Prefeasibility ReportFor Environment Clearance from MOEF under EIA

Notification Dated 14th September, 2006 as Amended

Page 2: Prefeasibility Report - environmentclearance.nic.in › writereaddata › District › pfr › 150… · Prefeasibility Report For Environment Clearance from MOEF under EIA Notification

1. SUMMARY

-

-

Village - Achholi

-

-

-

1. -

2. Geographical Co-ordinates LATITUDE

21°13'48.99"N

21°13'50.10"N

21°13'49.98"N

21°13'52.51"N

21°13'52.71"N

21°13'53.23"N

21°13'53.98"N

21°13'51.96"N

21°13'52.10"N

21°13'50.37"N

21°13'50.17"N

21°13'49.33"N

River -

Nalla - 440 m

Tanks - 170 m

Canal - 780 m

Reservoir - 12.20 km

4. -

-

6. -

Nalla towards south-east near mine

areaPond towards east near Achholi area

Canal towards north near Achholi

area

Towards south-east near Kauwajhar

village area

Pre - Feasibility ReportFor Achholi Flagstone Mine at Village - Achholi

Tehsil- Mahasamund & District- Mahasamund, State- Chhattisgarh.

82°04'02.12"E

BL4

District Mahasamund

State Chhattisgarh

Mining Lease Area & Type of Land 1.87 hect. / Private Land

Project Achholi Flagstone Mine

Name of Company/Mine Kishore Ashani

Tehsil/Taluka Mahasamund

BL8 82°03'56.58"E

BL9 82°03'55.92"E

BL10 82°03'55.84"E

82°04'02.48"E

BL5 82°04'01.13"E

BL6 82°04'01.24"E

BL7 82°03'56.56"E

BL11 82°03'56.39"E

BL12 82°03'56.35"E

5. Topography of the area Flat Land devoid of vegitation

Altitude - Max. 267 aMSL and Min. 265 aMSL

Surface slope - Towards north

Toposheet No.- 64K/4

3. Name of River/ Nallahs /Tanks

/Spring / Lakes etc.

- 2.50 km (Mahanadi river at west) & 860 m (Kurar

river at west )

- BOUNDRY POINT LONGITUDE

BL1 82°03'58.05"E

BL2 82°03'58.20"E

BL3

Project Proposal Scientific mining of Flag stone for proposed capacity of

maximum 4885.57 MT per year.

Name of Reserve Forest(s), Wild Life

Sanctuary/National Park

No such area within 10 km from applied land

Signature of Project Proponent

________________________________________________________________________________________________

___

2

Page 3: Prefeasibility Report - environmentclearance.nic.in › writereaddata › District › pfr › 150… · Prefeasibility Report For Environment Clearance from MOEF under EIA Notification

Pre - Feasibility ReportFor Achholi Flagstone Mine at Village - Achholi

Tehsil- Mahasamund & District- Mahasamund, State- Chhattisgarh.

7. -

8. -

9. -

10. -

11. -

12. -

13. -

14. -

15. 1. 1.87 Hect.

2. 1.07 Hect.

3. 0.462 Hect.

4. 0.077 Hect.

5. 0.032 Hect.

6. 0.23 Hect.

1.87 Hect.

7. 0.277 Hect.

8. 0.277 Hect.

9. 0.185 Hect.

16. -

17. -

18. -

19. -

20. -

Kishore Ashani

Registered office Kishore AshaniS/o. Shri Chunni Lal AshaniVillage/Post - Nawapara RajimTehsil - AbhanpurDistrict - Raipur

State - Chhattisgarh

Mine Office Village - AchholiE-Mail

Name of Mineral Mined Flag stone

Rate of Production (in tons) Maximum 4885.57 MT/year

Mining Method Open Cast Semi Mechanized

Ground Water table Intersection Below 30 meter from surface level

Drainage Pattern/ Water Courses Natural drainage towards north

Mineral Reserve (in tons) Geological Reserve (till 6m depth) -134640 tons.

Recoverable Reserve (till 6m depth) - 56223.24 tons.

Life of Mine 12 years for the excavation of recoverable reserve of

56223.24 MT

Drilling/Blasting No Blasting Is proposed

Plantation Area proposed over the dump

on dumping area

No Activity Zone on Mine Boundary as

per MMR 1961

Water Requirement & Source Requirement - 6 kilo litre per day, Source - Mine pit/Setting

tank, dug well and tube well of nearby village within

permited limits.

Solid waste/Tailings Top Soil & OB - total 31084.2 cum (Maximum yearly

generation @ 3108.42 cum).

Break-up of Land Utilization Pattern - Total Lease Area

Area proposed under mining pits

Area covered by statuary/mine boundary

Area for cutting, sizing etc

Area Kept for storage of stone

Unused Area within Lease area

Total Area (2+3+4+5+6) =

Dumping Area proposed within proposed

Statutory/mine Boundary

Name and Address of the company /

Proponent

Nil

IBM approval: Date Not Applicable

Cost of Project (Rs. Lacs) Rs. 13 lacs

Any Other (Specify) NIL

Signature of Project Proponent

________________________________________________________________________________________________

___

3

Page 4: Prefeasibility Report - environmentclearance.nic.in › writereaddata › District › pfr › 150… · Prefeasibility Report For Environment Clearance from MOEF under EIA Notification

Pre - Feasibility ReportFor Achholi Flagstone Mine at Village - Achholi

Tehsil- Mahasamund & District- Mahasamund, State- Chhattisgarh.

Prospecting Agency

Type of Activity

Utilities (Power, Water Requirement)

Manpower requirement

2. INTRODUCTION OF PROJECT/BACK INFORMATION

Kishore Ashani

S/o. Shri Chunni Lal Ashani

Village/Post - Nawapara Rajim

Tehsil - Abhanpur

District - Raipur

State - Chhattisgarh

(ii) Brief Description of Nature of the Project

Not Applicable

Open Cast Semi Mechanized Flag stone Quarry Mining

Power- 5 HP

Water – 6 KLD for Domestic, Dust Suppression & Plantation

Purpose

13 workers per day

The proposed project is mining activity of Flag stone with the name of 'Achholi Flagstone Mine'

which is situated at Khasra no. 1100/1, 1100/2, 1100/3, 1100/4, 1100/5, 1094, 1112 at village

Achholi, tehsil Mahasamund and district Mahasamund (C.G.). This site is 14.50 km away from

district office Mahasamund. The LOI for quarry lease of Flag stone mining has been sanctioned

for Lease period of 30 years from first commencement of lease as per Rule 38A(4) of MMR

2015 as ammended. to project proponent Kishore Ashani resident of Nawapara Rajim district

Raipur (C.G.). The LOI is granted for 1.87 hectare and the proposed maximum production

capacity is 4885.57 t. per annum. The excavation of Flag stone will be done by Open Cast Semi

Mechanized method without blast.

Letter of Intent for sanction of quarry lease has been granted by collectorate mining branch

vide letter is enclosed.

Proposed Flag stone Deposit is located at village Achholi, Tehsil Mahasamund, District Mahasamund

and state Chhattisgarh over an area of 1.87 ha. The proposed capacity of the project is maximum

4885.57 tones/annum. Proposed land is Private non forest revenue land. Open Cast Semi

Mechanized without blast method of mining is the most suitable mining procedure for this mine.

This method of mining is used for highest productivity and the lowest cost of any of the broadly used

mining methods Brief description of the project is described below –

(i) Identification of Project and Project Proponent

(a) Name of the Project: Achholi Flagstone Mine

(b) Project Proponent : Kishore Ashani

(c) Postal /Correspondence Address of Project Proponent:

Signature of Project Proponent

________________________________________________________________________________________________

___

4

Page 5: Prefeasibility Report - environmentclearance.nic.in › writereaddata › District › pfr › 150… · Prefeasibility Report For Environment Clearance from MOEF under EIA Notification

Pre - Feasibility ReportFor Achholi Flagstone Mine at Village - Achholi

Tehsil- Mahasamund & District- Mahasamund, State- Chhattisgarh.

(iii)

(iv)

For compliance of Rule 24 and 63 to 66 of MMR 2015 proponent was submitted quarry plan

before mining authorities and the plan so submitted has been duly approved by the sanctioning

authority vide letter no. Kha.Li./Teen-6/2017/301 Raipur, Dated 10.07.2017.

Demand - Supply Gap

Flag Stone is basic raw material of civil construction works likes building, dams, platforms etc.

for construction of walls/base.

Chhattisgarh is a developing state in map of India. Considering the growth, State Government

has divided the state in 27 districts out of which 9 are recently declared districts. State

Government, is carrying on various Infrastructure development projects in all districts, like

Pachri Nirman, Dams, Over bridge on rivers/nalla, approach roads etc. in addition to these

various power plants, steel plant and cement plants in private sectors are under

implementations, all above civil works require stone in different sizes which is in huge in

demand. However supply of flag stone in the above sectors are in huge shortage.

The proposed project is < 5 hect. Minor mineral and non-coal mining project thus it is classified

as “CATEGORY – B2” project under activity 1(a) of the schedule of EIA notification dated 14th

September 2006 as amended by Ministry of Environment, Forests and Climate Change, New

Delhi by S.O. 141(E) dated 15 January 2016, hence it comes under jurisdiction of DEIAA.

Therefore application is being filed before jurisdictional DEIAA of district Mahasamund for

getting permanent environmental clearance before starting of mining activity on granted lease

area.

All the other necessary permission and noc’s has been taken by the proponent. Consent to

establish & operate/Air/Water clearances from CGCECB will also be taken if instructed by

jurisdictional DEIAA.

Need for the Project and its Importance to the Country and/or Region

The Flag Stone will be used mainly for the purpose of house building materials i.e. Flooring /

Roofing / Beams / Paving / Doorsill / Boundary Construction and now a days it is widely used for

purpose of Footpath along the road shoulders, Flag Stone is also used in carving.

Chhattisgarh is a new state in map of India. Considering the growth, State Government has

divided the state in 27 districts out of which 9 are recently declared districts. State Government,

is carrying on various Infrastructure development projects in all districts. In addition to these

various power plants, steel plant and cement plants in private sectors are under

implementations, all above civil works require flagstone in different sizes which is in huge in

demand.

Signature of Project Proponent

________________________________________________________________________________________________

___

5

Page 6: Prefeasibility Report - environmentclearance.nic.in › writereaddata › District › pfr › 150… · Prefeasibility Report For Environment Clearance from MOEF under EIA Notification

Pre - Feasibility ReportFor Achholi Flagstone Mine at Village - Achholi

Tehsil- Mahasamund & District- Mahasamund, State- Chhattisgarh.

(v)

(vi)

a) Direct Employment

S.N.

1

2

3

4

b)

3. PROJECT DESCRIPTION

(i)

Demand - Supply Analysis

Exploiting this Flag stone deposit is important for the country’s long term economic growth and

regional growth. By mining the deposit, the lessee acts as bridge and fills the gap between

demand and supply of Flag stone in the market surrounding the area.

Therefore, a ready market is available for the proposed unit hence looking to the use and

demand of Flag stone which exist a good scope for the proposed project.

Skilled labours 9

Extra Skilled labours 2

Mining mate (Qualified) 1

Employment Generation (direct and indirect) due to the Project

Labors will be required for various purposes like excavation of stone and loading of stone in

various vehicle, management, maintenance & development of mine, making & maintenance of

ramp, transportation of material and book keeping. Experienced personals will be employed as

per the requirement.

The mining establishment presents opportunities of employment to various posts under various

cedars viz. supervisory, skilled workmen, semiskilled workmen and unskilled workmen beside

casual workmen. However the maximum required labours at the site to justify the production of

stone at applied land are detailed below-

Taking standard O.M.S. to be one the strength of labour, a labour can work for 2 tons of mineral

in one sift of 8 hours a day. Considering this parameter the manpower need for project is –

Particulars No of Workers

The proposed project is < 5 hect. Minor mineral and non-coal mining project thus it is classified

as “CATEGORY – B2” project under activity 1(a) of the schedule of EIA notification dated 14th

September 2006 as amended by Ministry of Environment, Forests and Climate Change, New

Delhi by S.O. 141(E) dated 15 January 2016, hence it comes under jurisdiction of DEIAA.

Chowkidars (Experienced) 1

Total 13

Indirect employment - Driver, cleaner for loader & dumper are the points were labors are

required. Moreover, manager, accountants will also be appointed as per need.

Type of Project (Including interlinked and interdependent projects, if any):

Signature of Project Proponent

________________________________________________________________________________________________

___

6

Page 7: Prefeasibility Report - environmentclearance.nic.in › writereaddata › District › pfr › 150… · Prefeasibility Report For Environment Clearance from MOEF under EIA Notification

Pre - Feasibility ReportFor Achholi Flagstone Mine at Village - Achholi

Tehsil- Mahasamund & District- Mahasamund, State- Chhattisgarh.

(ii)

The details of the lease area are as under:

The Coordinates of the area are:

BOUNDARY

POINT

LATITUDE

BL7 21°13'53.98"N

BL8 21°13'51.96"N

BL9 21°13'52.10"N

BL10 21°13'50.37"N

BL11 21°13'50.17"N

BL12 21°13'49.33"N

(iii)

(iv)

Waste in Stone

in cum

566.05

678.55

678.55

678.55

678.55

Location (map showing general location, specific location, and project boundary & project

site layout) with coordinates.

District / State Mahasamund / Chhattisgarh

Tehsil Mahasamund

BL2 21°13'50.10"N 82°03'58.20"E 82°03'56.58"E

Village Achholi

Area(ha) 1.87 hect.

BOUNDARY

POINT

LATITUDE LONGITUDE LONGITUDE

BL3 21°13'49.98"N 82°04'02.12"E 82°03'55.92"E

BL4 21°13'52.51"N 82°04'02.48"E 82°03'55.84"E

BL1 21°13'48.99"N 82°03'58.05"E 82°03'56.56"E

The site can be depicted in the toposheet number 64K/4 of Survey of India. Study area map in

Khasra map, toposheet and site specific surface map is attached as Plate-1, Plate -2 and Plate -4

of enclosed mine plan respectively.

Details of alternate sites considered and the basis of selecting the proposed site, particularly

the environmental considerations gone into should be highlighted:

BL5 21°13'52.71"N 82°04'01.13"E 82°03'56.39"E

BL6 21°13'53.23"N 82°04'01.24"E 82°03'56.35"E

1st Year 4075.57 3108.42

2nd Year 4885.57 3108.42

It is naturally occurring rocks which is site specific due to its geological origin. Mining is site

specific project. This lease is being granted by the state govt., hence alternative site is not

applicable. Size or Magnitude of Operation:

The total applied lease area is 1.87 hectare and total proposed maximum production capacity

will be 4885.57 TPA through Open Cast Semi Mechanized method of mining without blast.

Proposed production details during lease period are shown in below -

Production During Plan Period

Year Stone (ROM)

in tonne

Top Soil & OB

in cum

5th Year 4885.57 3108.42

3rd Year 4885.57 3108.42

4th Year 4885.57 3108.42

Signature of Project Proponent

________________________________________________________________________________________________

___

7

Page 8: Prefeasibility Report - environmentclearance.nic.in › writereaddata › District › pfr › 150… · Prefeasibility Report For Environment Clearance from MOEF under EIA Notification

Pre - Feasibility ReportFor Achholi Flagstone Mine at Village - Achholi

Tehsil- Mahasamund & District- Mahasamund, State- Chhattisgarh.

678.55

678.55

678.55

678.55

678.55

6673 cum

(v)

-

-

-

-

-

-

-

-

6th Year 4885.57 3108.42

9th Year 4885.57 3108.42

10th Year 4885.57 3108.42

7th Year 4885.57 3108.42

8th Year 4885.57 3108.42

7.50 m boundary will be left from the lease boundary around 4 sides (N, E, S, W) as barrier for

safety provisions, dumping of top soil & OB and afforestation.

The proposed heights of working bench will be as tabled below. Separate bench for soil is

proposed. Bench details and specifications are as under -

Bench Number Bench Specification Bench Height Bench Width along

the periphery of mine

Total 48045.7 t 31084.2 cum

Project description with process details (a schematic diagram/flow chart showing the project

layout, components of the project etc. should be given)-

It is proposed to carry out mining operation Open Cast Semi Mechanized method. The

development has been proposed for systematic and scientific mining.The excavation activity will be carried out till the depth of 6 m below general ground level or

occurrence of ground water table at the site which ever encountered earlier.

3rd Quarry Bench Mineral Bench 1.50 m 1.50 m

4th Quarry Bench Mineral Bench 1.50 m -

1st Quarry Bench Soil Bench 1.50 m 1.50 m

2nd Quarry Bench Soil Bench 1.50 m 1.50 m

Excavation and Resizing of stone by cutter

machine

Overall bench slope will be less than 450 with the horizontal.

Adequate slope and water sump will be gradually developed at the working pit.

Large size of stone will be manually sized as per the demand.

Loading will be done manually and the transporting will be done by 4.5 tones tractor or 10

tones tippers.

Flow chart of the ProjectRemoval of Overburden & Top Soil

Loading by Manually

Transportation by Tractor or Truck

Signature of Project Proponent

________________________________________________________________________________________________

___

8

Page 9: Prefeasibility Report - environmentclearance.nic.in › writereaddata › District › pfr › 150… · Prefeasibility Report For Environment Clearance from MOEF under EIA Notification

Pre - Feasibility ReportFor Achholi Flagstone Mine at Village - Achholi

Tehsil- Mahasamund & District- Mahasamund, State- Chhattisgarh.

(vi)

(vii)

Mine Site

Dust Suppression 3.00 KLD

Green Belt 2.00 KLD

Domestic

Sanitation & Drinking 1.00 KLD

Total 6.00 KLD

I)

II)

A)

Drilling & Blasting : Not Applicable

Raw material/consumables required along with estimated quantity, likely source, marketing

area of final products/s, Mode of transport of raw Material and Finished Product.

No raw material is required for the mining of Flag stone.

Marketing area: Flag stone will be used in form of building material in civil constructions

activity.

The excavated mineral will be transported to the destination by tipper/dumper/trucks and

broken Flag stone will be loaded manually or by loaders.

Availability of Water, its source, Energy/power requirement and source should be given -

Water Requirement:

Domestic usage: Drinking water is available from dug well and tube well in villages near the

applied area which is portable, pure and clean.However, if required, water might be supplied

from tube well within lease area.

Energy & Power Requirement and Source

Fossil Fuels :

Fuel is to be used in form of diesel for mining operations and running of tractors and other

transportation vehicles.

Quantity for fuel will depend upon the usage of transportation vehicle and other machineries

and level of achievement of estimated production. Diesel will be outsourced from nearby diesel

pumps.

It is expected that the total water need is about 6 kilo litter per day in the mine. The details of

water balance of existing / proposed mining project are given below:

Water Balance of Project

Process Total (KLD- Kilo Litter Per Day)

Sources of water:

For Green belt and dust suppression: Water will be made available from quarry mine pit which

is accumulated during the rainy season and shall be collected in settling tank for utilization in

green belt and dust suppression.However, if required, water might be supplied from tube well

within lease area or from nearby nalla or pond.

Signature of Project Proponent

________________________________________________________________________________________________

___

9

Page 10: Prefeasibility Report - environmentclearance.nic.in › writereaddata › District › pfr › 150… · Prefeasibility Report For Environment Clearance from MOEF under EIA Notification

Pre - Feasibility ReportFor Achholi Flagstone Mine at Village - Achholi

Tehsil- Mahasamund & District- Mahasamund, State- Chhattisgarh.

B)

S.N. Power

requirement

1 5 HP

C)

(viii)

a)

b)

c)

a)

Quantity of wastes to be generated (liquid and solid) and scheme for their

management/disposal –

Solid Waste:

Top Soil & overburden:

Top soil & OB. 31084.2 cum will be generated in total at the rate of maximum 3108.42 cum per

year for period of approved mine plan.

Mining Loss or Unusefull Waste Material:

All ROM mineral is useful and saleable.

Electricity :

Electricity will be required for Pumping of water and for administrative building & rest shelters.

The requirement of Power is estimated as under-

Particulars

Domestic Purpose

Source of Electricity:

The power requirement for the project will be met by electricity lines of Chhattisgarh State

Power Distribution Copany Limited available at village or nearby site area.

Top Soil & overburden:

Whatsoever quantity of top soil and overburden generated during the quarrying operation will

be stacked at the periphery of mine along the statutory/mine boundary in such manner that no

stacking will be done at the edge of quarry pit.

Mine/Statutory boundary is 7.50 m wide in order to comply the rules of MMR1961. Out of this

mine/statutory boundary 3.0 m wide area from the edge of mine pit is proposed to left to

comply the provisions of MMR1961. Dumping area is proposed on balance outer 4.50 m wide

area of mine/statutory boundary i.e. after 3.0 m of no activity zone. Threfore saperate dumping

area in the mine is not proposed. Rather outer 4.50 meter wide area under mine/statutory

boundary is itself considered as dumping area. plantation is also proposed on the same

dumping area over the dump. Roads within mine area is also peoposed to be constructed within

mine boundary only.

Sub grade material:

6673 cum material may be generated as unusefull subgrade material or may occur as mining

loss respectivelly during the plan period. "

Liquid Effluent:

Only domestic effluent is expected to be generated which will be treated through septic tank

followed by soak pits.

Selection of Dumping Site:

Signature of Project Proponent

________________________________________________________________________________________________

___

10

Page 11: Prefeasibility Report - environmentclearance.nic.in › writereaddata › District › pfr › 150… · Prefeasibility Report For Environment Clearance from MOEF under EIA Notification

Pre - Feasibility ReportFor Achholi Flagstone Mine at Village - Achholi

Tehsil- Mahasamund & District- Mahasamund, State- Chhattisgarh.

b)

c)

i)

ii)

iii)

a) Top Soil & Overburden :

b) Waste & Subgrade Material :

4. SITE ANALYSIS

Connectivity

Further if the area for dumping of OB gets short then the land (adjoining or nearby the mine)

owned or controlled by the lessee will be utilised with due permission of district mining office

for dumping of excess OB. Such excess OB dump will be utilised in priority for reclamation at the

time of reclalation of mine.

Manner of waste disposal & configuration:

Top Soil initially removed will be temprerorly stacked on mine boundary or other location

within lease area. Then whatsoever quantity of overburden & unusefull waste generated during

the quarrying operation will be spread at the periphery of mine along the mine boundary on

specified dumping areas. After proper dumping of OB and unusefull waste on mine boundary

the preserved Top Soil will be spreyed over the OB and/or unsuefull waste dump. Stack of dump

OB, waste & Top soil so developed is proposed to be stabilized the by grass plantation or cutting

of local bushes and dence plantation on it as per plantation programme so that spillage of

dump does not occur in the surroundings.

Further if the area for dumping of OB gets short then the land (adjoining or nearby the mine)

owned or controlled by the lessee will be utilised with due permission of district mining office

for dumping of excess OB. Such excess OB dump will be utilised in priority for reclamation at the

time of reclalation of mine.

No need of planing for dumping management of waste and subgrade material as all ROM is

saleable except Top Soil and Overburden.

The area is approachable from district office Mahasamund by fair weather road. The area is

14.50 km from Mahasamund. The applied area is 4.00 km away from Bhoring bus stand.

Hospital is available at Achholi at 800 m/Belsonda at 8.50 km distance. The nearest railway

station is at Belsondha (9.00 km) (S.E.C.RLY) and Nearest active airport is Raipur (34.00 km).

Waste:

No mining waste except from mining losses & OB will be generated during excavation of Flag

stone. All ROM mineral will be used. Flag stone is usable as building material hence saleable

therefore no mineral waste will be generated which requires their due management.

Sub grade material:

Removal of broken stone out of lease area for making stone chip by due approval of

district authority after payment of applied fee or royalty. However it depends upon the

availability of market and demand.

Utilise for reclamation purpose within the mine itself.

Utilise for road or ramp maintanance within the mine itself.

Signature of Project Proponent

________________________________________________________________________________________________

___

11

Page 12: Prefeasibility Report - environmentclearance.nic.in › writereaddata › District › pfr › 150… · Prefeasibility Report For Environment Clearance from MOEF under EIA Notification

Pre - Feasibility ReportFor Achholi Flagstone Mine at Village - Achholi

Tehsil- Mahasamund & District- Mahasamund, State- Chhattisgarh.

(i)

Form & Use : Flat, Non Forest, Revenue land.

Ownership : Private land.

Forest - Nil Area (ha)- Nil 1.87 Hect. Area

Nil

Nil

Nil

(ii)

(iii)

5. PLANNING BRIEF

Land form, Land Use & Land Ownership

(iv) others (specify)

Climate Data from Secondary Sources:

The climate of Mahasamund district in general and the Mahasamund in particular is

characterized by a hot summer and a well-distributed rainfall during the southwestern

monsoon season extending from end of June to October. The area has 4 well-defined seasons in

a year. The winter season commences from early December and continues up to the end of

February, summer season extends from March to early June, rainy season generally from mid-

June to September and the post-monsoon season from October to November.

Topography:

Existing land use pattern: Existing land use pattern of the proposed mining area is given in

below table.

Forest Area Non-forest Area

(i) waste land (Private),

(ii) grazing land,

(iii) Agriculture land,

Planning concept: It is a Flag stone mining project, for safe, scientific & systematic working to

follow the principles of safety & conservation of human health & mineral the planning for

mining of stone shall be governed by the approved Quarry Plan under Chhattisgarh Minor

Mineral Rules, 2015 vide letter no. Kha.Li./Teen-6/2017/301 Raipur, Dated 10.07.2017.

The study area consists of essentially Flat land with a very small pit. Gentle slope towards north,

Maximum elevation of the lease area is 267 meters above MSL

Social Infrastructure Available

Power line, telephone line, school, bank, govt. office, Hospital, Police station etc. at

Mahasamund.

The road facility is already available which shall be used and properly maintained. Preference

will be given to local labor from nearby villages. Other requisite infrastructure as transport of

mine labors is available by way of jeep, two-wheeler. Medical facility is available for first aid at

project site.

Planning concept (type of industries, facilities, transportation etc.) Town and country

Planning/Development authority Classification-

Signature of Project Proponent

________________________________________________________________________________________________

___

12

Page 13: Prefeasibility Report - environmentclearance.nic.in › writereaddata › District › pfr › 150… · Prefeasibility Report For Environment Clearance from MOEF under EIA Notification

Pre - Feasibility ReportFor Achholi Flagstone Mine at Village - Achholi

Tehsil- Mahasamund & District- Mahasamund, State- Chhattisgarh.

(i)

(ii)

Proposed Land Use Pattern of Proposed Quarry Lease Area

1. 1.87 Hect.

2. 1.07 Hect.

3. 0.462 Hect.

4. 0.077 Hect.

5. 0.032 Hect.6. 0.23 Hect.

1.87 Hect.

7. 0.277 Hect.

8. 0.277 Hect.

9. 0.185 Hect.

(iii)

Population projection:

The project is very small in magnitude. The project will employ most of the workers from nearby

villages. There will not be any increase in population of the area due to the establishment of

project. However, few people from other area may migrate in this area for business

opportunities.

Proposed Land Use Planning

Total Area (2+3+4+5+6) =

Dumping Area proposed within proposed

Statutory/mine Boundary

Plantation Area proposed over the dump on

dumping area

No Activity Zone on Mine Boundary as per MMR

1961

Assessment of infrastructure demand (physical and social)

Total Lease Area

Area proposed under mining pits

Area covered by statuary/mine boundary

Area for cutting, sizing etc

Area Kept for storage of stoneUnused Area within Lease area

Amenities / Facilities:

Specific amenities / facilities are not required in this mining project. However the same can be

provided as per prescribed instructions.

Road & Connectivity:

The road facility is already available around 30 m from the site which shall be used and properly

maintained.

Site Services:

Site services are required per the statutory provisions i.e rest shelters, toilets, drinking water

facilities, safety appliances, and regular medical checkup facilities are suitably needs to be

provided for labors and their families. The health and safety of the employees is required to be

given first priority during the mining operation. Training program organize for first aid.

First aid:

Specified first Aid station is needed to be maintained at the site office and the rest shelter as

per applicable statutory provision.

Office and stores:

Office and stores is needed to be provided as per applicable statutory provision.

Signature of Project Proponent

________________________________________________________________________________________________

___

13

Page 14: Prefeasibility Report - environmentclearance.nic.in › writereaddata › District › pfr › 150… · Prefeasibility Report For Environment Clearance from MOEF under EIA Notification

Pre - Feasibility ReportFor Achholi Flagstone Mine at Village - Achholi

Tehsil- Mahasamund & District- Mahasamund, State- Chhattisgarh.

6. PROPOSED INFRASTRUCTURE

(i) Industrial Area (Processing Area)

Not Applicable

(ii)

(iii)

No. OF SAPLING

(iv)

Manpower Requirement:

Apart from indirect manpower requirement for Driver, cleaner for loader & dumper, manager,

accountants; approx. 13 labours will be required directly for mining operation.

Afforestation program shall be started with the commencement of mining operation with

simultaneous clearing of land by spreading of soil along barrier of proposed lease boundary.

2.5m X 2.5m spacing with 0.6m depth have been suggested for sapling pits on which local

species will be planted as the following manner-

Year PROPOSED SITE SPECIES

1st Year Along boundary of quarry area Seesam, Bargad, Neem, Aam,

Pipal, etc.

100

Other requisite infrastructure: Transport of mine labors is available by way of jeep, two-

wheeler. Medical facility is available for first aid at project site.

Power line, telephone line, school, bank, govt. office, Hospital, Police station etc. are the other

requisites needed for mine operation and social facilitation.

Residential Area (Non Processing Area)

No residential area is proposed for the project except temporary rest shelters proposed for

labors.

Green belt

Under the afforestation plan, plantation in nearby villages and connecting roads be undertaken.

The implementation for development of greenbelt will be of paramount importance as it will

not only add up as an aesthetic feature but will also act as a pollution sink. The species to be

grown in the areas should be dust tolerant and fast growing species so that a permanent

greenbelt is created. Plantation in the barrier zone and roads is necessary as these areas will

contain fine particulates resulting from mining operation and vehicle movement Plantation will

also be carried out as social forestry programme in village, school and the areas allocated by the

Panchayat/State authorities. Native plants like Neem, Peepal, Khejri and other local species will

be planted. A suitable combination of trees that can grow fast and also have good leaf cover

shall be adopted to develop the greenbelt.

Social infrastructure

For the social developmental program on the need base assessment some development

program will be undertaken by the project proponent i.e. development of or maintenance of

urinals, toilets, safety appliances & training program, confirming availability of pure and clean

drinking water, periodic health checkup program, transportation facility to labours and their

children’s to schools etc.

Signature of Project Proponent

________________________________________________________________________________________________

___

14

Page 15: Prefeasibility Report - environmentclearance.nic.in › writereaddata › District › pfr › 150… · Prefeasibility Report For Environment Clearance from MOEF under EIA Notification

Pre - Feasibility ReportFor Achholi Flagstone Mine at Village - Achholi

Tehsil- Mahasamund & District- Mahasamund, State- Chhattisgarh.

OCCUPATIONAL HEALTH AND SAFETY

Occupational Health and Safety works as follow-

1)

2)

3)

4)

(v)

(vi)

(vii)

(viii)

A)

B)

S.N. Power

requirement1 5 HP

C)

Awareness program be conducted about likely occupational health hazards so as to

have preventive action in place.

Promote occupational health and safety within workers in mine and develop safer and

healthier ways of working;

Occupational Health and Safety are important. Periodic assessment of it will be useful.

Identifying workplace hazards, assessing risks to employee health and safety, are important.

Health and Safety points are also important in many of the environmental aspects of the

workplace.

Except dust generation there is no source which can show a probability for health

related diseases and proper dust suppression will control dust generation and

dispersion.

Power requirement & supply/source:

Fossil Fuels :

Fuel is to be used in form of diesel for mining operations and running of tractors and other

transportation vehicles. Quantity for fuel will depend upon the usage of transportation vehicle

and other machineries and level of achievement of estimated production. Diesel will be

outsourced from nearby diesel pumps.

Electricity :

Electricity will be required for Pumping of water and for administrative building & rest shelters.

The requirement of Power is estimated as under-

Particulars

Develop and implement training sessions for management, supervisors and workers on

health and safety practices and legislation;

Drinking Water Management (source & supply of water):

Drinking water is available in dug well and tube well at nearby village of the applied area which

is portable, pure and clean. It is also proposed to provide hand pump if needed in the lease area

for mitigating of drinking water, such hand pump will be arranged after taking statutory

permission.Sewerage System: No construction or sewage waste is expected from the mining process.

However the domestic waste from the toilets shall be given treatment through septic tank and

soak pit arrangement.

Industrial waste management: No industrial waste will be generated.

Domestic Purpose

Source of Electricity:

The power requirement for the project will be met by electricity lines of Chhattisgarh State

Power Distribution Copany Limited available at village or nearby site area.

Signature of Project Proponent

________________________________________________________________________________________________

___

15

Page 16: Prefeasibility Report - environmentclearance.nic.in › writereaddata › District › pfr › 150… · Prefeasibility Report For Environment Clearance from MOEF under EIA Notification

Pre - Feasibility ReportFor Achholi Flagstone Mine at Village - Achholi

Tehsil- Mahasamund & District- Mahasamund, State- Chhattisgarh.

7. REHABILITATION AND RESETTLEMENT (R&R) PLAN:

8. PROJECT SCHEDULE AND COST ESTIMATES

A)

B) Estimated project cost of the project -

S.N. Amount in Lacs

1 10.00

2 0.50

3 1.00

4 1.00

5 0.50

13.00

Likely date of start construction and likely date of completion (time schedule for project) –

The proposed mining project will be started after obtaining Environmental Clearance of quarry

lease and order to enter in lease area by District Collector (Mining Branch). Consent to establish

& operate from CGCECB will also be taken if instructed by DEIAA.

Particulars

Land Cost (market value)

Administrative Building & Rest Shelters

Mining Machineries & Equipment’s

No R&R plan is required as the mine area does not cover any habitation. Hence the mining

activity does not involve any displacement of human settlement. No public buildings, places,

monuments etc. exist within the lease area or in the vicinity of the mine lease area. The mining

operation will not disturb/ relocate any village or need resettlement. Thus no adverse impact is

anticipated.

Impact of the stone mining will be positive, as it will upgrade the socio-economic status of local

inhabitants in the nearby areas by giving employments to poor people of nearby villages. Due to

this positive impact the living standard will increase and will lead to educational upliftment.

Effect on Flora & Fauna:

Mining is restricted to very small area. No study have been conducted or record found on effect

on Floora & Fauna for mine area. However mining activity causes impact on flora and fauna due

to land degradation/deforestation etc.,

Land Development & Establishment cost

Others

Total Cost of Project :

Signature of Project Proponent

________________________________________________________________________________________________

___

16

Page 17: Prefeasibility Report - environmentclearance.nic.in › writereaddata › District › pfr › 150… · Prefeasibility Report For Environment Clearance from MOEF under EIA Notification

Pre - Feasibility ReportFor Achholi Flagstone Mine at Village - Achholi

Tehsil- Mahasamund & District- Mahasamund, State- Chhattisgarh.

9. CONCLUSION

(a)

(b)

(c)

(d)

(e)

Kishore Ashani

Date : / /2017

Place : Nawapara Rajim

The Proposal does not require further Infrastructure facilities other than few Mining

Machineries.

The Project is viable and environmental friendly as it’s a development project for the State &

Country.Increased financial benefits accruing to state and central agencies by ways of taxes, royalties,

cesses etc.

Signature of the applicant

In any human activity there are always possibilities of finding various options. Project proponent has

decided to examine and adopt one such option that will be both environment friendly and best

suited for Flag stone production. Various alternatives in terms of site, technology, and equipment

are considered. A final selection is thus arrived–The Proposal is for the Environment Clearance of the Proposed Mine.

The quarry project will create local employment to the villagers and they will get employment

in nonagricultural season.

Signature of Project Proponent