Prefeasibility ReportFor Environment Clearance from MOEF under EIA

Notification Dated 14th September, 2006 as Amended

1. SUMMARY

-

-

Village - Sayarrayi

--

-

1. -2. Geographical Co-ordinates LATITUDE

23°03'33.11"N 23°03'34.03"N 23°03'38.29"N 23°03'38.33"N 23°03'39.20"N 23°03'38.86"N 23°03'37.82"N 23°03'36.92"N

River -

Nalla - 280 m

Tanks - 780 m

Canal - 9.20 km

Reservoir - 6.50 km

4. -

-

6. -

7. -

Pond towards north near Sayarrayi

village area

Canal towards north-west near

Khairwar village areaGhunghutta reservior towards south-

west near Lawaidih village area &

Reservior at north-west near

Khairwar village

Pre - Feasibility Report

Chhattisgarh

1.744 hect. / Private Land

Chendra Reserve Forest & Khairbar Reserve Forest are at

2.00 km towards west form lease area. However, NOC

from DFO Ambikapur is obtained and enclosed.

Name of Reserve Forest(s), Wild Life

Sanctuary/National Park

Mining Lease Area & Type of Land

State

For Sayarrayi Brick Earthclay Quarry Mine & Fix Chimney Brick Plant, at Village - Sayarrayi

Surguja

Name of Company/Mine/Lessee

Project

Tehsil/Taluka

BL7BL8

Tehsil- Lundra & District- Surguja, State- Chhattisgarh.

5.

Mining of earth clay at the rate of maximum 2628.7 cum

per year and production of saleable red brick by fix

chimney plant at the rate of maximum 1667577 nos. per

year.

Project Proposal

Flat Land devoid of vegitation

Altitude - Max. 722 AMSL and Min. 719 AMSL

Surface slope - Towards south-west

Toposheet No.- 64M/8

Topography of the area

Ajay Arun Minj

Nalla towards south near mine area

-

District

BOUNDRY POINT

BL1BL2BL3BL4BL5BL6

Sayarrayi Brick Earthclay Quarry Mine & Fix Chimney Brick

Plant

Lundra

LONGITUDE

83°19'41.94"E 83°19'39.14"E 83°19'38.69"E 83°19'40.13"E 83°19'40.88"E 83°19'42.21"E 83°19'42.02"E 83°19'43.72"E

Brick Earth Clay

3. 12.00 km (Gungata river at south-west)-Name of River/ Nallahs /Tanks

/Spring / Lakes etc.

Name of Mineral Mined

Signature of Project Proponent

________________________________________________________________________________________________

___

2

Pre - Feasibility ReportFor Sayarrayi Brick Earthclay Quarry Mine & Fix Chimney Brick Plant, at Village - Sayarrayi

Tehsil- Lundra & District- Surguja, State- Chhattisgarh.

-

9. -

10. -

11. -12. -13. -14. -

15. 1. 1.744 Hect.2. 1.488 Hect.

3. 0.056 Hect.4. 0.2 Hect.5. 0 Hect.

6. 0 Hect.

1.744 Hect.

7. 0.056 Hect.

8. 0.056 Hect.

16. -

17. -

18. -19. -20. -

Ajay Arun Minj

Registered office Ajay Arun MinjS/o Shri Ujin MinjVillage/Post - NawaparaTehsil - AmbikapurDistrict - Surguja

State - Chhattisgarh

Mine Office Village - Sayarrayi

E-MailProspecting Agency

Type of Activity

Ground Water table Intersection

Drilling/Blasting

Drainage Pattern/ Water Courses

10 years for the excavation of recoverable reserve of

23173.33 MTNot Applicable

Open Cast Manual Brick Earth Clay Quarry Mining

-

8.

NIL

Water Requirement & Source Requirement - 9.33 kilo litre per day, Source - Mine

pit/Setting tank, dug well and tube well of nearby village or

of mine area within permited limits.

Mine loss/waste/OB - 10% i.e. total 2574.82 cum ( max.

yearly generation 292.08 cum)

Rejected or Broken Bricks - 5% i.e. total 2321.13 MT (Max.

Yearly generation 263.3 MT)

Mining of Earth clay - maximum 2628.7 cum/yearRate of Production (in tons)Production of saleable brick - max. 1667577 nos/year

Life of Mine

Mining MethodBelow 30 meter from surface levelNatural drainage towards south-west

Open Cast Manual

Any Other (Specify)

Not ApplicableCost of Project (Rs. Lacs)IBM approval: Date

Name and Address of the company /

Proponent

Total Lease AreaArea proposed under mining pits

Area covered by statuary/mine Area covered by Fixed Chimney/kilnArea Kept for storage

Unused/Prohibited Area within Lease

Dumping Area proposed within

proposed Statutory/mine BoundaryPlantation Area proposed over the

dump on obove dumping area

Break-up of Land Utilization Pattern

Total Area (2+3+4+5+6) =

Geological Reserve (till 2m depth) - 31420.34 cum.

Recoverable Reserve (till 2m depth) - 23173.33 cum.Mineral Reserve (in tons)

Rs. 27.5 lacs

Solid waste/Tailings

NilNot Applicable

Signature of Project Proponent

________________________________________________________________________________________________

___

3

Pre - Feasibility ReportFor Sayarrayi Brick Earthclay Quarry Mine & Fix Chimney Brick Plant, at Village - Sayarrayi

Tehsil- Lundra & District- Surguja, State- Chhattisgarh.

Utilities (Power, Water Requirement)

Manpower requirement

2. INTRODUCTION OF PROJECT/BACK INFORMATION

Ajay Arun Minj

S/o Shri Ujin Minj

Village/Post - Nawapara

Tehsil - Ambikapur

District - Surguja

State - Chhattisgarh

(ii) Brief Description of Nature of the Project

Power- 2 HP

Water – 9.33 KLD for Domestic, Dust Suppression &

Plantation Purpose34 workers per day

The proposed project is mining activity of Brick Earth Clay with the name of 'Sayarrayi Brick

Earthclay Quarry Mine & Fix Chimney Brick Plant' which is situated at Khasra no. 512 at village

Sayarrayi, tehsil Lundra and district Surguja (C.G.). This site is 16.00 km away from district

office Surguja. The quarry lease of Brick Earth Clay mining has been already sanctioned for

lease period of 10 year from 29.03.2008 to 28.03.2018 which is subjected to extension for 30

years from the date of first commencement of lease as per rule 38A of MMR 2015 as

ammended to the project proponent Ajay Arun Minj resident of Nawapara district Surguja

(C.G.). The quarry lease is granted for 1.744 hectare land and the proposed maximum

production capacity is 2628.7 cum. per annum of clay mining and production of red brick by fix

chimney plant at the rate of maximum 1667577 nos. per annum. The excavation of Brick Earth

Clay will be done by Open Cast Manual method of mining and manufacturing of bricks will be

done by fix chimney brick plant.

For compliance of Rule 24 and 63 to 66 of MMR 2015 proponent was submitted quarry plan

before mining authorities and the plan so submitted has been duly approved by the

sanctioning authority vide letter no. 434/Khanij/2017/ Balrampur, Dated 16/03/2017.

Identification of Project and Project Proponent

(a) Name of the Project: Sayarrayi Brick Earthclay Quarry Mine & Fix Chimney Brick Plant

(b) Project Proponent : Ajay Arun Minj

(c) Postal /Correspondence Address of Project Proponent:

Provisional Environment clearance were previously granted by SEIAA CG vide letter no. No

(i)

Proposed Brick Earth Clay Deposit is located at village Sayarrayi, Tehsil Lundra, District Surguja and

state Chhattisgarh over an area of 1.744 ha. The proposed capacity of the project is clay generation

of maximum 2628.7 cum/annum and production of saleable red brick by fix chimney plant at the

rate of maximum 1667577 nos. per year along with the aid of 25% of fly ash. Proposed land is

Private non forest revenue land. Open Cast Manual method of mining is the most suitable mining

procedure for this mine. This method of mining is used for highest productivity and the lowest cost

of any of the broadly used mining methods. Brief description of the project is described below –

Signature of Project Proponent

________________________________________________________________________________________________

___

4

Pre - Feasibility ReportFor Sayarrayi Brick Earthclay Quarry Mine & Fix Chimney Brick Plant, at Village - Sayarrayi

Tehsil- Lundra & District- Surguja, State- Chhattisgarh.

(iii)

(iv)

(v)

Bricks are basic raw material of civil construction works likes civil constructions, building &

colony development projects etc.

Chhattisgarh is a developing state in map of India. Considering the growth, State Government

has divided the state in 27 districts out of which 9 are recently declared districts. State

Government is carrying on various new township and building projects in all districts. In

addition to these various civil constructions, Building & Colony development projects are

coming in Private sectors and are under implementations, all above civil works require Bricks

which is in huge in demand.

Demand - Supply Analysis

Exploiting this bricks earth is important for the country’s long term economic growth and

regional growth. By mining the deposit and producing red bricks, the lessee acts as bridge and

fills the gap between demand and supply of Bricks in the market surrounding the area.

Therefore, a ready market is available for the proposed unit hence looking to the use and

demand of bricks which exist a good scope for the proposed project.

Need for the Project and its Importance to the Country and/or Region

All the other necessary permission and noc’s has been taken by the proponent. Consent to

establish & operate/Air/Water clearances from CGCECB will also be taken if instructed by

jurisdictional DEIAA.

Demand - Supply Gap

Mineral resources of any country are the “TREASURE-TROVE” of its national economy;

Chhattisgarh is one of the richest states in the country with its sparkling mineral wealth. The

Chhattisgarh State has enormous reserves of soil spread over the state. Bricks is basic material

of civil construction works likes building etc. for construction of walls. Chhattisgarh is a new

state in map of India. Considering the growth, State Government has divided the state in 27

districts out of which 9 are recently declared districts. State Government, is carrying on various

new township and building projects in all districts. In addition to these various civil

constructions, building & colony development projects are coming in Private sectors and are

under implementations, all above civil works require bricks which are in huge in demand.

Therefore application is being filed before jurisdictional DEIAA of district Surguja for getting

permanent environmental clearance before starting of mining activity on granted lease area.

The proposed project is < 5 hect. Minor mineral and non-coal mining project thus it is

classified as “CATEGORY – B2” project under activity 1(a) of the schedule of EIA notification

dated 14th September 2006 as amended by Ministry of Environment, Forests and Climate

Change, New Delhi by S.O. 141(E) dated 15 January 2016, hence it comes under jurisdiction of

DEIAA.

Signature of Project Proponent

________________________________________________________________________________________________

___

5

Pre - Feasibility ReportFor Sayarrayi Brick Earthclay Quarry Mine & Fix Chimney Brick Plant, at Village - Sayarrayi

Tehsil- Lundra & District- Surguja, State- Chhattisgarh.

(vi)

a) Direct Employment

S.N.

1

2

3

4

5

b)

3. PROJECT DESCRIPTION

(i)

(ii)

The details of the lease area are as under:

Extra Skilled labours 2

As per needSemi-Skilled

Mining mate (Qualified)

Chowkidars (Experienced)

Total

Mining will generate employment opportunity to local inhabitants directly and indirectly in

mining as well as in consequent related activity.

The proposed project is < 5 hect. Minor mineral and non-coal mining project thus it is

classified as “CATEGORY – B2” project under activity 1(a) of the schedule of EIA notification

dated 14th September 2006 as amended by Ministry of Environment, Forests and Climate

Change, New Delhi by S.O. 141(E) dated 15 January 2016, hence it comes under jurisdiction of

DEIAA.

Location (map showing general location, specific location, and project boundary & project

site layout) with coordinates.

1

1

34

Sayarrayi

1.744 hect.

Tehsil

No of Workers

Labors will be required for various purposes like excavation of clay, loading and unloading of

clay, clay molding, brick making and loading of bricks in various vehicle, management,

maintenance & development of mine, making & maintenance of ramp, transportation of

material and book keeping. Experienced personals will be employed as per the requirement.

Type of Project (Including interlinked and interdependent projects, if any):

District / State

Lundra

Surguja / Chhattisgarh

Taking standard O.M.S. to be one the strength of labour for 250 nos. of brick production per

day and working 240 days a year 34 labours per day will be required.

Indirect employment - Driver, cleaner for loader & dumper are the points were labors are

required. Moreover, manager, accountants will also be appointed as per need.

Employment Generation (direct and indirect) due to the Project

Particulars

Skilled labours 30

The mining establishment presents opportunities of employment to various posts under

various cedars viz. supervisory, skilled workmen, semiskilled workmen and unskilled workmen

beside casual workmen. However the maximum required labors at the site to justify the

manufacturing of bricks at applied land are detailed below-

Village

Area(ha)

Signature of Project Proponent

________________________________________________________________________________________________

___

6

Pre - Feasibility ReportFor Sayarrayi Brick Earthclay Quarry Mine & Fix Chimney Brick Plant, at Village - Sayarrayi

Tehsil- Lundra & District- Surguja, State- Chhattisgarh.

The Coordinates of the area are:

BOUNDARY

POINT

LATITUDE

BL8 23°03'36.92"N

BL9 0

BL10 0

BL11 0

BL12 0

BL13 0

BL14 0

(iii)

(iv)

Rejected Bricks

in MT

(5% of Brick

Production)196.23225.83

216.99210.96204.39213.53263.30263.30

263.30

263.30

2321.13 MT

292.08

LONGITUDE LONGITUDE

Year

1430258

7th Year

Mine Loss/Waste/OB

in CUM

(10% of Clay

Excavation)

Production During Plan Period

217.68

292.08

9th Year

10th Year

3rd Year4th Year5th Year6th Year 236.86

23°03'38.86"N

292.0816675771667577

1667577

1667577

240.70

8th Year

1374259

83°19'42.02"E

1st Year2nd Year

1242792250.51

Total Estimated

Production of

Finish Red Bricks

in No’s.

0BL6BL7

2574.82 cum

BL3

BL1

0

0

23°03'38.29"N

23°03'38.33"N

0

23°03'33.11"N

23°03'36.92"N

83°19'42.21"E

23°03'37.82"N

83°19'43.72"E

0

0

0

The site can be depicted in the toposheet number 64M/8 of Survey of India. Study area map in

Khasra map, toposheet and site specific surface map is attached as Plate-1, Plate -2 and Plate -

4 of enclosed mine plan respectively.

Details of alternate sites considered and the basis of selecting the proposed site, particularly

the environmental considerations gone into should be highlighted:

BL2

23°03'39.20"N

23°03'34.03"N

BOUNDARY

POINT

BL8

83°19'41.94"E

83°19'39.14"E

83°19'38.69"E

83°19'40.13"E

83°19'40.88"E

83°19'43.72"E

LATITUDE

BL4

BL5

The brick earth clay is exposed throughout the applied area. It is naturally site specific due to

its geological origin. Mining is site specific project. This lease granted/is being granted by the

state govt., hence alternative site is not applicable.

The total applied lease area is 1.744 hectare and total proposed maximum clay production

capacity will be 2628.7 cum per annum and production of finished saleable red brick is

1667577 nos/year through Open Cast Manual method of mining. Proposed production details

during lease period are shown in below -

Size or Magnitude of Operation:

Total 14700526 Nos.

133610012944841352325

292.08

234.02226.73

Signature of Project Proponent

________________________________________________________________________________________________

___

7

Pre - Feasibility ReportFor Sayarrayi Brick Earthclay Quarry Mine & Fix Chimney Brick Plant, at Village - Sayarrayi

Tehsil- Lundra & District- Surguja, State- Chhattisgarh.

(v)

-

-

-

-

-

-

-

-

(vi)

Produced clay will be shifted to stacking yard for production of Bricks.

33 meter heighted fix chimney Killen is installed and used for production of bricks.

Loading will be done manually and the transporting will be done by Tractor.

The process of brick making is explained in below chart:

Requirement of Fly Ash:

1.00 m boundary will be left from the lease boundary around 4 sides (N, E, S, W) as barrier for

safety provisions, dumping of OB and afforestation.

Blasting : Not Applicable

Project description with process details (a schematic diagram/flow chart showing the

project layout, components of the project etc. should be given)-

It is proposed to carry out Open Cast Manual mining of clay and fix chimney brick

manufacturing process.

The Mining of clay will be carried out manually with The help of simple instrument like,

crowbars, spades, chisels and hammers.

Raw material/consumables required along with estimated quantity, likely source, marketing

area of final products/s, Mode of transport of raw Material and Finished Product.

The excavation activity will be carried out till the depth of 2 m below general ground level or

water table which ever encounter earlier.

Drilling & Blasting : Not Applicable

Drilling : Not Applicable

Signature of Project Proponent

________________________________________________________________________________________________

___

8

Pre - Feasibility ReportFor Sayarrayi Brick Earthclay Quarry Mine & Fix Chimney Brick Plant, at Village - Sayarrayi

Tehsil- Lundra & District- Surguja, State- Chhattisgarh.

S.N. Detail

1 100000 no’s

2 3.00 kg

3 300.00 MT

4 25%

5 75MT

6 1.5

7 50 cum /1 lakh of

bricks

(vii)

Drinking &

Washing

Other

1st 2.5 -

2nd 2.5 -

3rd 2.5 -

4th 2.5 -

5th 2.5 -

6th 2.5 -

7th 2.5 -

8th 2.5 -

9th 2.5 -

10th 2.5 -

2

Marketing area: Bricks will be used building material in civil constructions activity around the

vicinity of Surguja.

The Bricks will be transported to the destination by trucks/tractors.

8.97

1.83

Year

Particulars

Number of brick

Weight of One Brick

Total Weight

Ratio of Addition of Fly Ash

Fly Ash required to be added with clay

mould for Bricks production

The above requirement will be mitigate by Korba Industrial Area.

Dust

Suppression

Fly Ash required to be added in MT

Density of Loose Fly Ash

Mine Site (in KLD) Bricks Molding (in

KLD)

9.33

9.33

1.47

9.07

9.01

Nil

Nil

Nil

Clay

Mining

1.36

1.57

1.51

9.33

1.83

1.83

1.42

1.48

Domestic (in KLD) Total Water

Requirement in

KLD

8.86

3

3

2

21.83

8.98

9.33

2

Nil

Clay

Molding

2

3

Green Belt

2

2

2

3

3

33

3

Nil

Nil

3

3

2 Nil

Nil

Nil

Nil

8.92

In the proposed process Fly Ash will be added minimum of 25% of the total volume of material

used for brick manufacturing. The requirement of fly ash has been computed below –

It is expected that the total water need is about 9.33 kilo litter per day in the mine. The details

of water balance of existing / proposed mining project are given below:

Fly Ash plays a big role in manufacturing of bricks in fix chimney Brick. The utilization of Fly Ash

adds various benefits as-

• It Increases the volume of material for production of bricks.

• It reduces the use of Earth Clay to save earth.

• It reduces the requirement of fuel as it works as fuel in the brick itself

• Decreased amount of coal burn reduces the pollution in the environment.

Availability of Water, its source, Energy/power requirement and source should be given -

Water Requirement:

2

Signature of Project Proponent

________________________________________________________________________________________________

___

9

Pre - Feasibility ReportFor Sayarrayi Brick Earthclay Quarry Mine & Fix Chimney Brick Plant, at Village - Sayarrayi

Tehsil- Lundra & District- Surguja, State- Chhattisgarh.

I)

II)

A)

S.N. Coal Need

per 1 lac of

Brick (in MT)

Maximum Annual

Coal Requirement

(in MT)

1 12 156.98

2 12 180.66

3 12 173.59

4 12 168.77

5 12 163.51

6 12 170.82

7 12 210.64

8 12 210.64

9 12 210.64

10 12 210.64

Coal will be obtained from Gevra Dipka coal project at Korba through coal auction proceedings

of S.E.C.L.

6th Year

2nd Year

3rd Year

1755344

1755344

1st

Year

Year

Fixed Chimney Plant requires burning of raw bricks in kiln which requires fuel. Fuel can be used

in form of burning wood, agriculture wastage or coal. It is feasible to burn coal as wood &

agriculture wastage are neither available as per need nor burning them is feasible. Diesel is

also required for mining operations and running of tractors and other transportation vehicles.

Sources of water:

Domestic usage: Drinking water is available from dug well and tube well in villages near the

applied area which is portable, pure and clean.However, if required, water might be supplied

from tube well within lease area .

Coal Requirement :

Annual Requirement of Coal:

For Clay Mounding, Green belt and dust suppression: Water will be made available from

quarry mine pit which is accumulated during the rainy season and shall be collected in settling

tank for utilization in green belt and dust suppression or from nearby pond or canal. However,

if required, water might be supplied from tube well within lease area or from nearby pond or

nalla also .

Fossil Fuels :

1423500

1755344

1755344

Total Estimated

Production of

Raw Bricks in

No’s.

1406421

1362615

The average annual requirement of coal for the process will be estimated in table below-

4th Year

8th Year

9th Year

10th

Year

Source of Coal

1308202

Quantity for diesel will depend upon the usage of transportation vehicle and other

machineries and level of achievement of estimated production. Diesel will be outsourced from

nearby diesel pumps.

1505535

1446588

5th Year

7th Year

Energy & Power Requirement and Source

Signature of Project Proponent

________________________________________________________________________________________________

___

10

Pre - Feasibility ReportFor Sayarrayi Brick Earthclay Quarry Mine & Fix Chimney Brick Plant, at Village - Sayarrayi

Tehsil- Lundra & District- Surguja, State- Chhattisgarh.

B)

S.N. Power

requirement1 2 HP

C)

(viii)

a)

b)

Scheme for management/disposal –

Top Soil & overburden: Not Applicable

Mining Loss or OB or Useful Waste Material:

2574.82 CUMTotal10thYear

292.08

292.08

292.08

i) Mine wastage will be gathered on suitable area with in lease area for reclamation purpose.

8thYear

9thYear

2321.13 MT

210.96

204.39

Year

263.30

Mining loss/OB/

Waste in CUM

(10% of Clay

Excavation)

Rejected Bricks

in MT

(5% of Brick

Production)

217.68

250.51

240.70

263.30

263.30

6thYear

263.30

Solid Waste:

2nd Year

3rd Year

4th Year

5th Year

Electricity will be required for Pumping of water and for administrative building & rest

shelters. The requirement of Power is estimated as under-

226.73

Quantity of wastes and reject material expected to be generate

Source of Electricity:

1st

Year

In the fix chimney brick manufacturing process some broken/ rejected brick may arises.

Moreover, ash gets generated due to burning of coal. Further mine waste may also get

generated in few quantity. These items requires their due management. Quantity of

generation of broken/rejected bricks and its manner of management has explained below-

Quantity of wastes to be generated (liquid and solid) and scheme for their

management/disposal –

7thYear

213.53

234.02

236.86

292.08

196.23

225.83

216.99

The power requirement for the project will be met by electricity lines of Chhattisgarh State

Power Distribution Company Limited available at village or nearby site area.

Electricity :

Particulars

Domestic Purpose

Signature of Project Proponent

________________________________________________________________________________________________

___

11

Pre - Feasibility ReportFor Sayarrayi Brick Earthclay Quarry Mine & Fix Chimney Brick Plant, at Village - Sayarrayi

Tehsil- Lundra & District- Surguja, State- Chhattisgarh.

c)

4. SITE ANALYSIS

Connectivity

(i)

Form & Use : Flat, Non Forest, Revenue land.

Ownership : Private land.

Forest - Nil Area (ha)- Nil 1.744 Hect. Area

Nil

Nil

Nil

(ii)

No sub-grade mineral will be generated during excavation of clay. All ROM mineral will be

used.

Only domestic effluent is expected to be generated which will be treated through septic tank

followed by soak pits.

Sub grade material:

ii) Non-saleable rejected or broken bricks, generated during operations have to be stored

separately in an open ground within lease area and will be disposed by using it to create haul

roads or for filling of pits at or around the proposed lease land.

The area is approachable from district office Surguja by fair weather road. The area is 16.00

km from Surguja. The applied area is 870 m away from Raghunathpur bus stand. Hospital is

available at Sayarrai at 500 m/Raghunathpur at 1.00 km /Ambikapur at 13.00 km distance. The

nearest railway station is at Ambikapur (20.70 km) (S.E.C.RLY) and Nearest active airport is

Raipur (264.00 km).

Forest Area Non-forest Area

Climate Data from Secondary Sources:

The climate of Surguja district in general and the Lundra in particular is characterized by a hot

summer and a well-distributed rainfall during the southwestern monsoon season extending

from end of June to October. The area has 4 well-defined seasons in a year. The winter season

commences from early December and continues up to the end of February, summer season

extends from March to early June, rainy season generally from mid-June to September and the

post-monsoon season from October to November.

(ii) grazing land,

(iii) Agriculture land,

(iv) others (specify)

Land form, Land Use & Land Ownership

Liquid Effluent:

Existing land use pattern: Existing land use pattern of the proposed mining area is given in

below table.

(i) waste land (Private),

iii) Generated ash from the plant will be reutilized for manufacturing of bricks by mixing it with

brick clay mix.

Signature of Project Proponent

________________________________________________________________________________________________

___

12

Pre - Feasibility ReportFor Sayarrayi Brick Earthclay Quarry Mine & Fix Chimney Brick Plant, at Village - Sayarrayi

Tehsil- Lundra & District- Surguja, State- Chhattisgarh.

(iii)

5. PLANNING BRIEF

(i)

(ii)

Proposed Land Use Pattern of Proposed Quarry Lease Area

1. 1.744 Hect.

2. 1.488 Hect.

3. 0.056 Hect.

4. 0.2 Hect.

5. 0 Hect.

6. 0 Hect.

1.744 Hect.

Unused/Prohibited Area within Lease area

Topography:

The road facility is already available which shall be used and properly maintained. Preference

will be given to local labor from nearby villages. Other requisite infrastructure as transport of

mine labors is available by way of jeep, two-wheeler. Medical facility is available for first aid at

project site.

The study area consists of essentially Flat land with a very small pit. Gentle slope towards

south-west, Maximum elevation of the lease area is 722 meters above MSL towards north-east

while the lowest elevation is 719 m in the south-western part of lease area.

Impact of the brick earth quarry mine will be positive, as it will upgrade the socio-economic

status of local inhabitants in the nearby areas by giving employments to poor people of nearby

villages. Due to this positive impact the living standard will increase and will lead to

Educational upliftment.

Social Infrastructure Available

Power line, telephone line, school, bank, govt. office, Hospital, Police station etc. at or from

Lundra.

Total Area (2+3+4+5+6) =

Total Lease Area

Area proposed under mining pits

Area covered by statuary/mine boundary

Area covered by Fixed Chimney/kiln

Area Kept for storage

Planning concept (type of industries, facilities, transportation etc.) Town and country

Planning/Development authority Classification-

Proposed Land Use Planning

Planning concept: It is a Brick Earth Clay mining project, for safe, scientific & systematic

working to follow the principles of safety & conservation of human health & mineral the

planning for mining of earth clay shall be governed by the approved Quarry Plan under

Chhattisgarh Minor Mineral Rules, 2015 vide letter no. 434/Khanij/2017/ Balrampur, Dated

16/03/2017.Population projection:

The project is very small in magnitude. The project will employ most of the workers from

nearby villages. There will not be any increase in population of the area due to the

establishment of project. However, few people from other area may migrate in this area for

business opportunities.

Signature of Project Proponent

________________________________________________________________________________________________

___

13

Pre - Feasibility ReportFor Sayarrayi Brick Earthclay Quarry Mine & Fix Chimney Brick Plant, at Village - Sayarrayi

Tehsil- Lundra & District- Surguja, State- Chhattisgarh.

7. 0.056 Hect.

8. 0.056 Hect.

(iii)

6. PROPOSED INFRASTRUCTURE

(i) Industrial Area (Processing Area)

(ii)

Dumping Area proposed within proposed

Statutory/mine Boundary

Plantation Area proposed over the dump on

obove dumping area

Fix Chimney Brick plant is installed within the lease area on 2000 sqm area. This area is

sufficient for brick making process.

Site services are required per the statutory provisions i.e. rest shelters, toilets, drinking water

facilities, safety appliances, and regular medical checkup facilities are suitably needs to be

provided for labors and their families. The health and safety of the employees is required to be

given first priority during the mining operation. Training program organize for first aid.

Specified first Aid station is needed to be maintained at the site office and the rest shelter as

per applicable statutory provision.

Office and stores is needed to be provided as per applicable statutory provision.

Site Services:

First aid:

Office and stores:

Amenities / Facilities:

Other requisite infrastructure: Transport of mine labors is available by way of jeep, two-

wheeler. Medical facility is available for first aid at project site.

Power line, telephone line, school, bank, govt. office, Hospital, Police station etc. are the other

requisites needed for mine operation and social facilitation.

Residential Area (Non Processing Area)

No residential area is proposed for the project except temporary rest shelters proposed for

labors.

Assessment of infrastructure demand (physical and social)

The road facility is already available around 680 m from the site which shall be used and

properly maintained.

Apart from indirect manpower requirement for Driver, cleaner for loader & dumper, manager,

accountants; approx. 34 labours will be required directly for mining operation.

Specific amenities / facilities are not required in this mining project. However the same can be

provided as per prescribed instructions.

Road & Connectivity:

Manpower Requirement:

Signature of Project Proponent

________________________________________________________________________________________________

___

14

Pre - Feasibility ReportFor Sayarrayi Brick Earthclay Quarry Mine & Fix Chimney Brick Plant, at Village - Sayarrayi

Tehsil- Lundra & District- Surguja, State- Chhattisgarh.

(iii)

No. OF SAPLING

(iv)

OCCUPATIONAL HEALTH AND SAFETY

Occupational Health and Safety works as follow-

1)

Under the afforestation plan, plantation in nearby villages and connecting roads be

undertaken. The implementation for development of greenbelt will be of paramount

importance as it will not only add up as an aesthetic feature but will also act as a pollution

sink. The species to be grown in the areas should be dust tolerant and fast growing species so

that a permanent greenbelt is created. Plantation in the barrier zone and roads is necessary as

these areas will contain fine particulates resulting from mining operation and vehicle

movement Plantation will also be carried out as social forestry programme in village, school

and the areas allocated by the Panchayat/State authorities. Native plants like Neem, Peepal,

Khejri and other local species will be planted. A suitable combination of trees that can grow

fast and also have good leaf cover shall be adopted to develop the greenbelt.

Except dust generation there is no source which can show a probability for health

related diseases and proper dust suppression will control dust generation and

dispersion.

Green belt

Afforestation program shall be started with the commencement of mining operation with

simultaneous clearing of land by spreading of clay lumps along barrier of lease boundary.

2.5m X 2.5m spacing with 0.6m depth have been suggested for sapling pits on which local

species i.e. Pipal, Neen, Aam, Arjun, Jamun, Imli, Sirus, Sisu, Karanj will be planted as the

following manner-

SPECIES

Seesam, Bargad, Neem, Aam,

Pipal, etc.

For the social developmental program on the need base assessment some development

program will be undertaken by the project proponent i.e. development of or maintenance of

urinals, toilets, safety appliances & training program, confirming availability of pure and clean

drinking water, periodic health checkup program, transportation facility to labors and their

children’s to schools etc.

Social infrastructure

Year

1st Year

PROPOSED SITE

Along boundary of quarry

area

140

If/Where no plantation is possible within the mine due to rocky nature of lease area then

plantation on transportation road side or on the Government waste land as

suggested/demarked by Gram Panchayat/Nagar Panchayat/ local body will be done as per

above plantation program.

Occupational Health and Safety are important. Periodic assessment of it will be useful.

Identifying workplace hazards, assessing risks to employee health and safety, are important.

Health and Safety points are also important in many of the environmental aspects of the

workplace.

Signature of Project Proponent

________________________________________________________________________________________________

___

15

Pre - Feasibility ReportFor Sayarrayi Brick Earthclay Quarry Mine & Fix Chimney Brick Plant, at Village - Sayarrayi

Tehsil- Lundra & District- Surguja, State- Chhattisgarh.

2)

3)

4)

(v)

(vi)

(vii)

(viii)

A)

S.N.

1

2

3

4

5

6

7

8

9

10

156.98

Annual Requirement of Coal:

The average annual requirement of coal for the process will be estimated in table below-

Year Maximum Annual

Coal Requirement

(in MT)

1st Year

Industrial waste management: No industrial waste will be generated.

Power requirement & supply/source:

Drinking water is available in dug well and tube well at nearby village of the applied area which

is portable, pure and clean. It is also proposed to provide hand pump if needed in the lease

area for mitigating of drinking water, such hand pump will be arranged after taking statutory

permission.

Sewerage System: No construction or sewage waste is expected from the mining process.

However the domestic waste from the toilets shall be given treatment through septic tank and

soak pit arrangement.

Develop and implement training sessions for management, supervisors and workers on

health and safety practices and legislation;

Awareness program be conducted about likely occupational health hazards so as to

have preventive action in place.

Promote occupational health and safety within workers in mine and develop safer and

healthier ways of working;

Drinking Water Management (source & supply of water):

Fossil Fuels :

Fuel is to be used in form of Fuel is to be used in form coal for burning of Raw brick in Killen

and diesel for mining operations and running of tractors and other transportation vehicles.

Quantity for fuel will depend upon the usage of transportation vehicle and other machineries

and level of achievement of estimated production. Diesel will be outsourced from nearby

diesel pumps.

2nd Year 180.66

3rd Year 173.59

4th Year 168.77

5th

Year 163.51

6th Year 170.82

7th Year 210.64

8th Year 210.64

9th Year 210.64

10th Year 210.64

Signature of Project Proponent

________________________________________________________________________________________________

___

16

Pre - Feasibility ReportFor Sayarrayi Brick Earthclay Quarry Mine & Fix Chimney Brick Plant, at Village - Sayarrayi

Tehsil- Lundra & District- Surguja, State- Chhattisgarh.

B)

S.N. Power

requirement1 2 HP

C)

7. REHABILITATION AND RESETTLEMENT (R&R) PLAN:

8. PROJECT SCHEDULE AND COST ESTIMATES

A) Likely date of start construction and likely date of completion (time schedule for project) –

Electricity :

Particulars

Domestic Purpose

Source of Electricity:

Electricity will be required for Pumping of water and for administrative building & rest

shelters. The requirement of Power is estimated as under-

The power requirement for the project will be met by electricity lines of Chhattisgarh State

Power Distribution Company Limited available at village or nearby site area.

No R&R plan is required as the mine area does not cover any habitation. Hence the mining

activity does not involve any displacement of human settlement. No public buildings, places,

monuments etc. exist within the lease area or in the vicinity of the mine lease area. The mining

operation will not disturb/ relocate any village or need resettlement. Thus no adverse impact

is anticipated.

Impact of the clay mining will be positive, as it will upgrade the socio-economic status of local

inhabitants in the nearby areas by giving employments to poor people of nearby villages. Due

to this positive impact the living standard will increase and will lead to educational upliftment.

The proposed mining project will be started after obtaining Environmental Clearance of

quarry lease and order to enter in lease area by District Collector (Mining Branch). Consent to

establish & operate from CGCECB will also be taken if instructed by DEIAA.

Effect on Flora & Fauna:

Mining is restricted to very small area. No study have been conducted or record found on

effect on Floora & Fauna for mine area. However mining activity causes impact on flora and

fauna due to land degradation/deforestation etc.,

Source of Coal

Coal will be obtained from Gevra Dipka coal project at Korba through coal auction proceedings

of S.E.C.L.

Signature of Project Proponent

________________________________________________________________________________________________

___

17

Pre - Feasibility ReportFor Sayarrayi Brick Earthclay Quarry Mine & Fix Chimney Brick Plant, at Village - Sayarrayi

Tehsil- Lundra & District- Surguja, State- Chhattisgarh.

B) Estimated project cost of the project -

S.N. Amount in Lacs1 11.00

2 0.50

3 15.00

4 0.50

5 0.5027.50

9. CONCLUSION

(a)

(b)

(c)

(d)

(e)

Ajay Arun Minj

Date : / /2017 Place : Nawapara

The Project is viable and environmental friendly as it’s a development project for the State &

Country.

ParticularsLand Cost (market value)

Administrative Building & Rest Shelters

Increased financial benefits accruing to state and central agencies by ways of taxes,

royalties, cesses etc.

Signature of the applicant

Chimney Killen, Mining Machineries & Equipment’s

Land Development & Establishment cost

Others Total Cost of Project :

The Proposal is for the Environment Clearance of the Proposed Mine.

The quarry project will create local employment to the villagers and they will get

employment in nonagricultural season.

The Proposal does not require further Infrastructure facilities other than few Mining

Machineries.

In any human activity there are always possibilities of finding various options. Project proponent has

decided to examine and adopt one such option that will be both environment friendly and best

suited for clay production. Various alternatives in terms of site, technology, and equipment are

considered. A final selection is thus arrived–

Signature of Project Proponent