State of the Art for New Generation Nuclear Power Plant

CGN Experiences

Bangkok August 2018

LIU Yunli, Chief Representative in Thailand, CGN

Page 2: PowerPoint Standard Template

Acknowledgement

All statistics for world nuclear power is from the websites of IAEA,

WNN,WNA…

All information, photos, pictures in this PPT are for technical exchange

and informaiton purposes only.

For official use or release to public, please contact the information owner

for confirmation and authorization.

Page 3: PowerPoint Standard Template

IAEA: Nuclear Power Plants Worldwide

NPP Location = Better Economy

Page 4: PowerPoint Standard Template
Page 5: PowerPoint Standard Template
Page 6: PowerPoint Standard Template
Page 7: PowerPoint Standard Template

From Developed to Developing countries…

Page 8: PowerPoint Standard Template

Status of NPP in China

By 2018, Operation 40 U, 38,174MW, FCD 19 U, 14,850 MW

By 2020, Operation 58,000MW, FCD 30,000MW

40

19

Page 9: PowerPoint Standard Template
Page 10: PowerPoint Standard Template
Page 11: PowerPoint Standard Template

Thailand Thailand is considering a

decision to launch a nuclear

power program. Currently,

Thailand is preparing the

infrastructure to support a

potential nuclear power

project in the future.

Human Resources Development

With no clear direction on the future of nuclear energy, not many

universities have established a specific program for nuclear sciences and

nuclear engineering. The most prominent existing program is in

Chulalongkorn University’s Nuclear Engineering Department. The program

offers nuclear engineering degrees at the graduate level and new

curriculum at the undergraduate level was introduced in June 2017.

Page 12: PowerPoint Standard Template

Based on IAEA’s INIR of December 2010, Thailand is ready to make

a knowledgeable commitment to nuclear power. In the future, if the

Government makes the decision to opt for nuclear energy, the

following phases will take place. …..

In PDP2015, 2 000

MW of nuclear

power is planned,

accounting for 5%

of total installed

capacity by the end

of 2035.

Page 13: PowerPoint Standard Template

Milestones in the Development of a National Infrastructure for Nuclear Power

IAEA, NG-G-3.1,

Page 14: PowerPoint Standard Template

2035 2025? 2020?

16Ys! 1991 1994 1986 1981

Page 15: PowerPoint Standard Template

Operators Training Process

学习“高操”选拔

操纵员影子培训

值长培训

副值长影子培训

隔离经理培训

SRO license

examination

高级操纵员培训

操纵员在岗培训

操纵员培训

基础理论知识培训

笔试 模拟机考试 面试

运行处推荐 培训中心考核 电厂考评会审核

New

staff

Senior operator

Shift manager

Deputy shift manager

Operator

Operator trainee

基本安全授权培训

在岗培训 面谈 心理素质测评 实际工作能力评价 面试与笔试

“学习操纵

员”选拔

RO License

examination

笔试 模拟机考试 面试

现场实习

12 courses

Examinations by NNSA

Show Training

8 courses

Exams by NNSA

Operating hours

3 years

1.5 years

3 years

New comers

50+courses

Assessments

8 years

91 courses

Examinations

Assessments

Restraining

Page 16: PowerPoint Standard Template

53 28 60408347

83

54

10566

11973

157

79

187

91

210

109

221

121

232

132

243

141

258

155

278

174

331

187

395

198

547

218

726

259

803

291

865

327

0

100

200

300

400

500

600

700

800

900

人数

1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 年份

RO SRO

Persons

Year

Page 17: PowerPoint Standard Template

New Graduates in Nuclear Disciplines in China

0

1,000

2,000

3,000

4,000

5,000

6,000

7,000

8,000

2010 2015 2020

Reactor Engineering Nuclear Technology Radiation Protection and Environmental Protection

Nuclear physics Nuclear Chemical Engineering and Nuclear Fuel Engineering

Others

Nu

mb

er

Year

40 Universities/Colleges

Page 18: PowerPoint Standard Template

Training &. Education Partnership

Page 19: PowerPoint Standard Template

JEP &. JDP

Order form education:15 collaborative universities,300-400 students per year

Joint education:5 collaborative universities,100 students per year

Excellent Engineer :Support internship

Postdoctoral program:develop R&D talents

engineers、technicians

High level and special engineers:

practicing opportunities

Page 20: PowerPoint Standard Template

JEP Curriculum

Page 21: PowerPoint Standard Template

JDP Curriculum

A Collaborate with university to train Engineer

500 complementary learning hours in Total

B Collaborate with polytechnic to train technician

900 complementary learning hours in Total

Page 22: PowerPoint Standard Template

The Evolution of Nuclear Power

Page 23: PowerPoint Standard Template

Enhanced Safety (Resistance to sever damage with radioactivity release)

Attractive Economy (Simple, 60 years lifetime, reduction of capital cost

and construction time)

Harmonization with Environment (Safety, higher burn-up, waste minimization)

Gen III nuclear reactors are essentially Gen II reactors with

evolutionary, state-of-the-art design improvements.

These improvements include fuel technology, thermal efficiency,

modularized construction, safety systems (eg. passive systems),

and standardized design.

Improvements in Gen III reactor technology have aimed at a

longer operational life, typically 60, potentially to exceed 60

years, prior to reactor pressure vessel replacement.

The Improvements in Gen III post-Fukushima

Page 24: PowerPoint Standard Template

IAEA-SSR, EUR, URD,GDA,HAF…

Items URD EUR

CDF(Core Damage Frequency),

/(reactor·year) <1×10-5 <1×10-5

LRF(Large Radioactive Release

Frequency), /(reactor·year) <1×10-6 <1×10-6

Fuel Thermal Margin >15% >15%

Design availability Factor ≥87% ≥90%

Safe shutdown earthquake 0.3g 0.25g

Operator grace time ≥30 min ≥30 min

Solid waste generation,

m3/(year·Unit) <50 <50

Design lifetime, year 60 60

Criteria &. Requirements

Page 25: PowerPoint Standard Template

Main Advanced Reactor Types

Page 26: PowerPoint Standard Template

New Generation Nuclear Power Plant

Page 27: PowerPoint Standard Template
Page 28: PowerPoint Standard Template
Page 29: PowerPoint Standard Template

18 17 16 15 14 13 12 11 10 09 08 07 06 05

14Ys 12Ys

9Ys

Page 30: PowerPoint Standard Template

200909--201808

Page 31: PowerPoint Standard Template

Parameter Unit M310 ACPR1000 AP1000 EPR1700 HPR1000

Reactor type PWR PWR PWR PWR PWR

RCS loops (hot/cold legs)

3(3/3) 3(3/3) 2(2/4) 4(4/4) 3(3/3)

layout Double units Double units Single unit Single unit Single unit

Fuel assemblies 157,17x17 157,17x17 157,17x17 241,17x17 177,17x17

Unit avail. % ≥90 ~93 ≥90 ≥92 Design lifetime years 40 40~60 60 60 60 I&C Analog Digital Digital Digital Digital Core thermal power MWt 2895 2895 3400 4590 3150 Gross electric power MWe ~900 ~1086 ~1250 ~1700 1150 RCP design flow m3/h 6.9E4 6.9E4 6.81E4 10.8E4 7.2E4 Core outlet temp ℃ 327.6 327.6 321.1 330 325 RCS average temp ℃ 310 310 304 313.1 310 RCS operating pres MPa 15.5 15.5 15.5 15.5 15.5 SSE g 0.2 0.2 0.3 0.25 0.3 Operator grace time min 10 30 72*60 30 30 CDF /r.y <1E-04 <1E-05 <1E-06 ~1E-6 <1E-06 LRF /r.y —— <1E-06 <1E-07 ~1E-07 <1E-07

Design Parameters of Some Advanced Rectors

Page 32: PowerPoint Standard Template

Example of Technical

Evolution CGN HPR1000

HPR1000

Page 33: PowerPoint Standard Template

Natural Energy Powering Nature

Double containment

• Double-containment with large free volume,

which improves safety performance under

design basis condition (DBC) and severe

accidents conditions.

• Ventilation system in double-containment

annulus, which reduces the risk of

radioactive release to the environment in

case of accidents.

• Resistance to the impact of a large

airplane crash.

Page 34: PowerPoint Standard Template

Natural Energy Powering Nature

Safeguard

Building A

Safeguard

Building C

Safeguard

Building B

Safety systems:

• 3 independent trains

• physically separated

• 3X100% redundancy

Core damage frequency (CDF)

decreased significantly compared

with the traditional 2-train system

More resistant to internal and

external hazards.

Three trains HL 1

CL 1

REACTOR

CORE

SG1

SG

3

SG

2

CL 3CL 2

HL 2HL 3

IRWST IRWST

IRWST

Containment

MHSI 1

LHSI 1ACC 1

MHSI 2

LHSI 2

ACC 2

MHSI 3

ACC 3

LHSI 3

Hot Leg Suction

Line In RHR Mode

Hot Leg Safety

Injection

Low Head Cold Leg

Safety Injection

Medium Head

Safety Injection

Suction Line In

Safety Injection Mode

Hot Leg Suction

Line In RHR Mode

Hot Leg Safety

Injection

Medium Head

Safety Injection

Low Head Cold Leg

Safety Injection

Suction Line In

Safety Injection Mode

Suction Line In

Safety Injection Mode

Medium Head

Safety Injection

Low Head Cold Leg

Safety Injection

Hot Leg Safety

Injection

Hot Leg Suction

Line In RHR Mode

Containment

Page 35: PowerPoint Standard Template

Natural Energy Powering Nature

Passive Systems

Ensuring long-term cooling of plant

by natural circulation in case all

active systems disabled

Secondary Passive Residual Heat

Removal System

Ensuring cooling of in-vessel retention

during severe accidents

Passive Reactor Cavity Injection

System (IVR)

Page 36: PowerPoint Standard Template

Natural Energy Powering Nature

Instrumentation & Control (I&C)

36

• Digital I & C System

• Diverse Actuation System

• Independent Severe Accident Panel

• Advanced main control room (MCR) with

emergency inhabitation system

Page 37: PowerPoint Standard Template

Natural Energy Powering Nature

37

Emergency

Power

- 3 emergency diesel generators

- 2 station blackout (SBO) diesel

generators

- 1 mobile diesel generator

- 2-hour battery units

- 12-hour battery units (in severe

accident)

Page 38: PowerPoint Standard Template

HPR 1000 in China

FCG Nuclear Power Plant

Page 39: PowerPoint Standard Template

Natural Energy Powering Nature

The FangChengGang NPP unit 3 will be the reference plant for the

proposed Bradwell project in the UK.

HPR 1000 in UK

Page 40: PowerPoint Standard Template

Natural Energy Powering Nature

ACPR100

ACPR50S

ACPR50s: Off-shore NPP of

progressive compact SMR

of 60MWe .

- Expected operation 2020.

ACPR: Advanced Customer-friendly Practicable Reliable

ACPR100: Land NPP

of innovative integral

SMR of 140MWe

- plan to put into

operation in 2023.

SMR R&D of CGN

From large to small,

From land to sea

Page 41: PowerPoint Standard Template

Natural Energy Powering Nature

41

Other Application of Nuclear Technology, EB

Page 42: PowerPoint Standard Template

China General Nuclear Power Corporation (CGN)

• A state owned utility for clean energy

• We invest, design, construct, operate both nuclear power

plants and renewable energy plants

• With 41 subsidiaries and over 40,000 employees worldwide

• No.1 in the world for both the number of nuclear power units

and the total capacity under construction, No. 1 in China as

nuclear power operator.

• Headquarters in Shenzhen, and Beijing

Page 43: PowerPoint Standard Template

Specialized nuclear power engineering construction general contracting services Professional nuclear power

operation services

Overhaul Operation

Preparation Spare Parts Training

Engineering

Design

Engineering

Procurement

Construction

Management Commissioning

Nuclear power business: Largest in China, leading in the world

x20 21.47GW

x8 10.26GW

As of the end of September 2017

South

China Sea

Islands

43

63%

domestically Units in operation: remains first domestically, enters top 5 globally(include the units which are available for commercial operation and the in-service units)

17%

globally

Units under construction: according to approved standard, makes CGN the largest nuclear power builder

Page 44: PowerPoint Standard Template

15 R&D centers, including 6 national energy R&D centers.

Digital I&C system R&D

center

Nuclear power plant construction

technology R&D center

Nuclear fuel element

R&D center

Nuclear equipment R&D

center

Nuclear safety and reliability

technology center

R&D center for plant life

evaluation and management

R&D

Page 45: PowerPoint Standard Template

•11/2009

1st MOU with EGAT

•05/2010

CGN Office in Thailand

•12/2017

Update MOU with EGAT

CGN And Thailand

Page 46: PowerPoint Standard Template

China and Thailand Signed the G2G Agreement for Cooperation in

the Peaceful uses of Nuclear Energy in March 2017

Page 47: PowerPoint Standard Template

1st JCCT-NPE Meeting

Joint Commission Setup

Page 48: PowerPoint Standard Template
Page 49: PowerPoint Standard Template

Supports Public Acceptance: Over 3000 Visitors

Page 50: PowerPoint Standard Template

Technical Training: 400+ man/times

Page 51: PowerPoint Standard Template

Supporting Public Acceptance in Thailand

Page 52: PowerPoint Standard Template

Exchanges with Universities

Suranaree University of Technology

Page 53: PowerPoint Standard Template

Scholarship

CGN supported Tsinghua University Promoting TUNEM Program with full

scholarship in Thailand in March 2018.

3 Students from Kasetsart / Khon Kaen

University got the scholarship.

Page 54: PowerPoint Standard Template

54/14

70%

20%

10%

混合式培养理念

Theory of Engineering Training

- 70% capabilities from everyday work;

- 20% capabilities from mentors, team leaders and co-workers;

- 10% capabilities from classes, seminars and reading.

20+ units in Operation

8+ units under construction

5+ sites,

8 + Full Scope Simulator

½ Full Scope Fuel Pool

Best for engineering and

operator training

“70-20-10” Theory

Page 55: PowerPoint Standard Template

Courses of Engineering Training

Procurement

Skills Skills ……

System * ……

…… QS

…..

*

*

3. Procurement Process

2. Contract Mgmt.

1. Procurement Basics

…… ……

Procurement

NDT Valves ……

…… Contracting ……

…… QS

…… …… ……

5 Fields, 6 Courses

5 Fields, 125 Courses

I&C

Mgmt. Erection ……

* * ……

…… CW

……. …… ……

I&C

Technical Cable ……

Quality

*

*

*

2. CW Organization

1. Layout

HV Equip. ……

…… CW

….. …… ……

12 Fields, 2 Courses

12 Fields, 79 Courses

E

(186)

P

(134)

Basic

C

(83)

Basic

Operation

5.Process Control

4.Desgin Mgmt. Procedures

3.Design Codes

2.Design Interface Mgmt.

1.Design Process

Overall Chart ……

Codes Operation ……

…… Technical

…… …… ……

Operation

Disaster Simulation ……

Categorization …… ……

…… Technical

…. …….. ……

37 Fields, 148 Courses

37 Fields, 33 Courses

Basic

Advanced Advanced Advanced

Electrical

Switches Insulation ……

Isolation * ……

…… NI

…… …… ……

Electrical

Risks Outage ……

…… Accident ……

…… NI

…… …… ……

23 Fields, 14 Courses

4. Electrical Testing

6. DCS Testing

5. Process Testing

3. I&C System Testing

2. Equipment Testing

1. Start-up Mgmt.

23 Fields, 130 Courses

S

(150)

Basic

Advanced

Au

tho

riz

atio

n

Co

urses

Page 56: PowerPoint Standard Template

Training Facilities

Skills Training Center

CGN University

Page 57: PowerPoint Standard Template

Training Facilities

Page 58: PowerPoint Standard Template

Painstaking & costly

Early start

IAEA guidelines

Knowledge VS Skills

Differences from other industries

Enhancement on nuclear safety culture

National &. International cooperation

Experience Sharing

Page 59: PowerPoint Standard Template

Some Ideas for Cooperation

In the framework of the existing G2G agreement and Joint

Commission between China and Thailand

Exchange with universities in China: Curriculums, Training

Materials, Reference Texts, Professors and Lecturers?

Exchanges with CGN:JEP Curriculums, JDP Curriculums?

Supports from CGN: Experts and Instructors for Lectures,

Seminars, Practicing Opportunities, Joint Researches, Use of

Skill Training Facilities, Site Visits…

Agreement with CGN University: Long Term Cooperation for

Mutual Benefits

Page 60: PowerPoint Standard Template

Thank You!

www.cgnpc.com.cn

CGN: Nuclear & Renewable Energy HPR1000-G3 technology, in China and UK EB in Thailand