Srtx
Infrastructure Tax 3,300,000 0 0 0 0 0 0 Transportation
Project Total 3,300,000 0 0 0 0 0 0
SW 38th Avenue Infrast Srtx
Infrastructure Tax 813,395 0 0 0 0 0 0 Transportation
Project Total 813,395 0 0 0 0 0 0
SW 49th 40th Ave Ph1 Infrast Srtx
Infrastructure Tax 1,750,000 4,626,907 0 0 0 0 4,626,907 Transportation
Project Total 1,750,000 4,626,907 0 0 0 0 4,626,907
SW 49th 40th Ave Ph1A Infrast Srtx
Infrastructure Tax 947,448 0 0 0 0 0 0 Transportation
Project Total 947,448 0 0 0 0 0 0
SW 49th 40th Ave Ph2 Infrast Srtx
Infrastructure Tax 2,953,000 0 0 0 0 0 0 Transportation
Project Total 2,953,000 0 0 0 0 0 0
SW 49th 40th Ave Ph3 Infrast Srtx
Infrastructure Tax 2,487,448 0 0 0 0 0 0 Transportation
Project Total 2,487,448 0 0 0 0 0 0
SW 49th Ave South Seg A Infrst Srtx
Infrastructure Tax 3,000,000 4,700,000 0 0 0 0 4,700,000 Transportation
Project Total 3,000,000 4,700,000 0 0 0 0 4,700,000
SW 49th Ave South Seg E Infrst Srtx
Infrastructure Tax 3,360,000 0 0 0 0 0 0 Transportation
Project Total 3,360,000 0 0 0 0 0 0
Total Transportation 72,194,818 15,026,907 0 0 0 0 15,026,907 Services
46
Marion <;~11ntJ
Marion County Board of County CommissionersProposed Capital Improvement Program
Summary: Expenditure Category / Project / Cost CenterFiscal Years 2021 thru 2025
Category / Project / Appropriated Five Year Cost Center To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Utilities Automated Meter Reading
Utilities Capital Constructruction
7,650,310 450,000 0 0 0 0 450,000
Project Total 7,650,310 450,000 0 0 0 0 450,000
Computerized Maint Management System
Utilities Capital 522,231 Constructruction
0 0 0 0 0 0
Project Total 522,231 0 0 0 0 0 0
CR484 At I75 Utility Reconstruction
Utilities Capital 300,000 Constructruction
0 0 0 0 0 0
Project Total 300,000 0 0 0 0 0 0
Florida Commerce Commercial Park
Utilities Capital Constructruction
1,603,167 0 0 0 0 0 0
Project Total 1,603,167 0 0 0 0 0 0
Florida Horse Park Sewer Connection
Utilities Capital Constructruction
1,296,553 0 0 0 0 0 0
Project Total 1,296,553 0 0 0 0 0 0
Golden Ocala Wastewater Treatment
Utilities Capital Constructruction
16,000,000 0 0 0 0 0 0
Project Total 16,000,000 0 0 0 0 0 0
Lift Station And Sewer Mains
Utilities Capital Constructruction
13,527,651 2,585,000 0 0 0 0 2,585,000
Project Total 13,527,651 2,585,000 0 0 0 0 2,585,000
Master Wastewater Feasibility Study
Utilities Capital 500,000 Constructruction
0 0 0 0 0 0
Project Total 500,000 0 0 0 0 0 0
Ocala Crossing South Pud Utility Improvement
Utilities Capital 2,101,103 Constructruction
0 0 0 0 0 0
Project Total 2,101,103 0 0 0 0 0 0
47
Marion <;~11ntJ
Marion County Board of County CommissionersProposed Capital Improvement Program
Summary: Expenditure Category / Project / Cost CenterFiscal Years 2021 thru 2025
Category / Project / Appropriated Five Year Cost Center To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Utilities Reclaimed Water Stations And Mains
Utilities Capital Constructruction
5,432,054 0 0 0 0 0 0
Project Total 5,432,054 0 0 0 0 0 0
Relocations Due To Construction
Utilities Capital Constructruction
1,878,032 200,000 0 0 0 0 200,000
Project Total 1,878,032 200,000 0 0 0 0 200,000
SE 108th Water Main Interconnect
Utilities Capital Constructruction
1,496,382 0 0 0 0 0 0
Project Total 1,496,382 0 0 0 0 0 0
Silver Springs Shores Wastewater
Utilities Capital 9,730,990 Constructruction
0 0 0 0 0 0
Project Total 9,730,990 0 0 0 0 0 0
Smart Water Software Integration
Utilities Capital 2,357,407 Constructruction
0 0 0 0 0 0
Project Total 2,357,407 0 0 0 0 0 0
Toilet Rebate Minor Capital Replacement
Utilities Capital 319,228 Constructruction
0 0 0 0 0 0
Project Total 319,228 0 0 0 0 0 0
Utilities Customer Service Building Renovation
Utilities Capital 395,820 Constructruction
0 0 0 0 0 0
Project Total 395,820 0 0 0 0 0 0
Utility Acquisitions
Utilities Capital Constructruction
300,000 100,000 0 0 0 0 100,000
Project Total 300,000 100,000 0 0 0 0 100,000
Wastewater Treatment Plant Improvements
Utilities Capital 13,620,044 Constructruction
300,000 0 0 0 0 300,000
Project Total 13,620,044 300,000 0 0 0 0 300,000
48
Marion <;~11ntJ
Marion County Board of County CommissionersProposed Capital Improvement Program
Summary: Expenditure Category / Project / Cost CenterFiscal Years 2021 thru 2025
Category / Project / Appropriated Five Year Cost Center To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Utilities Water Mains And Fire Hydrants
Utilities Capital 21,076,668 Constructruction
Project Total 21,076,668
Water Treatment Plant Improvements
Utilities Capital 7,547,322 Constructruction
Project Total 7,547,322
Total Utilities 107,654,962
Total - All Categories 291,823,333
3,250,000
3,250,000
1,350,000
1,350,000
8,235,000
59,301,225
0
0
0
0
0
10,202,386
0 0
0 0
0 0
0 0
0 0
7,729,836 12,795,836
0
0
0
0
0
5,326,696
3,250,000
3,250,000
1,350,000
1,350,000
8,235,000
95,355,979
49
MARION COUNTY BOARD OF COUNTY COMMISSIONERS REVENUE & EXPENDITURE ACTUAL & PROJECTED THROUGH SEPTEMBER 30, 2020
Prepared by: Clerk of the Circuit Court & Comptroller- Budget Department
SURTAX CAPITAL PROJECTS FUND (ONE CENT LOCAL OPTION SALES TAX) Revenues Actual Total
Through Projected Through 2018-19 2019-20 2019-20
One Cent Local Option Sales Tax Proceeds $ 69,288,790 $ 69,288,790 Less: (Proceeds shared with Municipalities) (1,559,735) (1,559,735) Net Earnings on Investments 8,677,524 3,850 8,681,374
Total Revenues $ 76,406,579 $ 3,850 $ 76,410,429
Expenditures Rainbow Springs Governmental Complex - Buildings $ 268,276 - $ 268,276 Expanded Office Space - BCC Departments - Bldgs & Improv 925,124 - 925,124 Ocala National Bank Building - Buildings 139,223 - 139,223 Sheriff Sub-station West State Road 200 - Buildings 287,203 - 287,203 Sheriff Jail Expansion - Buildings 29,357,731 - 29,357,731 Southeastern Livestock Pavilion Parking - Improvements 715,580 - 715,580 Belleview Public Library - Land, Bld & Improv 2,727,264 - 2,727,264 Judicial Center - Buildings 19,730,971 - 19,730,971 Old Jury Assembly Room Renovations - Buildings 171,965 - 171,965 Clerk Annex (Renovation of SA Building) - Buildings 2,746,204 - 2,746,204 Growth Management Center - Land, Bld & Improv 3,546,797 - 3,546,797 Public Defender Renovation - Buildings 556,432 - 556,432 Integrated Phone Systems - Buildings 542,178 - 542,178 Re-roof Tax/Property Appraisers' Bldg - Buildings 300,445 - 300,445 Construct District Station in Ocklawaha - Land & Buildings 377,565 - 377,565 Kennel Wings E & F - Buildings 361,875 - 361,875 Lobby Expansion/Interior Renovations - Buildings 123,023 - 123,023 Southeastern Livestock Pavilion - Phase 2 - Buildings 982,649 - 982,649 Replace roof on SELP livestock/horse barn - Buildings 205,289 - 205,289 Dunnellon Public Library - Land & Buildings 1,724,177 - 1,724,177 Marion County Health Unit Parking - Improvements 138,013 138,013 Jail Maintenance Shop - Buildings 1,114,457 - 1,114,457 Kennel Roof & Drain Replacement - Buildings 80,993 - 80,993 Forest Public Library - Buildings 442,991 - 442,991 SOE Multi-Purpose Facility - Buildings 164,825 - 164,825 Sheriff's Communication Center - Buildings 4,045,698 - 4,045,698 800 MHz Radio System Expansion - Buildings 1,102,618 - 1,102,618 Re-roof Clerk's Office - Buildings 150,000 - 150,000 Refurbish Exterior of Clerk's Office - Buildings 59,030 - 59,030 Clerk's Chillwater System - Buildings 200,000 - 200,000 Air Conditioning System Replacements - Buildings 26,045 - 26,045 Library Energy Management System - Buildings 17,636 - 17,636 Facilities Management Storage Facility - Land & Buildings 165,158 - 165,158 Facilities - Renovation of Old Jail - Buildings 4,872 - 4,872 Baseline Communication Tower Modifications - Improvements 45,000 - 45,000 SELP - Roping Arena - Buildings 468,819 - 468,819 SELP - Galvanized Stalls - Buildings 8,142 - 8,142 Airport - T-Hangers - Buildings - 60,000 60,000 Public Defender Building Expansion - Buildings - 228,307 228,307 Transportation Projects - Improvements 1,655,916 - 1,655,916 NW 35th Street Corridor - Improvements 398,228 - 398,228 Wells Fargo - Land 18,873 - 18,873 Other Improvements - Buildings - 24,837 24,837
Total Expenditures $ 76,097,285 $ 313,144 $ 76,410,429 Fund Balance Fiscal Year End $ 309,294 $ - $ -
51
MARION COUNTY BOARD OF COUNTY COMMISSIONERS
REVENUE & EXPENDITURE ACTUAL & PROJECTED THROUGH SEPTEMBER 30, 2020
Prepared by: Clerk of the Circuit Court & Comptroller- Budget Department
INFRASTRUCTURE SURTAX CAPITAL PROJECTS FUND (ONE CENT LOCAL OPTION SALES TAX)
Revenues Actual Total
Through Projected Through
2018-19 2019-20 2019-20
Infrastructure Surtax Proceeds - Capital $ 107,439,251 $ 37,137,707 $ 144,576,958
Infrastructure Surtax Proceeds - Debt $ 1,600,000 $ 6,578,659 8,178,659
Installment Purchase 7,694,627 - 7,694,627
Net Earnings on Investments 1,675,217 1,153,715 2,828,932
Total Revenues $ 118,409,095 $ 44,870,081 $ 163,279,176
Expenditures Fire - Buildings $ 2,560,122 $ 696,675 $ 3,256,797 Fire - Machinery & Equipment 5,654,214 4,235,490 9,889,704 EMS - Buildings - 2,200,000 2,200,000 EMS - Machinery & Equipment 4,955,292 2,796,735 7,752,027 Emergency Communications - Buildings 231,999 1,140,199 1,372,198 Emergency Communications - Improvements - 1,750,000 1,750,000 Emergency Communications - Machinery & Equipment 9,094,238 235,677 9,329,915 Emergency Communications - Software - 48,000 48,000 Emerg Comm - Lease Purchase - Machinery & Equipment 1,600,000 6,583,014 8,183,014 Sheriff Jail - Machinery & Equipment 101,153 135,644 236,797 Sheriff Regular - Machinery & Equipment 843,049 478,225 1,321,274 Sheriff MSTU - Buildings 202,416 7,756,421 7,958,837 Sheriff MSTU - Improvements - 238,000 238,000 Sheriff MSTU - Machinery & Equipment 11,693,302 4,165,853 15,859,155 Transportation Projects - Land Acquisitions - ROW 6,850,461 13,930,001 20,780,462 Transportation Projects - Improvements 19,370,263 47,000,551 66,370,814
Total Expenditures $ 63,156,509 $ 93,390,485 $ 156,546,994
Fund Balance Fiscal Year End $ 55,252,586 $ 6,732,182 $ 6,732,182
52
MARION COUNTY BOARD OF COUNTY COMMISSIONERS GENERAL CAPITAL IMPROVEMENTS FUNDING ANALYSIS
Prepared by: Clerk of the Circuit Court & Comptroller - Budget Department
INFRASTRUCTURE SURTAX CAPITAL PROJECTS FUND
Expenditure Schedule - Infrastructure Surtax Capital Projects Fund
Fiscal Year 2020-21 2021-22 2022-23 2023-24 2024-25 All Years
Annual Capital Cost
Annual Price Level Adj. (1) Annual Cost -
Future Price Level
$ 21,217,773
0.0%
$ 21,217,773
$
$
-
2.0%
-
$
$
-
2.0%
-
$
$
-
2.0%
-
$
$
-
2.0%
-
$ 21,217,773
$ 21,217,773
Annual Debt Cost Capital Future Price Level
& Debt Service
$ -
$ 21,217,773
$
$
-
-
$
$
-
-
$
$
-
-
$
$
-
-
$ -
$ 21,217,773
Funding Schedule - Infrastructure Surtax Capital Projects Fund
Fiscal Year 2020-21 2021-22 2022-23 Available Proceeds -Beginning Balance $ 6,732,182 $ 377,973 $ 377,973 Projected Surtax Revenue -Capital 14,863,564 - -Projected Surtax Revenue -Debt - - -
Available Funds $ 21,595,746 $ 377,973 $ 377,973 (Less) Capital Future
Price Level & Debt Service (21,217,773) - -Available Proceeds -
Ending Balance $ 377,973 $ 377,973 $ 377,973
$
$
$
2023-24
377,973
-
-
377,973
-
377,973
$
$
$
2024-25
377,973
-
-
377,973
-
377,973
All Years
$ 6,732,182
14,863,564
-
$ 21,595,746
(21,217,773)
$ 377,973
(1) Judgmental Cost Factor representing assumed future price level increases for the costs of land, buildings, and improvements & equipment.
53
- ......... Marion S:~'¾nry
Marion County Board of County Commissioners Proposed Capital Improvement Program - Project Detail
Fiscal Years 2021-2025
Project:
Department:
CSC000001
Community Services
Title: Comm Svc Silver Spring Shores Infrastructure
Project Description
Construction of water and sewer infrastructure in Silver Springs Shores.
Project Funding and Costs
Funding Source(s) Appropriated By Fund and Object To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
General Fund CDBG Urban Entitlement 229,999 - - - - - 229,999
Funding Total 229,999 - - - - - 229,999
Expenditure(s) Appropriated By Object and Cost Center To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Grants and Aid CDBG Community Develop Block
Grant 229,999 - - - - - 229,999
Expenditure Total 229,999 - - - - - 229,999
54
- ......... Marion S:~'¾nry
Marion County Board of County Commissioners Proposed Capital Improvement Program - Project Detail
Fiscal Years 2021-2025
Project: CTC000001 Title: Courtroom Audio and Video Upgrade
Department: Court Administration
Project Description
The Marion County Judicial is in need of funding to update courtroom infrastructure to replace technology and equipment for Marion County citizens and litigants and meet ADA requirements in the locations where judicial hearings are being held. Changing technology requires proper planning of technology wiring and equipment, and electrical systems infrastructure.
Project Funding and Costs
Funding Source(s) Appropriated By Fund and Object To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
General Fund Operating Revenue - 225,336 179,336 165,836 165,836 144,696 881,040
Funding Total - 225,336 165,836 144,696 179,336 165,836 881,040
Expenditure(s) Appropriated By Object and Cost Center To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Buildings CIP Courthouse Capital - 156,336 157,336 149,336 149,336 132,336 744,680
Machinery and Equipment CIP
Courthouse Capital - 69,000 22,000 16,500 16,500 12,360 136,360
Expenditure Total - 225,336 165,836 144,696 179,336 165,836 881,040
55
- ......... Marion S:~'¾nry
Marion County Board of County Commissioners Proposed Capital Improvement Program - Project Detail
Fiscal Years 2021-2025
Project: ESC000001 Title: Enterprise Resource Planning Capital
Department: Information Technology
Project Description
Multi-phase project installing hardware and software across all BCC departments for the Enterprise Resource Planning (ERP) conversion.
Project Funding Sources and Expenditures
Appropriated Funding Source(s) To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
General Fund Home Program 116 - - - - - 116 Emergency Solutions 34 - - - - - 34 CDBG Urban Entitlement 355 - - - - - 355 NSP1 Program Income 246 - - - - - 246 Operating Revenue 3,198,466 189,064 - - - - 3,387,530
County Transportation Maintenance Fund
Operating Revenue 662,165 64,160 - - - - 726,325
Tourist Development Tax Operating Revenue 22,751 1,927 - - - - 24,678
Parks and Recreation Fees Fund
Operating Revenue 147,153 34,276 - - - - 181,429
Fire Rescue and EMS Fund Operating Revenue 290,094 23,754 - - - - 313,848
Stormwater Program Operating Revenue 35,840 2,239 - - - - 38,079
Building Safety Fund Operating Revenue 214,929 16,844 - - - - 231,773
Local Housing Assistance Trust Fund
SHIP Program 13,179 1,121 - - - - 14,300
Solid Waste Disposal Fund Operating Revenue 144,866 11,675 - - - - 156,541
Marion County Utility Fund Operating Revenue 919,775 73,755 - - - - 993,530
Insurance Fund
56
Funding Source(s) Appropriated
To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total Operating Revenue 59,747 40,099 35,000 - - - 134,846
Funding Total 5,709,716 458,914 35,000 - - - 6,203,630
Expenditure(s) Appropriated
To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Machinery and Equipment CIP
General Government Capital 1,126,774 - - - - - 1,126,774 Transportation Visitors And Convention
25,475 - - - - - 25,475
Bureau 1,259 - - - - - 1,259 Parks & Recreation Fees 5,105 - - - - - 5,105 Fire Rescue Services 22,747 - - - - - 22,747 Stormwater Program 1,652 - - - - - 1,652 Building Safety 3,173 - - - - - 3,173 State House Initiative
Partner 701 - - - - - 701 Solid Waste Disposal Utilities Capital
Constructruction
11,191
105,147
-
-
-
-
-
-
-
-
-
-
11,191
105,147 Risk And Benefit Services 3,089 - - - - - 3,089
Intangible Software CIP Community Develop Block
Grant 355 - - - - - 355 Home Investment
Partnership Neighborhood Stabiliz Pgrm
116 - - - - - 116
1 246 - - - - - 246 Emergency Solutions
Program 34 - - - - - 34 General Government Capital Transportation Visitors And Convention
2,071,692 636,690
189,064 64,160
--
--
--
--
2,260,756 700,850
Bureau 21,492 1,927 - - - - 23,419 Parks & Recreation Fees 142,048 34,276 - - - - 176,324 Fire Rescue Services 267,347 23,754 - - - - 291,101 Stormwater Program 34,188 2,239 - - - - 36,427 Building Safety State House Initiative
211,756 16,844 - - - - 228,600
Partner 12,478 1,121 - - - - 13,599 Solid Waste Disposal Utilities Capital
Construction
133,675
814,628
11,675
73,755
-
-
-
-
-
-
-
-
145,350
888,383 Risk And Benefit Services 56,658 40,099 35,000 - - - 131,757
Expenditure Total 5,709,716 458,914 35,000 - - - 6,203,630
57
- ......... Marion S:~'¾nry
Marion County Board of County Commissioners Proposed Capital Improvement Program - Project Detail
Fiscal Years 2021-2025
Project: FHC000003 Title: Facilities Health Dept Re Roof Building
Department: Facilities Management
Project Description
The Health Department roof is nearing the end of its useful life and requires replacement. The roof is 5 years past warranty and needs to be replaced.
Project Funding and Costs
Funding Source(s) Appropriated By Fund and Object To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
General Fund Operating Revenue 502,000 - - - - - 502,000
Funding Total 502,000 - - - - - 502,000
Expenditure(s) Appropriated By Object and Cost Center To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Buildings CIP Health Services Capital 502,000 - - - - - 502,000
Expenditure Total 502,000 - - - - - 502,000
58
- ......... Marion S:~'¾nry
Marion County Board of County Commissioners Proposed Capital Improvement Program - Project Detail
Fiscal Years 2021-2025
Project: FHC000004 Title: Health Dept Replace Heating Boilers
Department: Facilities Management
Project Description
Replacement of two heaters at the Health Department that are over 20 yrs. old, and parts are not readily available any longer.
Project Funding and Costs
Funding Source(s) Appropriated By Fund and Object To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
General Fund Operating Revenue - - 160,000 - - - 160,000
Funding Total - - 160,000 - - - 160,000
Expenditure(s) Appropriated By Object and Cost Center To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Buildings CIP Health Services Capital - - 160,000 - - - 160,000
Expenditure Total - - 160,000 - - - 160,000
59
- ......... Marion S:~'¾nry
Marion County Board of County Commissioners Proposed Capital Improvement Program - Project Detail
Fiscal Years 2021-2025
Project: FLC000001 Title: New Consolidated Fleet Facility
Department: Fleet Management
Project Description
This will be a new facility for Fleet Management. The new shop will be a single building encompassing all 4 shops to include our Fleet Administration Office and parts room. The new building will be 82,000 square feet with our administration office in the front, with 32 bays and a centralized parts room. Fleet Management is in need due to the age and size of our current facility. As our fleet grows and the demand of our citizens increase, Fleet Management is required to keep up with our service needs of all of our vehicles and equipment. This will also include our Fire Fleet, which continues to grow every year. Fleet Management has outgrown their current facility.
Project Funding and Costs
Funding Source(s) Appropriated By Fund and Object To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
General Fund Operating Revenue - - - 350,000 1,000,000 4,000,000 5,350,000
Funding Total - - 350,000 4,000,000 - 1,000,000 5,350,000
Expenditure(s) Appropriated By Object and Cost Center To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Buildings CIP Fleet Capital - - - 350,000 1,000,000 4,000,000 5,350,000
Expenditure Total - - - 350,000 1,000,000 4,000,000 5,350,000
60
- ......... Marion S:~'¾nry
Marion County Board of County Commissioners Proposed Capital Improvement Program - Project Detail
Fiscal Years 2021-2025
Project: FMC000002 Title: Fac Mgmt Energy Mgmt Control
Department: Facilities Management
Project Description
Upgrade to the Energy Management Control system
Project Funding and Costs
Funding Source(s) Appropriated By Fund and Object To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
General Fund Operating Revenue 100,000 - - - - - 100,000
Funding Total 100,000 - - - - - 100,000
Expenditure(s) Appropriated By Object and Cost Center To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Improvements CIP General Government Capital 100,000 - - - - - 100,000
Expenditure Total 100,000 - - - - - 100,000
61
- ......... Marion S:~'¾nry
Marion County Board of County Commissioners Proposed Capital Improvement Program - Project Detail
Fiscal Years 2021-2025
Project: FMC000003 Title: Fac Mgmt Fire Panel Upgrades
Department: Facilities Management
Project Description
Change out all of the older Fire Panels throughout the County owned buildings.
Project Funding and Costs
Funding Source(s) Appropriated By Fund and Object To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
General Fund Operating Revenue 150,000 - - - - - 150,000
Funding Total 150,000 - - - - - 150,000
Expenditure(s) Appropriated By Object and Cost Center To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Improvements CIP General Government Capital 150,000 - - - - - 150,000
Expenditure Total 150,000 - - - - - 150,000
62
- ......... Marion S:~'¾nry
Marion County Board of County Commissioners Proposed Capital Improvement Program - Project Detail
Fiscal Years 2021-2025
Project: FMC000009 Title: AC Upgrades for TC and PA
Department: Facilities Management
Project Description
The HVAC system at the Tax/Property Appraiser building is nearing 25 years of age and needs to be upgraded and replaced to improve serviceability and energy efficiency. This replacement is part of the strategic plan for energy savings and cost-effective maintenance.
Project Funding and Costs
Funding Source(s) Appropriated By Fund and Object To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
General Fund Operating Revenue 500,000 - - - - - 500,000
Funding Total 500,000 - - - - - 500,000
Expenditure(s) Appropriated By Object and Cost Center To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Buildings CIP General Government Capital 500,000 - - - - - 500,000
Expenditure Total 500,000 - - - - - 500,000
63
- ......... Marion S:~'¾nry
Marion County Board of County Commissioners Proposed Capital Improvement Program - Project Detail
Fiscal Years 2021-2025
Project:
Department:
FMC000014
Facilities Management
Title: Fac Mgmt Jail E and F Pod Shower Replacement
Project Description
Replace 7 showers in Jail Pods E & F. The existing tile showers are 28 years old and the tiles have begun to crack and become a safety hazard. This project is to remove the old tiles and replace them new higher grade tiles.
Project Funding and Costs
Funding Source(s) Appropriated By Fund and Object To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
General Fund Operating Revenue 245,000 - - - - - 245,000
Funding Total 245,000 - - - - - 245,000
Expenditure(s) Appropriated By Object and Cost Center To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Buildings CIP Jail Capital 245,000 - - - - - 245,000
Expenditure Total 245,000 - - - - - 245,000
64
- ......... Marion S:~'¾nry
Marion County Board of County Commissioners Proposed Capital Improvement Program - Project Detail
Fiscal Years 2021-2025
Project: FMC000016 Title: Fac Mgmt Jail Sliding Cell Doors
Department: Facilities Management
Project Description
Replace the sliding cell doors at the Sheriff's Jail. The existing sliding cell doors are 35 years old, and parts are no longer available.
Project Funding and Costs
Funding Source(s) Appropriated By Fund and Object To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
General Fund Operating Revenue 600,000 - - - - - 600,000
Funding Total 600,000 - - - - - 600,000
Expenditure(s) Appropriated By Object and Cost Center To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Improvements CIP Jail Capital 600,000 - - - - - 600,000
Expenditure Total 600,000 - - - - - 600,000
65
- ......... Marion S:~'¾nry
Marion County Board of County Commissioners Proposed Capital Improvement Program - Project Detail
Fiscal Years 2021-2025
Project: FMC000017 Title: MCSO Jail Infrastructure Improvement
Department: Facilities Management
Project Description
Replacing the Jail toilets with stainless steel for safety of inmates and staff.
Project Funding and Costs
Funding Source(s) Appropriated By Fund and Object To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
General Fund Operating Revenue - - - - 280,000 - 280,000
Funding Total - - - - 280,000 - 280,000
Expenditure(s) Appropriated By Object and Cost Center To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Improvements CIP Jail Capital - - - - 280,000 - 280,000
Expenditure Total - - - - 280,000 - 280,000
66
- ......... Marion S:~'¾nry
Marion County Board of County Commissioners Proposed Capital Improvement Program - Project Detail
Fiscal Years 2021-2025
Project: FMC000018 Title: JC1 Replacement Of Air Handler Unit
Department: Facilities Management
Project Description
Replace existing air handler units that have exceeded their life expectancy.
Project Funding and Costs
Funding Source(s) Appropriated By Fund and Object To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
General Fund Operating Revenue - 800,000 - - - - 800,000
Funding Total - 800,000 - - - - 800,000
Expenditure(s) Appropriated By Object and Cost Center To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Improvements CIP General Government Capital - 800,000 - - - - 800,000
Expenditure Total - 800,000 - - - - 800,000
67
- ......... Marion S:~'¾nry
Marion County Board of County Commissioners Proposed Capital Improvement Program - Project Detail
Fiscal Years 2021-2025
Project: FMC000019 Title: MCSO Jail Repl Dayroom Window
Department: Facilities Management
Project Description
Replace the day room window frames. The existing steel frames have rusted and have passed the point of repair. They need to be replaced with new stainless frames for security measures.
Project Funding and Costs
Funding Source(s) Appropriated By Fund and Object To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
General Fund Operating Revenue - 200,000 - - - - 200,000
Funding Total - 200,000 - - - - 200,000
Expenditure(s) Appropriated By Object and Cost Center To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Improvements CIP Jail Capital - 200,000 - - - - 200,000
Expenditure Total - 200,000 - - - - 200,000
68
- ......... Marion S:~'¾nry
Marion County Board of County Commissioners Proposed Capital Improvement Program - Project Detail
Fiscal Years 2021-2025
Project: FMC000020 Title: JC2 Replacement Of Air Handlers
Department: Facilities Management
Project Description
Replace the existing air handler units that have exceeded their life expectancy at JC2.
Project Funding and Costs
Funding Source(s) Appropriated By Fund and Object To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
General Fund Operating Revenue - - 1,450,000 - - - 1,450,000
Funding Total - - 1,450,000 - - - 1,450,000
Expenditure(s) Appropriated By Object and Cost Center To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Improvements CIP General Government Capital - - 1,450,000 - - - 1,450,000
Expenditure Total - - 1,450,000 - - - 1,450,000
69
- ......... Marion S:~'¾nry
Marion County Board of County Commissioners Proposed Capital Improvement Program - Project Detail
Fiscal Years 2021-2025
Project: FMC000021 Title: MC Jail Indoor Air Quality Improvement
Department: Facilities Management
Project Description
The original jail's ductwork is over 30 years old and is internally lined ductwork. The existing ductwork needs to be assessed for air quality improvements.
Project Funding and Costs
Funding Source(s) Appropriated By Fund and Object To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
General FundOperating Revenue - - - - - 400,000 400,000
Funding Total - - - - - 400,000 400,000
Expenditure(s) Appropriated By Object and Cost Center To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Buildings CIP Jail Capital - - - - - 400,000 400,000
Expenditure Total - - - - - 400,000 400,000
70
- ......... Marion S:~'¾nry
Marion County Board of County Commissioners Proposed Capital Improvement Program - Project Detail
Fiscal Years 2021-2025
Project: FMC000022 Title: JC Upgrade Elevators
Department: Facilities Management
Project Description
Required upgrade and rebuild of elevators at the Judicial Center.
Project Funding and Costs
Funding Source(s) Appropriated By Fund and Object To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
General Fund Operating Revenue 1,200,000 225,000 - - - - 1,425,000
Funding Total 1,200,000 225,000 - - - - 1,425,000
Expenditure(s) Appropriated By Object and Cost Center To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Buildings CIP Courthouse Capital 1,200,000 225,000 - - - - 1,425,000
Expenditure Total 1,200,000 225,000 - - - - 1,425,000
71
- ......... Marion S:~'¾nry
Marion County Board of County Commissioners Proposed Capital Improvement Program - Project Detail
Fiscal Years 2021-2025
Project: FMC000023 Title: Security Upgrades Judicial Center 1
Department: Facilities Management
Project Description
Security upgrade for ingress/egress and improvement of access control of the facility at the Judicial Center.
Project Funding and Costs
Funding Source(s) Appropriated By Fund and Object To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
General Fund Operating Revenue 300,000 - - - - - 300,000
Funding Total 300,000 - - - - - 300,000
Expenditure(s) Appropriated By Object and Cost Center To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Buildings CIP Courthouse Capital 300,000 - - - - - 300,000
Expenditure Total 300,000 - - - - - 300,000
72
- ......... Marion S:~'¾nry
Marion County Board of County Commissioners Proposed Capital Improvement Program - Project Detail
Fiscal Years 2021-2025
Project: FRC000007 Title: Fire EMC Ocala Central
Department: Fire Rescue Services
Project Description
To demo and construct a new building for MCFR's EMS Ocala Central location, which is located in Downtown Ocala next to the Post Office. MCFR uses this building as a station for EMS Ambulances to run out of within the city limits.
Project Funding and Costs
Funding Source(s) Appropriated By Fund and Object To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Infrastructure Surtax Capital Projects
Operating Revenue 2,200,000 1,020,000 - - - - 3,220,000
Funding Total 2,200,000 1,020,000 - - - - 3,220,000
Expenditure(s) Appropriated By Object and Cost Center To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Buildings CIP Infrastructure Tax Medical
Service 2,200,000 1,020,000 - - - - 3,220,000
Expenditure Total 2,200,000 1,020,000 - - - - 3,220,000
73
- ......... Marion S:~'¾nry
Marion County Board of County Commissioners Proposed Capital Improvement Program - Project Detail
Fiscal Years 2021-2025
Project:
Department:
FRC000009
Fire Rescue Services
Title: Fire Station 18 Foundation Piers
Foundation Piers for Fire Station #18.
Project Description
Project Funding and Costs
Funding Source(s) Appropriated By Fund and Object To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Infrastructure Surtax Capital Projects
Operating Revenue 410,000 - - - - - 410,000
Funding Total 410,000 - - - - - 410,000
Expenditure(s) Appropriated By Object and Cost Center To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Buildings CIP Infrastructure Tax Fire 410,000 - - - - - 410,000
Expenditure Total 410,000 - - - - - 410,000
74
- ......... Marion S:~'¾nry
Marion County Board of County Commissioners Proposed Capital Improvement Program - Project Detail
Fiscal Years 2021-2025
Project: FRC000010 Title: Fire Employee Wellness Center
Department: Facilities Management
Project Description
Marion County's Health Happens Wellness Program is implementing an initiative to develop and implement a Wellness Center where employees can go for educational classes, participate in physical activities and meet with the Health and Wellness Coordinator to promote preventative health care and healthy living. It has been determined that Fire Rescue is responsible for a portion of two walls to separate the area and a community shower for the Fire Rescue training facility. Staff from both Fire Rescue and EMS will be utilizing the area.The interior of the existing storage area of the Veterans Services Building will be remodeled for the Center. The space will be separated into three sections consisting of the Employee Wellness Center, Fire Rescue training facility and a storage area for Facilities Management. The construction of the project will be performed by the Facilities Management Department.
Project Funding and Costs
Funding Source(s) By Fund and Object
Appropriated To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
General Fund Operating Revenue 8,720 - - - - - 8,720
Fire Rescue and EMS Fund Operating Revenue 13,080 - - - - - 13,080
Funding Total 21,800 - - - - - 21,800
Expenditure(s) By Object and Cost Center
Appropriated To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Buildings CIP Emergency Medical
Services Capital Fire Rescue Services
8,720 13,080
--
--
--
--
--
8,720 13,080
Expenditure Total 21,800 - - - - - 21,800
75
- ......... Marion S:~'¾nry
Marion County Board of County Commissioners Proposed Capital Improvement Program - Project Detail
Fiscal Years 2021-2025
Project: FRC000011 Title: Installation of Direct Capture System
Department: Fire Rescue Services
Project Description
Installation of direct capture systems to eliminate diesel fuel exhaust fumes in fire stations. This is part of cancer prevention strategy focusing on employee health and wellness. Twelve stations were eligible for funding under the AFG grant with a 10% match funded from Sales Tax. Fire Rescue also has funding for five additional stations.
Project Funding and Costs
Funding Source(s) Appropriated By Fund and Object To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Fire Rescue and EMS Fund Firefighters Assistance 573,182 - - - - - 573,182 Operating Revenue 536,394 - - - - - 536,394
Infrastructure Surtax Capital Projects
Operating Revenue 290,000 - - - - - 290,000
Funding Total 1,399,576 - - - - - 1,399,576
Expenditure(s) Appropriated By Object and Cost Center To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Buildings CIP Fire Rescue Services 1,109,576 - - - - - 1,109,576 Infrastructure Tax Fire 290,000 - - - - - 290,000
Expenditure Total 1,399,576 - - - - - 1,399,576
76
- ......... Marion S:~'¾nry
Marion County Board of County Commissioners Proposed Capital Improvement Program - Project Detail
Fiscal Years 2021-2025
Project: FRC000012 Title: Fire Station 28 Rolling Greens
Department: Fire Rescue Services
Project Description
Construction of a three bay station utilizing the current fire station design plans. The current station was built in 1987 and an addition was added in 2000. It is necessary to replace the current station due to expiration of the land lease in 2017 and the owner has expressed no interest in renewing the agreement.
Project Funding and Costs
Funding Source(s) Appropriated By Fund and Object To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Fire Rescue Impact Fees Fund
Operating Revenue 204,794 - - - - - 204,794
Infrastructure Surtax Capital Projects
Operating Revenue 2,556,797 - - - - - 2,556,797
Funding Total 2,761,591 - - - - - 2,761,591
Expenditure(s) Appropriated By Object and Cost Center To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Land CIP Fire Rescue Impact Fee 86,385 - - - - - 86,385
Buildings CIP Fire Rescue Impact Fee 118,409 - - - - - 118,409 Infrastructure Tax Fire 2,556,797 - - - - - 2,556,797
Expenditure Total 2,761,591 - - - - - 2,761,591
77
- ......... Marion S:~'¾nry
Marion County Board of County Commissioners Proposed Capital Improvement Program - Project Detail
Fiscal Years 2021-2025
Project: FRC000013 Title: HVAC System Fire Station 1
Department: Facilities Management
Project Description
HVAC redesign and installation at Fire Station #1 in Anthony.
Project Funding and Costs
Funding Source(s) Appropriated By Fund and Object To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
General Fund Operating Revenue 135,000 - - - - - 135,000
Funding Total 135,000 - - - - - 135,000
Expenditure(s) Appropriated By Object and Cost Center To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Buildings CIP Emergency Medical
Services Capital 135,000 - - - - - 135,000
Expenditure Total 135,000 - - - - - 135,000
78
- ......... Marion S:~'¾nry
Marion County Board of County Commissioners Proposed Capital Improvement Program - Project Detail
Fiscal Years 2021-2025
Project: ITC000001 Title: Granicus Solution
Department: Information Technology
Project Description
The Granicus Solution project includes website redesign, new agenda system that includes high definition video and closed captioning.
Project Funding and Costs
Funding Source(s) Appropriated By Fund and Object To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
General Fund Operating Revenue 143,460 - - - - - 143,460
County Transportation Maintenance Fund
Operating Revenue 3,200 - - - - - 3,200
Dunnellon Airport Fund Operating Revenue 3,200 - - - - - 3,200
Marion County Utility Fund Operating Revenue 3,200 - - - - - 3,200
Funding Total 153,060 - - - - - 153,060
Expenditure(s) Appropriated By Object and Cost Center To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Machinery and Equipment CIP
General Government Capital 11,000 - - - - - 11,000
Intangible Software CIP General Government Capital 132,460 - - - - - 132,460 Transportation 3,200 - - - - - 3,200 Dunnellon Airport 3,200 - - - - - 3,200 Utilities Capital
Construction 3,200 - - - - - 3,200
Expenditure Total 153,060 - - - - - 153,060
79
- ......... Marion S:~'¾nry
Marion County Board of County Commissioners Proposed Capital Improvement Program - Project Detail
Fiscal Years 2021-2025
Project: LBC375013 Title: Freedom Public Library Expansion
Department: Public Library System
Project Description
Expanding Freedom Public Library by 24,000 square feet from the existing 8,100 square feet.
Project Funding and Costs
Funding Source(s) Appropriated By Fund and Object To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
General Fund Operating Revenue - - 250,000 3,600,000 2,620,000 - 6,470,000
Funding Total - - 250,000 3,600,000 2,620,000 - 6,470,000
Expenditure(s) Appropriated By Object and Cost Center To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Buildings CIP Library Capital - - 250,000 3,600,000 1,770,000 - 5,620,000
Machinery and Equipment CIP
Library Capital - - - - 850,000 - 850,000
Expenditure Total - - 250,000 3,600,000 2,620,000 - 6,470,000
80
- ......... Marion S:~'¾nry
Marion County Board of County Commissioners Proposed Capital Improvement Program - Project Detail
Fiscal Years 2021-2025
Project: LPC000002 Title: SELP Electric Water Sewer
Department: Southeast Livestock Pavilion
Project Description
Hook up the open arena for water, sewer and electric at the Livestock Pavilion.
Project Funding and Costs
Funding Source(s) Appropriated By Fund and Object To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
General Fund Operating Revenue 150,000 - - - - - 150,000
Funding Total 150,000 - - - - - 150,000
Expenditure(s) Appropriated By Object and Cost Center To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Improvements CIP Livestock Pavilion Capital 150,000 - - - - - 150,000
Expenditure Total 150,000 - - - - - 150,000
81
- ......... Marion S:~'¾nry
Marion County Board of County Commissioners Proposed Capital Improvement Program - Project Detail
Fiscal Years 2021-2025
Project: LPC000003 Title: SELP Fans In Back Arena
Department: Southeast Livestock Pavilion
Project Description
Purchase and install large barn fans to circulate air in the back open arena during events.
Project Funding and Costs
Funding Source(s) Appropriated By Fund and Object To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
General Fund Operating Revenue - - - 176,000 - - 176,000
Funding Total - - - 176,000 - - 176,000
Expenditure(s) Appropriated By Object and Cost Center To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Improvements CIP Livestock Pavilion Capital - - - 176,000 - - 176,000
Expenditure Total - - - 176,000 - - 176,000
82
- ......... Marion S:~'¾nry
Marion County Board of County Commissioners Proposed Capital Improvement Program - Project Detail
Fiscal Years 2021-2025
Project: LPC000004 Title: SELP Wash Rack For Back Arena
Department: Southeast Livestock Pavilion
Project Description
Construction of a new wash rack for the back open arena at the Livestock Pavilion.
Project Funding and Costs
Funding Source(s) Appropriated By Fund and Object To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
General Fund Operating Revenue - - - - - 200,000 200,000
Funding Total - - - - - 200,000 200,000
Expenditure(s) Appropriated By Object and Cost Center To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Improvements CIP Livestock Pavilion Capital - - - - - 200,000 200,000
Expenditure Total - - - - - 200,000 200,000
83
- ......... Marion S:~'¾nry
Marion County Board of County Commissioners Proposed Capital Improvement Program - Project Detail
Fiscal Years 2021-2025
Project: LPC000005 Title: SELP Repair Drainage On Wash Rack
Department: Southeast Livestock Pavilion
Project Description
Repair the water drainage from the wash racks on the west side of the barn.
Project Funding and Costs
Funding Source(s) Appropriated By Fund and Object To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
General Fund Operating Revenue 100,000 - - - - - 100,000
Funding Total 100,000 - - - - - 100,000
Expenditure(s) Appropriated By Object and Cost Center To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Improvements CIP Livestock Pavilion Capital 100,000 - - - - - 100,000
Expenditure Total 100,000 - - - - - 100,000
84
- ......... Marion S:~'¾nry
Marion County Board of County Commissioners Proposed Capital Improvement Program - Project Detail
Fiscal Years 2021-2025
Project: LPC000006 Title: SELP Phase 3
Department: Southeast Livestock Pavilion
Project Description
Southeastern Livestock Pavilion Phase 4 will continue to improve to the facility.
Project Funding and Costs
Funding Source(s) Appropriated By Fund and Object To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
General Fund Dept of Agriculture Livestock
Pavilion 3,671,768 - - - - - 3,671,768
Funding Total 3,671,768 - - - - - 3,671,768
Expenditure(s) Appropriated By Object and Cost Center To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Buildings CIP Livestock Pavilion Capital 3,671,768 - - - - - 3,671,768
Expenditure Total 3,671,768 - - - - - 3,671,768
85
- ......... Marion S:~'¾nry
Marion County Board of County Commissioners Proposed Capital Improvement Program - Project Detail
Fiscal Years 2021-2025
Project: LPC000010 Title: SELP Galvanized Stalls
Department: Southeast Livestock Pavilion
Project Description
Purchase 120 galvanized stalls for the Roping Arena. The stalls will be purchased in phases.
Project Funding and Costs
Funding Source(s) Appropriated By Fund and Object To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
General FundOperating Revenue 34,962 - - - - - 34,962
Surtax Capital Projects Operating Revenue 8,142 - - - - - 8,142
Funding Total 43,104 - - - - - 43,104
Expenditure(s) Appropriated By Object and Cost Center To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Buildings CIP Livestock Pavilion Capital 34,962 - - - - - 34,962 Surtax Capital Projects 8,142 - - - - - 8,142
Expenditure Total 43,104 - - - - - 43,104
86
- ......... Marion S:~'¾nry
Marion County Board of County Commissioners Proposed Capital Improvement Program - Project Detail
Fiscal Years 2021-2025
Project: LPC032720 Title: SELP Auditorium Av Upgrade
Department: Southeast Livestock Pavilion
Project Description
The AV system in the SELP auditorium has been an issue for many years. We hired a sound consultant to evaluate the sound and from the report we are taking corrective measure repair the A/V system.
Project Funding and Costs
Funding Source(s) Appropriated By Fund and Object To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
General Fund Operating Revenue - 327,750 - - - - 327,750
Funding Total - 327,750 - - - - 327,750
Expenditure(s) Appropriated By Object and Cost Center To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Buildings CIP Livestock Pavilion Capital - 327,750 - - - - 327,750
Expenditure Total - 327,750 - - - - 327,750
87
- ......... Marion S:~'¾nry
Marion County Board of County Commissioners Proposed Capital Improvement Program - Project Detail
Fiscal Years 2021-2025
Project: LPC202001 Title: SELP Back Arena Announcers Booth
Department: Southeast Livestock Pavilion
Project Description
The North Arena needs an announcer's booth with electricity and furnishings.
Project Funding and Costs
Funding Source(s) Appropriated By Fund and Object To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
General Fund Operating Revenue - - - 120,000 - - 120,000
Funding Total - - - 120,000 - - 120,000
Expenditure(s) Appropriated By Object and Cost Center To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Buildings CIP Livestock Pavilion Capital - - - 120,000 - - 120,000
Expenditure Total - - - 120,000 - - 120,000
88
- ......... Marion S:~'¾nry
Marion County Board of County Commissioners Proposed Capital Improvement Program - Project Detail
Fiscal Years 2021-2025
Project: LPC202002 Title: SELP Extension Auditorium Remodel
Department: Southeast Livestock Pavilion
Project Description
Replace and upgrade the A/V equipment in the auditorium. Repaint the outside of the building. Repair/upgrade the electrical to support new A/V system.
Project Funding and Costs
Funding Source(s) Appropriated By Fund and Object To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
General Fund Operating Revenue - 216,095 - - - - 216,095
Funding Total - 216,095 - - - - 216,095
Expenditure(s) Appropriated By Object and Cost Center To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Improvements CIP Livestock Pavilion Capital - 216,095 - - - - 216,095
Expenditure Total - 216,095 - - - - 216,095
89
- ......... Marion S:~'¾nry
Marion County Board of County Commissioners Proposed Capital Improvement Program - Project Detail
Fiscal Years 2021-2025
Project: LPC202003 Title: SELP Sales Arena Remodel
Department: Southeast Livestock Pavilion
Project Description
The ceiling needs to be raised to allow better sound quality and reduce moisture and the ceiling tiles need to be replaced. The restrooms are not currently ADA compliant. They need to be completely remodeled and brought up to code.
Project Funding and Costs
Funding Source(s) Appropriated By Fund and Object To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
General Fund Operating Revenue - - - 190,000 - - 190,000
Funding Total - - - 190,000 - - 190,000
Expenditure(s) Appropriated By Object and Cost Center To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Improvements CIP Livestock Pavilion Capital - - - 190,000 - - 190,000
Expenditure Total - - - 190,000 - - 190,000
90
- ......... Marion S:~'¾nry
Marion County Board of County Commissioners Proposed Capital Improvement Program - Project Detail
Fiscal Years 2021-2025
Project:
Department:
MAC000001
Airport - Dunnellon
Title: Airport Master Plan Update
Update of the Airport Master Plan.
Project Description
Project Funding and Costs
Funding Source(s) Appropriated By Fund and Object To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Dunnellon Airport Fund Federal Grant Dunnellon
Airport 270,000 - - - - - 270,000 State Grant Dunnellon
Airport 24,000 - - - - - 24,000 Operating Revenue 6,000 - - - - - 6,000
Funding Total 300,000 - - - - - 300,000
Expenditure(s) Appropriated By Object and Cost Center To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Improvements CIP Dunnellon Airport 300,000 - - - - - 300,000
Expenditure Total 300,000 - - - - - 300,000
91
- ......... Marion S:~'¾nry
Marion County Board of County Commissioners Proposed Capital Improvement Program - Project Detail
Fiscal Years 2021-2025
Project: MAC000005 Title: Design And Construct 20 T Hangars
Department: Airport - Dunnellon
Project Description
The new T hangars will replace the previous plan to construct quad boxes at the airport. The T hangars will be on an annual lease to the tenants and will increase the revenues on leases and fuel sales at the airport.
Project Funding and Costs
Funding Source(s) Appropriated By Fund and Object To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Dunnellon Airport Fund State Grant Dunnellon
Airport 719,368 - - - - - 719,368 Operating Revenue 312,643 - - - - - 312,643
Surtax Capital Projects Operating Revenue 60,000 - - - - - 60,000
Funding Total 1,092,011 - - - - - 1,092,011
Expenditure(s) Appropriated By Object and Cost Center To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Buildings CIP Dunnellon Airport 1,032,011 - - - - - 1,032,011 Surtax Capital Projects 60,000 - - - - - 60,000
Expenditure Total 1,092,011 - - - - - 1,092,011
92
- ......... Marion S:~'¾nry
Marion County Board of County Commissioners Proposed Capital Improvement Program - Project Detail
Fiscal Years 2021-2025
Project: MAC202001 Title: Fuel Farm Replacement
Department: Airport - Dunnellon
Project Description
Plan, design and replace existing fuel farm, consisting of two (2) 12,000 gallon fuel tanks; one (1) AvGas and one (1) JetA.
Project Funding Sources and Expenditures
Funding Source(s) Appropriated By Fund and Object To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Dunnellon Airport Fund State Grant Dunnellon
Airport - - - 600,000 - - 600,000 Operating Revenue - - - 150,000 - - 150,000
Funding Total - - - 750,000 - - 750,000
Expenditure(s) Appropriated By Object and Cost Center To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Machinery and Equipment CIP
Dunnellon Airport - - - 750,000 - - 750,000
Expenditure Total - - - 750,000 - - 750,000
93
- ......... Marion S:~'¾nry
Marion County Board of County Commissioners Proposed Capital Improvement Program - Project Detail
Fiscal Years 2021-2025
Project: MAC202002 Title: T-Hanger Construction
Department: Airport - Dunnellon
Project Description
Plan, design and build two buildings consisting of 20 T-Hangars for general aviation tenant rental units.
Project Funding Sources and Expenditures
Appropriated Funding Source(s) To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Dunnellon Airport Fund
State Grant Dunnellon Airport - - 1,120,000 - - - 1,120,000 Operating Revenue - - 280,000 - - - 280,000
Funding Total - - 1,400,000 - - - 1,400,000
Appropriated Expenditure(s) To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Buildings CIP
Dunnellon Airport - - 1,400,000 - - - 1,400,000
Expenditure Total - - 1,400,000 - - - 1,400,000
94
- ......... Marion S:~'¾nry
Marion County Board of County Commissioners Proposed Capital Improvement Program - Project Detail
Fiscal Years 2021-2025
Project: PCC000002 Title: Public Safety Comm Bunkhouse
Department: Fire - EMS
Project Description
Expand the physical structure of the Communication Center to create multi-purpose spaces for regular use that will convert into two or more bunk rooms with bathing & laundry facilities.
Project Funding and Costs
Funding Source(s) Appropriated By Fund and Object To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Infrastructure Surtax Capital Projects
Operating Revenue 666,117 - - - - - 666,117
Funding Total 666,117 - - - - - 666,117
Expenditure(s) Appropriated By Object and Cost Center To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Buildings CIP Infrastructure Tax Emerg
Comm 666,117 - - - - - 666,117
Expenditure Total 666,117 - - - - - 666,117
95
- ......... Marion S:~'¾nry
Marion County Board of County Commissioners Proposed Capital Improvement Program - Project Detail
Fiscal Years 2021-2025
Project: PCC000003 Title: Backup EOC
Department: Fire - EMS
Project Description
Create a backup Emergency Operation Center to use as a backup (or in addition) to the current EOC.
Project Funding and Costs
Funding Source(s) Appropriated By Fund and Object To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
General Fund Operating Revenue 112,000 - - - - - 112,000
Infrastructure Surtax Capital Projects
Operating Revenue 1,033,150 - - - - - 1,033,150
Funding Total 1,145,150 - - - - - 1,145,150
Expenditure(s) Appropriated By Object and Cost Center To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Buildings CIP General Government Capital 112,000 - - - - - 112,000 Infrastructure Tax Emerg
Comm 706,080 - - - - - 706,080
Machinery and Equipment CIP
Infrastructure Tax Emerg Comm 279,070 - - - - - 279,070
Intangible Software CIP Infrastructure Tax Emerg
Comm 48,000 - - - - - 48,000
Expenditure Total 1,145,150 - - - - - 1,145,150
96
- ......... Marion S:~'¾nry
Marion County Board of County Commissioners Proposed Capital Improvement Program - Project Detail
Fiscal Years 2021-2025
Project: PCC000004 Title: Work Station Replacement
Department: Fire - EMS
Project Description
Replace the workstations/computers in the Public Safety Communication Center.
Project Funding and Costs
Funding Source(s) Appropriated By Fund and Object To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Infrastructure Surtax Capital Projects
Operating Revenue 469,583 - - - - - 469,583
Funding Total 469,583 - - - - - 469,583
Expenditure(s) Appropriated By Object and Cost Center To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Machinery and Equipment CIP
Infrastructure Tax Emerg Comm 469,583 - - - - - 469,583
Expenditure Total 469,583 - - - - - 469,583
97
- ......... Marion S:~'¾nry
Marion County Board of County Commissioners Proposed Capital Improvement Program - Project Detail
Fiscal Years 2021-2025
Project: PCC000006 Title: 800MHz Tower Site Marion Oaks
Department: 911 Management
Project Description
Add a radio tower in the Marion Oaks area.
Project Funding and Costs
Funding Source(s) Appropriated By Fund and Object To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Infrastructure Surtax Capital Projects
Operating Revenue 600,000 - - - - - 600,000
Funding Total 600,000 - - - - - 600,000
Expenditure(s) Appropriated By Object and Cost Center To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Improvements CIP Infrastructure Tax Emerg
Comm 600,000 - - - - - 600,000
Expenditure Total 600,000 - - - - - 600,000
98
- ......... Marion S:~'¾nry
Marion County Board of County Commissioners Proposed Capital Improvement Program - Project Detail
Fiscal Years 2021-2025
Project: PCC000008 Title: 911 System Replacement
Department: 911 Management
Project Description
Replacement of the E9-1-1 System to include all Customer Premise Equipment (CPE), backroom controllers and emergency mapping system.
Project Funding and Costs
Funding Source(s) Appropriated By Fund and Object To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
911 Management Fund Operating Revenue 1,381,580 - - - - - 1,381,580
Funding Total 1,381,580 - - - - - 1,381,580
Expenditure(s) Appropriated By Object and Cost Center To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Machinery and Equipment CIP
9-1-1 Management 1,381,580 - - - - - 1,381,580
Expenditure Total 1,381,580 - - - - - 1,381,580
99
- ......... Marion S:~'¾nry
Marion County Board of County Commissioners Proposed Capital Improvement Program - Project Detail
Fiscal Years 2021-2025
Project: PCC000009 Title: EOC Radio DBA
Department: Fire - EMS
Project Description
Emergency Operations Center Radio
Project Funding and Costs
Funding Source(s) By Fund and Object
Appropriated To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Infrastructure Surtax Capital Projects
Operating Revenue 37,500 - - - - - 37,500
Funding Total 37,500 - - - - - 37,500
Expenditure(s) By Object and Cost Center
Appropriated To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Machinery and Equipment CIP
Infrastructure Tax Emerg Comm 37,500 - - - - - 37,500
Expenditure Total 37,500 - - - - - 37,500
100
- ......... Marion S:~'¾nry
Marion County Board of County Commissioners Proposed Capital Improvement Program - Project Detail
Fiscal Years 2021-2025
Project:
Department:
PCC000010
Fire - EMS
Title: CADD Computer Replacement
Public Communications CAD Replacement
Project Description
Project Funding and Costs
Funding Source(s) By Fund and Object
Appropriated To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Infrastructure Surtax Capital Projects
Operating Revenue 48,000 - - - - - 48,000
Funding Total 48,000 - - - - - 48,000
Expenditure(s) By Object and Cost Center
Appropriated To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Machinery and Equipment CIP
Infrastructure Tax Emerg Comm 48,000 - - - - - 48,000
Expenditure Total 48,000 - - - - - 48,000
101
- ......... Marion S:~'¾nry
Marion County Board of County Commissioners Proposed Capital Improvement Program - Project Detail
Fiscal Years 2021-2025
Project:
Department:
PCC000011
Fire - EMS
Title: Radio Master Control Site Relocation
Radio Master Control Site Relocations
Project Description
Project Funding and Costs
Funding Source(s) By Fund and Object
Appropriated To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Infrastructure Surtax Capital Projects
Operating Revenue 20,000 - - - - - 20,000
Funding Total 20,000 - - - - - 20,000
Expenditure(s) By Object and Cost Center
Appropriated To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Improvements CIP Infrastructure Tax Emerg
Comm 20,000 - - - - - 20,000
Expenditure Total 20,000 - - - - - 20,000
102
- ......... Marion S:~'¾nry
Marion County Board of County Commissioners Proposed Capital Improvement Program - Project Detail
Fiscal Years 2021-2025
Project:
Department:
PCC000012
Fire - EMS
Title: Radio GPS Tracker
Radio GPS Tracker
Project Description
Project Funding and Costs
Funding Source(s) Appropriated By Fund and Object To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Infrastructure Surtax Capital Projects
Operating Revenue - 200,000 - - - - 200,000
Funding Total - 200,000 - - - - 200,000
Expenditure(s) Appropriated By Object and Cost Center To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Machinery and Equipment CIP
Infrastructure Tax Emerg Comm - 200,000 - - - - 200,000
Expenditure Total - 200,000 - - - - 200,000
103
- ......... Marion S:~'¾nry
Marion County Board of County Commissioners Proposed Capital Improvement Program - Project Detail
Fiscal Years 2021-2025
Project:
Department:
PCC000013
Fire - EMS
Title: Radio Signal Aligner
Radio signal aligner
Project Description
Project Funding and Costs
Funding Source(s) By Fund and Object
Appropriated To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Infrastructure Surtax Capital Projects
Operating Revenue - 50,000 - - - - 50,000
Funding Total - 50,000 - - - - 50,000
Expenditure(s) By Object and Cost Center
Appropriated To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Machinery and Equipment CIP
Infrastructure Tax Emerg Comm - 50,000 - - - - 50,000
Expenditure Total - 50,000 - - - - 50,000
104
- ......... Marion S:~'¾nry
Marion County Board of County Commissioners Proposed Capital Improvement Program - Project Detail
Fiscal Years 2021-2025
Project: PCC000015 Title: Emergency Management Antenna
Department: Fire - EMS
Project Description
Replacement of NOAA Weather Transmitter System for Emergency Management.
Project Funding and Costs
Funding Source(s) By Fund and Object
Appropriated To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Infrastructure Surtax Capital Projects
Operating Revenue 50,000 - - - - - 50,000
Funding Total 50,000 - - - - - 50,000
Expenditure(s) By Object and Cost Center
Appropriated To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Improvements CIP Infrastructure Tax Emerg
Comm 50,000 - - - - - 50,000
Expenditure Total 50,000 - - - - - 50,000
105
- ......... Marion S:~'¾nry
Marion County Board of County Commissioners Proposed Capital Improvement Program - Project Detail
Fiscal Years 2021-2025
Project: PCC000016 Title: PSC Server Replacement
Department: Fire - EMS
Project Description
Replacement of end of life server per the IT Department.
Project Funding and Costs
Funding Source(s) By Fund and Object
Appropriated To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Infrastructure Surtax Capital Projects
Operating Revenue 24,000 - - - - - 24,000
Funding Total 24,000 - - - - - 24,000
Expenditure(s) By Object and Cost Center
Appropriated To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Machinery and Equipment CIP
Infrastructure Tax Emerg Comm 24,000 - - - - - 24,000
Expenditure Total 24,000 - - - - - 24,000
106
- ......... Marion S:~'¾nry
Marion County Board of County Commissioners Proposed Capital Improvement Program - Project Detail
Fiscal Years 2021-2025
Project: PCC000017 Title: Radio Systems Tower Repair
Department: Fire - EMS
Project Description
Structural analysis and repair of Radio System Towers.
Project Funding and Costs
Funding Source(s) By Fund and Object
Appropriated To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Infrastructure Surtax Capital Projects
Operating Revenue 80,000 - - - - - 80,000
Funding Total 80,000 - - - - - 80,000
Expenditure(s) By Object and Cost Center
Appropriated To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Improvements CIP Infrastructure Tax Emerg
Comm 80,000 - - - - - 80,000
Expenditure Total 80,000 - - - - - 80,000
107
- ......... Marion S:~'¾nry
Marion County Board of County Commissioners Proposed Capital Improvement Program - Project Detail
Fiscal Years 2021-2025
Project: PCC000018 Title: 800MHz System Infra Upgrade
Department: Fire - EMS
Project Description
The 800Mhz Radio system was constructed in 2005 and is currently transmitting data via predominately T-1 circuit connections, which at the time was the high capacity system. With the addition of several tower sites and increasing use of bandwidth, this older technology is no longer able to maintain the data transmission capacity needed and prevents expansion of the system. Further, the operational cost of the T-1 circuitry continues to increase, as fewer companies offer this, or maintain the lines and T-1 can be unstable under certain conditions. This project will allow the Marion County Radio System to upgrade to an Ether-net and fiber based data transmission system, enhancing the stability and capacity of the radio system.
Project Funding and Costs
Funding Source(s) By Fund and Object
Appropriated To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Infrastructure Surtax Capital Projects
Operating Revenue 1,000,000 - - - - - 1,000,000
Funding Total 1,000,000 - - - - - 1,000,000
Expenditure(s) By Object and Cost Center
Appropriated To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Improvements CIP Infrastructure Tax Emerg
Comm 1,000,000 - - - - - 1,000,000
Expenditure Total 1,000,000 - - - - - 1,000,000
108
- ......... Marion S:~'¾nry
Marion County Board of County Commissioners Proposed Capital Improvement Program - Project Detail
Fiscal Years 2021-2025
Project: PDC000001 Title: Public Defender Building Expansion
Department: Facilities Management
Project Description
The Public Defender has requested an expansion proposal in our yearly Capital Improvement Program since roughly 2008, based on county-funded personnel projection study performed in 2007. in our FY15-16 request, we revised our estimated growth. It is anticipated that over the next three (3) years our Marion County location could increase by fifteen (15) employees. Our current location is unable to absorb this growth, requiring an increase of space. One option to accommodate our anticipated growth would be to add an additional 10,000 square feet to our current Public Defender building. located at 204 NW 3rd Avenue in Ocala, FL. The current Public Defender building is 13,000 square feet, with the requested addition bringing it to 23,000 square feet.
Project Funding and Costs
Funding Source(s) By Fund and Object
Appropriated To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
General Fund Operating Revenue 1,819,693 - - - - - 1,819,693
Surtax Capital Projects Operating Revenue 228,307 - - - - - 228,307
Funding Total 2,048,000 - - - - - 2,048,000
Expenditure(s) By Object and Cost Center
Appropriated To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Buildings CIP Courthouse Capital Surtax Capital Projects
1,819,693 228,307
--
--
--
--
--
1,819,693 228,307
Expenditure Total 2,048,000 - - - - - 2,048,000
109
- ......... Marion S:~'¾nry
Marion County Board of County Commissioners Proposed Capital Improvement Program - Project Detail
Fiscal Years 2021-2025
Project: PRC000003 Title: Blue Run Restroom
Department: Parks and Recreation
Project Description
Construction and installation of a restroom at Blue Run of Dunnellon
Project Funding and Costs
Funding Source(s) Appropriated By Fund and Object To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
General Fund Fla Rec Dev Assist Prog 150,000 - - - - - 150,000
Parks and Recreation Fees Fund
Operating Revenue 150,000 - - - - - 150,000
Funding Total 300,000 - - - - - 300,000
Expenditure(s) Appropriated By Object and Cost Center To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Improvements CIP Other Recreation Programs 150,000 - - - - - 150,000 Parks & Recreation Fees 150,000 - - - - - 150,000
Expenditure Total 300,000 - - - - - 300,000
110
- ......... Marion S:~'¾nry
Marion County Board of County Commissioners Proposed Capital Improvement Program - Project Detail
Fiscal Years 2021-2025
Project: PRC000005 Title: Little Lake Weir Bulkhead Improvements
Department: Parks and Recreation
Project Description
Little Lake Weir swim area bulkhead and stabilization improvements. Design and Permitting in FY 18 ($15K) with construction in FY19 ($130K)
Project Funding and Costs
Funding Source(s) Appropriated By Fund and Object To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Parks and Recreation Fees Fund
Operating Revenue 145,000 - - - - - 145,000
Funding Total 145,000 - - - - - 145,000
Expenditure(s) Appropriated By Object and Cost Center To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Improvements CIP Parks & Recreation Fees 145,000 - - - - - 145,000
Expenditure Total 145,000 - - - - - 145,000
111
- ......... Marion S:~'¾nry
Marion County Board of County Commissioners Proposed Capital Improvement Program - Project Detail
Fiscal Years 2021-2025
Project: PRC000007 Title: Wrigley Batting Cages
Department: Parks and Recreation
Project Description
Construction of a new Batting Cage at Wrigley Fields to enhance the ball park.
Project Funding and Costs
Funding Source(s) Appropriated By Fund and Object To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Parks and Recreation Fees Fund
Operating Revenue 163,925 - - - - - 163,925
Funding Total 163,925 - - - - - 163,925
Expenditure(s) Appropriated By Object and Cost Center To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Buildings CIP Parks & Recreation Fees 163,925 - - - - - 163,925
Expenditure Total 163,925 - - - - - 163,925
112
- ......... Marion S:~'¾nry
Marion County Board of County Commissioners Proposed Capital Improvement Program - Project Detail
Fiscal Years 2021-2025
Project: PRC000009 Title: Shocker Park Improvements
Department: Parks and Recreation
Project Description
Make improvements at Shocker Park to include new scoreboards, replacing the bleachers and the addition of trees within the park.
Project Funding and Costs
Funding Source(s) Appropriated By Fund and Object To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
General Fund Fla Rec Dev Assist Prog 200,000 - - - - - 200,000
Parks and Recreation Fees Fund
Operating Revenue 125,000 - - - - - 125,000
Funding Total 325,000 - - - - - 325,000
Expenditure(s) Appropriated By Object and Cost Center To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Improvements CIP Other Recreation Programs 200,000 - - - - - 200,000 Parks & Recreation Fees 125,000 - - - - - 125,000
Expenditure Total 325,000 - - - - - 325,000
113
- ......... Marion S:~'¾nry
Marion County Board of County Commissioners Proposed Capital Improvement Program - Project Detail
Fiscal Years 2021-2025
Project: PRC000010 Title: Shocker Park Restrooms Upper Field
Department: Parks and Recreation
Project Description
Construction of bathrooms at Shocker Park on the upper field
Project Funding and Costs
Funding Source(s) Appropriated By Fund and Object To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Parks and Recreation Fees Fund
Operating Revenue 200,000 - - - - - 200,000
Funding Total 200,000 - - - - - 200,000
Expenditure(s) Appropriated By Object and Cost Center To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Buildings CIP Parks & Recreation Fees 200,000 - - - - - 200,000
Expenditure Total 200,000 - - - - - 200,000
114
- ......... Marion S:~'¾nry
Marion County Board of County Commissioners Proposed Capital Improvement Program - Project Detail
Fiscal Years 2021-2025
Project: PRC000017 Title: Ray Wayside Park Improvements
Department: Parks and Recreation
Project Description
Make improvements at Ray Wayside Park to include the construction of a pavilion near the kayak / canoe launch, replace the kayak / canoe launch, even out the boat ramp, add floating dock, addition of sidewalks, hide the irrigation pump station, repaving, restroom facilities improvements and add an ADA fishing platform.
Project Funding and Costs
Funding Source(s) By Fund and Object
Parks and Recreation Fees Fund
Operating Revenue
Infrastructure Surtax Capital Projects
Appropriated To Date
50,000
FY 2021
-
FY 2022
-
FY 2023
-
FY 2024
-
FY 2025
-
Total
50,000
Funding Total 50,000 - - - - - 50,000
Expenditure(s) By Object and Cost Center
Improvements CIP Parks & Recreation Fees
Appropriated To Date
50,000
FY 2021
-
FY 2022
-
FY 2023
-
FY 2024
-
FY 2025
-
Total
50,000
Expenditure Total 50,000 - - - - - 50,000
115
- ......... Marion S:~'¾nry
Marion County Board of County Commissioners Proposed Capital Improvement Program - Project Detail
Fiscal Years 2021-2025
Project: PRC000031 Title: Heagy Burry Boat Ramp
Department: Parks and Recreation
Project Description
Improvements to include installation of a two person capacity restroom, shoreline stabilization and additional parking. Site design to be completed by Parks. The Florida Fish and Wildlife Conservation Commission (FWC) has expressed interest in funding the replacement of the steep, single-lane boat ramp with a double ramp, shoreline stablization and courtesy dock and assisting where possible in all phases of park improvement.
Project Funding and Costs
Funding Source(s) Appropriated By Fund and Object To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
General Fund Florida Boater Improvement
Program 80,920 - - - - - 80,920
Parks and Recreation Fees Fund
Operating Revenue 636,477 - - - - - 636,477
Parks Capital Project Fund Operating Revenue 272,925 - - - - - 272,925
Funding Total 990,322 - - - - - 990,322
Expenditure(s) Appropriated By Object and Cost Center To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Buildings CIP Parks & Land Acq Capital 100,000 - - - - - 100,000
Improvements CIP Other Recreation Programs 80,920 - - - - - 80,920 Parks & Recreation Fees 636,477 - - - - - 636,477 Parks & Land Acq Capital 172,925 - - - - - 172,925
Expenditure Total 990,322 - - - - - 990,322
116
- ......... Marion S:~'¾nry
Marion County Board of County Commissioners Proposed Capital Improvement Program - Project Detail
Fiscal Years 2021-2025
Project: PRC000032 Title: Ray Wayside Park
Department: Parks and Recreation
Project Description
Project management, design, permitting, and construction of improvements to the boat docking and loading facilities and renovation/replacement of boat ramps and restrooms. Site design, floating docks and wood construction details to be completed by Parks.
Project Funding and Costs
Funding Source(s) Appropriated By Fund and Object To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
General Fund Florida Boater Improvement
Program 289,801 - - - - - 289,801
Parks and Recreation Fees Fund
Operating Revenue 100,000 - - - - - 100,000
Funding Total 389,801 - - - - - 389,801
Expenditure(s) Appropriated By Object and Cost Center To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Improvements CIP Other Recreation Programs 289,801 - - - - - 289,801 Parks & Recreation Fees 100,000 - - - - - 100,000
Expenditure Total 389,801 - - - - - 389,801
117
- ......... Marion S:~'¾nry
Marion County Board of County Commissioners Proposed Capital Improvement Program - Project Detail
Fiscal Years 2021-2025
Project:
Department:
PRC202001
Parks and Recreation
Title: Salt Springs Civic Park Restroom
Construct restroom at Salt Springs Civic Park.
Project Description
Project Funding and Costs
Funding Source(s) Appropriated By Fund and Object To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Parks and Recreation Fees Fund
Operating Revenue - - 150,000 - - - 150,000
Funding Total - - 150,000 - - - 150,000
Expenditure(s) Appropriated By Object and Cost Center To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Buildings CIP Parks & Recreation Fees - - 150,000 - - - 150,000
Expenditure Total - - 150,000 - - - 150,000
118
- ......... Marion S:~'¾nry
Marion County Board of County Commissioners Proposed Capital Improvement Program - Project Detail
Fiscal Years 2021-2025
Project: PRC202002 Title: Gores Landing Improvements
Department: Parks and Recreation
Project Description
Design and permit for capital improvements. Construct new restroom and shower house.
Project Funding and Costs
Funding Source(s) Appropriated By Fund and Object To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Parks and Recreation Fees Fund
Operating Revenue - - 800,000 - - - 800,000
Funding Total - - 800,000 - - - 800,000
Expenditure(s) Appropriated By Object and Cost Center To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Buildings CIP Parks & Recreation Fees - - 400,000 - - - 400,000
Improvements CIP Parks & Recreation Fees - - 400,000 - - - 400,000
Expenditure Total - - 800,000 - - - 800,000
119
- ......... Marion S:~'¾nry
Marion County Board of County Commissioners Proposed Capital Improvement Program - Project Detail
Fiscal Years 2021-2025
Project:
Department:
PRC202003
Parks and Recreation
Title: North Shop Extension
Extension of existing North District shop.
Project Description
Project Funding and Costs
Funding Source(s) Appropriated By Fund and Object To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Parks and Recreation Fees Fund
Operating Revenue - - 155,000 - - - 155,000
Funding Total - - 155,000 - - - 155,000
Expenditure(s) Appropriated By Object and Cost Center To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Improvements CIP Parks & Recreation Fees - - 155,000 - - - 155,000
Expenditure Total - - 155,000 - - - 155,000
120
- ......... Marion S:~'¾nry
Marion County Board of County Commissioners Proposed Capital Improvement Program - Project Detail
Fiscal Years 2021-2025
Project: PRC202004 Title: Central Shop Extension and Restroom
Department: Parks and Recreation
Project Description
Extension of existing shop and installation of restroom.
Project Funding and Costs
Funding Source(s) Appropriated By Fund and Object To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Parks and Recreation Fees Fund
Operating Revenue - - 280,000 - - - 280,000
Funding Total - - 280,000 - - - 280,000
Expenditure(s) Appropriated By Object and Cost Center To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Improvements CIP Parks & Recreation Fees - - 280,000 - - - 280,000
Expenditure Total - - 280,000 - - - 280,000
121
- ......... Marion S:~'¾nry
Marion County Board of County Commissioners Proposed Capital Improvement Program - Project Detail
Fiscal Years 2021-2025
Project: PRC202005 Title: Belleview Sportsplex Phase I
Department: Parks and Recreation
Project Description
Refurbish basketball courts; parking/vehicular circulation improvements; ball field complex improvements; tennis courts, landscape budget.
Project Funding and Costs
Funding Source(s) Appropriated By Fund and Object To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Parks and Recreation Fees Fund
Operating Revenue - - - - 4,560,000 - 4,560,000
Funding Total - - - - 4,560,000 - 4,560,000
Expenditure(s) Appropriated By Object and Cost Center To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Buildings CIP Parks & Recreation Fees - - - - 1,000,000 - 1,000,000
Improvements CIP Parks & Recreation Fees - - - - 3,560,000 - 3,560,000
Expenditure Total - - - - 4,560,000 - 4,560,000
122
- ......... Marion S:~'¾nry
Marion County Board of County Commissioners Proposed Capital Improvement Program - Project Detail
Fiscal Years 2021-2025
Project: PRC202006 Title: Ray Wayside Site Improvements
Department: Parks and Recreation
Project Description
Park improvements to include: boat ramp, kayak and canoe launch, new pavilion, additional sidewalks, floating dock, ADA fishing platform, paving and restroom improvements.
Project Funding and Costs
Funding Source(s) Appropriated By Fund and Object To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Parks and Recreation Fees Fund
Operating Revenue - - 460,000 - - - 460,000
Funding Total - - 460,000 - - - 460,000
Expenditure(s) Appropriated By Object and Cost Center To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Improvements CIP Parks & Recreation Fees - - 460,000 - - - 460,000
Expenditure Total - - 460,000 - - - 460,000
123
- ......... Marion S:~'¾nry
Marion County Board of County Commissioners Proposed Capital Improvement Program - Project Detail
Fiscal Years 2021-2025
Project: PRC202007 Title: Baseline Road Trailhead Improvements
Department: Parks and Recreation
Project Description
Baseline Road Trailhead Improvements include replacing safety playground surface, new playground, shade structure for playground and repaving of the trail.
Project Funding and Costs
Funding Source(s) Appropriated By Fund and Object To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Parks and Recreation Fees Fund
Operating Revenue - - 925,000 - 2,000,000 - 2,925,000
Funding Total - - 925,000 - 2,000,000 - 2,925,000
Expenditure(s) Appropriated By Object and Cost Center To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Improvements CIP Parks & Recreation Fees - - 925,000 - 2,000,000 - 2,925,000
Expenditure Total - - 925,000 - 2,000,000 - 2,925,000
124
- ......... Marion S:~'¾nry
Marion County Board of County Commissioners Proposed Capital Improvement Program - Project Detail
Fiscal Years 2021-2025
Project: PRC202008 Title: Westbrook Park Improvements
Department: Parks and Recreation
Project Description
Westbrook Park Improvements – Phase 1 will include walking trails, picnic tables and BBQ grills as well as parking. Phase 2 will include the following improvements: playground, pavilion, multi-purpose field and restrooms.
Project Funding and Costs
Funding Source(s) Appropriated By Fund and Object To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Parks and Recreation Fees Fund
Operating Revenue - - - 200,000 - 330,000 530,000
Funding Total - - - 200,000 - 330,000 530,000
Expenditure(s) Appropriated By Object and Cost Center To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Buildings CIP Parks & Recreation Fees - - - - - 200,000 200,000
Improvements CIP Parks & Recreation Fees - - - 200,000 - 130,000 330,000
Expenditure Total - - - 200,000 - 330,000 530,000
125
- ......... Marion S:~'¾nry
Marion County Board of County Commissioners Proposed Capital Improvement Program - Project Detail
Fiscal Years 2021-2025
Project: PRC202009 Title: Ocala Park Estates Improvements
Department: Parks and Recreation
Project Description
Installing new ADA compliant parking, playground and pavilion.
Project Funding and Costs
Funding Source(s) Appropriated By Fund and Object To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Parks and Recreation Fees Fund
Operating Revenue - 155,000 - - - - 155,000
Funding Total - 155,000 - - - - 155,000
Expenditure(s) Appropriated By Object and Cost Center To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Improvements CIP Parks & Recreation Fees - 155,000 - - - - 155,000
Expenditure Total - 155,000 - - - - 155,000
126
- ......... Marion S:~'¾nry
Marion County Board of County Commissioners Proposed Capital Improvement Program - Project Detail
Fiscal Years 2021-2025
Project: PRC202010 Title: Kiwanis Beach Improvements
Department: Parks and Recreation
Project Description
This is a Master Plan project which includes improving restrooms at Kiwanis Beach by adding lighting inside the building. These are outdoor restrooms that currently do not have any lighting. This project also includes renovation of the parking lot.
Project Funding and Costs
Funding Source(s) Appropriated By Fund and Object To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Parks and Recreation Fees Fund
Operating Revenue - - 150,000 - - - 150,000
Funding Total - - 150,000 - - - 150,000
Expenditure(s) Appropriated By Object and Cost Center To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Improvements CIP Parks & Recreation Fees - - 150,000 - - - 150,000
Expenditure Total - - 150,000 - - - 150,000
127
- ......... Marion S:~'¾nry
Marion County Board of County Commissioners Proposed Capital Improvement Program - Project Detail
Fiscal Years 2021-2025
Project: PRC202011 Title: Brick City ADA Improvements
Department: Parks and Recreation
Project Description
This is a Master Plan project to include: ADA path from overflow parking area, track access and playground access.
Project Funding and Costs
Funding Source(s) Appropriated By Fund and Object To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Parks and Recreation Fees Fund
Operating Revenue - - - 108,000 - - 108,000
Funding Total - - - 108,000 - - 108,000
Expenditure(s) Appropriated By Object and Cost Center To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Improvements CIP Parks & Recreation Fees - - - 108,000 - - 108,000
Expenditure Total - - - 108,000 - - 108,000
128
- ......... Marion S:~'¾nry
Marion County Board of County Commissioners Proposed Capital Improvement Program - Project Detail
Fiscal Years 2021-2025
Project: PRC202012 Title: Eureka West Ramp Site Improvements
Department: Parks and Recreation
Project Description
This is part of the Master Plan and will be a complete renovation of the Eureka West Boat Ramp.
Project Funding and Costs
Funding Source(s) Appropriated By Fund and Object To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Parks and Recreation FeesFund
Operating Revenue - - - 175,000 - - 175,000
Funding Total - - - 175,000 - - 175,000
Expenditure(s) Appropriated By Object and Cost Center To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Improvements CIP Parks & Recreation Fees - - - 175,000 - - 175,000
Expenditure Total - - - 175,000 - - 175,000
129
- ......... Marion S:~'¾nry
Marion County Board of County Commissioners Proposed Capital Improvement Program - Project Detail
Fiscal Years 2021-2025
Project: PRC202013 Title: Forest Community Center Site Improvements
Department: Parks and Recreation
Project Description
This project is part of the Master Plan and will include the addition of a new pavilion and paving the overflow parking area.
Project Funding and Costs
Funding Source(s) Appropriated By Fund and Object To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Parks and Recreation Fees Fund
Operating Revenue - - - - - 127,000 127,000
Funding Total - - - - - 127,000 127,000
Expenditure(s) Appropriated By Object and Cost Center To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Improvements CIP Parks & Recreation Fees - - - - - 127,000 127,000
Expenditure Total - - - - - 127,000 127,000
130
- ......... Marion S:~'¾nry
Marion County Board of County Commissioners Proposed Capital Improvement Program - Project Detail
Fiscal Years 2021-2025
Project: PRC202014 Title: Horsehoe Lake ADA Site Improvements
Department: Parks and Recreation
Project Description
This is a Master Plan Project that will include ADA improvements to two cabins, the beach/picnic area, restrooms, parking lot, sidewalk, playground and fishing platforms.
Project Funding and Costs
Funding Source(s) Appropriated By Fund and Object To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Parks and Recreation Fees Fund
Operating Revenue - - - - - 125,000 125,000
Funding Total - - - - - 125,000 125,000
Expenditure(s) Appropriated By Object and Cost Center To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Improvements CIP Parks & Recreation Fees - - - - - 125,000 125,000
Expenditure Total - - - - - 125,000 125,000
131
- ......... Marion S:~'¾nry
Marion County Board of County Commissioners Proposed Capital Improvement Program - Project Detail
Fiscal Years 2021-2025
Project:
Department:
PRC202015
Parks and Recreation
Title: John Van Fleet Parking Lot Site Improvements
Project Description
This is a Master Plan Project that includes renovation of the parking lot.
Project Funding and Costs
Funding Source(s) Appropriated By Fund and Object To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Parks and Recreation FeesFund
Operating Revenue - - - 175,000 - - 175,000
Funding Total - - - 175,000 - - 175,000
Expenditure(s) Appropriated By Object and Cost Center To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Improvements CIP Parks & Recreation Fees - - - 175,000 - - 175,000
Expenditure Total - - - 175,000 - - 175,000
132
- ......... Marion S:~'¾nry
Marion County Board of County Commissioners Proposed Capital Improvement Program - Project Detail
Fiscal Years 2021-2025
Project: PRC202017 Title: KP Hole Dive Improvements
Department: Parks and Recreation
Project Description
Improvements to include building a concession for the rental of dive equipment.
Project Funding and Costs
Funding Source(s) Appropriated By Fund and Object To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Parks and Recreation Fees Fund
Operating Revenue - - - 120,000 - - 120,000
Funding Total - - - 120,000 - - 120,000
Expenditure(s) Appropriated By Object and Cost Center To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Buildings CIP Parks & Recreation Fees - - - 120,000 - - 120,000
Expenditure Total - - - 120,000 - - 120,000
133
- ......... Marion S:~'¾nry
Marion County Board of County Commissioners Proposed Capital Improvement Program - Project Detail
Fiscal Years 2021-2025
Project: PRC202018 Title: Moorhead Ramp Parking Lot Improvements
Department: Parks and Recreation
Project Description
This is a Master Plan project and will include the complete renovation of the parking lot, a new pavilion and picnic tables.
Project Funding and Costs
Funding Source(s) Appropriated By Fund and Object To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Parks and Recreation Fees Fund
Operating Revenue - - - - 110,000 - 110,000
Funding Total - - - - 110,000 - 110,000
Expenditure(s) Appropriated By Object and Cost Center To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Improvements CIP Parks & Recreation Fees - - - - 110,000 - 110,000
Expenditure Total - - - - 110,000 - 110,000
134
- ......... Marion S:~'¾nry
Marion County Board of County Commissioners Proposed Capital Improvement Program - Project Detail
Fiscal Years 2021-2025
Project: PRC202019 Title: Rotary Sportsplex Improvements
Department: Parks and Recreation
Project Description
This is a Master Plan Project that will include the addition of paved parking at the Babe Ruth Baseball fields and install ADA sidewalk improvements throughout the facility.
Project Funding and Costs
Funding Source(s) Appropriated By Fund and Object To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Parks and Recreation Fees Fund
Operating Revenue - 180,000 - - - - 180,000
Funding Total - 180,000 - - - - 180,000
Expenditure(s) Appropriated By Object and Cost Center To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Improvements CIP Parks & Recreation Fees - 180,000 - - - - 180,000
Expenditure Total - 180,000 - - - - 180,000
135
- ......... Marion S:~'¾nry
Marion County Board of County Commissioners Proposed Capital Improvement Program - Project Detail
Fiscal Years 2021-2025
Project: RBC000001 Title: Employee Wellness Center
Department: Facilities Management
Project Description
Develop and implement an Employee Wellness Center where employees can go for educational classes, participate in physical activities and meet with the Health and Wellness Coordinator to promote preventative health care and healthy living.The interior of the existing storage area of the Veterans Services Building will be remodeled for the Center. The space will be separated into three sections consisting of the Employee Wellness Center, Fire Rescue training facility and a storage area for Facilities Management. The construction of the project will be performed by the Facilities Management Department.
Project Funding and Costs
Funding Source(s) Appropriated By Fund and Object To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Insurance Fund Operating Revenue 325,000 - - - - - 325,000
Funding Total 325,000 - - - - - 325,000
Expenditure(s) Appropriated By Object and Cost Center To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Buildings CIP Risk Benefits Capital 251,671 - - - - - 251,671
Machinery and Equipment CIP
Risk Benefits Capital 73,329 - - - - - 73,329
Expenditure Total 325,000 - - - - - 325,000
136
- ......... Marion S:~'¾nry
Marion County Board of County Commissioners Proposed Capital Improvement Program - Project Detail
Fiscal Years 2021-2025
Project: SAC000001 Title: State Attorney Expansion and Courtrooms
Department: Facilities Management
Project Description
The State Attorney's Office (SAO) has reached its capacity on the fifth floor. There are no empty offices in the current space. The SAO is requesting to expand part of the fourth floor to accommodate the growing staff.
Project Funding and Costs
Funding Source(s) Appropriated By Fund and Object To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
General Fund Operating Revenue 230,000 - 1,400,000 1,600,000 - - 3,230,000
Funding Total 230,000 - 1,400,000 1,600,000 - - 3,230,000
Expenditure(s) Appropriated By Object and Cost Center To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Buildings CIP Courthouse Capital 230,000 - 1,400,000 1,600,000 - - 3,230,000
Expenditure Total 230,000 - 1,400,000 1,600,000 - - 3,230,000
137
- ......... Marion S:~'¾nry
Marion County Board of County Commissioners Proposed Capital Improvement Program - Project Detail
Fiscal Years 2021-2025
Project: SMC0001MA Title: Timucuan Rd and Lake Weir Culvert Imprv
Department: Office of the County Engineer
Project Description
Timucuan Rd/Lake Weir Culvert Improvement Project
Project Funding and Costs
Funding Source(s) Appropriated By Fund and Object To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Stormwater Program Operating Revenue - 250,000 - - - - 250,000
Funding Total - 250,000 - - - - 250,000
Expenditure(s) Appropriated By Object and Cost Center To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Improvements CIP Stormwater Program - 250,000 - - - - 250,000
Expenditure Total - 250,000 - - - - 250,000
138
- ......... Marion S:~'¾nry
Marion County Board of County Commissioners Proposed Capital Improvement Program - Project Detail
Fiscal Years 2021-2025
Project:
Department:
SMC0002DR
Office of the County Engineer
Title: Country Gardens SWRF CP 59
Country Gardens Stormwater Retrofit CP 59
Project Description
Project Funding and Costs
Funding Source(s) Appropriated By Fund and Object To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Stormwater Program Operating Revenue - 227,250 - - - - 227,250
Funding Total - 227,250 - - - - 227,250
Expenditure(s) Appropriated By Object and Cost Center To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Improvements CIP Stormwater Program - 227,250 - - - - 227,250
Expenditure Total - 227,250 - - - - 227,250
139
- ......... Marion S:~'¾nry
Marion County Board of County Commissioners Proposed Capital Improvement Program - Project Detail
Fiscal Years 2021-2025
Project: SMC0002FL Title: Stanton-Weirsdale Drainage Project
Department: Office of the County Engineer
Project Description
SE 134th Ave Rd Drainage Improvements (Stanton-Weirsdale)
Project Funding and Costs
Funding Source(s) Appropriated By Fund and Object To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Stormwater Program Operating Revenue - 120,000 - - - - 120,000
Funding Total - 120,000 - - - - 120,000
Expenditure(s) Appropriated By Object and Cost Center To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Improvements CIP Stormwater Program - 120,000 - - - - 120,000
Expenditure Total - 120,000 - - - - 120,000
140
- ......... Marion S:~'¾nry
Marion County Board of County Commissioners Proposed Capital Improvement Program - Project Detail
Fiscal Years 2021-2025
Project: SMC0002WQ Title: SSS 23 Innov SWRF CP 75
Department: Office of the County Engineer
Project Description
Silver Springs Shores Unit 23 Innovative Stormwater Retrofit of DRAS 7276, 7280, and 7387 CP 75
Project Funding and Costs
Funding Source(s) Appropriated By Fund and Object To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Stormwater Program Operating Revenue - - 972,300 - - - 972,300
Funding Total - - 972,300 - - - 972,300
Expenditure(s) Appropriated By Object and Cost Center To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Improvements CIP Stormwater Program - - 972,300 - - - 972,300
Expenditure Total - - 972,300 - - - 972,300
141
- ......... Marion S:~'¾nry
Marion County Board of County Commissioners Proposed Capital Improvement Program - Project Detail
Fiscal Years 2021-2025
Project: SMC0003FL Title: SW 27th Ave Flood Relief HMGP
Department: Office of the County Engineer
Project Description
SW 27th Ave Flooding Relief Project, FEMA Hazard Mitigation Grant Program Project Number 4337-399
Project Funding and Costs
Funding Source(s) Appropriated By Fund and Object To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Stormwater Program Disaster Relief - 1,406,427 - - - - 1,406,427 Operating Revenue - 468,809 - - - - 468,809
Funding Total - 1,875,236 - - - - 1,875,236
Expenditure(s) Appropriated By Object and Cost Center To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Land CIP Stormwater Program - 367,500 - - - - 367,500
Improvements CIP Stormwater Program - 1,507,736 - - - - 1,507,736
Expenditure Total - 1,875,236 - - - - 1,875,236
142
- ......... Marion S:~'¾nry
Marion County Board of County Commissioners Proposed Capital Improvement Program - Project Detail
Fiscal Years 2021-2025
Project: SMC0003WQ Title: RS 5th Replat Innov SWRF CP 74
Department: Office of the County Engineer
Project Description
Rainbow Springs 5th Replat Innovative Stormwater Retrofit of DRAS 2160, 2169, 2171, and 2210 CP 74
Project Funding and Costs
Funding Source(s) Appropriated By Fund and Object To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Stormwater Program Operating Revenue - - 435,750 - - - 435,750
Funding Total - - 435,750 - - - 435,750
Expenditure(s) Appropriated By Object and Cost Center To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Improvements CIP Stormwater Program - - 435,750 - - - 435,750
Expenditure Total - - 435,750 - - - 435,750
143
- ......... Marion S:~'¾nry
Marion County Board of County Commissioners Proposed Capital Improvement Program - Project Detail
Fiscal Years 2021-2025
Project: SMC0004FL Title: SW 52nd St Flood Relief HMGP
Department: Office of the County Engineer
Project Description
SW 52nd St Flooding Relief Project, FEMA Hazard Mitigation Grant Program Project Number 4337-385-R (404)
Project Funding and Costs
Funding Source(s) Appropriated By Fund and Object To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Stormwater Program Disaster Relief - 396,627 - - - - 396,627 Operating Revenue - 132,209 - - - - 132,209
Funding Total - 528,836 - - - - 528,836
Expenditure(s) Appropriated By Object and Cost Center To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Land CIP Stormwater Program - 137,700 - - - - 137,700
Improvements CIP Stormwater Program - 391,136 - - - - 391,136
Expenditure Total - 528,836 - - - - 528,836
144
- ......... Marion S:~'¾nry
Marion County Board of County Commissioners Proposed Capital Improvement Program - Project Detail
Fiscal Years 2021-2025
Project: SMC0005FL Title: NW 115th Ct Flood Relief HMGP
Department: Office of the County Engineer
Project Description
NW 115th Ct Flooding Relief Project; Fairfield Oaks Subdivision; FEMA Hazard Mitigation Grant Program Project Number 4337-359-R (400)
Project Funding and Costs
Funding Source(s) Appropriated By Fund and Object To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Stormwater Program Disaster Relief - 818,344 - - - - 818,344 Operating Revenue - 272,781 - - - - 272,781
Funding Total - 1,091,125 - - - - 1,091,125
Expenditure(s) Appropriated By Object and Cost Center To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Land CIP Stormwater Program - 605,888 - - - - 605,888
Improvements CIP Stormwater Program - 485,237 - - - - 485,237
Expenditure Total - 1,091,125 - - - - 1,091,125
145
- ......... Marion S:~'¾nry
Marion County Board of County Commissioners Proposed Capital Improvement Program - Project Detail
Fiscal Years 2021-2025
Project: SMC0006FL Title: Country Gardens Flood Relief HMGP
Department: Office of the County Engineer
Project Description
Country Gardens Flooding Relief Project, FEMA Hazard Mitigation Grant Program Project Number 4337-360-R (453)
Project Funding and Costs
Funding Source(s) Appropriated By Fund and Object To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Stormwater Program Disaster Relief - 424,546 - - - - 424,546 Operating Revenue - 141,514 - - - - 141,514
Funding Total - 566,060 - - - - 566,060
Expenditure(s) Appropriated By Object and Cost Center To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Land CIP Stormwater Program - 310,450 - - - - 310,450
Improvements CIP Stormwater Program - 255,610 - - - - 255,610
Expenditure Total - 566,060 - - - - 566,060
146
- ......... Marion S:~'¾nry
Marion County Board of County Commissioners Proposed Capital Improvement Program - Project Detail
Fiscal Years 2021-2025
Project: SMC0006WQ Title: SSS Unit 68 Innov SWRF CP 79
Department: Office of the County Engineer
Project Description
Silver Springs Shores Unit 68 Innovative Stormwater Retrofit of DRAS 7282, 7402, and 7426 CP 79
Project Funding and Costs
Funding Source(s) Appropriated By Fund and Object To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Stormwater Program Operating Revenue - 899,850 - - - - 899,850
Funding Total - 899,850 - - - - 899,850
Expenditure(s) Appropriated By Object and Cost Center To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Improvements CIP Stormwater Program - 899,850 - - - - 899,850
Expenditure Total - 899,850 - - - - 899,850
147
- ......... Marion S:~'¾nry
Marion County Board of County Commissioners Proposed Capital Improvement Program - Project Detail
Fiscal Years 2021-2025
Project: SOC000002 Title: Sheriff Evidence Forensics Building
Department: Facilities Management
Project Description
The Sheriff would like to request a hardened building large enough to store all of Marion County Sheriff Office's evidence. Currently, he plans to move the evidence into the Juvenile Detention Facility, however, it is not a hardened building.
Project Funding and Costs
Funding Source(s) Appropriated By Fund and Object To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Infrastructure Surtax Capital Projects
Operating Revenue 7,517,837 - - - - - 7,517,837
Funding Total 7,517,837 - - - - - 7,517,837
Expenditure(s) Appropriated By Object and Cost Center To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Buildings CIP Infrastructure Tax Sheriff
Patrol 7,517,837 - - - - - 7,517,837
Expenditure Total 7,517,837 - - - - - 7,517,837
148
- ......... Marion S:~'¾nry
Marion County Board of County Commissioners Proposed Capital Improvement Program - Project Detail
Fiscal Years 2021-2025
Project: SOC000003 Title: MCSO Jail AC Upgrade
Department: Facilities Management
Project Description
The original Jail is approx. 30 years of age and needs upgrades and replacement of the HVAC system to improve serviceability and energy efficiency. We propose to remove the original DX units and replace them with a chill water system as in the new Jail addition.
Project Funding and Costs
Funding Source(s) Appropriated By Fund and Object To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
General Fund Operating Revenue - 650,000 - - - - 650,000
Funding Total - 650,000 - - - - 650,000
Expenditure(s) Appropriated By Object and Cost Center To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Buildings CIP Jail Capital - 650,000 - - - - 650,000
Expenditure Total - 650,000 - - - - 650,000
149
- ......... Marion S:~'¾nry
Marion County Board of County Commissioners Proposed Capital Improvement Program - Project Detail
Fiscal Years 2021-2025
Project: SOC000005 Title: MCSO Jail Reroof Ops Building
Department: Facilities Management
Project Description
Replacement of an existing 20 year old roofing system with a new roofing system at the Sheriff Ops Building.
Project Funding and Costs
Funding Source(s) Appropriated By Fund and Object To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
General FundOperating Revenue - - 800,000 - - - 800,000
Funding Total - - 800,000 - - - 800,000
Expenditure(s) Appropriated By Object and Cost Center To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Buildings CIP Jail Capital - - 800,000 - - - 800,000
Expenditure Total - - 800,000 - - - 800,000
150
- ......... Marion S:~'¾nry
Marion County Board of County Commissioners Proposed Capital Improvement Program - Project Detail
Fiscal Years 2021-2025
Project: SOC000006 Title: MCSO Jail Boiler Replacements
Department: Facilities Management
Project Description
Replacing obsolete heating boilers at the Marion County jail. The county had a company that was making retro-fits parts, but went out of business in 2017.
Project Funding and Costs
Funding Source(s) Appropriated By Fund and Object To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
General Fund Operating Revenue - 200,000 200,000 - - - 400,000
Funding Total - 200,000 200,000 - - - 400,000
Expenditure(s) Appropriated By Object and Cost Center To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Buildings CIP Jail Capital - 200,000 200,000 - - - 400,000
Expenditure Total - 200,000 200,000 - - - 400,000
151
- ......... Marion S:~'¾nry
Marion County Board of County Commissioners Proposed Capital Improvement Program - Project Detail
Fiscal Years 2021-2025
Project: SOC000008 Title: Sheriff Remodel Evidence Section
Department: Facilities Management
Project Description
Remodel the current evidence section to better utilize the space.
Project Funding and Costs
Funding Source(s) Appropriated By Fund and Object To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Infrastructure Surtax Capital Projects
Operating Revenue 441,000 - - - - - 441,000
Funding Total 441,000 - - - - - 441,000
Expenditure(s) Appropriated By Object and Cost Center To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Buildings CIP Infrastructure Tax Sheriff
Patrol 441,000 - - - - - 441,000
Expenditure Total 441,000 - - - - - 441,000
152
- ......... Marion S:~'¾nry
Marion County Board of County Commissioners Proposed Capital Improvement Program - Project Detail
Fiscal Years 2021-2025
Project: SOC000009 Title: Sheriff Demo Pave Old Evidence Bld
Department: Facilities Management
Project Description
Demolish the old evidence building and construct a paved parking lot in its place.
Project Funding and Costs
Funding Source(s) Appropriated By Fund and Object To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Infrastructure Surtax Capital Projects
Operating Revenue 238,000 - - - - - 238,000
Funding Total 238,000 - - - - - 238,000
Expenditure(s) Appropriated By Object and Cost Center To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Improvements CIP Infrastructure Tax Sheriff
Patrol 238,000 - - - - - 238,000
Expenditure Total 238,000 - - - - - 238,000
153
- ......... Marion S:~'¾nry
Marion County Board of County Commissioners Proposed Capital Improvement Program - Project Detail
Fiscal Years 2021-2025
Project: SOC000010 Title: MCSO Jail Construct Security Fence
Department: Facilities Management
Project Description
An increase of security is needed by installing about 6,000 feet of fencing as an outer perimeter of the County Jail. This was a recommendation after review by Staff and external consultant.
Project Funding and Costs
Funding Source(s) Appropriated By Fund and Object To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
General Fund Operating Revenue - 450,000 - - - - 450,000
Funding Total - 450,000 - - - - 450,000
Expenditure(s) Appropriated By Object and Cost Center To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Improvements CIP Jail Capital - 450,000 - - - - 450,000
Expenditure Total - 450,000 - - - - 450,000
154
- ......... Marion S:~'¾nry
Marion County Board of County Commissioners Proposed Capital Improvement Program - Project Detail
Fiscal Years 2021-2025
Project: SOC000011 Title: MCSO Admin Remodel
Department: Facilities Management
Project Description
After the construction of the new forensic/evidence building the old evidence area will be vacated and in need of remodeling.
Project Funding and Costs
Funding Source(s) Appropriated By Fund and Object To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
General Fund Operating Revenue - - - - 560,000 - 560,000
Funding Total - - - - 560,000 - 560,000
Expenditure(s) Appropriated By Object and Cost Center To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Buildings CIP Sheriff Capital - - - - 560,000 - 560,000
Expenditure Total - - - - 560,000 - 560,000
155
- ......... Marion S:~'¾nry
Marion County Board of County Commissioners Proposed Capital Improvement Program - Project Detail
Fiscal Years 2021-2025
Project: SOC000012 Title: MCSO Training Bldg Enhancements
Department: Facilities Management
Project Description
The training offices and classrooms have noise bleed over because there is no ceiling; therefore, affecting instructors and students. Adding a drop ceiling will reduce this issue and enhance productivity, and compliance with Building Code.
Project Funding and Costs
Funding Source(s) Appropriated By Fund and Object To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
General Fund Operating Revenue - 152,000 - - - - 152,000
Funding Total - 152,000 - - - - 152,000
Expenditure(s) Appropriated By Object and Cost Center To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Buildings CIP Sheriff Capital - 152,000 - - - - 152,000
Expenditure Total - 152,000 - - - - 152,000
156
- ......... Marion S:~'¾nry
Marion County Board of County Commissioners Proposed Capital Improvement Program - Project Detail
Fiscal Years 2021-2025
Project: SOC000013 Title: MCSO Jail Renovation Assessment
Department: Facilities Management
Project Description
Assessment of the current jail structure to provide guidance for renovations or expansion. This project will help provide the proper mechanical, electrical, and plumbing information required for the county to decide the next step to take in improving the jail infrastructure.
Project Funding and Costs
Funding Source(s) Appropriated By Fund and Object To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
General Fund Operating Revenue - 100,000 - - - - 100,000
Funding Total - 100,000 - - - - 100,000
Expenditure(s) Appropriated By Object and Cost Center To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Buildings CIP Jail Capital - 100,000 - - - - 100,000
Expenditure Total - 100,000 - - - - 100,000
157
- ......... Marion S:~'¾nry
Marion County Board of County Commissioners Proposed Capital Improvement Program - Project Detail
Fiscal Years 2021-2025
Project: SSC810001 Title: SSS Roof Replacement
Department: MSTU - SSS Recreation Center
Project Description
Silver Springs Shores Community Center Roof Replacement
Project Funding and Costs
Funding Source(s) Appropriated By Fund and Object To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Silver Springs Shores Special Tax District
Operating Revenue 126,520 - - - - - 126,520
Funding Total 126,520 - - - - - 126,520
Expenditure(s) Appropriated By Object and Cost Center To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Buildings CIP Silver Springs Shores
Recreation 126,520 - - - - - 126,520
Expenditure Total 126,520 - - - - - 126,520
158
- ......... Marion S:~'¾nry
Marion County Board of County Commissioners Proposed Capital Improvement Program - Project Detail
Fiscal Years 2021-2025
Project: STC0732IT Title: Fire Info Tech Infrastruct Surtax
Department: Fire Rescue Services
Project Description
Purchase information technology equipment for the Marion County Fire Department with Infrastructure Surtax.
Project Funding and Costs
Funding Source(s) Appropriated By Fund and Object To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Infrastructure Surtax Capital Projects
Operating Revenue 108,000 - - - - - 108,000
Funding Total 108,000 - - - - - 108,000
Expenditure(s) Appropriated By Object and Cost Center To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Machinery and Equipment Infrastructure Tax Fire 108,000 - - - - - 108,000
Expenditure Total 108,000 - - - - - 108,000
159
- ......... Marion S:~'¾nry
Marion County Board of County Commissioners Proposed Capital Improvement Program - Project Detail
Fiscal Years 2021-2025
Project: STC0732SG Title: Fire Safety Gear Infrastruct Surtax
Department: Fire Rescue Services
Project Description
Purchase SCBA replacement equipment for the Marion County Fire Department with funds from the Infrastructure Surtax.
Project Funding and Costs
Funding Source(s) Appropriated By Fund and Object To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Infrastructure Surtax Capital Projects
Operating Revenue 1,787,933 - - - - - 1,787,933
Funding Total 1,787,933 - - - - - 1,787,933
Expenditure(s) Appropriated By Object and Cost Center To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Machinery and Equipment Infrastructure Tax Fire 1,787,933 - - - - - 1,787,933
Expenditure Total 1,787,933 - - - - - 1,787,933
160
- ......... Marion S:~'¾nry
Marion County Board of County Commissioners Proposed Capital Improvement Program - Project Detail
Fiscal Years 2021-2025
Project: STC0732VE Title: Fire Vehicles Infrastruct Surtax
Department: Fire Rescue Services
Project Description
Purchase various types of vehicles for the Marion County Fire Department with funds from the Infrastructure Surtax.
Project Funding and Costs
Funding Source(s) Appropriated By Fund and Object To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Infrastructure Surtax Capital Projects
Operating Revenue 7,993,769 961,875 - - - - 8,955,644
Funding Total 7,993,769 961,875 - - - - 8,955,644
Expenditure(s) Appropriated By Object and Cost Center To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Machinery and Equipment Infrastructure Tax Fire 7,993,769 961,875 - - - - 8,955,644
Expenditure Total 7,993,769 961,875 - - - - 8,955,644
161
- ......... Marion S:~'¾nry
Marion County Board of County Commissioners Proposed Capital Improvement Program - Project Detail
Fiscal Years 2021-2025
Project: STC0733IT Title: EMS Info Tech Infrastructure Surtax
Department: Fire Logistics
Project Description
Purchase information technology equipment for the Marion County EMS Department with Infrastructure Surtax.
Project Funding and Costs
Funding Source(s) Appropriated By Fund and Object To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Infrastructure Surtax Capital Projects
Operating Revenue 452,222 - - - - - 452,222
Funding Total 452,222 - - - - - 452,222
Expenditure(s) Appropriated By Object and Cost Center To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Machinery and Equipment Infrastructure Tax Medical
Service 452,222 - - - - - 452,222
Expenditure Total 452,222 - - - - - 452,222
162
- ......... Marion S:~'¾nry
Marion County Board of County Commissioners Proposed Capital Improvement Program - Project Detail
Fiscal Years 2021-2025
Project: STC0733SG Title: EMS Safety Gear Infrastruct Surtax
Department: Fire Logistics
Project Description
Purchase SCBA replacement equipment for the Marion County EMS Department with Infrastructure Surtax.
Project Funding and Costs
Funding Source(s) Appropriated By Fund and Object To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Infrastructure Surtax Capital Projects
Operating Revenue 990,966 - - - - - 990,966
Funding Total 990,966 - - - - - 990,966
Expenditure(s) Appropriated By Object and Cost Center To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Machinery and Equipment Infrastructure Tax Medical
Service 990,966 - - - - - 990,966
Expenditure Total 990,966 - - - - - 990,966
163
- ......... Marion S:~'¾nry
Marion County Board of County Commissioners Proposed Capital Improvement Program - Project Detail
Fiscal Years 2021-2025
Project: STC0733VE Title: EMS Vehicles Infrastructure Surtax
Department: Fire Logistics
Project Description
Purchase various types of vehicles for the Marion County EMS Department with Infrastructure Surtax.
Project Funding and Costs
Funding Source(s) Appropriated By Fund and Object To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Infrastructure Surtax Capital Projects
Operating Revenue 6,308,839 1,452,650 - - - - 7,761,489
Funding Total 6,308,839 1,452,650 - - - - 7,761,489
Expenditure(s) Appropriated By Object and Cost Center To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Machinery and Equipment Infrastructure Tax Medical
Service 6,308,839 1,452,650 - - - - 7,761,489
Expenditure Total 6,308,839 1,452,650 - - - - 7,761,489
164
- ......... Marion S:~'¾nry
Marion County Board of County Commissioners Proposed Capital Improvement Program - Project Detail
Fiscal Years 2021-2025
Project: STC0734CC Title: Emerg Comm Infrastructure Surtax
Department: 911 Management
Project Description
Purchase equipment for the Emergency Communications Center with funds from the Infrastructure Surtax.
Project Funding and Costs
Funding Source(s) Appropriated By Fund and Object To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Infrastructure Surtax Capital Projects
Operating Revenue 8,471,762 - - - - - 8,471,762
Funding Total 8,471,762 - - - - - 8,471,762
Expenditure(s) Appropriated By Object and Cost Center To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Machinery and Equipment Infrastructure Tax Emerg
Comm 8,471,762 - - - - - 8,471,762
Expenditure Total 8,471,762 - - - - - 8,471,762
165
- ......... Marion S:~'¾nry
Marion County Board of County Commissioners Proposed Capital Improvement Program - Project Detail
Fiscal Years 2021-2025
Project: STC0735IT Title: Sheriff Jail Info Tech Infrast Surtax
Department: Sheriff
Project Description
Purchase information technology equipment for the Sheriff's Jail Facilities with funds from Infrastructure Surtax.
Project Funding and Costs
Funding Source(s) Appropriated By Fund and Object To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Infrastructure Surtax Capital Projects
Operating Revenue 236,797 55,095 - - - - 291,892
Funding Total 236,797 55,095 - - - - 291,892
Expenditure(s) Appropriated By Object and Cost Center To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Machinery and Equipment Infrastructure Tax Sheriff Jail 236,797 55,095 - - - - 291,892
Expenditure Total 236,797 55,095 - - - - 291,892
166
- ......... Marion S:~'¾nry
Marion County Board of County Commissioners Proposed Capital Improvement Program - Project Detail
Fiscal Years 2021-2025
Project: STC0736IT Title: Sheriff Regular Info Tech Infrast Surtax
Department: Sheriff
Project Description
Purchase information technology for the Sheriff's Department with funds from the Infrastructure Surtax.
Project Funding and Costs
Funding Source(s) Appropriated By Fund and Object To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Infrastructure Surtax CapitalProjects
Operating Revenue 572,843 120,061 - - - - 692,904
Funding Total 572,843 120,061 - - - - 692,904
Expenditure(s) Appropriated By Object and Cost Center To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Machinery and Equipment Infrastructure Tax Sheriff
Regular 572,843 120,061 - - - - 692,904
Expenditure Total 572,843 120,061 - - - - 692,904
167
- ......... Marion S:~'¾nry
Marion County Board of County Commissioners Proposed Capital Improvement Program - Project Detail
Fiscal Years 2021-2025
Project: STC0736SG Title: Sheriff Reg Safety Gear Infrast Surtax
Department: Sheriff
Project Description
Purchase x-ray machine for the Sheriff's Department with funds from the Infrastructure Surtax.
Project Funding and Costs
Funding Source(s) By Fund and Object
Appropriated To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Infrastructure Surtax Capital Projects
Operating Revenue 28,523 - - - - - 28,523
Funding Total 28,523 - - - - - 28,523
Expenditure(s) By Object and Cost Center
Appropriated To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Machinery and Equipment Infrastructure Tax Sheriff
Regular 28,523 - - - - - 28,523
Expenditure Total 28,523 - - - - - 28,523
168
- ......... Marion S:~'¾nry
Marion County Board of County Commissioners Proposed Capital Improvement Program - Project Detail
Fiscal Years 2021-2025
Project: STC0736VE Title: Sheriff Regular Vehicles Infrast Surtax
Department: Sheriff
Project Description
Purchase various vehicles for the Sheriff's Department with funds from the Infrastructure Surtax.
Project Funding and Costs
Funding Source(s) Appropriated By Fund and Object To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Infrastructure Surtax Capital Projects
Operating Revenue 719,908 141,127 - - - - 861,035
Funding Total 719,908 141,127 - - - - 861,035
Expenditure(s) Appropriated By Object and Cost Center To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Machinery and Equipment Infrastructure Tax Sheriff
Regular 719,908 141,127 - - - - 861,035
Expenditure Total 719,908 141,127 - - - - 861,035
169
- ......... Marion S:~'¾nry
Marion County Board of County Commissioners Proposed Capital Improvement Program - Project Detail
Fiscal Years 2021-2025
Project: STC0737AV Title: Sheriff Patrol Aviation Infrast Surtax
Department: Sheriff
Project Description
Purchase an aircraft for the Sheriff's Patrol with funds from the Infrastructure Surtax.
Project Funding and Costs
Funding Source(s) Appropriated By Fund and Object To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Infrastructure Surtax CapitalProjects
Operating Revenue 3,552,119 - - - - - 3,552,119
Funding Total 3,552,119 - - - - - 3,552,119
Expenditure(s) Appropriated By Object and Cost Center To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Machinery and Equipment Infrastructure Tax Sheriff
Patrol 3,552,119 - - - - - 3,552,119
Expenditure Total 3,552,119 - - - - - 3,552,119
170
- ......... Marion S:~'¾nry
Marion County Board of County Commissioners Proposed Capital Improvement Program - Project Detail
Fiscal Years 2021-2025
Project: STC0737IT Title: Sheriff Patrol Info Tech Infrast Surtax
Department: Sheriff
Project Description
Purchase information technology for the Sheriff Patrol with funds from the Infrastructure Surtax.
Project Funding and Costs
Funding Source(s) Appropriated By Fund and Object To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Infrastructure Surtax Capital Projects
Operating Revenue 2,826,805 473,845 - - - - 3,300,650
Funding Total 2,826,805 473,845 - - - - 3,300,650
Expenditure(s) Appropriated By Object and Cost Center To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Machinery and Equipment Infrastructure Tax Sheriff
Patrol 2,826,805 473,845 - - - - 3,300,650
Expenditure Total 2,826,805 473,845 - - - - 3,300,650
171
- ......... Marion S:~'¾nry
Marion County Board of County Commissioners Proposed Capital Improvement Program - Project Detail
Fiscal Years 2021-2025
Project: STC0737SG Title: Sheriff Patrol Safety Gear Infrast Surtx
Department: Sheriff
Project Description
Purchase bullet proof vests and SWAT vests for the Sheriff's Patrol with funds from the Infrastructure Surtax.
Project Funding and Costs
Funding Source(s) Appropriated By Fund and Object To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Infrastructure Surtax Capital Projects
Operating Revenue 718,961 36,300 - - - - 755,261
Funding Total 718,961 36,300 - - - - 755,261
Expenditure(s) Appropriated By Object and Cost Center To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Machinery and Equipment Infrastructure Tax Sheriff
Patrol 718,961 36,300 - - - - 755,261
Expenditure Total 718,961 36,300 - - - - 755,261
172
- ......... Marion S:~'¾nry
Marion County Board of County Commissioners Proposed Capital Improvement Program - Project Detail
Fiscal Years 2021-2025
Project: STC0737VE Title: Sheriff Patrol Vehicles Infrast Surtax
Department: Sheriff
Project Description
Purchase various vehicles for the Sheriff Patrol with funds from the Infrastructure Surtax.
Project Funding and Costs
Funding Source(s) Appropriated By Fund and Object To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Infrastructure Surtax CapitalProjects
Operating Revenue 8,761,270 1,679,913 - - - - 10,441,183
Funding Total 8,761,270 1,679,913 - - - - 10,441,183
Expenditure(s) Appropriated By Object and Cost Center To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Machinery and Equipment Infrastructure Tax Sheriff
Patrol 8,761,270 1,679,913 - - - - 10,441,183
Expenditure Total 8,761,270 1,679,913 - - - - 10,441,183
173
- ......... Marion S:~'¾nry
Marion County Board of County Commissioners Proposed Capital Improvement Program - Project Detail
Fiscal Years 2021-2025
Project: STC073801 Title: NW 49th 35th St Ph 2B Infrast Srtx
Department: Office of the County Engineer
Project Description
Transportation project at NW 49th/35th Street Phase 2B to be completed with funds from the Infrastructure Surtax.
Project Funding and Costs
Funding Source(s) Appropriated By Fund and Object To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Infrastructure Surtax Capital Projects
Operating Revenue 14,875,000 - - - - - 14,875,000
Funding Total 14,875,000 - - - - - 14,875,000
Expenditure(s) Appropriated By Object and Cost Center To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Land Acquisition Right of Way Easements
Infrastructure Tax Transportation 5,995,000 - - - - - 5,995,000
Improvements Road and Bridge
Infrastructure Tax Transportation 8,880,000 - - - - - 8,880,000
Expenditure Total 14,875,000 - - - - - 14,875,000
174
- ......... Marion S:~'¾nry
Marion County Board of County Commissioners Proposed Capital Improvement Program - Project Detail
Fiscal Years 2021-2025
Project: STC073802 Title: NW 49th 35th St Ph 2C Infrast Srtx
Department: Office of the County Engineer
Project Description
Transportation project at NW 49th/35th Street Phase 2C to be completed with funds from the Infrastructure Surtax.
Project Funding and Costs
Funding Source(s) Appropriated By Fund and Object To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Infrastructure Surtax Capital Projects
Operating Revenue 6,855,462 5,700,000 - - - - 12,555,462
Funding Total 6,855,462 5,700,000 - - - - 12,555,462
Expenditure(s) Appropriated By Object and Cost Center To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Land Acquisition Right of Way Easements
Infrastructure Tax Transportation 6,855,462 5,700,000 - - - - 12,555,462
Expenditure Total 6,855,462 5,700,000 - - - - 12,555,462
175
- ......... Marion S:~'¾nry
Marion County Board of County Commissioners Proposed Capital Improvement Program - Project Detail
Fiscal Years 2021-2025
Project: STC073804 Title: SW 49th 40th Ave Ph1 Infrast Srtx
Department: Office of the County Engineer
Project Description
Transportation project at SW 49th/40th Avenue Phase 1 to be completed with funds from the Infrastructure Surtax.
Project Funding and Costs
Funding Source(s) Appropriated By Fund and Object To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Infrastructure Surtax Capital Projects
Operating Revenue 1,750,000 4,626,907 - - - - 6,376,907
Funding Total 1,750,000 4,626,907 - - - - 6,376,907
Expenditure(s) Appropriated By Object and Cost Center To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Land Acquisition Right of Way Easements
Infrastructure Tax Transportation 1,200,000 - - - - - 1,200,000
Improvements Road and Bridge
Infrastructure Tax Transportation 550,000 4,626,907 - - - - 5,176,907
Expenditure Total 1,750,000 4,626,907 - - - - 6,376,907
176
- ......... Marion S:~'¾nry
Marion County Board of County Commissioners Proposed Capital Improvement Program - Project Detail
Fiscal Years 2021-2025
Project: STC073806 Title: SW 49th Ave South Seg E Infrst Srtx
Department: Office of the County Engineer
Project Description
Transportation project at SW 49th Avenue - South Segment E to be completed with funds from the Infrastructure Surtax.
Project Funding and Costs
Funding Source(s) Appropriated By Fund and Object To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Infrastructure Surtax Capital Projects
Operating Revenue 3,360,000 - - - - - 3,360,000
Funding Total 3,360,000 - - - - - 3,360,000
Expenditure(s) Appropriated By Object and Cost Center To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Improvements Road and Bridge
Infrastructure Tax Transportation 3,360,000 - - - - - 3,360,000
Expenditure Total 3,360,000 - - - - - 3,360,000
177
- ......... Marion S:~'¾nry
Marion County Board of County Commissioners Proposed Capital Improvement Program - Project Detail
Fiscal Years 2021-2025
Project: STC073807 Title: SW 49th 40th Ave Ph2 Infrast Srtx
Department: Office of the County Engineer
Project Description
Transportation project at SW 49th/40th Avenue Phase 2 to be completed with funds from the Infrastructure Surtax.
Project Funding and Costs
Funding Source(s) Appropriated By Fund and Object To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Infrastructure Surtax Capital Projects
Operating Revenue 2,953,000 - - - - - 2,953,000
Funding Total 2,953,000 - - - - - 2,953,000
Expenditure(s) Appropriated By Object and Cost Center To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Improvements Road and Bridge
Infrastructure Tax Transportation 2,953,000 - - - - - 2,953,000
Expenditure Total 2,953,000 - - - - - 2,953,000
178
- ......... Marion S:~'¾nry
Marion County Board of County Commissioners Proposed Capital Improvement Program - Project Detail
Fiscal Years 2021-2025
Project: STC073808 Title: SW 49th 40th Ave Ph3 Infrast Srtx
Department: Office of the County Engineer
Project Description
Transportation project at SW 49th/40th Avenue Phase 3 to be completed with funds from the Infrastructure Surtax.
Project Funding and Costs
Funding Source(s) Appropriated By Fund and Object To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Infrastructure Surtax Capital Projects
Operating Revenue 2,487,448 - - - - - 2,487,448
Funding Total 2,487,448 - - - - - 2,487,448
Expenditure(s) Appropriated By Object and Cost Center To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Improvements Road and Bridge
Infrastructure Tax Transportation 2,487,448 - - - - - 2,487,448
Expenditure Total 2,487,448 - - - - - 2,487,448
179
- ......... Marion S:~'¾nry
Marion County Board of County Commissioners Proposed Capital Improvement Program - Project Detail
Fiscal Years 2021-2025
Project: STC073809 Title: SW 49th 40th Ave Ph1A Infrast Srtx
Department: Office of the County Engineer
Project Description
Transportation project at SW 49th/40th Avenue Phase 1A to be completed with funds from the Infrastructure Surtax.
Project Funding and Costs
Funding Source(s) Appropriated By Fund and Object To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Infrastructure Surtax Capital Projects
Operating Revenue 947,448 - - - - - 947,448
Funding Total 947,448 - - - - - 947,448
Expenditure(s) Appropriated By Object and Cost Center To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Improvements Road and Bridge
Infrastructure Tax Transportation 947,448 - - - - - 947,448
Expenditure Total 947,448 - - - - - 947,448
180
- ......... Marion S:~'¾nry
Marion County Board of County Commissioners Proposed Capital Improvement Program - Project Detail
Fiscal Years 2021-2025
Project: STC073810 Title: SW 49th Ave South Seg A Infrst Srtx
Department: Office of the County Engineer
Project Description
Transportation project at SW 49th Avenue - South Segment A to be completed with funds from the Infrastructure Surtax.
Project Funding and Costs
Funding Source(s) Appropriated By Fund and Object To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Infrastructure Surtax Capital Projects
Operating Revenue 3,000,000 4,700,000 - - - - 7,700,000
Funding Total 3,000,000 4,700,000 - - - - 7,700,000
Expenditure(s) Appropriated By Object and Cost Center To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Land Acquisition Right of Way Easements
Infrastructure Tax Transportation 3,000,000 - - - - - 3,000,000
Improvements Road and Bridge
Infrastructure Tax Transportation - 4,700,000 - - - - 4,700,000
Expenditure Total 3,000,000 4,700,000 - - - - 7,700,000
181
- ......... Marion S:~'¾nry
Marion County Board of County Commissioners Proposed Capital Improvement Program - Project Detail
Fiscal Years 2021-2025
Project: STC073858 Title: NE Hwy 315 Infrast Srtx
Department: Office of the County Engineer
Project Description
Transportation project at NE Hwy 315 to be completed with funds from the Infrastructure Surtax.
Project Funding and Costs
Funding Source(s) Appropriated By Fund and Object To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Infrastructure Surtax Capital Projects
Operating Revenue 5,074,391 - - - - - 5,074,391
Funding Total 5,074,391 - - - - - 5,074,391
Expenditure(s) Appropriated By Object and Cost Center To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Improvements Road and Bridge
Infrastructure Tax Transportation 5,074,391 - - - - - 5,074,391
Expenditure Total 5,074,391 - - - - - 5,074,391
182
- ......... Marion S:~'¾nry
Marion County Board of County Commissioners Proposed Capital Improvement Program - Project Detail
Fiscal Years 2021-2025
Project: STC073860 Title: S Hwy 314A Infrast Srtx
Department: Office of the County Engineer
Project Description
Transportation project at S Hwy 314A to be completed with funds from the Infrastructure Surtax.
Project Funding and Costs
Funding Source(s) Appropriated By Fund and Object To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Infrastructure Surtax Capital Projects
Operating Revenue 3,300,000 - - - - - 3,300,000
Funding Total 3,300,000 - - - - - 3,300,000
Expenditure(s) Appropriated By Object and Cost Center To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Improvements Road and Bridge
Infrastructure Tax Transportation 3,300,000 - - - - - 3,300,000
Expenditure Total 3,300,000 - - - - - 3,300,000
183
- ......... Marion S:~'¾nry
Marion County Board of County Commissioners Proposed Capital Improvement Program - Project Detail
Fiscal Years 2021-2025
Project: STC073861 Title: S 182nd Avenue Rd Infrast Srtx
Department: Office of the County Engineer
Project Description
Transportation project at SE 182nd Avenue Road to be completed with funds from the Infrastructure Surtax.
Project Funding and Costs
Funding Source(s) Appropriated By Fund and Object To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Infrastructure Surtax Capital Projects
Operating Revenue 3,111,089 - - - - - 3,111,089
Funding Total 3,111,089 - - - - - 3,111,089
Expenditure(s) Appropriated By Object and Cost Center To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Improvements Road and Bridge
Infrastructure Tax Transportation 3,111,089 - - - - - 3,111,089
Expenditure Total 3,111,089 - - - - - 3,111,089
184
- ......... Marion S:~'¾nry
Marion County Board of County Commissioners Proposed Capital Improvement Program - Project Detail
Fiscal Years 2021-2025
Project: STC073863 Title: SW 38th Avenue Infrast Srtx
Department: Office of the County Engineer
Project Description
Transportation project at SW 38th Avenue to be completed with funds from the Infrastructure Surtax.
Project Funding and Costs
Funding Source(s) Appropriated By Fund and Object To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Infrastructure Surtax Capital Projects
Operating Revenue 813,395 - - - - - 813,395
Funding Total 813,395 - - - - - 813,395
Expenditure(s) Appropriated By Object and Cost Center To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Improvements Road and Bridge
Infrastructure Tax Transportation 813,395 - - - - - 813,395
Expenditure Total 813,395 - - - - - 813,395
185
- ......... Marion S:~'¾nry
Marion County Board of County Commissioners Proposed Capital Improvement Program - Project Detail
Fiscal Years 2021-2025
Project: STC073864 Title: CR 484 Infrast Srtx
Department: Office of the County Engineer
Project Description
Transportation project at CR 484 - South to be completed with funds from the Infrastructure Surtax.
Project Funding and Costs
Funding Source(s) Appropriated By Fund and Object To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Infrastructure Surtax Capital Projects
Operating Revenue 8,900,000 - - - - - 8,900,000
Funding Total 8,900,000 - - - - - 8,900,000
Expenditure(s) Appropriated By Object and Cost Center To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Land Acquisition Right of Way Easements
Infrastructure Tax Transportation 860,000 - - - - - 860,000
Improvements Road and Bridge
Infrastructure Tax Transportation 8,040,000 - - - - - 8,040,000
Expenditure Total 8,900,000 - - - - - 8,900,000
186
- ......... Marion S:~'¾nry
Marion County Board of County Commissioners Proposed Capital Improvement Program - Project Detail
Fiscal Years 2021-2025
Project: STC073865 Title: Emerald Road Extension Infrast Srtx
Department: Office of the County Engineer
Project Description
Transportation project at Emerald Road Extension to be completed with funds from the Infrastructure Surtax.
Project Funding and Costs
Funding Source(s) Appropriated By Fund and Object To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Infrastructure Surtax Capital Projects
Operating Revenue 409,622 - - - - - 409,622
Funding Total 409,622 - - - - - 409,622
Expenditure(s) Appropriated By Object and Cost Center To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Improvements Road and Bridge
Infrastructure Tax Transportation 409,622 - - - - - 409,622
Expenditure Total 409,622 - - - - - 409,622
187
- ......... Marion S:~'¾nry
Marion County Board of County Commissioners Proposed Capital Improvement Program - Project Detail
Fiscal Years 2021-2025
Project: STC073866 Title: NW 80th 70th Avenue Infrast Srtx
Department: Office of the County Engineer
Project Description
Transportation project at NW 80th/70th Avenue to be completed with funds from the Infrastructure Surtax.
Project Funding and Costs
Funding Source(s) Appropriated By Fund and Object To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Infrastructure Surtax Capital Projects
Operating Revenue 2,297,963 - - - - - 2,297,963
Funding Total 2,297,963 - - - - - 2,297,963
Expenditure(s) Appropriated By Object and Cost Center To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Improvements Road and Bridge
Infrastructure Tax Transportation 2,297,963 - - - - - 2,297,963
Expenditure Total 2,297,963 - - - - - 2,297,963
188
- ......... Marion S:~'¾nry
Marion County Board of County Commissioners Proposed Capital Improvement Program - Project Detail
Fiscal Years 2021-2025
Project: STC073867 Title: NW 70th Ave At Us 27 Infrast Srtx
Department: Office of the County Engineer
Project Description
Transportation project at NW 70th Ave at US 27 to be completed with funds from the Infrastructure Surtax.
Project Funding and Costs
Funding Source(s) Appropriated By Fund and Object To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Infrastructure Surtax Capital Projects
Operating Revenue 6,710,000 - - - - - 6,710,000
Funding Total 6,710,000 - - - - - 6,710,000
Expenditure(s) Appropriated By Object and Cost Center To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Land Acquisition Right of Way Easements
Infrastructure Tax Transportation 1,840,000 - - - - - 1,840,000
Improvements Road and Bridge
Infrastructure Tax Transportation 4,870,000 - - - - - 4,870,000
Expenditure Total 6,710,000 - - - - - 6,710,000
189
- ......... Marion S:~'¾nry
Marion County Board of County Commissioners Proposed Capital Improvement Program - Project Detail
Fiscal Years 2021-2025
Project: STC073868 Title: NW 80th Ave At Sr 40 Infrast Srtx
Department: Office of the County Engineer
Project Description
Transportation project at NW 80th Ave at SR 40 to be completed with funds from Infrastructure Surtax.
Project Funding and Costs
Funding Source(s) Appropriated By Fund and Object To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Infrastructure Surtax Capital Projects
Operating Revenue 5,350,000 - - - - - 5,350,000
Funding Total 5,350,000 - - - - - 5,350,000
Expenditure(s) Appropriated By Object and Cost Center To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Land Acquisition Right of Way Easements
Infrastructure Tax Transportation 1,030,000 - - - - - 1,030,000
Improvements Road and Bridge
Infrastructure Tax Transportation 4,320,000 - - - - - 4,320,000
Expenditure Total 5,350,000 - - - - - 5,350,000
190
- ......... Marion S:~'¾nry
Marion County Board of County Commissioners Proposed Capital Improvement Program - Project Detail
Fiscal Years 2021-2025
Project: SWC000001 Title: Recycling Centers Improvements
Department: Solid Waste
Project Description
Repair and modification to existing seventeen (17) recycling centers (other than BL RC), including but not limited to: lighting, fencing, sheds, road resurfacing, drainage, striping, landscaping and other needs as determined.
Project Funding and Costs
Funding Source(s) Appropriated By Fund and Object To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Solid Waste Disposal Fund Operating Revenue 1,710,000 300,000 - - - - 2,010,000
Funding Total 1,710,000 300,000 - - - - 2,010,000
Expenditure(s) Appropriated By Object and Cost Center To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Improvements CIP Solid Waste Recycling 1,440,000 300,000 - - - - 1,740,000
Machinery and Equipment CIP
Solid Waste Recycling 270,000 - - - - - 270,000
Expenditure Total 1,710,000 300,000 - - - - 2,010,000
191
- ......... Marion S:~'¾nry
Marion County Board of County Commissioners Proposed Capital Improvement Program - Project Detail
Fiscal Years 2021-2025
Project: SWC000006 Title: Martel Landfill
Department: Solid Waste
Project Description
Martel Landfill contamination assessment and the remediation action plan implementation. Complete the contamination assessment and associated required remediation; construct a drinking water supply line for residential units next to landfill.
Project Funding and Costs
Funding Source(s) Appropriated By Fund and Object To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Solid Waste Disposal Fund Operating Revenue 1,673,011 - - - - - 1,673,011
Funding Total 1,673,011 - - - - - 1,673,011
Expenditure(s) Appropriated By Object and Cost Center To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Professional Services Solid Waste Disposal 148,430 - - - - - 148,430
Improvements CIP Solid Waste Disposal 1,524,581 - - - - - 1,524,581
Expenditure Total 1,673,011 - - - - - 1,673,011
192
- ......... Marion S:~'¾nry
Marion County Board of County Commissioners Proposed Capital Improvement Program - Project Detail
Fiscal Years 2021-2025
Project: SWC000011 Title: Davis Landfill
Department: Solid Waste
Project Description
Davis Landfill contamination assessment and remediation action plan implementation. Includes additional groundwater monitoring well installation and expanding the landfill gas collection system for increased effectiveness.
Project Funding and Costs
Funding Source(s) Appropriated By Fund and Object To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Solid Waste Disposal Fund Operating Revenue 2,527,251 - - - - - 2,527,251
Funding Total 2,527,251 - - - - - 2,527,251
Expenditure(s) Appropriated By Object and Cost Center To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Professional Services Solid Waste Disposal 536,295 - - - - - 536,295
Improvements CIP Solid Waste Disposal 1,990,956 - - - - - 1,990,956
Expenditure Total 2,527,251 - - - - - 2,527,251
193
- ......... Marion S:~'¾nry
Marion County Board of County Commissioners Proposed Capital Improvement Program - Project Detail
Fiscal Years 2021-2025
Project: SWC000012 Title: Davis Potable Water System
Department: Solid Waste
Project Description
Davis Landfill area requires the installation of a potable water supply system well and pipeline to replace an existing water supply well with a distribution pipeline system. Extension of drinking water distribution pipeline along SE 132nd Street that is within extent of groundwater contamination.
Project Funding and Costs
Funding Source(s) Appropriated By Fund and Object To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Solid Waste Disposal Fund Operating Revenue 3,554,098 - - - - - 3,554,098
Funding Total 3,554,098 - - - - - 3,554,098
Expenditure(s) Appropriated By Object and Cost Center To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Professional Services Solid Waste Disposal 210,683 - - - - - 210,683
Improvements CIP Solid Waste Disposal 3,343,415 - - - - - 3,343,415
Expenditure Total 3,554,098 - - - - - 3,554,098
194
- ......... Marion S:~'¾nry
Marion County Board of County Commissioners Proposed Capital Improvement Program - Project Detail
Fiscal Years 2021-2025
Project: SWC000013 Title: Baseline Landfill
Department: Solid Waste
Project Description
Baseline Landfill and Urban Landfill (closed cell) operational improvements and the contamination assessment activities with the remediation action plan implementation.
Project Funding and Costs
Funding Source(s) Appropriated By Fund and Object To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Solid Waste Disposal Fund Operating Revenue 2,562,970 - - - - - 2,562,970
Funding Total 2,562,970 - - - - - 2,562,970
Expenditure(s) Appropriated By Object and Cost Center To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Professional Services Solid Waste Disposal 230,114 - - - - - 230,114
Improvements CIP Solid Waste Disposal 1,960,143 - - - - - 1,960,143
Machinery and Equipment CIP
Solid Waste Disposal 372,713 - - - - - 372,713
Expenditure Total 2,562,970 - - - - - 2,562,970
195
- ......... Marion S:~'¾nry
Marion County Board of County Commissioners Proposed Capital Improvement Program - Project Detail
Fiscal Years 2021-2025
Project: SWC000018 Title: Baseline Landfill Improvements I
Department: Solid Waste
Project Description
Baseline Landfill entrance road / storm water improvements / side slope modification.
Project Funding and Costs
Funding Source(s) Appropriated By Fund and Object To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Solid Waste Disposal Fund Operating Revenue 2,610,285 - - - - - 2,610,285
Funding Total 2,610,285 - - - - - 2,610,285
Expenditure(s) Appropriated By Object and Cost Center To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Professional Services Solid Waste Disposal 54,105 - - - - - 54,105
Improvements CIP Solid Waste Disposal 2,556,180 - - - - - 2,556,180
Expenditure Total 2,610,285 - - - - - 2,610,285
196
- ......... Marion S:~'¾nry
Marion County Board of County Commissioners Proposed Capital Improvement Program - Project Detail
Fiscal Years 2021-2025
Project: SWC000020 Title: Baseline Landfill Improvements III
Department: Solid Waste
Project Description
Baseline Landfill gas collection system and landfill flare modification improvement projects.
Project Funding and Costs
Funding Source(s) Appropriated By Fund and Object To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Solid Waste Disposal Fund Operating Revenue 3,077,750 - - - - - 3,077,750
Funding Total 3,077,750 - - - - - 3,077,750
Expenditure(s) Appropriated By Object and Cost Center To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Professional Services Solid Waste Disposal 205,560 - - - - - 205,560
Computer Software Solid Waste Disposal 6,749 - - - - - 6,749
Improvements CIP Solid Waste Disposal 2,787,190 - - - - - 2,787,190
Machinery and Equipment CIP
Solid Waste Disposal 78,251 - - - - - 78,251
Expenditure Total 3,077,750 - - - - - 3,077,750
197
- ......... Marion S:~'¾nry
Marion County Board of County Commissioners Proposed Capital Improvement Program - Project Detail
Fiscal Years 2021-2025
Project: SWC000026 Title: Single Stream Recycling
Department: Solid Waste
Project Description
Implement single stream recycling at the 18 recycling centers. This project may require capital improvements in order to equip and/or modify the recycling centers to provide for adequate collection of single stream recyclables.
Project Funding and Costs
Funding Source(s) Appropriated By Fund and Object To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Solid Waste Disposal Fund Operating Revenue 380,500 - - - - - 380,500
Funding Total 380,500 - - - - - 380,500
Expenditure(s) Appropriated By Object and Cost Center To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Improvements CIP Solid Waste Disposal 380,500 - - - - - 380,500
Expenditure Total 380,500 - - - - - 380,500
198
- ......... Marion S:~'¾nry
Marion County Board of County Commissioners Proposed Capital Improvement Program - Project Detail
Fiscal Years 2021-2025
Project: SWC000027 Title: Citizen Drop Off Facility Baseline
Department: Solid Waste
Project Description
Planning a convenient and safe facility for hand-unload vehicles that are currently using the transfer station. Will keep hand-unload vehicles away from heavy equipment and large commercial truck operations. Citizens drop off will be implemented in anticipation of the closure of the Baseline Landfill and the transfer of waste to the Heart of Florida Landfill.
Project Funding and Costs
Funding Source(s) Appropriated By Fund and Object To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Solid Waste Disposal Fund Operating Revenue 3,163,726 - - - - - 3,163,726
Funding Total 3,163,726 - - - - - 3,163,726
Expenditure(s) Appropriated By Object and Cost Center To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Improvements CIP Solid Waste Disposal 3,163,726 - - - - - 3,163,726
Expenditure Total 3,163,726 - - - - - 3,163,726
199
- ......... Marion S:~'¾nry
Marion County Board of County Commissioners Proposed Capital Improvement Program - Project Detail
Fiscal Years 2021-2025
Project: SWC000028 Title: Baseline Transfer Station Improvements
Department: Solid Waste
Project Description
Transfer Station improvements in anticipation of transferring waste to the Heart of Florida Landfill after closing of the Baseline Landfill. Improvements include the resurfacing of the transfer station floor, tunnel scales replacement, leachate collection system improvements, and eventual preparation and painting, both external and internal.
Project Funding and Costs
Funding Source(s) Appropriated By Fund and Object To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Solid Waste Disposal Fund Operating Revenue 684,121 - - - - - 684,121
Funding Total 684,121 - - - - - 684,121
Expenditure(s) Appropriated By Object and Cost Center To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Improvements CIP Solid Waste Disposal 484,121 - - - - - 484,121
Machinery and Equipment CIP
Solid Waste Disposal 200,000 - - - - - 200,000
Expenditure Total 684,121 - - - - - 684,121
200
- ......... Marion S:~'¾nry
Marion County Board of County Commissioners Proposed Capital Improvement Program - Project Detail
Fiscal Years 2021-2025
Project: SWC000029 Title: Baseline Landfill A B C Wet Wells
Department: Solid Waste
Project Description
Baseline Landfill A, B and C Wet Well pumps, plumbing, and electrical improvements.
Project Funding and Costs
Funding Source(s) Appropriated By Fund and Object To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Solid Waste Disposal Fund Operating Revenue 1,125,000 - - - - - 1,125,000
Funding Total 1,125,000 - - - - - 1,125,000
Expenditure(s) Appropriated By Object and Cost Center To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Improvements CIP Solid Waste Disposal 1,100,000 - - - - - 1,100,000
Machinery and Equipment CIP
Solid Waste Disposal 25,000 - - - - - 25,000
Expenditure Total 1,125,000 - - - - - 1,125,000
201
- ......... Marion S:~'¾nry
Marion County Board of County Commissioners Proposed Capital Improvement Program - Project Detail
Fiscal Years 2021-2025
Project: SWC000030 Title: Newton Contamination Remediation
Department: Solid Waste
Project Description
Newton Landfill contamination remediation. Original project was to complete the contamination assessment; install a landfill closure plan to grade and shape the land for stormwater control; provide a drinking water supply for on-site facilities; construct a recycling center.
Project Funding and Costs
Funding Source(s) Appropriated By Fund and Object To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Solid Waste Disposal Fund Operating Revenue 585,000 - - - - - 585,000
Funding Total 585,000 - - - - - 585,000
Expenditure(s) Appropriated By Object and Cost Center To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Improvements CIP Solid Waste Disposal 585,000 - - - - - 585,000
Expenditure Total 585,000 - - - - - 585,000
202
- ......... Marion S:~'¾nry
Marion County Board of County Commissioners Proposed Capital Improvement Program - Project Detail
Fiscal Years 2021-2025
Project: SWC000033 Title: Baseline Class I Landfill Closure
Department: Solid Waste
Project Description
Design, permitting, construction and other associated tasks related to closing the permitted class I landfill.
Project Funding and Costs
Funding Source(s) Appropriated By Fund and Object To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Solid Waste Disposal Fund Operating Revenue 1,400,000 17,500,000 - - - - 18,900,000
Funding Total 1,400,000 17,500,000 - - - - 18,900,000
Expenditure(s) Appropriated By Object and Cost Center To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Improvements CIP Solid Waste Disposal 1,400,000 17,500,000 - - - - 18,900,000
Expenditure Total 1,400,000 17,500,000 - - - - 18,900,000
203
- ......... Marion S:~'¾nry
Marion County Board of County Commissioners Proposed Capital Improvement Program - Project Detail
Fiscal Years 2021-2025
Project: SWC000034 Title: Baseline Scale Complex Improvements
Department: Solid Waste
Project Description
Investigate, improve scale/scale house settling, connect scale house sewage to sewer line and other scale and scale house upgrades and enhancements.
Project Funding and Costs
Funding Source(s) Appropriated By Fund and Object To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Solid Waste Disposal Fund Operating Revenue 120,000 - - - - - 120,000
Funding Total 120,000 - - - - - 120,000
Expenditure(s) Appropriated By Object and Cost Center To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Improvements CIP Solid Waste Disposal 100,000 - - - - - 100,000
Machinery and Equipment CIP
Solid Waste Disposal 20,000 - - - - - 20,000
Expenditure Total 120,000 - - - - - 120,000
204
- ......... Marion S:~'¾nry
Marion County Board of County Commissioners Proposed Capital Improvement Program - Project Detail
Fiscal Years 2021-2025
Project: SWC000035 Title: Solid Waste Animal Svc Master Plan
Department: Solid Waste
Project Description
Master site plan to include design, plan, permitting, and construction of operational facilities. Plan includes Solid Waste administration building expansion, animal storage freezer, storm water needs, utilities needs, demolition and removal of old buildings, and improvements to the Baseline Recycling Center.
Project Funding and Costs
Funding Source(s) Appropriated By Fund and Object To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Solid Waste Disposal Fund Operating Revenue 157,909 - - - - - 157,909
Funding Total 157,909 - - - - - 157,909
Expenditure(s) Appropriated By Object and Cost Center To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Improvements CIP Solid Waste Disposal 157,909 - - - - - 157,909
Expenditure Total 157,909 - - - - - 157,909
205
- ......... Marion S:~'¾nry
Marion County Board of County Commissioners Proposed Capital Improvement Program - Project Detail
Fiscal Years 2021-2025
Project: SWC000036 Title: Hazard Mitigation Generators
Department: Solid Waste
Project Description
Purchase and installation of four permanent generators at four waste recycling centers to mitigate damage from storms.
Project Funding and Costs
Funding Source(s) Appropriated By Fund and Object To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Solid Waste Disposal Fund Hazard Mitigation 180,000 - - - - - 180,000 Operating Revenue 60,000 - - - - - 60,000
Funding Total 240,000 - - - - - 240,000
Expenditure(s) Appropriated By Object and Cost Center To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Improvements CIP Solid Waste Recycling 240,000 - - - - - 240,000
Expenditure Total 240,000 - - - - - 240,000
206
- ......... Marion S:~'¾nry
Marion County Board of County Commissioners Proposed Capital Improvement Program - Project Detail
Fiscal Years 2021-2025
Project: SWC000040 Title: Baseline LF New Recycling Center
Department: Solid Waste
Project Description
Design and construction of new recycling center at Baseline LF
Project Funding and Costs
Funding Source(s) Appropriated By Fund and Object To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Solid Waste Disposal Fund Operating Revenue - 1,800,000 - - - - 1,800,000
Funding Total - 1,800,000 - - - - 1,800,000
Expenditure(s) Appropriated By Object and Cost Center To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Improvements CIP Solid Waste Recycling - 1,800,000 - - - - 1,800,000
Expenditure Total - 1,800,000 - - - - 1,800,000
207
- ......... Marion S:~'¾nry
Marion County Board of County Commissioners Proposed Capital Improvement Program - Project Detail
Fiscal Years 2021-2025
Project:
Department:
SWC000041
Solid Waste
Title: Inbound Scale With Automation Design
Additional inbound scale with automation design
Project Description
Project Funding and Costs
Funding Source(s) Appropriated By Fund and Object To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Solid Waste Disposal Fund Operating Revenue - 200,000 - - - - 200,000
Funding Total - 200,000 - - - - 200,000
Expenditure(s) Appropriated By Object and Cost Center To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Improvements CIP Solid Waste Disposal - 200,000 - - - - 200,000
Expenditure Total - 200,000 - - - - 200,000
208
- ......... Marion S:~'¾nry
Marion County Board of County Commissioners Proposed Capital Improvement Program - Project Detail
Fiscal Years 2021-2025
Project: UTC000059 Title: Lift Station And Sewer Mains
Department: Utilities Management
Project Description
These projects include construction and rehab of gravity mains, force mains, manholes, and lift stations throughout the County. The projects included are:1) Rehabilitation of 10 lift stations 2) Sewer main cleaning services3) Manhole rehabilitation4) Odor Control
Project Funding and Costs
Funding Source(s) Appropriated By Fund and Object To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Marion County Utility Fund Bond Proceeds 265,674 - - - - - 265,674 Operating Revenue 13,261,977 2,585,000 - - - - 15,846,977
Funding Total 13,527,651 2,585,000 - - - - 16,112,651
Expenditure(s) Appropriated By Object and Cost Center To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Improvements CIP Utilities Capital Construction 13,261,977 2,585,000 - - - - 15,846,977
Improvements 2010 Utility Debt
Utilities Capital Construction 265,674 - - - - - 265,674
Expenditure Total 13,527,651 2,585,000 - - - - 16,112,651
209
- ......... Marion S:~'¾nry
Marion County Board of County Commissioners Proposed Capital Improvement Program - Project Detail
Fiscal Years 2021-2025
Project: UTC000115 Title: Relocations Due To Construction
Department: Utilities Management
Project Description
Ongoing project to fund water and sewer relocations due to roadway improvements. These infrastructure improvements are associated with the water and wastewater transmission component of the utility capital charge fee.
Project Funding and Costs
Funding Source(s) Appropriated By Fund and Object To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Marion County Utility Fund Bond Proceeds 189,415 - - - - - 189,415 Operating Revenue 1,688,617 200,000 - - - - 1,888,617
Funding Total 1,878,032 200,000 - - - - 2,078,032
Expenditure(s) Appropriated By Object and Cost Center To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Improvements CIP Utilities Capital Construction 1,688,617 200,000 - - - - 1,888,617
Improvements 2010 Utility Debt
Utilities Capital Construction 189,415 - - - - - 189,415
Expenditure Total 1,878,032 200,000 - - - - 2,078,032
210
- ......... Marion S:~'¾nry
Marion County Board of County Commissioners Proposed Capital Improvement Program - Project Detail
Fiscal Years 2021-2025
Project: UTC000116 Title: Water Mains And Fire Hydrants
Department: Utilities Management
Project Description
Design and construction of new water mains and new fire hydrants Countywide. The projects included are:1) Replacement of the Lindale mobile home park water system2) Watermain extension on Del Webb Blvd. & WTP #1 watermain replacement3) Marion Oaks watermain extension and SW HWY 484 watermain replacement4) Continue County-wide upgrade of fire hydrants5) Baseline - 464 South to RR
Project Funding and Costs
Funding Source(s) Appropriated By Fund and Object To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Marion County Utility Fund Bond Proceeds 1,171,638 - - - - - 1,171,638 Operating Revenue 19,905,030 3,250,000 - - - - 23,155,030
Funding Total 21,076,668 3,250,000 - - - - 24,326,668
Expenditure(s) Appropriated By Object and Cost Center To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Improvements CIP Utilities Capital Construction 19,905,030 3,250,000 - - - - 23,155,030
Improvements 2010 Utility Debt
Utilities Capital Construction 1,171,638 - - - - - 1,171,638
Expenditure Total 21,076,668 3,250,000 - - - - 24,326,668
211
- ......... Marion S:~'¾nry
Marion County Board of County Commissioners Proposed Capital Improvement Program - Project Detail
Fiscal Years 2021-2025
Project: UTC000117 Title: Automated Meter Reading
Department: Utilities Management
Project Description
This program will allow installation of automatic meter reading equipment and meter exchanges in accordance with recommended operating procedures.
Project Funding and Costs
Funding Source(s) Appropriated By Fund and Object To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Marion County Utility FundBond Proceeds 1,163,790 - - - - - 1,163,790 Operating Revenue 6,486,520 450,000 - - - - 6,936,520
Funding Total 7,650,310 450,000 - - - - 8,100,310
Expenditure(s) Appropriated By Object and Cost Center To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Improvements CIP Utilities Capital Construction 6,486,520 450,000 - - - - 6,936,520
Improvements 2010 Utility Debt
Utilities Capital Construction 1,163,790 - - - - - 1,163,790
Expenditure Total 7,650,310 450,000 - - - - 8,100,310
212
- ......... Marion S:~'¾nry
Marion County Board of County Commissioners Proposed Capital Improvement Program - Project Detail
Fiscal Years 2021-2025
Project: UTC000135 Title: Reclaimed Water Stations And Mains
Department: Utilities Management
Project Description
Design & Construct reclaimed capabilitiesThe project is:1) Silver Springs Shores Baseline Reclaimed Water Line & Pumps (GCC/Belleview)
Project Funding and Costs
Funding Source(s) Appropriated By Fund and Object To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Marion County Utility Fund Operating Revenue 5,432,054 - - - - - 5,432,054
Funding Total 5,432,054 - - - - - 5,432,054
Expenditure(s) Appropriated By Object and Cost Center To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Improvements CIP Utilities Capital Construction 5,432,054 - - - - - 5,432,054
Expenditure Total 5,432,054 - - - - - 5,432,054
213
- ......... Marion S:~'¾nry
Marion County Board of County Commissioners Proposed Capital Improvement Program - Project Detail
Fiscal Years 2021-2025
Project: UTC000136 Title: Water Treatment Plant Improvements
Department: Utilities Management
Project Description
Design and construction of new water plants and rehabilitation or expansion of existing water plants Countywide.The projects are:1) Rehabilitation of Water Treatment Plant #4 in Marion Oaks2) New Alternative Water Test Wells @ North SR2003) New well @ Golden Ocala4) New well @ Ashley Farms
Project Funding and Costs
Funding Source(s) Appropriated By Fund and Object To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Marion County Utility Fund Operating Revenue 7,547,322 1,350,000 - - - - 8,897,322
Funding Total 7,547,322 1,350,000 - - - - 8,897,322
Expenditure(s) Appropriated By Object and Cost Center To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Improvements CIP Utilities Capital Construction 7,547,322 1,350,000 - - - - 8,897,322
Expenditure Total 7,547,322 1,350,000 - - - - 8,897,322
214
- ......... Marion S:~'¾nry
Marion County Board of County Commissioners Proposed Capital Improvement Program - Project Detail
Fiscal Years 2021-2025
Project: UTC000138 Title: Wastewater Treatment Plant Improvements
Department: Utilities Management
Project Description
Design and construction of new wastewater plants and rehabilitation or expansion of existing wastewater plants Countywide.
Project Funding and Costs
Funding Source(s) Appropriated By Fund and Object To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Marion County Utility Fund Operating Revenue 13,620,044 300,000 - - - - 13,920,044
Funding Total 13,620,044 300,000 - - - - 13,920,044
Expenditure(s) Appropriated By Object and Cost Center To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Improvements CIP Utilities Capital Construction 13,620,044 300,000 - - - - 13,920,044
Expenditure Total 13,620,044 300,000 - - - - 13,920,044
215
- ......... Marion S:~'¾nry
Marion County Board of County Commissioners Proposed Capital Improvement Program - Project Detail
Fiscal Years 2021-2025
Project: UTC000140 Title: Computerized Maint Management System
Department: Utilities Management
Project Description
Purchase, installation, integration, and data import of a Computerized Maintenance Management System. Computer software to improve inventory control, database information, valuation information, work order flow, maintenance schedules, track expenditures in labor and parts, provide manpower requirements to complete tasks, and help in planning the budget.
Project Funding and Costs
Funding Source(s) Appropriated By Fund and Object To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Marion County Utility Fund Operating Revenue 522,231 - - - - - 522,231
Funding Total 522,231 - - - - - 522,231
Expenditure(s) Appropriated By Object and Cost Center To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Improvements CIP Utilities Capital Construction 522,231 - - - - - 522,231
Expenditure Total 522,231 - - - - - 522,231
216
- ......... Marion S:~'¾nry
Marion County Board of County Commissioners Proposed Capital Improvement Program - Project Detail
Fiscal Years 2021-2025
Project: UTC000144 Title: Toilet Rebate Minor Capital Replacement
Department: Utilities Management
Project Description
These funds allow for small scale water conservation efforts and campaigns. These programs offset the withdrawal of groundwater which would delay the need of an alternative water source.
Project Funding and Costs
Funding Source(s) Appropriated By Fund and Object To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Marion County Utility Fund Operating Revenue 319,228 - - - - - 319,228
Funding Total 319,228 - - - - - 319,228
Expenditure(s) Appropriated By Object and Cost Center To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Professional Services Utilities Capital Construction 200,000 - - - - - 200,000
Improvements CIP Utilities Capital Construction 119,228 - - - - - 119,228
Expenditure Total 319,228 - - - - - 319,228
217
- ......... Marion S:~'¾nry
Marion County Board of County Commissioners Proposed Capital Improvement Program - Project Detail
Fiscal Years 2021-2025
Project:
Department:
UTC000154
Utilities Management
Title: Ocala Crossing South Pud Utility Improvements
Project Description
Improvements to the Ocala Crossings South PUD utilities system infrastructure.
Project Funding and Costs
Funding Source(s) Appropriated By Fund and Object To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Marion County Utility Fund Operating Revenue 2,101,103 - - - - - 2,101,103
Funding Total 2,101,103 - - - - - 2,101,103
Expenditure(s) Appropriated By Object and Cost Center To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Improvements CIP Utilities Capital Construction 2,101,103 - - - - - 2,101,103
Expenditure Total 2,101,103 - - - - - 2,101,103
218
- ......... Marion S:~'¾nry
Marion County Board of County Commissioners Proposed Capital Improvement Program - Project Detail
Fiscal Years 2021-2025
Project: UTC000155 Title: Smart Water Software Integration
Department: Utilities Management
Project Description
Marion County Utilities is soliciting proposals for the services of a consulting firm to assist the MCU staff in the feasibility, planning, designing, implementing and selecting of a Smart Water software integration system. The basic responsibility of the Firm shall be to propose the solution options and develop the appropriate strategies and supporting documentation to guide MCU towards the ultimate goal of implementing, integrating and installing a Smart Water system.
Project Funding and Costs
Funding Source(s) Appropriated By Fund and Object To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Marion County Utility Fund Operating Revenue 2,357,407 - - - - - 2,357,407
Funding Total 2,357,407 - - - - - 2,357,407
Expenditure(s) Appropriated By Object and Cost Center To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Improvements CIP Utilities Capital Construction 2,357,407 - - - - - 2,357,407
Expenditure Total 2,357,407 - - - - - 2,357,407
219
- ......... Marion S:~'¾nry
Marion County Board of County Commissioners Proposed Capital Improvement Program - Project Detail
Fiscal Years 2021-2025
Project: UTC000161 Title: Utility Acquisitions
Department: Utilities Management
Project Description
Funds to be used for various utilities acquisitions.
Project Funding and Costs
Funding Source(s) Appropriated By Fund and Object To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Marion County Utility Fund Operating Revenue 300,000 100,000 - - - - 400,000
Funding Total 300,000 100,000 - - - - 400,000
Expenditure(s) Appropriated By Object and Cost Center To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Improvements CIP Utilities Capital Construction 300,000 100,000 - - - - 400,000
Expenditure Total 300,000 100,000 - - - - 400,000
220
- ......... Marion S:~'¾nry
Marion County Board of County Commissioners Proposed Capital Improvement Program - Project Detail
Fiscal Years 2021-2025
Project: UTC000163 Title: Florida Horse Park Sewer Connection
Department: Utilities Management
Project Description
The Florida Horse Park and Marion County have partnered together for a 100% Florida Department of Environmental Protection (FDEP) grant to eliminate existing septic systems for two properties, the Florida Horse Park and Anthony's Pizza restaurant. Marion County is the grantee managing the grant and project. The Florida Horse Park sewer project includes surveying the site as well as the east right-of-way of County Road 475A; designing a lift station to county standards, approximately 11,000 linear feet of eight inch force main, and approximately 3,300 linear feet of eight inch gravity sewer; and constructing this infrastructure according to plan. The restaurant project includes extension of an existing force main connection to the County gravity collection system. The owner of the restaurant is responsible for design and construction with estimated project cost of $75,613. The grant will provide a $35,000 match for this project. Both projects will allow the properties to abandon their existing septic systems and connect to central wastewater, which will reduce their nitrogen loading on the environment.
Project Funding and Costs
Funding Source(s) By Fund and Object
Appropriated To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Marion County Utility Fund Water Protect Sustain
Program 1,296,553 - - - - - 1,296,553
Funding Total 1,296,553 - - - - - 1,296,553
Expenditure(s) By Object and Cost Center
Appropriated To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Improvements CIP Utilities Capital Construction 1,296,553 - - - - - 1,296,553
Expenditure Total 1,296,553 - - - - - 1,296,553
221
- ......... Marion S:~'¾nry
Marion County Board of County Commissioners Proposed Capital Improvement Program - Project Detail
Fiscal Years 2021-2025
Project: UTC000164 Title: SE 108th Water Main Interconnect
Department: Utilities Management
Project Description
The South East 108th Water Main interconnect project will consist of constructing a water main interconnect between two non-connected potable water systems (PWS) within Silver Springs Springshed. The water main will be approximately 14,200 linear feet of 16" PVC along a portion of County Road 464 to East Highway 25 along South East 108th Terrace Road.
Project Funding and Costs
Funding Source(s) Appropriated By Fund and Object To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Marion County Utility Fund SJRWMD Reimbursement 596,106 - - - - - 596,106 Operating Revenue 900,276 - - - - - 900,276
Funding Total 1,496,382 - - - - - 1,496,382
Expenditure(s) Appropriated By Object and Cost Center To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Improvements CIP Utilities Capital Construction 1,496,382 - - - - - 1,496,382
Expenditure Total 1,496,382 - - - - - 1,496,382
222
- ......... Marion S:~'¾nry
Marion County Board of County Commissioners Proposed Capital Improvement Program - Project Detail
Fiscal Years 2021-2025
Project:
Department:
UTC000165
Utilities Management
Title: Utilities Customer Service Building Renovation
Project Description
This project is to renovate the customer service building in Belleview. Renovations include expanding the break-room, installing more cubicles downstairs, installing a barrier wall between customers and office areas downstairs, creating office spaces upstairs and a new conference room.
Project Funding and Costs
Funding Source(s) Appropriated By Fund and Object To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Marion County Utility Fund Disaster Relief 86,580 - - - - - 86,580 Operating Revenue 309,240 - - - - - 309,240
Funding Total 395,820 - - - - - 395,820
Expenditure(s) Appropriated By Object and Cost Center To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Buildings CIP Utilities Capital Construction 105,320 - - - - - 105,320
Improvements CIP Utilities Capital Construction 290,500 - - - - - 290,500
Expenditure Total 395,820 - - - - - 395,820
223
- ......... Marion S:~'¾nry
Marion County Board of County Commissioners Proposed Capital Improvement Program - Project Detail
Fiscal Years 2021-2025
Project: UTC000166 Title: Master Wastewater Feasibility Study
Department: Utilities Management
Project Description
This project will study the feasi.bility of expanding central sewer and utilizing advanced on-site treatment and disposal systems to meet the nutrient reduction goals of the Silver Springs and Rainbow Springs Basin Management Action Plans (BMAPs)
Project Funding and Costs
Funding Source(s) Appropriated By Fund and Object To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Marion County Utility Fund Water Management
Protection 500,000 - - - - - 500,000
Funding Total 500,000 - - - - - 500,000
Expenditure(s) Appropriated By Object and Cost Center To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Improvements CIP Utilities Capital Construction 500,000 - - - - - 500,000
Expenditure Total 500,000 - - - - - 500,000
224
- ......... Marion S:~'¾nry
Marion County Board of County Commissioners Proposed Capital Improvement Program - Project Detail
Fiscal Years 2021-2025
Project: UTC000167 Title: Golden Ocala Wastewater Treatment
Department: Utilities Management
Project Description
Expansion of Golden Ocala wastewater plant.
Project Funding and Costs
Funding Source(s) Appropriated By Fund and Object To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Marion County Utility Fund SRF Loan Proceeds 16,000,000 - - - - - 16,000,000
Funding Total 16,000,000 - - - - - 16,000,000
Expenditure(s) Appropriated By Object and Cost Center To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Improvements SRF Loan Utilities Capital Construction 16,000,000 - - - - - 16,000,000
Expenditure Total 16,000,000 - - - - - 16,000,000
225
- ......... Marion S:~'¾nry
Marion County Board of County Commissioners Proposed Capital Improvement Program - Project Detail
Fiscal Years 2021-2025
Project: UTC000170 Title: Silver Springs Shores Wastewater
Department: Utilities Management
Project Description
This project is to expand the Silver Springs Shores Wastewater Treatment Facility capacity from 1.5 million gallons per day (MGD) to 2.0 MGD. The project includes upgrading and expanding the biological treatment process to advanced wastewater treatment standards, expanding headworks, adding new influent screen, expanding grit removal equipment, constructing chemical feed building, installing supplemental carbon system, installing alum system, and installing sludge holding tank decanter equipment.
Project Funding and Costs
Funding Source(s) Appropriated By Fund and Object To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Marion County Utility Fund SJRWMD Reimbursement 3,487,038 - - - - - 3,487,038 Operating Revenue 6,243,952 - - - - - 6,243,952
Funding Total 9,730,990 - - - - - 9,730,990
Expenditure(s) Appropriated By Object and Cost Center To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Improvements CIP Utilities Capital Construction 9,730,990 - - - - - 9,730,990
Expenditure Total 9,730,990 - - - - - 9,730,990
226
- ......... Marion S:~'¾nry
Marion County Board of County Commissioners Proposed Capital Improvement Program - Project Detail
Fiscal Years 2021-2025
Project: UTC000171 Title: Florida Commerce Commercial Park
Department: Utilities Management
Project Description
Florida Commerce Commercial Park improvements to water and sewer forcemain.
Project Funding and Costs
Funding Source(s) Appropriated By Fund and Object To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Marion County Utility Fund LAP Agreement 1,414,319 - - - - - 1,414,319 Operating Revenue 188,848 - - - - - 188,848
Funding Total 1,603,167 - - - - - 1,603,167
Expenditure(s) Appropriated By Object and Cost Center To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Improvements CIP Utilities Capital Construction 1,603,167 - - - - - 1,603,167
Expenditure Total 1,603,167 - - - - - 1,603,167
227
- ......... Marion S:~'¾nry
Marion County Board of County Commissioners Proposed Capital Improvement Program - Project Detail
Fiscal Years 2021-2025
Project: UTC000184 Title: CR484 At I75 Utility Reconstruction
Department: Utilities Management
Project Description
CR 484 at I-75 Utility Relocation from West of SW 20th Ave Rd to East of County Road 475A. FDOT is widening CR 484 under the I-75 overpass. As part of the work, MCU has utilities that will need to be relocated. FDOT is paying for the design and construction of our mains. This project also includes some additional design for designing a transmission main west of the FDOT work.
Project Funding and Costs
Funding Source(s) Appropriated By Fund and Object To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Marion County Utility Fund FDOT Reimbursement 300,000 - - - - - 300,000
Funding Total 300,000 - - - - - 300,000
Expenditure(s) Appropriated By Object and Cost Center To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Improvements CIP Utilities Capital Construction 300,000 - - - - - 300,000
Expenditure Total 300,000 - - - - - 300,000
228
- ......... Marion S:~'¾nry
Marion County Board of County Commissioners Proposed Capital Improvement Program - Project Detail
Fiscal Years 2021-2025
Project: VCC000001 Title: VCC Gateway Signage 42nd St Flyover
Department: Visitors and Convention Bureau
Project Description
Gateway Signage for Marion County for the 42nd Street Flyover.
Project Funding and Costs
Funding Source(s) Appropriated By Fund and Object To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Tourist Development Tax Operating Revenue 984,255 - - - - - 984,255
Funding Total 984,255 - - - - - 984,255
Expenditure(s) Appropriated By Object and Cost Center To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Improvements CIP Visitors And Convention
Bureau 984,255 - - - - - 984,255
Expenditure Total 984,255 - - - - - 984,255
229
- ......... Marion S:~'¾nry
Marion County Board of County Commissioners Proposed Capital Improvement Program - Project Detail
Fiscal Years 2021-2025
Project: VCC000002 Title: VCC Gateway Signage NW 49th Street
Department: Visitors and Convention Bureau
Project Description
Gateway Signage at the NW 49th Street Interchange
Project Funding and Costs
Funding Source(s) Appropriated By Fund and Object To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Tourist Development Tax Operating Revenue - - - - 1,500,000 - 1,500,000
Funding Total - - - - 1,500,000 - 1,500,000
Expenditure(s) Appropriated By Object and Cost Center To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Improvements CIP Visitors And Convention
Bureau - - - - 1,500,000 - 1,500,000
Expenditure Total - - - - 1,500,000 - 1,500,000
230
- ......... Marion S:~'¾nry
Marion County Board of County Commissioners Proposed Capital Improvement Program - Project Detail
Fiscal Years 2021-2025
Project: VCC000003 Title: VCC North County Line Gateway Sign
Department: Visitors and Convention Bureau
Project Description
Entryway pillar at the northern county line of Marion County. These would be entryway pillars that are at the northernmost county line to welcome visitors to the destination and to complement the NW 49th Street gateway signage.
Project Funding and Costs
Funding Source(s) Appropriated By Fund and Object To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Tourist Development Tax Operating Revenue 200,000 - - - - - 200,000
Funding Total 200,000 - - - - - 200,000
Expenditure(s) Appropriated By Object and Cost Center To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Improvements CIP Visitors And Convention
Bureau 200,000 - - - - - 200,000
Expenditure Total 200,000 - - - - - 200,000
231
- ......... Marion S:~'¾nry
Marion County Board of County Commissioners Proposed Capital Improvement Program - Project Detail
Fiscal Years 2021-2025
Project: VCC000004 Title: VCC South County Line Gateway Sign
Department: Visitors and Convention Bureau
Project Description
Entryway pillar at the southern county line of Marion County. These would be entryway pillars that are at the southernmost county line to welcome visitors to the destination and to complement the NW 42nd Street gateway signage. Plans and concept have not been developed for this project.
Project Funding and Costs
Funding Source(s) Appropriated By Fund and Object To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Tourist Development Tax Operating Revenue 200,000 - - - - - 200,000
Funding Total 200,000 - - - - - 200,000
Expenditure(s) Appropriated By Object and Cost Center To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Improvements CIP Visitors And Convention
Bureau 200,000 - - - - - 200,000
Expenditure Total 200,000 - - - - - 200,000
232
- ......... Marion S:~'¾nry
Marion County Board of County Commissioners Proposed Capital Improvement Program - Project Detail
Fiscal Years 2021-2025
Project: VCC000005 Title: VCC Visitor Center Signage
Department: Visitors and Convention Bureau
Project Description
This will cover monument and affixed signage for the Visitors and Convention Bureau building.
Project Funding and Costs
Funding Source(s) Appropriated By Fund and Object To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Tourist Development Tax Operating Revenue - 150,000 - - - - 150,000
Funding Total - 150,000 - - - - 150,000
Expenditure(s) Appropriated By Object and Cost Center To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Improvements CIP Visitors And Convention
Bureau - 150,000 - - - - 150,000
Expenditure Total - 150,000 - - - - 150,000
233
- ......... Marion S:~'¾nry
Marion County Board of County Commissioners Proposed Capital Improvement Program - Project Detail
Fiscal Years 2021-2025
Project: VHC000001 Title: Veterans Nursing Home
Department: Administration
Project Description
Preliminary engineering and site feasibility studies pertaining to the construction of a state veterans' nursing home in Marion County.
Project Funding and Costs
Funding Source(s) Appropriated By Fund and Object To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
General Fund Veterans Nursing Home
Grant 500,000 - - - - - 500,000
Funding Total 500,000 - - - - - 500,000
Expenditure(s) Appropriated By Object and Cost Center To Date FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Total
Buildings CIP Health Services Capital 500,000 - - - - - 500,000
Expenditure Total 500,000 - - - - - 500,000