PROJECT No. 20-07 / Task 395MASH Equivalency of

NCHRP 350-Approved Bridge Railings

2018 AASHTO SCOBS T-7 Committee Meeting, Burlington Vermont

June 27, 2018William Williams, P.E.

Page 2: PROJECT No. 20-07 / Task 395 MASH Equivalency …...PROJECT No. 20-07 / Task 395 MASH Equivalency of NCHRP 350-Approved Bridge Railings 2018 AASHTO SCOBS T-7 Committee Meeting, Burlington

Acknowledgements

• Waseem Dekelbab, PhD, PE, PMP, Senior Program Officer

• Project Panel

– SCOBS T7, TCRS, State DOTs, Consultants

2

Page 3: PROJECT No. 20-07 / Task 395 MASH Equivalency …...PROJECT No. 20-07 / Task 395 MASH Equivalency of NCHRP 350-Approved Bridge Railings 2018 AASHTO SCOBS T-7 Committee Meeting, Burlington

Research Team

• Roger Bligh, P.I.

• William Williams, Co-P.I.

• Chiara Silvestri Dobrovolny

• Sana Moran

• Nathan Schulz

Page 4: PROJECT No. 20-07 / Task 395 MASH Equivalency …...PROJECT No. 20-07 / Task 395 MASH Equivalency of NCHRP 350-Approved Bridge Railings 2018 AASHTO SCOBS T-7 Committee Meeting, Burlington

Research Objectives• Identify and prioritize bridge rail systems

• Determine MASH equivalent test levels

• Determine whether individual bridge rails can be submitted to FHWA for determination of federal-aid reimbursement eligibility or whether testing is needed.

4

Page 5: PROJECT No. 20-07 / Task 395 MASH Equivalency …...PROJECT No. 20-07 / Task 395 MASH Equivalency of NCHRP 350-Approved Bridge Railings 2018 AASHTO SCOBS T-7 Committee Meeting, Burlington

Tasks

5

Task 1. Identification and Prioritization

Task 2. Develop Methodology for Bridge Rail Analysis

Task 3. Analysis of Bridge Rails

Task 4. MASH Coordination Effort

Task 5. Eligibility Letters

Task 6. Presentations

Task 7. Final Report

Page 6: PROJECT No. 20-07 / Task 395 MASH Equivalency …...PROJECT No. 20-07 / Task 395 MASH Equivalency of NCHRP 350-Approved Bridge Railings 2018 AASHTO SCOBS T-7 Committee Meeting, Burlington

Task 1 – Collect Bridge Rail Information

6

• Electronic survey of State DOT personnel:

Type of bridge rails used

Relative frequency of use

Prior test information

Intended future use

• Categorize and prioritize systems

Page 7: PROJECT No. 20-07 / Task 395 MASH Equivalency …...PROJECT No. 20-07 / Task 395 MASH Equivalency of NCHRP 350-Approved Bridge Railings 2018 AASHTO SCOBS T-7 Committee Meeting, Burlington

Bridge Rail Prioritization

7

34 survey responses (33 DOT Agencies and FHWA Federal Lands)

Responses organized based on bridge rail categories and

subcategories:

Concrete-Only

o Vertical profile

o Post and beam

o New Jersey profile

o Single Slope profile

o F-Shape profile

Metal-Only

o Deck-Mounted

o Side-Mounted

Combination Traffic-Pedestrian

o With Sidewalk

o Without Sidewalk

Metal on Concrete Curb/Parapet

With Curb

o 3 metal members

o 2 metal members

o 1 metal member

With Parapet

o 3 metal members

o 2 metal members

o 1 metal member

Wood-Only

Noise Wall-Only

Retrofit-Only

Page 8: PROJECT No. 20-07 / Task 395 MASH Equivalency …...PROJECT No. 20-07 / Task 395 MASH Equivalency of NCHRP 350-Approved Bridge Railings 2018 AASHTO SCOBS T-7 Committee Meeting, Burlington

Weighted Frequency of Use (WFofU)

8

Page 9: PROJECT No. 20-07 / Task 395 MASH Equivalency …...PROJECT No. 20-07 / Task 395 MASH Equivalency of NCHRP 350-Approved Bridge Railings 2018 AASHTO SCOBS T-7 Committee Meeting, Burlington

Prioritization by WFofU

9

WFofU10 - 19

WFofU≥ 20

Page 10: PROJECT No. 20-07 / Task 395 MASH Equivalency …...PROJECT No. 20-07 / Task 395 MASH Equivalency of NCHRP 350-Approved Bridge Railings 2018 AASHTO SCOBS T-7 Committee Meeting, Burlington

Task 2 - Assess Analysis Methodologies

• Assess methodologies previously used/accepted by FHWA

• Develop methodology for evaluating MASH compliance of existing bridge rails– Crash tested and/or FHWA eligible railings

• Consider:– Previous level of testing

– MASH impact severity

– MASH evaluation criteria

Page 11: PROJECT No. 20-07 / Task 395 MASH Equivalency …...PROJECT No. 20-07 / Task 395 MASH Equivalency of NCHRP 350-Approved Bridge Railings 2018 AASHTO SCOBS T-7 Committee Meeting, Burlington

Simulation Study for MASH TL-3 Bridge Rail Analysis

• Finite element simulations were conducted to determine minimum rail height and lateral impact loads for MASH Test Level 3

– Rigid vertical wall

– MASH 2270P vehicle

Page 12: PROJECT No. 20-07 / Task 395 MASH Equivalency …...PROJECT No. 20-07 / Task 395 MASH Equivalency of NCHRP 350-Approved Bridge Railings 2018 AASHTO SCOBS T-7 Committee Meeting, Burlington

27-inch Rail Height

Page 13: PROJECT No. 20-07 / Task 395 MASH Equivalency …...PROJECT No. 20-07 / Task 395 MASH Equivalency of NCHRP 350-Approved Bridge Railings 2018 AASHTO SCOBS T-7 Committee Meeting, Burlington

29-inch Rail Height

Page 14: PROJECT No. 20-07 / Task 395 MASH Equivalency …...PROJECT No. 20-07 / Task 395 MASH Equivalency of NCHRP 350-Approved Bridge Railings 2018 AASHTO SCOBS T-7 Committee Meeting, Burlington

Global Equivalencies• Stability

Minimum Rail Height (in)

Test Level NCHRP 350a MASH

3 27 29b

4 32 36

5 42 42a AASHTO LRFD Bridge Design Specifications, Section 13b Resulting minimum rail height from simulation analysis

Page 15: PROJECT No. 20-07 / Task 395 MASH Equivalency …...PROJECT No. 20-07 / Task 395 MASH Equivalency of NCHRP 350-Approved Bridge Railings 2018 AASHTO SCOBS T-7 Committee Meeting, Burlington

Global Equivalencies• Strength

Test

Level

NCHRP 350a MASH

Lateral

Impact

Force (kips)

Resultant

Force

Height (in)

Moment

(kip-in)

Lateral

Impact

Force (kips)

Resultant

Force

Height (in)

Moment

(kip-in)

TL-3 54 24 1296 71 19.5 1385

TL-4 54 32 1728 68b 25b 1700

a AASHTO LRFD Bridge Design Specifications, Section 13b Impact force and resulting height corresponds to 36 in tall barrier

Page 16: PROJECT No. 20-07 / Task 395 MASH Equivalency …...PROJECT No. 20-07 / Task 395 MASH Equivalency of NCHRP 350-Approved Bridge Railings 2018 AASHTO SCOBS T-7 Committee Meeting, Burlington

• AASHTO LRFD Bridge Design Specifications

– Figures A13.1.1-2 and A13.1.1-3

Rail Geometrics

Page 17: PROJECT No. 20-07 / Task 395 MASH Equivalency …...PROJECT No. 20-07 / Task 395 MASH Equivalency of NCHRP 350-Approved Bridge Railings 2018 AASHTO SCOBS T-7 Committee Meeting, Burlington

Global Equivalencies• Rail Geometrics – Pickup Truck Crash Test Data

0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

0.9

0 2 4 6 8 10 12

Rat

io o

f R

ail C

on

tact

Wid

th t

o H

eigh

t

Post Setback Distance (in)

Post Setback Criteria

350 TL-3

MASH TL-3

350 TL-4

MASH TL-4

MASH TL-5

350 Failed Tests

MASH Failed Tests

Not Recommended

Preferred

Oregon Bridge Rail (Crooked River)

F411

NY (2-member)

T4(A) Bridge Rail

T77

T101

Caltrans ST-10T131

Page 18: PROJECT No. 20-07 / Task 395 MASH Equivalency …...PROJECT No. 20-07 / Task 395 MASH Equivalency of NCHRP 350-Approved Bridge Railings 2018 AASHTO SCOBS T-7 Committee Meeting, Burlington

Global Equivalencies• Rail Geometrics – Pickup Truck Crash Test Data

0

5

10

15

20

25

30

0 2 4 6 8 10 12 14

Ver

tica

l Cle

ar O

pen

ing

(in

)

Post Setback Distance (in)

Snag Potential

350 TL-3

MASH TL-3

350 TL-4

MASH TL-4

MASH TL-5

350 Failed Tests

MASH Failed Tests

High Potential

Low Potential

T4(A)Bridge Rail

F411

T77

Oregon Bridge Rail (Crooked

River)

NY (2-member)

T101

T131Caltrans

ST-10

Page 19: PROJECT No. 20-07 / Task 395 MASH Equivalency …...PROJECT No. 20-07 / Task 395 MASH Equivalency of NCHRP 350-Approved Bridge Railings 2018 AASHTO SCOBS T-7 Committee Meeting, Burlington

Global Equivalencies• Bridge rail systems were separated into

categories to establish global test equivalency– Solid Concrete Parapet

– Concrete Post and Beam

– Metal Rail • Deck or Side Mounted

– Metal Rail on Curb• Curb height less than or equal to 11 inches

– Metal Rail on Concrete Parapet• Concrete parapet height greater than or equal to 12 inches

Page 20: PROJECT No. 20-07 / Task 395 MASH Equivalency …...PROJECT No. 20-07 / Task 395 MASH Equivalency of NCHRP 350-Approved Bridge Railings 2018 AASHTO SCOBS T-7 Committee Meeting, Burlington

Global Equivalencies

* Concrete parapet height greater than or equal to 24 inches

NCHRP 350 Rail

System Type

MASH Test Level

TL-2 TL-3 TL-4 TL-5

Solid Concrete Parapet TL-2TL-3

TL-4TL-5

Concrete Post and

Beam

TL-2

TL-3

TL-4

TL-5

Metal Rail Deck

Mounted

TL-2

TL-3

TL-4

TL-5

Metal Rail on Curb

TL-2

TL-3

TL-4

TL-5

Metal Rail on Concrete

Parapet*TL-2

TL-3

TL-4TL-5

Page 21: PROJECT No. 20-07 / Task 395 MASH Equivalency …...PROJECT No. 20-07 / Task 395 MASH Equivalency of NCHRP 350-Approved Bridge Railings 2018 AASHTO SCOBS T-7 Committee Meeting, Burlington

• Analyze existing data to determine if equivalent MASH test levels can be established– Supplemented by limited finite element impact

simulations

• Evaluate prioritized bridge rails (Task 1) using approved methodology (Task 2)– Conservative analysis

– MASH equivalent test level

– Crash testing needed?

Task 3 - Analyze Selected Bridge Rails

Page 22: PROJECT No. 20-07 / Task 395 MASH Equivalency …...PROJECT No. 20-07 / Task 395 MASH Equivalency of NCHRP 350-Approved Bridge Railings 2018 AASHTO SCOBS T-7 Committee Meeting, Burlington

Key MASH Considerations

• Structural Adequacy

– Strength

• Rail Height

– Stability

• Rail Geometry

– Occupant risk

Page 23: PROJECT No. 20-07 / Task 395 MASH Equivalency …...PROJECT No. 20-07 / Task 395 MASH Equivalency of NCHRP 350-Approved Bridge Railings 2018 AASHTO SCOBS T-7 Committee Meeting, Burlington

Structural Adequacy

• Increased impact severity results in increased impact forces

TestImpact Severity (k-ft) Percent

DifferenceNCHRP 350 MASH

3-10 27.3 55.9 +105%

3-11 101.4 115.2 +13%

4-12 98.5 154.4 +56%

Page 24: PROJECT No. 20-07 / Task 395 MASH Equivalency …...PROJECT No. 20-07 / Task 395 MASH Equivalency of NCHRP 350-Approved Bridge Railings 2018 AASHTO SCOBS T-7 Committee Meeting, Burlington

Structural Adequacy

Test

Level

NCHRP 350a MASH

Lateral

Impact

Force (kips)

Resultant

Force

Height (in)

Moment

(kip-in)

Lateral

Impact

Force (kips)

Resultant

Force

Height (in)

Moment

(kip-in)

TL-3 54 24 1296 71 19.5 1385

TL-4 54 32 1728 68b 25b 1700

Page 25: PROJECT No. 20-07 / Task 395 MASH Equivalency …...PROJECT No. 20-07 / Task 395 MASH Equivalency of NCHRP 350-Approved Bridge Railings 2018 AASHTO SCOBS T-7 Committee Meeting, Burlington

Rail height

• Minimum height for vehicle stability varies with test level

Test Level

NCHRP 350* MASH

3 27 29

4 32 36

5 42 42* AASHTO LRFD Bridge Design Specifications, Section 13

Page 26: PROJECT No. 20-07 / Task 395 MASH Equivalency …...PROJECT No. 20-07 / Task 395 MASH Equivalency of NCHRP 350-Approved Bridge Railings 2018 AASHTO SCOBS T-7 Committee Meeting, Burlington

Rail Geometry

• Rail geometry effects vehicle-barrier interaction– Post setback distance– Vertical clear opening– Contact surface area

• Increased impact severity increases snagging potential

• Applicability of AASHTO LRFD Bridge Design Specification relationships unknown– Different vehicles– Different impact conditions

Page 27: PROJECT No. 20-07 / Task 395 MASH Equivalency …...PROJECT No. 20-07 / Task 395 MASH Equivalency of NCHRP 350-Approved Bridge Railings 2018 AASHTO SCOBS T-7 Committee Meeting, Burlington

• AASHTO LRFD Bridge Design Specifications

– Figures A13.1.1-2 and A13.1.1-3

Rail Geometrics

Page 28: PROJECT No. 20-07 / Task 395 MASH Equivalency …...PROJECT No. 20-07 / Task 395 MASH Equivalency of NCHRP 350-Approved Bridge Railings 2018 AASHTO SCOBS T-7 Committee Meeting, Burlington

Bridge Rail Analysis Categories

• Analysis templates created for the following categories:

– Solid Concrete Parapet

– Concrete Post and Beam

– Steel Post and Beam

– Combination Steel Post and Concrete Parapet

Page 29: PROJECT No. 20-07 / Task 395 MASH Equivalency …...PROJECT No. 20-07 / Task 395 MASH Equivalency of NCHRP 350-Approved Bridge Railings 2018 AASHTO SCOBS T-7 Committee Meeting, Burlington

Strength Analysis• From templates

Note: Yellow cell = input; Green cell = results check

Page 30: PROJECT No. 20-07 / Task 395 MASH Equivalency …...PROJECT No. 20-07 / Task 395 MASH Equivalency of NCHRP 350-Approved Bridge Railings 2018 AASHTO SCOBS T-7 Committee Meeting, Burlington

Analyzed Bridge Rails

30

Page 31: PROJECT No. 20-07 / Task 395 MASH Equivalency …...PROJECT No. 20-07 / Task 395 MASH Equivalency of NCHRP 350-Approved Bridge Railings 2018 AASHTO SCOBS T-7 Committee Meeting, Burlington

• Coordinate with pooled fund efforts and other research initiatives– Collect available information

– Share information to avoid duplication of effort

– Work toward compiling information on all MASH devices

• Roadside Safety Pooled Fund Program– MASH Implementation Coordination Effort

• Develop and maintain databases for MASH implementation needs and testing

Task 4 – MASH Coordination

Page 32: PROJECT No. 20-07 / Task 395 MASH Equivalency …...PROJECT No. 20-07 / Task 395 MASH Equivalency of NCHRP 350-Approved Bridge Railings 2018 AASHTO SCOBS T-7 Committee Meeting, Burlington

MASH Databasewww.roadsidepooledfund.org

Page 33: PROJECT No. 20-07 / Task 395 MASH Equivalency …...PROJECT No. 20-07 / Task 395 MASH Equivalency of NCHRP 350-Approved Bridge Railings 2018 AASHTO SCOBS T-7 Committee Meeting, Burlington

Task 5 – FHWA Eligibility Requests

• Prepare necessary documentation and rationale for submission of eligibility requests to FHWA

• Selected, prioritized bridge rail systems

• Methodology and rationale should be applicable to other rail systems

Page 34: PROJECT No. 20-07 / Task 395 MASH Equivalency …...PROJECT No. 20-07 / Task 395 MASH Equivalency of NCHRP 350-Approved Bridge Railings 2018 AASHTO SCOBS T-7 Committee Meeting, Burlington

FHWA Eligibility Letter Request & Summary

• Numerous eligibility letters requests were prepared and sent for the systems that passed

• A list of these systems (13 total) are provided in Appendix D of the report.

• Some systems are borderline… TBD

• Some systems will need to be crash tested

• NCHRP 22-35 is currently underway - Evaluation of Bridge Rail Systems to Confirm AASHTO MASH Compliance

Page 35: PROJECT No. 20-07 / Task 395 MASH Equivalency …...PROJECT No. 20-07 / Task 395 MASH Equivalency of NCHRP 350-Approved Bridge Railings 2018 AASHTO SCOBS T-7 Committee Meeting, Burlington

Contact Information• William Williams

[email protected]

(979) 862-2297

• Roger Bligh

[email protected]