Presentation of Kawasaki Presentation of Kawasaki FGD and SCR SystemFGD and SCR System

March 12, 2012

Page 2: Presentation of Kawasaki FGD and SCR  · PDF file2. Process Feature of Kawasaki FGD 3. ... Anan Thermal Power Plant No.3 Client: ... Fuel: Coal Boiler Capacity: 660MW x 2

Main Topics

All photos quoted from http://www.nationalgeographic.co.jp/environment/photos

FGD: Flue Gas DesulfurizationSCR: Selective Catalytic Reduction

1. History of Kawasaki FGD2. Process Feature of Kawasaki FGD 3. Experience of Kawasaki FGD 4. Introduction of Kawasaki SCR

Page 3: Presentation of Kawasaki FGD and SCR  · PDF file2. Process Feature of Kawasaki FGD 3. ... Anan Thermal Power Plant No.3 Client: ... Fuel: Coal Boiler Capacity: 660MW x 2

To Keep Our Earth Clean

Combustion of coal or oil in boilers

http:// www.nationalgeographic.co.jp /environment/photos

Acid RainSO2 (Sulfur Dioxide)NOX (Nitrogen Oxide)

Kawasaki has been supplying;- Flue Gas Desulfurization (FGD) Plants for SO2 removal- Selective Catalytic Reduction (SCR) Plants for NOx removal

Page 4: Presentation of Kawasaki FGD and SCR  · PDF file2. Process Feature of Kawasaki FGD 3. ... Anan Thermal Power Plant No.3 Client: ... Fuel: Coal Boiler Capacity: 660MW x 2

Kawasaki FGD History SummaryIn 1968, Kawasaki started R&D of FGD process and developed its own Magnesium-gypsum process and Limestone-gypsum process.

As of end of 2011 Kawasaki has installed total 111 Plants (42 inJapan and 59 Overseas), which covers 28,500 MW.

0

5000

10000

15000

20000

25000

30000

'73~'77 ~'82 ~'87 ~'92 ~'97 ~'02 ~'07 ~Now

Equivalent(MW)

Limestone-gypsum process

Magnesium-gypsum process

Page 5: Presentation of Kawasaki FGD and SCR  · PDF file2. Process Feature of Kawasaki FGD 3. ... Anan Thermal Power Plant No.3 Client: ... Fuel: Coal Boiler Capacity: 660MW x 2

Unit 2 (700MW)in 1991

Unit 4,5 (1,000MW x 2)in 2001, 2002

Kawasaki FGD Technology applies to one of the largest coal fired power plants in the world

Hekinan Thermal Power Station, JapanTotal 4,100 MW Capacity (700MW x 3units +1000MW x 2 units)Kawasaki FGD technology covers 2,700MW capacity

Page 6: Presentation of Kawasaki FGD and SCR  · PDF file2. Process Feature of Kawasaki FGD 3. ... Anan Thermal Power Plant No.3 Client: ... Fuel: Coal Boiler Capacity: 660MW x 2

Features of Kawasaki FGD TechnologyFeatures of Kawasaki FGD Technology

1.1. Kawasaki Compact AbsorberKawasaki Compact AbsorberSO2 and dust in flue gas are removed by efficient contact with absorbent slurry

Advantages1) Absorber height lowered2) Easy maintenance achieved

Page 7: Presentation of Kawasaki FGD and SCR  · PDF file2. Process Feature of Kawasaki FGD 3. ... Anan Thermal Power Plant No.3 Client: ... Fuel: Coal Boiler Capacity: 660MW x 2

Features of Kawasaki FGD TechnologyFeatures of Kawasaki FGD Technology

2.2. Kawasaki Spiral Spray Nozzle Kawasaki Spiral Spray Nozzle

SpecificationType : SpiralMaterial: Ceramics

Advantages1) High SO2 and dust removal performance2) High flow rate and low spray pressure3) Less clogging due to large throat diameter4) High durability to erosion and corrosion

Page 8: Presentation of Kawasaki FGD and SCR  · PDF file2. Process Feature of Kawasaki FGD 3. ... Anan Thermal Power Plant No.3 Client: ... Fuel: Coal Boiler Capacity: 660MW x 2

Advantages of Kawasaki FGD TechnologyAdvantages of Kawasaki FGD Technology

With applying Kawasaki Compact Absorber andKawasaki Spiral Spray Nozzle, Kawasaki achieves;

1. Superior PerformanceKawasaki’s spiral water curtain spray nozzle achieves superior SO2 and dust removal efficiency.

2. High ReliabilityKawasaki has achieved the highest level of successful operational reliability.

3. Low Energy ConsumptionAdequate spray pressure achieves the lowest practical level of energy consumption.

4. Easy MaintenanceSimple absorber design and mist eliminator located outside absorber make maintenance work easier.

Page 9: Presentation of Kawasaki FGD and SCR  · PDF file2. Process Feature of Kawasaki FGD 3. ... Anan Thermal Power Plant No.3 Client: ... Fuel: Coal Boiler Capacity: 660MW x 2

Kawasaki FGD / Wet LimestoneKawasaki FGD / Wet Limestone--Gypsum ProcessGypsum Process

Page 10: Presentation of Kawasaki FGD and SCR  · PDF file2. Process Feature of Kawasaki FGD 3. ... Anan Thermal Power Plant No.3 Client: ... Fuel: Coal Boiler Capacity: 660MW x 2

Main EquipmentMain Equipment

Boost Up Fan (BUF) Circulation Pump

Gypsum Separator Ball Mill

Page 11: Presentation of Kawasaki FGD and SCR  · PDF file2. Process Feature of Kawasaki FGD 3. ... Anan Thermal Power Plant No.3 Client: ... Fuel: Coal Boiler Capacity: 660MW x 2

Easy and Reliable OperationEasy and Reliable Operation

DCS OperationDCS OperationAll equipment in FGD is operated and controlled by Distributed Control System (DCS).

The important controlling factors for FGD performance, are performed automatically by DCS according to boiler operation condition.

Page 12: Presentation of Kawasaki FGD and SCR  · PDF file2. Process Feature of Kawasaki FGD 3. ... Anan Thermal Power Plant No.3 Client: ... Fuel: Coal Boiler Capacity: 660MW x 2

Advanced FGD DesignAdvanced FGD Design

Flow Simulation Droplet Flow Analysis

Kawasaki can;1. Confirm uniform flow balance 2. Avoid gas short-pass3. Avoid scaling trouble4. Minimize pressure loss

Kawasaki can;1. Check spray droplets behavior2. Select optimized gas velocity3. Reduce carried mist

Page 13: Presentation of Kawasaki FGD and SCR  · PDF file2. Process Feature of Kawasaki FGD 3. ... Anan Thermal Power Plant No.3 Client: ... Fuel: Coal Boiler Capacity: 660MW x 2

Advanced FGD DesignAdvanced FGD Design

FEM Stress Analysis 3D Piping Design

Kawasaki can;1. Check structural design2. Select adequate reinforcement

(FEM: Finite Element Method)

Kawasaki can;1. Determine appropriate piping route2. Check no interference among

piping, equipment structure, etc3. Avoid site modification work

Page 14: Presentation of Kawasaki FGD and SCR  · PDF file2. Process Feature of Kawasaki FGD 3. ... Anan Thermal Power Plant No.3 Client: ... Fuel: Coal Boiler Capacity: 660MW x 2

Recent FGD ExperienceRecent FGD Experience

Hekinan Thermal Power StationUnit No.4, 5Client: Chubu Electric Power Co. Inc. Location: Hekinan Aichi, JapanFuel: CoalBoiler Capacity: 1000MW x 2Commercial Operation: 2001, 2002

Anan Thermal Power Plant No.3Client: Shikoku Electric Power Co. Inc.Location: Anan Tokushima, JapanFuel: OilBoiler Capacity: 450MW x 1Commercial Operation: 1998

Page 15: Presentation of Kawasaki FGD and SCR  · PDF file2. Process Feature of Kawasaki FGD 3. ... Anan Thermal Power Plant No.3 Client: ... Fuel: Coal Boiler Capacity: 660MW x 2

Recent FGD ExperienceRecent FGD Experience

Opatovice Power Plant No.1~6Client: Elektrany OpatoviceLocation: Pardubice, Czech RepublicFuel: CoalBoiler Capacity: 55 MW x 6

(Total: 330MW)Commercial Operation: 1996, 1997

Ho-Ping Power Plant Unit No.1, 2Client: Ho-Ping Power Company Co., LTD.Location: Ho-Ping, TaiwanFuel: CoalBoiler Capacity: 660MW x 2Commercial Operation: 2002

Page 16: Presentation of Kawasaki FGD and SCR  · PDF file2. Process Feature of Kawasaki FGD 3. ... Anan Thermal Power Plant No.3 Client: ... Fuel: Coal Boiler Capacity: 660MW x 2

Recent FGD ExperienceRecent FGD Experience

Anshun Power Plant Unit No.3, 4Client: Guizhou Electric Power Corp.Location: Anshun Guizhou, ChinaFuel: CoalBoiler Capacity: 300MW x 2Commercial Operation: 2003

Dingzhou Power Plant Unit No.1, 2Client: Hebei Guohua Dingzhou Electric

Power Corp.Location: Dingzhou Hebei, ChinaFuel: CoalBoiler Capacity: 600MW x 2Commercial Operation: 2004, 2005

Page 17: Presentation of Kawasaki FGD and SCR  · PDF file2. Process Feature of Kawasaki FGD 3. ... Anan Thermal Power Plant No.3 Client: ... Fuel: Coal Boiler Capacity: 660MW x 2

Recent FGD ExperienceRecent FGD Experience

Uong Bi Extension Power PlantClient: Vietnam Electricity (EVN)Location: Uong Bi, VientamFuel: CoalBoiler Capacity: 300MW x 1Commercial Operation: 2006

Saudi / IWSP ProjectClient: Rabigh Arabian Water and

Electricity CompanyLocation: Rabigh, Saudi ArabiaFuel: OilBoiler Capacity: 470t/h x 3 x 3

(330MW equiv. x 3)Commercial Operation: 2007, 2008

Page 18: Presentation of Kawasaki FGD and SCR  · PDF file2. Process Feature of Kawasaki FGD 3. ... Anan Thermal Power Plant No.3 Client: ... Fuel: Coal Boiler Capacity: 660MW x 2

Kawasaki Kawasaki NOxNOx Removal SystemRemoval System

Kawasaki offers NOx removal system based on Selective Catalytic Reduction (SCR) process using ammonia.

Kawasaki SCR consists of catalyst and ammonia injection device.

Page 19: Presentation of Kawasaki FGD and SCR  · PDF file2. Process Feature of Kawasaki FGD 3. ... Anan Thermal Power Plant No.3 Client: ... Fuel: Coal Boiler Capacity: 660MW x 2

Wide Application of Kawasaki SCR SystemWide Application of Kawasaki SCR System

Waste Incineration Plant

Gas Turbine Power Plant

Diesel Power Plant

Boiler Plant

Page 20: Presentation of Kawasaki FGD and SCR  · PDF file2. Process Feature of Kawasaki FGD 3. ... Anan Thermal Power Plant No.3 Client: ... Fuel: Coal Boiler Capacity: 660MW x 2

Opatvice Power Plant No. 1 - 6Location: Pardubice, Czech RepublicFuel: Lignite CoalCapacity: 330MWCommercial Operation Year: 1997

Anan Thermal Power Station No. 3Location: Anan Tokushima, JapanFuel: OilCapacity: 450MWCommercial Operation Year:1998

Hekinan Thermal Power No.4&5Location: Hekinan Aichi, JapanFuel: Bituminous CoalCapacity: 1.000MWCommercial Operation Year:2001, 2002

Dingzhou Power Station Location: Dingzhou Hebei, ChinaFuel: Bituminous CoalCapacity: 600MWCommercial Operation Year:2004, 2005

Saudi / IWSP Project Unit No.1, 2, 3Location: Saudi / RabighFuel: Heavy OilBoiler Capacity: 330MWx3Commercial Operation: Oct. 2008

Kawasaki will continue to refine its Kawasaki will continue to refine its technology and supply FGD and SCR Plants technology and supply FGD and SCR Plants all over the world to keep our earth clean.all over the world to keep our earth clean.

Yangzhou Power Plant No. 5Location: Yangzhou Jiangsu, ChinaFuel: Bituminous CoalCapacity: 200 MWCommercial Operation Year: 2003