33
 PRELIMINARY GEOTECHNICAL INVESTIGATION CS-6: WILLIAM RUTLEY SOLAR PARK 15041 COLONIAL DRIVE INGLESIDE, ONTARIO Date: January 13, 2011 Reference No.: T020822-A6

Preliminary Geotechnical Investigation William Rutley Solar Park, Ontario, Canada

Embed Size (px)

DESCRIPTION

Inspec-Sol Inc. (Inspec-Sol) was authorized to carry out a Preliminary GeotechnicalInvestigation for the proposed William Rutley Solar Park which is located at 15041 ColonialDrive in Ingleside, Ontario (Site). Authorization to proceed with this study was provided by Mr.Jeff Roy representing Canadian Solar Solutions Inc. (Client).The purpose of the investigation was to carry out a preliminary field program to evaluate thesubsoil stratigraphy found at test locations; and based upon the collected preliminary data,provide recommendations concerning foundation options and associated bearing pressures, aswell as provide comments to assist designers and the Client in regard to excavations, backfill,access roads, underground services, and construction field review.This report has been prepared with the understanding that the design will be carried out inaccordance with all applicable codes and standards. Any changes to the described project willrequire a review by Inspec-Sol to assess the impact of the changes on the reportrecommendations provided herein. Additional field programs involving boreholes will be carried out in the near future.

Citation preview

  • PRELIMINARY GEOTECHNICAL INVESTIGATION CS-6: WILLIAM RUTLEY SOLAR PARK

    15041 COLONIAL DRIVE INGLESIDE, ONTARIO

    Date: January 13, 2011 Reference No.: T020822-A6

  • Reference No.: T020822-A6 January 13, 2011 Mr. Jeff Roy Project Manager Canadian Solar Solutions Inc. 67A Sparks Street, Suite 300 Ottawa, Ontario K1P 5A5

    Re: Preliminary Geotechnical Investigation CS-6: William Rutley Solar Park 15041 Colonial Drive Ingleside, Ontario

    Dear Mr. Roy, In accordance with your instructions, Inspec-Sol Inc. (Inspec-Sol) has completed a Preliminary Geotechnical Investigation at the above-mentioned Site and is pleased to present the findings. We trust this information meets with your approval. Please do not hesitate to contact us should any questions arise. Yours very truly, INSPEC-SOL INC.

    Joseph B. Bennett, P. Eng. Vice-President SD/vl Dist: Mr. Jeff Roy Email - ([email protected]),

  • Reference No.:T020822-A6 i

    TABLE OF CONTENTS

    1.0 INTRODUCTION .................................................................................................1

    2.0 SITE DESCRIPTION............................................................................................2

    3.0 GEOLOGICAL DISCUSSION ............................................................................2

    4.0 FIELDWORK ........................................................................................................3

    5.0 LABORATORY TESTING ..................................................................................3

    6.0 SUBSOIL CONDITIONS......................................................................................3 6.1 Surficial Topsoil ..........................................................................................4 6.2 Sandy Silt with some Clay (Glacial Till).....................................................4 6.3 Clayey Silt with some Sand (Glacial Till) ...................................................4 6.4 Bedrock .............................................................................................4

    7.0 GROUNDWATER CONDITIONS.......................................................................5

    8.0 DISCUSSION AND RECOMMENDATIONS.....................................................5 8.1 Project Description ......................................................................................5 8.2 General Considerations................................................................................6 8.3 Site Preparation............................................................................................6 8.4 Excavation and Dewatering.........................................................................6 8.5 Solar Panel Foundations ..............................................................................7 8.5.1 Pad Foundations Systems ................................................................7 8.5.2 Helical Pile Foundation Systems .....................................................8 8.5.3 Resisting Foundation Uplift.............................................................9 8.5.4 Frost Protection of Foundations.......................................................9 8.5.4.1 Protection of Bearing Soils ..................................................9 8.5.4.2 Frost Adhesion.....................................................................9 8.5.5 Seismic Site Classification ..............................................................9 8.5.6 Engineered Fill...............................................................................10 8.6 Construction of Underground Services .....................................................11 8.6.1 Bedding and Cover ........................................................................11 8.6.2 Service Trench Backfill .................................................................11 8.7 Construction of Gravel Access Roads .......................................................12

    9.0 CONSTRUCTION FIELD REVIEW................................................................13

  • Reference No.: T020822-A6 ii

    10.0 REPORT CONDITIONS AND LIMITATIONS..............................................14

    TABLES

    Table 1: Suggested Parameters for Screw Piles for Preliminary Design Pg. 8 Table 2: Recommended Gravel Access Road Structure Pg. 12

    DRAWINGS Site Location Map T020822-A6-1 Borehole and Test Pit Location Plan T020822-A6-2

    ENCLOSURES

    Test Pit Logs Enclosure No.: 1 Results of Laboratory Testing Enclosure No.: 2 Certificate of Analysis from Laboratory Enclosure No.: 3

    APPENDICES

    Explanatory Notes for Borehole and Test Pit Logs Appendix A

  • Reference No.: T020822-A6 1

    1.0 INTRODUCTION

    Inspec-Sol Inc. (Inspec-Sol) was authorized to carry out a Preliminary Geotechnical Investigation for the proposed William Rutley Solar Park which is located at 15041 Colonial Drive in Ingleside, Ontario (Site). Authorization to proceed with this study was provided by Mr. Jeff Roy representing Canadian Solar Solutions Inc. (Client). The purpose of the investigation was to carry out a preliminary field program to evaluate the subsoil stratigraphy found at test locations; and based upon the collected preliminary data, provide recommendations concerning foundation options and associated bearing pressures, as well as provide comments to assist designers and the Client in regard to excavations, backfill, access roads, underground services, and construction field review. This report has been prepared with the understanding that the design will be carried out in accordance with all applicable codes and standards. Any changes to the described project will require a review by Inspec-Sol to assess the impact of the changes on the report recommendations provided herein. Additional field programs involving boreholes will be carried out in the near future. The scope of work for Inspec-Sol consisted of the following activities:

    Desktop Study: Consultation of publicly available soil and bedrock mapping in the vicinity of the Site, if available.

    Field Work: Excavation of twelve (12) test pits located approximately equally spaced across the Site;

    Laboratory Testing: Submittal of five (5) grab samples to the laboratory for analysis of pH, redox potential, sulfate concentration, chloride concentration, and resistivity; and

    Analysis and Report: Review of field results, laboratory testing, and preparation of geotechnical report to provide comments and recommendations for design and construction of the proposed solar farm.

  • Reference No.: T020822-A6 2

    2.0 SITE DESCRIPTION

    The proposed solar farm is located at a municipal address of 15041 Colonial Drive in Ingleside, Ontario. The project boundaries form parts of Lot 16 and 17 on Concession 2 in Osnabruck Township. Our understanding of the project boundaries is based on the Plan View PV System Layout (Canadian Solar, Ref No. OICI-2010-0071, dated October 18, 2010), received from the Client. The location of the Site within the town of Ingleside is shown on the attached Site Location Map: T020822-A6-1 The Site is currently undeveloped and has grass or crop cover. There are localized areas of small tree and brush along the borderlines between the individual fields. It was reported by the Client and Landowner that there is a weeping tile system in place across the Site. The Site topography is relatively flat and appears to be gently sloping downward towards the north. There appeared to be ongoing efforts to clear the land of trees and brush.

    3.0 GEOLOGICAL DISCUSSION

    The desktop study component of the Preliminary Geotechnical Investigation consisted of consulting publicly available soils and bedrock maps, as well as previous Inspec-Sol reports. For this Site, the following resources were consulted:

    Ontario Well Registry Data, updates ongoing; Surficial Geology Winchester, ON Geological Survey of Canada, 1982; and Two (2) nearby Inspec-Sol reports (Cornwall and Finch).

    Based on the above sources, the local soils were expected to consist of surficial sands overlying Glacial Till with a significant cobble and boulder content. Bedrock was estimated at a depth of approximately 5 m to 6 m below the surface grade. The bedrock in this area is expected to consist of a limestone of the Trenton Formation. The groundwater level is reported to be ranging in depth from 2 m to 6 m below the ground surface.

  • Reference No.: T020822-A6 3

    4.0 FIELDWORK

    4.1 Test Pit Program The test pit component of the fieldwork for this Preliminary Geotechnical Investigation was undertaken on November 4, 2010, by means of a rubber tired tractor backhoe, under the supervision of Inspec-Sol field staff. A total of twelve (12) test pits were dug to practical refusal or to the full reach of the equipment, within the native till. They were dug to an average depth of 2.5 m blow the existing ground surface. The location of these test pits can be found on the attached Test Pit Location Plan: T020822-A6-2. A leveling survey of the test pit locations was not completed as part of this Preliminary Geotechnical Investigation.

    5.0 LABORATORY TESTING

    The laboratory testing component of this Preliminary Geotechnical Investigation consisted of the following tests. Five (5) samples were submitted to Maxxam Analytics on November 11, 2010 under chain of custody number 572721. The samples were submitted for the parameters of redox potential, resistivity, sulphate, chloride, and pH. The testing results were received on November 17, 2010, under report number BOG2743. The Certificate of Analysis received from the laboratory can be found attached as Enclosure No.: 3. 6.0 SUBSOIL CONDITIONS The soils encountered within the twelve (12) test pit locations, were found to be relatively consistent. In general most test pit locations had organic topsoil overlying a native glacial till. In test pits TP-1, TP-2, and TP-5, a grey more cohesive till was found to be underlying this. The findings of the Preliminary Geotechnical Investigation are in general agreement with the published geology this area. The subsoil encountered at each test pit location is presented in the Test Pit Logs attached as Enclosure No.:1. Each soil type is described in more detail in the following sections. The Results of Laboratory Testing for each of the submitted samples is presented as Enclosure No.: 2, at the end of this report.

  • Reference No.: T020822-A6 4

    6.1 Surficial Topsoil

    In all test pit locations, except TP-1, there was found to be a surficial covering of topsoil. This topsoil is described as dark brown with many organics. It was soft in consistency, and was recovered in a moist to wet condition. The thickness of this topsoil layer ranged from approximately 0.2 m in test pits TP-2, TP-3, TP-4, TP-5, TP-6, and TP-11; up to approximately 0.8 m in TP-7. The topsoil descriptions found within this report and in the test pit logs should not be used for quantity takeoffs or quality assessments.

    6.2 Sandy Silt with some Clay (Glacial Till)

    In all cases the surficial topsoil was found to be underlain by native sandy silt with some clay. Trace amounts of cobbles and boulders were found within this layer in test pits TP-2, TP-4, TP-5, and TP-10. This deposit behaves as a cohesive soil, and was stiff in consistency. The soil was light to medium mottled brown in colour, and it was recovered in a damp to moist condition. Test pits TP-3, TP-4, TP-6, TP-7, TP-8, TP-9, TP-10, TP-11 and TP-12 were terminated within this layer near 3.0 m. Locations TP-8, TP-11, and TP-9 found difficulty of excavation through the cobbles and boulders and terminated at a shallower depth.

    6.3 Clayey Silt with some Sand (Glacial Till)

    In test pits TP-1, TP-2, and TP-5, the cohesive sandy silt described above was underlain by a clayey silt till. It was found at depths of approximately 3.3 m, 2.7 m, and 2.7 m, respectively. This till can be described as a clayey silt with some sand and trace gravel. It was firm to stiff in consistency and was recovered in a moist to wet condition. It was medium grey in colour. The presence of cobbles, some in excess of 1.2 m in nominal diameter were also noted within this deeper grey till. Test pits TP-1, TP-2, and TP-5 were terminated near 3.0 m within this soil and this depth represents the full reach of the backhoe.

    6.4 Bedrock

    Bedrock was not encountered within the depth of the test pits at any of the test locations.

  • Reference No.: T020822-A6 5

    7.0 GROUNDWATER CONDITIONS

    No standpipes were installed as part of this scope of work. As there was heavy rain during the day of fieldwork program, it was difficult to indicate the groundwater level, if any, within the test pits. The Site was low-lying and in some areas had standing water near the surface. In test pit TP-6 water infiltration was observed through the wall of the excavation at a depth of approximately 1.4 m. Additionally, based on the grey colour of the deeper till samples, the groundwater level should be expected at a depth of approximately 1 m to 2 m below the existing grade. A review of the Ontario Well Registry data indicates that the water levels in this area range from approximately 1.5 m to approximately 6.0 m below the ground surface. It should be noted that the groundwater table is expected to be subject to seasonal fluctuations and precipitation events it is typically at its highest level during the thaw in early spring.

    8.0 DISCUSSION AND RECOMMENDATIONS

    8.1 Project Description

    Based on the information provided by the Clients Request for Quotation (Ref No: 2010-06-10, dated June 10, 2010) and the Plan View PV System Layout (Canadian Solar, Ref No. OICI-2010-0071, dated October 18, 2010), the proposed project scope is summarized as follows:

    Design forces for solar panel foundations are considered to be 9 kN horizontally, at a height of 1.2 m above the ground surface; 23 kN vertically in the downward direction; and 9 kN vertically in the upward direction;

    The tolerable movement of the foundation systems are 50 mm in the horizontal direction or a maximum settlement of 25 mm in the vertical direction;

    Various concrete slabs for electrical equipment pads are to be installed on grade; A network of connecting underground electrical circuits installed in open cut trenches

    to a maximum depth of 1.8 m; and A network of connecting gravel access roads is planned across the Site.

  • Reference No.: T020822-A6 6

    If any of these assumptions are incorrect or these facts change through the design or construction process, Inspec-Sol should be notified and retained to assess the impact of these changes from a geotechnical standpoint.

    8.2 General Considerations

    Based upon the results of the Preliminary Geotechnical Investigation and assuming that they are representative of the soil conditions of this Site, comments and recommendations are offered in the following sections for the solar panels and related infrastructure. The most significant geotechnical considerations for the design and construction of the proposed project are related to the following:

    Frost protection for solar panel foundation elements; and Contract allowances for the presence of cobbles and boulders during drilling and

    within general excavations.

    8.3 Site Preparation

    It is expected that site preparation will consist of the removal of trees, brush, topsoil, and root zone to expose the native soils beneath the connecting access roads. Once exposed, native subgrades should be assessed by geotechnical personnel by means of proof rolling under heavy construction equipment, to look for local anomalies or soft spots. The soils on this Site are considered to be sensitive to disturbance by construction traffic as well as moisture damage. An adequate ditching and pumping system may be necessary in order to collect surface run-off or shallow groundwater, and to provide stable working conditions.

    8.4 Excavation and Dewatering

    Excavations for the structures and site services for this project are expected to extend to a maximum depth of approximately 2.0 m below the existing surface grade.

  • Reference No.: T020822-A6 7

    All excavations should be completed and maintained in accordance with the Occupational Health and Safety Act (OHSA) requirements. Based on the results of the Geotechnical Investigation, the native soils encountered within the expected excavation depth are considered to be a Type 2 Soils, as defined in the OHSA Regulations for Construction. Any excavated soils should be handled, transported and disposed of in an environmentally suitable manner meeting all current environmental legislation. The groundwater level has been estimated to be between approximately 1.5 to 2.5 m below the existing ground surface. Groundwater infiltration into excavations should be expected. This seepage will require adequate handling so as to minimize interference with construction.

    8.5 Solar Panel Foundations

    Based on the project description in Section 8.1, the foundation options that the Client typically considers consist of either pad foundations systems founded on the native glacial till, piles (driven or drilled), or helical pile foundation systems advanced into the native glacial till. Designers and Contractors should consider the soil descriptions contained within this report carefully to asses the advantages of each foundation system. Again, it should be noted that frequent cobbles and boulders are likely to be present on this Site which may interfere with the advancement of any foundation system.

    8.5.1 Pad Foundations Systems

    Based on the results of this Preliminary Geotechnical Investigation, the recommended preliminary design bearing capacity for pad foundations founded on the native glacial till is 150 kPa under Serviceability Limit States (SLS) conditions and 350 kPa (factored) under Ultimate Limit States (ULS) conditions. For footings founded on the native till and designed using the recommended bearing pressures under SLS conditions is expected to be less then 25 mm total and 12 mm differential. Due to the frequency of cobbles and boulders observed during the fieldwork, it is recommended that an allowance for the excavation of cobbles, boulders be included within the Contract Documents.

  • Reference No.: T020822-A6 8

    8.5.2 Helical Pile Foundation Systems

    It is understood that the Client is considering the use of helical pile foundation system to support the solar panel arrays. Helical systems are typically proprietary and we would recommend that the information presented below is to assist Designers with selection of approximate numbers of anchors and foundation or cap details. However, we recommend that the final tender documents allow for this item to be a Design/Build type. The Designers and Contractor should be aware that installation may be difficult due to the presence of cobbles and boulders in the native till. And that this Site is not ideally suited for this foundation option. If used, helical pile foundation systems should be installed to a depth such that all helixes are below the frost depth, which is considered to be 1.8 m for unheated or isolated structures in this area. Furthermore, if adhesion between the steel stem and the native soil is considered in the design, it should be considered to be nil (0) within this 1.8 m frost zone. The following parameters are provided for the preliminary concept design of helical piles. It should be noted that these parameters may be later adjusted based on the results of the upcoming borehole fieldwork program and the accompanying laboratory testing program.

    Table 1: Suggested Parameters for Screw Piles for Preliminary Design GEOTECHNICAL PARAMETER PRELIMINARY DESIGN VALUE

    Average Unit Weight of Native Till [] 20 kN/m3 Adhesion Between Till and Steel [fs] 40 kPa*

    End Bearing Capacity in Native Till [Q] 100 kPa (SLS) End Bearing Capacity in Native Till [Q] 300 kPa (factored ULS)**

    * According to the Canadian Foundation Engineering Manual (CFEM-2006) adhesion between the native soils and stem should not be considered in the design if the stem has a diameter of less than 100 mm.

    ** Based on a geotechnical resistance factor of ( = 0.4); It is recommended that a compression load testing program be performed on several of the helical piles at the outset of the project to verify that design capacities are being achieved in the field.

  • Reference No.: T020822-A6 9

    Again, due to the frequency of cobbles and boulders observed during the fieldwork, it is recommended that an allowance for cobbles and boulders be included within the Contract Documents.

    8.5.3 Resisting Foundation Uplift

    Regardless of the foundation system selected, uplift capacities are assumed to be resisted by the dead weight of the foundation and the overlying soil. These comments are based on our understanding that design uplift is approximately 9 kN. If increased uplift capacities are required, Inspec-Sol should be retained to review. Greater uplift capacities may need to be proven in the field using a program of tension testing.

    8.5.4 Frost Protection of Foundations

    8.5.4.1 Protection of Bearing Soils

    The native soils found on Site are considered to be frost susceptible. All bearing surfaces will require a minimum of 1.8 m of soil cover, or an equivalent insulation detail. Inspec-Sol should be retained to review a specific insulation detail if this option is chosen.

    8.5.4.2 Frost Adhesion

    In order to minimize the effects of adfreezing on the foundation systems (anchor shafts, piles, etc.), it is recommended that the foundation elements be backfilled with a coarse grained non frost susceptible soil. One example would be an OPSS Granular B, Type I. Also, we recommend that the use of a bond break be incorporated into the design of the foundation system to prevent frost adhering to foundation elements. The upcoming final Geotechnical Reports, however, will provide further comments and recommended adfreezing parameters

    8.5.5 Seismic Site Classification

    Based on the test pit program that was undertaken as part of this Preliminary Geotechnical Investigation, bedrock was not encountered within the sampling depths. An additional borehole program is planned as part of the second phase of Geotechnical Investigation which may serve to locate the bedrock. At this point there is not enough information available to assign a Site Classification for Seismic Site Response.

  • Reference No.: T020822-A6 10

    Designers should confirm whether these ground mount solar panels are governed by Part 4 of the Ontario Building Code (OBC-2006). If a Site Classification for Seismic Site Response according to Table 4.1.8.4.A of OBC-2006 is required, additional work such as geophysical testing may be required. Please inform Inspec-Sol if this is required so we can discuss the available options.

    8.5.6 Engineered Fill

    The fill operations for Engineered Fill if necessary on this Site, must satisfy the following criteria:

    Engineered Fill must be placed under continuous supervision of the Geotechnical Engineer. Prior to placing any Engineered Fill, all unsuitable fill materials must be removed, and the subgrade proof rolled, and approved. Any deficient areas should be repaired.

    Prior to the placement of Engineered Fill, the source or borrow areas for the Engineered Fill must be evaluated for its suitability. Samples of proposed fill material must be provided to the Geotechnical Engineer and tested in the geotechnical laboratory for Standard Proctor Maximum Dry Density (SPMDD) and grain size, prior to approval of the material for use as Engineered Fill. The Engineered Fill must consist of environmentally suitable soils (as per industry standard procedures of federal or provincial guidelines/regulations), free of organics and other deleterious material (building debris such as wood, bricks, metal, and the like), compactable, and of suitable moisture content so that it is within -2% to +0.5% of the Optimum Moisture as determined by the Standard Proctor test. Imported granular soils meeting the requirements of Granular A.

    The Engineered Fill must be placed in maximum loose lift thicknesses of 0.2 m. Each lift of Engineered Fill must be compacted with a heavy roller to 100% of its SPMDD.

    Field density tests must be taken by the Geotechnical Engineer, on each lift of Engineered Fill. Any Engineered Fill, which is tested and found to not meet the specifications, shall be either removed or reworked and retested.

  • Reference No.: T020822-A6 11

    8.6 Construction of Underground Services

    8.6.1 Bedding and Cover

    The following are recommendations for service trench bedding and cover materials:

    Bedding for buried utilities should be OPSS Granular A and placed in accordance with pertinent Ontario Provincial Standard Drawings (OPSD).

    Use of clear 19 mm stone is not recommended for use as bedding. The cover material should be a sand material or Granular A and the dimensions

    should comply with pertinent OPSD standards. The bedding material and cover materials should be compacted as per OPSS 501

    and 514 and to at least 95% of its SPMDD. Compaction equipment should be used in such a way that the utility pipes are not

    damaged during construction.

    8.6.2 Service Trench Backfill

    Backfill above the cover for buried utilities should be in accordance with the following recommendations:

    For service trenches under access roads, the backfill should be placed and

    compacted in uniform thickness compatible with the selected compaction equipment and not thicker than 200 mm. Each lift should be compacted to a minimum of 95% of its SPMDD.

    The backfill placed in the upper 300 mm below the access road subgrade elevation should be compacted to a minimum of 100% of its SPMDD.

    To reduce the potential for differential settlement and frost heave, the selected backfill materials should reasonably match the existing soil profile within the frost penetration zone (1.8 m below finished grade). Alternatively, if imported backfill, including granular materials, are used then the excavation sides should have frost tapers as per OPSD 800 series which essentially indicates that there should be a backslope of 10H:1V from the bedding grade to the finished grade.

  • Reference No.: T020822-A6 12

    If the native excavated soils are used as backfill, this material should be protected from moisture increases during construction. The native excavated soils should be assessed and approved by a Geotechnical Engineer prior to placement.

    Excavated soils that are too wet (i.e. greater than 5% above the optimum moisture content based upon a Standard Proctor Test) will become problematic to compact and may not perform properly during construction period. If such conditions occur, the options include drying of the soils; compacting and leaving the area untravelled for a period of time; importation of more suitable material; or a combination of above and the use of geotextiles at the base and possibly additional layers within the access road structures granular courses. The appropriate measures will need to be discussed during construction period and be such to achieve adequate performance from the access roads.

    8.7 Construction of Gravel Access Roads

    Gravel access roads are expected to be constructed over the existing till subgrade. In order to prepare the Site for the roadway structure, it is recommended that the topsoil be stripped and the exposed subgrade be proof-rolled with heavy construction equipment to identify soft spots or local anomalies. Any areas where rutting or appreciable deflection is noted should be sub-excavated and replaced with suitable fill, and use of geotextiles may be warranted for strength improvement. Any fill used to raise the grade below future access road structure should be considered Engineered Fill and should be treated as such. The gravel sections described in Table 1 below are general recommendations for areas subjected to parking lot and access road traffic. Alternative designs would require additional testing and analysis.

    Table 2: Recommended Access Road Structure

    Pavement Layer Light Duty

    (Parking Areas) Heavy Duty

    (Travelled Roadways)

    Granular A Base 200 mm 250 mm

    Granular B Type II Subbase 300 mm 350 mm

  • Reference No.: T020822-A6 13

    Drainage of the granular layers is important. The surface of each layer of the access road section should be provided with a suitable cross fall (approximately 2%) to prevent water from ponding on the surface and beneath the layers. Surface runoff should be directed into ditches. Sufficient field-testing should be carried out during construction to assess compaction of each lift of the granular courses. All granular base and sub-base course materials should be compacted to 100% of their SPMDD. The recommended access road structures provided within this report are considered sufficient for the expected end-use conditions only, which includes light vehicular traffic and occasional maintenance vehicles. These granular thicknesses may be required to be increased to properly support heavy equipment during construction period. Regular maintenance will be required to achieve maximum life expectancy. 9.0 CONSTRUCTION FIELD REVIEW The discussion and recommendations provided within this report are based upon our current understanding of the project. Inspec-Sol requests to be retained to review the structural plans and specifications once they become available to verify that the recommendations within this report have been adequately addressed, and to look for obvious geotechnical problems. The recommendations provided in this report are also based on an adequate level of construction monitoring being conducted during the construction phase of the proposed development. Due to the nature of the proposed development, an adequate level of construction monitoring is considered to be as follows:

    Prior to construction of footings, the exposed footing subgrade should be examined by a Geotechnical Engineer or a qualified technologist acting under the supervision of a Geotechnical Engineer, to assess whether the subgrade conditions correspond to those encountered in the test pits, and that the recommendations provided in this report have been implemented.

    The use of Engineered Fill, if necessary should be monitored on a full-time basis by a qualified engineering technologist.

    The materials proposed to be used as backfill or granular courses should be submitted to a geotechnical engineer for testing and approval prior to use.

  • Reference No.: T020822-A6 14

    Backfilling operations should be conducted in the presence of a qualified technologist to ensure that proper material is employed and specified compaction is achieved.

    Testing of concrete strength should be conducted by a qualified technologist to ensure the specifications for the project have been met.

    A Site specific program of Quality Control or Quality Assurance should be developed to verify the ongoing installation of the helical pile foundation systems.

    Several compression and tension load testing programs should be undertaken at the outset of the Project to ensure that design uplift and bearing capacities are being achieved.

    10.0 REPORT CONDITIONS AND LIMITATIONS

    This report is intended solely for Canadian Solar Solutions Inc. and the other parties explicitly identified within the report. It is prohibited for use by others without Inspec-Sols prior written consent. This report is considered Inspec-Sols professional work product and shall remain the sole property of Inspec-Sol. Any unauthorized reuse, redistribution of or reliance on the report shall be at the Client and recipients sole risk, without liability to Inspec-Sol. Client shall defend, indemnify and hold Inspec-Sol harmless from any liability arising from or related to Clients unauthorized distribution of the report. No portion of this report may be used as a separate entity; it is to be read in its entirety and shall include all supporting drawings and appendices. The recommendations made in this report are in accordance with our present understanding of the project, the current site use, ground surface elevations and conditions, and are based on the work scope approved by the Client and described in the report. The services were performed in a manner consistent with that level of care and skill ordinarily exercised by members of geotechnical engineering professions currently practicing under similar conditions in the same locality. No other representations, and no warranties or representations of any kind, either expressed or implied, are made. Any use which a third party makes of this report, or any reliance on or decisions to be made based on it, are the responsibility of such third parties.

  • Reference No.: T020822-A6 15

    All details of design and construction are rarely known at the time of completion of a geotechnical study. The recommendations and comments made in the study report are based on our subsurface investigation and resulting understanding of the project, as defined at the time of the study. We should be retained to review our recommendations when the drawings and specifications are complete. Without this review, Inspec-Sol will not be liable for any misunderstanding of our recommendations or their application and adaptation into the final design. By issuing this report, Inspec-Sol is the geotechnical engineer of record. It is recommended that Inspec-Sol be retained during construction of all foundations and during earthwork operations to confirm the conditions of the subsoil are actually similar to those observed during our study. The intent of this requirement is to verify that conditions encountered during construction are consistent with the findings in the report and that inherent knowledge developed as part of our study is correctly carried forward to the construction phases. It is important to emphasize that a soil investigation is, in fact, a random sampling of a site and the comments included in this report are based on the results obtained at the twelve (12) test pit locations only. The subsurface conditions confirmed at these twelve (12) test locations may vary at other locations. Soil and groundwater conditions between and beyond the test locations may differ both horizontally and vertically from those encountered at the test locations and conditions may become apparent during construction which could not be detected or anticipated at the time of our investigation. Should any conditions at the Site be encountered which differ from those found at the test locations, we request that we be notified immediately in order to permit a reassessment of our recommendations. If changed conditions are identified during construction, no matter how minor, the recommendations in this report shall be considered invalid until sufficient review and written assessment of said conditions by Inspec-Sol is completed. INSPEC-SOL INC.

    Shane Dunstan, B.A.Sc., E.I.T. Joseph B. Bennett, P. Eng. SD/vl Dist: Mr. Jeff Roy Email - ([email protected])

  • D R A W I N G S

    SITE LOCATION MAP BOREHOLE LOCATION PLAN

  • E N C L O S U R E S

    TEST PIT LOGS RESULTS OF LABORATORY TESTING

    CERTIFICATE OF ANALYSIS FROM LABORATORY

  • INSPEC-SOL INC.179 Colonnade Rd., Suite 400Ottawa, ON K2E 7J4Tel.:(613) 727-0895 Fax: (613) 727-0581

    Reference No.: T020822-A6Client: Canadian Solar Solutions Inc.

    Project: WILLIAM RUTLEY SOLAR PARK, Ingleside, ON

    Enclosure No.:1 Test Pit Logs

    TP-1 0.0 - 1.5 Sandy Silt, some clay, stiff, mottled brown, damp

    1.5 - 3.3 Clayey Silt, some sand, trace gravel, soft, grey, moist

    TP-2 0.0 - 0.2 Topsoil, dark brown, moist, many organics

    0.2 - 1.5 Sandy Silt, some clay, stiff, mottled brown, damp

    1.5 - 2.7 Clayey Silt, some sand, trace cobbles and boulders, firm, grey, moist

    TP-3 0.0 - 0.2 Topsoil, dark brown, moist, many organics

    0.2 - 2.8 Sandy Silt, some clay, stiff, mottled brown, damp

    2.8 End of test pit on dense cobbles and boulders

    TP-4 0.0 - 0.2 Topsoil, dark brown, moist, many organics

    0.2 - 2.7 Sandy Silt, some clay, stiff, mottled brown, damp

    2.7 Sandy Silt, some gravel, trace clay, trace cobbles and boulders, firm, grey, moist

    TP-5 0.0 - 0.2 Topsoil, dark brown, moist, many organics

    0.2 - 2.7 Sandy Silt, some clay, stiff, mottled brown, damp

    2.7 Clayey silt, some sand trace gravel, trace cobbles, firm, grey, wet

    TP-6 0.0 - 0.2 Topsoil, dark brown, moist, many organics

    0.2 - 2.8 Sandy Silt, some clay, stiff, mottled brown, damp

    TP-7 0.0 - 0.8 Topsoil, dark brown, moist, many organics

    0.8 - 2.9 Sandy Silt, some clay, stiff, mottled brown, damp

    TP-8 0.0 - 0.6 Topsoil, dark brown, moist, many organics

    0.6 - 2.4 Sandy Silt, some clay, cobbles and boulders, stiff, mottled brown, damp

    TP-9 0.0 - 0.6 Topsoil, dark brown, moist, many organics

    0.6 - 1.9 Sandy Silt, some clay, stiff, mottled brown, damp

    TP-10 0.0 - 0.3 Topsoil, dark brown, moist, many organics

    0.3 - 1.5 Sandy Silt, some clay, stiff, mottled brown, damp

    1.5 - 2.8 Difficulty excavating due to dense cobbles and boulders

    TP-11 0.0 - 0.2 Topsoil, dark brown, moist, many organics

    0.2 - 2.4 Sandy Silt, some clay, boulders in excess of 1.2 m, stiff, mottled brown, damp

    TP-12 0.0 - 0.5 Topsoil, dark brown, moist, many organics

    0.5 - 2.9 Sand and Silt, some gravel, trace cobbles and boulders, compact, light brown, wet

    DescriptionDepth

    (m)Location

  • INSPEC-SOL INC.179 Colonnade Rd., Suite 400Ottawa, ON K2E 7J4Tel.:(613) 727-0895 Fax: (613) 727-0581

    Reference No.: T020822-A6Client: Canadian Solar Solutions Inc.

    Project: WILLIAM RUTLEY SOLAR PARK, Ingleside, ON

    Enclosure No.:2 Results of Laboratory TestingSample No. TP1, GS2 TP3, GS1 TP7, GS1 TP9, GS1 TP12, GS1Depth (m) 1.5 - 3.3 0.2 - 2.8 0.8 - 2.9 0.6 - 1.9 0.5 - 2.9Soil Type Glacial Till Glacial Till Glacial Till Glacial Till Glacial TillParameterpH 7.70 7.73 7.71 7.53 7.74Chloride [Cl-] (ug/g) ND ND ND ND NDSulphate [SO4

    -] (ug/g) 160 ND ND ND NDRedox Potential (mV) 184 160 108 141 134Conductivity (umho/cm) 258 117 130 152 120

  • Your Project #: T020822-AG Site: WILLIAM RUTLEY, INGLESIDE, ON Your C.O.C. #: 00572721

    Attention: Shane DunstanInspec-Sol Inc179 Colonnade RdSuite 400Nepean, ONCANADA K2E 7J4

    Report Date: 2010/11/17

    CERTIFICATE OF ANALYSIS

    MAXXAM JOB #: B0G2743Received: 2010/11/12, 11:22

    Sample Matrix: Soil# Samples Received: 5

    Date Date MethodAnalyses Quantity Extracted Analyzed Laboratory Method ReferenceChloride (20:1 extract) 5 N/A 2010/11/17 CAM SOP-00463 Conductivity 5 N/A 2010/11/17 CAM SOP-00414 APHA 2510 pH CaCl2 EXTRACT 5 2010/11/17 2010/11/17 CAM SOP-00413 SM 4500 H Resistivity of Soil 5 2010/11/12 2010/11/17 CAM SOP-00414 APHA 2510 Sulphate (20:1 Extract) 5 N/A 2010/11/17 CAM SOP-00464 EPA 375.4 Redox Potential ( 1 ) 5 2010/11/15 2010/11/17 APHA-SM 2580 B (18th

    Edition:1992) Mod. &ASTM D1498-76 Mod.

    * RPDs calculated using raw data. The rounding of final results may result in the apparent difference.

    (1) This test was performed by Maxxam Sladeview Petrochemical

    Encryption Key

    Please direct all questions regarding this Certificate of Analysis to your Project Manager.

    JULIE CLEMENT, Ottawa Customer ServiceEmail: [email protected]# (613) 274-3549

    ====================================================================

    Maxxam has procedures in place to guard against improper use of the electronic signature and have the required "signatories", as per section5.10.2 of ISO/IEC 17025:2005(E), signing the reports. For Service Group specific validation please refer to the Validation Signature Page.

    Total cover pages: 1

    Maxxam Analytics International Corporation o/a Maxxam Analytics Maxxam Ottawa : 32 Colonnade Unit 1000, Nepean ON, K2E 7J6

    Page 1 of 5

  • Inspec-Sol IncMaxxam Job #: B0G2743 Client Project #: T020822-AGReport Date: 2010/11/17 Project name: WILLIAM RUTLEY, INGLESIDE, ON

    Sampler Initials: DH

    RESULTS OF ANALYSES OF SOIL

    Maxxam ID H V 4 7 8 3 H V 4 7 8 4 H V 4 7 8 5 H V 4 7 8 6 H V 4 7 8 7Sampling Date 2010/11/06 2010/11/06 2010/11/06 2010/11/06 2010/11/06COC Number 00572721 00572721 00572721 00572721 00572721 U n i t s TP1, GS2 TP3, GS1 TP7, GS1 TP9, GS1 TP12, GS1 RDL QC Batch

    Calculated ParametersResistivity ohm-cm 3900 8600 7700 6600 8300 2328110InorganicsSoluble (20:1) Chloride (Cl) ug/g ND ND ND ND ND 20 2332361Conductivity umho/cm 258 117 130 152 120 2 2332132Available (CaCl2) pH pH 7.70 7.73 7.71 7.53 7.74 2332060Soluble (20:1) Sulphate (SO4) ug/g 160 ND ND ND ND 20 2332363Subcontracted AnalysisRedox Potential mV +184 +160 +108 +141 +134 2329716

    ND = Not detectedRDL = Reportable Detection LimitQC Batch = Quality Control Batch

    Page 2 of 5

  • Inspec-Sol IncMaxxam Job #: B0G2743 Client Project #: T020822-AGReport Date: 2010/11/17 Project name: WILLIAM RUTLEY, INGLESIDE, ON

    Sampler Initials: DH

    GENERAL COMMENTS

    Results relate only to the items tested.

    Page 3 of 5

  • Inspec-Sol IncAttention: Shane Dunstan Client Project #: T020822-AGP.O. #: Project name: WILLIAM RUTLEY, INGLESIDE, ON

    Quality Assurance ReportMaxxam Job Number: TB0G2743

    QA/QC DateBatch AnalyzedNum Init QC Type Parameter yyyy/mm/dd Value Recovery Units QC Limits

    2329716 VSZ QC Standard Redox Potential 2010/11/17 +241 % N/AMethod Blank Redox Potential 2010/11/17 +340 mVRPD [ H V 4 7 8 7 - 0 1 ] Redox Potential 2010/11/17 5.4 % N/A

    2332132 YPA QC Standard Conductivity 2010/11/17 103 % 75 - 125Method Blank Conductivity 2010/11/17 ND, RDL=2 umho/cmRPD Conductivity 2010/11/17 0.6 % 35

    2332361 DRM Matrix Spike[HV4783-01] Soluble (20:1) Chloride (Cl) 2010/11/17 102 % 75 - 125Spiked Blank Soluble (20:1) Chloride (Cl) 2010/11/17 109 % 85 - 115Method Blank Soluble (20:1) Chloride (Cl) 2010/11/17 ND, RDL=20 ug/gRPD [ H V 4 7 8 3 - 0 1 ] Soluble (20:1) Chloride (Cl) 2010/11/17 NC % 35

    2332363 DRM Matrix Spike[HV4783-01] Soluble (20:1) Sulphate (SO4) 2010/11/17 93 % 75 - 125Spiked Blank Soluble (20:1) Sulphate (SO4) 2010/11/17 96 % 85 - 115Method Blank Soluble (20:1) Sulphate (SO4) 2010/11/17 ND, RDL=20 ug/gRPD [ H V 4 7 8 3 - 0 1 ] Soluble (20:1) Sulphate (SO4) 2010/11/17 3.6 % 35

    N/A = Not ApplicableDuplicate: Paired analysis of a separate portion of the same sample. Used to evaluate the variance in the measurement.Matrix Spike: A sample to which a known amount of the analyte of interest has been added. Used to evaluate sample matrix interference.QC Standard: A blank matrix to which a known amount of the analyte has been added. Used to evaluate analyte recovery.Spiked Blank: A blank matrix to which a known amount of the analyte has been added. Used to evaluate analyte recovery.Method Blank: A blank matrix containing all reagents used in the analytical procedure. Used to identify laboratory contamination.NC (RPD): The RPD was not calculated. The level of analyte detected in the parent sample and its duplicate was not sufficiently significant to permit areliable calculation.

    Maxxam Analytics International Corporation o/a Maxxam Analytics Maxxam Ottawa : 32 Colonnade Unit 1000, Nepean ON, K2E 7J6

    Page 4 of 5

  • Validation Signature Page

    Maxxam Job #: B0G2743

    The analytical data and all QC contained in this report were reviewed and validated by the following individual(s).

    EWA PRANJIC, M.Sc., C.Chem, Scientific Specialist

    GRACE SISON, Technical and Customer Service Coordinator

    ====================================================================

    Maxxam has procedures in place to guard against improper use of the electronic signature and have the required "signatories", as per section 5.10.2 ofISO/IEC 17025:2005(E), signing the reports. For Service Group specific validation please refer to the Validation Signature Page.

    Page 5 of 5

  • A P P E N D I X

    EXPLANATORY NOTES FOR BOREHOLE AND TEST PIT LOGS

  • CLASSIFICATION

    1 - 10%10 - 20%20 - 35%35 - 50%

    silt

    < 2525 - 5050 - 7575 - 90> 90

    0 - 44 - 1010 - 3030 - 50> 50

    < 250250 - 500500 - 10001000 - 20002000 - 4000

    > 4000

    < 1212 - 2525 - 50

    50 - 100100 - 200

    > 200

    0,075 to 0,425mm0,425mm to 2,0mm

    2,0 to 4,75mm

    4,75mm to 19mm19 to 75mm

    < 0,002mm0,002 to 0,075mm

    0,075 to 4,75mm

    4,75 to 75mm

    75 to 300mm> 300mm

    C

    SOIL DESCRIPTION:Each subsoil stratum is described using the following terminology. The relative density of granular soils is determined by the standardpenetration index ("N" value), while the consistency of clayey soils is measured by the value of the undrained shear strength (Cu).

    "traces""some"adjective (silty, sandy)"and"

    RELATIVE DENSITY OFGRANULAR SOILS

    (BLOWS/ft - 300mm)

    ClaySiltSand

    Gravel

    CobblesBoulders

    Very looseLooseCompactDenseVery dense

    Very softSoftMediumStiffVery stiffHard

    UNDRAINED SHEARSTRENGTH (Cu)

    (P.S.F.) (kPa)

    ROCK QUALITY DESIGNATION

    "RQD" (%) VALUE QUALIFICATIVE

    SAMPLES:TYPE AND NUMBER

    ST: Shelby tubePS: Piston sample (Osterberg)

    The type of sample recovered is shown on the log by the abbreviation listed hereafter. The numbering of samples is sequential for each typeof sample.

    RQD

    RECOVERYThe recovery, shown as a percentage, is the ratio of length of the sample obtained to the distance the sampler was driven/pushed into thesoil.

    N: Standard penetration indexR: Refusal to penetration

    LABORATORY TESTS:Ip: Plasticity indexWl: Liquid limitWp: Plastic limit

    A: Atterberg limitsw: Water contentg: Unit weight CHEM: Chemical analysis

    CS: Swedish fall coneC: Consolidation O.V.: Organic vapor

    PS-020.01/IA/06-05

    sand gravel

    clay

    Bedrock(limestone)

    fill

    cobbles &boulders

    CONSISTANCY OFCOHESIVE SOILS

    TERMINOLOGY

    very poorpoorfairgoodexcellent

    The "Rock Quality Designation" or "RQD" value, expressed as a percentage, is the ratio of the total length of all core fragments of 4 inches(10cm) or more to the total length of the run.

    IN-SITU TESTS:

    SS: Split spoonSSE, GSE, AGE: Environnemental sampling

    NOTES ON BOREHOLEAND TEST PIT REPORTS

    (UNIFIED SYSTEM)

    AG: AugerRC: Rock coreGS: Grab sample

    k: PermeabilityABS: Absorption (Packer test)

    STANDARD PENETRATIONINDEX "N" VALUE

    STRATIGRAPHIC LEGEND

    organic soil

    N : Dynamic cone penetration indexCu: Undrained shear strengthPr: Pressuremeter

    H: Hydrometer analysisGSA: Grain size analysis

    finemediumcoarse

    finecoarse

  • PS-020.02/IA / 06-05

    PROCEDURES FOR IN-SITU TESTING

    IN GEOTECHNICS A- Soil Sampling

    Soil samples are normally recovered with a split-spoon sampler or a thin-walled Shelby tube. The split spoon is dynamically driven into the ground and takes a remoulded sample of the soil found at depth. A standard penetration test is thereby obtained, and is described in the following paragraph. The Shelby tube is pushed into the ground to obtain undisturbed samples of clay or clayey soils. Rock samples are obtained by drilling a core barrel into the rock formation; the diameter of the recovered sample varies with the size of the drilling bit used.

    B- Standard Penetration Test (SPT)

    A standard penetration test consists of driving a standard split-spoon sampler into the soil be dropping a 140 lb. weight (63.5 kg) from a height of 30 inches (76 cm). The sampler is driven 18 inches (45 cm) into the soil and the number of blows of the drop weight is recorded for every 6 inches (15 cm) of penetration. The total number of blows for the last 12 inches (30 cm) of penetration is the standard penetration index ("N" value). This value obtained at regular intervals provides vital information from which the density, compressibility and bearing capacity of the various soil horizons can be estimated. The test is however seldom used in clayey soils.

    C- Dynamic Penetration Test

    A dynamic penetration test (or cone penetration test) is similar to a standard penetration test with the difference that the split-spoon sampler is replaced by a conical point 10 cm2 in area. The number of blows is recorded continuously for every foot of penetration (30 cm) thus obtaining a systematic indication of the relative density of the materials encountered at depth. This test also helps in determining the depth to a dense soil horizon or bedrock.

    Note: The presence of large gravel, cobbles or boulders in the subsoil may distort the results of both the standard penetration test

    and the dynamic penetration test by giving abnormally high resistance values. When it becomes impossible to drive the cone deeper a refusal ("R") is then recorded.

    D- Shear Test

    An undrained shear test may be carried out by pushing into the undisturbed soil a vane shear apparatus consisting of a four-bladed vane connected to a rod and by measuring the torque value required to shear the clay. This test may be repeated at regular intervals and the torque values calculated to obtain the undrained shear strength of the clay at each test level. The shear strength profiles permit the calculation of the allowable bearing capacity of the clay. The apparatus used is the "Nilcon" of Scandinavian origin.

    E- Permeability Test (Lefranc)

    This test consists of determining the coefficient of permeability K of the soil around a permeable lens of known dimensions and which has been formed below the driving shoe. The procedure used is the falling head method. Tests of the Lefranc type are carried out in soils with average granulometry and average permeability.

    F- Packer Test

    This test is conducted in bedrock by sealing off a section of the borehole with one or two inflatable rubber packers and then pumping water into the isolated section of the hole. The permeability of the rock adjacent to the isolated section of the borehole is measured as a function of the pumping head (pressure) and rate of water loss (absorption) from the sealed-off section over a fixed period of time.

    G- Menard Pressuremeter Test

    The pressuremeter test developed by Menard (1956) consists of laterally loading the sidewalls of a borehole by dilating a cylindrical probe. The test permits the determination of the modulus EM and the limit pressure pl, which are a measure of the strength of the soil, and enables the calculation of the bearing capacity and settlements for foundations.

    1.0 0BINTRODUCTION2.0 1BSITE DESCRIPTION3.0 2BGEOLOGICAL DISCUSSION4.0 3BFIELDWORK5.0 4BLABORATORY TESTING6.0 5BSUBSOIL CONDITIONS 10B6.1 Surficial Topsoil 11B6.2 Sandy Silt with some Clay (Glacial Till)12B6.3 Clayey Silt with some Sand (Glacial Till)13B6.4 Bedrock

    7.0 6BGROUNDWATER CONDITIONS7B8.0 DISCUSSION AND RECOMMENDATIONS14B8.1 Project Description15B8.2 General Considerations16B8.3 Site Preparation 17B8.4 Excavation and Dewatering18B8.5 Solar Panel Foundations19B8.5.1 Pad Foundations Systems20B8.5.2 Helical Pile Foundation Systems 21B8.5.3 Resisting Foundation Uplift22B8.5.4 Frost Protection of Foundations23B8.5.4.1 Protection of Bearing Soils24B8.5.4.2 Frost Adhesion25B8.5.5 Seismic Site Classification26B8.5.6 Engineered Fill27B8.6 Construction of Underground Services29B8.6.1 Bedding and Cover30B8.6.2 Service Trench Backfill

    28B8.7 Construction of Gravel Access Roads

    8B9.0 CONSTRUCTION FIELD REVIEW9B10.0 REPORT CONDITIONS AND LIMITATIONST020822-A6 Test Pit Logs.pdfTest Pit LogsLab Testing