Capital Improvement Program Fiscal Year 2020 Proposed Budget Summary
- 5 - City of San Diego Fiscal Year 2020 Proposed Budget
Fiscal Year 2020 Proposed Budget Summary
The Fiscal Year 2020 Proposed Capital Improvements Program (CIP) Budget is $715.8 million. This Proposed Budget allocates existing funds and anticipated revenues to both new and continuing projects in the City's multi-year CIP. The Proposed allocation of funds is based upon an analysis of available funding sources as well as a review of project needs and priorities. The City's CIP needs often exceed available resources; therefore, the Proposed Budget is constrained by the availability of funds. The Fiscal Year 2020 Proposed CIP Budget, as summarized in Table 1 below, is funded by a variety of sources, including, but not limited to, water and sewer enterprise funds, TransNet, General Fund Infrastructure, and park improvement funds. Further details on all funding sources and the specific projects included in the Fiscal Year 2020 Proposed CIP Budget can be found later in this section.
Table 1: Fiscal Year 2020 Proposed CIP Budget
Funding Source FY 2020
Proposed Percent of Total
CIP Budget
Fleet Services Internal Service Fund $ 1,270,598 0.18 %
Gas Tax Fund 4,156,286 0.58 %
General Fund 258,000 0.04 %
Golf Course Enterprise Fund 3,000,000 0.42 %
Infrastructure Fund 7,600,622 1.06 %
Mission Bay Park Improvement Fund 7,734,786 1.08 %
Mission Trails Regional Park Fund 195,332 0.03 %
Recycling Fund 1,100,000 0.15 %
Refuse Disposal Fund 4,300,000 0.60 %
San Diego Regional Parks Improvement Fund 3,500,000 0.49 %
Sewer Funds 310,278,460 43.35 %
TransNet Funds 20,589,394 2.88 %
Trench Cut/Excavation Fee Fund 2,000,000 0.28 %
Utilities Undergrounding Program Fund 5,000,000 0.70 %
Water Fund 344,777,064 48.17 %
Grand Total $ 715,760,542
An additional $294.3 million of funding is anticipated to be received during Fiscal Year 2020. This anticipated funding is not included in the Proposed CIP Budget because the funding sources either require additional City Council approval, such as Development Impact Fees (DIF), bonds, and grants, or the funding sources are more tentative, and staff will request City Council approval to appropriate when the funds have been received. Anticipated funding includes a variety of sources such as donations, grants, debt financing, developer funding, and DIF.
Capital Improvement Program Fiscal Year 2020 Proposed Budget Summary
- 6 - City of San Diego Fiscal Year 2020 Proposed Budget
The Fiscal Year 2020 Proposed CIP Budget will support various types of projects, as displayed in Figure 1, such as water and sewer facilities, buildings, and transportation projects. Because the allocation of resources is primarily driven by the availability of funds, the distribution of the Proposed CIP Budget is concentrated on those project types with dedicated funding sources. The Water and Sewer Funds account for 91.5 percent of the Proposed CIP Budget and support water and wastewater project types. In addition, 90.8 percent of the Proposed CIP Budget allocation for City buildings pertains to buildings that are maintained and operated by the Public Utilities Department which are funded by the Water and Sewer Funds. Transportation projects are primarily funded by TransNet and gas taxes, which may also fund transportation components of other project types in the right-of-way. Landfills, airports, and golf project types are funded by enterprise funds. Parks, and other building projects such as police, fire, and library buildings, compete for scarce resources, including Development Impact Fees and the City's General Fund.
Figure 1: Fiscal Year 2020 Proposed Budget by Project Type
The City's multi-year CIP includes assets which are maintained and operated by a variety of City departments, as shown below in Table 2. The largest funding allocation in the Fiscal Year 2020 Proposed CIP Budget is for the Public Utilities Department's projects, receiving $655.1 million, or 91.5 percent, of the Proposed CIP Budget. The second largest allocation is for the Transportation & Storm Water Department's projects, with $35.0 million, or 4.8 percent, of the Proposed CIP Budget. This distribution of funding for each department's projects is primarily dependent upon the resources available for funding the types of assets maintained by each department, combined with the amount, size and condition of those assets. Project pages for each asset managing department can be found later in this volume, beginning on page 87.
Capital Improvement Program Fiscal Year 2020 Proposed Budget Summary
- 7 - City of San Diego Fiscal Year 2020 Proposed Budget
Table 2: Multi-Year CIP
Department Prior Year FY2020
Proposed Future Years Total
Airports $ 19,411,043 $ - $ - $ 19,411,043
Citywide 86,395,588 1,528,598 691,577,385 779,501,571
Environmental Services 81,113,599 3,550,000 - 84,663,599
Fire-Rescue 97,062,762 - 87,435,003 184,497,765
Library 245,082,730 - 34,044,561 279,127,291
Parks & Recreation 450,463,269 17,677,951 234,700,127 702,841,347
Police 22,766,045 - - 22,766,045
Public Utilities 1,766,049,882 655,055,524 2,128,589,282 4,549,694,688
Public Works - Facilities Services 44,402,677 2,964,500 87,331,000 134,698,177
Sustainability 31,732,349 - 2,000,000 33,732,349
Transportation & Storm Water 1,060,907,365 34,983,969 1,985,953,608 3,081,844,942
Grand Total $ 3,905,387,310 $ 715,760,542 $ 5,251,630,966 $ 9,872,778,818
The Fiscal Year 2020 Proposed CIP Budget will add $715.8 million to the City's $9.87 billion multi-year CIP, as reflected in Table 2. City Council previously approved $3.91 billion towards projects that are continuing from previous fiscal years. An estimated $5.25 billion of additional funding will be needed in future years to complete the projects currently in the City's CIP and to annually fund ongoing capital expenses, such as road resurfacing and pipe replacements. The City's CIP does not include all of the City's unfunded CIP needs or new projects which may be added in future years. For more information about the City's multi-year CIP, please refer to the Profile of the City of San Diego's CIP section.
Funding Sources for the Fiscal Year 2020 Proposed CIP Budget
The Fiscal Year 2020 Proposed CIP Budget of $715.8 million was developed by evaluating available funding sources for new and continuing CIP projects. The following discussion identifies the funding sources which have been allocated to projects for Fiscal Year 2020 and describes each funding source's purpose and constraints. Some funding sources are very flexible and can be used for a variety of projects while other funding sources are restricted, in some cases to certain types of projects or areas of the community. Furthermore, funds to support capital projects are limited, requiring that project needs, and priorities be evaluated within the requirements of the funding sources. For more information on common funding sources used in the CIP, refer to the Funding Sources section of this volume. While projects are prioritized within project types, funding sources may be constrained by other factors, such as geographic region or specific contractual agreements. Therefore, projects with low priority scores may be proposed to receive funding
Capital Improvement Program Fiscal Year 2020 Proposed Budget Summary
- 8 - City of San Diego Fiscal Year 2020 Proposed Budget
because they are the highest scoring projects that meet the requirements of a particular funding source.
The Fiscal Year 2020 Proposed CIP Budget includes funding for 72 CIP projects, of which four are new this year. Most of the projects are standalones, limited to a single asset or set of assets with a clear scope for project completion, while others are annual allocation projects which receive funding each year to provide for ongoing repair and replacement of a certain asset type.
Included with the description of each funding source is a list of the projects that will receive funding in Fiscal Year 2020. Projects are listed in alphabetical order along with the project's page number, an indication of whether the project is new for Fiscal Year 2020 or continuing from a prior year, the project's priority score and category, and the Fiscal Year 2020 Proposed Budget amount. Annual allocation projects are not scored. Refer to the Project Prioritization section for more information on the scoring process.
Fleet Services Internal Service Fund
The Fleet Services Internal Service Fund provides all City Departments with motive equipment and comprehensive fleet management services. As an internal service fund, the Fleet Services Internal Service Fund is funded by other City departments on a cost-reimbursement basis. A total of $1.3 million has been added to the Fiscal Year 2020 Proposed Budget as shown in Table 3.
Table 3: Fleet Services Internal Service Fund Project Page No Project Status Priority Score Priority Category FY 2020
Fleet Operations Facilities / L14002 110 Continuing 84 High $ 270,598
Kearny Mesa Repair Facility / P20000 101 New N/A N/A 1,000,000
Total $ 1,270,598
Gas Tax Fund
The Gas Tax Fund collects revenue resulting from a tax on the sale of gasoline. The City's share of gas tax revenue is based on a formula that takes into account vehicle registration, and population. The Gas Tax funds received are used to perform citywide repairs and restoration to existing roadways, reduce congestion, improve safety, and provide for the construction of assets within the public right-of-way. A total of $4.2 million has been added to the Fiscal Year 2020 Proposed Budget as shown in Table 4.
Capital Improvement Program Fiscal Year 2020 Proposed Budget Summary
- 9 - City of San Diego Fiscal Year 2020 Proposed Budget
Table 4: Gas Tax Fund Project Page No Project Status Priority Score Priority Category FY 2020
Street Resurfacing and Reconstruction / AID00005
495 Continuing Annual Annual $ 4,156,286
Total $ 4,156,286
General Fund
The City's General Fund supports core community services, such as public safety, parks, libraries, refuse collection, and roadway maintenance. The largest funding sources for the General Fund are taxes, such as property, sales and transient occupancy taxes, and franchise fees. Because the General Fund is the primary funding source for basic City services and those funds are limited, General Fund monies are only used for the most urgent capital projects that do not have any other available funding sources. The use of General Fund monies for CIP impacts the operational budgets of the departments requesting these funds. The General Fund CIP budget for Fiscal Year 2020 is $258,000 as shown in Table 5.
Table 5: General Fund Project Page No Project Status Priority Score Priority Category FY 2020
Governmental Funded IT Projects / ATT00001
111 Continuing Annual Annual $ 258,000
Total $ 258,000
Golf Course Enterprise Fund
The Golf Course Enterprise Funds support the City's three municipal golf courses: Balboa Park, Mission Bay, and Torrey Pines. These funds receive revenue from the operations of the golf courses, which are in turn used to fund capital projects that improve and/or maintain the condition of the courses. A project for Mission Bay Golf Course received additional funding in Fiscal Year 2020, resulting in total Golf Course Enterprise Fund allocation of $3.0 million, as shown in Table 6.
Table 6: Golf Course Enterprise Fund Project Page No Project Status Priority Score Priority Category FY 2020
MB GC Clbhouse Demo/Prtbl Building Instl / S01090
241 Continuing 60 High $ 3,000,000
Total $ 3,000,000
Capital Improvement Program Fiscal Year 2020 Proposed Budget Summary
- 10 - City of San Diego Fiscal Year 2020 Proposed Budget
Infrastructure Fund
The Infrastructure Fund was established by Section 77.1 of Article VII of the City Charter to be a dedicated source of revenue to fund General Fund infrastructure efforts. This amendment to the charter was passed by San Diego voters in June 2016. These funds are used exclusively for the acquisition of real property, construction, reconstruction, rehabilitation, repair and maintenance of infrastructure, including the associated financing and personnel costs. The amount of revenue received by the fund is determined based on a formula that accounts for growth in major General Fund revenues and reductions in pension costs. For Fiscal Year 2020, a total amount of $7.6 million has been allocated to ten projects, as shown in Table 7.
Table 7: Infrastructure Fund Project Page No Project Status Priority Score Priority Category FY 2020
City Facilities Improvements / ABT00001
401 Continuing Annual Annual $ 964,500
CNG Fueling Station for Refuse & Recycling / S15000
123 Continuing 55 Low 150,000
Drainage Projects / ACA00001 451 Continuing Annual Annual 866,667
Egger/South Bay Community Park ADA Improvements / S15031
222 Continuing 60 Medium 800,000
Hickman Fields Athletic Area / S00751 231 Continuing 60 Medium 1,000,000
Olive Grove Community Park ADA Improve / S15028
258 Continuing 65 High 1,050,000
Park Improvements / AGF00007 264 Continuing Annual Annual 397,833
Sidewalk Repair and Reconstruction / AIK00003
485 Continuing Annual Annual 1,000,000
Street Resurfacing and Reconstruction / AID00005
495 Continuing Annual Annual 1,121,622
Traffic Calming / AIL00001 500 Continuing Annual Annual 250,000
Total $ 7,600,622
Mission Bay Park Improvement Fund
The Mission Bay Park Improvement Fund receives revenue from Mission Bay rents and concessions in accordance with San Diego City Charter Article V, Section 55.2. These funds may only be spent in Mission Bay Park for capital improvements. The Proposed Budget of $7.7 million is based on current projections of the revenue to be received by the end of Fiscal Year 2019. Once the revenue is received, the Parks & Recreation Department will work with the Mission Bay Park Improvement Fund Oversight Committee to identify specific sub-projects per the City Charter based on the actual amount of available revenue. For Fiscal Year 2020, $7.7 million has been allocated in the Mission Bay Improvements annual allocation, as shown in Table 8.
Capital Improvement Program Fiscal Year 2020 Proposed Budget Summary
- 11 - City of San Diego Fiscal Year 2020 Proposed Budget
Table 8: Mission Bay Park Improvement Fund Project Page No Project Status Priority Score Priority Category FY 2020
Mission Bay Improvements / AGF00004 247 Continuing Annual Annual $ 7,734,786
Total $ 7,734,786
Mission Trails Regional Park Fund
The Mission Trails Regional Park Fund mainly consists of rent monies from a variety of different communication facilities leases on Cowles Mountain. Funds are to be used for capital improvements in the Mission Trails Regional Park. For Fiscal Year 2020, $195,332 has been allocated in the Resource-Based open Space Parks annual allocation, as shown in Table 9.
Table 9: Mission Trails Regional Park Fund Project Page No Project Status Priority Score Priority Category FY 2020
Resource-Based Open Space Parks / AGE00001
268 Continuing Annual Annual $ 195,332
Total $ 195,332
Recycling Fund
The Recycling Fund is an enterprise fund that supports the City’s recycling programs, which receives revenue from a variety of fees associated with recycling. For Fiscal Year 2020, a total of $1.1 million has been allocated to two projects as shown in Table 10.
Table 10: Recycling Fund Project Page No Project Status Priority Score Priority Category FY 2020
CNG Fueling Station for Refuse & Recycling / S15000
123 Continuing 55 Low $ 100,000
Miramar Landfill Facility Improvements / L17000
126 Continuing 77 Low 1,000,000
Total $ 1,100,000
Capital Improvement Program Fiscal Year 2020 Proposed Budget Summary
- 12 - City of San Diego Fiscal Year 2020 Proposed Budget
Refuse Disposal Fund
The Refuse Disposal Fund is an enterprise fund that is used to operate the City's Miramar Landfill and maintain the City's inactive landfills. Most of the capital projects supported by this fund are focused on ensuring regulatory compliance at these landfills. Projects are funded and prioritized based on deferred capital and regulatory requirements. For Fiscal Year 2020, $4.3 million has been allocated, as shown in Table 11.
Table 11: Refuse Disposal Fund Project Page No Project Status Priority Score Priority Category FY 2020
City Facilities Improvements / ABT00001
401 Continuing Annual Annual $ 2,000,000
Minor Improvements to Landfills / AFA00001
125 Continuing Annual Annual 200,000
Miramar Landfill Facility Improvements / L17000
126 Continuing 77 Low 2,100,000
Total $ 4,300,000
San Diego Regional Parks Improvement Fund
The San Diego Regional Parks Improvement Fund receives revenue from Mission Bay rents and concessions in accordance with San Diego City Charter Article V, Section 55.2. These funds may only be spent on capital improvements in the City's regional parks, including Balboa Park, Chollas Lake Park, Mission Trails Regional Park, Otay River Valley Park, Presidio Park, San Diego River Park, open space parks, and coastal beaches and contiguous coastal parks. Once the revenue is received, the Parks & Recreation Department works with the San Diego Regional Parks Improvement Fund Oversight Committee to identify specific sub-projects based on the actual amount of available revenue. The Proposed Budget of $3.5 million is based on current projections of the revenue for Fiscal Year 2019. For Fiscal Year 2020, $3.5 million has been allocated to five projects, as shown in Table 12.
Table 12: San Diego Regional Parks Improvement Fund Project Page No Project Status Priority Score Priority Category FY 2020
Balboa Pk Bud Kearns AquaticComplex Imp / S17000
188 Continuing 65 Low $ 1,000,000
Coastal Erosion and Access /AGF00006
211 Continuing Annual Annual 565,000
EB Scripps Pk Comfort StationReplacement / S15035
221 Continuing 66 Low 1,085,000
Museum of Man Seismic Retrofit /L12003
252 Continuing 68 High 100,000
Total $ 3,500,000
Regional Park Improvements / AGF00005
267 Continuing Annual Annual 750,000
Capital Improvement Program Fiscal Year 2020 Proposed Budget Summary
- 13 - City of San Diego Fiscal Year 2020 Proposed Budget
Sewer Funds
The Sewer Funds are enterprise funds that support the Municipal and Metropolitan Sewer Systems. Funding for sewer capital projects is provided by sewer rates, debt financing, and grants. Projects utilize a variety of financing strategies, including pay-as-you-go cash financing, bond financing, and state revolving fund loans. A total of $310.3 million in Sewer Funds is added to the CIP budget for Fiscal Year 2020, as shown in Table 13. This funding will support projects to meet the requirements of the Clean Water Act, projects to replace and/or rehabilitate the aging sewer system infrastructure, and the Pure Water program.
Table 13: Sewer Funds Project Page No Project Status Priority Score Priority Category FY 2020
Alvarado Trunk Sewer Phase IV / S15019
330 Continuing 84 Low $ 6,670,000
EMTS Boat Dock Esplanade / S00319 338 Continuing 81 Medium 400,000
Harbor Drive Trunk Sewer / S18006 342 Continuing 89 Medium 5,000,000
Kearny Mesa Trunk Sewer / S20000 344 New 77 Low 500,000
MBC Equipment Upgrades / S17013 352 Continuing 85 High 11,266,772
Metropolitan Waste Water Department Trunk Sewers / AJB00001
355 Continuing Annual Annual 845,801
Metro Treatment Plants / ABO00001 353 Continuing Annual Annual 2,014,156
NCWRP Improvements to 30 mgd / S17012
361 Continuing 85 High 8,320,539
Pipeline Rehabilitation / AJA00002 367 Continuing Annual Annual 35,066,239
PS2 Power Reliability & Surge Protection / S00312
370 Continuing 90 High 15,350,000
Pure Water Pooled Contingency / P19002
325 Continuing 85 High 12,498,069
PURE Water Program / ALA00001 373 Continuing Annual Annual 177,112,108
Sewer Main Replacements / AJA00001 378 Continuing Annual Annual 31,734,776
Tecolote Canyon Trunk Sewer Improvement / S15020
381 Continuing 84 Low 2,500,000
Wet Weather Storage Facility / S00314 394 Continuing 83 Medium 1,000,000
Total $ 310,278,460
Capital Improvement Program Fiscal Year 2020 Proposed Budget Summary
- 14 - City of San Diego Fiscal Year 2020 Proposed Budget
TransNet Funds
TransNet is a one-half cent local sales tax that can only be used for projects in the City's right-of-way. The primary goal of TransNet funding is to reduce traffic congestion. In addition to roadway improvements, the funds can be used for bicycle facilities, bridges, pedestrian facilities, and traffic signals. The City's transportation needs greatly exceed the availability of funds. Projects are considered for inclusion in the budget based on community needs and the individual project's priority score. Efforts are made to distribute funding among all transportation assets types, such as roadways, traffic signals and calming, and bike facilities. Priority scores vary among the transportation asset types which results in funding some projects that are scored lower within the overall transportation category but highest within the individual asset type. The Fiscal Year 2020 Proposed Budget of $20.6 million, as shown in Table 14, adds funding to 13 projects.
Table 14: TransNet Funds Project Page No Project Status Priority Score Priority Category FY 2020
Bridge Rehabilitation / AIE00001 434 Continuing Annual Annual $ 200,000
Coastal Rail Trail / S00951 448 Continuing 72 High 2,000,000
Installation of City Owned Street Lights / AIH00001
460 Continuing Annual Annual 200,000
Install T/S Interconnect Systems / AIL00002
459 Continuing Annual Annual 100,000
Market Street-47th to Euclid-Complete Street / S16061
468 Continuing 87 High 2,900,000
Median Installation / AIG00001 470 Continuing Annual Annual 800,000
Minor Bike Facilities / AIA00001 471 Continuing Annual Annual 335,000
New Walkways / AIK00001 474 Continuing Annual Annual 2,375,000
Streamview Drive Improvements Phase 2 / S18000
493 Continuing 67 High 760,000
Street Resurfacing and Reconstruction / AID00005
495 Continuing Annual Annual 8,919,394
Traffic Calming / AIL00001 500 Continuing Annual Annual 500,000
Traffic Signals - Citywide / AIL00004 501 Continuing Annual Annual 750,000
Traffic Signals Modification / AIL00005 502 Continuing Annual Annual 750,000
Total $ 20,589,394
Trench Cut/Excavation Fee Fund
Pavement deterioration studies show that pavement excavations significantly degrade and shorten pavement life. Street Damage Fees are collected from excavators to recover the increased repaving and reconstruction costs incurred by the City as a result of trenching. In conjunction with the Streets Preservation Ordinance adopted in January 2013, Council approved a graduated increase in fees
Capital Improvement Program Fiscal Year 2020 Proposed Budget Summary
- 15 - City of San Diego Fiscal Year 2020 Proposed Budget
towards full cost recovery. Fees depend on the size of the trench, the age of the pavement, and the type of utility. For Fiscal Year 2020, $2.0 million has been allocated to one annual allocation, as shown in Table 15.
Table 15: Trench Cut/Excavation Fee Fund Project Page No Project Status Priority Score Priority Category FY 2020
Street Resurfacing and Reconstruction / AID00005
495 Continuing Annual Annual $ 2,000,000
Total $ 2,000,000
Utilities Undergrounding Program Fund
This fund provides for the undergrounding of City utilities. San Diego Gas & Electric (SDG&E) includes a surcharge for the undergrounding of utilities on electric bills. This amount is deposited with the City to be used solely for the undergrounding of electrical lines and associated activities. For Fiscal Year 2020, $5.0 million has been allocated in the Utilities Undergrounding Program annual allocation, as shown in Table 16.
Table 16: Utilities Undergrounding Program Fund Project Page No Project Status Priority Score Priority Category FY 2020
Utilities Undergrounding Program / AID00001
505 Continuing Annual Annual $ 5,000,000
Total $ 5,000,000
Water Fund
The Water Fund is an enterprise fund that supports the City's Water System. Funding for water capital projects is provided by a variety of sources including water rates and grants. Projects utilize a variety of financing strategies, including pay-as-you-go cash financing, bond financing, commercial paper, and state revolving fund loans. The Fiscal Year 2020 Proposed Budget of $344.8 million from the Water Fund, as shown in Table 17, includes projects contained in the Compliance Order from the California Department of Public Health as well as projects to meet the requirements of the federal Safe Drinking Act, projects to replace and/or rehabilitate the aging water system infrastructure, and the Pure Water Program.
Table 17: Water Fund Project Page No Project Status Priority Score Priority Category FY 2020
30th Street Pipeline Replacement / S12010
326 Continuing 93 Medium $ 6,253,592
Alvarado 2nd Extension Pipeline / S12013
329 Continuing 92 Medium 5,000,000
Capital Improvement Program Fiscal Year 2020 Proposed Budget Summary
- 16 - City of San Diego Fiscal Year 2020 Proposed Budget
Chollas Building / S11025 334 Continuing 77 Medium 2,700,000
Cielo & Woodman Pump Station / S12012
335 Continuing 90 High 4,200,000
El Monte Pipeline No 2 / S10008 337 Continuing 86 Low 500,000
Groundwater Asset Development Program / ABM00001
340 Continuing Annual Annual 1,000,000
La Jolla View Reservoir / S15027 346 Continuing 80 Low 955,001
Large Diameter Water Transmission PPL / AKA00003
347 Continuing Annual Annual 5,750,295
Miramar Clearwell Improvements / S11024
356 Continuing 100 High 9,915,800
Morena Pipeline / S16027 359 Continuing 92 Medium 15,364,419
Morena Reservoir Outlet Tower Upgrade / S00041
360 Continuing 90 High 2,000,000
Otay 1st/2nd PPL West of Highland Avenue / S12016
363 Continuing 91 Medium 10,000,000
Otay 2nd Pipeline Phase 4 / S20001 364 New 99 High 500,000
Otay Second Pipeline Relocation-PA / S15016
365 Continuing 98 High 8,262,079
Pacific Beach Pipeline South (W) / S12015
366 Continuing 92 Medium 5,737,598
Pressure Reduction Facility Upgrades / AKA00002
368 Continuing Annual Annual 800,000
Pure Water Pooled Contingency / P19002
325 Continuing 85 High 17,535,429
PURE Water Program / ALA00001 373 Continuing Annual Annual 179,692,713
Standpipe and Reservoir Rehabilitations / ABL00001
380 Continuing Annual Annual 2,361,000
Tierrasanta (Via Dominique) Pump Station / S12040
382 Continuing 96 High 580,000
University Heights Reservoir Rehabilitation / S20002
383 New 94 High 500,000
Water Main Replacements / AKB00003 391 Continuing Annual Annual 64,191,685
Water Pump Station Restoration / ABJ00001
392 Continuing Annual Annual 477,453
Water Treatment Plants / ABI00001 393 Continuing Annual Annual 500,000
Total $ 344,777,064
Developer Credits
Pursuant to the Municipal Code and the City of San Diego Regional Transportation Congestion Improvement Program (RTCIP) Funding Program, the City may accept public facilities improvements as consideration in lieu of the Facilities Benefit Assessments (FBA), DIF, or RTCIP.
Capital Improvement Program Fiscal Year 2020 Proposed Budget Summary
- 17 - City of San Diego Fiscal Year 2020 Proposed Budget
In these cases, a developer provides capital improvements as credit against current and future fees. The amount of the credit is based on the final cost of the capital improvements as verified by the City. A credit is only available based upon an executed reimbursement agreement which has been approved by City Council and pursuant to the RTCIP Credit Policy. Because the City does not receive cash for capital improvements provided by the developer, DIF/FBA credits are not included as a funding source in the department’s CIP project pages. Therefore, in order to show the contribution of DIF/FBA credits to the Capital Improvement Program, a list of projects receiving developer credits are listed below in Table 18.
Table 18: Developer Credit Allocations to Capital Improvements
Project
PFFP1 Project No. Reference
Prior Fiscal Year FY2020
Future Fiscal Year
Funding Source Total
Black Mountain Ranch FBA
Camino Del Sur - Bernardo Lakes Dr to Lone Quail Rd - 4 lanes T-34.2 $ 4,388,128 $ - $ 2,130,193 $ 6,518,321
Camino Del Sur South Wildlife Crossing-San Dieguito Road to Carmel Valley Road5 T-12 2,779,376 - 623,392 3,402,768
Camino Del Sur Widening-San Dieguito Rd to Paseo Del Sur T-6 2,675,351 - 467,322 3,142,673
Camino Del Sur Widening-Carmel Valley Road south to SR-56 T-14 1,694,000 - 3,424,316 5,118,316
Camino Del Sur Widening-San Dieguito Road south to Carmel Valley Road T-10 4,546,056 - 364,350 4,910,406
Camino San Bernardo-Paseo Del Sur East to City Limit5 T-47.2 1,702,295 - 299,258 2,001,553
Carmel Valley Rd East Wildlife Crossing Widening T-27 1,775,184 - 617,971 2,393,155
Carmel Valley Rd/Black Mountain Rd to Camino Crisalida - Widen to 4 Lanes T-25.3 2,904,925 - 1,031,015 3,935,940
Black Mountain Ranch Community Park P-1 5,066,304 - 9,677,642 14,743,946
North Neighborhood Park (NP #2) P-5 1,813,113 - 2,278,048 4,091,161
Paseo Del Sur-Camino Del Sur East to Babcock St - 4 Lanes T-47.1 10,287,153 - 1,545,522 11,832,675
Paseo Del Sur-Potomac Ridge Rd to Camino Del Sur - 2 Lanes T-47.3 621,553 - 1,466,809 2,088,362
Ranch Bernardo Rd Widening-I-15 TO Bernardo Center Dr - 2 Lanes T-40 527,500 - 3,050,055 3,577,555
Via de la Valle Widening-West El Camino Real to San Andres Dr T-32.1 1,351,395 - 6,590,160 7,941,555
West Bernardo Dr at Bernardo Center Dr intersection Improvements T-45 282,500 - 818,758 1,101,258
West Bernardo Dr Spot Improvements-I-15 South to Aquamiel Rd T-43 185,000 - 528,465 713,465
Capital Improvement Program Fiscal Year 2020 Proposed Budget Summary
- 18 - City of San Diego Fiscal Year 2020 Proposed Budget
Project
PFFP1 Project No. Reference
Prior Fiscal Year FY2020
Future Fiscal Year
Funding Source Total
Total Black Mountain Ranch FBA $ 42,599,833 $ - $ 34,913,276 $ 77,513,109
Mission Valley DIF
Central Park (14.28 Acres) - Land Acquisition, Design & Construction P-6 $ 18,387,607 $ 11,256,196 $ 11,256,197 $ 40,900,000
Creekside Park (1.30 Acres) P-6 398,872 - 5,148,128 5,547,000
Franklin Ridge Pocket Park (0.20 Acre) P-6 - - 963,000 963,000
Phyllis Place Park (1.33 Acre) P-6 - - 2,200,000 2,200,000
Total Mission Valley DIF $ 18,786,479 $ 11,256,196 $ 19,567,325 $ 49,610,000
City of San Diego RTCIP Funding Program
Friars Rd EB Ramp/Qualcomm Way 17 1,957,130 1,957,130 - 3,914,260
Friars Rd/1-15 SB Off-ramp 19 - - 1,056,044 1,056,044
Friars Rd/SR-163 Interchange 15a - - 2,660,000 2,660,000
Friars Road - Pedestrian Bridge across Friars Road 16 - - 3,500,000 3,500,000
Friars Road - Qualcomm Way to Mission Center Road 4 880,412 880,412 853,138 2,613,962
Mission Center Road/l-8 Interchange 15b (Phase 2) - - 1,000,000 1,000,000
Mission Ctr Rd/ l-8 Interchange 15b (Phase 3) - - 13,034,250 13,034,250
Qualcomm Way / I-8 WB off ramp 21 - - 626,175 626,175
Texas St/ El Cajon Blvd 20 - - 416,350 416,350
Total City of San Diego RTCIP Funding Program $ 2,837,542 $ 2,837,542 $ 23,145,957 $ 28,821,041
Total $ 64,223,854 $ 14,093,738 $ 77,626,558 $ 155,944,150
Notes: 1. The credit amounts above are exclusive to those projects which are being funded through FBA, DIF, and RTCIP
credits and is not inclusive of the entire funding program.2. Except for the Prior Fiscal Year totals, all other amounts shown are estimates based on the applicable
reimbursement agreements and project status.3. In the case of the Black Mountain Ranch FBA projects, the amounts shown only reflect the BMR FBA funding.
Some projects may contain other funding sources.4. A full description of each project is contained in the respective Black Mountain Ranch and Mission Valley Public
Facilities Financing Plans, and the Quarry Falls Transportation Phasing Plan.5. Future Fiscal Year amounts are subject to change as a result of actual project costs differing from estimated costs
and delays in project completions.
$ $ $ $
Capital Improvement Program Fiscal Year 2020 Proposed Budget Summary
- 19 - City of San Diego Fiscal Year 2020 Proposed Budget
6. The Funding Source Total amounts are subject to change as a result of revised cost estimates resulting fromPublic Facilities Financing Plan (PFFP) updates, and amendments to applicable reimbursement agreements.
7. No future credit allocations are anticipated for Black Mountain Ranch FBA projects. Remaining reimbursementswill be in cash.
Planned Construction Contracts
As part of continual process improvements and implementing CIP streamlining measures, City Council approved increases in the Mayor's CIP contract execution thresholds. As a result, most CIP projects are able to proceed with awarding construction contracts without returning to City Council for additional authorization, as long as City Council has approved the project's budget and the contract is under $30 million. This is estimated to reduce project execution timelines by three to 12 months. Since the individual contracts are no longer brought before City Council prior to award, they are provided here. The list of projects anticipated to move forward to bid and award construction contracts during Fiscal Year 2020 is shown in Table 19; any changes to the list (i.e., added/deleted projects or contracting method) throughout the fiscal year will be communicated to the City Council by the Public Works Department. The list is organized by department and then alphabetically by project and includes the construction contract delivery method and estimated amount of the contract.
Capital Improvement Program Fiscal Year 2020 Proposed Budget Summary
- 20 - City of San Diego Fiscal Year 2020 Proposed Budget
Table 19: Construction Contracts
Project Delivery Method
Estimated Construction
Contract
Estimated Total Project
Cost Environmental Services
Miramar Landfill Trailer Replacement / L17000.6 Design Build $ 2,755,000 $ 3,275,000
Environmental Services Total $ 2,755,000 $ 3,275,000
Fire-Rescue Fire-Rescue Air Operations Facility, Phase II / S18007 Design Build $ 11,000,000 $ 12,750,000
Fire-Rescue Total $ 11,000,000 $ 12,750,000
Library
Scripps Miramar Ranch Lib / S00811 Design Bid Build $ 4,270,000 $ 6,076,377
Library Total $ 4,270,000 $ 6,076,377
Parks and Recreation City Facility Improvements / ABT00001
Canyonside CP AC System / B17172 Job Order Contract $ 550,000 $ 1,115,000 MLK Rec Center Moisture Intrusion / B19001 Design Bid Build 428,000 640,000
Mission Bay Improvements / AGF00004 Bonita Cove West Playground Improvements / B18229 Design Bid Build 1,294,000 1,834,000
Bonita Cove West Comfort Station Improve / B18230 Design Bid Build 730,000 1,053,000 Park Improvements / AGF00007 John F Kennedy NP Restrm & Playgrnd Impr / B18005 Design Bid Build 1,161,000 1,961,000
Sherman Heights Com Center Playground / B18006 Job Order Contract 366,700 566,000 Resource Based Open Space Parks / AGE00001
La Jolla Pkwy/Mt Soledad Erosion Control / B10089 Design Bid Build 1,519,920 2,584,523 Sidewalk Repair & Replacement / AIK00003 ADACA Crown Point Missing Sidewalks GF 16 / B16095 Design Bid Build 506,000 860,999 Torrey Pines Golf Course / AEA00001
Torrey Pines Gf-Repr Storm Drain Outfall / B17152 Design Bid Build 2,496,000 3,360,000 Gamma Street Mini-Park ADA Improvements / L16000.1 Design Bid Build 607,649 1,319,649 Island Ave Mini Park Improvements / L16000.2 Design Bid Build 1,565,000 2,601,099 Clay Street Mini Park Improvement / L16000.5 Design Bid Build 563,000 1,271,930 J Street Mini Park Improvement / L16000.6 Design Bid Build 546,000 1,027,870 Hickman Fields Athletic Area / S00751 Design Bid Build 7,321,598 9,560,312 Riviera Del Sol Neighborhood Park / S00999 Design Bid Build 6,055,474 8,970,838 Fairbrook Neighborhood Park – Developmen / S01083 Design Bid Build 3,743,156 5,422,022 MBGC Clbhouse Demo/Prtbl Building Instl / S01090 Design Bid Build 5,292,502 6,400,000 MBGC Irrigation & Electrical Upgrades / S11010 Design Bid Build 2,807,051 4,460,000 Valencia Park Acquisition & Development / S11103 Design Bid Build 1,502,338 2,603,754 Mohnike Adobe and Barn Restoration / S13008 Design Bid Build 1,950,000 2,697,000 El Cuervo Adobe Improvements / S14006 Design Bid Build 273,480 693,713 Salk Neighborhood Park & Joint Use Devel / S14007 Design Bid Build 4,476,686 6,136,686
Capital Improvement Program Fiscal Year 2020 Proposed Budget Summary
- 21 - City of San Diego Fiscal Year 2020 Proposed Budget
Project Delivery Method
Estimated Construction
Contract
Estimated Total Project
Cost Olive Grove Community Park ADA Improvements / S15028 Design Bid Build 1,050,000 1,617,849 Egger/South Bay Comm Pk ADA Improvements / S15031 Design Bid Build 1,678,886 2,439,886
Solana Highlands NP-Comfort Station / S16032 Design Bid Build 967,000 1,650,266 Carmel Knoll NP-Comfort Station / S16033 Design Bid Build 572,500 978,729 Carmel Del Mar NP Comfort Station - Dev / S16034 Design Bid Build 1,583,564 2,330,564 Sage Canyon NP Concession Bldg-Develop / S16035 Design Bid Build 767,500 1,310,500 Torrey Highlands Neighborhood Park Upgra / S16036 Design Bid Build 431,358 785,000 Carmel Grove NP-Comfort Station / S16038 Design Bid Build 941,000 1,561,532 Carmel Mission Neighborhood Park Comfort Station Development / S16039 Design Bid Build 572,499 978,729 Cañon Street Pocket Park / S16047 Design Bid Build 845,752 1,415,452 Villa Monserate Neigh Park Upgrade / S16048 Design Bid Build 1,062,580 1,695,462 Balboa Pk Bud Kearns Aquatic Complex Imp / S17000 Design Bid Build 2,340,787 2,957,204
Parks and Recreation Total $ 58,568,980 $ 86,860,568
Public Utilities Groundwater Asset Development Program / ABM00001
Bonita Direct Transfer Station / B15073 Design Bid Build $ 4,099,099 $ 5,821,396 Main Replacements / AKB00003
Redwood Village Standpipe Main Replcm. / B15030 Design Bid Build 1,064,424 1,350,920 Market Street Water Pipe Replacement / B17052 Design Bid Build 490,000 655,000 Balboa Park Pipeline Repl Ph III (W) / B17141 Design Bid Build 3,010,000 5,004,135 AC Water Group 1038 / B17153 Design Bid Build 19,637,160 25,779,866 Sewer and AC Water Group 765 (W) / B17167 Design Bid Build 1,754,818 2,589,260 Mission Beach Water & Sewer Repl (W) / B17169 Design Bid Build 9,856,500 12,833,000 AC Water & Sewer Group 1044 (W) / B17186 Design Bid Build 2,758,636 3,574,736 Mission Cliff Drive Water Main Repl / B18028 Design Bid Build 518,000 700,000 Sewer & AC Water Group 841(W) / B18072 Design Bid Build 947,528 1,702,028 Water Group 970 CI / B18075 Design Bid Build 6,154,700 9,970,645
AC Water and Sewer Group 1053 (W) / B18093
Multiple Award Construction
Contract 6,997,400 8,314,400 AC Water Group 1059 / B18196 Design Bid Build 2,957,000 4,392,000 Mountain View Accelerated (W) / B19075 Design Bid Build 859,500 1,106,500
Rancho Peñasquitos Improvement 1 / B19093
Multiple Award Construction
Contract 7,000,000 9,800,000 MWWD Trunk Sewers / AJB00001
Accelerated Trunk Sewer Referral Group 1 / B18145 Job Order Contract 1,056,800 1,288,800 Accelerated Trunk Sewer Referral Group 1 South / B19150 Job Order Contract 400,000 550,000 Pipeline Rehabilitation / AJA00002
Pipeline Rehabilitation AR-1 / B17150 Design Bid Build 3,947,000 4,813,000 Pipeline Rehabilitation AQ-1 / B17151 Design Bid Build 4,838,000 5,900,000 Pipeline Rehabilitation AV-1 / B18062 Design Bid Build 4,325,000 5,275,000 Pipeline Rehabilitation AW-1 / B18120 Design Bid Build 4,545,000 5,543,000 Accelerated Pipeline Rehab Ref Group 846 / B18185 Design Bid Build 1,005,500 1,226,200 Pipeline Rehabilitation AX-1 / B18203 Design Bid Build 4,754,000 5,798,000
Pressure Reduction Upgrade / AKA00002
$ $
Capital Improvement Program Fiscal Year 2020 Proposed Budget Summary
- 22 - City of San Diego Fiscal Year 2020 Proposed Budget
Project Delivery Method
Estimated Construction
Contract
Estimated Total Project
Cost Pressure Reducing Stations Upgrades Phs1 / B16017 Design Bid Build $ 3,740,000 $ 6,290,000
Pure Water Program / ALA00001 North City Pure Water Facility (Package 2) / B15139 Design Bid Build 383,821,000 489,368,000 North City Pure Water Pump Station / B15140 Design Bid Build 12,710,000 18,222,000 Morena Pump Station / B15141 Design Bid Build 93,975,000 118,342,000 Morena Northern Pipeline and Tunnels / B15141 Design Bid Build 86,345,000 108,734,000 Morena Middle Pipeline / B15141 Design Bid Build 53,651,000 67,563,000 Morena Southern Pipeline / B15141 Design Bid Build 48,469,000 61,037,000
North City Water Reclamation Plant Expansion (Package 2) /
B15142 Design Bid Build 148,292,000 191,787,000 North City Water Reclamation Plant Expansion (Package 1) /
B15142 Design Bid Build 9,734,000 12,313,000 North City Pure Water Pipeline & Dechlorination Facility
(Package 1) / B16035 Design Bid Build 75,150,000 99,229,000 North City Pure Water Subaqueous Pipeline (Package
2) /B16035 Design Bid Build 5,272,000 6,961,000
North City Water Reclamation Plant Expansion (Package 3) /
B16140 Design Bid Build 18,939,000 23,958,000 Metro Biosolids Center Improvements / B17006 Design Bid Build 2,392,000 3,308,000
Sewer Main Replacements / AJA00001 Sewer and AC Water Group 765 (S) / B00369 Design Bid Build 1,798,516 2,757,630 Sewer Group 806 / B00406 Design Bid Build 1,224,989 1,941,558 Sewer GJ 798C / B00409 Design Bid Build 212,420 484,380 Sewer & AC Water Group 841(S) / B16037 Design Bid Build 1,007,342 1,464,842 Market Street Sewer Pipe Replacement / B17054 Design Bid Build 160,000 214,000 Balboa Park Pipeline Repl Ph III (S) / B17134 Design Bid Build 1,213,000 1,998,500 Mission Beach Water & Sewer Repl (S) / B17170 Design Bid Build 1,365,022 1,751,000 AC Water & Sewer Group 1044 (S) / B17185 Design Bid Build 317,746 392,246 Mission Cliff Drive Sewer Main Repl / B18025 Design Bid Build 878,000 1,100,000
AC Water and Sewer Group 1053 (S) / B18099
Multiple Award Construction
Contract 6,217,800 7,266,600 Mountain View Accelerated (S) / B19076 Design Bid Build 411,100 529,200
Alvarado Trunk Sewer Phase IV / S15019 Design Bid Build 47,005,240 54,633,174 Morena Pipeline / S16027 Design Bid Build 27,058,956 38,173,392 North City Water Reclamation Plant Electrical Upgrades / S17012 Design Bid Build 26,450,000 26,450,000 MBC Equipment Upgrades / S17013 Design Bid Build 30,631,000 39,560,000 Harbor Drive Trunk Sewer TS Participation Agreement / S18006 Design Bid Build 15,780,000 21,045,000
Public Utilities Total $ 1,197,197,196 $ 1,530,861,408
Transportation & Storm Water Bridge Rehabilitation / AIE00001
Off FHWA System Bridge Rehabilitation / B15127 Design Bid Build $ 265,233 $ 492,063 On System Bridge Rehabilitation / B15128 Design Bid Build 1,546,846 2,168,010
Capital Improvement Program Fiscal Year 2020 Proposed Budget Summary
- 23 - City of San Diego Fiscal Year 2020 Proposed Budget
Project Delivery Method
Estimated Construction
Contract
Estimated Total Project
Cost Nimitz Bridge at NTC Rehabilitation / B15198 Design Bid Build 653,000 1,021,600
Drainage Projects / ACA00001 Laurel Ridge Court Storm Drain / B10161 Design Bid Build 590,000 1,259,059
Rue Cheaumont (12275) Storm Drain Replac / B12031 Design Bid Build 708,849 1,534,095
Campus Point Dr (9900) Storm Drain Repl / B13016 Design Bid Build 740,000 1,641,279 Adams Ave (1620) Storm Drain Replacement / B13102 Design Bid Build 500,000 868,000
Lobrico Ct (615) Storm Drain / B13116 Design Bid Build 388,000 953,094 Navajo Storm Drains / B15029 Design Bid Build 1,588,000 2,326,845 El Cerrito & Rolando Park SD & GI (SD) / B15167 Design Bid Build 1,992,000 3,000,000 Jamacha Lomita GI & SD (SD) / B16094 Design Bid Build 2,263,000 3,315,000 Mira Mesa South Storm Drain Replacement / B16175 Design Bid Build 2,091,000 3,000,725
Installation of City Owned Street Lights / AIH00001 Citywide Street Lights Group 1601 / B16007 Design Bid Build 363,620 500,000 Citywide Street Lights Group 1602 / B16008 Design Bid Build 363,620 500,000 Citywide Street Lights Group 1701 / B17050 Design Bid Build 419,500 700,600 Citywide Street Lights Group 1702 / B17051 Design Bid Build 441,200 731,500
Median Installation / AIG00001
Adams Ave & 49th St Splitter Islands / B17025 Design Bid Build 263,650 584,000 Minor Bike Facilities / AIA00001 Downtown Complete Streets Implementation (Cycle Way,
Phase 1B &2A) / B17056 Design Bid Build 7,025,600 9,695,400 New Walkways / AIK00001
SD Mission Rd w/o Fairmount Av Sdwk S/S / B13130 Design Bid Build 619,000 1,116,800 Genesee Ave-Chateau to Sauk Sidewalk / B15168 Design Bid Build 1,428,924 2,345,400 70th-Alvarado to Saranac-Sidewalk / B17065 Design Bid Build 541,600 892,400
Sidewalk Repair & Replacement / AIK00003
ADA S/W Group 3E W. Point Loma / B16100 Design Bid Build
$
473,000
$
868,498 ADA SW Group 4E College / B16107 Design Bid Build 1,205,000 1,736,000 ADA Curb Ramp Winder and McKee / B16108 Design Bid Build 363,300 626,000 Curb Ramp Improvement Group 1701 / B17114 Design Bid Build 1,725,000 3,111,038
Street Light Circuit Upgrades / AIH00002 Loma Palisades SL Series Circuit Conv / B16118 Design Bid Build 824,800 1,297,000 Plumosa Park Series Circuit / B17101 Design Bid Build 765,000 1,100,000 Abbot Street Series Circuit / B17145 Design Bid Build 275,000 422,500 Kensington Hts #2 Series Circuit Upgrad / B17146 Design Bid Build 554,950 799,950
Traffic Calming / AIL00001 India St at West Palm St Hybrid Beacon / B17100 Design Bid Build 237,500 395,400
Traffic Signals - Citywide / AIL00004 4th Ave & Date St Traffic Signal / B13137 Design Bid Build 214,589 275,000 Beyer Bl @ Smythe Ave Traffic Signal / B14015 Job Order Contract 235,900 320,000 Bernardo Hts Py @ Calle Pueblito TS / B17018 Design Bid Build 319,600 438,100
Utilities Undergrounding Program / AID00001 Fanuel St PI Archer to Tourmaline UUD / B00721 Job Order Contract 69,740 82,047 District 1 Block 1-J UUD / B00836 Job Order Contract 137,536 161,808 Stlight Design & Install 30th St - Ocean / B12001 Job Order Contract 107,100 126,000 Block 8C UUD (Greater Golden Hill) / B13155 Job Order Contract 345,600 1,209,601 Block 1M1 UUP (La Jolla) / B15084 Job Order Contract 252,450 297,000 Block 6H UUP / B15086 Job Order Contract 359,550 423,000
Capital Improvement Program Fiscal Year 2020 Proposed Budget Summary
- 24 - City of San Diego Fiscal Year 2020 Proposed Budget
Project Delivery Method
Estimated Construction
Contract
Estimated Total Project
Cost Block 4Y UUP - CIP / B15087 Design Bid Build $ 564,000 $ 1,064,907
Baker St/Shawnee Rd UUP (Morena to Shawn / B15090 Job Order Contract 91,800 108,000
Hancock Street UUP (Witherby to Tourquoi / B15096 Job Order Contract 53,550 63,000 Block 2S2 UUP / B15098 Job Order Contract 260,100 306,000
Ingraham St (Beryl-Garnet) SL UU141 - 15 lights / B17011 Job Order Contract 162,000 180,000 Mt Acadia (Mt Alifan-Mt Burnham) SL UU621 - 19 lights /
B17012 Job Order Contract 205,200 228,000 Seminole PH2 (El Cajon-Stanley) SL UU630 - 10 / B17013 Job Order Contract 108,000 120,000
Fanuel St Phase III / B17071 Design Bid Build 106,911 144,329 San Vicente St, Ph I & II / B17098 Design Bid Build 359,483 485,302 Howard Ave Ph I & II / B18136 Design Bid Build 190,910 257,729 Wightman Street / B18138 Design Bid Build 123,367 166,546 Mission Boulevard / B18140 Design Bid Build 170,777 230,549 Golfcrest Drive / B18149 Design Bid Build 221,988 299,684 Hilltop Drive, Ph I / B18153 Design Bid Build 235,392 317,779
Watershed CIP / ACC00001 Logan Heights LID (South) / B15051 Design Bid Build 2,300,000 3,305,000 El Cerrito & Rolando Park SD & GI (GI) / B15171 Design Bid Build 2,068,000 3,000,000 Green Infrastructure Group 1012 / B16111 Design Bid Build 2,025,000 3,000,000 Green Infrastructure Group 1027 / B15103 Design Bid Build 1,496,000 2,000,000
Miramar Road I-805 Easterly Ramps / S00880 Design Bid Build 4,947,049 8,048,073
University Avenue Mobility / S00915 Design Bid Build 3,884,599 7,430,000 Otay Mesa Truck Route Phase 4 / S11060 Design Bid Build 6,556,851 13,730,000 Market St-47th ST to Euclid Complete St / S16061 Design Bid Build 5,025,503 7,807,000
Transportation & Storm Water Total $ 64,414,737 $ 104,626,710
$ 1,338,205,913 $ 1,744,450,063
Conclusion
The Fiscal Year 2020 Proposed CIP Budget provides a $715.8 million increase to the City's multi-year CIP. This budget will establish four new projects and add funding to 68 continuing projects from a variety of departments and project types. The Fiscal Year 2020 Proposed CIP Budget also includes a list of projects which are anticipated to enter into construction contracts during the fiscal year.
Page Intentionally Left Blank