Proposed Bridge Construction Staging Finished Bridge (south end, looking north) Construction - Stage 2 Construction - Stage 1 Existing Bridge (looking north) 12’ Demolish existing bridge; construct west portion of new bridge; maintain traffic on new east portion of bridge Traffic maintained on existing bridge Construct east portion of new bridge 12’

Proposed Bridge Construction Staging · Proposed Bridge Construction Staging Finished Bridge (south end, looking north) Construction - Stage 2 Construction - Stage 1 Existing Bridge

  • Upload
    others

  • View
    49

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Proposed Bridge Construction Staging · Proposed Bridge Construction Staging Finished Bridge (south end, looking north) Construction - Stage 2 Construction - Stage 1 Existing Bridge

Proposed Bridge Construction Staging

Finished Bridge(south end, looking north)

Construction - Stage 2

Construction - Stage 1

Existing Bridge(looking north)

12’

Demolish existing bridge; construct west portion of new bridge; maintain traffic on new east portion of bridge

Traffic maintained on existing bridge Construct east portion of new bridge

12’

Page 2: Proposed Bridge Construction Staging · Proposed Bridge Construction Staging Finished Bridge (south end, looking north) Construction - Stage 2 Construction - Stage 1 Existing Bridge

Tell Us What You Like!Bridge Concepts:

Straight Girder

Arched Girder

Color:Color Option A

Color Option B

Color Option C

Railing: Rail Option A

Rail Option B

Rail Option C

Rail Option D

Form Liners:Fractured Granite

Stacked Rock

Custom Mural(Options: Fish, Mountains, or Other?)