Prefeasibility ReportFor Environment Clearance from MOEF under EIA
Notification Dated 14th September, 2006 as Amended
1. SUMMARY
-
-
Village - Sayarrayi
--
-
1. -2. Geographical Co-ordinates LATITUDE
23°03'33.11"N 23°03'34.03"N 23°03'38.29"N 23°03'38.33"N 23°03'39.20"N 23°03'38.86"N 23°03'37.82"N 23°03'36.92"N
River -
Nalla - 280 m
Tanks - 780 m
Canal - 9.20 km
Reservoir - 6.50 km
4. -
-
6. -
7. -
Pond towards north near Sayarrayi
village area
Canal towards north-west near
Khairwar village areaGhunghutta reservior towards south-
west near Lawaidih village area &
Reservior at north-west near
Khairwar village
Pre - Feasibility Report
Chhattisgarh
1.744 hect. / Private Land
Chendra Reserve Forest & Khairbar Reserve Forest are at
2.00 km towards west form lease area. However, NOC
from DFO Ambikapur is obtained and enclosed.
Name of Reserve Forest(s), Wild Life
Sanctuary/National Park
Mining Lease Area & Type of Land
State
For Sayarrayi Brick Earthclay Quarry Mine & Fix Chimney Brick Plant, at Village - Sayarrayi
Surguja
Name of Company/Mine/Lessee
Project
Tehsil/Taluka
BL7BL8
Tehsil- Lundra & District- Surguja, State- Chhattisgarh.
5.
Mining of earth clay at the rate of maximum 2628.7 cum
per year and production of saleable red brick by fix
chimney plant at the rate of maximum 1667577 nos. per
year.
Project Proposal
Flat Land devoid of vegitation
Altitude - Max. 722 AMSL and Min. 719 AMSL
Surface slope - Towards south-west
Toposheet No.- 64M/8
Topography of the area
Ajay Arun Minj
Nalla towards south near mine area
-
District
BOUNDRY POINT
BL1BL2BL3BL4BL5BL6
Sayarrayi Brick Earthclay Quarry Mine & Fix Chimney Brick
Plant
Lundra
LONGITUDE
83°19'41.94"E 83°19'39.14"E 83°19'38.69"E 83°19'40.13"E 83°19'40.88"E 83°19'42.21"E 83°19'42.02"E 83°19'43.72"E
Brick Earth Clay
3. 12.00 km (Gungata river at south-west)-Name of River/ Nallahs /Tanks
/Spring / Lakes etc.
Name of Mineral Mined
Signature of Project Proponent
________________________________________________________________________________________________
___
2
Pre - Feasibility ReportFor Sayarrayi Brick Earthclay Quarry Mine & Fix Chimney Brick Plant, at Village - Sayarrayi
Tehsil- Lundra & District- Surguja, State- Chhattisgarh.
-
9. -
10. -
11. -12. -13. -14. -
15. 1. 1.744 Hect.2. 1.488 Hect.
3. 0.056 Hect.4. 0.2 Hect.5. 0 Hect.
6. 0 Hect.
1.744 Hect.
7. 0.056 Hect.
8. 0.056 Hect.
16. -
17. -
18. -19. -20. -
Ajay Arun Minj
Registered office Ajay Arun MinjS/o Shri Ujin MinjVillage/Post - NawaparaTehsil - AmbikapurDistrict - Surguja
State - Chhattisgarh
Mine Office Village - Sayarrayi
E-MailProspecting Agency
Type of Activity
Ground Water table Intersection
Drilling/Blasting
Drainage Pattern/ Water Courses
10 years for the excavation of recoverable reserve of
23173.33 MTNot Applicable
Open Cast Manual Brick Earth Clay Quarry Mining
-
8.
NIL
Water Requirement & Source Requirement - 9.33 kilo litre per day, Source - Mine
pit/Setting tank, dug well and tube well of nearby village or
of mine area within permited limits.
Mine loss/waste/OB - 10% i.e. total 2574.82 cum ( max.
yearly generation 292.08 cum)
Rejected or Broken Bricks - 5% i.e. total 2321.13 MT (Max.
Yearly generation 263.3 MT)
Mining of Earth clay - maximum 2628.7 cum/yearRate of Production (in tons)Production of saleable brick - max. 1667577 nos/year
Life of Mine
Mining MethodBelow 30 meter from surface levelNatural drainage towards south-west
Open Cast Manual
Any Other (Specify)
Not ApplicableCost of Project (Rs. Lacs)IBM approval: Date
Name and Address of the company /
Proponent
Total Lease AreaArea proposed under mining pits
Area covered by statuary/mine Area covered by Fixed Chimney/kilnArea Kept for storage
Unused/Prohibited Area within Lease
Dumping Area proposed within
proposed Statutory/mine BoundaryPlantation Area proposed over the
dump on obove dumping area
Break-up of Land Utilization Pattern
Total Area (2+3+4+5+6) =
Geological Reserve (till 2m depth) - 31420.34 cum.
Recoverable Reserve (till 2m depth) - 23173.33 cum.Mineral Reserve (in tons)
Rs. 27.5 lacs
Solid waste/Tailings
NilNot Applicable
Signature of Project Proponent
________________________________________________________________________________________________
___
3
Pre - Feasibility ReportFor Sayarrayi Brick Earthclay Quarry Mine & Fix Chimney Brick Plant, at Village - Sayarrayi
Tehsil- Lundra & District- Surguja, State- Chhattisgarh.
Utilities (Power, Water Requirement)
Manpower requirement
2. INTRODUCTION OF PROJECT/BACK INFORMATION
Ajay Arun Minj
S/o Shri Ujin Minj
Village/Post - Nawapara
Tehsil - Ambikapur
District - Surguja
State - Chhattisgarh
(ii) Brief Description of Nature of the Project
Power- 2 HP
Water – 9.33 KLD for Domestic, Dust Suppression &
Plantation Purpose34 workers per day
The proposed project is mining activity of Brick Earth Clay with the name of 'Sayarrayi Brick
Earthclay Quarry Mine & Fix Chimney Brick Plant' which is situated at Khasra no. 512 at village
Sayarrayi, tehsil Lundra and district Surguja (C.G.). This site is 16.00 km away from district
office Surguja. The quarry lease of Brick Earth Clay mining has been already sanctioned for
lease period of 10 year from 29.03.2008 to 28.03.2018 which is subjected to extension for 30
years from the date of first commencement of lease as per rule 38A of MMR 2015 as
ammended to the project proponent Ajay Arun Minj resident of Nawapara district Surguja
(C.G.). The quarry lease is granted for 1.744 hectare land and the proposed maximum
production capacity is 2628.7 cum. per annum of clay mining and production of red brick by fix
chimney plant at the rate of maximum 1667577 nos. per annum. The excavation of Brick Earth
Clay will be done by Open Cast Manual method of mining and manufacturing of bricks will be
done by fix chimney brick plant.
For compliance of Rule 24 and 63 to 66 of MMR 2015 proponent was submitted quarry plan
before mining authorities and the plan so submitted has been duly approved by the
sanctioning authority vide letter no. 434/Khanij/2017/ Balrampur, Dated 16/03/2017.
Identification of Project and Project Proponent
(a) Name of the Project: Sayarrayi Brick Earthclay Quarry Mine & Fix Chimney Brick Plant
(b) Project Proponent : Ajay Arun Minj
(c) Postal /Correspondence Address of Project Proponent:
Provisional Environment clearance were previously granted by SEIAA CG vide letter no. No
(i)
Proposed Brick Earth Clay Deposit is located at village Sayarrayi, Tehsil Lundra, District Surguja and
state Chhattisgarh over an area of 1.744 ha. The proposed capacity of the project is clay generation
of maximum 2628.7 cum/annum and production of saleable red brick by fix chimney plant at the
rate of maximum 1667577 nos. per year along with the aid of 25% of fly ash. Proposed land is
Private non forest revenue land. Open Cast Manual method of mining is the most suitable mining
procedure for this mine. This method of mining is used for highest productivity and the lowest cost
of any of the broadly used mining methods. Brief description of the project is described below –
Signature of Project Proponent
________________________________________________________________________________________________
___
4
Pre - Feasibility ReportFor Sayarrayi Brick Earthclay Quarry Mine & Fix Chimney Brick Plant, at Village - Sayarrayi
Tehsil- Lundra & District- Surguja, State- Chhattisgarh.
(iii)
(iv)
(v)
Bricks are basic raw material of civil construction works likes civil constructions, building &
colony development projects etc.
Chhattisgarh is a developing state in map of India. Considering the growth, State Government
has divided the state in 27 districts out of which 9 are recently declared districts. State
Government is carrying on various new township and building projects in all districts. In
addition to these various civil constructions, Building & Colony development projects are
coming in Private sectors and are under implementations, all above civil works require Bricks
which is in huge in demand.
Demand - Supply Analysis
Exploiting this bricks earth is important for the country’s long term economic growth and
regional growth. By mining the deposit and producing red bricks, the lessee acts as bridge and
fills the gap between demand and supply of Bricks in the market surrounding the area.
Therefore, a ready market is available for the proposed unit hence looking to the use and
demand of bricks which exist a good scope for the proposed project.
Need for the Project and its Importance to the Country and/or Region
All the other necessary permission and noc’s has been taken by the proponent. Consent to
establish & operate/Air/Water clearances from CGCECB will also be taken if instructed by
jurisdictional DEIAA.
Demand - Supply Gap
Mineral resources of any country are the “TREASURE-TROVE” of its national economy;
Chhattisgarh is one of the richest states in the country with its sparkling mineral wealth. The
Chhattisgarh State has enormous reserves of soil spread over the state. Bricks is basic material
of civil construction works likes building etc. for construction of walls. Chhattisgarh is a new
state in map of India. Considering the growth, State Government has divided the state in 27
districts out of which 9 are recently declared districts. State Government, is carrying on various
new township and building projects in all districts. In addition to these various civil
constructions, building & colony development projects are coming in Private sectors and are
under implementations, all above civil works require bricks which are in huge in demand.
Therefore application is being filed before jurisdictional DEIAA of district Surguja for getting
permanent environmental clearance before starting of mining activity on granted lease area.
The proposed project is < 5 hect. Minor mineral and non-coal mining project thus it is
classified as “CATEGORY – B2” project under activity 1(a) of the schedule of EIA notification
dated 14th September 2006 as amended by Ministry of Environment, Forests and Climate
Change, New Delhi by S.O. 141(E) dated 15 January 2016, hence it comes under jurisdiction of
DEIAA.
Signature of Project Proponent
________________________________________________________________________________________________
___
5
Pre - Feasibility ReportFor Sayarrayi Brick Earthclay Quarry Mine & Fix Chimney Brick Plant, at Village - Sayarrayi
Tehsil- Lundra & District- Surguja, State- Chhattisgarh.
(vi)
a) Direct Employment
S.N.
1
2
3
4
5
b)
3. PROJECT DESCRIPTION
(i)
(ii)
The details of the lease area are as under:
Extra Skilled labours 2
As per needSemi-Skilled
Mining mate (Qualified)
Chowkidars (Experienced)
Total
Mining will generate employment opportunity to local inhabitants directly and indirectly in
mining as well as in consequent related activity.
The proposed project is < 5 hect. Minor mineral and non-coal mining project thus it is
classified as “CATEGORY – B2” project under activity 1(a) of the schedule of EIA notification
dated 14th September 2006 as amended by Ministry of Environment, Forests and Climate
Change, New Delhi by S.O. 141(E) dated 15 January 2016, hence it comes under jurisdiction of
DEIAA.
Location (map showing general location, specific location, and project boundary & project
site layout) with coordinates.
1
1
34
Sayarrayi
1.744 hect.
Tehsil
No of Workers
Labors will be required for various purposes like excavation of clay, loading and unloading of
clay, clay molding, brick making and loading of bricks in various vehicle, management,
maintenance & development of mine, making & maintenance of ramp, transportation of
material and book keeping. Experienced personals will be employed as per the requirement.
Type of Project (Including interlinked and interdependent projects, if any):
District / State
Lundra
Surguja / Chhattisgarh
Taking standard O.M.S. to be one the strength of labour for 250 nos. of brick production per
day and working 240 days a year 34 labours per day will be required.
Indirect employment - Driver, cleaner for loader & dumper are the points were labors are
required. Moreover, manager, accountants will also be appointed as per need.
Employment Generation (direct and indirect) due to the Project
Particulars
Skilled labours 30
The mining establishment presents opportunities of employment to various posts under
various cedars viz. supervisory, skilled workmen, semiskilled workmen and unskilled workmen
beside casual workmen. However the maximum required labors at the site to justify the
manufacturing of bricks at applied land are detailed below-
Village
Area(ha)
Signature of Project Proponent
________________________________________________________________________________________________
___
6
Pre - Feasibility ReportFor Sayarrayi Brick Earthclay Quarry Mine & Fix Chimney Brick Plant, at Village - Sayarrayi
Tehsil- Lundra & District- Surguja, State- Chhattisgarh.
The Coordinates of the area are:
BOUNDARY
POINT
LATITUDE
BL8 23°03'36.92"N
BL9 0
BL10 0
BL11 0
BL12 0
BL13 0
BL14 0
(iii)
(iv)
Rejected Bricks
in MT
(5% of Brick
Production)196.23225.83
216.99210.96204.39213.53263.30263.30
263.30
263.30
2321.13 MT
292.08
LONGITUDE LONGITUDE
Year
1430258
7th Year
Mine Loss/Waste/OB
in CUM
(10% of Clay
Excavation)
Production During Plan Period
217.68
292.08
9th Year
10th Year
3rd Year4th Year5th Year6th Year 236.86
23°03'38.86"N
292.0816675771667577
1667577
1667577
240.70
8th Year
1374259
83°19'42.02"E
1st Year2nd Year
1242792250.51
Total Estimated
Production of
Finish Red Bricks
in No’s.
0BL6BL7
2574.82 cum
BL3
BL1
0
0
23°03'38.29"N
23°03'38.33"N
0
23°03'33.11"N
23°03'36.92"N
83°19'42.21"E
23°03'37.82"N
83°19'43.72"E
0
0
0
The site can be depicted in the toposheet number 64M/8 of Survey of India. Study area map in
Khasra map, toposheet and site specific surface map is attached as Plate-1, Plate -2 and Plate -
4 of enclosed mine plan respectively.
Details of alternate sites considered and the basis of selecting the proposed site, particularly
the environmental considerations gone into should be highlighted:
BL2
23°03'39.20"N
23°03'34.03"N
BOUNDARY
POINT
BL8
83°19'41.94"E
83°19'39.14"E
83°19'38.69"E
83°19'40.13"E
83°19'40.88"E
83°19'43.72"E
LATITUDE
BL4
BL5
The brick earth clay is exposed throughout the applied area. It is naturally site specific due to
its geological origin. Mining is site specific project. This lease granted/is being granted by the
state govt., hence alternative site is not applicable.
The total applied lease area is 1.744 hectare and total proposed maximum clay production
capacity will be 2628.7 cum per annum and production of finished saleable red brick is
1667577 nos/year through Open Cast Manual method of mining. Proposed production details
during lease period are shown in below -
Size or Magnitude of Operation:
Total 14700526 Nos.
133610012944841352325
292.08
234.02226.73
Signature of Project Proponent
________________________________________________________________________________________________
___
7
Pre - Feasibility ReportFor Sayarrayi Brick Earthclay Quarry Mine & Fix Chimney Brick Plant, at Village - Sayarrayi
Tehsil- Lundra & District- Surguja, State- Chhattisgarh.
(v)
-
-
-
-
-
-
-
-
(vi)
Produced clay will be shifted to stacking yard for production of Bricks.
33 meter heighted fix chimney Killen is installed and used for production of bricks.
Loading will be done manually and the transporting will be done by Tractor.
The process of brick making is explained in below chart:
Requirement of Fly Ash:
1.00 m boundary will be left from the lease boundary around 4 sides (N, E, S, W) as barrier for
safety provisions, dumping of OB and afforestation.
Blasting : Not Applicable
Project description with process details (a schematic diagram/flow chart showing the
project layout, components of the project etc. should be given)-
It is proposed to carry out Open Cast Manual mining of clay and fix chimney brick
manufacturing process.
The Mining of clay will be carried out manually with The help of simple instrument like,
crowbars, spades, chisels and hammers.
Raw material/consumables required along with estimated quantity, likely source, marketing
area of final products/s, Mode of transport of raw Material and Finished Product.
The excavation activity will be carried out till the depth of 2 m below general ground level or
water table which ever encounter earlier.
Drilling & Blasting : Not Applicable
Drilling : Not Applicable
Signature of Project Proponent
________________________________________________________________________________________________
___
8
Pre - Feasibility ReportFor Sayarrayi Brick Earthclay Quarry Mine & Fix Chimney Brick Plant, at Village - Sayarrayi
Tehsil- Lundra & District- Surguja, State- Chhattisgarh.
S.N. Detail
1 100000 no’s
2 3.00 kg
3 300.00 MT
4 25%
5 75MT
6 1.5
7 50 cum /1 lakh of
bricks
(vii)
Drinking &
Washing
Other
1st 2.5 -
2nd 2.5 -
3rd 2.5 -
4th 2.5 -
5th 2.5 -
6th 2.5 -
7th 2.5 -
8th 2.5 -
9th 2.5 -
10th 2.5 -
2
Marketing area: Bricks will be used building material in civil constructions activity around the
vicinity of Surguja.
The Bricks will be transported to the destination by trucks/tractors.
8.97
1.83
Year
Particulars
Number of brick
Weight of One Brick
Total Weight
Ratio of Addition of Fly Ash
Fly Ash required to be added with clay
mould for Bricks production
The above requirement will be mitigate by Korba Industrial Area.
Dust
Suppression
Fly Ash required to be added in MT
Density of Loose Fly Ash
Mine Site (in KLD) Bricks Molding (in
KLD)
9.33
9.33
1.47
9.07
9.01
Nil
Nil
Nil
Clay
Mining
1.36
1.57
1.51
9.33
1.83
1.83
1.42
1.48
Domestic (in KLD) Total Water
Requirement in
KLD
8.86
3
3
2
21.83
8.98
9.33
2
Nil
Clay
Molding
2
3
Green Belt
2
2
2
3
3
33
3
Nil
Nil
3
3
2 Nil
Nil
Nil
Nil
8.92
In the proposed process Fly Ash will be added minimum of 25% of the total volume of material
used for brick manufacturing. The requirement of fly ash has been computed below –
It is expected that the total water need is about 9.33 kilo litter per day in the mine. The details
of water balance of existing / proposed mining project are given below:
Fly Ash plays a big role in manufacturing of bricks in fix chimney Brick. The utilization of Fly Ash
adds various benefits as-
• It Increases the volume of material for production of bricks.
• It reduces the use of Earth Clay to save earth.
• It reduces the requirement of fuel as it works as fuel in the brick itself
• Decreased amount of coal burn reduces the pollution in the environment.
Availability of Water, its source, Energy/power requirement and source should be given -
Water Requirement:
2
Signature of Project Proponent
________________________________________________________________________________________________
___
9
Pre - Feasibility ReportFor Sayarrayi Brick Earthclay Quarry Mine & Fix Chimney Brick Plant, at Village - Sayarrayi
Tehsil- Lundra & District- Surguja, State- Chhattisgarh.
I)
II)
A)
S.N. Coal Need
per 1 lac of
Brick (in MT)
Maximum Annual
Coal Requirement
(in MT)
1 12 156.98
2 12 180.66
3 12 173.59
4 12 168.77
5 12 163.51
6 12 170.82
7 12 210.64
8 12 210.64
9 12 210.64
10 12 210.64
Coal will be obtained from Gevra Dipka coal project at Korba through coal auction proceedings
of S.E.C.L.
6th Year
2nd Year
3rd Year
1755344
1755344
1st
Year
Year
Fixed Chimney Plant requires burning of raw bricks in kiln which requires fuel. Fuel can be used
in form of burning wood, agriculture wastage or coal. It is feasible to burn coal as wood &
agriculture wastage are neither available as per need nor burning them is feasible. Diesel is
also required for mining operations and running of tractors and other transportation vehicles.
Sources of water:
Domestic usage: Drinking water is available from dug well and tube well in villages near the
applied area which is portable, pure and clean.However, if required, water might be supplied
from tube well within lease area .
Coal Requirement :
Annual Requirement of Coal:
For Clay Mounding, Green belt and dust suppression: Water will be made available from
quarry mine pit which is accumulated during the rainy season and shall be collected in settling
tank for utilization in green belt and dust suppression or from nearby pond or canal. However,
if required, water might be supplied from tube well within lease area or from nearby pond or
nalla also .
Fossil Fuels :
1423500
1755344
1755344
Total Estimated
Production of
Raw Bricks in
No’s.
1406421
1362615
The average annual requirement of coal for the process will be estimated in table below-
4th Year
8th Year
9th Year
10th
Year
Source of Coal
1308202
Quantity for diesel will depend upon the usage of transportation vehicle and other
machineries and level of achievement of estimated production. Diesel will be outsourced from
nearby diesel pumps.
1505535
1446588
5th Year
7th Year
Energy & Power Requirement and Source
Signature of Project Proponent
________________________________________________________________________________________________
___
10
Pre - Feasibility ReportFor Sayarrayi Brick Earthclay Quarry Mine & Fix Chimney Brick Plant, at Village - Sayarrayi
Tehsil- Lundra & District- Surguja, State- Chhattisgarh.
B)
S.N. Power
requirement1 2 HP
C)
(viii)
a)
b)
Scheme for management/disposal –
Top Soil & overburden: Not Applicable
Mining Loss or OB or Useful Waste Material:
2574.82 CUMTotal10thYear
292.08
292.08
292.08
i) Mine wastage will be gathered on suitable area with in lease area for reclamation purpose.
8thYear
9thYear
2321.13 MT
210.96
204.39
Year
263.30
Mining loss/OB/
Waste in CUM
(10% of Clay
Excavation)
Rejected Bricks
in MT
(5% of Brick
Production)
217.68
250.51
240.70
263.30
263.30
6thYear
263.30
Solid Waste:
2nd Year
3rd Year
4th Year
5th Year
Electricity will be required for Pumping of water and for administrative building & rest
shelters. The requirement of Power is estimated as under-
226.73
Quantity of wastes and reject material expected to be generate
Source of Electricity:
1st
Year
In the fix chimney brick manufacturing process some broken/ rejected brick may arises.
Moreover, ash gets generated due to burning of coal. Further mine waste may also get
generated in few quantity. These items requires their due management. Quantity of
generation of broken/rejected bricks and its manner of management has explained below-
Quantity of wastes to be generated (liquid and solid) and scheme for their
management/disposal –
7thYear
213.53
234.02
236.86
292.08
196.23
225.83
216.99
The power requirement for the project will be met by electricity lines of Chhattisgarh State
Power Distribution Company Limited available at village or nearby site area.
Electricity :
Particulars
Domestic Purpose
Signature of Project Proponent
________________________________________________________________________________________________
___
11
Pre - Feasibility ReportFor Sayarrayi Brick Earthclay Quarry Mine & Fix Chimney Brick Plant, at Village - Sayarrayi
Tehsil- Lundra & District- Surguja, State- Chhattisgarh.
c)
4. SITE ANALYSIS
Connectivity
(i)
Form & Use : Flat, Non Forest, Revenue land.
Ownership : Private land.
Forest - Nil Area (ha)- Nil 1.744 Hect. Area
Nil
Nil
Nil
(ii)
No sub-grade mineral will be generated during excavation of clay. All ROM mineral will be
used.
Only domestic effluent is expected to be generated which will be treated through septic tank
followed by soak pits.
Sub grade material:
ii) Non-saleable rejected or broken bricks, generated during operations have to be stored
separately in an open ground within lease area and will be disposed by using it to create haul
roads or for filling of pits at or around the proposed lease land.
The area is approachable from district office Surguja by fair weather road. The area is 16.00
km from Surguja. The applied area is 870 m away from Raghunathpur bus stand. Hospital is
available at Sayarrai at 500 m/Raghunathpur at 1.00 km /Ambikapur at 13.00 km distance. The
nearest railway station is at Ambikapur (20.70 km) (S.E.C.RLY) and Nearest active airport is
Raipur (264.00 km).
Forest Area Non-forest Area
Climate Data from Secondary Sources:
The climate of Surguja district in general and the Lundra in particular is characterized by a hot
summer and a well-distributed rainfall during the southwestern monsoon season extending
from end of June to October. The area has 4 well-defined seasons in a year. The winter season
commences from early December and continues up to the end of February, summer season
extends from March to early June, rainy season generally from mid-June to September and the
post-monsoon season from October to November.
(ii) grazing land,
(iii) Agriculture land,
(iv) others (specify)
Land form, Land Use & Land Ownership
Liquid Effluent:
Existing land use pattern: Existing land use pattern of the proposed mining area is given in
below table.
(i) waste land (Private),
iii) Generated ash from the plant will be reutilized for manufacturing of bricks by mixing it with
brick clay mix.
Signature of Project Proponent
________________________________________________________________________________________________
___
12
Pre - Feasibility ReportFor Sayarrayi Brick Earthclay Quarry Mine & Fix Chimney Brick Plant, at Village - Sayarrayi
Tehsil- Lundra & District- Surguja, State- Chhattisgarh.
(iii)
5. PLANNING BRIEF
(i)
(ii)
Proposed Land Use Pattern of Proposed Quarry Lease Area
1. 1.744 Hect.
2. 1.488 Hect.
3. 0.056 Hect.
4. 0.2 Hect.
5. 0 Hect.
6. 0 Hect.
1.744 Hect.
Unused/Prohibited Area within Lease area
Topography:
The road facility is already available which shall be used and properly maintained. Preference
will be given to local labor from nearby villages. Other requisite infrastructure as transport of
mine labors is available by way of jeep, two-wheeler. Medical facility is available for first aid at
project site.
The study area consists of essentially Flat land with a very small pit. Gentle slope towards
south-west, Maximum elevation of the lease area is 722 meters above MSL towards north-east
while the lowest elevation is 719 m in the south-western part of lease area.
Impact of the brick earth quarry mine will be positive, as it will upgrade the socio-economic
status of local inhabitants in the nearby areas by giving employments to poor people of nearby
villages. Due to this positive impact the living standard will increase and will lead to
Educational upliftment.
Social Infrastructure Available
Power line, telephone line, school, bank, govt. office, Hospital, Police station etc. at or from
Lundra.
Total Area (2+3+4+5+6) =
Total Lease Area
Area proposed under mining pits
Area covered by statuary/mine boundary
Area covered by Fixed Chimney/kiln
Area Kept for storage
Planning concept (type of industries, facilities, transportation etc.) Town and country
Planning/Development authority Classification-
Proposed Land Use Planning
Planning concept: It is a Brick Earth Clay mining project, for safe, scientific & systematic
working to follow the principles of safety & conservation of human health & mineral the
planning for mining of earth clay shall be governed by the approved Quarry Plan under
Chhattisgarh Minor Mineral Rules, 2015 vide letter no. 434/Khanij/2017/ Balrampur, Dated
16/03/2017.Population projection:
The project is very small in magnitude. The project will employ most of the workers from
nearby villages. There will not be any increase in population of the area due to the
establishment of project. However, few people from other area may migrate in this area for
business opportunities.
Signature of Project Proponent
________________________________________________________________________________________________
___
13
Pre - Feasibility ReportFor Sayarrayi Brick Earthclay Quarry Mine & Fix Chimney Brick Plant, at Village - Sayarrayi
Tehsil- Lundra & District- Surguja, State- Chhattisgarh.
7. 0.056 Hect.
8. 0.056 Hect.
(iii)
6. PROPOSED INFRASTRUCTURE
(i) Industrial Area (Processing Area)
(ii)
Dumping Area proposed within proposed
Statutory/mine Boundary
Plantation Area proposed over the dump on
obove dumping area
Fix Chimney Brick plant is installed within the lease area on 2000 sqm area. This area is
sufficient for brick making process.
Site services are required per the statutory provisions i.e. rest shelters, toilets, drinking water
facilities, safety appliances, and regular medical checkup facilities are suitably needs to be
provided for labors and their families. The health and safety of the employees is required to be
given first priority during the mining operation. Training program organize for first aid.
Specified first Aid station is needed to be maintained at the site office and the rest shelter as
per applicable statutory provision.
Office and stores is needed to be provided as per applicable statutory provision.
Site Services:
First aid:
Office and stores:
Amenities / Facilities:
Other requisite infrastructure: Transport of mine labors is available by way of jeep, two-
wheeler. Medical facility is available for first aid at project site.
Power line, telephone line, school, bank, govt. office, Hospital, Police station etc. are the other
requisites needed for mine operation and social facilitation.
Residential Area (Non Processing Area)
No residential area is proposed for the project except temporary rest shelters proposed for
labors.
Assessment of infrastructure demand (physical and social)
The road facility is already available around 680 m from the site which shall be used and
properly maintained.
Apart from indirect manpower requirement for Driver, cleaner for loader & dumper, manager,
accountants; approx. 34 labours will be required directly for mining operation.
Specific amenities / facilities are not required in this mining project. However the same can be
provided as per prescribed instructions.
Road & Connectivity:
Manpower Requirement:
Signature of Project Proponent
________________________________________________________________________________________________
___
14
Pre - Feasibility ReportFor Sayarrayi Brick Earthclay Quarry Mine & Fix Chimney Brick Plant, at Village - Sayarrayi
Tehsil- Lundra & District- Surguja, State- Chhattisgarh.
(iii)
No. OF SAPLING
(iv)
OCCUPATIONAL HEALTH AND SAFETY
Occupational Health and Safety works as follow-
1)
Under the afforestation plan, plantation in nearby villages and connecting roads be
undertaken. The implementation for development of greenbelt will be of paramount
importance as it will not only add up as an aesthetic feature but will also act as a pollution
sink. The species to be grown in the areas should be dust tolerant and fast growing species so
that a permanent greenbelt is created. Plantation in the barrier zone and roads is necessary as
these areas will contain fine particulates resulting from mining operation and vehicle
movement Plantation will also be carried out as social forestry programme in village, school
and the areas allocated by the Panchayat/State authorities. Native plants like Neem, Peepal,
Khejri and other local species will be planted. A suitable combination of trees that can grow
fast and also have good leaf cover shall be adopted to develop the greenbelt.
Except dust generation there is no source which can show a probability for health
related diseases and proper dust suppression will control dust generation and
dispersion.
Green belt
Afforestation program shall be started with the commencement of mining operation with
simultaneous clearing of land by spreading of clay lumps along barrier of lease boundary.
2.5m X 2.5m spacing with 0.6m depth have been suggested for sapling pits on which local
species i.e. Pipal, Neen, Aam, Arjun, Jamun, Imli, Sirus, Sisu, Karanj will be planted as the
following manner-
SPECIES
Seesam, Bargad, Neem, Aam,
Pipal, etc.
For the social developmental program on the need base assessment some development
program will be undertaken by the project proponent i.e. development of or maintenance of
urinals, toilets, safety appliances & training program, confirming availability of pure and clean
drinking water, periodic health checkup program, transportation facility to labors and their
children’s to schools etc.
Social infrastructure
Year
1st Year
PROPOSED SITE
Along boundary of quarry
area
140
If/Where no plantation is possible within the mine due to rocky nature of lease area then
plantation on transportation road side or on the Government waste land as
suggested/demarked by Gram Panchayat/Nagar Panchayat/ local body will be done as per
above plantation program.
Occupational Health and Safety are important. Periodic assessment of it will be useful.
Identifying workplace hazards, assessing risks to employee health and safety, are important.
Health and Safety points are also important in many of the environmental aspects of the
workplace.
Signature of Project Proponent
________________________________________________________________________________________________
___
15
Pre - Feasibility ReportFor Sayarrayi Brick Earthclay Quarry Mine & Fix Chimney Brick Plant, at Village - Sayarrayi
Tehsil- Lundra & District- Surguja, State- Chhattisgarh.
2)
3)
4)
(v)
(vi)
(vii)
(viii)
A)
S.N.
1
2
3
4
5
6
7
8
9
10
156.98
Annual Requirement of Coal:
The average annual requirement of coal for the process will be estimated in table below-
Year Maximum Annual
Coal Requirement
(in MT)
1st Year
Industrial waste management: No industrial waste will be generated.
Power requirement & supply/source:
Drinking water is available in dug well and tube well at nearby village of the applied area which
is portable, pure and clean. It is also proposed to provide hand pump if needed in the lease
area for mitigating of drinking water, such hand pump will be arranged after taking statutory
permission.
Sewerage System: No construction or sewage waste is expected from the mining process.
However the domestic waste from the toilets shall be given treatment through septic tank and
soak pit arrangement.
Develop and implement training sessions for management, supervisors and workers on
health and safety practices and legislation;
Awareness program be conducted about likely occupational health hazards so as to
have preventive action in place.
Promote occupational health and safety within workers in mine and develop safer and
healthier ways of working;
Drinking Water Management (source & supply of water):
Fossil Fuels :
Fuel is to be used in form of Fuel is to be used in form coal for burning of Raw brick in Killen
and diesel for mining operations and running of tractors and other transportation vehicles.
Quantity for fuel will depend upon the usage of transportation vehicle and other machineries
and level of achievement of estimated production. Diesel will be outsourced from nearby
diesel pumps.
2nd Year 180.66
3rd Year 173.59
4th Year 168.77
5th
Year 163.51
6th Year 170.82
7th Year 210.64
8th Year 210.64
9th Year 210.64
10th Year 210.64
Signature of Project Proponent
________________________________________________________________________________________________
___
16
Pre - Feasibility ReportFor Sayarrayi Brick Earthclay Quarry Mine & Fix Chimney Brick Plant, at Village - Sayarrayi
Tehsil- Lundra & District- Surguja, State- Chhattisgarh.
B)
S.N. Power
requirement1 2 HP
C)
7. REHABILITATION AND RESETTLEMENT (R&R) PLAN:
8. PROJECT SCHEDULE AND COST ESTIMATES
A) Likely date of start construction and likely date of completion (time schedule for project) –
Electricity :
Particulars
Domestic Purpose
Source of Electricity:
Electricity will be required for Pumping of water and for administrative building & rest
shelters. The requirement of Power is estimated as under-
The power requirement for the project will be met by electricity lines of Chhattisgarh State
Power Distribution Company Limited available at village or nearby site area.
No R&R plan is required as the mine area does not cover any habitation. Hence the mining
activity does not involve any displacement of human settlement. No public buildings, places,
monuments etc. exist within the lease area or in the vicinity of the mine lease area. The mining
operation will not disturb/ relocate any village or need resettlement. Thus no adverse impact
is anticipated.
Impact of the clay mining will be positive, as it will upgrade the socio-economic status of local
inhabitants in the nearby areas by giving employments to poor people of nearby villages. Due
to this positive impact the living standard will increase and will lead to educational upliftment.
The proposed mining project will be started after obtaining Environmental Clearance of
quarry lease and order to enter in lease area by District Collector (Mining Branch). Consent to
establish & operate from CGCECB will also be taken if instructed by DEIAA.
Effect on Flora & Fauna:
Mining is restricted to very small area. No study have been conducted or record found on
effect on Floora & Fauna for mine area. However mining activity causes impact on flora and
fauna due to land degradation/deforestation etc.,
Source of Coal
Coal will be obtained from Gevra Dipka coal project at Korba through coal auction proceedings
of S.E.C.L.
Signature of Project Proponent
________________________________________________________________________________________________
___
17
Pre - Feasibility ReportFor Sayarrayi Brick Earthclay Quarry Mine & Fix Chimney Brick Plant, at Village - Sayarrayi
Tehsil- Lundra & District- Surguja, State- Chhattisgarh.
B) Estimated project cost of the project -
S.N. Amount in Lacs1 11.00
2 0.50
3 15.00
4 0.50
5 0.5027.50
9. CONCLUSION
(a)
(b)
(c)
(d)
(e)
Ajay Arun Minj
Date : / /2017 Place : Nawapara
The Project is viable and environmental friendly as it’s a development project for the State &
Country.
ParticularsLand Cost (market value)
Administrative Building & Rest Shelters
Increased financial benefits accruing to state and central agencies by ways of taxes,
royalties, cesses etc.
Signature of the applicant
Chimney Killen, Mining Machineries & Equipment’s
Land Development & Establishment cost
Others Total Cost of Project :
The Proposal is for the Environment Clearance of the Proposed Mine.
The quarry project will create local employment to the villagers and they will get
employment in nonagricultural season.
The Proposal does not require further Infrastructure facilities other than few Mining
Machineries.
In any human activity there are always possibilities of finding various options. Project proponent has
decided to examine and adopt one such option that will be both environment friendly and best
suited for clay production. Various alternatives in terms of site, technology, and equipment are
considered. A final selection is thus arrived–
Signature of Project Proponent
________________________________________________________________________________________________
___
18