Project Guidelines of MBA FLEXI

Embed Size (px)

Citation preview

  • 8/10/2019 Project Guidelines of MBA FLEXI

    1/18

    MBA Program Guide Page No.: 1

    Project Guidelines of MBA FLEXI

    A) Introduction:

    This guide will provide you all the information you need to know for

    developing a project dissertation. The Project work for MBA course

    curriculum has been marked four credits.

    The following guidelines are to be adopted for MBA and MBA

    specializations

    1. The duration of the project is 2 semesters starting from 3rd

    Semesterwith synopsis preparation and ending with evaluation during the 4th

    Semester.

    2. It must be a live project either done at the place of work or some other

    organization.

    3. The project must be taken up under a guide of student`s choice.

    4. Student must select two guides

    1. Organization guide

    2. Academic Guide

    5. Eligibility criteria for guides

    Organization Guide:Guide from the organization should have minimum 5years of corporate experience.

    Academic Guide:

    Guide should be a post graduate

    Guide should have minimum 5 years academic experience /

    corporate experience. It is not compulsory but it is desired that the

    guide has specialized or working in the area of the project chosen.

    Academic guide should sign the project report vouching that the

    project is done by the student

    6. It is desirable that the project relate to the specialization pursued.

  • 8/10/2019 Project Guidelines of MBA FLEXI

    2/18

    MBA Program Guide Page No.: 2

    B) The Project Flowchart:

    Selection of the Project Topic

    Prepare Project Synopsis

    Submit the Project Synopsis

    Feedback from the University

    Corrections

    Carried Out

    Preparethe Executive

    summary, Project Report and

    the PowerPoint presentation

    Viva Voce / Project PresentationStudent should

    submit the hardcopy of the Executive summary,

    Project Report and soft copy of the PowerPoint

    30 Days from

    Registration in to

    the 3rd

    Semester

    Viva Voce will be

    conducted on the date

    specified by the University

    in the 4th

    Semester

    Submit the Soft copy of the Executive summary,

    Project Report and the PowerPoint presentation

  • 8/10/2019 Project Guidelines of MBA FLEXI

    3/18

    MBA Program Guide Page No.: 3

    C) Selection of Project title:

    The title selected should be coherent with the stream of study or

    specialization

    A list of suggested topics is provided at the end of this document.

    However, the student and the guide have the freedom to identify an

    appropriate topic

    The title should be specific and focus towards the objectives of the

    project

    D) Project Process:

    1. Prepare Project Synopsis:

    The project synopsis needs to be submitted within the deadline specified

    by the university. Student can refer to the Project Synopsis Template

    document for standard template.

    It needs to be prepared with the following components:

    Should be of approximately 1000 words

    Title of the project

    Introduction

    Research problem

    Significance of the research

    Should outline the methodology to be used

    Expected results

    Should mention the tools / techniques to be used for data analysis

    Literature review / related research outcomes (a brief review of

    similar or related studies conducted elsewhere. (should not be more

    than 500 words )

    Work done:- visits to company; list of functionaries met; documents

    received from company; registers and files seen; observations made;field visits; number of samples collected/questionnaires filled;

    Books, sites, journals, magazines referred

  • 8/10/2019 Project Guidelines of MBA FLEXI

    4/18

    MBA Program Guide Page No.: 4

    2. The actual Project study can be completed after getting the feedback

    from the university on the synopsis.

    3. The Final report:The Soft copy of the final project report, executive summary and the

    power point presentation should be submitted to the University at least

    20 days before the VIVA VOCE. The date for submission of the reports

    will be intimated by mail to you by the university.

    4. Viva Voce / Presentation:

    Viva will be conducted as per the schedule given by the Office of

    Additional RegistrarStudent Evaluation. Hard copy of the final project

    report and the executive summary should be submitted along with the

    softcopy of the power point slides. The student should demonstrate or

    make a power point presentation of the project to the University

    approved External and Internal Examiners.

    The project work terminates with the viva voce / presentation. A

    summary of the project is to be submitted.

    Executive summary:Should be 500 words, besides being a part of the

    project report, a copy of the executive summary should be submitted

    separately also. The following are the constituents of the summary:

    o Titleo Statement of the problem

    o Methodology used

    o Main findings / outcome of the study with respect to objectives

    o Recommendations

    E) Project Report:

    The final project report should consist of the following components:

    Cover page

    Title page

    Acknowledgement

  • 8/10/2019 Project Guidelines of MBA FLEXI

    5/18

    MBA Program Guide Page No.: 5

    Bonafide Letter (from the company where the project was

    undertaken)

    Table of contents

    List of Tables & List of Figures

    List of Symbols, Abbreviations and Nomenclature

    Executive Summary

    Chapters

    o Introduction

    o Project details

    Title of the project

    Aims and objectives of the study

    Problem statement

    Scope of the study Significance of the Study

    o Literature review / related research outcomes (should not be

    more than 500 words)

    o Methodology used: Data collection method, research tools used,

    sampling methodology, validity of the data

    o Data analysis and interpretation / Research findings

    o Recommendations and conclusions

    o Limitations of the study and scope for further research if any

    References/BibliographyFormat for Bibliography:

    Books:

    Authors or Editors Names, Title of the Book, Place of Publication,

    Publisher, Year of Publication, Page number

    Example:

    R.C.Goyal, Hospital Administration and Human Resource

    Management, New Delhi: Prentice Hall Publication, 2008, Pg. 75

    S. K. Joshi, Quality Management in Hospitals, New Delhi: Jaypee

    Brothers, 2009, pg 89-93Journals:

    Author, Article Title, Periodical Title, Date of Publication, Page

    Numbers of the article.

  • 8/10/2019 Project Guidelines of MBA FLEXI

    6/18

  • 8/10/2019 Project Guidelines of MBA FLEXI

    7/18

    MBA Program Guide Page No.: 7

    H) Suggested Project topics for MBA but are not limited to:

    Sl No. Project Topics

    PROJECT TOPICS RELATED TO HUMAN RESOURCESMANAGEMENT

    1. A study of performance appraisal / performance managementsystem in XYZ organization

    2. Assessment of role stress amongst the employees of XYZorganization

    3. Job satisfaction survey at XYZ organization

    4. Competency mapping in an organization

    5. Training effectiveness in an organization6. Study of organizational culture OCTAPACE profile.

    7. Motivational analysis of organization

    8. A comparative study of team effectives in an organization: Teameffectiveness assessment measure.

    9. A study of Compensation Management System

    10. A detailed study of promotion and reward policy of organization

    11. A study of quality of work life in an organization.

    12. Mapping training need of employees: Training Need Analysis

    PROJECT TOPICS RELATED TO MARKETING13. Formulation of marketing strategies to improve the market share

    of the organization

    14. Improving the effectiveness & efficiency of sales operations ofthe organization.

    15. Developing a service delivery model to bridge the gap betweenservices expected & provided by the organization.

    16. Strategies for increasing the occupancy rate of the hotel

    17. A market feasibility study for new product of an organization.

    18. Distribution mapping & dealer satisfaction survey.

    19. A study of marketing strategies & distribution channels of anorganization.

    20. A study to increase penetration level & brand loyalty amongexisting consumers of an organization.

  • 8/10/2019 Project Guidelines of MBA FLEXI

    8/18

    MBA Program Guide Page No.: 8

    PROJECT TOPICS RELATED TO FINANCE

    21. The impact of Global recession on Information Technologysector in India.

    22. The impact of recent global economic slump on Indian capitalmarket.

    23. A comparative study of bancassurance products in banks.

    24. A Comparative study of Equity linked Savings Schemes floatedby domestic Mutual fund players.

    25. A Comparative Study of cost of capital inAutomobile/Steel/Pharma/ Finance industry.

    26. A comparative study of Finance performance of banks usingvarious ratios.

    27. Profitability and Operational Efficiency of Public Sector banks.28. Profitability and Operational Efficiency of banks in India.

    29. A study of working capital management in small scale industries.

    30. The scope of Microfinance in Indian context.

    31. Financial Inclusion- The scope and effect in Indian economy.

    32. Rural banking in India.

    33. DematerializationThe scope and effect.

    34. The future of Investment banks in the post Lehman Brothers era.

    PROJECT TOPICS RELATED TO INFORMATION SYSTEMS

    35. Role of software agents as a collaborative tool - Ecommerce36. Hospital Management System- Database Approach

    37. Automation of Banking database, XYZ Bank.

    38. Automation of Customer Relation Database, A SAP Product

    39. A study on Electronic data storage

    40. A webpage design using JAVA-Google page

    PROJECT TOPICS RELATED TO MBA-HCS

    41. A study on the identification of high risk groups prone to spinaldisorders / diabetes / heart attacks (or any other lifestylecondition) and corresponding prevention recommendations.

    42. A study on the wellness practices in a target group (MNCemployees, school children, and adults) and recommendationson wellness practices.

  • 8/10/2019 Project Guidelines of MBA FLEXI

    9/18

    MBA Program Guide Page No.: 9

    43. A study on the identification of causes of delays in in-patientdischarges and recommendations to avoid delays and increasepatient satisfaction.

    44. A comparative study on patient satisfaction in (executive suites,VIP suites, Out-patient department, General ward, Laboratoryservices, etc.) and recommendations to increase patientsatisfaction.

    45. A study on the identification of causes of delays in patienttransfer (internal/ external) and recommendations to decreasewaiting time and increase patient satisfaction.

    46. A comparative study on waiting time in various hospitaldepartments and recommendations to decrease waiting time(Out-patient dept, billing, etc).

    47. A study on job satisfaction of nurses / paramedic staff in ICU /Operation Theatre/ wards / etc. and correspondingrecommendations to improve job satisfaction.

    48. A study of sickness absenteeism among various groups ofhospital employees (nurses, House-keeping staff, ward boys,CSSD employees, doctors, etc

    49. A study on work safety for employees in the radiologydepartment / waste disposal department / lab / housekeeping /etc. and corresponding recommendations to improve worksafety. A comparative study may also be undertaken betweenthe departments.

    50. A study on Waste disposal management in a hospital andrecommendations for safe disposal.

    51. A study on hospital acquired infections and preventionrecommendations.

    52. A study on the efficiency of CSSD (or any other department of amulti-specialty hospital)

    53. A cost analysis study in general ward (or any other department)of a hospital to develop user charges.

    54. A comparative study on cost analysis of the various departmentsin a hospital and cost-cutting recommendations.

    55. A study on formulation of marketing strategies to promote a

    healthcare service (e.g.: Women Wellness check-uppromotion).

    56. A study on involvement of Doctors / nurses / paramedics in ruralhealthcare and suggestions to improve involvement.

  • 8/10/2019 Project Guidelines of MBA FLEXI

    10/18

    MBA Program Guide Page No.: 10

    57. A study on medical representative triumphs and trials.Recommendation to improve liaison of medical reps and doctors.

    58. A comparative study of in-house pharmacy and retail pharmacy.

    59. A Study on the identification of the causes of delays in cashlesshospitalization and suggest recommendations to reduce timelags.

    PROJECT TOPICS RELATED TO INTERNATIONAL BUSINESS

    60.

    Market entry strategies and programs for a particular sector/Company/ Product

    61. Cross cultural issues and managing cross border teams

    62. Strategies adopted by MNCs to cope with Indian brands

    63. Impact of FDI on any particular sector64. Multinational mergers and acquisitions

    65. HR policiesGlobal and Local

    66. Transfer pricing- issues and government policies

    67. Impact of HRM practices on operational performance in MNCs

    68. Changes in banking industry after incorporation of FEMA

    PROJECT TOPICS RELATED TO PROJECT MANAGEMENT

    69. Application of project management to Global product

    development system

    70. Application of project management to software development

    cycle

    71. Project cost estimation

    72. Project Scheduling

    73. Information Risk Management

    74. Knowledge management in project management

    75. Project administration

    76. Force field analysis

    77. Critical path analysis to software projects

    78. Importance of Human resource Management in project

    management

    79. Importance of communication in project management

  • 8/10/2019 Project Guidelines of MBA FLEXI

    11/18

    MBA Program Guide Page No.: 11

    I) Templates / Details of the Project Report

    1. Cover page and Title page

    2. Acknowledgement

    3. Bonafide Letter

    4. Executive Summary

    5. Table of contents

    6. List of Tables

    7. List of Figures

    8. List of Symbols, Abbreviations and Nomenclature

    9. Chapters

    10. References/Bibliography11. Instructions

  • 8/10/2019 Project Guidelines of MBA FLEXI

    12/18

    MBA Program Guide Page No.: 12

    1) Cover Page and Title page:

    About Cover page and Title Page:

    A PROJECT REPORT

    Under the guidance Of

    ______________________________

    Submit ted by

    ______________________________

    in partial fulfillment o f the requirement

    for the award of the degree

    Of

    MBA

    IN[Finance/Marketing/Human Resource Management/Information Systems/ Banking/Retail

    Operations/ Operations Management/ Project Management/ Total Quality Management]

    &

  • 8/10/2019 Project Guidelines of MBA FLEXI

    13/18

    MBA Program Guide Page No.: 13

    2) Acknowledgement:

    Acknowledgment is the regards given to the people and organization who

    have helped you in completing the project undertaken. Mainly it mustacknowledge the organization in which you carried out the study, followed

    by the people who have helped you in the process.

    3) Bonafide Certificate

    Bonafide Certificate:

    BONAFIDE CERTIFICATE

    Certified that this project report titled .. is the bonafide

    work of ...who carried out the project

    work under my supervision.

    SIGNATURE SIGNATURE

    HEAD OF THE DEPARTMENT FACULTY IN CHARGE

  • 8/10/2019 Project Guidelines of MBA FLEXI

    14/18

    MBA Program Guide Page No.: 14

    4) Executive Summary:

    Executive summary should be of one page summary of the project report. It

    should consist of the statement of the problem, main findings, andrecommendations for the further use. It should be typed in double line

    spacing, Font Style-Times New Roman and Font Size-14.

    5) Table of contents:

    It is the list of all the contents in the report and all the detailed content

    precedes this table of content. A Specimen is shown below

    TABLE OF CONTENTS

    ChapterNo.

    Title Page No.

    1 Introduction

    1.1 Detail 1

    1.2 Detail 5

    1.3 Detail 10

    2 Literature review.

    2.1 Detail 14

    2.2 Detail 21

    6) List of Tables:

    Give the same name for the table as they exactly appear above the tables in

    the text. The caption of the Table must be present above the table. 1.5 line

    spacing should be adopted for typing the matter under this head.

    Table 1

    Field 1 Field 2 Field 3 Field 4 Field 5 Field 6

  • 8/10/2019 Project Guidelines of MBA FLEXI

    15/18

    MBA Program Guide Page No.: 15

    List of tables

    1. Table 1:

    2.

    Note:By the word Table, we mean tabulated numerical data in the body of

    the project report as well as in the appendices (if any). All other non-verbal

    materials used in the body of the project work and appendices such as

    charts, graphs, maps, photographs and diagrams may be designated as

    figures.

    7) List of Figures:

    Give the same name for the table as they exactly appear below the figuresin the text. The caption of the figure must be present below the figure. 1.5

    line spacing should be adopted for typing the matter under this head.

    Figure 1: < Caption of the Figure>

    List of Figures

    1. Figure 1:

    2. .

  • 8/10/2019 Project Guidelines of MBA FLEXI

    16/18

    MBA Program Guide Page No.: 16

    8) List of Symbols, Abbreviations and Nomenclature:

    1.5 line spacing should be adopted for typing the matter under this head.

    Standard symbols, abbreviations etc. should be used.

    9) Chapters:

    Mainly the chapters can be broadly classified into 3 parts

    1. Introductory chapter

    2. Chapter(s) on the main content of the project

    3. Concluding chapter.

    The main text will be divided into several chapters and each chapter can be

    further divided into several divisions and sub-divisions.

    Each chapter should be given a relevant title.

    Tables and figures in a chapter should be placed in the position with

    respect to the reference where they are cited.

    Headers and Footnotes should be used sparingly. The title of the

    project must be reflected in the left side of the header and chapter

    name must be in the right side of the headers. Page numbers are to

    be placed in the right side of the footer. They should be typed single

    space and placed directly underneath in the very same page, which

    refers to the material they annotate.

    Note: Always the report must be ended with the concluding chapter and

    future enhancements

  • 8/10/2019 Project Guidelines of MBA FLEXI

    17/18

    MBA Program Guide Page No.: 17

    10) References/Bibliography:

    The listing of references should be typed 4 spaces below the heading

    REFERENCES in alphabetical order in single spacing left justified. The

    reference material should be listed in the alphabetical order of the first

    author. The name of the author/authors should be immediately followed by

    the year and other details. Any website reference must be referred preceded

    by the publications reference.

    11) Instructions:

    The text in the printed copies must in black color.

    1.5 line spacing should be used for typing the general text. The generaltext shall be typed in the Font style Times New Roman and Font

    size 14.

  • 8/10/2019 Project Guidelines of MBA FLEXI

    18/18

    MBA Program Guide Page No.: 18

    ANNEXURE 1

    No Objection Certificate

    This is to certify that the project titled

    _______________________________________ is the bonafide work of

    Mr./Ms. _________________________________ with roll number

    ________________ carried out for/in

    ________________________________________ (Organization Name).

    We have no objection with he/she selecting

    ___________________________________ (project title) as his/her Project

    for the requirements of his/her MBA degree. He / She will be allowed to

    present the necessary technical details to the panel of examiners for the

    purpose of evaluation.

    Signature of the Organization Guide

    (Name, Designation and Organization Details)