PRELIMINARY
GEOTECHNICAL
INVESTIGATION 272 ALBERT STREET
WATERLOO, ONTARIO
2616359 ONTARIO INC.
FINAL REPORT (VERSION 1)
PROJECT NO.: 18M-01394-00
DATE: MAY 03, 2019
WSP
SUITE 300
4 HUGHSON STREET SOUTH
HAMILTON, ON, CANADA L8N 3Z1
T: +1 905 529-4414
F: +1 905 521-2699
WSP.COM
PRELIMINARY GEOTECHNICAL INVESTIGATION - 272 ALBERT STREET Project No. 18M-01394-00 2616359 ONTARIO INC.
WSPMay 2019
Page i
1 INTRODUCTION ............................................. 1
2 SITE AND REGIONAL GEOLOGY ................. 1
3 METHOD OF INVESTIGATION ...................... 1
3.1 Drilling Investigation Work and Field Testing ............ 1
3.2 Geotechnical Laboratory Testing ................................ 2
4 SUBSURFACE CONDITIONS ........................ 2
4.1 Subsoil Conditions ........................................................ 2
4.2 Groundwater Conditions .............................................. 3
5 PRELIMINARY GEOTECHNICAL
INTERPRETATION AND
RECOMMENDATIONS ................................... 5
5.1 Overview of Subsurface Conditions ........................... 5
5.2 Foundations ................................................................... 5
5.3 Floor Slab and Permanent Drainage ........................... 6
5.4 Frost Protection ............................................................. 6
5.5 Excavations and Services ............................................ 6
5.6 Earth Pressures and Basement Walls ......................... 7
5.7 Earthquake Considerations .......................................... 7
5.8 Pavements ...................................................................... 7
6 GENERAL COMMENTS ................................. 8
7 LIMITATIONS OF REPORT ............................ 9
7.1 Limited Use .................................................................... 9
7.2 Excerpts ......................................................................... 9
7.3 Info By Others ................................................................ 9
7.4 Standard Of Care ........................................................... 9
PRELIMINARY GEOTECHNICAL INVESTIGATION - 272 ALBERT STREET Project No. 18M-01394-00 2616359 ONTARIO INC.
WSPMay 2019
Page ii
7.5 Limited Scope ................................................................ 9
7.6 Changes Over Time ..................................................... 10
7.7 Variability Between Test Locations ........................... 10
7.8 Surveying ..................................................................... 10
7.9 Use For Design And Construction ............................ 10
PRELIMINARY GEOTECHNICAL INVESTIGATION - 272 ALBERT STREET Project No. 18M-01394-00 2616359 ONTARIO INC.
WSPMay 2019
Page iii
TABLES
TABLE 4-1 –GRAIN SIZE DISTRIBUTION RESULTS FOR CLAYEY SILT ............................. 3
TABLE 4-2 –GRAIN SIZE DISTRIBUTION RESULTS FOR SILT ............................................. 3
TABLE 4-3 – GROUNDWATER DEPTHS AND ELEVATIONS IN MONITORING WELLS ................................................. 4
TABLE 5-1 - BEARING CAPACITY VALUES AND FOUNDING LEVELS OF SPREAD FOOTINGS ON NATIVE SOILS .......... 5
TABLE 5-2 - RECOMMENDED PAVEMENT STRUCTURE THICKNESS ................. 7
APPENDICES
DRAWINGS
DRAWING 1 – BOREHOLE LOCATION PLAN
DRAWING 2 – DRAINAGE AND BACKFILL
RECOMMENDATIONS
A EXPLANATION OF TERMS USED IN BOREHOLE LOGS
LOGS OF BOREHOLES (19-1 TO 19-4)
B GRAIN SIZE DISTRIBUTION CURVES
(FIGURES B-1 AND B-2)
PLASTICITY CHART (FIGURE B-3)
PRELIMINARY GEOTECHNICAL INVESTIGATION - 272 ALBERT STREET Project No. 18M-01394-00 2616359 ONTARIO INC.
WSPMay 2019
Page 1
1 INTRODUCTION WSP Canada Inc. (WSP) was retained by 2616359 Ontario Inc. to undertake a preliminary geotechnical investigation
at 272 Albert Street (the ‘Site’), in Waterloo, Ontario. The proposed development at the site is an eight-storey mixed
used condominium. The existing site includes five (5) single detached residential house lots, and one (1) single
detached double residential house lot. The total area that the site occupies is approximately 0.42 hectares.
The purpose of this preliminary investigation was to determine the subsurface conditions at four (4) borehole locations
and based on the conditions, make preliminary engineering recommendations for the following:
— Foundations
— Floor slabs and permanent drainage
— Frost protection
— Excavations and backfill
— Earth pressures
— Earthquake considerations
— Pavements
This report is provided on the basis of the terms of reference presented above and on the assumption that the design
will be in accordance with the applicable codes and standards. If there are any changes in the design features relevant
to the geotechnical analysis, or if any questions arise concerning the geotechnical aspects of the codes and standards,
this office should be contacted to review the design. It may then be necessary to carry out additional borings and
reporting before the recommendations of this office can be relied upon.
This investigation did not include evaluation of soil and groundwater environmental quality; however, such data is
required as part of future work.
The site investigation and recommendations follow generally accepted practice for geotechnical consultants in
Ontario. The format and content are guided by client specific needs and economics and do not conform to generalized
standards for services. Laboratory testing for the most part, follows ASTM or CSA Standards or modifications of
these standards that have become standard practice.
This report has been prepared for 2616359 Ontario Inc. and its architects and designers. Third party use of this report
without the consent of WSP is prohibited. The limitation conditions presented in this report form an integral part of
the report and they must be considered in conjunction with the report’s contents.
It is expected that additional detail – design stage geotechnical investigations will be required for this site at such a
time as the existing on-site buildings have been demolished and the design for the new structure have progressed.
2 SITE AND REGIONAL GEOLOGY The proposed eight-storey condominium is located at 272 Albert Street, Waterloo Ontario. The Quaternary Geology
in the area is characterized by ice-contact stratified deposits and fine-textured glaciolacustrine deposits of silt and clay,
with minor sand and gravel.
3 METHOD OF INVESTIGATION
3.1 DRILLING INVESTIGATION WORK AND FIELD TESTING
Borehole locations for this investigation were established by WSP personnel in accordance with the requirements of
2616359 Ontario Inc.
PRELIMINARY GEOTECHNICAL INVESTIGATION - 272 ALBERT STREET Project No. 18M-01394-00 2616359 ONTARIO INC.
WSPMay 2019
Page 2
Four (4) boreholes (19-1 to 19-4) were drilled at the Site on April 2, 2019 to 7.5m below existing ground surface.
Approximate borehole locations are shown on Drawing 1.
Drilling was conducted with hollow stem continuous flight auger equipment by a drilling sub-contractor under the
supervision of WSP personnel. The soil stratigraphy as recorded by observing the quality and changes of augered
materials which were withdrawn from the boreholes, and by sampling the soils at regular intervals of depth using a
50mm O.D. split spoon sampler, in accordance with the Standard Penetration Test (ASTM D 1586) method. This
sampling method recovers samples from the soil strata, and the number of blows required to drive the sampler 0.3m
into undisturbed soil (SPT ‘N’-values) gives an indication of the compactness condition or consistency of the sampled
soil material. The SPT ‘N’-values are indicated on the Borehole Logs in Appendix A.
Upon completion of the drilling, the ground surface elevations at the borehole locations were surveyed by WSP and
were referenced to a geodetic benchmark.
Water level observations were made during drilling and in open boreholes upon completion of the drilling operations.
For the monitoring of the long-term groundwater levels, monitoring wells of 50mm dia. were installed in boreholes
19-1 and 19-3.
3.2 GEOTECHNICAL LABORATORY TESTING
The soil samples were taken to our laboratory where they were re-examined. Representative samples were selected
for geotechnical index testing. The testing program consisted of: the measurement of natural moisture contents in all
samples and grain size analyses and Atterberg Limits tests on two (2) selected soil samples. The grain size analysis
and plasticity results are enclosed in Appendix B.
4 SUBSURFACE CONDITIONS
4.1 SUBSOIL CONDITIONS
The four (4) boreholes revealed the presence of topsoil and fill deposits overlying deposits of clayey silt, silty clay,
sandy silt, and silt. More specific details on the subsurface conditions at the individual boring locations are given in
the borehole log sheets enclosed in Appendix A. The following notes are, therefore, intended only to summarize the
data and to amplify some of the general characteristic of these deposits.
TOPSOIL
A surficial layer of topsoil was encountered at the surface of all boreholes. The topsoil was 200 to 300mm thick at the
borehole locations, generally dark brown in colour containing an appreciable amount of roots and humus. These
materials are compressible under loads; therefore, the topsoil should not be re-used as structural fill, but can be used
for general landscaping purposes.
FILL
Fill soils were encountered beneath the surficial topsoil at all boreholes and extended to depths of 0.8 to 2.3m below
ground surface. The fill soil consisted of clayey silt mixed with sand, trace gravel, was dark brown in colour, moist,
and was inferred to be very soft to stiff based on SPT ‘N’-values of 1 to 15 blows per 0.3m of penetration. The natural
moisture contents measured from seven (7) samples ranged from 13 to 28%
CLAYEY SILT
Underlying the fill, clayey silt was encountered at all boreholes with the exception of borehole 19-1 where the clayey
silt was encountered beneath a 1.5m thick deposit of silt. The clayey silt extended to depths of 6.1m to the full
exploration depth of boreholes 19-3 and 19-4 (7.5m). This clayey silt layer was brown, contained some sand, trace
PRELIMINARY GEOTECHNICAL INVESTIGATION - 272 ALBERT STREET Project No. 18M-01394-00 2616359 ONTARIO INC.
WSPMay 2019
Page 3
gravel, and its consistency was inferred to be stiff to hard based on SPT ‘N’-values of 14 to 35 blows per 0.3m of
penetration. The natural moisture contents measured from sixteen (16) samples ranged from 15 to 23%.
One (1) grain size analysis and Atterberg limits test was conducted on a sample of the clayey silt. The test results are
shown in Table 4-1. The grain size distribution curve is presented on Figure B-1 and the Atterberg Limits Results are
shown on Figure B-3, enclosed in Appendix B. Based on the grain size results, the clayey silt has a moderate to high
frost susceptibility.
Table 4-1 –Grain Size Distribution Results for Clayey Silt
SAMPLE ID
GRAIN SIZE DISTRIBUTION (%) ATTERBERG LIMITS (%)
GRAVEL SAND SILT CLAY
Plastic Limit
(PL)
Liquid Limit
(LL)
Plasticity
Index (PI)
19-3/SS9 0 1 80 19 16 21 5
SANDY SILT TO SILT
Underlying the clayey silt, a deposit of sandy silt to silt was encountered at boreholes 19-1 to 19-3. A 1.5m thick
deposit of silt was also encountered above the clayey silt deposit at borehole 19-1. The lower sandy silt to silt extended
beyond the exploration depth of the boreholes (7.5m).
The upper silt deposit was brown and contained trace sand and trace clay. The compactness condition of the upper silt
was inferred to be compact, based on SPT ‘N’-values of 23 and 25 blows per 0.3m of penetration. The natural moisture
content measured from two (2) samples ranged from 18 to 23%.
The lower sandy silt to silt was brown or grey, contained trace to some sand, trace clay, was typically wet to saturated,
and its compactness was inferred to be compact to very dense based on SPT ‘N’-values of 16 to in excess of 50 blows
per 0.3m of penetration. The natural moisture contents measured from six (6) samples ranged from 16 to 26%.
Boulders/cobbles should be expected within the sandy silt.
One (1) grain size analysis and Atterberg limits test was conducted on a sample from the silt deposit. The grain size
analysis and Atterberg Limits test results are shown in Table 4-2. The grain size distribution curves are presented on
Figure B-2 and the Atterberg Limits Results are shown on Figure B-3, enclosed in Appendix B. Based on the grain-
size results, the silt is highly frost susceptible.
Table 4-2 –Grain Size Distribution Results for Silt
SAMPLE ID
GRAIN SIZE DISTRIBUTION (%) ATTERBERG LIMITS (%)
GRAVEL SAND SILT CLAY
Plastic Limit
(PL)
Liquid Limit
(LL)
Plasticity
Index (PI)
19-1/SS7 0 6 86 8 Non-plastic
4.2 GROUNDWATER CONDITIONS
Groundwater conditions in all of the four (4) boreholes were observed during and at the completion of drilling.
Groundwater was encountered in all boreholes.
A monitoring well was installed at boreholes 19-1 and 19-3 upon completion of drilling. The groundwater levels
measured in the two (2) wells ranged from at 4.6 to 7.3m below ground surface (Elev. 338.6 to 337.7m). Groundwater
level and elevation measurements are shown in Table 4-3.
PRELIMINARY GEOTECHNICAL INVESTIGATION - 272 ALBERT STREET Project No. 18M-01394-00 2616359 ONTARIO INC.
WSPMay 2019
Page 4
Table 4-3 – Groundwater Depths and Elevations in Monitoring Wells
BOREHOLE ID
DATE OF WELL
INSTALLATION
DATE OF
MEASUREMENT
GROUNDWATER
DEPTH (m)
GROUNDWATER
ELEVATION (m)
19-1 April 2, 2019
April 15, 2019 4.82 337.69
April 25, 2019 4.65 337.86
19-3 April 2, 2019
April 15, 2019 7.26 338.44
April 25, 2019 7.10 338.60
We would also expect that a perched water table lies within the upper silt deposit and fill soils.
Note that the piezometric levels as indicated in Table 4-3 represent short-term observations only and given the
expected low hydraulic conductivity of the materials into which the wells are screened, the observed water levels may
not be fully equilibrated (i.e. they will likely continue to rise). Additional groundwater level measurements are
recommended.
It should be noted that groundwater levels can vary and are subject to seasonal fluctuations and in response to major
weather events.
PRELIMINARY GEOTECHNICAL INVESTIGATION - 272 ALBERT STREET Project No. 18M-01394-00 2616359 ONTARIO INC.
WSPMay 2019
Page 5
5 PRELIMINARY GEOTECHNICAL
INTERPRETATION AND
RECOMMENDATIONS
5.1 OVERVIEW OF SUBSURFACE CONDITIONS
In this section, the subsurface conditions are interpreted as they relate to the design and construction of the proposed
eight-storey mixed use condominium structure. It is assumed that the proposed structure will be a slab-on-grade
structure with one level of basement. The finished floor elevation of the of the proposed building is not known at the
time of this report.
5.2 FOUNDATIONS
The proposed building can be supported on conventional spread and strip footings of footings founded on the
undisturbed native stiff to hard clayey silt or compact silt for a bearing capacity value of 150 to 250kPa at the SLS
(Serviceability Limit State), and for a factored geotechnical resistance of 225 to 375kPa at ULS (Ultimate Limit State)
at depths and elevations shown on Table 5-1.
Table 5-1 - Bearing Capacity Values and Founding Levels of Spread Footings on Native Soils
BOREHOLE MATERIAL
BEARING
CAPACITY AT
SLS (kPa)
FACTORED
GEOTECHNICAL
RESISTANCE AT
ULS (kPa)
FOUNDING
DEPTH AT OR
BELOW EXISTING
GRADE (m)*
AT OR BELOW
FOUNDING
ELEVATION (m)*
19-1 Silt over
clayey silt 150 225 3.0 339.5
19-2 Clayey Silt 250 375 3.0 342.5
19-3 Clayey Silt 250 375 3.0 342.5
19.4 Clayey Silt 250 375 3.0 343.0
*1.4m of soil cover must be maintained for all footings exposed to seasonal freezing conditions
Foundations designed to the specified bearing capacity at the Serviceability Limit States (SLS) are expected to settle
less than 25 mm total and 19 mm differential.
All footings exposed to seasonal freezing conditions must have at least 1.4 metres of soil cover for frost protection.
Where it is necessary to place footings at different levels, the upper footing must be founded below an imaginary 10
horizontal to 7 vertical line drawn up from the base of the lower footing. The lower footing must be installed first to
help minimize the risk of undermining the upper footing.
In the vicinity of the existing buried utilities, all footings must be lowered to undisturbed native soils, or alternatively
the services must be structurally bridged.
It should be noted that the recommended bearing capacities have been calculated by WSP from the borehole
information for the design stage only. The investigation and comments are necessarily on-going as new information
of the underground conditions becomes available. For example, more specific information is available with respect to
conditions between boreholes when foundation construction is underway. The interpretation between boreholes and
PRELIMINARY GEOTECHNICAL INVESTIGATION - 272 ALBERT STREET Project No. 18M-01394-00 2616359 ONTARIO INC.
WSPMay 2019
Page 6
the recommendations of this report must therefore be checked through field inspections provided by WSP to validate
the information for use during the construction stage. All foundation bases must be inspected by WSP prior to the
placement of concrete.
5.3 FLOOR SLAB AND PERMANENT DRAINAGE
The floor slab can be supported on grade provided the topsoil and organics are stripped and surficial disturbed and
wet soils are removed and the subgrade proof rolled with a heavy roller. Any soft spots detected and revealed by proof-
rolling must be removed and replaced with select fill material. The fill should be placed in shallow lifts and compacted
to 98 percent of Standard Proctor Maximum Dry Density (SPMDD) under the supervision of WSP personnel.
A capillary break consisting of at least 200 mm of 19 mm clear crushed stone should be installed under the floor slab.
For buildings with one level of basement slab, a perimeter drainage system will be required around the exterior
basement walls. The perimeter drainage system shown on Drawing 2 is recommended for the basement walls where
open cut procedures are used.
Additional groundwater levels are required to assess whether sub-slab drainage piping is also required.
5.4 FROST PROTECTION
All footings exposed to seasonal freezing conditions must have at least 1.4 metres of soil cover for frost protection.
There is no official rule governing the required founding depth for footings below unheated basement floors. Certainly,
it will not be greater than the 1.4 m required in Southern Ontario for exterior footings. Un-monitored experience
indicates that a shallower depth ranging from 0.82 to 0.9 m for interior column footings and 0.4 m for wall footings
has been successful where 2 or more basement levels apply. The 0.82 m depth is believed to be close to the minimum
structural requirement for interior column footings. Adjacent to air shafts and entrance and exit doors, a footing depth
of 1.4 m below floor level is required or, alternatively, insulation protection must be provided.
It is also emphasized that underfloor drainage and/or an adequate free draining gravel base is required to minimize the
risk of floor dampness. Floor dampness could lead to temporary icing and the risk of accidents.
5.5 EXCAVATIONS AND SERVICES
Excavations can be carried out with heavy hydraulic backhoes. Water bearing sandy silt to silt soils were found to be
wet to saturated below the depths of 6.1 m. The groundwater level was measured in monitoring wells at depths ranging
from 4.6 to 7.3m below ground surface (Elev. 338.6 to 337.7m). However, the surficial fill soils and upper silt are also
expected to contain perched groundwater as well. The groundwater table must be lowered to at least 1.0 m below the
deepest excavation base.
All excavations must be carried out in accordance with the most recent Occupational Health and Safety Act (OHSA).
In accordance with OHSA, the fill material and the native cohesionless deposits of silt and sandy silt can be classified
as Type 3 Soil above groundwater table and Type 4 Soil below groundwater table. The clayey silt can be classified as
Type 2 Soil above the groundwater table and Type 3 Soil below the groundwater table.
Selected inorganic fill and native soils free from topsoil and organics can be used as general construction backfill
where it can be compacted with sheep's foot type compactors. Depending on the time of construction and weather,
some excavated material may be too wet to compact and will require aeration prior to its use. Loose lifts of soil, which
are to be compacted, should not exceed 200 mm.
The excavated soils are not considered to be free draining. Where free draining backfill is required, imported granular
fill such as OPSS Granular B should be used.
Imported granular fill, which can be compacted with hand held equipment, should be used in confined areas.
Underfloor fill should be compacted to at least 98 percent of Standard Proctor Maximum Dry Density (SPMDD).
PRELIMINARY GEOTECHNICAL INVESTIGATION - 272 ALBERT STREET Project No. 18M-01394-00 2616359 ONTARIO INC.
WSPMay 2019
Page 7
It should be noted that the excavated soils are subject to moisture content increase during wet weather which would
make these materials too wet for adequate compaction. Stockpiles should be compacted at the surface or be covered
with tarpaulins to minimize moisture uptake.
5.6 EARTH PRESSURES AND BASEMENT WALLS
The lateral earth pressures acting on basement walls may be calculated from the following expression:
p = K (γ h +q)
where,
p = Lateral earth pressure in kPa acting at depth h
K = Earth pressure coefficient, assumed to be 0.45 for vertical walls, and horizontal backfill for
permanent construction
γ = Unit weight of backfill, a value of 21 kN/m3 may be assumed
h = Depth to point of interest in metres
q = Equivalent value of surcharge on the ground surface in kPa
The above expression assumes that the perimeter drainage system prevents the buildup of any hydrostatic pressure
behind the wall. Refer to Drawing 2.
5.7 EARTHQUAKE CONSIDERATIONS
Based on the borehole information and according to Table 4.1.8.4.A of OBC 2012, the subject site for the proposed
structure can be classified as ‘Class D’ for seismic site response.
5.8 PAVEMENTS
Based on the borehole information, the recommended pavement structures are provided on Table 5-2. A functional
design life of eight to ten years has been used to establish the pavement recommendations. This represents the number
of years to the first major rehabilitation, assuming regular maintenance is carried out.
The long term performance of the pavement structure is highly dependent upon the subgrade support conditions.
Stringent construction control procedures should be maintained to ensure uniform subgrade moisture and density
conditions are achieved. In addition, the need for adequate drainage cannot be over-emphasized. The finished
pavement surface and underlying subgrade should be free of depressions and should be sloped (preferably at a
minimum grade of two percent) to provide effective surface drainage toward catch basins.
Areas disturbed by demolition of existing residential buildings must be restored and basements backfilled under the
full time inspection of WSP personnel. Basement walls must be fully removed along with floor slabs. Do not place
any demolition rubble in the excavations. Backfill basements with compacted granular fill in max. 300mm lifts to 98%
SPMDD at a placement water content of ±2% of optimum.
Table 5-2 - Recommended Pavement Structure Thickness
PAVEMENT LAYER
COMPACTION
REQUIREMENTS
LIGHT DUTY PAVEMENT
(PARKING FOR CARS)
HEAVY DUTY PAVEMENT
(DELIVERY TRUCKS)
Asphaltic Concrete 92% Maximum Relative
Density
40mm OPSS HL3 40mm OPSS HL3
50mm OPSS HL8 80mm OPSS HL8
PRELIMINARY GEOTECHNICAL INVESTIGATION - 272 ALBERT STREET Project No. 18M-01394-00 2616359 ONTARIO INC.
WSPMay 2019
Page 8
PAVEMENT LAYER
COMPACTION
REQUIREMENTS
LIGHT DUTY PAVEMENT
(PARKING FOR CARS)
HEAVY DUTY PAVEMENT
(DELIVERY TRUCKS)
OPSS Granular ‘A’
Base (Crushed
Limestone)
100% SPMDD* 150mm 150mm
OPSS Granular ‘B’,
Type II Sub-base 100% SPMDD* 300mm 300 to 450mm
*Denotes Standard Proctor Maximum Dry Density, ASTM D698
The subgrade must be compacted to 98% SPMDD for at least the upper 300 mm unless accepted by WSP.
Additional comments on the construction of parking areas and access roadways are as follows:
1 As part of the subgrade preparation, proposed driveway and parking areas should be stripped of the obvious
objectionable material. The subgrade should be properly shaped, crowned then proof-rolled in the full time
presence of a representative of this office. The primary purposes of proof rolling are to identify the soft or spongy
areas, check the subgrade compaction, to carry out the intent of the design, and to provide uniform support for
the pavement structure. Soft subgrade areas that are located should be corrected so that the subgrade density can
be maintained throughout the construction. Soft subgrade areas should be sub-excavated and properly replaced
with suitable approved backfill compacted to 98% SPMDD. Backfill to raise the grade to the subgrade surface
level can consist of inorganic soil, placed in shallow lifts and compacted to 98 percent of Standard Proctor
Maximum Dry density (SPMDD).
2 The locations and extent of sub-drainage required within the paved areas should be reviewed by this office in
conjunction with the proposed lot grading. Satisfactory crossfalls in the order of two percent (2%) should be
provided.
3 Subdrains extending from and between catch basins should be installed to intercept excess subsurface moisture
and prevent subgrade softening. In the event that shallower crossfalls are considered, a more extensive system of
sub-drainage may be necessary and should be reviewed by WSP.
4 The most severe loading conditions on light-duty pavement areas and the subgrade may occur during construction.
Consequently, special provisions such as restricted access lanes, half-loads during paving, etc., may be required,
especially if construction is carried out during unfavourable weather.
5 It is recommended that WSP be retained to review the final pavement structure designs and drainage plans prior
to construction to ensure that they are consistent with the recommendations of this report.
6 GENERAL COMMENTS This is a preliminary geotechnical report for preliminary design purposes only. Additional subsurface geotechnical
and geo-environmental site investigations are required in support of final design.
The comments given in this report are intended only for the guidance of design engineers for preliminary design
purposes. The number of boreholes and test pits required to determine the localized underground conditions between
boreholes and test pits affecting construction costs, techniques, sequencing, equipment, scheduling, etc., would be
much greater than has been carried out for design purposes. Contractors bidding on or undertaking the works should,
in this light, decide on their own investigations, as well as their own interpretations of the factual borehole and test pit
results, so that they may draw their own conclusions as to how the subsurface conditions may affect them.
PRELIMINARY GEOTECHNICAL INVESTIGATION - 272 ALBERT STREET Project No. 18M-01394-00 2616359 ONTARIO INC.
WSPMay 2019
Page 9
7 LIMITATIONS OF REPORT
7.1 LIMITED USE
This Report was prepared for the Client, solely for their exclusive use to provide an Assessment of current
environmental/geotechnical conditions in association with the Site. WSP will not be responsible for any use of this
report by any other party, for any decisions to be made based on it, or for the consequences thereof, unless written
reliance is granted by WSP. Unless otherwise agreed in writing by WSP, it shall not be used to express or imply
warranty as to the suitability of the property for a particular purpose. WSP disclaims responsibility of consequential
financial effects on transactions or property values, or requirements for follow-up actions and costs.
7.2 EXCERPTS
The Report is intended to be used in its entirety. No excerpts may be taken to be representative of the findings in the
assessment.
7.3 INFO BY OTHERS
In evaluating the Site, WSP has relied in good faith on information provided by others, as noted in the Report. WSP
has assumed that the information provided is correct and WSP assumes no responsibility for the accuracy,
completeness or workmanship of any such information.
7.4 STANDARD OF CARE
This project has been carried out using investigation techniques and engineering analysis methods consistent with
those ordinarily exercised by WSP and other engineering/scientific practitioners, working under similar conditions
and subject to the time, financial and physical constraints applicable to this project. The conclusions presented in this
Report are based on Work undertaken by trained professional and technical staff and the reasonable and professional
interpretation using accepted engineering and scientific practices current at the time the work was performed.
Conclusions presented in this report should not be construed as legal advice. WSP makes no other representations
whatsoever, including those concerning the legal significance of its findings, or as to other legal matters touched on
in the Report, including, but not limited to, ownership of any property, or the application of any law to the findings of
the Assessment.
7.5 LIMITED SCOPE
The Report summarizes WSP’s review of available data in accordance with the principal components of the stated
regulations, standards and guidelines and the scope, terms and conditions of the contract or proposal to which the
Assignment was conducted. No other warranties are either expressed or implied with respect to the professional
services provided under the terms of the contract or proposal and represented in this Report. Conditions may exist
which were not detected given the nature of the inquiry WSP was retained to undertake with respect to the Site.
Additional environmental studies and actions may be recommended.
PRELIMINARY GEOTECHNICAL INVESTIGATION - 272 ALBERT STREET Project No. 18M-01394-00 2616359 ONTARIO INC.
WSPMay 2019
Page 10
7.6 CHANGES OVER TIME
The Report is based on data and information collected at the time of this Assessment, as stated in the Report. Site use
or conditions change and the information and conclusions in the Report may no longer apply following the date of
this Report. If any conditions become apparent that differ significantly from that presented in this Report, we request
that we be notified to reassess the conclusions and recommendations provided herein. WSP disclaims any obligation
to update this Report for conditions that may be identified after the date of this Report; however, WSP reserves the
right to amend or supplement this report based on additional information, documentation or evidence.
7.7 VARIABILITY BETWEEN TEST LOCATIONS
Conclusions are based on the Site conditions observed by WSP at the time the work was performed and may include
information obtained at specific testing and/or sampling locations. It is recognized that overall conditions can only be
extrapolated to an undefined limited area around these testing and sampling locations. The conditions that WSP
interprets to exist between testing and sampling points may differ from those that actually exist. The accuracy of any
extrapolation and interpretation beyond the sampling locations will depend on natural conditions, the history of Site
development and changes through construction and other activities. In addition, analysis has been carried out for the
identified chemical and physical parameters only, and it should not be inferred that other chemical species or physical
conditions are not present. WSP cannot warrant against undiscovered environmental liabilities or adverse impacts off-
Site.
7.8 SURVEYING
Benchmark and elevations used in this report are primarily to establish relative elevation differences between the
specific testing and/or sampling locations and should not be used for other purposes, such as grading, excavating,
construction, planning, development, etc.
7.9 USE FOR DESIGN AND CONSTRUCTION
Design recommendations given in this report are applicable only to the project and areas as described in the text and
then only if constructed in accordance with the details stated in this report. The comments made in this report on
potential construction issues and possible methods are intended only for the guidance of the designer. The number of
testing and/or sampling locations may not be sufficient to determine all the factors that may affect construction
methods and costs. For example, the thickness of surficial topsoil or fill layers may vary markedly and unpredictably.
Contractors bidding on this project or undertaking the construction should, therefore, make their own interpretation
of the factual information presented and draw their own conclusions as to how the subsurface conditions may affect
their work. We accept no responsibility for any decisions made or actions taken as a result of this report unless we are
specifically advised of and participate in such action, in which case our responsibility will be as agreed to at that time.
Yours very truly,
WSP CANADA INC.
APPENDIX
DRAWINGS DRAWING 1 – BOREHOLE LOCATION PLAN
DRAWING 2 – DRAINAGE AND BACKFILL RECOMMENDATIONS
D
Y
H
WV
WV
WV
UP-A
WV
WV
WV
RE
TA
IN
IN
G W
ALL
ENTR
ASPH
CONCRETE SIDEWALK
CO
NC
RE
TE
S
ID
EW
AL
K
CN
C S
ID
EW
AL
K
CNC SIDEWALK
CNC SIDEWALK
BR
IC
K S
ID
EW
ALK
RE
TA
IN
IN
G W
ALL
RETAINING WALL
RE
TA
IN
IN
G W
ALL
BALCONY
RETAINING WALL
RETAINING WALL
RE
TA
IN
IN
G W
ALL
ST
EP
S
ENTR
ASPH
ENTR
ASPH
ENTR
ASPH
ST
EP
S
ENTR
ASPH
EN
TR
AS
PH
EN
TR
AS
PH
PORCH
BALCONY
STEPS
DECK
STEPS
STEPS
STEPS
STEPS
STEPS
DECK
STEPS
ST
EP
S
STEPS
BOARD FENCE
DECK
DECK
DECK
FE
NC
E
FE
NC
E
STEPS
STEPS
C
O
N
C
CONC
CONC
FE
NC
E
STEPS
2 STY
BRICK
1 STY
FRAME
1 STY
BRICK
1 STY
BRICK
1 STY
STUCCO
2 STY
GARAGE
2 STY
GARAGE
2 STY
BRICK
2 STY
BRICK
GARAGE
GARAGE
GARAGE
2 STY
BRICK
CONC
CONC
CONC
CONC
GRASS
GRASS
GRASS
GRASS
GRASSGRASS
GR
AS
S
GRASS
GRASS
GRASS
GUTTER
G
U
T
T
E
R
CURB
CU
RB
CU
RB
CU
RB
CU
RB
CURB
CURB
ALBERT STREET
HIC
KO
RY
S
TR
EE
T W
ES
T
HE
DG
E
HE
DG
E
HEDGE
HEDGE
CONC
PIN
22363-0078 (LT
)
PIN
22363-0077 (LT
)
PIN
22363-0076 (LT
)
PIN
22363-0043 (LT
)
N28°19'20"W
20.12 (P2&MS) 15.24 13.72 13.72 15.24 15.24
PIN
22363-0044 (LT
)
PIN
22363-0045 (LT
)
PIN
22363-0046 (LT
)
PIN
22363-0047 (LT
)
PIN
22363-0048 (LT
)
PIN
22363-0049 (LT
)
(P1,P2&MS)
(P2&SET)
42.67 (P1&MS)
18.29 (D1&SET)30.44(MS) (D2&SET)
N61°45'10"E
40
.23
80.55
(P
2&
SE
T)
N28°20'50"W
57.93 (P1&MEAS)
(P
1&
MS
)
19.90
15.24 13.72 11.27 2.45 15.24 19.41(P1&MS)
40.23 (P2&MS)
(D4&SET)
(D4&SET)
(D5&SET)
(D5&SET)(D6&MS)
(D6&MS)13.72
N28°15'50"W
10.98 15.24 18.29(D1&SET)
(D2&SET)
N61°45'10"E
40
.23
N61°45'10"E
40
.23
N61°43'05"E
40
.25
N61°44'55"E
40
.26
N61°40'40"E
40
.23
N61°40'40"E
40
.23
PIN
22363-0322 (LT
)
PIN22363-0042 (LT)
PIN
22364-0002 (LT
)
N61°38'30"E
(P
1)
N61°40'40"E
(P
2)
80.47 (P
2)
(D
4,D
5&
MS
)
(D
5,D
6&
MS
)
(M
S)
40.23 (D
6)
(M
S)
40.23 (D
3)
(D
2,D
3&
MS
)
(D
1,D
2&
MS
)
PART 1 PART 2 PART 3 PART 4 PART 5 PART 6
BO
AR
D F
EN
CE
BO
AR
D F
EN
CE
BO
AR
D F
EN
CE
BO
AR
D F
EN
CE
BOARD FENCE
FENCE
0.25 S
FENCE
0.05 S
FENCE
0.25 S
FENCE
0.2 S
0.6 W
FENCE
0.15 S
0.4 W
FENCE
0.3 S
FENCE
0.25 S
FENCE
0.15 S
FENCE
0.05S
FENCE
0.35 N
N61°45'10"E
(M
S)
40.23 (P
2&
MS
)
N61°44'10"E
(P
2)
PIN
22363-0134 (LT
)
NORTH WEST CORNER
LOT 63 REGISTERED PLAN 707
CONCRETE RETAINING WALL
WALL
0.08E
WALL
0.04E
30.48 (D3)
121.88 (P1&MS)
CO
NC
RE
TE
R
ET
AIN
IN
G W
ALL
WALL
0.13 N
WALL
0.04 N
9.15
CENTERLINE OF ROAD
9.15
18.29 (P
2)
77.3344.55
30.48 (D3)
(MS)30.39
40.30 (P
1)
40.33 (P
1)
PROPOSED ROAD WIDENING 11.50m
2.35
2.37
1
9
-
1
1
9
-
2
1
9
-
3
1
9
-
4
\\cac
mb2
dat0
1\ca
cmb2
\Pub
lic\C
omm
on fi
les\
0000
WSP
Pro
ject
s\18
1\18
M-0
1394
-00
- GI -
272
Alb
ert S
treet
\CAD
\Bor
ehol
e Pl
an N
ew.d
wg
LEGEND
PROJECT NO: DRAWING NO:
CHECKED BY:DRAWN BY:
SCALE:DATE:
ORIGINAL SIZE: REV. #
CLIENT:
TITLE:
PROJECT:
18M-01394-00 1
CC SP
AS SHOWNAPR 29, 2019
LETTER N/A
BOREHOLE LOCATION PLAN
GEOTECHNICAL INVESTIGATION - 272 ALBERT STREET, WATERLOO, ON
2616359 ONTARIO INC.
Borehole Location
Monitoring Well Location
300 - 4 HUGHSON STREET SHAMILTON, ONTARIO CANADA L8N 3Z1
TEL.: 905-529-4414 | WWW.WSP.COM
APPENDIX
A EXPLANATION OF TERMS USED IN BOREHOLE LOGS
LOGS OF BOREHOLES (19-1 TO 19-4)
TOPSOIL: 200mm
FILL: clayey silt mixed with sand,trace gravel, brown to dark brown,moist, very soft to firm
SILT: trace sand, trace clay,brown, moist, very stiff
CLAYEY SILT: trace sand, greyishbrown, trace orange mottling, moist,stiff
SILT: trace sand, trace clay, brown, saturated, very dense
END OF BOREHOLENOTES:1. 50mm diameter monitoring wellinstalled.2. Groundwater levelmeasurements:Date Depth (m)Apr 15/19 4.8Apr 25/19 4.7
86
342.3
340.2
338.7
336.4
335.0
SS
SS
SS
SS
SS
SS
SS
SS
1
2
3
4
5
6
7
8
7
3
1
25
23
14
64
61
0
0.2
2.3
3.8
6.1
7.5
6 8
:
10 20 30
REMARKS
AND
GRAIN SIZE
DISTRIBUTION
(%)
NATURALMOISTURECONTENT
3
SI
GRAPHNOTES
LIQUIDLIMIT
SAMPLES
NU
MB
ER
342
341
340
339
338
337
336
NA
TU
RA
L U
NIT
WT
PO
CK
ET
PE
N.
SOIL PROFILE
ELE
VA
TIO
N
20 40 60 80 100
QUICK TRIAXIAL
GR
OU
ND
WA
TE
R
CO
ND
ITIO
NS
"N"
B
LOW
S
0.3
m
4th3rdGROUNDWATER ELEVATIONS
DESCRIPTION
PROJECT: 272 Albert Street
CLIENT: 2616359 Ontario Inc.
PROJECT LOCATION: Waterloo, Ontario
DATUM: Geodetic, NAD83 UTM Zone 17T, mASL
BH LOCATION: N 4813852 E 537746
GR
1
2
3
4
5
6
7
Numbers referto Sensitivity
w
DEPTH
SA
LOG OF BOREHOLE 19-1
1st 2nd
Ground Surface
(kN
/m3)
ST
RA
TA
PLO
T
LAB VANE
SHEAR STRENGTH (kPa)
TY
PE
,3
CL
=3%Strain at Failure
Measurement
(Cu)
(kP
a)(m)
342.5
PLASTICLIMIT
FIELD VANE& Sensitivity
ELEV
DYNAMIC CONE PENETRATIONRESISTANCE PLOT
wL
0.0
UNCONFINED
1 OF 1
20 40 60 80 100
WATER CONTENT (%)
wP
Method: Hollow Stem Auger
Diameter: 150mm
Date: Apr-02-2019
KW
CC
SP
REF. NO.: 18M-01394-00
ENCL NO.: 1
ORIGINATED BY
COMPILED BY
CHECKED BY
WS
P-S
OIL
-RO
CK
-MA
Y-2
9-2
01
7.G
LB
WS
P S
OIL
LO
G
18
M-0
13
94
-00
.GP
J 1
9-5
-1
Non-Plastic
W. L. 337.9 mApr 25, 2019W. L. 337.7 mApr 15, 2019
TOPSOIL: 200mm
FILL: clayey silt mixed with sand,trace gravel, brown to dark brown,moist, firm to stiff
CLAYEY SILT: trace sand, brown,trace orange mottling, moist, verystiff to hard- 25mm thick layer of sand andgravel
SANDY SILT: trace clay, brownsaturated, compact
END OF BOREHOLENOTES:1. Borehole open and dry uponcompletion of drillng.
345.2
343.1
339.3
337.9
SS
SS
SS
SS
SS
SS
SS
SS
1
2
3
4
5
6
7
8
6
7
9
24
33
28
16
26
0.2
2.3
6.1
7.5
:
10 20 30
REMARKS
AND
GRAIN SIZE
DISTRIBUTION
(%)
NATURALMOISTURECONTENT
3
SI
GRAPHNOTES
LIQUIDLIMIT
SAMPLES
NU
MB
ER
345
344
343
342
341
340
339
338
NA
TU
RA
L U
NIT
WT
PO
CK
ET
PE
N.
SOIL PROFILE
ELE
VA
TIO
N
20 40 60 80 100
QUICK TRIAXIAL
GR
OU
ND
WA
TE
R
CO
ND
ITIO
NS
"N"
B
LOW
S
0.3
m
4th3rdGROUNDWATER ELEVATIONS
DESCRIPTION
PROJECT: 272 Albert Street
CLIENT: 2616359 Ontario Inc.
PROJECT LOCATION: Waterloo, Ontario
DATUM: Geodetic, NAD83 UTM Zone 17T, mASL
BH LOCATION: N 4813812 E 537735
GR
1
2
3
4
5
6
7
Numbers referto Sensitivity
w
DEPTH
SA
LOG OF BOREHOLE 19-2
1st 2nd
Ground Surface
(kN
/m3)
ST
RA
TA
PLO
T
LAB VANE
SHEAR STRENGTH (kPa)
TY
PE
,3
CL
=3%Strain at Failure
Measurement
(Cu)
(kP
a)(m)
345.4
PLASTICLIMIT
FIELD VANE& Sensitivity
ELEV
DYNAMIC CONE PENETRATIONRESISTANCE PLOT
wL
0.0
UNCONFINED
1 OF 1
20 40 60 80 100
WATER CONTENT (%)
wP
Method: Hollow Stem Auger
Diameter: 150mm
Date: Apr-02-2019
KW
CC
SP
REF. NO.: 18M-01394-00
ENCL NO.: 2
ORIGINATED BY
COMPILED BY
CHECKED BY
WS
P-S
OIL
-RO
CK
-MA
Y-2
9-2
01
7.G
LB
WS
P S
OIL
LO
G
18
M-0
13
94
-00
.GP
J 1
9-5
-1
TOPSOIL: 300mm
FILL: clayey silt mixed with sand,trace gravel, brown to dark brown,moist, soft
CLAYEY SILT: trace sand, brown,trace orange mottling, moist, verystiff to hard
END OF BOREHOLENOTES:1. 50mm diameter monitoring wellinstalled.2. Groundwater levelmeasurements:Date Depth (m)Apr 15/19 7.3Apr 25/19 7.1
80
345.4
344.9
338.2
SS
SS
SS
SS
SS
SS
SS
SS
SS
1
2
3
4
5
6
7
8
9
4
15
27
25
35
24
28
17
19 0
0.3
0.8
7.5
1 19
:
10 20 30
REMARKS
AND
GRAIN SIZE
DISTRIBUTION
(%)
NATURALMOISTURECONTENT
3
SI
GRAPHNOTES
LIQUIDLIMIT
SAMPLES
NU
MB
ER
345
344
343
342
341
340
339
NA
TU
RA
L U
NIT
WT
PO
CK
ET
PE
N.
SOIL PROFILE
ELE
VA
TIO
N
20 40 60 80 100
QUICK TRIAXIAL
GR
OU
ND
WA
TE
R
CO
ND
ITIO
NS
"N"
B
LOW
S
0.3
m
4th3rdGROUNDWATER ELEVATIONS
DESCRIPTION
PROJECT: 272 Albert Street
CLIENT: 2616359 Ontario Inc.
PROJECT LOCATION: Waterloo, Ontario
DATUM: Geodetic, NAD83 UTM Zone 17T, mASL
BH LOCATION: N 4813795 E 537756
GR
1
2
3
4
5
6
7
Numbers referto Sensitivity
w
DEPTH
SA
LOG OF BOREHOLE 19-3
1st 2nd
Ground Surface
(kN
/m3)
ST
RA
TA
PLO
T
LAB VANE
SHEAR STRENGTH (kPa)
TY
PE
,3
CL
=3%Strain at Failure
Measurement
(Cu)
(kP
a)(m)
345.7
PLASTICLIMIT
FIELD VANE& Sensitivity
ELEV
DYNAMIC CONE PENETRATIONRESISTANCE PLOT
wL
0.0
UNCONFINED
1 OF 1
20 40 60 80 100
WATER CONTENT (%)
wP
Method: Hollow Stem Auger
Diameter: 150mm
Date: Apr-02-2019
KW
CC
SP
REF. NO.: 18M-01394-00
ENCL NO.: 3
ORIGINATED BY
COMPILED BY
CHECKED BY
WS
P-S
OIL
-RO
CK
-MA
Y-2
9-2
01
7.G
LB
WS
P S
OIL
LO
G
18
M-0
13
94
-00
.GP
J 1
9-5
-1
W. L. 338.6 mApr 25, 2019W. L. 338.4 mApr 15, 2019
TOPSOIL: 200mm
FILL: clayey silt mixed with sand,trace gravel, brown to dark brown,moist, firm to stiff
CLAYEY SILT: trace sand, brown,moist, very stiff to hard
- 25mm thick layer of coarse sandand gravel
- greyish brown
END OF BOREHOLENOTES:1. Borehole open and dry uponcompletion of drilling.
346.1
344.0
338.8
SS
SS
SS
SS
SS
SS
SS
SS
1
2
3
4
5
6
7
8
5
6
10
19
33
31
28
21
0.2
2.3
7.5
:
10 20 30
REMARKS
AND
GRAIN SIZE
DISTRIBUTION
(%)
NATURALMOISTURECONTENT
3
SI
GRAPHNOTES
LIQUIDLIMIT
SAMPLES
NU
MB
ER
346
345
344
343
342
341
340
339
NA
TU
RA
L U
NIT
WT
PO
CK
ET
PE
N.
SOIL PROFILE
ELE
VA
TIO
N
20 40 60 80 100
QUICK TRIAXIAL
GR
OU
ND
WA
TE
R
CO
ND
ITIO
NS
"N"
B
LOW
S
0.3
m
4th3rdGROUNDWATER ELEVATIONS
DESCRIPTION
PROJECT: 272 Albert Street
CLIENT: 2616359 Ontario Inc.
PROJECT LOCATION: Waterloo, Ontario
DATUM: Geodetic, NAD83 UTM Zone 17T, mASL
BH LOCATION: N 4813760 E 537764
GR
1
2
3
4
5
6
7
Numbers referto Sensitivity
w
DEPTH
SA
LOG OF BOREHOLE 19-4
1st 2nd
Ground Surface
(kN
/m3)
ST
RA
TA
PLO
T
LAB VANE
SHEAR STRENGTH (kPa)
TY
PE
,3
CL
=3%Strain at Failure
Measurement
(Cu)
(kP
a)(m)
346.3
PLASTICLIMIT
FIELD VANE& Sensitivity
ELEV
DYNAMIC CONE PENETRATIONRESISTANCE PLOT
wL
0.0
UNCONFINED
1 OF 1
20 40 60 80 100
WATER CONTENT (%)
wP
Method: Hollow Stem Auger
Diameter: 150mm
Date: Apr-02-2019
KW
CC
SP
REF. NO.: 18M-01394-00
ENCL NO.: 4
ORIGINATED BY
COMPILED BY
CHECKED BY
WS
P-S
OIL
-RO
CK
-MA
Y-2
9-2
01
7.G
LB
WS
P S
OIL
LO
G
18
M-0
13
94
-00
.GP
J 1
9-5
-1
APPENDIX
B GRAIN SIZE DISTRIBUTION CURVES
(FIGURES B-1 AND B-2)
PLASTICITY CHART
(FIGURE B-3)
(no specification provided)
PL= LL= PI=
D90= D85= D60=D50= D30= D15=D10= Cu= Cc=
USCS= AASHTO=
*
Clayey Silt, trace sand4.75mm2.00mm.850mm.425mm.250mm.106mm.075mm
0.0360 mm.0.0259 mm.0.0172 mm.0.0110 mm.0.0081 mm.0.0060 mm.0.0031 mm.0.0013 mm.
100.0100.0
99.999.799.598.998.696.793.883.962.251.341.524.715.8
16 21 5
0.0209 0.0177 0.01040.0078 0.0040
CL-ML A-4(3)
# Lab No: 33-19
271 Albert Street, Waterloo
18M-01394-00
Soil Description
Atterberg Limits
Coefficients
Classification
Remarks
Sample Number: BH19-3 SS9Date:
Client:
Project:
Project No: Figure
SIEVE PERCENT SPEC.* PASS?
SIZE FINER PERCENT (X=NO)
PE
RC
EN
T F
INE
R
0
10
20
30
40
50
60
70
80
90
100
GRAIN SIZE - mm.
0.0010.010.1110100
% +75mmCoarse
% Gravel
Fine Coarse Medium
% Sand
Fine Silt
% Fines
Clay
0.0 0.0 0.0 0.0 0.3 1.1 79.7 18.9
6 in
.
3 in
.
2 in
.
1½
in.
1 in
.
¾ in
.
½ in
.
3/8
in.
#4
#1
0
#2
0
#3
0
#4
0
#6
0
#1
00
#1
40
#2
00
Particle Size Distribution Report
(no specification provided)
PL= LL= PI=
D90= D85= D60=D50= D30= D15=D10= Cu= Cc=
USCS= AASHTO=
*
Silt, trace clay, trace sand4.75mm 2.00mm.850mm.425mm.250mm.106mm.075mm
0.0425 mm.0.0319 mm.0.0212 mm.0.0127 mm.0.0091 mm.0.0065 mm.0.0032 mm.0.0014 mm.
100.0100.0100.0
99.999.898.494.461.345.530.620.817.814.8
9.96.9
0.0672 0.0612 0.04170.0350 0.0207 0.00660.0033 12.60 3.12
# Lab No: 33-19
271 Albert Street, Waterloo
18M-01394-00
Soil Description
Atterberg Limits
Coefficients
Classification
Remarks
Sample Number: BH19-1 SS7Date:
Client:
Project:
Project No: Figure
SIEVE PERCENT SPEC.* PASS?
SIZE FINER PERCENT (X=NO)
PE
RC
EN
T F
INE
R
0
10
20
30
40
50
60
70
80
90
100
GRAIN SIZE - mm.
0.0010.010.1110100
% +75mmCoarse
% Gravel
Fine Coarse Medium
% Sand
Fine Silt
% Fines
Clay
0.0 0.0 0.0 0.0 0.1 5.5 86.4 8.0
6 in
.
3 in
.
2 in
.
1½
in.
1 in
.
¾ in
.
½ in
.
3/8
in.
#4
#1
0
#2
0
#3
0
#4
0
#6
0
#1
00
#1
40
#2
00
Particle Size Distribution Report
0
10
20
30
40
50
60
0 10 20 30 40 50 60 70 80 90 100
MI OR OI
MH OR OH
PLASTICITY CHARTMay 1, 2019
JOB NO.
ML OR OL
PL
AS
TIC
ITY
IND
EX
(%
)
DATE
LIQUID LIMIT (%)
FIGURE NO. B-3
LEGEND
CL - ML
19-3
18M-01394-00
SS 9
CL
CI
CH
"U" Line"A" Line
ML
Non-plastic 19-1 SS7