(B)PREFEASIBILITY REPORT

OF

PROPOSED SAND MININGPROJECT

OFPintu Gopiji Vanzara

AT VILLAGE:- PETHAPUR, TALUKA:-GANDHINAGAR , DIST.:-GANDHINAGAR

Page 2: PREFEASIBILITY REPORT OF - Welcome to …environmentclearance.nic.in/writereaddata/FormB/TOR/PFR/...PREFEASIBILITY REPORT OF PROPOSED SAND MINING PROJECT OF Pintu Gopiji Vanzara AT

CONTENTS

1.0 INTRODUCTION

1.1 PREAMBLE

2.0 EXECUTIVE SUMMARY

3.0 INTRODUCTION OF THE PROJECT /BACKGROUND INFORMATION

4.0 PROJECT DESCRIPTION

4.0 AVAILABLITY OF RAW MATERIAL

5.0 SELECTION OF SITE & LOCATION OF STONE MINE

6.0 PLANNING BRIEF

7.0 PROPOSED INFRASTRUCTURE

8.0 REHABILITATION AND RESETTLEMENT (R & R) PLAN

9.0 PROJECT SCHEDULE & COST ESTIMATES

10.0 ANALYSIS OF PROPSAL (FINAL RECOMMENDATION)

Page 3: PREFEASIBILITY REPORT OF - Welcome to …environmentclearance.nic.in/writereaddata/FormB/TOR/PFR/...PREFEASIBILITY REPORT OF PROPOSED SAND MINING PROJECT OF Pintu Gopiji Vanzara AT

1.0 INTRODUCTION

1.1 Preamble

Ordinary Sand is base of all types of Building works, Construction of Road,

Construction of Cement Concrete road, The need of Ordinary Sand is in all

fields are very essential as it is a compulsory material for all types of

construction, and Industries fields, Ordinary Sand Mines are providing

employments to the local Labour in Rural area, as the labour of rural area

have no any work for labour, They are Unemployed, Thus this proposed mine

is providing work to many labours and it is a good employment.

2.0 Executive Summary

Pintu Gopiji Vanzara is a proposed mine, as the demand of construction

material in all sectors are highly necessary, and This project is providing and

trying to fulfil major demands of Ordinary Sand in complete around area.

About 00-76-00 hectare of land is under possession of Pintu Gopiji VanzaraAt, Village : Pethapur, Taluka : Gandhinagar, Dist : Gandhinagar.

As per the statuary obligation this project needs environmental clearance from

department of Environment and forest dept. (GPCB) Gujarat. it is proposed

lease and to renew and start quarrying operations (production) Accordingly

project proponent has submitted form 1, pre-feasibility report and copy of

Approval letter from department of mines and geology Gujarat, to the state

level environmental assessment authority of Gujarat constituted by MOEF,

GOI for issuing environmental clearance, as per EIA, September 14.2006

notification.

3.0 Introduction of the Project/Background information :

3.1 Name of the proposed unit : Pintu Gopiji Vanzara

Page 4: PREFEASIBILITY REPORT OF - Welcome to …environmentclearance.nic.in/writereaddata/FormB/TOR/PFR/...PREFEASIBILITY REPORT OF PROPOSED SAND MINING PROJECT OF Pintu Gopiji Vanzara AT

Registered Office : Pintu Gopiji Vanzara

67/ 68, Sector-2,

Nirnay Nagar, Ranip Road,

Ahmedabad.

Location of proposed unit : Village : Pethapur,

On River bed Sabarmati River

Patt Paiky S. No. 3030,

3031, 3053

Taluka : Gandhinagar.

Dist: Gandhinagar. (Gujarat)

Name of Owner : Pintu Gopiji Vanzara

3.2 Brief description of nature of the project :

It is a Ordinary Sand Quarrying, it contains Ordinary Sand which is used

in construction of infrastructures and road, railways and building

construction etc.

3.3 Demand - Supply Gap : As sand is used as raw material in

construction of building and infrastructure projects, the demand of sand

is increasing day by day. In past, demand was not too much but now a

days due to rapid industrialization and urbanization its demand

increasing with pace of time. At present, demand of sand is more than

the supply.

3.4 Imports vs. Indigenous Production : In Gandhinagar of Gujarat, a

number of sand mines are there. There is abundance of sand in the

area; it had become a major source of economy in the area/region.

Page 5: PREFEASIBILITY REPORT OF - Welcome to …environmentclearance.nic.in/writereaddata/FormB/TOR/PFR/...PREFEASIBILITY REPORT OF PROPOSED SAND MINING PROJECT OF Pintu Gopiji Vanzara AT

3.5 Export Possibility : There is ban on sand export to other states in the

Gujarat by Govt. so export possibility of river sand from this area is

marginal. Major consumers of sand located almost in nearby areas in

the district.

3.6 Domestic / Export Markets : Sand produced is used locally as well as

circulated in nearby area. So clearly there is a huge market of sand in

the area.

3.7 Employment Generation (Direct and Indirect) due to the project :

By this mining project of river sand in the area, peoples get

employment, The project directly generates the employment for the

local people and indirectly for the others. Also the marketing of the

product generates the employment for peoples. By this project,

approximately Skilled labours-3 and Unskillled-10 to 15 labours on

project site.

4.0 Project Description :

4.1 Type of project including interlinked and interdependent project ifany : No others material is interlinked with this mining work.

4.2 Location (map showing general location, specific location andproject boundary & project site layout) with co-ordinates : The area

has been marked on Google map including the mining lease location.

This comprises the mining lease near village : Pethapur, Taluka :

Gandhinagar, Dist Gandhinagar of Gujarat location of the mining lease

is as under.

Page 6: PREFEASIBILITY REPORT OF - Welcome to …environmentclearance.nic.in/writereaddata/FormB/TOR/PFR/...PREFEASIBILITY REPORT OF PROPOSED SAND MINING PROJECT OF Pintu Gopiji Vanzara AT
Page 7: PREFEASIBILITY REPORT OF - Welcome to …environmentclearance.nic.in/writereaddata/FormB/TOR/PFR/...PREFEASIBILITY REPORT OF PROPOSED SAND MINING PROJECT OF Pintu Gopiji Vanzara AT

The geographical location of the project is as follows :

N E

230.15'34.78" 720 40'48.97"

4.3 Details of alternate sites, considered and the basis of selecting theproposed site, particularly the environmental considerations goneinto should be highlighted : No other site is considered for the

proposed project. The land has been allocated by government for the

mining only. As sand in the river is replenished every year by river so,

site is adequate for sand mining.

4.4 Size or magnitude of operation : B category manual.

The proposed Capacity / year is 3500 TPM. Total area of mining lease

is 00-76-00 Ha. The mining operation will be @ 3500 Tonne Production

of River sand per annum.

4.5 Project description with process details (a schematic diagram/flowchart showing the project layout, components of the project etc. isgiven below:

Open cast mining

OB removal

Loading

Transportation to end use

Page 8: PREFEASIBILITY REPORT OF - Welcome to …environmentclearance.nic.in/writereaddata/FormB/TOR/PFR/...PREFEASIBILITY REPORT OF PROPOSED SAND MINING PROJECT OF Pintu Gopiji Vanzara AT

4.6 Raw material required along with estimated quantity, likely source,marketing area of final products. Mode of transport of rawmaterials And finished products :

No raw material is required during the mining process.

4.7 Resource optimization / recycling and reuse envisaged in the

project. If any, should be briefly outlined :

As a result of extraction of mineral, the rate of recharging of ground

water is likely to be increased considerably.

4.8 Availability of water its source, Energy/power requirement and

source should be given :

Total water requirement in the mine will be about 2.0 KLD for drinking &

domestic use, dust suppression and plantation. Drinking water will be

brought by water tanker from nearby village Pethapur. Diesel will be

used in dumpers and tractors.

Nearby village Pethapur is well electrified.

4.9 Quantity of wastes to generated (liquid and solid) and scheme for

their Management/disposal :

No waste will be generated. All the material is saleable.

4.10 Schematic representations of the feasibility drawing which give

information of EIA purpose :

According to MOEF mining project containing area ≤5 Ha. are

considered in category B2. Schematic representations of the feasibility is

as under.

Page 9: PREFEASIBILITY REPORT OF - Welcome to …environmentclearance.nic.in/writereaddata/FormB/TOR/PFR/...PREFEASIBILITY REPORT OF PROPOSED SAND MINING PROJECT OF Pintu Gopiji Vanzara AT

Project Concept and Site selection

Form 1 pre-feasibility project report

with proposed TOR to MOEF (EAC)

Scoping by SEAC (site visit by

sub group of SEAC, if necessary

Category B2 - EIA not required

Appraisal and recommended by SEAC

Approval by SEIAA

Display on the SPCB/UTPCC website

& project proponent website

5.0 Site Analysis :

5.1 Connectivity :

Mine site is well connected with rail and road transport. Nearest railway

station is at Gandhinagar Railway Station (5.95 km) of mine site.

Gandhingar Vijapur Highway Road (1.68 km). Nearest highway is a

National highway No. 8C Passes in about (1.70 km).

5.2 Land Form - Land use and land Ownership :

The area of lease is 00-76-00 Ha. Land is Govt. land (Sabarmati River

Patt Paiky). The lease area forms part of S. No. 3030, 3031, 3053, No

forest land is involved in leased area. Details are given in below table.

Page 10: PREFEASIBILITY REPORT OF - Welcome to …environmentclearance.nic.in/writereaddata/FormB/TOR/PFR/...PREFEASIBILITY REPORT OF PROPOSED SAND MINING PROJECT OF Pintu Gopiji Vanzara AT

S.

No.

Type of

Land

Area

in

(Ha.)

Near

Village

Tehsil District State

1 On River

bed

Sabarmati

River Patt

Paiky

00-

76-00

Pethapur Gandhinagar Gandhiangar Gujarat

5.3 Topography (Google image) :

The lease area is situated of village Pethapur. Topographically, the area

is almost flat & river bed area.

Page 11: PREFEASIBILITY REPORT OF - Welcome to …environmentclearance.nic.in/writereaddata/FormB/TOR/PFR/...PREFEASIBILITY REPORT OF PROPOSED SAND MINING PROJECT OF Pintu Gopiji Vanzara AT
Page 12: PREFEASIBILITY REPORT OF - Welcome to …environmentclearance.nic.in/writereaddata/FormB/TOR/PFR/...PREFEASIBILITY REPORT OF PROPOSED SAND MINING PROJECT OF Pintu Gopiji Vanzara AT

5.4 Proposed land use pattern (agriculture, non-agriculture, forest,water bodies including area under CRZ), shortest distances fromthe periphery of the project to periphery of the forests, nationalpark, wild life sanctuary, eco sensitive areas, water bodies(distance from the HFL of the river), CRZ. In case of notifiedindustrial area, a copy of the Gazette notification should be given:

Nearest SensitiveArea

Name Distance fromthe Project

within 10 kms

a) Reserve Forest There is no

reserve or

protected forest

within 10.0 km

of lease area.

b) National Park There is no

national park or

wild life

sanctuary within

10.0 km of

lease area.

c) Wild life

Sanctuary

Page 13: PREFEASIBILITY REPORT OF - Welcome to …environmentclearance.nic.in/writereaddata/FormB/TOR/PFR/...PREFEASIBILITY REPORT OF PROPOSED SAND MINING PROJECT OF Pintu Gopiji Vanzara AT

d) Eco sensitive

areas

There is no eco

sensitive area

within 10.0 km

of lease area

e) Water source

(a) Ground water

Map

No big water

reservoir is

within 10.0 km

of lease area.

The grounder

water level is

10 to 15 mt.

deep

(b) Surface water

bodies map

The project is

located in seismic

zone-III. There is no

flood. cloudburst and

landslide reported so

far.

f) CRZ N.A. There is no

C.R.Z. within

10.00 km

Page 14: PREFEASIBILITY REPORT OF - Welcome to …environmentclearance.nic.in/writereaddata/FormB/TOR/PFR/...PREFEASIBILITY REPORT OF PROPOSED SAND MINING PROJECT OF Pintu Gopiji Vanzara AT

periphery of

lease area.

5.5 Proposed infrastructure :Mine office is proposed in lease area. A well equipped first aid facility is

proposed to be available at there. Temporary rest shelter urinal and

latrine are proposed. Water will be purchased from nearby tube well

from nearby villages. A small water tank is also proposed in mine office

premises. This can be used for supply of water to drinking purposes.

5.6 Soil classification :

Soil of the region falls within medium rain fall zone of 703-750 mm. Thesoils are sandy loam, shallow depth reddish-black soils.

5.7 Climatic data from secondary sources :

Mansa has a tropical climate. In winter there is much more rainfall inMansa than in summer. According to Köppen and Geiger climate isclassified as As. The average annual temperature in Mansa is 27.1 °C.About 703 mm of precipitation falls annually.

Page 15: PREFEASIBILITY REPORT OF - Welcome to …environmentclearance.nic.in/writereaddata/FormB/TOR/PFR/...PREFEASIBILITY REPORT OF PROPOSED SAND MINING PROJECT OF Pintu Gopiji Vanzara AT

1. Climate graph - Year 2013

2. Temperature graph - Year 2013

3. Climate table - Year 2013

Page 16: PREFEASIBILITY REPORT OF - Welcome to …environmentclearance.nic.in/writereaddata/FormB/TOR/PFR/...PREFEASIBILITY REPORT OF PROPOSED SAND MINING PROJECT OF Pintu Gopiji Vanzara AT

5.8 Social Infrastructure available : N.A.

6.0 Planning Brief :

6.1 Planning Concept (type of industries, facilities, transportation etc.)Town and country planning development authority classification :

No industries and town planning programmers in the proposed area.

6.2 Population projection :

No Human settlements near project area.

6.3 Land use planning (breakup along with green belt etc) :

Details will be given in land use pattern of quarry plan.

6.4 Assessment of Infrastructure Demand (Physical & Social) :

There is no large infra structure demand near to proposed area.

6.5 Amenities / Facilities :

Not applicable as it is a small project.

7.0 Proposed Infrastructure :

7.1 Industrial Area (processing Area) : --NA--

7.2 Residential Area (Non Processing Area) : --NA--

7.3 Green Belt :

The plant is following the norms and is in process to developing 33%green belt in lease area.

7.4 Social Infrastructure : N.A..

7.5 Connectivity (Traffic and Transportation Road/Rail/Metro/Waterways etc) :

Well connected with Road/Rail. No metro and water ways.

7.6 Drinking Water Management (Source & Supply of water) :

Drinking water is procured from tube well proposed nearby.

7.7 Sewage system :

The domestic wastewater treat in the septic tank followed by soak pit.

7.8 Industrial waste management : --NA--

7.9 Solid waste management : --NA--

Page 17: PREFEASIBILITY REPORT OF - Welcome to …environmentclearance.nic.in/writereaddata/FormB/TOR/PFR/...PREFEASIBILITY REPORT OF PROPOSED SAND MINING PROJECT OF Pintu Gopiji Vanzara AT

7.10 Power Requirement & Supply / Source : --N.A.--

8.0 Rehabilitation and Resettlement (R & R) Plan :

Policy to be adopted (Central / State) in respect of the project affectedpersons including home outstees, land outstees and landless labourers(a brief outline to be given) : --NA--

9.0 Project Schedule & Cost Estimates :

Project cost

No. Particulars Amounts (Rs.)

1 Mining equipments 50,000/-

2 Tanker based trolley with Tractor 1,50,000/-

Total 2,00,000/-

9.1 Likely date of start of construction and likely date of completion(Time schedule for the project to be given) :

It is a proposed project.

9.2 Estimated project cost along with analysis in terms of economicviability of the project :

The proposed cost of the project is Rs. 2,00,000 and it is economically10.0 Analysis of proposal (Final Recommendation) :

Financial and social benefits with special emphasis on the benefit to theThis project is creating employment potential for approximately about 10to 15 local people.