2
You will find your local partner at: www.boschpackagingservices.com Preventive Maintenance Kits for KKE checkweighers 10/2010 | PAUR/MKT | Bosch Packaging Services (subject to alterations) Preventive Maintenance made easy: PM Kits for KKE checkweighers We have all been there: An entire packaging line is down for an hour because a small bearing deep inside a machine has failed just as an urgent shipment is scheduled to leave for the distribution center. This would not have happened, had the bearing been replaced during a scheduled downtime the previous weekend. Preventive Maintenance has long been instituted in manufacturing plants around the world, but it comes with its own challenges. Which parts do you replace? How often do they need to be replaced? This is where our PM Kits come in. Bosch has drawn on its experience from seeing equipment in many different plants and circumstances, and has compiled a kit with parts that should be replaced at certain intervals. This takes the guesswork out of preventive maintenance, and eliminates time consuming ordering of individual small parts. Your Benefits Preventive Maintenance without the guesswork. Know which parts to replace at which interval. Minimize maintenance downtime by following a methodical, planned approach. Typically 5% discount on kit orders compared to individual parts. Minimize unplanned downtime with scheduled preventive maintenance Standard approach, customized solution When an order is received, Bosch begins its review by comparing the standard list of parts for each machine type with the original bill of material of the specific machine being serviced. This ensures an efficient and standardized solution that is tailored to your needs. Pricing On all standard PM Kits, Bosch is granting a discount of typically 5% off the price of individual parts.

Preventive Maintenance made easy: PM Kits for KKE ...€¦ · PM Kit for KKE 2500 8111 359 079 every 4,000 hours or two years, whichever comes first List of individual PM Kits Use

  • Upload
    others

  • View
    5

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Preventive Maintenance made easy: PM Kits for KKE ...€¦ · PM Kit for KKE 2500 8111 359 079 every 4,000 hours or two years, whichever comes first List of individual PM Kits Use

You will find your local partner at: www.boschpackagingservices.com

Preventive Maintenance Kits for KKE checkweighers 10/2010 | PAUR/MKT | Bosch Packaging Services (subject to alterations)

Preventive Maintenance made easy:PM Kits for KKE checkweighers

We have all been there: An entire packaging line is down for an hour because a small bearing deep inside a machine has failed just as an urgent shipment is scheduled to leave for the distribution center. This would not have happened, had the bearing been replaced during a scheduled downtime the previous weekend.

Preventive Maintenance has long been instituted in manufacturing plants around the world, but it comes with its own challenges. Which parts do you replace? How often do they need to be replaced?

This is where our PM Kits come in. Bosch has drawn on its experience from seeing equipment in many different plants and circumstances, and has compiled a kit with parts that should be replaced at certain intervals. This takes the guesswork out of preventive maintenance, and eliminates time consuming ordering of individual small parts.

Your Benefits

Preventive Maintenance without the guesswork. Know which parts to replace at which interval.

Minimize maintenance downtime by following a methodical, planned approach.

Typically 5% discount on kit orders compared to individual parts.

Minimize unplanned downtime with scheduled preventive maintenance

Standard approach, customized solutionWhen an order is received, Bosch begins its review by comparing the standard list of parts for each machine type with the original bill of material of the specific machine being serviced. This ensures an efficient and standardized solution that is tailored to your needs.

PricingOn all standard PM Kits, Bosch is granting a discount of typically 5% off the price of individual parts.

Page 2: Preventive Maintenance made easy: PM Kits for KKE ...€¦ · PM Kit for KKE 2500 8111 359 079 every 4,000 hours or two years, whichever comes first List of individual PM Kits Use

You will find your local partner at: www.boschpackagingservices.com

Preventive Maintenance Kits for KKE checkweighers 10/2010 | PAUR/MKT | Bosch Packaging Services (subject to alterations)

Preventive Maintenance made easy:PM Kits for KKE checkweighers

Figure 1 — Sample contents of a PM Kit (PM Kit for GKF/DMW 12-bore shown)

PM Kit Part number Recommended frequency*

PM Kit for KKE 1500 8111 354 035 every 4,000 hours or two years, whichever comes first- optional mechanical drive cam for KKE 1500 8111 869 031

PM Kit for KKE 2000 8111 354 061 every 4,000 hours or two years, whichever comes first- optional mechanical drive cam for KKE 2000 8111 910 270

PM Kit for KKE 2500 8111 359 079 every 4,000 hours or two years, whichever comes first

List of individual PM KitsUse the table provided below to reference the specific PM Kit for your machine.

* Assumes typical use. Depending on product type, environmental conditions, etc., the required interval may be longer or shorter.