35
8/4/2019 1 INNOVATION IN URBAN DESIGN Coler Rehabilitation And Nursing Care Center Transformation September 7, 2017 JAMESTOWN INTERMODEL TRANSPORTATION PROJECT Pedestrian Bridges over Chadakoin River NYSCHSA - Summer Conference August 27, 2019 Presented by: Daniel Duprey, P.E. Jennifer Michniewicz, P.E. PTOE PROJECT LOCATION PROJECT HISTORY DESIGN TEAM DESIGN PHASE DESIGN DETAILS CONSTRUCTION PHASE QUESTIONS AND ANSWERS AGENDA

Daniel Duprey, P.E. Jennifer Michniewicz, P.E. PTOE · Jennifer Michniewicz, P.E. PTOE PROJECT LOCATION PROJECT HISTORY DESIGN TEAM ... • No Construction Staging in River • Bridge

  • Upload
    others

  • View
    16

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Daniel Duprey, P.E. Jennifer Michniewicz, P.E. PTOE · Jennifer Michniewicz, P.E. PTOE PROJECT LOCATION PROJECT HISTORY DESIGN TEAM ... • No Construction Staging in River • Bridge

8/4/2019

1

INNOVATION IN URBAN DESIGNColer Rehabilitation And Nursing Care Center Transformation

September 7, 2017

JAMESTOWN INTERMODEL TRANSPORTATION PROJECT

Pedestrian Bridges over Chadakoin River

NYSCHSA - Summer ConferenceAugust 27, 2019

Presented by:Daniel Duprey, P.E.

Jennifer Michniewicz, P.E. PTOE

PROJECT LOCATION PROJECT HISTORY DESIGN TEAM DESIGN PHASE DESIGN DETAILS CONSTRUCTION PHASE QUESTIONS AND ANSWERS

AGENDA

Page 2: Daniel Duprey, P.E. Jennifer Michniewicz, P.E. PTOE · Jennifer Michniewicz, P.E. PTOE PROJECT LOCATION PROJECT HISTORY DESIGN TEAM ... • No Construction Staging in River • Bridge

8/4/2019

2

PROJECT LOCATION

PROJECT LOCATION

Page 3: Daniel Duprey, P.E. Jennifer Michniewicz, P.E. PTOE · Jennifer Michniewicz, P.E. PTOE PROJECT LOCATION PROJECT HISTORY DESIGN TEAM ... • No Construction Staging in River • Bridge

8/4/2019

3

PROJECT LOCATION

PROJECT LOCATION

City of Jamestown• Population of 30,000• Largest population center in

Chautauqua County• Chautauqua Lake, Chadakoin

River, Jamestown RiverWalk –Key Recreation Destinations

Page 4: Daniel Duprey, P.E. Jennifer Michniewicz, P.E. PTOE · Jennifer Michniewicz, P.E. PTOE PROJECT LOCATION PROJECT HISTORY DESIGN TEAM ... • No Construction Staging in River • Bridge

8/4/2019

4

PROJECT LOCATION

City of Jamestown• Home of Robert H. Jackson• Birthplace of Rodger Tory Peterson• Birthplace of Lucille Ball

PROJECT LOCATION

Robert H. Jackson• US Solicitor General• US Attorney General• US Supreme Court

Page 5: Daniel Duprey, P.E. Jennifer Michniewicz, P.E. PTOE · Jennifer Michniewicz, P.E. PTOE PROJECT LOCATION PROJECT HISTORY DESIGN TEAM ... • No Construction Staging in River • Bridge

8/4/2019

5

PROJECT LOCATION

Rodger Tory Peterson• Naturalist• Ornithologist• Educator• Founding Inspiration to 20th

Century Environmental Movement

PROJECT LOCATION

Birthplace of Lucille Ball• Actress• Comedian• Model• Studio Executive• Inspiration for “Scary Lucy”…

Page 6: Daniel Duprey, P.E. Jennifer Michniewicz, P.E. PTOE · Jennifer Michniewicz, P.E. PTOE PROJECT LOCATION PROJECT HISTORY DESIGN TEAM ... • No Construction Staging in River • Bridge

8/4/2019

6

PROJECT LOCATION

“Scary Lucy”

How did this all get started?

Page 7: Daniel Duprey, P.E. Jennifer Michniewicz, P.E. PTOE · Jennifer Michniewicz, P.E. PTOE PROJECT LOCATION PROJECT HISTORY DESIGN TEAM ... • No Construction Staging in River • Bridge

8/4/2019

7

PROJECT HISTORY

The City wanted to connect the Greater Jamestown RiverWalk Trail that runs along the north and south banks of the Chadakoin River using two pedestrian bridges

PROJECT HISTORY

2014 Transportation Alternative Program award of $1.6 Million plus $400,000 City share = $2 Million total budget

Page 8: Daniel Duprey, P.E. Jennifer Michniewicz, P.E. PTOE · Jennifer Michniewicz, P.E. PTOE PROJECT LOCATION PROJECT HISTORY DESIGN TEAM ... • No Construction Staging in River • Bridge

8/4/2019

8

PROJECT HISTORY

Situated behind the Historic Gateway Train Station, the $50 million National Comedy Center (opened Fall 2018), and the Comedy Center Park

PROJECT HISTORY

National Comedy Center

Page 9: Daniel Duprey, P.E. Jennifer Michniewicz, P.E. PTOE · Jennifer Michniewicz, P.E. PTOE PROJECT LOCATION PROJECT HISTORY DESIGN TEAM ... • No Construction Staging in River • Bridge

8/4/2019

9

TIMELINE

Design StartSummer 2015

Let for Construction

May 2017

Construction Complete

July 2018

CPLPrime Consultant

Prudent Engineering

Surveying

SJB/Empire Geotechnical Services, Inc.Geotechnical

TBDContractor

City of JamestownProject Owner

INITIAL TEAM

Page 10: Daniel Duprey, P.E. Jennifer Michniewicz, P.E. PTOE · Jennifer Michniewicz, P.E. PTOE PROJECT LOCATION PROJECT HISTORY DESIGN TEAM ... • No Construction Staging in River • Bridge

8/4/2019

10

CPLPrime Consultant

City of JamestownSurveying

SJB/Empire Geotechnical Services, Inc.Geotechnical

TBDContractor

City of JamestownProject Owner

INITIAL TEAM

CPLPrime Consultant

GPISurveying

Right-of-Way Professionals

ROW

ForeconHabitat

City of JamestownSurveying

LDILighting

Rogers SurveyingSurveying

SJB/Empire Geotechnical Services, Inc.Geotechnical

Union Concrete Corp.

Contractor

City of JamestownProject Owner

FINAL TEAM

Page 11: Daniel Duprey, P.E. Jennifer Michniewicz, P.E. PTOE · Jennifer Michniewicz, P.E. PTOE PROJECT LOCATION PROJECT HISTORY DESIGN TEAM ... • No Construction Staging in River • Bridge

8/4/2019

11

DESIGN PHASE

Locally Administered Federal Aid Project (LAFAP) Process• Local Sponsor• NYSDOT Oversight• Phased Design – cannot

proceed to next phase without NYSDOT approval

• NYSDOT Specs & Standards• All work to be inside ROW• Funding is Capped

DESIGN PHASE

TopographicSurvey

Page 12: Daniel Duprey, P.E. Jennifer Michniewicz, P.E. PTOE · Jennifer Michniewicz, P.E. PTOE PROJECT LOCATION PROJECT HISTORY DESIGN TEAM ... • No Construction Staging in River • Bridge

8/4/2019

12

DESIGN PHASE

Threatened Endangered Species – Federal• Northern Long-eared Bat

DESIGN PHASE

Threatened Endangered Species – State• Spiny Softshell Turtle• Bald Eagle

Page 13: Daniel Duprey, P.E. Jennifer Michniewicz, P.E. PTOE · Jennifer Michniewicz, P.E. PTOE PROJECT LOCATION PROJECT HISTORY DESIGN TEAM ... • No Construction Staging in River • Bridge

8/4/2019

13

DESIGN PHASE

Article 16 Permit/Working in Floodway

DESIGN PHASE

Article 16 Permit/Working in Floodway• 1977 Flood Study

Page 14: Daniel Duprey, P.E. Jennifer Michniewicz, P.E. PTOE · Jennifer Michniewicz, P.E. PTOE PROJECT LOCATION PROJECT HISTORY DESIGN TEAM ... • No Construction Staging in River • Bridge

8/4/2019

14

DESIGN PHASE

Article 16 Permit/Working in Floodway• 1977 Flood Study• 1980 Record Plans

DESIGN PHASE

Article 16 Permit/Working in Floodway • 1977 Flood Study• 1980 Record Plans• 2014/2015 Dam Study

Page 15: Daniel Duprey, P.E. Jennifer Michniewicz, P.E. PTOE · Jennifer Michniewicz, P.E. PTOE PROJECT LOCATION PROJECT HISTORY DESIGN TEAM ... • No Construction Staging in River • Bridge

8/4/2019

15

DESIGN PHASE

Article 16 Permit/Working in Floodway• 1977 Flood Study• 1980 Record Plans• 2014/2015 Dam Study• CPL Calculations

DESIGN PHASE

Article 16 Permit/Working in Floodway – Permit Restrictions• No Fill in Floodway• No Construction Staging in River • Bridge Clearances

Page 16: Daniel Duprey, P.E. Jennifer Michniewicz, P.E. PTOE · Jennifer Michniewicz, P.E. PTOE PROJECT LOCATION PROJECT HISTORY DESIGN TEAM ... • No Construction Staging in River • Bridge

8/4/2019

16

DESIGN PHASE

Community Engagement

DESIGN PHASE

Design Challenges: View from Panzarella Park vs. ADA Requirements

Page 17: Daniel Duprey, P.E. Jennifer Michniewicz, P.E. PTOE · Jennifer Michniewicz, P.E. PTOE PROJECT LOCATION PROJECT HISTORY DESIGN TEAM ... • No Construction Staging in River • Bridge

8/4/2019

17

DESIGN PHASE

Design Challenges: View from Panzarella Park vs. ADA Requirements

DESIGN PHASE

Design Challenges: View from Panzarella Park vs. ADA Requirements

Page 18: Daniel Duprey, P.E. Jennifer Michniewicz, P.E. PTOE · Jennifer Michniewicz, P.E. PTOE PROJECT LOCATION PROJECT HISTORY DESIGN TEAM ... • No Construction Staging in River • Bridge

8/4/2019

18

DESIGN PHASE

Design Challenges:Lighting• Step Light• Lamppost

DESIGN PHASE

Design Challenges:Washington St Bridge Location

Page 19: Daniel Duprey, P.E. Jennifer Michniewicz, P.E. PTOE · Jennifer Michniewicz, P.E. PTOE PROJECT LOCATION PROJECT HISTORY DESIGN TEAM ... • No Construction Staging in River • Bridge

8/4/2019

19

DESIGN PHASE

Right-of-Way Acquisitions / Right-of-Way Projection

DESIGN PHASE

Right-of-Way Acquisitions / Right-of-Way Projection

Page 20: Daniel Duprey, P.E. Jennifer Michniewicz, P.E. PTOE · Jennifer Michniewicz, P.E. PTOE PROJECT LOCATION PROJECT HISTORY DESIGN TEAM ... • No Construction Staging in River • Bridge

8/4/2019

20

DESIGN PHASE

PIN Approved Special Specifications

DESIGN PHASE

Bid Alternatives• Base Bid – Panzarella Bridge and Lighting• Bid Alt 1 – Washington Street Bridge• Bid Alt 2 – Washington Street Bridge and Lighting

Page 21: Daniel Duprey, P.E. Jennifer Michniewicz, P.E. PTOE · Jennifer Michniewicz, P.E. PTOE PROJECT LOCATION PROJECT HISTORY DESIGN TEAM ... • No Construction Staging in River • Bridge

8/4/2019

21

PANZARELLA PARK BRIDGE

PANZARELLA PARK BRIDGE

190’ single span

12’ rail-to-rail

timber decking

10’ freeboard

Page 22: Daniel Duprey, P.E. Jennifer Michniewicz, P.E. PTOE · Jennifer Michniewicz, P.E. PTOE PROJECT LOCATION PROJECT HISTORY DESIGN TEAM ... • No Construction Staging in River • Bridge

8/4/2019

22

WASHINGTON STREET BRIDGE

WASHINGTON STREET BRIDGE

150’ single span

12’ rail-to-rail

timber decking

4’ freeboard

Page 23: Daniel Duprey, P.E. Jennifer Michniewicz, P.E. PTOE · Jennifer Michniewicz, P.E. PTOE PROJECT LOCATION PROJECT HISTORY DESIGN TEAM ... • No Construction Staging in River • Bridge

8/4/2019

23

CONSTRUCTION PHASE

High Water

CONSTRUCTION DETAILS

Page 24: Daniel Duprey, P.E. Jennifer Michniewicz, P.E. PTOE · Jennifer Michniewicz, P.E. PTOE PROJECT LOCATION PROJECT HISTORY DESIGN TEAM ... • No Construction Staging in River • Bridge

8/4/2019

24

Foundations:Reinforced concrete cast-in-place abutments founded on closed end concrete-filled pipe piles

CONSTRUCTION DETAILS

CONSTRUCTION DETAILS

Page 25: Daniel Duprey, P.E. Jennifer Michniewicz, P.E. PTOE · Jennifer Michniewicz, P.E. PTOE PROJECT LOCATION PROJECT HISTORY DESIGN TEAM ... • No Construction Staging in River • Bridge

8/4/2019

25

Concrete Abutments with Epoxy Coated Steel

CONSTRUCTION DETAILS

Approaches:Landings, stairways, and ramps at both approaches to the Panzarella bridge

CONSTRUCTION DETAILS

Page 26: Daniel Duprey, P.E. Jennifer Michniewicz, P.E. PTOE · Jennifer Michniewicz, P.E. PTOE PROJECT LOCATION PROJECT HISTORY DESIGN TEAM ... • No Construction Staging in River • Bridge

8/4/2019

26

2 Cranes

BRIDGE INSTALLATION

Washington Street Bridge Panzarella Bridge

2 sections 3 sections

Clark crane on south side Put 2 together on south side

Benchley crane on north side Lifted 2 sections with Clark crane

Spliced together over water Lifted 1 section from north side with Benchley crane

Spliced together over water

Page 27: Daniel Duprey, P.E. Jennifer Michniewicz, P.E. PTOE · Jennifer Michniewicz, P.E. PTOE PROJECT LOCATION PROJECT HISTORY DESIGN TEAM ... • No Construction Staging in River • Bridge

8/4/2019

27

CONSTRUCTION DETAILS

CONSTRUCTION DETAILS

Page 28: Daniel Duprey, P.E. Jennifer Michniewicz, P.E. PTOE · Jennifer Michniewicz, P.E. PTOE PROJECT LOCATION PROJECT HISTORY DESIGN TEAM ... • No Construction Staging in River • Bridge

8/4/2019

28

CONSTRUCTION DETAILS

CONSTRUCTION DETAILS

Page 29: Daniel Duprey, P.E. Jennifer Michniewicz, P.E. PTOE · Jennifer Michniewicz, P.E. PTOE PROJECT LOCATION PROJECT HISTORY DESIGN TEAM ... • No Construction Staging in River • Bridge

8/4/2019

29

CONSTRUCTION DETAILS

CONSTRUCTION DETAILS

Page 30: Daniel Duprey, P.E. Jennifer Michniewicz, P.E. PTOE · Jennifer Michniewicz, P.E. PTOE PROJECT LOCATION PROJECT HISTORY DESIGN TEAM ... • No Construction Staging in River • Bridge

8/4/2019

30

CONSTRUCTION PHASE TIMELINE

FINAL PRODUCT

Page 31: Daniel Duprey, P.E. Jennifer Michniewicz, P.E. PTOE · Jennifer Michniewicz, P.E. PTOE PROJECT LOCATION PROJECT HISTORY DESIGN TEAM ... • No Construction Staging in River • Bridge

8/4/2019

31

FINAL PRODUCT

RIBBON CUTTING

Page 32: Daniel Duprey, P.E. Jennifer Michniewicz, P.E. PTOE · Jennifer Michniewicz, P.E. PTOE PROJECT LOCATION PROJECT HISTORY DESIGN TEAM ... • No Construction Staging in River • Bridge

8/4/2019

32

PDH QUESTIONS

1: Why was the freeboard for the Washington Street bridge limited to 4’?

PDH QUESTIONS

A: To prevent small craft from reaching the Warner Dam 200’ downstream.

Page 33: Daniel Duprey, P.E. Jennifer Michniewicz, P.E. PTOE · Jennifer Michniewicz, P.E. PTOE PROJECT LOCATION PROJECT HISTORY DESIGN TEAM ... • No Construction Staging in River • Bridge

8/4/2019

33

PDH QUESTIONS

2: What was the Funding source and for how much money?

PDH QUESTIONS

A: Transportation Alternative Program (TAP) for $1.6 million plus $400,000 from the City of Jamestown.

Page 34: Daniel Duprey, P.E. Jennifer Michniewicz, P.E. PTOE · Jennifer Michniewicz, P.E. PTOE PROJECT LOCATION PROJECT HISTORY DESIGN TEAM ... • No Construction Staging in River • Bridge

8/4/2019

34

PDH QUESTIONS

3: What was the method used to bid the project before all of the ROW Acquisitions were completed?

PDH QUESTIONS

A: ROW Projection Form.

Page 35: Daniel Duprey, P.E. Jennifer Michniewicz, P.E. PTOE · Jennifer Michniewicz, P.E. PTOE PROJECT LOCATION PROJECT HISTORY DESIGN TEAM ... • No Construction Staging in River • Bridge